一种工程咨询用施工进度管理装置

By designing a foldable construction progress management device for engineering consulting, the problems of large size, inconvenient transportation, and poor stability have been solved, achieving convenient storage and stable support.

CN224516338UActive Publication Date: 2026-07-17

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Filing Date
2025-05-30
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing engineering consulting construction progress management devices cannot be stored in a compact manner, resulting in increased size, inconvenience in transportation and carrying, and lack of auxiliary support mechanisms, leading to poor stability.

Method used

A ground fixing device is designed, comprising a crossbar, a bidirectional threaded rod, a rotary motor, a support rod, an adjusting motor, and an electro-hydraulic push rod. The device can be folded and unfolded by rotating the threaded rod and lead screw driven by the motor, and stable support is provided by the use of ground nails or anti-slip mats.

Benefits of technology

This design enables convenient storage and transportation of the device, improving its portability while enhancing its stability and practicality during use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224516338U_ABST
    Figure CN224516338U_ABST
Patent Text Reader

Abstract

本实用新型公开了一种工程咨询用施工进度管理装置,包括横杆,所述横杆的顶部开设有条形槽,所述条形槽的内部转动安装有双向螺纹杆,所述双向螺纹杆的表面两侧皆螺纹套接有滑套,所述横杆的一侧固定安装有旋转电机,所述旋转电机的输出端贯穿横杆并与双向螺纹杆的一侧固定连接,所述横杆的顶部两侧皆固定安装有固定板,所述固定板的一端皆转动安装有调节杆,所述横杆的一端开设有滑槽,所述滑槽的内部两侧皆活动安装有滑块,所述滑块的一端与滑套的一端固定连接。该一种工程咨询用施工进度管理装置,操作人员启动旋转电机,旋转电机的运行会使得双向螺纹杆发生转动,随之双向螺纹杆会带动滑套在条形槽的内部发生滑动。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A construction progress management device for engineering consultation, comprising a crossbar (1), characterized in that: The top of the crossbar (1) is provided with a strip-shaped slot (2), the inside of the strip-shaped slot (2) is rotatably provided with a bidirectional threaded rod (3), the surface of the bidirectional threaded rod (3) is threadedly sleeved with a sliding sleeve (4) on both sides, one side of the crossbar (1) is fixedly provided with a rotary motor (5), the output end of the rotary motor (5) penetrates through the crossbar (1) and is fixedly connected with one side of the bidirectional threaded rod (3), the top of the crossbar (1) is fixedly provided with a fixed plate (6) on both sides, one end of the fixed plate (6) is rotatably provided with an adjusting rod (7), one end of the crossbar (1) is provided with a sliding groove (8), the inside of the sliding groove (8) is movably provided with a sliding block (9) on both sides, one end of the sliding block (9) is fixedly connected with one end of the sliding sleeve (4), and the sliding block (9) and the adjusting rod (7) are hingedly connected with a connecting rod (10).

2. The construction progress management device for engineering consultation according to claim 1, characterized in that: The opposite faces of the adjusting rod (7) are provided with a storage groove (11), and the inside of the storage groove (11) is movably provided with a display plate (12).

3. The construction progress management device for engineering consultation according to claim 1, characterized in that: The bottom of the crossbar (1) is fixedly provided with a supporting rod (13) on both sides, the top of the supporting rod (13) is provided with a long slot (14), the inside of the long slot (14) is rotatably provided with a bidirectional screw rod (15), and the surface of the bidirectional screw rod (15) is threadedly sleeved with a screw sleeve (16) at both ends.

4. The construction progress management device for engineering consultation according to claim 3, characterized by: One end of the supporting rod (13) is fixedly provided with an adjusting motor (17), and the output end of the adjusting motor (17) penetrates through the supporting rod (13) and is fixedly connected with one end of the bidirectional screw rod (15).

5. The construction progress management device for engineering consultation according to claim 3, characterized in that: The top of the screw sleeve (16) is fixedly provided with a horizontal plate (18), the bottom of the horizontal plate (18) is fixedly provided with an electric hydraulic push rod (19), the bottom of the output end of the electric hydraulic push rod (19) is fixedly provided with a circular plate (20), and the bottom of the circular plate (20) is fixedly provided with a ground nail (21).

6. The construction progress management device for engineering consultation according to claim 3, characterized in that: The bottom of the supporting rod (13) is movably provided with a universal wheel (22) at both ends, and the universal wheels (22) are of the same size.