A prefabricated rainwater inspection well

By using modular design and multi-point connection components, the complexity of operation and difficulty in opening manhole covers during the production and manufacturing process of prefabricated rainwater inspection wells have been solved, enabling convenient operation and adaptable connection of multi-specification pipes, thereby improving construction efficiency and safety.

CN224565297UActive Publication Date: 2026-07-28YICHANG GUJIAN NEW MATERIAL TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
YICHANG GUJIAN NEW MATERIAL TECHNOLOGY CO LTD
Filing Date
2025-09-04
Publication Date
2026-07-28

AI Technical Summary

Technical Problem

Existing prefabricated rainwater inspection wells are complex to operate during the manufacturing process, have difficult-to-open covers, are not user-friendly in design, and are difficult to adapt to the diversity of pipe specifications.

Method used

The modular prefabricated components include a precise fit between the cover plate and the regulating cylinder. The opening component is achieved through the ingenious combination of the top frame, rotating cover, hinge seat and guide sleeve. The connecting component adapts to different pipe specifications through a multi-point connection design.

Benefits of technology

The prefabrication process has been simplified, enabling convenient opening of manhole covers, accommodating connections to pipes of different specifications, and improving construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224565297U_ABST
    Figure CN224565297U_ABST
Patent Text Reader

Abstract

This utility model discloses a precast rainwater inspection well, including a precast cement well. The precast cement well is equipped with precast components, each including a cover plate and an adjusting cylinder. The cover plate is fitted onto the precast cement well, and the adjusting cylinder is fitted onto the cover plate. A connecting block is installed on the precast cement well. A control groove is formed on the cover plate, which is adapted to the connecting block. A sealing groove is formed on the cover plate. An opening component is provided on the adjusting cylinder, comprising a top frame and a rotating cover. The top frame is mounted on the adjusting cylinder, and the rotating cover is rotatably connected to the top frame. A hinge seat is installed on the top frame. This invention addresses the numerous inconveniences in the manufacturing process of existing precast rainwater inspection wells mentioned in the background art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of inspection well technology, and more specifically, to a prefabricated rainwater inspection well. Background Technology

[0002] In the existing technology, the existing prefabricated rainwater inspection wells have many inconveniences in the production and manufacturing process. The traditional prefabrication process usually uses fixed molds to cast the product in one go. Although this method can ensure the structural strength of the product, the operation is complicated in the process of mold disassembly, demolding and subsequent maintenance.

[0003] The existing rotating covers on top of manholes present significant operational obstacles during opening. Traditional manhole covers are usually made of heavy cast iron or concrete, which is quite heavy. Operators need to use special tools to open them, which is time-consuming, laborious, and poses safety hazards. More importantly, the opening mechanism of existing manhole covers is not user-friendly and lacks an effective manual operating device.

[0004] Traditional manhole designs are usually based on standard drawings or conventional specifications. Designers often only consider the most common pipe diameter connection requirements during the product development stage. This "one-size-fits-all" design approach ignores the diversity and complexity of pipe specifications in actual engineering, resulting in a large gap between the product and actual needs. Utility Model Content

[0005] (a) Technical problems to be solved In view of the problems existing in the prior art, this utility model provides a prefabricated rainwater inspection well to solve the technical problems mentioned in the background art that there are many inconveniences in the production and manufacturing process of existing prefabricated rainwater inspection wells.

[0006] (II) Technical Solution To achieve the above objectives, this utility model provides the following technical solution: a precast rainwater inspection well, comprising a precast cement well, wherein a precast component is provided on the precast cement well, the precast component comprising a cover plate and an adjusting cylinder, the cover plate being fitted onto the precast cement well, the adjusting cylinder being fitted onto the cover plate, a connecting block being installed on the precast cement well, a control groove being provided on the cover plate, the control groove being adapted to the connecting block, a sealing groove being provided on the cover plate, an opening component being provided on the adjusting cylinder, the opening component comprising a top frame and a rotating cover, the top frame being provided on the adjusting cylinder, the rotating cover being rotatably connected to the top frame, and a hinge seat being installed on the top frame.

[0007] The present invention is further configured such that a control block is installed on the adjusting cylinder, the control block being adapted to the sealing groove, thereby facilitating the completion of the fitting process of the adjusting cylinder by using the control block.

[0008] The present invention is further configured such that a guide sleeve is rotatably connected to the hinge seat, and a guide rod is slidably connected to the guide sleeve. The cooperation of the various components facilitates the completion of the sliding movement process of the guide rod.

[0009] The present invention is further configured such that a mounting seat is installed on the rotating cover, the mounting seat is rotatably connected to the guide rod, and a pull rod is installed on the rotating cover. The cooperation of the various components facilitates the completion of the pulling process of the pull rod.

[0010] The present invention is further provided that a pull ring is connected to the pull rod, so as to facilitate the opening process of the rotating cover.

[0011] The present invention is further configured such that a connecting component is provided on the precast cement well, the connecting component including a first connecting seat and a second connecting seat, the first connecting seat and the second connecting seat being disposed on the precast cement well, and a third connecting seat being installed on the precast cement well, thereby facilitating the completion of the connection process for external pipelines through the cooperative use of each component.

[0012] The present invention is further configured such that a control seat is installed on the first connecting seat, the second connecting seat and the third connecting seat, thereby facilitating the completion of the pipe fixing process by using the control seat.

[0013] The present invention is further configured such that the control seat is threadedly connected with bolts, thereby facilitating the fixing process of the precast concrete well and the external pipeline.

[0014] (III) Beneficial Effects Compared with the prior art, this utility model provides a prefabricated rainwater inspection well, which has the following beneficial effects: 1. The prefabricated components achieve modular assembly of the inspection well through the fitting configuration of the cover plate and the regulating cylinder. The control groove on the cover plate and the connecting block on the cement prefabricated well form a precise fit, ensuring stable connection and accurate positioning between components. The matching design of the control block on the regulating cylinder and the sealing groove of the cover plate enables rapid fitting. This modular design significantly simplifies the prefabrication process and reduces the complexity of on-site construction.

[0015] 2. The opening assembly, through the ingenious cooperation of the top frame, rotating cover, hinge seat, guide sleeve and guide rod, completely solves the problem of difficult opening of traditional manhole covers. The design of the pull rod and pull ring provides operators with a convenient operating interface, and the manhole cover can be easily opened without the aid of special tools. The sliding connection mechanism of the guide sleeve and guide rod ensures the smooth movement of the rotating cover during the opening process and avoids jamming.

[0016] 3. The connection assembly achieves flexible adaptation to pipes of different specifications through the multi-point connection design of the first connecting seat, the second connecting seat and the third connecting seat. The threaded connection of the control seat and the bolt provides adjustable connection strength, which can adapt to external pipes of different materials and specifications. The setting of multiple connecting seats allows a single inspection well to connect multiple pipes of different directions and specifications at the same time. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of the overall structure of a prefabricated rainwater inspection well according to this utility model; Figure 2 This is a cross-sectional view of the structure of this utility model; Figure 3 This is a partial cross-sectional structural schematic diagram of the present invention; Figure 4 This is a schematic diagram of the opening component in this utility model; Figure 5 This is a cross-sectional view of the opening component in this utility model.

[0018] In the diagram: 1. Precast cement well; 2. Cover plate; 3. Adjusting cylinder; 4. Connecting block; 5. Control groove; 6. Sealing groove; 7. Top frame; 8. Rotating cover; 9. Hinge seat; 10. Control block; 11. Guide sleeve; 12. Guide rod; 13. Mounting seat; 14. Tie rod; 15. Pull ring; 16. First connecting seat; 17. Second connecting seat; 18. Third connecting seat; 19. Control seat; 20. Bolt. Detailed Implementation

[0019] It should be noted that, unless otherwise specified, the embodiments and features described in this application can be combined with each other. The present invention will now be described in detail with reference to the accompanying drawings and embodiments.

[0020] It should be noted that, unless otherwise specified, all technical and scientific terms used in this application have the same meaning as commonly understood by one of ordinary skill in the art to which this application pertains.

[0021] In this utility model, unless otherwise stated, the orientations used, such as "up" and "down", usually refer to the direction shown in the accompanying drawings, or to the vertical, perpendicular, or gravitational direction; similarly, for ease of understanding and description, "left" and "right" usually refer to the left and right shown in the accompanying drawings; "inner" and "outer" refer to the inner and outer contours of each component itself, but the above directional terms are not used to limit this utility model.

[0022] Please see Figures 1-5A prefabricated rainwater inspection well includes a precast cement well 1. The precast cement well 1 is equipped with precast components, including a cover plate 2 and an adjusting cylinder 3. The cover plate 2 is fitted onto the precast cement well 1, and the adjusting cylinder 3 is fitted onto the cover plate 2. A connecting block 4 is installed on the precast cement well 1. A control groove 5 is opened on the cover plate 2, which is adapted to the connecting block 4. A sealing groove 6 is opened on the cover plate 2. An opening component is provided on the adjusting cylinder 3. The opening component includes a top frame 7 and a rotating cover 8. The top frame 7 is set on the adjusting cylinder 3, and the rotating cover 8 is rotatably connected to the top frame 7. A hinge seat 9 is installed on the top frame 7.

[0023] A control block 10 is installed on the regulating cylinder 3, and the control block 10 is adapted to the sealing groove 6.

[0024] A guide sleeve 11 is rotatably connected to the hinge seat 9, and a guide rod 12 is slidably connected to the guide sleeve 11.

[0025] A mounting base 13 is installed on the rotating cover 8, and the mounting base 13 is rotatably connected to the guide rod 12. A pull rod 14 is installed on the rotating cover 8.

[0026] A pull ring 15 is connected to the pull rod 14.

[0027] In this embodiment, the connecting block 4 on the precast cement well 1 is aligned with the control groove 5 on the cover plate 2, so that they fit together. Then, the control block 10 on the adjusting cylinder 3 is aligned with the sealing groove 6 on the cover plate 2, so that they fit together, thus completing the precast installation process. When it is necessary to open the rotating cover 8 on the adjusting cylinder 3, the pull ring 15 is manually pulled to drive the pull rod 14, thereby causing the rotating cover 8 to rotate along the top frame 7. During the rotation, the guide rod 12 on the mounting base 13 slides along the guide sleeve 11 on the hinge base 9, thus completing the opening of the rotating cover 8.

[0028] Please see Figure 1-2 As an embodiment of a precast rainwater inspection well with a connecting component: a connecting component is provided on the precast cement well 1. The connecting component includes a first connecting seat 16 and a second connecting seat 17. The first connecting seat 16 and the second connecting seat 17 are provided on the precast cement well 1. A third connecting seat 18 is installed on the precast cement well 1.

[0029] Control base 19 is installed on the first connecting base 16, the second connecting base 17 and the third connecting base 18.

[0030] The control base 19 is threaded with bolts 20.

[0031] More specifically, when it is necessary to connect an external pipe to the precast concrete well 1, the pipe with the appropriate diameter is fitted with the appropriate first connecting seat 16, second connecting seat 17 or third connecting seat 18, and then the bolt 20 is rotated along the thread of the control seat 19 to complete the connection process of the appropriate pipe.

[0032] In summary, when using or running the entire equipment: align the connecting block 4 on the precast cement well 1 with the control groove 5 on the cover plate 2 to make them fit together; then align the control block 10 on the adjusting cylinder 3 with the sealing groove 6 on the cover plate 2 to make them fit together, thus completing the precast installation process. When it is necessary to open the rotating cover 8 on the adjusting cylinder 3, manually pull the pull ring 15 to drive the pull rod 14, thereby causing the rotating cover 8 to rotate along the top frame 7. During rotation, the guide rod 12 on the mounting base 13 will slide along the guide sleeve 11 on the hinge base 9 to open the rotating cover 8.

[0033] When it is necessary to connect an external pipe to the precast concrete well 1, fit the pipe of appropriate diameter with the appropriate first connecting seat 16, second connecting seat 17 or third connecting seat 18, and then rotate the bolt 20 along the thread of the control seat 19 to complete the connection process of the appropriate pipe.

[0034] Of all the solutions mentioned above, those involving the connection between two components can be selected according to the actual situation, such as welding, bolt and nut connection, bolt or screw connection, or other known connection methods, which will not be elaborated here. For all the fixed connections mentioned above, welding is preferred. Although embodiments of this utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of this utility model. The scope of this utility model is defined by the appended claims and their equivalents.

Claims

1. A precast rainwater inspection well, comprising a precast cement well (1), characterized in that: The precast cement well (1) is provided with a precast component, which includes a cover plate (2) and an adjusting cylinder (3). The cover plate (2) is fitted onto the precast cement well (1), and the adjusting cylinder (3) is fitted onto the cover plate (2). A connecting block (4) is installed on the precast cement well (1). A control groove (5) is opened on the cover plate (2), which is adapted to the connecting block (4). A sealing groove (6) is opened on the cover plate (2). An opening component is provided on the adjusting cylinder (3). The opening component includes a top frame (7) and a rotating cover (8). The top frame (7) is set on the adjusting cylinder (3), and the rotating cover (8) is rotatably connected to the top frame (7). A hinge seat (9) is installed on the top frame (7).

2. A prefabricated rainwater inspection well according to claim 1, characterized in that: A control block (10) is installed on the regulating cylinder (3), and the control block (10) is adapted to the sealing groove (6).

3. A prefabricated rainwater inspection well according to claim 2, characterized in that: The hinge seat (9) is rotatably connected to a guide sleeve (11), and the guide sleeve (11) is slidably connected to a guide rod (12).

4. A prefabricated rainwater inspection well according to claim 3, characterized in that: The rotating cover (8) is provided with a mounting base (13), which is rotatably connected to the guide rod (12). The rotating cover (8) is provided with a pull rod (14).

5. A prefabricated rainwater inspection well according to claim 4, characterized in that: A pull ring (15) is connected to the pull rod (14).

6. A prefabricated rainwater inspection well according to any one of claims 1-5, characterized in that: The precast cement well (1) is provided with a connecting component, which includes a first connecting seat (16) and a second connecting seat (17). The first connecting seat (16) and the second connecting seat (17) are provided on the precast cement well (1), and a third connecting seat (18) is installed on the precast cement well (1).

7. A prefabricated rainwater inspection well according to claim 6, characterized in that: A control seat (19) is installed on the first connecting seat (16), the second connecting seat (17) and the third connecting seat (18).

8. A prefabricated rainwater inspection well according to claim 7, characterized in that: The control seat (19) is threaded with a bolt (20).