Technical Problem

Existing pipeline mounting supports cannot rotate accordingly with the pipeline, resulting in problems such as long pipelines, easy tangling, and damage.

Method used

A rotating pipeline clamp structure is designed, including a first clamping body and a second clamping body. The clamping body is allowed to rotate through a gap fit with the installation platform via a connector, thereby enabling flexible rotation of the pipeline.

Benefits of technology

This ensures that the pipeline remains undamaged during rotation, keeps the channel unobstructed, and avoids tangling and breakage caused by excessively long pipelines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224932305U_ABST
    Figure CN224932305U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of rotary pipeline clamp structures, including first clamping body (1) and second clamping body (2), the first clamping body and the second clamping body are oppositely arranged, and the both ends of the first clamping body and the both ends of the second clamping body are connected respectively, pipeline passage (3) is left between the middle part of the first clamping body and the middle part of the second clamping body, the middle part of the first clamping body and / or second clamping body is provided with connecting through-hole, at least one the connecting through-hole is configured with connecting piece for being connected with mounting platform, and the connecting through-hole and the connecting piece gap fit. The utility model when pipeline rotates, first, second clamping body rotates correspondingly, and then can avoid pipeline damage possibly caused by first, second clamping body unable to rotate with pipeline.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to pipeline clamps, specifically to a rotating pipeline clamp structure. Background Technology

[0002] Construction machinery is equipped with various pipelines, such as cables, signal cables, liquid hoses, and gas hoses. Because construction machinery frequently extends, retracts, and rotates during operation, the pipelines installed on it also extend, retract, and rotate synchronously. Therefore, it is necessary to flexibly fix the pipelines and allow them to rotate as needed.

[0003] Common pipeline installation methods in the prior art involve fixing the pipeline along its path with multiple pipe clamps or binding it to related structures with cable ties. These common methods can only fix the pipeline's path and cannot allow it to rotate. Therefore, the pipeline needs to be designed to be long in order to accommodate synchronous expansion and contraction and rotation. However, the long pipeline design makes it very easy for tangling or even damage to occur. Utility Model Content

[0004] The technical problem to be solved by this utility model is to address the deficiency of existing pipeline installation supports that cannot rotate accordingly with the rotation of the pipeline. This utility model provides a rotating pipeline clamp structure that can rotate accordingly with the rotation of the pipeline.

[0005] To solve the above-mentioned technical problems, the present invention adopts the following technical solution: A rotating pipeline clamp structure includes a first clamping body and a second clamping body. The structure is characterized in that the first clamping body and the second clamping body are arranged opposite to each other, and the two ends of the first clamping body and the two ends of the second clamping body are respectively connected. A pipeline channel is provided between the middle portion of the first clamping body and the middle portion of the second clamping body. A connecting through hole is provided in the middle portion of the first clamping body and / or the second clamping body. At least one of the connecting through holes is equipped with a connector for connection to an installation platform, and the connecting through hole and the connector are clearance-fitted.

[0006] A further improvement to the above solution is that the connector includes a head and a connecting portion connected below the head, wherein the outer diameter of the head is larger than the diameter of the connecting through hole, and the outer diameter of the connecting portion is smaller than the diameter of the connecting through hole.

[0007] A further improvement to the above solution is that a bolt hole is provided in the middle of the connector, and the connector is rotatably connected to the mounting platform via a first bolt passing through the bolt hole.

[0008] A further improvement to the above solution is that the bolt hole is set below the upper surface of the connector, and when the first bolt is installed, the head of the first bolt is not higher than the upper surface of the connector.

[0009] A further improvement to the above solution is that the two ends of the first clamping body and the two ends of the second clamping body are respectively connected by a second bolt.

[0010] Compared with the prior art, the beneficial effects of this utility model are: 1) The present invention is provided with a connector for connecting to the installation platform in the connecting through hole, and the connecting through hole and the connector are clearance fit, so that the first and second clamping bodies can rotate relative to the connector, and thus the first and second clamping bodies rotate accordingly when the pipeline rotates, thereby avoiding pipeline damage that may be caused by the first and second clamping bodies not rotating with the pipeline.

[0011] 2) The bolt holes of this utility model are set below the upper surface of the connector. When the first bolt is installed, the head of the first bolt is not higher than the upper surface of the connector. This can effectively ensure that the pipeline channel is not affected by the installation of the first bolt and ensure the unobstructed flow of the pipeline channel. Attached Figure Description

[0012] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0013] Figure 1 This is a structural schematic diagram of an embodiment of the present utility model.

[0014] Figure 2 This is a first-view structural schematic diagram of the connector according to an embodiment of the present utility model.

[0015] Figure 3 This is a second-view structural schematic diagram of the connector according to an embodiment of the present invention. Detailed Implementation

[0016] The present invention will be further described below with reference to specific preferred embodiments, but this does not limit the scope of protection of the present invention.

[0017] In the description of this utility model, it should be noted that the terms "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the accompanying drawings and are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.

[0018] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "joining" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.

[0019] Please see Figure 1 - Figure 3 An embodiment of the rotary pipeline clamp structure of this utility model includes a first clamping body 1 and a second clamping body 2. The first clamping body 1 and the second clamping body 2 are arranged opposite to each other, and the two ends of the first clamping body 1 and the two ends of the second clamping body 2 are respectively connected. A pipeline channel 3 is left between the middle part of the first clamping body 1 and the middle part of the second clamping body 2. A connecting through hole 4 is provided in the middle part of the first clamping body 1 and / or the second clamping body 2. At least one of the connecting through holes 4 is provided with a connector 6 for connecting to the installation platform, and the connecting through hole 4 and the connector 6 are clearance fit.

[0020] The connector 6 includes a head 61 and a connecting portion 62 connected below the head 61. The outer diameter of the head 61 is larger than the diameter of the connecting through hole 4, and the outer diameter of the connecting portion 62 is smaller than the diameter of the connecting through hole 4. A bolt hole 63 is provided in the middle of the connector 6, and the connector 6 is rotatably connected to the mounting platform via a first bolt 5 passing through the bolt hole 63.

[0021] To prevent the first bolt 5 from interfering with the passage of pipelines in the pipeline channel 3, the bolt hole 63 is set below the upper surface of the connector 6. When the first bolt 5 is installed, the head of the first bolt 5 is not higher than the upper surface of the connector 6.

[0022] In this embodiment, the two ends of the first clamping body 1 and the two ends of the second clamping body 2 are respectively connected by a second bolt (not shown in the figure). However, it is obvious that the first clamping body 1 and the second clamping body 2 can be connected by other connection methods, such as welding.

[0023] When this utility model is used, the first clamping body 1 or the second clamping body 2 is connected to the installation platform via the first bolt 5 installed on the connector 6. The pipeline passes through the pipeline channel 3 to fix the pipeline. Since the connector 6 is clearance-fitted with the connecting through hole 4 on the first clamping body 1 or the second clamping body 2, the first clamping body 1 and the second clamping body 2 rotate accordingly when the pipeline rotates, thereby avoiding pipeline damage that may be caused by the first and second clamping bodies not rotating with the pipeline.

[0024] The above description is merely a specific embodiment of this utility model, but the protection scope of this utility model is not limited thereto. Any person skilled in the art can make many possible variations and modifications to the technical solution of this utility model, or modify it into equivalent embodiments with equivalent changes, without departing from the scope of the technical solution of this utility model. Therefore, any simple modifications, equivalent changes, and modifications made to the above embodiments based on the technical essence of this utility model without departing from the content of the technical solution of this utility model should fall within the protection scope of the technical solution of this utility model.

Claims

1. A rotating pipeline clamp structure, comprising a first clamping body (1) and a second clamping body (2), characterized in that, The first clamping body and the second clamping body are arranged opposite to each other, and the two ends of the first clamping body and the two ends of the second clamping body are respectively connected. A pipeline channel (3) is left between the middle part of the first clamping body and the middle part of the second clamping body. A connecting through hole is provided in the middle part of the first clamping body and / or the second clamping body. At least one of the connecting through holes is equipped with a connector for connecting to the installation platform, and the connecting through hole and the connector are clearance fit.

2. The rotary pipeline clamp structure according to claim 1, characterized in that, The connector includes a head and a connecting portion connected below the head. The outer diameter of the head is larger than the diameter of the connecting through hole, and the outer diameter of the connecting portion is smaller than the diameter of the connecting through hole.

3. The rotary pipeline clamp structure according to claim 1 or 2, characterized in that, The connector has a bolt hole in the middle, and the connector is rotatably connected to the mounting platform via a first bolt passing through the bolt hole.

4. The rotating pipeline clamp structure according to claim 3, characterized in that, The bolt hole is set below the upper surface of the connector, and when the first bolt is installed, the head of the first bolt is not higher than the upper surface of the connector.

5. The rotary pipeline clamp structure according to claim 1 or 2, characterized in that, The two ends of the first clamping body and the two ends of the second clamping body are respectively connected by the second bolt.