An overflow brick installation centering device

By designing a modular overflow brick installation centering device, and utilizing a combination of installation brackets and follow-up guide rods, the problem of difficulty in adjusting the centering accuracy during overflow brick installation was solved, enabling fast and accurate overflow brick installation and improving production efficiency and product quality.

CN224981503UActive Publication Date: 2026-11-17IRICO DISPLAY DEVICES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522316736.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-10-31
Publication Date
2026-11-17
Estimated Expiration
2035-10-31

AI Technical Summary

Technical Problem

The lack of efficient and reliable overflow brick installation and alignment devices in the existing technology leads to difficulties in adjusting the alignment accuracy during the installation process, low efficiency, and inability to adapt to the size and structural differences of muffle furnace steel structures of different generations, affecting production efficiency and product quality.

Method used

A design was developed that includes first and second centering devices horizontally suspended below the steel structure of a muffle furnace. The design is modular, utilizing a combination of mounting brackets, follow-up guide rods, and centering blocks to achieve precise positioning and visual operation. The coordination between the suspension device and the follow-up centering device ensures the stability and accuracy of the centering process.

Benefits of technology

It enables rapid and precise installation of overflow bricks, significantly improves hoisting efficiency, reduces the tedious process of multiple fine adjustments, lowers construction difficulty and time costs, ensures continuous stability and high precision in the centering process, and avoids damage caused by centering deviation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224981503U_ABST
    Figure CN224981503U_ABST
Patent Text Reader

Abstract

This utility model discloses an overflow brick installation and alignment device, including a first alignment device horizontally hung at the far end below the steel structure of the muffle furnace and a second alignment device horizontally hung at the near end below the steel structure of the muffle furnace. The first and second alignment devices have identical structures and are used in a group. The first alignment device includes a mounting bracket, with a suspension device on each side of the mounting bracket along its length and a follow-up alignment device in the middle of the mounting bracket along its length. This utility model can provide a reliable overflow brick installation and alignment device for installing overflow bricks in muffle furnace equipment for different generations of substrate glass, and through optimized structural design, it achieves convenient and reliable manufacturing and installation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the technical field of TFT substrate glass forming equipment, specifically to an overflow brick installation and centering device. Background Technology

[0002] Overflow brick installation and alignment devices are mainly used in the production of substrate glass, particularly in the installation of overflow bricks within muffle furnaces. The muffle furnace is a critical piece of equipment in the substrate glass production process, and its internal steel structure requires the installation of overflow bricks to achieve specific process requirements. In actual production, the steel structures of muffle furnaces from different generations of substrate glass differ in size and structure, thus placing high demands on the alignment of the overflow bricks. Currently, the hoisting and alignment process for overflow bricks lacks efficient and reliable alignment devices, leading to difficulties in adjusting alignment accuracy and low efficiency during installation, making it difficult to meet technical requirements.

[0003] In the field of substrate glass production, the alignment of overflow bricks in muffle furnace equipment has always been a technical challenge. Due to the lack of efficient and reliable alignment devices, adjusting the alignment accuracy of the overflow bricks after they are hoisted into the muffle furnace steel structure is difficult, often requiring multiple fine-tuning adjustments to meet technical requirements. This not only affects production efficiency but can also lead to product quality issues due to inaccurate alignment. Furthermore, the differences in size and structure between different generations of muffle furnace steel structures further increase the difficulty of aligning the overflow bricks during installation.

[0004] To address the problems encountered during the alignment process of overflow brick installation, existing technologies have proposed several solutions. For example, attempts have been made to improve alignment accuracy and efficiency by designing simple alignment tools or employing manual adjustments. However, these methods are not ideal in practical applications. Simple alignment tools often cannot adapt to the size and structural differences of muffle furnace steel structures from different generations, leading to unstable alignment accuracy. Manual adjustments, on the other hand, suffer from low efficiency and high labor intensity, making them unsuitable for large-scale production.

[0005] Despite existing technologies offering some solutions, numerous problems persist in the overflow brick installation and alignment process. First, the lack of an efficient and reliable alignment device leads to difficulties in adjusting alignment accuracy, resulting in low efficiency and failing to meet technical requirements. Second, existing solutions often cannot adapt to the size and structural differences of muffle furnace steel structures across different generations, resulting in a lack of versatility and compatibility in the alignment devices. Finally, existing solutions present inconveniences in manufacturing, installation, and use, impacting production efficiency and product quality. Therefore, designing an overflow brick installation and alignment device that is adaptable to different generations of muffle furnace steel structures and is convenient and reliable to manufacture, install, and use is urgently needed. Utility Model Content

[0006] To address the problems existing in the prior art, this utility model provides an overflow brick installation and alignment device, which can provide a reliable overflow brick installation and alignment device when installing overflow bricks in muffle furnace equipment for different generations of substrate glass. Through optimized structural design, it achieves convenient and reliable manufacturing, installation and use.

[0007] To achieve the above objectives, this utility model provides the following technical solution: an overflow brick installation centering device, comprising a first centering device horizontally hung at the far end below the steel structure of the muffle furnace and a second centering device horizontally hung at the near end below the steel structure of the muffle furnace, wherein the first centering device and the second centering device have the same structure and are used in a group. The first centering device includes a mounting bracket, with a suspension device on each side of the mounting bracket along its length and a follow-up centering device in the middle of the mounting bracket along its length.

[0008] Furthermore, the follow-up centering device includes a follow-up guide rod, a spring, and a centering block. Centering lines are provided on the centering block. One end of the follow-up guide rod is fixed to the bottom of the centering block, the spring is sleeved on the follow-up guide rod, and the other end of the follow-up guide rod is fixed to the mounting bracket.

[0009] Furthermore, one end of the follower guide rod is connected to the centering block through a guide rod mounting hole provided at the bottom of the centering block, and the one end of the follower guide rod is interference-fitted with the guide rod mounting hole.

[0010] Furthermore, two guide rod mounting holes are provided at the bottom of the middle block.

[0011] Furthermore, the interior of the central block is an overflow brick placement area. The top of the overflow brick placement area has a V-shaped structure with the same angle as the tip of the overflow brick, and the bottom of the overflow brick placement area does not contact the tip of the overflow brick. Furthermore, the middle block is made of nylon or bakelite.

[0012] Furthermore, the mounting bracket is a horizontal square tube with a length greater than the width of the muffle furnace. A guide hole is provided in the width direction of the middle of the horizontal square tube, and the follow-up centering device is fixed in the middle of the length direction of the mounting bracket through the guide hole.

[0013] Furthermore, the suspension device includes a fixing structure, a suspension structure, and an adjustment structure. The fixing structure is a vertical square tube, which is welded to both sides of the horizontal square tube along its length, and a reinforcing rib is provided between the vertical and horizontal square tubes. The vertical square tube is provided with a suspension structure and an adjustment structure from top to bottom. The suspension structure is used to hang the mounting bracket horizontally along the width of the muffle furnace directly below the muffle furnace steel structure. The adjustment structure is used to adjust the mounting bracket to the bottom centerline position of the muffle furnace steel structure and fix it.

[0014] Furthermore, the suspension structure consists of mounting screws, with a horizontal through hole provided on the vertical square tube, and the mounting screws are fixed in the horizontal through hole.

[0015] Furthermore, the adjustment structure is an adjustment screw, with a horizontal through hole provided on the vertical square tube, and a nut welded to the outside of the horizontal through hole. The adjustment screw and the nut are used in conjunction.

[0016] Compared with the prior art, the present invention has at least the following beneficial effects: This invention provides an overflow brick installation centering device. By having two centering devices, horizontally suspended below the muffle furnace steel structure at both the near and far ends, work in concert, it effectively solves the precision adjustment problem encountered during the installation of key equipment. The structure adopts a modular design, with identical structures on both sides, ensuring symmetry and simplifying spare parts management. The mounting bracket, as the core load-bearing component, has suspension devices on both sides along its length that can be quickly fixed to the muffle furnace steel structure. The centrally located follow-up centering device forms a precise positioning system. This invention solves the problems of high difficulty and low efficiency in precision adjustment in traditional installation methods. Through the cooperation of the suspension devices and the follow-up centering device, it achieves visualized operation and one-time precise positioning during the centering process, significantly reducing the tedious process of multiple fine-tuning steps.

[0017] This utility model device achieves proper installation and follow-up function of the centering block through precise cooperation between the centering block and the mounting bracket. The centering block adopts a special size design, which not only ensures stable installation in the middle position of the bracket but also automatically adjusts its position according to the hoisting height through a follow-up guiding mechanism, ensuring effective guidance throughout the entire hoisting process. This design cleverly solves the problem of centering stability when hoisting at different heights, avoiding positioning deviations caused by height changes. Simultaneously, the device adopts a modular design concept, with standardized dimensions for each component and simplified manufacturing process, ensuring both manufacturing accuracy and improved production efficiency. During installation, operators only need to complete two steps: bracket suspension and centering block positioning, achieving rapid installation, significantly reducing construction difficulty and time costs, demonstrating the practicality and economy of the structural design.

[0018] Furthermore, the unique V-shaped structure of the centering block can quickly conform to the shape of the overflow brick, achieving initial and accurate centering. Combined with clearly marked centering lines, operators can quickly complete verification and adjustments. This design significantly shortens centering and debugging time. Compared to traditional manual centering methods, hoisting efficiency is significantly improved, effectively reducing equipment downtime and increasing overall production efficiency.

[0019] Furthermore, the mounting bracket, with the addition of reinforcing ribs, significantly enhances its overall structural strength, enabling it to stably bear the weight of the overflow bricks and ensuring that it will not deform or loosen during hoisting. The follow-up guide rod and the guide through-hole of the mounting bracket employ a precision clearance fit, ensuring both guiding flexibility and effectively limiting displacement deviation. The introduction of a spring buffer mechanism can absorb vibrations and minor positional deviations generated during hoisting in real time, preventing rigid collisions from damaging the device or causing centering misalignment. This multi-layered protection mechanism ensures continuous stability during the centering process, maintaining high-precision centering even under complex working conditions.

[0020] Furthermore, the centering block is made of high-quality soft materials such as nylon or bakelite, and a special space is reserved at the tip of the overflow brick. This design completely avoids scratches or squeezing damage to the surface and tip of the overflow brick. The high-precision centering design reduces installation rework caused by centering deviations and significantly reduces the workpiece loss rate. Attached Figure Description

[0021] Figure 1 An isometric drawing of an overflow brick installation centering device.

[0022] Figure 2 This is a schematic diagram of an overflow brick installation centering device.

[0023] In the attached diagram: 1. Mounting bracket; 2. Mounting screw; 3. Adjusting screw; 4. Follower guide rod; 5. Spring; 6. Centering block. Detailed Implementation

[0024] The present invention will be further described below with reference to the accompanying drawings and specific embodiments.

[0025] like Figure 1 As shown, this utility model provides an overflow brick installation and centering device, which can provide a reliable overflow brick installation and centering device when installing overflow bricks in muffle furnace equipment of different generations of substrate glass. This device consists of 6 parts: mounting bracket 1 (the foundation of the device), mounting screw 2, adjusting screw 3, follower guide rod 4, spring 5 on the guide rod, and centering block 6 (nylon or bakelite material). A total of 2 sets are required to form a complete device, which are installed horizontally at the near and far ends below the steel structure of the muffle furnace.

[0026] The mounting bracket 1 is a horizontal square tube with a length greater than the width of the muffle furnace. Two through holes in the upper and lower directions are designed on both sides of the middle position of the horizontal square tube for sliding guidance. Vertical square tubes of the same specification and a certain length are welded above the two ends of the horizontal square tube. Reinforcing ribs are welded between the vertical square tube and the horizontal square tube. Two horizontal through holes are designed in the upper and lower directions of the vertical square tube (the upper through hole is used to pass through the mounting screw 2, so that the bracket is hung horizontally under the steel structure of the muffle furnace along the width direction of the muffle furnace; a nut of a certain specification is welded to the outside of the lower through hole, and then the corresponding adjusting screw 3 is screwed in. The bracket is adjusted to the bottom centerline position of the steel structure of the muffle furnace and fixed by using the screws on both sides of the vertical square tube of the bracket).

[0027] Furthermore, the mounting screw 2 passes through the through hole on the vertical square tube of the mounting bracket 1 and is screwed into the threaded hole at the corresponding position on the side of the muffle furnace steel structure, so that the bracket is hung horizontally under the muffle furnace steel structure along the width direction of the muffle furnace.

[0028] Furthermore, screw the adjusting screw 3 into the nut hole under the vertical square tube of the mounting bracket 1, adjust the entire bracket to the bottom centerline position of the muffle furnace steel structure and fix it in place.

[0029] Furthermore, the centering block 6 has an overflow brick placement area inside. The top of the overflow brick placement area has a V-shaped structure with the same angle as the tip of the overflow brick. There is space between the bottom of the overflow brick placement area and the tip of the overflow brick to ensure that it does not contact the tip of the brick or its vicinity during the entire process. The bottom surface of the centering block 6 is designed with two guide rod mounting holes (to ensure a certain interference fit) for installing the follow-up guide rod 4. The centering block 6 is designed with centering lines for verification with the on-site layout center.

[0030] Furthermore, the middle block 6 is made of nylon or bakelite.

[0031] Furthermore, the follower guide rod 4, with a certain interference fit, is inserted into the centering block 6, and then the spring 5 on the guide rod is installed. Following the designed clearance fit, it is then inserted into the two guide holes of the horizontal square tube of the mounting bracket 1. This completes the installation of one set of devices.

[0032] The above-mentioned mounting bracket 1—centering block 6, consisting of 6 parts, forms a set. Two sets are required to form a complete device, which are installed laterally at the near and far ends below the muffle furnace steel structure. During the hoisting of overflow bricks, the entire device can effectively ensure efficient and reliable centering during the hoisting of overflow bricks in the muffle furnace equipment.

[0033] The overflow brick installation and centering device provided by this utility model achieves precise positioning during overflow brick hoisting through a combination of a fixed and adjustable bracket structure and a centering component with guiding and buffering functions. First, the mounting bracket 1 serves as the basic load-bearing structure, utilizing a combination of horizontal and vertical square tubes to stably hang it under the muffle furnace steel structure (a metal frame for industrial furnaces used for high-temperature heating). Simultaneously, through the through holes and screws on the vertical square tubes, it meets the requirements for position adjustment and fixation. Second, the centering block 6 adopts a V-shaped design that matches the angle of the overflow brick, allowing it to conform to the shape of the overflow brick for initial centering. Combined with the sliding of the follower guide rod 4 within the guide through hole of the mounting bracket 1, and the buffering force provided by the spring 5, it can accommodate minor positional deviations of the overflow brick during hoisting. Finally, by verifying the centering mark with the on-site layout center, the final centering accuracy is ensured. The entire process relies on a rigid structure to ensure stability while utilizing flexible components (springs) and precise design (V-shaped blocks, markings) to achieve high-precision centering.

[0034] Example 1 This utility model provides an overflow brick installation centering device, wherein: Mounting bracket 1 is made of Q235 carbon steel with galvanized anti-rust coating. It is a horizontal square tube with a length greater than the width of the muffle furnace by 200mm and a cross-section of 80mm×80mm×5mm. The diameter of the guide hole in the middle is 25mm. The vertical square tube is made of the same Q235 carbon steel as the mounting bracket, with a height of 300mm and a cross-section of 60mm×60mm×4mm. The horizontal through hole has a diameter of 18mm for mounting screw 2, and the lower nut hole has a diameter of 22mm for welding M20 nuts for adjusting screw 3. Mounting screw 2 is made of 304 stainless steel, with a specification of M16×80mm and a spring washer. Adjusting screw 3 is made of 45# steel with heat treatment, specification M20×100mm, and comes with double nuts; The follower guide rod 4 is made of 40Cr alloy steel with a quenched and tempered finish, with a diameter of 20mm and a length of 400mm, and is chrome-plated. Spring 5 is made of 60Si2Mn spring steel, with an outer diameter of 25mm, a wire diameter of 3mm, a free height of 150mm, and a stiffness coefficient of 50N / mm; The center block 6 is made of MC nylon (PA6+GF30% reinforcement), with dimensions of 150mm long × 100mm wide × 80mm high. The included angle of the V-groove is consistent with the tip of the overflow brick, and the guide rod mounting hole diameter is 20.1mm with an interference fit of 0.1mm. Key mating dimensions include the gap between the guide hole of the mounting bracket and the follower guide rod 4 (0.3~0.7mm), the gap between the V-groove of the centering block 6 and the overflow brick (1~2mm), and the preload of the mounting screws (80~120N·m).

[0035] like Figure 2 As shown, the specific steps for installing the centering device using the overflow brick provided by this utility model are as follows: First, fix bracket 1: The mounting bracket 1 is hung horizontally below the muffle furnace steel structure along the width direction of the muffle furnace by mounting screw 2. The mounting bracket 1 is then adjusted to the bottom centerline position of the muffle furnace steel structure and fixed by adjusting the adjusting screws 3 on both sides of the vertical square tube.

[0036] Secondly, the assembly and installation of the intermediate components: First, process the V-shaped structure in which the overflow brick placement area inside the centering block 6 is at the same angle as the overflow brick, and reserve space at the brick tip to prevent contact damage. At the same time, process two guide rod mounting holes on the bottom surface of the centering block 6 (to ensure a certain interference fit). Then, insert the follower guide rod 4 into the guide rod mounting hole of the centering block 6 with an interference fit, install the spring 5 on the follower guide rod, and then insert the assembled centering assembly into the two guide through holes of the horizontal square tube of the mounting bracket according to the design clearance fit.

[0037] Finally, assemble the entire device: repeat the above steps to assemble another set of the same device (including mounting bracket, mounting screws, adjusting screws, follower guide rod, spring, and centering block), and install the two sets of devices laterally at the near and far ends below the muffle furnace steel structure to complete the realization of the entire device.

[0038] The assembly has been verified by finite element analysis. Under the impact of hoisting a 100kg overflow brick, the maximum deformation is ≤0.5mm, the centering accuracy is ±0.3mm, and the service life is over 5 years.

Claims

1. An overflow brick installation centering device, characterized in that, It includes a first centering device that is horizontally hung at the far end below the steel structure of the muffle furnace and a second centering device that is horizontally hung at the near end below the steel structure of the muffle furnace. The first centering device and the second centering device have the same structure and are used in a group. The first centering device includes a mounting bracket (1), with a suspension device on both sides of the mounting bracket (1) along its length and a follow-up centering device in the middle of the mounting bracket (1) along its length.

2. A spill brick installation centering device according to claim 1, wherein, The follow-up centering device includes a follow-up guide rod (4), a spring (5) and a centering block (6). Centering lines are set on the centering block (6). One end of the follow-up guide rod (4) is fixed to the bottom of the centering block (6), the spring (5) is sleeved on the follow-up guide rod (4), and the other end of the follow-up guide rod (4) is fixed on the mounting bracket (1).

3. A spill brick installation centering device according to claim 2, wherein, One end of the follower guide rod (4) is connected to the centering block (6) through the guide rod mounting hole at the bottom of the centering block (6), and the other end of the follower guide rod (4) is interference-fitted with the guide rod mounting hole.

4. A spill brick installation centering device according to claim 3, wherein, There are two guide rod mounting holes at the bottom of the center block (6).

5. A spill brick installation centering device according to claim 2, wherein, The interior of the middle block (6) is the overflow brick placement area. The top of the overflow brick placement area is a V-shaped structure with the same angle as the tip of the overflow brick. The bottom of the overflow brick placement area does not contact the tip of the overflow brick.

6. A spill brick installation centering device according to claim 2, wherein, The middle block (6) is made of nylon or bakelite.

7. A spill brick installation centering device according to claim 1, wherein The mounting bracket (1) is a horizontal square tube with a length greater than the width of the muffle furnace. A guide hole is provided in the middle of the horizontal square tube in the width direction. The follow-up centering device is fixed in the middle of the length direction of the mounting bracket (1) through the guide hole.

8. A spill brick installation centering device according to claim 7, wherein, The suspension device includes a fixed structure, a suspension structure and an adjustment structure. The fixed structure is a vertical square tube, which is welded to both sides of the horizontal square tube along its length, and a reinforcing rib is provided between the vertical square tube and the horizontal square tube. The vertical square tube is provided with a suspension structure and an adjustment structure from top to bottom. The suspension structure is used to hang the mounting bracket (1) horizontally along the width of the muffle furnace directly below the steel structure of the muffle furnace. The adjustment structure is used to adjust the mounting bracket (1) to the center line position at the bottom of the steel structure of the muffle furnace and fix it.

9. A spill brick installation centering device according to claim 8, wherein, The suspension structure is a mounting screw (2), with a horizontal through hole provided on the vertical square tube, and the mounting screw (2) is fixed in the horizontal through hole.

10. A spill brick installation centering device according to claim 8, wherein, The adjustment structure is an adjustment screw (3), with a horizontal through hole on the vertical square tube and a nut welded to the outside of the horizontal through hole. The adjustment screw (3) is used in conjunction with the nut.