Weathering steel tower assembly tooling

CN224693152UActive Publication Date: 2026-08-28HENAN DINGLI POLES & TOWERS COMPANY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522103087.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-09-29
Publication Date
2026-08-28
Estimated Expiration
2035-09-29

AI Technical Summary

Technical Problem

[0003]本实用新型提出一种耐候钢铁塔组装用工装,以解决现有工装使用不便的问题

Benefits of technology

(1)本申请设置有模具,并且通过模具底部的底架插入至其他模具上的浇筑腔中,让施工人员浇筑混凝土至模具中时,使混凝土基座的规格可以调节,进而让装置可以依据钢铁塔的规格调节预埋深度,可以依据实际情况进行调节,装置使用便利性高,使用范围大;

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224693152U_ABST
    Figure CN224693152U_ABST
Patent Text Reader

Abstract

The utility model relates to power iron tower installation technical field, and disclose a kind of tool for weathering steel tower assembly, including N profiled parts, N=1, the profiled part includes mould, the mould is opened and is formed for pouring concrete pouring cavity, and mould bottom is fixedly connected with underframe, the underframe is matched with pouring cavity, the mould upper portion is provided with the connecting piece for connecting steel tower, the connecting piece includes cross, the pouring cavity inner wall forms the clamping slot, the cross is matched with clamping slot, and including the multiple connecting holes being set on cross;The utility model is inserted to the pouring cavity on other mould by setting mould and the underframe of mould bottom, when let construction personnel pour concrete into mould, the specification of concrete pedestal can be adjusted, and then let device can adjust embedment depth according to the specification of steel tower, can be adjusted according to actual situation, and device is high in use convenience, and wide in use range.
Need to check novelty before this filing date? Find Prior Art