A high-concentration hydrochloric acid regeneration system
By connecting a falling film absorption tower and a packed absorption tower in series in the hydrochloric acid regeneration system, and using a countercurrent contact method to treat high and low concentrations of hydrogen chloride, the problems of high energy consumption and low absorption efficiency in the existing technology are solved, and a highly efficient and stable hydrochloric acid regeneration effect is achieved.
Patent Information
- Application Number
- CN202522619173.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-10
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-10
Smart Images

Figure CN224976399U_ABST
Abstract
Description
Technical Field
[0001] This application belongs to the field of acid regeneration technology, and specifically relates to a high-concentration hydrochloric acid regeneration system. Background Technology
[0002] Currently, mainstream hydrochloric acid regeneration technologies in industry include spray roasting, diaphragm electrolysis, and extraction. Among these, spray roasting has become the most widely used technology due to its advantages such as large processing capacity, high regeneration efficiency, and simultaneous recovery of metal oxides. The core principle of this method is to atomize a high-concentration chloride solution and send it into a high-temperature roasting furnace. Through hydrolysis, metal oxides and hydrogen chloride gas are generated. The hydrogen chloride is then recovered by an absorption device to regenerate hydrochloric acid, while the metal oxides are recycled as byproducts.
[0003] However, in practical applications, existing spray roasting hydrochloric acid regeneration systems use multiple absorption towers of the same type for hydrogen chloride absorption. Single-stage absorption is difficult to achieve deep purification of hydrogen chloride, while multiple absorption towers of the same type suffer from high energy consumption and diminishing marginal benefits of absorption efficiency, resulting in poor stability of regenerated hydrochloric acid concentration. Utility Model Content
[0004] In view of the technical problems existing in the background art, this application provides a high-concentration hydrochloric acid regeneration system, comprising: The spray roasting device converts a high-concentration chloride salt solution into metal oxides and hydrogen chloride through a high-temperature hydrolysis reaction. An oxide collection device is connected to the spray roasting device via a gas delivery pipeline; A dust removal device is connected to the flue gas outlet of the spray roasting device; A flue gas cooling device is connected to the flue gas outlet of the spray roasting device and connected in series after the dust removal device; An acid absorption device includes a falling film absorption tower and a packed absorption tower. The falling film absorption tower is connected to the outlet pipe of the flue gas cooling device via an acid-resistant pipe. The packed absorption tower is connected in series after the falling film absorption tower. The exhaust gas treatment device is connected after the acid absorption device.
[0005] In some embodiments, the falling film absorption tower is provided in one stage or in series with multiple stages.
[0006] In some embodiments, the acid absorption device includes a primary falling film absorption tower and a secondary falling film absorption tower, wherein a regenerated acid storage tank is provided at the outlet end of the primary falling film absorption tower.
[0007] In some embodiments, a secondary transfer tank is provided at the outlet end of the secondary falling film absorption tower, and the secondary transfer tank is connected to the regenerated acid storage tank.
[0008] In some embodiments, a secondary transfer tank is provided at the outlet end of the secondary falling film absorption tower, and a primary transfer tank is provided at the outlet end of the packed absorption tower. The secondary transfer tank is connected to the regenerated acid storage tank, and the primary transfer tank is connected to the secondary transfer tank.
[0009] In some embodiments, the flue gas cooling device is provided in one stage or in series with multiple stages.
[0010] In some embodiments, the oxide collecting device includes: An oxide silo receives metal oxide particles from the spray roasting device via a gas delivery pipeline; An oxide dust collector is installed on top of the oxide silo to filter the conveyed gas.
[0011] In some embodiments, the dust removal device includes: dust collector; The return pipe is used to transport the dust collected by the dust collector back to the spray roasting device.
[0012] In some embodiments, the exhaust gas treatment device includes: A scrubbing tower, which has multiple stages, is used to purify the residual exhaust gas after acid absorption.
[0013] In some embodiments, the exhaust gas treatment device further includes: A conveying fan is installed before the multi-stage scrubbing tower to keep the entire process from the spray roasting device to the conveying fan under negative pressure.
[0014] This application provides a high-concentration hydrochloric acid regeneration system, comprising: The spray roasting device converts a high-concentration chloride salt solution into metal oxides and hydrogen chloride through a high-temperature hydrolysis reaction. An oxide collection device is connected to the spray roasting device via a gas delivery pipeline; A dust removal device is connected to the flue gas outlet of the spray roasting device; A flue gas cooling device is connected to the flue gas outlet of the spray roasting device and connected in series after the dust removal device; An acid absorption device includes a falling film absorption tower and a packed absorption tower. The falling film absorption tower is connected to the outlet pipe of the flue gas cooling device via an acid-resistant pipe. The packed absorption tower is connected in series after the falling film absorption tower. The exhaust gas treatment device is connected after the acid absorption device.
[0015] By connecting a falling film absorber and a packed absorber in series, two absorption devices with different mass transfer mechanisms are connected in series, allowing each tower to undertake an absorption task that matches its own advantages. The falling film absorber, with its large gas-liquid contact area and fast mass transfer rate, is suitable for initial flue gas with high hydrogen chloride concentration. It has a larger specific surface area and, combined with the countercurrent contact method, can better absorb hydrogen chloride under low concentration conditions. The combination of the two improves the absorption rate of hydrogen chloride in flue gas. Attached Figure Description
[0016] To more clearly illustrate the technical solutions of this application, the accompanying drawings used in this application will be briefly described below. Obviously, the drawings described below are merely some embodiments of this application. For those skilled in the art, other drawings can be obtained from these drawings without any creative effort.
[0017] Figure 1 This is a schematic diagram of a high-concentration hydrochloric acid regeneration system provided in an embodiment of this application.
[0018] Explanation of reference numerals in the attached drawings: 1. Spray roasting furnace; 2. Combustion mechanism; 3. Dust collector; 4. Primary flue gas cooling device; 5. Secondary flue gas cooling device; 6. Primary falling film absorption tower; 7. Secondary falling film absorption tower; 8. Packed absorption tower; 9. Conveying fan; 10. Droplet separation device; 11. Primary scrubbing tower; 12. Secondary scrubbing tower; 13. Chimney; 14. Oxide silo; 15. Oxide dust collector; 16. Oxide conveying fan; 17. Combustion air conveying fan; 18. Packed absorption device circulation pump; 19. Secondary falling film absorption tower circulation pump; 20. Primary falling film absorption tower circulation pump; 21. Primary scrubbing tower circulation pump; 22. Secondary scrubbing tower circulation pump; 23. Regenerated acid storage tank; 24. Secondary transfer storage tank; 25. Primary transfer storage tank. Detailed Implementation
[0019] The embodiments of the technical solution of this application will now be described in detail with reference to the accompanying drawings. These embodiments are only used to more clearly illustrate the technical solution of this application and are therefore merely examples, and should not be used to limit the scope of protection of this application.
[0020] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application pertains; the terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the application; the terms “comprising” and “having”, and any variations thereof, in the specification, claims, and foregoing description of the drawings are intended to cover non-exclusive inclusion.
[0021] In the description of the embodiments of this application, technical terms such as "first" and "second" are used only to distinguish different objects and should not be construed as indicating or implying relative importance or implicitly specifying the number, specific order, or primary and secondary relationship of the indicated technical features. In the description of the embodiments of this application, "multiple" means two or more, unless otherwise explicitly defined.
[0022] In this document, the term "embodiment" means that a particular feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places throughout the specification does not necessarily refer to the same embodiment, nor is it a separate or alternative embodiment mutually exclusive with other embodiments. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments.
[0023] In the description of the embodiments in this application, the term "and / or" is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, and B existing alone. Additionally, the character " / " in this document generally indicates that the preceding and following related objects have an "or" relationship.
[0024] In the description of the embodiments of this application, the term "multiple" refers to two or more (including two), similarly, "multiple sets" refers to two or more (including two sets), and "multiple pieces" refers to two or more (including two pieces).
[0025] In the description of the embodiments of this application, the technical terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," and "circumferential" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing the embodiments of this application and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the embodiments of this application.
[0026] In the description of the embodiments of this application, unless otherwise expressly specified and limited, technical terms such as "installation," "connection," "joining," and "fixing" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. For those skilled in the art, the specific meaning of the above terms in the embodiments of this application can be understood according to the specific circumstances.
[0027] In some implementations, refer to Figure 1 A high-concentration hydrochloric acid regeneration system, comprising: The spray roasting device converts a high-concentration chloride solution into metal oxides and hydrogen chloride through a high-temperature hydrolysis reaction. Specifically, in this embodiment, the spray roasting device corresponds to a spray roasting furnace 1, which is equipped with a combustion mechanism 2, a high-pressure atomizing nozzle, and a temperature and pressure monitoring and control system. The combustion mechanism 2 maintains the reaction temperature of 350-750°C in the furnace by mixing and burning natural gas and combustion air. The atomizing nozzle disperses the high-concentration chloride solution into fine droplets, which are rapidly dried and hydrolyzed in the furnace to generate metal oxide powder and high-temperature flue gas containing HCl, thus completing the resource conversion.
[0028] The oxide collection device is connected to the spray roasting device via a gas delivery pipeline. Specifically, the oxide collection device is a device that recovers metal oxide powder through negative pressure gas delivery, with the aim of separating and collecting the solid oxides generated by spray roasting from the reaction system.
[0029] For example, refer to Figure 1 The oxide collection device includes an oxide silo 14, with an oxide dust collector 15 and an oxide conveying fan 16 installed on the top of the oxide silo 14. The silo 14 is connected to the solid powder outlet at the bottom of the spray roasting furnace 1 via a gas conveying pipe. The oxide conveying fan 16 provides negative pressure to draw the oxide powder at the bottom of the roasting furnace into the collection device, preventing dust leakage caused by positive pressure. The oxide dust collector 15 captures fine powder entrained in the conveying gas, ensuring that the discharged gas is clean. The fine powder falls back into the collection device, improving the total oxide yield.
[0030] The dust removal device is connected to the flue gas outlet of the spray roasting device. Specifically, the dust removal device is a device connected to the flue gas outlet of the spray roasting device to remove fine oxide dust entrained in the flue gas. Its function is to purify the high-temperature flue gas containing HCl and prevent dust from entering the subsequent cooling and absorption system, contaminating the regenerated hydrochloric acid or clogging the equipment.
[0031] For example, refer to Figure 1 The dust removal device includes a dust collector 3, which is connected to the flue gas outlet at the top of the spray roasting furnace 1 via a high-temperature pipeline. The dust collector 3 is made of metal bag filter, ceramic fiber filter or electrostatic precipitator, and is equipped with an online dust removal system to ensure dust removal efficiency.
[0032] In some implementations, refer to Figure 1 The dust outlet of the dust collector 3 is connected to the lower part of the spray roasting furnace 1 through a return pipe, so that the incompletely decomposed fine powder is sent back into the furnace for secondary roasting, thereby improving the yield of metal oxides and reducing the generation of waste residue.
[0033] The flue gas cooling device is connected to the flue gas outlet of the spray roasting device and is connected in series after the dust removal device. Specifically, the flue gas cooling device is connected in series after the dust removal device to cool the high-temperature clean flue gas to a temperature suitable for acid absorption. By reducing the flue gas temperature through heat exchange, the high temperature is avoided from affecting the HCl absorption efficiency. At the same time, the temperature reduction reduces the corrosion of subsequent absorption equipment by HCl.
[0034] In some implementations, refer to Figure 1 The flue gas cooling device includes a single flue gas cooling device. In this case, the length of the flue gas cooling device must be sufficient to support the cooling of the high-temperature flue gas.
[0035] In other embodiments, reference is made to... Figure 1 The flue gas cooling device includes a primary flue gas cooling device 4 and a secondary flue gas cooling device 5 connected in series after the dust collector 3. The primary flue gas cooling device 4 and the secondary flue gas cooling device 5 are connected to the clean gas outlet of the dust collector 3 through pipelines. The primary flue gas cooling device 4 uses a heat exchanger made of titanium, titanium alloy or stainless steel to cool the flue gas after dust removal from 300-450℃ to about 200℃. The secondary flue gas cooling device 5 uses a heat exchanger made of titanium, titanium alloy or polytetrafluoroethylene to further cool the flue gas to below 120℃, which is suitable for the temperature requirements of subsequent acid absorption. At the same time, the graded material selection avoids heat exchanger corrosion and perforation, and extends the service life of the equipment.
[0036] The acid absorption device includes a falling film absorption tower and a packed absorption tower. The falling film absorption tower is connected to the outlet pipe of the flue gas cooling device through an acid-resistant pipe. The packed absorption tower is connected in series after the falling film absorption tower. Specifically, the falling film absorption tower is a device that absorbs HCl by countercurrent contact between a liquid film and gas. It includes a graphite heat exchange wall and a liquid distributor. The liquid distributor evenly distributes the absorbent liquid on the graphite wall to form a thin liquid film. The HCl-containing flue gas rises from the bottom of the tower and comes into countercurrent contact with the liquid film, thereby absorbing the HCl in the flue gas.
[0037] A packed absorber is a device that absorbs residual HCl by increasing the gas-liquid contact area through packing. The packed absorber is filled with inert packing, and the absorbent is sprayed from the top of the tower and flows down along the surface of the packing. Low-concentration HCl flue gas that has not been completely absorbed by the falling film tower rises from the bottom of the tower and comes into full contact with the liquid on the surface of the packing, further removing HCl.
[0038] In some implementations, refer to Figure 1The acid absorption device includes a primary falling film absorption tower 6 and a packed absorption tower 8. The primary falling film absorption tower 6 is connected to the outlet of the flue gas cooling device through an acid-resistant pipe. The packed absorption tower 8 is connected in series after the primary falling film absorption tower 6. The primary falling film absorption tower 6 is made of graphite and is equipped with a primary falling film absorption tower circulation pump 20 to ensure stable circulation of the absorbent. The packed absorption tower is equipped with a packed absorption device circulation pump 18, and the absorbent is reused from the rear end to the front end.
[0039] Falling film absorbers excel at handling high-concentration HCl, rapidly absorbing most of it to produce high-concentration hydrochloric acid. However, due to the short contact time between the liquid film and the gas, falling film absorbers have low absorption efficiency for low-concentration HCl. Packed absorbers, on the other hand, can increase the contact area and restrict the passage of flue gas through the packing material, thus extending the contact time. Therefore, connecting the two in series can achieve synergistic effects of rapid absorption of high-concentration HCl and purification of low-concentration HCl, thereby improving flue gas absorption efficiency.
[0040] In some implementations, refer to Figure 1 The falling film absorption tower is configured with multiple stages. For example, the acid absorption device includes a primary falling film absorption tower 6, a secondary falling film absorption tower 7, and a packed absorption tower 8. The falling film absorption tower is connected to the outlet of the flue gas cooling device through an acid-resistant pipe, and the packed absorption tower is connected in series after the falling film absorption tower. The flue gas containing HCl exiting the flue gas cooling device has a high initial HCl concentration. The first-stage falling film absorber 6 preferentially contacts the high-concentration flue gas, performing primary absorption through the uniform liquid film on the graphite wall. After primary absorption, the HCl concentration in the flue gas decreases. However, because the contact time between the liquid film and the gas in the falling film absorber is short, when the initial HCl concentration in the flue gas is still high, the HCl in the flue gas received by the subsequent packed absorber 8 after primary absorption may still exceed the processing capacity of the packed absorber 8. In this case, a second-stage falling film absorber 7 is connected in series after the first-stage falling film absorber 6 to further absorb the remaining HCl, reducing the HCl concentration in the flue gas to within the processing range of the packed absorber 8. This avoids the problem of incomplete absorption due to high concentration overload in a single-stage falling film absorber, improves the overall HCl absorption rate, reduces the processing pressure on the subsequent packed absorber 8, and extends the service life of the packing.
[0041] The exhaust gas treatment device is connected after the acid absorption device. Specifically, the exhaust gas treatment device is a device connected after the acid absorption device to ensure that the exhaust gas meets emission standards. It is used to remove trace amounts of HCl, dust and other pollutants remaining in the exhaust gas after absorption, to prevent emissions from exceeding standards, and at the same time, it prevents harmful gases from escaping through negative pressure control.
[0042] In some implementations, refer to Figure 1The exhaust gas treatment device includes a single scrubbing tower, which is connected to the exhaust gas outlet of the acid absorption device via a pipeline and is equipped with a scrubbing liquid circulation pump to ensure stable circulation of the scrubbing liquid within the tower. At the same time, the exhaust gas treatment device also includes a conveying fan installed before the scrubbing tower to provide negative pressure power for the entire exhaust gas treatment process and prevent harmful gases from leaking out.
[0043] Specifically, a scrubbing tower is a device used to treat trace amounts of residual pollutants in the exhaust gas from an acid absorption unit. It removes pollutants through spray contact. The operating conditions of a single scrubbing tower can correspond to… Figure 1 The system can be configured with a separate primary washing tower 11 or a secondary washing tower 12. The corresponding washing liquid circulation pump is the circulation pump for the corresponding tower body. If the primary washing tower 11 is selected, a primary washing tower circulation pump 21 is provided. This circulation pump pressurizes the washing liquid at the bottom of the tower and delivers it to the spray assembly at the top of the tower to ensure that the washing liquid covers the cross section of the tower in the form of uniform droplets or liquid film.
[0044] The exhaust gas discharged from the acid absorption device enters the scrubbing tower from the bottom under the negative pressure traction of the conveying fan 9. At the same time, the scrubbing liquid is pressurized by the circulating pump and sprayed from the spray head at the top of the tower, forming a downward spray liquid flow. The exhaust gas and the spray liquid form a countercurrent contact in the tower, and the residual HCl gas can react with the scrubbing liquid. If a water washing process is used, HCl dissolves in the water. If an alkaline washing process is used, HCl and alkaline solution undergo a neutralization reaction to generate harmless salt substances, and the salt mist entrained in the exhaust gas is captured by the spray droplets. The exhaust gas after washing and purification is discharged from the top of the tower and emitted through the chimney 13.
[0045] The advantage of this single scrubbing tower design is its simple structure, requiring only one tower body, pipeline and circulation pump. It has a small initial equipment investment and footprint, and is easy to operate and maintain. It is suitable for scenarios where the acidity of the outlet exhaust gas of the acid absorption device is stable and low.
[0046] In some implementations, refer to Figure 1 The exhaust gas treatment device includes a scrubbing tower, which has multiple stages to purify the residual exhaust gas after acid absorption.
[0047] Specifically, the first-stage scrubber, as a preliminary purification unit, focuses on removing high concentrations of residual pollutants in the exhaust gas; the final-stage scrubber, as a fine purification unit, focuses on removing trace pollutants and droplets remaining after the first-stage scrubber.
[0048] For example, refer to Figure 1When the acidity of the exhaust gas is high, the primary scrubbing tower 11 adopts an alkaline scrubbing process. The primary scrubbing tower circulation pump 21 delivers an 8% NaOH solution to the top of the tower for spraying. Most of the HCl in the exhaust gas undergoes a neutralization reaction with NaOH, reducing the HCl concentration in the exhaust gas. Subsequently, the exhaust gas after primary alkaline scrubbing enters the secondary scrubbing tower 12, where the secondary scrubbing tower circulation pump 22 delivers clean water for water scrubbing. This dissolves the trace amounts of HCl remaining in the exhaust gas and captures the alkaline mist entrained during the primary alkaline scrubbing process, reducing the HCl concentration in the exhaust gas to within the national emission standards. When the acidity of the exhaust gas is low and the acid absorption device is operating stably, both the primary scrubbing tower 11 and the secondary scrubbing tower 12 adopt water washing process. The two-stage circulating pumps deliver clean water for spraying, and the exhaust gas passes through water washing twice in sequence to fully dissolve residual HCl and capture salt spray. There is no need to consume alkali solution, thereby reducing operating costs.
[0049] The advantage of multi-stage scrubbing tower design is that when the HCl concentration in the tail gas at the outlet of the acid absorption device is high, a single-stage scrubbing tower is unlikely to reduce it to the standard range in one go. However, two stages in series can stably control the concentration of pollutants in the tail gas within the standard range through a cascade treatment of coarse removal in the first stage and fine removal in the last stage. In addition, by adjusting the type of washing liquid, fluctuations in the acidity of the exhaust gas can be addressed, avoiding the limitations of single-stage processes that can only be water-washed or only alkaline-washed, thus improving process flexibility.
[0050] In some implementations, refer to Figure 1 The acid absorption device includes a primary falling film absorption tower and a secondary falling film absorption tower. A regenerated acid storage tank is installed at the outlet end of the primary falling film absorption tower.
[0051] Specifically, the primary falling film absorber 6 is connected to the outlet of the flue gas cooling device via an acid-resistant pipe, and is equipped with a primary falling film absorber circulation pump 20 to maintain the circulation of the absorbent liquid; the regenerated acid storage tank 23 is used to store the high-concentration hydrochloric acid produced by the primary falling film absorber 6. During operation, HCl-containing flue gas first enters the primary falling film absorber 6, is efficiently absorbed by the absorbent liquid to generate qualified regenerated acid, and is directly discharged into the regenerated acid storage tank 23 through the outlet pipe; the secondary falling film absorber 7 is connected in series after the primary falling film absorber 6 to treat the low-concentration HCl remaining after the primary absorption. The generated lower-concentration acid can be reused as the primary falling film absorbent liquid, realizing the cascade utilization of acid liquid. At the same time, the regenerated acid storage tank 23 directly collects the core qualified product to ensure stable product concentration.
[0052] In some implementations, refer to Figure 1 A secondary transfer tank is installed at the outlet end of the secondary falling film absorption tower, and the secondary transfer tank is connected to the regenerated acid storage tank.
[0053] Specifically, the secondary falling film absorber 7 is equipped with a secondary falling film absorber circulation pump 19, the outlet of which is connected to a secondary transfer storage tank 24 via a pipeline. The secondary transfer storage tank 24 is then connected to a regenerated acid storage tank 23 via a pipeline. The secondary falling film absorber 7 absorbs the residual HCl after the primary falling film absorber, and the resulting hydrochloric acid has a slightly lower concentration than the primary falling film product. It is temporarily stored in the secondary transfer storage tank 24. When the acid concentration in the storage tank accumulates to near the regenerated acid standard, it is then transported to the regenerated acid storage tank 23 to avoid low-concentration acid directly mixing into the regenerated acid storage tank 23 and causing the overall concentration to fail to meet the standard. Alternatively, after the solution in the regenerated acid storage tank 23 is discharged, it can be used as a supplementary solution and transported to the regenerated acid storage tank 23, thereby improving the overall process efficiency.
[0054] In some implementations, refer to Figure 1 The outlet of the secondary falling film absorption tower is equipped with a secondary transfer tank, and the outlet of the packed absorption tower is equipped with a primary transfer tank. The secondary transfer tank is connected to the regenerated acid storage tank, and the primary transfer tank is connected to the secondary transfer tank.
[0055] Specifically, the packed absorber 8 is equipped with a circulating pump 18 for the packed absorber device. Its outlet is connected to a primary transfer storage tank 25. The primary transfer storage tank 25 is connected to a secondary transfer storage tank 24 via pipeline, and the secondary transfer storage tank 24 is then connected to a regenerated acid storage tank 23. The packed absorber 8 processes the trace amount of HCl after the secondary falling film absorption tower, generating low-concentration acid which is stored in the primary transfer storage tank 25 and then transported to the secondary transfer storage tank 24. There, it is mixed with the acid produced by the secondary falling film absorption tower for concentration. When the concentration reaches the standard after mixing, it is sent from the secondary transfer storage tank 24 to the regenerated acid storage tank 23. Through cascaded concentration and temporary storage recovery of acid from each stage, and by using the low-concentration acid as a supplement liquid for the preceding absorption process, the gradient absorption design further improves process efficiency.
[0056] It should be noted that this application is not limited to the above-described embodiments. The above embodiments are merely examples, and any embodiments with the same structure and effect as the technical concept within the scope of this application are included in the technical scope of this application. Furthermore, various modifications that can be conceived by those skilled in the art to the embodiments, and other ways of constructing by combining some of the constituent elements of the embodiments, without departing from the spirit of this application, are also included in the scope of this application.
Claims
1. A high-concentration hydrochloric acid regeneration system, characterized in that, include: The spray roasting device converts a high-concentration chloride salt solution into metal oxides and hydrogen chloride through a high-temperature hydrolysis reaction. An oxide collection device is connected to the spray roasting device via a gas delivery pipeline; A dust removal device is connected to the flue gas outlet of the spray roasting device; A flue gas cooling device is connected to the flue gas outlet of the spray roasting device and connected in series after the dust removal device; An acid absorption device includes a falling film absorption tower and a packed absorption tower. The falling film absorption tower is connected to the outlet pipe of the flue gas cooling device via an acid-resistant pipe. The packed absorption tower is connected in series after the falling film absorption tower. The exhaust gas treatment device is connected after the acid absorption device.
2. The high-concentration hydrochloric acid regeneration system according to claim 1, characterized in that, The falling film absorption tower is configured with one stage or multiple stages connected in series.
3. The high-concentration hydrochloric acid regeneration system according to claim 2, characterized in that, The acid absorption device includes a primary falling film absorption tower and a secondary falling film absorption tower, and a regenerated acid storage tank is provided at the outlet end of the primary falling film absorption tower.
4. The high-concentration hydrochloric acid regeneration system according to claim 3, characterized in that, The outlet end of the secondary falling film absorption tower is equipped with a secondary transfer storage tank, which is connected to the regenerated acid storage tank.
5. A high-concentration hydrochloric acid regeneration system according to claim 3, characterized in that, The outlet end of the secondary falling film absorption tower is equipped with a secondary transfer storage tank, and the outlet end of the packed absorption tower is equipped with a primary transfer storage tank. The secondary transfer storage tank is connected to the regenerated acid storage tank, and the primary transfer storage tank is connected to the secondary transfer storage tank.
6. The high-concentration hydrochloric acid regeneration system according to claim 1, characterized in that, The flue gas cooling device is configured with one stage or multiple stages connected in series.
7. A high-concentration hydrochloric acid regeneration system according to claim 1, characterized in that, The oxide collection device includes: An oxide silo receives metal oxide particles from the spray roasting device via a gas delivery pipeline; An oxide dust collector is installed on top of the oxide silo to filter the conveyed gas.
8. The high-concentration hydrochloric acid regeneration system according to claim 1, characterized in that, The dust removal device includes: dust collector; The return pipe is used to transport the dust collected by the dust collector back to the spray roasting device.
9. A high-concentration hydrochloric acid regeneration system according to claim 1, characterized in that, The exhaust gas treatment device includes: A scrubbing tower, which has multiple stages, is used to purify the residual exhaust gas after acid absorption.
10. A high-concentration hydrochloric acid regeneration system according to claim 9, characterized in that, The exhaust gas treatment device further includes: A conveying fan is installed before the multi-stage scrubbing tower to keep the entire process from the spray roasting device to the conveying fan under negative pressure.