Double layer rubber stacker conveyor

The double-layer rubber material conveying device enables efficient rubber material storage and automated conveying within a limited space, solving the space limitations of vertical and horizontal warehouses and improving the production efficiency of tire manufacturing.

CN224312592UActive Publication Date: 2026-06-02TRIANGLE TIRE

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
TRIANGLE TIRE
Filing Date
2025-05-21
Publication Date
2026-06-02

AI Technical Summary

Technical Problem

In current tire production, vertical warehouses store a large amount of rubber material but are limited by the height of the workshop, while horizontal warehouses occupy a large area and have limited storage space, which restricts production scheduling.

Method used

Design a double-layer rubber material conveying device. Utilize the support structure of the first and second layers of the conveyor, combined with an elevator and RGV conveyor trolley, to achieve stacked storage and automated conveying of rubber materials, ensuring the first-in, first-out principle.

Benefits of technology

Without increasing the height of the workshop, we can make full use of the space, increase the storage capacity of rubber materials, and improve production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224312592U_ABST
    Figure CN224312592U_ABST
Patent Text Reader

Abstract

The utility model relates to a double -deck rubber material stack way conveying device belongs to tire production device field. Be equipped with one layer conveying stack way, one layer conveying stack way bottom is supported by one layer stack way support, and one layer conveying stack way top is supported by two layer stack way support and is installed with two layer conveying stack way, and is arranged in the same position up and down, and the elevator main part is installed in two layer conveying stack way end, and is equipped with the lifting platform in the elevator main part, and the lifting platform is connected with the elevator drive motor through the lifting platform connecting chain, link wheel, and one layer conveying stack way end is equipped with RGV conveying dolly, and RGV conveying dolly bottom is installed with conveying dolly roller, and is installed with the roller on one layer conveying stack way, two layer stack way. The utility model can make full use of the limited space inside the factory, satisfy the demand of rubber material production storage, improve production efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of tire production, and more specifically to a double-layer rubber material conveying device. Background Technology

[0002] As is well known, the final rubber used in tire production needs to be stored separately after passing through the rubber sheet cooling device in the mixing workshop for use in the next process. Currently, the storage and transportation of finished rubber materials are mainly carried out in two ways: vertical warehouses and flat warehouses with ramps. Although vertical warehouses can store more rubber materials, they are limited by the height of the workshop. Although flat warehouses have a simple structure, single-layer flat warehouses have the disadvantage of large footprint and small storage capacity. The limited rubber material storage space directly affects the production schedule. Summary of the Invention

[0003] To overcome the shortcomings of existing technologies, this utility model provides a double-layer rubber material conveying device, which increases the storage of rubber materials without increasing the height of the workshop, and ensures first-in, first-out.

[0004] The technical solution adopted by this utility model to solve its technical problem is: a double-layer rubber material conveying device, which is provided with a single-layer conveying stack. The feature is that the bottom of the single-layer conveying stack is supported by a single-layer stack pillar, and a second-layer conveying stack is installed above the single-layer conveying stack and supported by a second-layer stack pillar. The two stacks are arranged in the same position. The main body of the elevator is installed at the end of the second-layer conveying stack. The elevator body is provided with a lifting platform. The lifting platform is connected to the elevator drive motor through a lifting platform connecting chain and a connecting sprocket. An RGV conveying trolley is provided at the end of the single-layer conveying stack. The bottom of the RGV conveying trolley is equipped with conveying trolley rollers. Rollers are installed on the single-layer and second-layer conveying stacks.

[0005] The beneficial effect of this utility model is that it makes full use of the limited space inside the factory, meets the needs of rubber production and storage, and improves production efficiency. Attached Figure Description

[0006] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0007] Figure 1 This is a schematic diagram of the structure of the present invention.

[0008] In the diagram: 1. Conveying forklift; 2. Finished rubber compound; 3. Rubber compound pallet; 4. Second-level walkway support column; 5. First-level walkway support column; 6. Walkway conveyor rollers; 7. Second-level conveyor walkway; 8. First-level conveyor walkway; 9. Connecting sprocket; 10. Lifting machine drive motor; 11. Lifting platform connecting chain; 12. Lifting platform; 13. Lifting machine body; 14. RGV conveyor trolley; 15. Conveying trolley rollers. Detailed Implementation

[0009] In the figure, the present invention has a first-layer conveyor trolley 8, the bottom of which is supported by a first-layer trolley support column 5. A second-layer conveyor trolley 7 is installed above the first-layer conveyor trolley 8 and supported by a second-layer trolley support column 4. The two trolleys are arranged in the same position above and below. The elevator body 13 is installed at the end of the second-layer conveyor trolley 7. The elevator body 13 has a lifting platform 12 inside. The lifting platform 12 is connected to the elevator drive motor 10 via a lifting platform connecting chain 11 and a connecting sprocket 9. An RGV conveyor trolley 14 is provided at the end of the first-layer conveyor trolley 8. A conveyor trolley roller 15 is installed at the bottom of the RGV conveyor trolley 14. Rollers are installed on the first-layer conveyor trolley 8 and the second-layer trolley 7.

[0010] After the finished rubber compound 2 is produced and stacked, it is placed on the rubber compound pallet 3. A forklift 1 then lifts the finished rubber compound 2 from the pallet 3 and places it onto the conveyor belt. Rubber compounds of the same type can be freely placed on either the first-layer conveyor belt 8 or the second-layer conveyor belt 7. The rubber compound pallet 3, carrying the finished rubber compound 2, is conveyed to the inside of the belt via rollers driven by the belt itself for operation and storage. The elevator body 13 is installed at the end of the belt. After the storage time of the rubber compound on the second-layer conveyor belt 7 expires, it enters the lifting platform 12 inside the elevator body 13. The elevator drive motor 10, through the rotation of the connecting sprocket 9 and the lifting platform connecting chain 11, completes the task of lifting and conveying the finished rubber compound vertically. The usage invitation of the finished rubber compound 2 is wirelessly sent to the RGV transport trolley 14. The rollers 15 of the transport trolley rotate to move the finished rubber compound 2 onto the trolley, realizing the transfer and conveying of finished materials. The system automatically identifies the time when the rubber compound enters the belt and outputs the rubber compound according to the first-in, first-out principle, completing the purpose of material flow, conveying, and storage.

Claims

1. A double-layer rubber material conveying device, comprising a single conveying stack, characterized in that, The bottom of the first-level conveyor walkway is supported by the first-level walkway pillars. Above the first-level conveyor walkway, a second-level conveyor walkway is installed with the support of the second-level walkway pillars and arranged in the same position. The main body of the elevator is installed at the end of the second-level conveyor walkway. The elevator body is equipped with a lifting platform. The lifting platform is connected to the elevator drive motor via a lifting platform connecting chain and connecting sprocket. An RGV conveyor trolley is installed at the end of the first-level conveyor walkway. The bottom of the RGV conveyor trolley is equipped with conveyor trolley rollers. Rollers are installed on the first-level and second-level conveyor walkways.