Cast-in-situ bored pile construction operation platform
By designing a drilling and grouting pile construction operation platform, the problem of inconvenience for construction personnel operating on unhardened soil foundations was solved, and safety and portability were improved. It is applicable to different pile hole diameters and improves the working environment.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- HUNAN CONSTRUCTION ENGINEERING GROUP CO LTD
- Filing Date
- 2025-07-11
- Publication Date
- 2026-04-21
AI Technical Summary
When drilling and grouting piles, it is inconvenient for construction workers to operate on unhardened soil, which poses safety hazards, and existing equipment is difficult to effectively protect against and is not portable.
A drilling and grouting pile construction operation platform was designed, which includes a frame, a grid frame, patterned steel plates, and double doors. It is fixed by pins, provides horizontal protection and portability, is suitable for different pile hole diameters, and is equipped with a secondary platform to improve the working environment.
It improves construction safety and work efficiency, ensures the safety of workers, is highly applicable, easy to store and move, and improves the working environment around the pile hole.
Smart Images

Figure CN224149134U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of bored pile construction technology, and in particular to a bored pile construction operation platform. Background Technology
[0002] Drilled cast-in-place piles are commonly constructed using the mud wall protection method. After drilling, a lengthy cleaning process and frequent mud performance testing are required. When pouring concrete for the pile foundation, the tremie method is commonly used. When lowering the tremie pipe into the borehole, a long, narrow valve is typically placed at the borehole opening. The tremie pipe is then secured to the valve for extension or disassembly. Workers frequently need to move around the pile hole during cleaning, testing, and pouring. However, the area around the borehole opening is often unhardened soil, which becomes muddy and slippery after rain, making movement and operation difficult and posing safety hazards. Utility Model Content
[0003] The technical problem this invention aims to solve is to provide a drilling and grouting pile construction operation platform, addressing the aforementioned technical deficiencies. This platform provides horizontal protection, improves the working environment, is easy to fold and store, reduces space occupation, and is convenient to carry and use.
[0004] The technical solution adopted by this utility model to solve its technical problem is: a drilling and grouting pile construction operation platform, including a frame, a grid frame welded inside the frame, a patterned steel plate welded to the upper end of the frame, a double door in the middle of the patterned steel plate, the double door being hinged to the patterned steel plate, a circular through hole in the middle of the double door, and four auxiliary platforms on the outside of the frame.
[0005] Furthermore, the two longitudinal parallel beams of the grid frame are each provided with several insertion holes, and the insertion holes are connected to the corresponding positions of the patterned steel plate.
[0006] Furthermore, four of the insertion holes of the grid frame correspond to the inner wall of the steel casing, and pins are inserted into the insertion holes to prevent the platform from moving.
[0007] Furthermore, the pin has a T-shaped structure and can be fixedly installed in the socket.
[0008] Furthermore, the patterned steel plate is welded to the grid frame.
[0009] Furthermore, the circular through hole in the middle of the double door is semi-circular and symmetrical on each side of the door, and the diameter of the circular through hole is equal to the outer diameter of the infusion conduit.
[0010] Furthermore, the double door is equipped with two handles.
[0011] Furthermore, the sub-platform is a steel grating structure, and each sub-platform is hinged to the frame.
[0012] Compared with the prior art, the beneficial effects of this utility model are:
[0013] 1. Full horizontal protection of pile holes not only increases the safety of workers but also ensures their working environment and improves work efficiency;
[0014] 2. The platform is highly adaptable and can be fixed with appropriate insertion pins according to the diameter of the pile hole to prevent the platform from moving.
[0015] 3. Setting up a secondary platform can improve the working environment around the pile hole and enhance safety; the secondary platform is movable, making it easy to store and move. Attached Figure Description
[0016] Figure 1 This is a schematic plan view of the frame of an embodiment of the present utility model;
[0017] Figure 2 This is a plan view of the patterned steel plate according to an embodiment of the present utility model;
[0018] Figure 3 This is a schematic diagram of the planar structure of an embodiment of the present utility model;
[0019] Figure 4 This is a longitudinal section schematic diagram of the usage state of an embodiment of this utility model;
[0020] Explanation of the reference numerals in the figure:
[0021] 1. Frame, 2. Well-shaped frame, 3. Patterned steel plate, 4. Double door, 41. Handle, 5. Through hole, 6. Insertion hole, 7. Pin, 8. Sub-platform, 9. Steel casing. Detailed Implementation
[0022] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. The described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of the present utility model.
[0023] Reference Figures 1 to 4 This embodiment provides a drilling and grouting pile construction operation platform, including a frame 1, a grid frame 2 welded inside the frame 1, a patterned steel plate 3 welded to the upper end of the frame 1, a double door 4 in the middle of the patterned steel plate 3, the double door 4 being hinged to the patterned steel plate 3, a circular through hole 5 in the middle of the double door 4, and four auxiliary platforms 8 on the outside of the frame 1.
[0024] In this embodiment, the two longitudinal parallel beams of the grid frame 2 are provided with several insertion holes 6, and the insertion holes 6 are connected to the corresponding positions of the patterned steel plate 3.
[0025] In this embodiment, four of the insertion holes 6 of the grid frame 2 correspond to the inner wall of the steel casing 9. Pins 7 are inserted into the insertion holes 6 to prevent the platform from moving. The pins 7 have a T-shaped structure and can be fixedly installed in the insertion holes 6.
[0026] In this embodiment, the patterned steel plate 3 is welded to the grid frame 2, making it more stable and reliable in use.
[0027] In this embodiment, the circular through hole in the middle of the double door 4 is semi-circular and symmetrical on each side of the door, and the diameter of the circular through hole is equal to the outer diameter of the infusion conduit.
[0028] In this embodiment, the double door 4 is provided with two handles 41.
[0029] In this embodiment, the sub-platform 8 is a steel grating structure, and a single sub-platform 8 is hinged to the frame 1.
[0030] This embodiment also provides a construction method for the above-mentioned drilling and grouting pile construction operation platform, which specifically includes the following steps:
[0031] Step 1: Place the platform. Based on the diameter of the steel casing 9, locate the corresponding insertion hole 6 of the grid frame 2 inside the steel casing 9. Insert the pin 7 into the insertion hole 6 to prevent the platform from moving.
[0032] Step 2: Install 4 secondary platforms 8, and adjust the height of the secondary platforms 8 according to the site conditions;
[0033] Step 3: When installing or removing the conduit, open or close the double door 4 as needed.
[0034] Finally, it should be noted that the above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. A bored pile construction operation platform, characterized by: The system includes a frame, within which a grid frame is welded, and a patterned steel plate is welded to the upper end of the frame. The patterned steel plate has a double door in the middle, which is hinged to the patterned steel plate. The double door has a circular through hole in the middle, and four auxiliary platforms are provided on the outer side of the frame.
2. The construction operation platform for bored piles according to claim 1, characterized in that: The two longitudinal parallel beams of the grid frame are provided with several insertion holes, which are connected to the corresponding positions of the patterned steel plate.
3. The construction operation platform for bored piles according to claim 2, characterized in that: Four of the holes in the grid frame correspond to the inner wall of the steel casing. Pins are inserted into the holes to prevent the platform from moving.
4. The construction operation platform for a bored pile according to claim 3, characterized in that: The pin has a T-shaped structure and can be fixedly installed in the socket.
5. The construction operation platform for bored piles according to any one of claims 1 to 4, characterized in that: The patterned steel plate is welded to the grid frame.
6. The construction operation platform for bored piles according to any one of claims 1 to 4, characterized in that: The circular through hole in the middle of the double door is semi-circular and symmetrical on each side of the door, and the diameter of the circular through hole is equal to the outer diameter of the infusion conduit.
7. The construction operation platform for bored piles according to any one of claims 1 to 4, characterized in that: The double door is equipped with two handles.
8. A drilling and grouting pile construction operation platform according to any one of claims 1-4, characterized in that: The sub-platform is a steel grating structure, and each sub-platform is hinged to the frame.