A desulfurization slurry supply system for an absorption tower
The absorption tower desulfurization slurry supply system with dual slurry tanks, dual pumps, and multiple pipelines solves the problem of downtime caused by pipeline blockage or slurry pump failure, achieves uninterrupted slurry supply, reduces maintenance costs and environmental risks, and improves desulfurization efficiency.
Patent Information
- Application Number
- CN202522562088.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-02
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-02
AI Technical Summary
Existing desulfurization slurry supply systems are prone to shutdown when pipelines are blocked or slurry pumps malfunction, leading to reduced desulfurization efficiency and the risk of exceeding environmental standards, and also incurring high maintenance costs.
Design a desulfurization slurry supply system for an absorber tower. The system adopts a dual slurry tank, dual pump, and multi-pipeline structure. It achieves multi-path slurry supply through connecting pipelines and cross-diameter connecting pipelines, ensuring that slurry supply can continue through another path in the event of a failure in one pipeline, and allowing for timely repair.
This enables uninterrupted slurry supply even in the event of pipeline failure, reducing downtime losses, avoiding the risk of exceeding environmental standards, and improving the reliability and efficiency of the desulfurization system.
Smart Images

Figure CN224976140U_ABST
Abstract
Description
Technical Field
[0001] This disclosure relates to the field of desulfurization technology, specifically to a desulfurization slurry supply system for an absorption tower. Background Technology
[0002] Currently, wet desulfurization technology is widely used due to its mature process and high desulfurization efficiency. The process involves pumping limestone slurry into the desulfurization absorption tower for desulfurization. Most current desulfurization slurry supply systems adopt a "single slurry tank - single pump - single pipeline" slurry supply mode.
[0003] This slurry supply method has certain problems, such as a high risk of supply interruption: the slurry tank and the slurry pump are tied together, and there is no alternative slurry source when the limestone slurry tank pipeline is blocked. When the pipeline is blocked, the machine needs to be shut down for treatment. However, because limestone slurry has a high solids content (20%-30%), it is prone to sedimentation and blockage. Unblocking requires dismantling the pipeline, and a single downtime loss is about 120,000 yuan. In addition, faults are generally detected manually. From fault detection to switching to backup equipment, the average time is 15-20 minutes. During this period, the sulfur dioxide emission concentration exceeds 50mg / Nm³ (ultra-low emission standard), which poses a risk of environmental penalties.
[0004] Therefore, there is an urgent need for a desulfurization slurry supply system for absorption towers that can supply slurry without interruption even when problems such as pipeline blockage occur. Utility Model Content
[0005] The purpose of this disclosure is to provide a desulfurization slurry supply system for an absorber tower, which solves the problem that existing systems require shutdown due to pipeline blockage or slurry pump damage, thereby affecting continuous slurry supply and causing losses.
[0006] To achieve the above objectives, a first aspect of this disclosure provides an absorber desulfurization slurry supply system for supplying slurry to an absorber, comprising: At least two slurry tanks are provided, and each slurry tank is equipped with a first outlet pipe and a second outlet pipe. The first outlet pipe and the second outlet pipe are respectively equipped with a manual gate valve and a pressure gauge. The first outlet main pipe is connected to the first outlet pipe on each of the slurry tanks; The second outlet main pipe is connected to the second outlet pipe on each of the slurry tanks; The first connecting pipeline group has its inlet end connected to the first outlet main pipe and its outlet end connected to the absorption tower. The second connecting pipeline group has its inlet end connected to the second outlet main pipe and its outlet end connected to the absorption tower.
[0007] In some embodiments, there are two slurry tanks and two absorption towers, namely a first absorption tower and a second absorption tower. The outlet end of the first connecting pipeline is connected to the first absorption tower, and the outlet end of the second connecting pipeline is connected to the second absorption tower.
[0008] In some embodiments, the first communication conduit includes: The first grout supply pipe is equipped with a first grout supply pump and a first control valve. The second grout supply pipe is equipped with a second grout supply pump and a second control valve. The inlet ends of the first slurry supply pipe and the second slurry supply pipe are connected in parallel to each other and connected to the first outlet main pipe. The outlet ends of the first slurry supply pipe and the second slurry supply pipe are connected in parallel to each other and connected to the first absorption tower.
[0009] In some embodiments, the second communication conduit includes: The third grout supply pipe is equipped with a third grout supply pump and a third control valve; The fourth grout supply pipe is equipped with a fourth grout supply pump and a fourth control valve. The inlet ends of the third and fourth slurry supply pipes are connected in parallel to each other and connected to the second outlet main pipe. The outlet ends of the third and fourth slurry supply pipes are connected in parallel to each other and connected to the second absorption tower.
[0010] In some embodiments, the absorber desulfurization slurry supply system further includes: The first input pipe, the outlet ends of the first slurry supply pipe and the second slurry supply pipe are connected in parallel to each other and communicate with the first input pipe; The first inlet main pipe is connected to the first absorption tower; A first connecting pipe, on which a first valve is provided; A second connecting pipe, on which a second valve is provided; The inlet ends of the first connecting pipe and the second connecting pipe are connected in parallel and communicate with the first input pipe. The outlet ends of the first connecting pipe and the second connecting pipe are connected in parallel and communicate with the first inlet main pipe.
[0011] In some embodiments, the absorber desulfurization slurry supply system further includes: The outlet ends of the second input pipe, the third slurry supply pipe and the fourth slurry supply pipe are connected in parallel to each other and communicate with the second input pipe; The second inlet main pipe is connected to the second absorption tower; A third connecting pipe, on which a third valve is provided; The fourth connecting pipe is equipped with a fourth valve; The inlet ends of the third connecting pipe and the fourth connecting pipe are connected in parallel and communicate with the second input pipe. The outlet ends of the third connecting pipe and the fourth connecting pipe are connected in parallel and communicate with the second inlet main pipe.
[0012] In some embodiments, the absorber desulfurization slurry supply system further includes a cross-diameter connecting pipe, one end of which is connected to the first input pipe and the other end of which is connected to the second input pipe; A connection control valve is installed on the span connection pipe.
[0013] In some embodiments, the absorber desulfurization slurry supply system further includes: The first return pipe is connected at one end to the first input pipe, and at the other end is connected to the two slurry tanks through the first branch pipe. The second return pipe is connected at one end to the second input pipe, and at the other end is connected to the two slurry tanks through the second branch pipe; A reflux valve is installed on the first branch pipe and the second branch pipe respectively.
[0014] In some embodiments, the absorber desulfurization slurry supply system further includes: A first AFT tower, with a first absorption tube connected to the first AFT tower; The first receiving tube has one end connected to the first input tube; The first pipeline is equipped with a first absorption valve; The second pipeline is equipped with a second absorption valve; The inlet ends of the first pipeline and the second pipeline are connected in parallel to each other and are connected to the first receiving pipe. The outlet ends of the first pipeline and the second pipeline are connected in parallel to each other and are connected to the first absorption pipe.
[0015] In some embodiments, the absorber desulfurization slurry supply system further includes: A second AFT tower, with a second absorption tube connected to it; The second connector has one end connected to the second input connector; The third pipeline is equipped with a third absorption valve; The fourth pipeline is equipped with a fourth absorption valve; The inlet ends of the third pipeline and the fourth pipeline are connected in parallel and communicate with the second receiving pipe. The outlet ends of the third pipeline and the fourth pipeline are connected in parallel and communicate with the second absorption pipe.
[0016] Through the aforementioned technical solution, utilizing the first and second connecting pipeline groups, the limestone slurry in the slurry tank enters the absorption tower for desulfurization treatment from both directions during slurry supply. This allows for continuous slurry supply even if one pipeline becomes blocked, using the other direction for ongoing supply. This enables slurry supply without shutting down the system and facilitates repair of any problematic pipeline, minimizing downtime losses. Furthermore, the use of cross-diameter connecting pipes allows for cross-path slurry supply and replenishment, preventing losses due to absorption tower shutdowns.
[0017] Other features and advantages of this disclosure will be described in detail in the following detailed description section. Attached Figure Description
[0018] The accompanying drawings are provided to further illustrate the present disclosure and form part of the specification. They are used together with the following detailed description to explain the present disclosure, but do not constitute a limitation thereof. In the drawings: Figure 1 This is a schematic diagram of the overall structure of the desulfurization slurry supply system for the absorption tower provided in this embodiment.
[0019] Explanation of reference numerals in the attached figures 1. Slurry tank; 11. First outlet pipe; 12. Second outlet pipe; 13. Manual gate valve; 14. First outlet main pipe; 15. Second outlet main pipe; 2. First connecting pipe assembly; 21. First slurry supply pipe; 22. First slurry supply pump; 23. First control valve; 24. Second slurry supply pipe; 25. Second slurry supply pump; 26. Second control valve; 3. Second connecting pipe assembly; 31. Third slurry supply pipe; 32. Third slurry supply pump; 33. Third control valve; 34. Fourth slurry supply pipe; 35. Fourth slurry supply pump; 36. Fourth control valve; 4. First absorption tower; 41. First input pipe; 42. First connecting pipe; 43. First valve; 44. Second connecting pipe; 45. Second valve; 46. First inlet main pipe 5. Second Absorber Tower; 51. Second Inlet Pipe; 52. Second Inlet Main Pipe; 53. Third Connecting Pipe; 54. Third Valve; 55. Fourth Connecting Pipe; 56. Fourth Valve; 6. Span Connection Pipe; 61. Connection Control Valve; 71. First Return Slurry Pipe; 72. First Branch Pipe; 73. Second Return Slurry Pipe; 74. Second Branch Pipe; 75. Return Valve; 8. First AFT Tower; 81. First Absorber Pipe; 82. First Connecting Pipe; 83. First Pipeline; 84. First Absorber Valve; 85. Second Pipeline; 86. Second Absorber Valve; 9. Second AFT Tower; 91. Second Absorber Pipe; 92. Second Connecting Pipe; 93. Third Pipeline; 94. Third Absorber Valve; 95. Fourth Pipeline; 96. Fourth Absorber Valve. Detailed Implementation
[0020] The specific embodiments of this disclosure will be described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are for illustration and explanation only and are not intended to limit this disclosure.
[0021] This disclosure provides a desulfurization slurry supply system for an absorption tower. This system can be used on the absorption tower to supply slurry to the absorption tower. In the event of a failure in any pipeline or pump, the backup system can be switched in a timely manner, effectively avoiding the risk of reduced desulfurization efficiency and exceeding environmental standards due to slurry supply interruption.
[0022] like Figure 1 As shown, the desulfurization slurry supply system of the absorption tower includes a slurry tank 1, a first outlet main pipe 14, a second outlet main pipe 15, a first connecting pipeline group 2, and a second connecting pipeline group 3. At least two slurry tanks 1 are provided, each connected to a first outlet pipeline 11 and a second outlet pipeline 12. Manual gate valves 13 and pressure gauges are respectively installed on the first outlet pipeline 11 and the second outlet pipeline 12. The first outlet main pipe 14 is connected to the first outlet pipeline 11 of each slurry tank 1, and the second outlet main pipe 15 is connected to the second outlet pipeline 12 of each slurry tank 1. The inlet end of the first connecting pipeline group 2 is connected to the first outlet main pipe 14, and the outlet end is connected to the absorption tower. The inlet end of the second connecting pipeline group 3 is connected to the second outlet main pipe 15, and the outlet end is connected to the absorption tower.
[0023] With this structural design, during slurry supply, all manual gate valves 13 can be opened, allowing the limestone slurry in the slurry tank 1 to enter the absorption tower through the first outlet main pipe 14 and the first connecting pipeline group 2. Alternatively, the limestone slurry can enter the absorption tower through the second outlet main pipe 15 and the second connecting pipeline. This allows the slurry to enter the absorption tower from multiple different directions. If a blockage occurs in one pipeline, slurry supply can continue using another pipeline, allowing for slurry supply without shutting down the system and enabling repairs to be made to the problematic pipeline, thus reducing downtime losses. Furthermore, the pressure gauge will show a sudden pressure increase if the manual gate valve 13 in the first outlet pipe 11 or the second outlet pipe 12 becomes blocked, indicating a blockage in the corresponding pipeline. If all pipelines are functioning normally and are not blocked, the pressure gauge reading will be normal. For example, if all pressure gauges show normal pressure (0.2-0.4 MPa), then all pipelines are operating normally. However, if the pressure gauge on one pipeline shows a sudden increase in pressure (if the reading is >0.8 MPa), while the other pressure gauges remain at 0.2-0.4 MPa, creating a significant pressure difference (ΔP >0.6 MPa), it indicates that the pipeline with the sudden increase in reading is blocked. In this case, the pipeline should be shut down and dealt with promptly, while the other pipelines continue to supply slurry normally.
[0024] like Figure 1 As mentioned above, there are two slurry tanks 1 and two absorption towers, namely a first absorption tower 4 and a second absorption tower 5. The outlet end of the first connecting pipeline is connected to the first absorption tower 4, and the outlet end of the second connecting pipeline is connected to the second absorption tower 5.
[0025] By using two slurry tanks and two absorption towers, the demand for sufficient slurry supply can be met, and multiple absorption towers can receive slurry for desulfurization treatment, thereby improving the desulfurization efficiency.
[0026] In some embodiments, such as Figure 1 As shown, the aforementioned first connecting pipeline includes a first slurry supply pipe 21 and a second slurry supply pipe 24. A first slurry supply pump 22 and a first control valve 23 are installed on the first slurry supply pipe 21, and a second slurry supply pump 25 and a second control valve 26 are installed on the second slurry supply pipe 24. The inlet ends of the first slurry supply pipe 21 and the second slurry supply pipe 24 are connected in parallel and communicate with the first outlet main pipe 14. The outlet ends of the first slurry supply pipe 21 and the second slurry supply pipe 24 are connected in parallel and communicate with the first absorption tower 4.
[0027] With this structure, when the first slurry pump 22 and the second slurry pump 25 are turned on, the slurry can enter the first absorption tower 4 through the first slurry pipe 21 and the second slurry pipe 24 to meet the slurry supply requirements. When the first slurry pipe 21 or the second slurry pump 25 malfunctions, a timely response can be made by closing the first control valve 23 and opening the second control valve 26, so that the second slurry pump can run at full speed without delaying the slurry supply to the first absorption tower 4. In this way, when the first slurry pipe 21 or the first slurry pump 22 is being processed, the continued supply of slurry to the first absorption tower 4 for desulfurization will not be affected.
[0028] Furthermore, such as Figure 1 As shown, the aforementioned second connecting pipeline includes a third slurry supply pipe 31 and a fourth slurry supply pipe 34. A third slurry supply pump 32 and a third control valve 33 are installed on the third slurry supply pipe 31, and a fourth slurry supply pump 35 and a fourth control valve 36 are installed on the fourth slurry supply pipe 34. The inlet ends of the third slurry supply pipe 31 and the fourth slurry supply pipe 34 are connected in parallel and communicate with the second outlet main pipe 15. The outlet ends of the third slurry supply pipe 31 and the fourth slurry supply pipe 34 are connected in parallel and communicate with the second absorption tower 5.
[0029] Thus, when the third slurry pump 32 and the fourth slurry pump 35 are turned on, the slurry can enter the second absorption tower 5 through the first slurry pipe 21 and the second slurry pipe 24 to carry out desulfurization in the second absorption tower 5. If the third slurry pipe 31 or the third slurry pump 32 malfunctions, the third control valve 33 can be closed in time and the fourth control valve 36 can be opened, so that the other fourth slurry pump can run at full speed without delaying the supply of slurry to the second absorption tower 5. Conversely, the third slurry pipe 31 can be used for slurry supply. In this way, when dealing with the faulty part, the continued supply of slurry to the second absorption tower 5 for desulfurization will not be affected.
[0030] In some embodiments, such as Figure 1 As shown, the above-mentioned desulfurization slurry supply system for the absorption tower also includes a first input pipe 41, a first inlet main pipe 46, a first connecting pipe 42, and a second connecting pipe 44. The outlet ends of the first slurry supply pipe 21 and the second slurry supply pipe 24 are connected in parallel to each other and communicate with the first input pipe 41. The first inlet main pipe 46 is connected to the first absorption tower 4. Furthermore, a first valve 43 is installed on the first connecting pipe 42, and a second valve 45 is installed on the second connecting pipe 44. The inlet ends of the first connecting pipe 42 and the second connecting pipe 44 are connected in parallel to each other and communicate with the first input pipe 41. The outlet ends of the first connecting pipe 42 and the second connecting pipe 44 are connected in parallel to each other and communicate with the first inlet main pipe 46.
[0031] With the above structure, after opening the first valve 43 and the second valve 45, the slurry passing through the first connecting pipeline can enter the first absorption tower 4 through the first connecting pipe 42, the second connecting pipe 44, and the first inlet main pipe 46, respectively, that is, it enters the first absorption tower 4 through two paths. In this way, if one pipeline becomes blocked or has other problems, the other pipeline can be used to supply slurry, avoiding the problem of needing to shut down the unit for maintenance due to pipeline blockage and thus being unable to continuously supply slurry to the first absorption tower 4.
[0032] In a further embodiment, such as Figure 1 As shown, the above-mentioned desulfurization slurry supply system for the absorption tower also includes a second input pipe 51, a second inlet main pipe 52, a third connecting pipe 53, and a fourth connecting pipe 55. The outlet ends of the third slurry supply pipe 31 and the fourth slurry supply pipe 34 are connected in parallel and communicate with the second input pipe 51. The second inlet main pipe 52 is connected with the second absorption tower 5. Furthermore, a third valve 54 is installed on the third connecting pipe 53, and a fourth valve 56 is installed on the fourth connecting pipe 55. The inlet ends of the third connecting pipe 53 and the fourth connecting pipe 55 are connected in parallel and communicate with the second input pipe 51. The outlet ends of the third connecting pipe 53 and the fourth connecting pipe 55 are connected in parallel and communicate with the second inlet main pipe 52.
[0033] Thus, when supplying slurry to the second absorption tower 5, the third valve 54 and the fourth valve 56 can be opened, allowing the slurry from the second connecting pipeline to enter the second absorption tower 5 through the second input pipe 51, the first connecting pipe 42, the second connecting pipe 44, and the second inlet main pipe 52, respectively. This allows the slurry to enter the second absorption tower 5 through two paths. In this way, if one pipeline becomes blocked or encounters other problems, the other pipeline can be used for slurry supply, avoiding the problem of needing to shut down the unit due to pipeline blockage and thus preventing continuous slurry supply to the second absorption tower 5.
[0034] Furthermore, such as Figure 1 As shown, the above-mentioned absorption tower desulfurization slurry supply system also includes a cross-diameter connecting pipe 6. One end of the cross-diameter connecting pipe 6 is connected to the first input pipe 41, and the other end is connected to the second input pipe 51. A connecting control valve 61 is installed on the cross-diameter connecting pipe 6.
[0035] The cross-path slurry supply and replenishment operations can be achieved through the cross-path slurry connection pipe 6. For example, when both pipes in the first cross-path slurry group 2 experience problems, the first valve 43 and the second valve 45 can be closed, and the third valve 54 and the fourth valve 56 can be opened. This allows slurry to be supplied to the first absorption tower 4 through the second cross-path slurry group 3, the second input pipe 51, the cross-path slurry connection pipe 6, and the first input pipe 41, preventing problems caused by the first absorption tower 4 shutting down. Correspondingly, when the pipes in the second cross-path slurry group 3 are blocked, or when the third slurry pump 32 or the fourth slurry pump 35 malfunction, slurry can be supplied to the second absorption tower 5 through the first cross-path slurry group 2, the first input pipe 41, the cross-path slurry connection pipe 6, and the second input pipe. When the entire pipeline is functioning properly, the connection control valve 61 on the cross-path slurry connection pipe 6 can be closed to prevent slurry from running on this pipeline.
[0036] In some embodiments, the absorber desulfurization slurry supply system further includes a first slurry return pipe 71 and a second slurry return pipe 73. One end of the first slurry return pipe 71 is connected to the first input pipe 41, and the other end is connected to two slurry tanks 1 via a first branch pipe 72. One end of the second slurry return pipe 73 is connected to the second input pipe 51, and the other end is connected to two slurry tanks 1 via a second branch pipe 74. Additionally, a reflux valve 75 is provided on both the first branch pipe 72 and the second branch pipe 74.
[0037] By utilizing the first return slurry pipe 71 and the second return slurry pipe 73, multi-path slurry transportation can be better realized. For example, when the first connecting pipe 42 or the second connecting pipe 44 becomes blocked, the first connecting pipeline group 2 can still be operated to input the slurry into another slurry tank 1, so that the slurry is input into the second absorption tower 5 through the other slurry tank 1 and the second connecting pipeline group 3. This makes the slurry input in the entire system more flexible.
[0038] In some embodiments, such as Figure 1 As shown, the above-mentioned absorption tower desulfurization slurry supply system also includes a first AFT tower 8, a first connecting pipe 82, a first pipeline 83, and a second pipeline 85. Specifically, a first absorption pipe 81 is connected to the first AFT tower 8, and one end of the first connecting pipe 82 is connected to a first input pipe 41. A first absorption valve 84 is installed on the first pipeline 83, and a second absorption valve 86 is installed on the second pipeline 85. The inlet ends of the first pipeline 83 and the second pipeline 85 are connected in parallel and communicate with the first connecting pipe 82. The outlet ends of the first pipeline 83 and the second pipeline 85 are connected in parallel and communicate with the first absorption pipe 81.
[0039] Using the above structure, during the slurry supply process, a portion of the slurry from the first input pipe 41 can enter the first AFT tower 8 through the first connecting pipe 82, etc., allowing for further operations on the slurry in the first AFT tower 8 to ensure rapid and thorough desulfurization treatment. The first pipeline 83, the second pipeline 85, and the first absorption valve 84 and the second absorption valve 86 are provided to ensure continuous system operation by supplying slurry through the other pipeline should one pipeline become blocked.
[0040] Furthermore, such as Figure 1 As shown, the desulfurization slurry supply system of the absorption tower also includes a second AFT tower 9, a second connecting pipe 92, a third pipe 93, and a fourth pipe 95. A second absorption pipe 91 is connected to the second AFT tower 9, and one end of the second connecting pipe 92 is connected to the second input pipe 51. In addition, a third absorption valve 94 is installed on the third pipe 93, and a fourth absorption valve 96 is installed on the fourth pipe 95. The inlet ends of the third pipe 93 and the fourth pipe 95 are connected in parallel to each other and are connected to the second connecting pipe 92. The outlet ends of the third pipe 93 and the fourth pipe 95 are connected in parallel to each other and are connected to the second absorption pipe 91.
[0041] In this way, during slurry supply, a portion of the slurry from the second input pipe 51 can enter the second AFT tower 9 through the second connecting pipe 92 and other pipelines, allowing for further processing of the slurry in the second AFT tower 9 to fully perform additional desulfurization treatment. The third pipeline 93, the fourth pipeline 95, and the third absorption valve 94 and the fourth absorption valve 96 are also provided to ensure continuous system operation by supplying slurry through the other pipeline in case of blockage in one pipeline.
[0042] The preferred embodiments of this disclosure have been described in detail above with reference to the accompanying drawings. However, this disclosure is not limited to the specific details of the above embodiments. Within the scope of the technical concept of this disclosure, various simple modifications can be made to the technical solutions of this disclosure, and these simple modifications all fall within the protection scope of this disclosure.
[0043] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, this disclosure will not describe the various possible combinations separately.
[0044] Furthermore, various different embodiments of this disclosure can be combined in any way, as long as they do not violate the spirit of this disclosure, they should also be regarded as the content disclosed in this disclosure.
Claims
1. An absorbent tower desulfurization slurry supply system for supplying slurry to an absorbent tower, characterized by, include: At least two slurry tanks are provided, and each slurry tank is equipped with a first outlet pipe and a second outlet pipe. The first outlet pipe and the second outlet pipe are respectively equipped with a manual gate valve and a pressure gauge. The first outlet main pipe is connected to the first outlet pipe on each of the slurry tanks; The second outlet main pipe is connected to the second outlet pipe on each of the slurry tanks; The first connecting pipeline group has its inlet end connected to the first outlet main pipe and its outlet end connected to the absorption tower. The second connecting pipeline group has its inlet end connected to the second outlet main pipe and its outlet end connected to the absorption tower.
2. The slurry supply system for an absorption tower desulfurization according to claim 1, characterized by, The slurry tank is provided in two ways, and the absorption tower is provided in two ways, namely the first absorption tower and the second absorption tower. The outlet end of the first connecting pipeline is connected to the first absorption tower, and the outlet end of the second connecting pipeline is connected to the second absorption tower.
3. The slurry supply system for an absorption tower desulfurization according to claim 2, characterized by, The first communication conduit includes: The first grout supply pipe is equipped with a first grout supply pump and a first control valve. The second grout supply pipe is equipped with a second grout supply pump and a second control valve. The inlet ends of the first slurry supply pipe and the second slurry supply pipe are connected in parallel to each other and connected to the first outlet main pipe. The outlet ends of the first slurry supply pipe and the second slurry supply pipe are connected in parallel to each other and connected to the first absorption tower.
4. The slurry supply system for an absorption tower desulfurization according to claim 3, characterized by, The second communication conduit includes: The third grout supply pipe is equipped with a third grout supply pump and a third control valve; The fourth grout supply pipe is equipped with a fourth grout supply pump and a fourth control valve. The inlet ends of the third and fourth slurry supply pipes are connected in parallel to each other and connected to the second outlet main pipe. The outlet ends of the third and fourth slurry supply pipes are connected in parallel to each other and connected to the second absorption tower.
5. The slurry supply system for an absorption tower desulfurization according to claim 4, wherein The absorber desulfurization slurry supply system also includes: The first input pipe, the outlet ends of the first slurry supply pipe and the second slurry supply pipe are connected in parallel to each other and communicate with the first input pipe; The first inlet main pipe is connected to the first absorption tower; A first connecting pipe, on which a first valve is provided; A second connecting pipe, on which a second valve is provided; The inlet ends of the first connecting pipe and the second connecting pipe are connected in parallel and communicate with the first input pipe. The outlet ends of the first connecting pipe and the second connecting pipe are connected in parallel and communicate with the first inlet main pipe.
6. The slurry supply system for an absorption tower desulfurization according to claim 5, wherein The absorber desulfurization slurry supply system also includes: The outlet ends of the second input pipe, the third slurry supply pipe and the fourth slurry supply pipe are connected in parallel to each other and communicate with the second input pipe; The second inlet main pipe is connected to the second absorption tower; A third connecting pipe, on which a third valve is provided; The fourth connecting pipe is equipped with a fourth valve; The inlet ends of the third connecting pipe and the fourth connecting pipe are connected in parallel and communicate with the second input pipe. The outlet ends of the third connecting pipe and the fourth connecting pipe are connected in parallel and communicate with the second inlet main pipe.
7. The slurry supply system for an absorption tower desulfurization according to claim 6, characterized by, The desulfurization slurry supply system of the absorption tower also includes a cross-diameter connecting pipe, one end of which is connected to the first input pipe and the other end of which is connected to the second input pipe; A connection control valve is installed on the span connection pipe.
8. The slurry supply system for an absorption tower desulfurization according to claim 6, characterized by, The absorber desulfurization slurry supply system also includes: The first return pipe is connected at one end to the first input pipe, and at the other end is connected to the two slurry tanks through the first branch pipe. The second return pipe is connected at one end to the second input pipe, and at the other end is connected to the two slurry tanks through the second branch pipe; A reflux valve is installed on the first branch pipe and the second branch pipe respectively.
9. The slurry supply system for an absorption tower desulfurization according to claim 6, wherein The absorber desulfurization slurry supply system also includes: A first AFT tower, with a first absorption tube connected to the first AFT tower; The first receiving tube has one end connected to the first input tube; The first pipeline is equipped with a first absorption valve; The second pipeline is equipped with a second absorption valve; The inlet ends of the first pipeline and the second pipeline are connected in parallel to each other and are connected to the first receiving pipe. The outlet ends of the first pipeline and the second pipeline are connected in parallel to each other and are connected to the first absorption pipe.
10. The slurry supply system for an absorption tower desulfurization according to claim 6, characterized by, The absorber desulfurization slurry supply system also includes: A second AFT tower, with a second absorption tube connected to it; The second connector has one end connected to the second input connector; The third pipeline is equipped with a third absorption valve; The fourth pipeline is equipped with a fourth absorption valve; The inlet ends of the third pipeline and the fourth pipeline are connected in parallel and communicate with the second receiving pipe. The outlet ends of the third pipeline and the fourth pipeline are connected in parallel and communicate with the second absorption pipe.