A boiler and steam cleaning machine

By setting up heating channels, vaporization channels, and insulation channels inside the boiler, the conversion rate and quantity of steam are improved, solving the problems of low vaporization efficiency and poor atomization effect in existing boilers, and achieving efficient steam generation and atomization.

CN224932704UActive Publication Date: 2026-11-03SHENZHEN KONKA INTELLIGENT ELECTRIC TECHNOLOGY CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202522457051.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-19
Publication Date
2026-11-03
Estimated Expiration
2035-11-19

AI Technical Summary

Technical Problem

Existing boilers have low vaporization efficiency, low steam volume, and poor atomization effect, and water is easily sprayed out of the steam outlet.

Method used

A heating channel and a vaporization channel are set up inside the boiler to form a vaporization insulation channel and an insulation channel. The heating element is wrapped around the heating channel, and the water gradually heats up in the heating channel and is vaporized under pressure in the vaporization channel. The steam is kept warm in the insulation channel, which extends the steam flow path to improve the steam volume and atomization effect.

Benefits of technology

It significantly improved the steam conversion rate, increased the steam volume to 30 mL/min, reduced water spraying, and improved the atomization effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224932704U_ABST
    Figure CN224932704U_ABST
Patent Text Reader

Abstract

A boiler and steam cleaning machine, the boiler comprises a boiler body, the boiler body includes a furnace core and a shell, the furnace core is arranged in the shell, one end of the boiler body is provided with a water inlet, the other end is provided with a steam outlet, the furnace core is provided with a heating component, the furnace core is provided with a heating channel for heating and warming water and a vaporization channel for water vaporization, the water inlet, the heating channel and the vaporization channel are sequentially communicated, the heating channel and the vaporization channel are arranged in a detour to each other, the outer wall of the furnace core and the inner wall of the shell form a vaporization heat preservation channel for continuous vaporization of water and steam heat preservation and pressure preservation and a heat preservation channel for steam heat preservation and pressure preservation, the vaporization heat preservation channel and the heat preservation channel are arranged around the periphery of the furnace core, the vaporization channel, the vaporization heat preservation channel, the heat preservation channel and the steam outlet are sequentially communicated. The boiler can greatly improve the steam conversion rate, improve the steam capacity of the boiler, thereby greatly reducing the water amount from the steam outlet, so that the steam outlet basically does not spray water, and the atomization effect is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of steam cleaning machine technology, and in particular to a boiler and a steam cleaning machine. Background Technology

[0002] Chinese Patent Document No. CN203379076U, published on January 8, 2014, discloses a vertical steam cleaner, comprising a base, a device body mounted on the base and rotatable at the bottom via a first rotating shaft, a water tank, and a steam system with a steam boiler. A first electric water pump is provided between the water tank and the steam boiler, and a first electric switch is configured on the first electric water pump. A switch assembly is provided on the handle, and the switch assembly includes a trigger and a trigger spring. The trigger has an external operating surface and an internal part, and the internal part of the trigger is kinetically connected to the first electric switch. A safety locking mechanism is provided between the base and the device body, and the safety locking mechanism includes a foot pedal component and a foot pedal spring. The foot pedal component has a footrest surface and a retaining part located inside the base. The foot pedal component is rotatably mounted on the base via a second rotating shaft. The boiler of this steam cleaner is similar to conventional boilers on the market, with low vaporization efficiency, resulting in low steam output (approximately 18 mL / min), poor atomization effect, and easy water spraying from the steam outlet.

[0003] Therefore, further improvements are necessary. Utility Model Content

[0004] The purpose of this utility model is to provide a boiler and steam cleaner with simple structure, high vaporization efficiency, large steam volume, good atomization effect, and strong practicality, so as to overcome the shortcomings of the prior art.

[0005] A boiler designed for this purpose includes a boiler body, characterized in that: the boiler body includes a furnace core and an outer shell, the furnace core is disposed inside the outer shell, one end of the boiler body is provided with a water inlet and the other end is provided with a steam outlet, a heating element is provided on the furnace core, a heating channel for heating and raising the temperature of water and a vaporization channel for vaporizing water are provided inside the furnace core, the water inlet, the heating channel and the vaporization channel are sequentially connected, the heating channel and the vaporization channel are arranged in a tortuous manner, a vaporization heat preservation channel for continuous vaporization of water and a heat preservation channel for heat preservation and pressure preservation of steam are formed between the outer wall of the furnace core and the inner wall of the outer shell, the vaporization heat preservation channel and the heat preservation channel are arranged around the periphery of the furnace core, and the vaporization channel, the vaporization heat preservation channel, the heat preservation channel and the steam outlet are sequentially connected.

[0006] The heating element is wound around the periphery of the heating channel. A notch is provided at one end of the furnace core. The water inlet connects to the beginning of the heating channel, and the end of the heating channel connects to the vaporization channel through the notch. The width of the heating channel gradually increases from the beginning to the end.

[0007] The vaporization channel includes a first channel and a second channel connected in sequence, with the first channel and the second channel distributed sequentially front and back. The heating channel is connected to the first channel, and the second channel is connected to the vaporization insulation channel. The width of the first channel is greater than the width of the second channel. The heating component is located on one side of the vaporization channel.

[0008] The heating channel is connected to the beginning of the first channel, the end of the first channel is connected to the beginning of the second channel, and the end of the second channel is connected to the vaporization insulation channel. The width of the beginning of the first channel gradually decreases to the end of the first channel, and the width of the beginning of the second channel gradually decreases to the end of the second channel.

[0009] The furnace core is provided with through holes, connecting ports and a first barrier rib on its side. The vaporization channel is connected to the vaporization insulation channel through the through holes, and the vaporization insulation channel is connected to the insulation channel through the connecting ports. The outer side of the first barrier rib abuts against the inner wall of the outer shell. The through holes are located on one side of the first barrier rib, and the connecting ports are located on the other side of the first barrier rib, so that the vaporization insulation channel is arranged around the periphery of the furnace core.

[0010] The outer ring of the furnace core is provided with a second barrier rib, the outer side of which abuts against the inner wall of the outer shell. The vaporization insulation channel and the insulation channel are separated from each other by the second barrier rib, and the connecting port is located on one side of the second barrier rib. The insulation channel and the vaporization insulation channel are distributed in sequence front and back.

[0011] The furnace core has a figure-eight shaped guide rib protruding from the front end, and the outer shell has a figure-eight shaped barrier guide rib. The guide ribs and the barrier guide ribs are interlocked, forming a heat insulation channel between the guide ribs, the barrier guide ribs and the inner wall of the outer shell. The furnace core has a flow channel on its side, and the connecting port is connected to the heat insulation channel through the flow channel. The flow channel is located on one side of the guide ribs and the barrier guide ribs, and the steam outlet is located on the other side of the guide ribs and the barrier guide ribs, so that the heat insulation channel is divided into a third channel and a fourth channel distributed vertically. The flow channel is connected to the steam outlet through the third channel and the fourth channel respectively.

[0012] The guide ribs are provided with insertion grooves, and the barrier guide ribs are provided with insertion parts, which are inserted into each other with the insertion grooves; the heat preservation channel is separated from the heating channel and the vaporization channel by the barrier guide ribs.

[0013] The heating element is a heating tube in a spiral shape. The furnace core and the heating element are integrally formed. The periphery of the heating element is close to the vaporization insulation channel and the insulation channel.

[0014] A steam cleaning machine designed for this purpose is characterized by including the aforementioned boiler.

[0015] This utility model boiler incorporates heating and vaporization channels within the furnace core. A vaporization and insulation channel is formed between the outer wall of the furnace core and the inner wall of the outer shell. Water enters the heating channel through the inlet and is first heated by heating components. The heating channel gradually widens, allowing the water to remain in the heating channel for a longer period, thus increasing the water temperature. The heated water then enters the vaporization channel to vaporize into steam. Here, the vaporization channel narrows, hindering the water flow and making it easier for the heated and pressurized water to vaporize, thereby improving vaporization efficiency. Most of the water vaporizes into steam within the vaporization channel, and then... Steam and a small amount of remaining water reach the vaporization and insulation channel. The remaining water absorbs heat from the outside of the furnace core and vaporizes. The heat from the outside of the furnace core keeps the steam warm, preventing it from liquefying and further improving vaporization efficiency. The steam then reaches the insulation channel and continues to absorb heat from the outside of the furnace core for insulation. Finally, the steam is discharged from the boiler through the steam outlet. This structure can greatly improve the steam conversion rate and increase the steam output of the boiler (up to 30 mL / min), thereby greatly reducing the amount of water coming out of the steam outlet, making the steam outlet virtually free of water spray, and improving the atomization effect. Attached Figure Description

[0016] Figure 1 This is a cross-sectional view of the boiler in one embodiment of the present invention.

[0017] Figure 2 This is a schematic diagram of the overall structure of the boiler in one embodiment of the present invention.

[0018] Figure 3 This is a cross-sectional view of the boiler from another position in one embodiment of the present invention.

[0019] Figure 4 This is a cross-sectional view of the boiler at the third position in one embodiment of the present invention.

[0020] Figure 5 This is a cross-sectional view of the boiler at the fourth position in one embodiment of the present invention.

[0021] Figure 6 This is a schematic diagram of the overall structure of the furnace core in one embodiment of the present invention.

[0022] Figure 7 This is an exploded view of the boiler in one embodiment of the present invention.

[0023] Figure 8 This is a schematic diagram of the overall structure of the furnace core from another position in one embodiment of the present invention.

[0024] Figure 9 This is a schematic diagram of the overall structure of the outer shell in one embodiment of the present invention.

[0025] Figure 10This is a cross-sectional view of a steam cleaner according to one embodiment of the present invention. Detailed Implementation

[0026] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0027] See Figures 1-10 This boiler includes a boiler body 1, which includes a furnace core 2 and an outer shell 3. The furnace core 2 is located inside the outer shell 3. The boiler body 1 has a water inlet 4 at the rear end and a steam outlet 5 at the front end. The furnace core 2 is equipped with a heating element 6. The furnace core 2 has a heating channel 7 for heating water and a vaporization channel 8 for vaporizing water. The water inlet 4, heating channel 7, and vaporization channel 8 are connected in sequence and are arranged in a meandering manner. The outer wall of the furnace core 2 and the inner wall of the outer shell 3 form a vaporization insulation channel 9 for continuous water vaporization and steam insulation and pressure maintenance, and an insulation channel 10 for steam insulation and pressure maintenance. The vaporization insulation channel 9 and insulation channel 10 are arranged around the furnace core 2. The vaporization channel 8, vaporization insulation channel 9, insulation channel 10, and steam outlet 5 are connected in sequence.

[0028] Heating element 6 is wound around the periphery of heating channel 7 to increase the contact area between furnace core 2 and heating element 6, thereby improving heating efficiency. Furnace core 2 has a notch 11 at the front end, and water inlet 4 connects to the beginning of heating channel 7. The end of heating channel 7 connects to vaporization channel 8 through notch 11. Hot water from heating channel 7 enters vaporization channel 8 through notch 11. The width of heating channel 7 gradually increases from the beginning to the end, which can reduce the water flow speed, allowing the water to stay in heating channel 7 for a longer time, and also increasing the contact area between water and furnace core 2, thus fully exchanging heat and increasing water temperature, making the water easier to vaporize. The water in heating channel 7 mainly absorbs heat from inside furnace core 2.

[0029] The vaporization channel 8 includes a first channel 12 and a second channel 13 connected in sequence. The first channel 12 and the second channel 13 are distributed one after the other. The heating channel 7 is connected to the first channel 12, and the second channel 13 is connected to the vaporization insulation channel 9. The width of the first channel 12 is greater than the width of the second channel 13. The heating component 6 is located on one side of the vaporization channel 8 and can continue to heat the water and steam in the vaporization channel 8, thereby vaporizing the water. The second channel 13 is narrower. When the water reaches the second channel 13, it will be pressurized. Most of the high-temperature and high-pressure water is vaporized in the second channel 13, while the water in the first channel 12 will be hindered by the steam in the second channel 13, resulting in a slower flow rate and a longer heating time. Moreover, the water is heated and pressurized, and some of the water will turn into steam, thereby improving the vaporization efficiency.

[0030] Heating channel 7 connects to the beginning of first channel 12, the end of first channel 12 connects to the beginning of second channel 13, and the end of second channel 13 connects to vaporization insulation channel 9. The width of first channel 12 gradually decreases from the beginning to the end, and the width of second channel 13 gradually decreases from the beginning to the end. This structure makes the water under pressure gradually increase, thus making it easier to turn into steam. The water in vaporization channel 8 mainly absorbs heat from inside furnace core 2.

[0031] The furnace core 2 has a through hole 14, a connecting port 15, and a first barrier rib 16 on its side. The vaporization channel 8 (second channel 13) is connected to the vaporization insulation channel 9 through the through hole 14. The vaporization insulation channel 9 is connected to the insulation channel 10 through the connecting port 15. The outer side of the first barrier rib 16 abuts against the inner wall of the outer shell 3. The through hole 14 is located on one side of the first barrier rib 16, and the connecting port 15 is located on the other side of the first barrier rib 16. The connecting port 15 is set close to the first barrier rib 16 so that the vaporization insulation channel 9 is arranged around the periphery of the furnace core 2. The water and steam entering the vaporization insulation channel 9 will circle the furnace core 2 before reaching the connecting port 15. The water and steam can fully absorb the heat outside the furnace core 2, so that the water will be basically vaporized, while the steam will be fully insulated, thereby improving the vaporization efficiency. The water and steam in the vaporization insulation channel 9 mainly absorb the heat from the rear end of the furnace core 2.

[0032] The outer ring of the furnace core 2 is provided with a second barrier rib 17. The outer side of the second barrier rib 17 abuts against the inner wall of the outer shell 3. The vaporization heat preservation channel 9 and the heat preservation channel 10 are separated from each other by the second barrier rib 17. The connecting port 15 is located on one side of the second barrier rib 17. The heat preservation channel 10 and the vaporization heat preservation channel 9 are distributed in sequence front and back.

[0033] The furnace core 2 has a protruding V-shaped guide rib 18 at its front end, and the outer shell 3 has a V-shaped barrier guide rib 19 at its front end. The guide rib 18 and the barrier guide rib 19 are interlocked, forming a heat-insulating channel 10 between the guide rib 18, the barrier guide rib 19, and the inner wall of the outer shell 3. The furnace core 2 has a flow channel 20 on its side, and the connecting port 15 connects to the heat-insulating channel 10 through the flow channel 20. The flow channel 20 passes through one side of the second barrier rib 17 to form the connecting port 15. The steam vaporizing the heat-insulating channel 9 passes through the connecting port 15 and the flow channel 20 to reach the heat-insulating channel 10. The flow channel 20 is located on one side of the guide rib 18 and the barrier guide rib 19, and the steam outlet 5 is located on the other side of the guide rib 18 and the barrier guide rib 19, dividing the heat-insulating channel 10 into a third channel 21 and a fourth channel 22 distributed vertically. The flow channel 20 passes through the third channel 21 and the fourth channel 22 respectively. 22 connects to steam outlet 5; the steam coming out of flow channel 20 will enter the third channel 21 and the fourth channel 22 respectively, and then the steam in the third channel 21 and the fourth channel 22 will flow to steam outlet 5 respectively, converge at steam outlet 5, and then be discharged from the boiler body 1 through steam outlet 5; the third channel 21 is shaped like one loop of the figure eight, and the fourth channel 22 is another loop of the figure eight, so that the steam has to go around once to reach steam outlet 5, extending the steam flow path, and the steam can fully absorb the heat outside the furnace core 2, improve the heat preservation effect, and prevent steam liquefaction; the steam in the heat preservation channel 10 mainly absorbs the heat at the front end of the furnace core 2; in summary, the heat inside the furnace core 2, outside the furnace core 2, rear end of the furnace core 2, and front end of the furnace core 2 are basically absorbed by water and steam, and the heat of the entire furnace core 2 can be basically utilized, thereby improving the steam conversion rate.

[0034] The guide rib 18 is provided with a plug groove 23, and the barrier guide rib 19 is provided with a plug part 24. The plug part 24 and the plug groove 23 are plugged into each other to connect the guide rib 18 and the barrier guide rib 19. The heat preservation channel 10 is separated from the heating channel 7 and the vaporization channel 8 (first channel 12) by the barrier guide rib 19 to prevent water in the heating channel 7 and the vaporization channel 8 from entering the heat preservation channel 10, and also to prevent steam in the heat preservation channel 10 from entering the heating channel 7 and the vaporization channel 8.

[0035] The flow guide rib 19 is provided with a first insertion hole 25 and a second insertion hole 26. The front end of the heating channel 7 is inserted into the first insertion hole 25, and the front end of the first channel 12 is inserted into the second insertion hole 26.

[0036] The flow guide rib 19 has a positioning part 27 in the middle, and the flow guide rib 18 has a positioning groove 28 in the middle. The positioning part 27 is inserted into the positioning groove 28 so that the outer shell 3 and the furnace core 2 are positioned relative to each other. The outer shell 3 and the furnace core 2 are connected by screws. The notch 11 is set in the middle of the flow guide rib 18, and the positioning grooves 28 are respectively set on both sides of the notch 11.

[0037] The outer shell 3 has a conical inner cavity 29, the furnace core 2 is conical and is inserted into the inner cavity 29; the water inlet 4 is located at the rear end of the furnace core 2, and the steam outlet 5 is located at the front end of the outer shell 3.

[0038] The heating element 6 is a heating tube and is spiral-shaped, which increases the contact area between the furnace core 2 and the heating element 6. The furnace core 2 and the heating element 6 are integrally die-cast to improve the heat transfer efficiency and allow the heat to be fully transferred to the furnace core 2. The periphery of the heating element 6 is close to the vaporization insulation channel 9 and the insulation channel 10, so that the heat can fully reach the vaporization insulation channel 9 and the insulation channel 10.

[0039] This steam cleaner includes a boiler, a connecting pipe 30, a floor brush 31, and a housing 32. The housing 32 contains an electrical cavity 33 and a receiving cavity 34. The boiler body 1 is located within the electrical cavity 33. A water tank 35 is located within the receiving cavity 34. One end of the water tank 35 has a water outlet connector 36, which is connected to a water inlet 4 via a water pipe. A water pump is installed inside the water tank 35, which pumps water from the tank to the heating channel 7. The housing 32 is connected to the floor brush 31 via the connecting pipe 30. The floor brush 31 has a steam port. The steam outlet 5, the connecting pipe 30, and the steam port are sequentially connected. Steam generated by the boiler body 1 reaches the steam port through the connecting pipe 30 and is released through the steam outlet to sterilize the surface of items. The above structure is existing technology and will not be described in detail here.

[0040] The above describes the preferred embodiments of this utility model, illustrating and describing its basic principles, main features, and advantages. Those skilled in the art should understand that this utility model is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of this utility model. Various changes and modifications can be made without departing from the spirit and scope of this utility model, and all such changes and modifications fall within the scope of the claims. The scope of protection of this utility model is defined by the appended claims and their equivalents.

Claims

1. A boiler, comprising a boiler body (1), characterized in that: The boiler body (1) includes a furnace core (2) and an outer shell (3). The furnace core (2) is located inside the outer shell (3). The boiler body (1) has a water inlet (4) at one end and a steam outlet (5) at the other end. A heating element (6) is provided on the furnace core (2). The furnace core (2) has a heating channel (7) for heating water and a vaporization channel (8) for vaporizing water. The water inlet (4), heating channel (7) and vaporization channel (8) are connected in sequence. The heating channel (7) and vaporization channel (8) are arranged in a meandering manner. A vaporization insulation channel (9) for continuous vaporization of water and a insulation channel (10) for steam insulation and pressure preservation are formed between the outer wall of the furnace core (2) and the inner wall of the outer shell (3). The vaporization insulation channel (9) and insulation channel (10) are arranged around the outer periphery of the furnace core (2). The vaporization channel (8), vaporization insulation channel (9), insulation channel (10) and steam outlet (5) are connected in sequence.

2. The boiler according to claim 1, characterized in that: The heating element (6) is wound around the periphery of the heating channel (7). The furnace core (2) has a notch (11) at one end. The water inlet (4) is connected to the beginning of the heating channel (7). The end of the heating channel (7) is connected to the vaporization channel (8) through the notch (11). The width of the beginning of the heating channel (7) gradually increases to the width of the end of the heating channel (7).

3. The boiler according to claim 1, characterized in that: The vaporization channel (8) includes a first channel (12) and a second channel (13) connected in sequence. The first channel (12) and the second channel (13) are distributed in front and behind each other. The heating channel (7) is connected to the first channel (12), and the second channel (13) is connected to the vaporization insulation channel (9). The width of the first channel (12) is greater than the width of the second channel (13). The heating component (6) is located on one side of the vaporization channel (8).

4. The boiler according to claim 3, characterized in that: The heating channel (7) is connected to the beginning of the first channel (12), the end of the first channel (12) is connected to the beginning of the second channel (13), and the end of the second channel (13) is connected to the vaporization insulation channel (9). The width of the beginning of the first channel (12) gradually decreases to the width of the end of the first channel (12), and the width of the beginning of the second channel (13) gradually decreases to the width of the end of the second channel (13).

5. The boiler according to claim 1, characterized in that: The furnace core (2) is provided with a through hole (14), a connecting port (15) and a first barrier rib (16) on the side. The vaporization channel (8) is connected to the vaporization insulation channel (9) through the through hole (14). The vaporization insulation channel (9) is connected to the insulation channel (10) through the connecting port (15). The outer side of the first barrier rib (16) abuts against the inner wall of the outer shell (3). The through hole (14) is located on one side of the first barrier rib (16), and the connecting port (15) is located on the other side of the first barrier rib (16), so that the vaporization insulation channel (9) is arranged around the periphery of the furnace core (2).

6. The boiler according to claim 5, characterized in that: The outer ring of the furnace core (2) is provided with a second barrier rib (17). The outer side of the second barrier rib (17) abuts against the inner wall of the outer shell (3). The vaporization insulation channel (9) and the insulation channel (10) are separated from each other by the second barrier rib (17). The connecting port (15) is located on one side of the second barrier rib (17). The insulation channel (10) and the vaporization insulation channel (9) are distributed in sequence.

7. The boiler according to claim 5, characterized in that: The furnace core (2) has a figure-eight shaped guide rib (18) protruding from the front end, and the outer shell (3) has a figure-eight shaped barrier guide rib (19) at the front end. The guide rib (18) and the barrier guide rib (19) are interlocked. A heat preservation channel (10) is formed between the guide rib (18), the barrier guide rib (19) and the inner wall of the outer shell (3). A flow channel (20) is provided on the side of the furnace core (2). The connecting port (15) is connected to the heat preservation channel (10) through the flow channel (20). The flow channel (20) is located on one side of the guide rib (18) and the barrier guide rib (19), and the steam outlet (5) is located on the other side of the guide rib (18) and the barrier guide rib (19) to divide the heat preservation channel (10) into a third channel (21) and a fourth channel (22) distributed vertically in sequence. The flow channel (20) is connected to the steam outlet (5) through the third channel (21) and the fourth channel (22) respectively.

8. The boiler according to claim 5, characterized in that: The guide rib (18) is provided with a plug groove (23), and the barrier guide rib (19) is provided with a plug part (24). The plug part (24) and the plug groove (23) are plugged into each other. The heat preservation channel (10) is separated from the heating channel (7) and the vaporization channel (8) by the barrier guide rib (19).

9. The boiler according to claim 1, characterized in that: The heating element (6) is a heating tube and is spiral in shape. The furnace core (2) and the heating element (6) are integrally formed. The periphery of the heating element (6) is close to the vaporization insulation channel (9) and the insulation channel (10).

10. A steam cleaner, characterized in that: Including the boiler as described in any one of claims 1-9.

Citation Information

Patent Citations

  • Vertical type steam cleaner

    CN203379076U