Intelligent lining trolley for super-large section underground excavated station capable of providing large TBM to pass through

CN224835036UActive Publication Date: 2026-10-09SINOHYDRO BUREAU 6 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202521684169.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-08-08
Publication Date
2026-10-09
Estimated Expiration
2035-08-08

AI Technical Summary

Technical Problem

[0004]为了解决传统人工衬砌效率低且安全性差,而且TBM在暗挖车站的衬砌过程中无法过站的问题,本实用新型提供了一种特大断面暗挖车站可供大型TBM过站的智能化衬砌台车

Benefits of technology

[0034]本实用新型的有益效果:本实用新型,通过设计双层台车组件,其一层台架底部形成供TBM过站的通道,其能够在施工过程中满足TBM过站行走的需求,而且双层台车组件用于支撑衬台组件,从而能够快速在衬台组件与隧道内侧的浇筑区域,相比较传统的模板结构,其施工效率大大提高,而且施工安全性更好。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224835036U_ABST
    Figure CN224835036U_ABST
Patent Text Reader

Abstract

The utility model provides a kind of super section subsurface excavation station can supply the intelligent lining trolley of large TBM passing station, belong to the field of subsurface excavation station construction, comprising: double-deck trolley component, lining platform component, telescopic support and trough structure.The utility model, by designing double-deck trolley component, its one layer rack bottom forms the passage for TBM passing station, it can meet the demand of TBM passing station walking in construction process, and double-deck trolley component is used to support lining platform component, to be able to quickly in lining platform component and pouring area inside tunnel, compared with traditional formwork structure, its construction efficiency is greatly improved, and construction safety is better.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of tunnel construction, specifically to an intelligent lining trolley for tunnels with extra-large cross-sections that can accommodate large TBMs passing through. Background Technology

[0002] Mined tunnel stations are often located in bustling urban areas with dense surrounding buildings and complex underground pipelines. Simultaneously, the surrounding rock conditions are complex, with abundant groundwater, requiring a balance between construction safety and structural stability. Large-section tunnels place extremely high demands on the load-bearing capacity, structural rigidity, and stability of the lining trolleys; traditional trolleys are ill-suited for large-span pouring requirements and are prone to problems such as residual grouting air bubbles, affecting lining quality.

[0003] Traditional manual lining is inefficient and unsafe, requiring mechanized technologies such as integrated hydraulic jack systems and automatic demolding devices to improve construction efficiency. With the increasing use of mechanization, the use of TBMs is becoming more widespread. However, TBMs often need to pass through stations during the lining process of cut-and-cover tunnels. Therefore, this utility model provides an intelligent lining trolley for extra-large cross-section cut-and-cover tunnels that allows large TBMs to pass through. Utility Model Content

[0004] To address the problems of low efficiency and poor safety of traditional manual lining, and the inability of TBMs to pass through stations during the lining process in cut-and-cover tunnels, this utility model provides an intelligent lining trolley for extra-large cross-section cut-and-cover stations that allows large TBMs to pass through.

[0005] To achieve the above objectives, the present invention adopts the following technical solution:

[0006] An intelligent lining trolley for a large-section cut-and-cover railway station, capable of accommodating large TBMs, includes:

[0007] A double-layer trolley assembly, wherein the bottom of the first layer of the double-layer trolley assembly forms a passage for the TBM to pass through the station;

[0008] A liner assembly fitted to the inside of the tunnel, wherein a telescopic support is hinged to the inside of the liner assembly, and the end of the telescopic support away from the liner assembly is hinged to the outside of the double-layer trolley assembly.

[0009] A material trough structure is installed on a double-layer trolley assembly and is used to pour concrete at the working window of the lining assembly.

[0010] The lining assembly is equipped with several sets of grouting components with molds.

[0011] As a further description of the above technical solution:

[0012] The double-layer trolley assembly includes:

[0013] A single-layer platform, comprising several spaced-apart portal frames, which are fixedly connected by connecting frames, and a traveling assembly is fixedly installed at the bottom of the single-layer platform;

[0014] The second-layer platform is fixedly connected to the top of the first-layer platform, and an auxiliary platform is fixedly connected to the top of the second-layer platform.

[0015] As a further description of the above technical solution:

[0016] The walking assembly is hinged to a ground support member on the inner side of the first-floor platform. The ground support member is a telescopic member.

[0017] As a further description of the above technical solution:

[0018] Ladders are installed on the first-layer platform, the second-layer platform, and the auxiliary platform.

[0019] As a further description of the above technical solution:

[0020] The lining assembly includes a top platform, which is located at the top centerline of the tunnel along the tunnel's inner edge. The tunnel station is provided with a first side platform, a second side platform, and a third side platform on both sides of the top platform along the tunnel's inner side.

[0021] As a further description of the above technical solution:

[0022] A vibrator is provided on the inner side of the lining assembly;

[0023] The vibrators are spaced apart on the top platform along the length of the tunnel of the mined station, and two vibrators are installed on the top platform;

[0024] A vibrator is installed on the first, second, and third side platforms.

[0025] As a further description of the above technical solution:

[0026] The trough structure includes:

[0027] A top chute is installed on the top of a single-layer or double-layer platform, and a material distribution chute is provided on the side of the top chute.

[0028] The first material channel and the second material channel are corresponding to the liner assembly. The first material channel corresponds to the end of the material distribution chute, and a guide assembly is provided between the first material channel and the second material channel.

[0029] As a further description of the above technical solution:

[0030] The molded grouting assembly includes:

[0031] A fixed flange is fixedly connected to the liner assembly, and the liner assembly has an insertion port corresponding to the center hole of the fixed flange.

[0032] The grouting pipe has a detachable flange fixedly connected to its outer side, and the detachable flange is fixedly connected to the fixed flange by fastening bolts.

[0033] The grouting pipe is equipped with a pressure gauge and a ball valve, and the end of the grouting pipe is connected to a grouting connector.

[0034] The beneficial effects of this utility model are as follows: By designing a double-layer trolley assembly, the bottom of the first layer of the trolley forms a passage for the TBM to pass through the station, which can meet the needs of the TBM to move through the station during construction. Moreover, the double-layer trolley assembly is used to support the lining assembly, thereby enabling rapid pouring in the lining assembly and the inner side of the tunnel. Compared with the traditional formwork structure, its construction efficiency is greatly improved and its construction safety is better. Attached Figure Description

[0035] To more clearly illustrate an intelligent lining trolley for a large-section cut-and-cover station that can accommodate large TBMs, the following figures are shown;

[0036] Figure 1 This is a cross-sectional schematic diagram of the present invention;

[0037] Figure 2 This is a schematic diagram of the material trough structure of this utility model;

[0038] Figure 3 This is a layout diagram of the lining work window and vibrator of this utility model.

[0039] Figure 4 This is a schematic diagram of the grouting assembly with mold of this utility model.

[0040] The labels in the attached diagram;

[0041] 1. First-layer platform; 2. Second-layer platform; 3. Auxiliary platform; 4. Walking assembly; 4a. Ground support; 5. Lining assembly; 501. Top platform; 502. First side platform; 503. Second side platform; 504. Third side platform; 6. Vibrator; 7. Material trough structure; 701. Top chute; 702. Distribution chute; 703. Guiding assembly; 704. First material channel; 705. Second material channel; 8. Telescopic support; 9. Ladder assembly; 10. Grouting assembly with mold; 1001. Grouting pipe; 1002. Fixed flange; 1003. Pressure gauge; 1004. Ball valve; 1005. Grouting connector; 1006. Removable flange; 1007. Fastening bolts. Detailed Implementation

[0042] Please refer to the attached document. Figures 1-4This application illustrates an intelligent lining trolley for a large cross-section underground railway station that can accommodate large TBMs passing through, specifically including: a double-layer trolley assembly, a lining platform assembly 5, a telescopic support 8, and a material trough structure 7.

[0043] The bottom of the first layer of the double-layer trolley assembly forms a passage for the TBM to pass through, meeting the TBM's movement needs during construction. The double-layer trolley assembly is a movable structure; after pouring a section, the structure attached to the inner side of the tunnel can be moved forward a certain distance to allow for the pouring of the second section, significantly improving the efficiency of lining pouring. The lining platform assembly 5 is attached to the inner side of the tunnel, and a telescopic support 8 is hinged to the inner side of the lining platform assembly 5. The end of the telescopic support 8 furthest from the lining platform assembly 5 is hinged to the outer side of the double-layer trolley assembly, allowing for telescopic movement. Support component 8 is a hydraulic expansion component / threaded expansion component, which is used to support the lining assembly 5, so that the lining assembly 5 and the inner side of the tunnel form a pouring interlayer (the interlayer needs to be tied with steel bars, and the construction process of tying steel bars can also rely on the double-layer trolley assembly, without the need to erect additional scaffolding). The material trough structure 7 is installed on the double-layer trolley assembly and is used to pour concrete at the working window of the lining assembly 5. The material trough structure 7 guides the concrete to the working window of the lining assembly 5, and from the working window of the lining assembly 5, it enters the pouring area between the lining assembly 5 and the inner side of the tunnel for pouring.

[0044] This utility model, through the design of a double-layer trolley assembly, forms a passage at the bottom of the first-layer platform 1 for the TBM to pass through the station, which can meet the needs of the TBM to move through the station during construction. Moreover, the double-layer trolley assembly is used to support the lining assembly 5, thereby enabling rapid pouring in the pouring area between the lining assembly 5 and the inner side of the tunnel. Compared with the traditional formwork structure, its construction efficiency is greatly improved and its construction safety is better.

[0045] In order to achieve efficient grouting, several sets of grouting components with molds are provided on the liner assembly 5.

[0046] Specifically, the double-layer trolley assembly includes: a first-layer trolley frame 1 and a second-layer trolley frame 2.

[0047] The first-level platform 1 includes several spaced-apart portal frames, which are fixedly connected by connecting frames to form a passage structure. The bottom of the first-level platform 1 is fixedly installed with a traveling component 4, which is driven by four 3kW synchronous motors and then drives the portal frames to move through a reducer and gear reduction. The second-level platform 2 is fixedly connected to the top of the first-level platform 1. The second-level platform 2 consists of columns, crossbars and longitudinal bars. The top of the second-level platform 2 is fixedly connected with an auxiliary platform 3, which consists of several platforms whose height matches the top of the tunnel.

[0048] In one embodiment, a ground support 4a is hinged to the walking component 4 on the inner side of the first-layer platform 1. The ground support 4a is a telescopic component and is used to stabilize the first-layer platform 1. When walking, the bottom of the ground support 4a needs to be separated from the ground.

[0049] In one embodiment, ladders 9 are installed on the first-floor platform 1, the second-floor platform 2, and the auxiliary platform 3 to allow construction personnel to go up and down the first-floor platform 1, the second-floor platform 2, and the auxiliary platform 3.

[0050] In one embodiment, the lining assembly 5 includes a top platform 501, which is located at the top centerline of the tunnel along the tunnel interior of the tunnel-excavated station. A first side platform 502, a second side platform 503, and a third side platform 504 are respectively provided on both sides of the top platform 501 along the tunnel interior of the tunnel-excavated station.

[0051] The top platform 501 has one set, and the first side platform 502, the second side platform 503, and the third side platform 504 each have two sets, and their unfolding forms are as follows: Figure 3 As shown, the top platform 501, the first side platform 502, the second side platform 503, and the third side platform 504 together form the shape of the inner side of the tunnel.

[0052] In one embodiment, a vibrator 6 is provided on the inner side of the lining assembly 5. The vibrator 6 is used to vibrate the concrete to make the concrete more compact.

[0053] Vibrators 6 are spaced apart on the roof platform 501 along the length of the tunnel, with two vibrators 6 installed on each roof platform 501. Figure 3 As shown, two vibrators 6 are installed on the top platform 501 that are spaced apart, and one vibrator 6 is installed on the first side platform 502, the second side platform 503, and the third side platform 504. All the vibrators 6 should be evenly distributed on the plane to ensure that all the concrete can be well vibrated.

[0054] In one embodiment, the material trough structure 7 includes: a top chute 701, a material distribution chute 702, and a first material channel 704 and a second material channel 705 corresponding to the liner assembly 5; the top chute 701, the material distribution chute 702, and the first material channel 704 and the second material channel 705 corresponding to the liner assembly 5 are all fixedly installed with the double-layer trolley assembly.

[0055] The top chute 701 is installed on the top of the first-layer platform 1 or the second-layer platform 2. A material distribution chute 702 is provided on the side of the top chute 701. The first material channel 704 corresponds to the end of the material distribution chute 702. A guide component 703 is provided between the first material channel 704 and the second material channel 705.

[0056] When in use, align the bottom of the material distribution chute 702 with the first material channel 704, and the concrete will be guided from the first material channel 704 to the corresponding lining work window. Alternatively, the first material channel 704 can be offset, and the guiding component 703 can be aligned with the material distribution chute 702, thereby guiding the concrete to the second material channel 705 using the guiding component 703.

[0057] In one embodiment, the grouting assembly 10 includes: a fixed flange 1002, a grouting pipe 1001, a detachable flange 1006, a pressure gauge 1003, a ball valve 1004, and a grouting connector 1005.

[0058] The fixed flange 1002 is fixedly connected to the liner assembly 5. The liner assembly 5 has an insertion port corresponding to the center hole of the fixed flange 1002. The outer side of the grouting pipe 1001 is fixedly connected to a detachable flange 1006. When in use, the detachable flange 1006 and the fixed flange 1002 are fixedly connected by fastening bolts (1007).

[0059] To facilitate monitoring of the grouting process, a pressure gauge 1003 and a ball valve 1004 are installed on the grouting pipe 1001, and a grouting connector 1005 is connected to the end of the grouting pipe 1001.

[0060] To ensure the safety of the trolley during use, a vision-based anti-drop-off alarm device was also designed to guarantee safety during use.

[0061] Other embodiments of the present invention will readily occur to those skilled in the art upon consideration of the specification and practice of the disclosure herein. This application is intended to cover any variations, uses, or adaptations of the present invention that follow the general principles of the present invention and include common knowledge or customary techniques in the art not disclosed herein. The specification and examples are to be considered exemplary only, and the true scope and spirit of the present invention are indicated by the following claims.

[0062] It should be understood that relational terms such as "first" and "second" are used merely to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. This invention is not limited to the precise structures described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from its scope. The scope of this invention is limited only by the appended claims.

Claims

1. An intelligent lining trolley for a large-section tunnel-cut station, capable of accommodating large TBMs passing through, characterized in that: include: A double-layer trolley assembly, wherein the bottom of the first layer of the double-layer trolley assembly (1) forms a passage for the TBM to pass through the station; A liner assembly (5) is attached to the inside of the tunnel. A telescopic support (8) is hinged to the inside of the liner assembly (5). The end of the telescopic support (8) away from the liner assembly (5) is hinged to the outside of the double-layer trolley assembly. The material trough structure (7) is installed on the double-layer trolley assembly and is used to pour concrete at the working window of the lining assembly (5). The liner assembly (5) is provided with several sets of grouting assemblies (10) with molds.

2. The intelligent lining trolley for a large-section underground railway station according to claim 1, characterized in that, The double-layer trolley assembly includes: A single-layer platform (1) includes several spaced portal frames that are fixedly connected by a connecting frame. A walking component (4) is fixedly installed at the bottom of the single-layer platform (1). The second-layer platform (2) is fixedly connected to the top of the first-layer platform (1), and an auxiliary platform (3) is fixedly connected to the top of the second-layer platform (2).

3. The intelligent lining trolley for a large-section tunnel-cut station as described in claim 2, characterized in that: The walking assembly (4) is hinged to a ground support (4a) on the inner side of the first-layer platform (1), and the ground support (4a) is a telescopic component.

4. The intelligent lining trolley for a large-section tunnel-cut station as described in claim 2, characterized in that: Ladder components (9) are installed on the first-layer platform (1), the second-layer platform (2), and the auxiliary platform (3).

5. The intelligent lining trolley for a large-section tunnel-cut station as described in claim 1, characterized in that, The lining assembly (5) includes: a top platform (501), which is located at the top centerline of the tunnel along the tunnel wall of the underground station. The underground station is provided with a first side platform (502), a second side platform (503), and a third side platform (504) on both sides of the top platform (501) along the tunnel wall.

6. The intelligent lining trolley for a large-section tunnel-cut station as described in claim 5, characterized in that: A vibrator (6) is provided on the inner side of the lining assembly (5); The vibrators (6) are spaced apart on the top platform (501) along the length of the tunnel of the mined station, and two vibrators (6) are installed on the top platform (501); A vibrator (6) is installed on the first side platform (502), the second side platform (503), and the third side platform (504).

7. The intelligent lining trolley for a large-section tunnel-cut station as described in claim 2, characterized in that, The trough structure (7) includes: A top chute (701) is installed on the top of a single-layer frame (1) or a double-layer frame (2), and a material distribution chute (702) is provided on the side of the top chute (701). The first material channel (704) and the second material channel (705) are corresponding to the liner assembly (5). The first material channel (704) corresponds to the end of the material distribution chute (702). A guide assembly (703) is provided between the first material channel (704) and the second material channel (705).

8. The intelligent lining trolley for a large-section tunnel-cut station as described in claim 1, characterized in that, The grouting assembly (10) with mold includes: A fixed flange (1002) is fixedly connected to the liner assembly (5), and the liner assembly (5) has an insertion port corresponding to the center hole of the fixed flange (1002); Grouting pipe (1001), the outside of which is fixedly connected to a detachable flange (1006), the detachable flange (1006) and the fixed flange (1002) are fixedly connected by fastening bolts (1007); A pressure gauge (1003) and a ball valve (1004) are installed on the grouting pipe (1001), and a grouting connector (1005) is connected to the end of the grouting pipe (1001).