A drainage and sewage separation structure for caverns in water conservancy and hydropower projects

By combining a water collection pit, drainage ditch, and movable water tank, the problem of high drainage treatment costs and water waste during the construction of caverns in water conservancy and hydropower projects is solved. It enables the separate collection and treatment of clean water and sewage, simplifies the scale of facilities and construction difficulty, and improves the utilization rate of water resources.

CN224982132UActive Publication Date: 2026-11-17POWERCHINA ZHONGNAN ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522716076.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-22
Publication Date
2026-11-17
Estimated Expiration
2035-12-22

AI Technical Summary

Technical Problem

In the construction of existing water conservancy and hydropower tunnels, drainage treatment costs are high and water resources are wasted seriously. Furthermore, the existing sewage diversion structure involves a large amount of engineering work and is inconvenient to operate and maintain.

Method used

The system employs a combination of sump pits, drainage ditches, and movable water tanks to collect sewage and clean water respectively. The drainage is then discharged outside the tunnel via booster pumps and relay pumps. Gravity flow and pumps accelerate the drainage process, simplifying the facility's scale and reducing construction difficulty.

Benefits of technology

It enables the separate collection and treatment of clean water and wastewater, reduces construction costs and treatment expenses, improves water resource utilization, and is suitable for mountainous caverns with abundant water or caverns with large water inflow.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224982132U_ABST
    Figure CN224982132U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of tunnel construction technology in water conservancy and hydropower engineering, specifically disclosing a drainage and wastewater separation structure for tunnels in water conservancy and hydropower engineering. The structure includes: a collection pit located at the bottom of the tunnel face for collecting wastewater generated from the tunnel face and the initial lining; a drainage ditch located along the tunnel's orientation on both sides, with one end connected to the collection pit and the other end connected to the outside of the tunnel; and a movable water trough detachably installed within the drainage ditch near the tunnel sidewall for collecting clean water from the secondary lining section. The movable water trough also has a water-blocking head at its end near the tunnel face, and the other end connects to the outside of the tunnel. This drainage and wastewater separation structure for water conservancy and hydropower engineering tunnels achieves separate collection of clean water and wastewater, effectively reducing the difficulty of drainage treatment during tunnel construction, improving resource utilization, and significantly reducing construction and treatment costs. It has high application value for mountainous tunnels with abundant water or large inflow volumes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of tunnel construction technology in water conservancy and hydropower engineering, specifically to a drainage and sewage separation structure for tunnels in water conservancy and hydropower engineering. Background Technology

[0002] During the construction of tunnels in hydropower projects, a large amount of drainage is generated. This drainage originates partly from groundwater seepage mixed with rock powder and construction wastewater from tunnel face excavation and concrete pouring, typically containing a high amount of suspended solids; and partly from groundwater seepage after the secondary lining of the tunnel, which is usually relatively clean. Currently, most drainage treatment in hydropower projects involves collecting all drainage and treating it centrally, introducing both types of drainage into sedimentation tanks for settling, followed by further treatment based on water quality. This method not only suffers from high treatment costs and water waste, but also, due to complex geological conditions and rapid changes in groundwater levels, can exceed the design capacity of the treatment facilities, potentially leading to accidental discharges. On the one hand, centralized treatment requires large-scale wastewater treatment equipment, increasing chemical dosage and power consumption, thus raising costs. On the other hand, the clear water seeping from the tunnel walls later in the construction process is of good quality and can generally be directly reused for concrete curing and equipment washing, but currently, there is a lack of effective collection and reuse methods, resulting in the waste of this water resource. While some existing technologies exist for separating clean water and wastewater collection in cavern drainage, achieving water resource recycling while reducing treatment costs, the separate collection method requires constructing clean water ditches and wastewater ditches on both sides of the cavern to collect clean water and wastewater respectively. Furthermore, an additional clean water connection pipe needs to be constructed across the cavern to collect clean water from the circumferential and longitudinal blind pipes in the secondary lining section on one side of the drainage ditch. This results in a complex drainage pipe and trench layout within the cavern, a large workload, and inconvenient operation and maintenance.

[0003] Therefore, there is an urgent need for a simpler, more feasible, and more economical drainage and sewage separation structure for water conservancy and hydropower engineering caverns to solve the problems existing in the current technology. Utility Model Content

[0004] The technical problem to be solved by this utility model is to overcome the shortcomings of the existing technology and provide a simpler, more feasible and more economical drainage and sewage separation structure for water conservancy and hydropower engineering caverns.

[0005] To solve the above-mentioned technical problems, the present invention adopts the following technical solution: A drainage and sewage separation structure for caverns in water conservancy and hydropower projects includes: A water collection pit is provided at the bottom of the working face to collect wastewater generated from the working face and the initial lining of the tunnel. A drainage ditch is provided on both sides of the cavern along the cavern's orientation. One end of the drainage ditch is connected to a sump pit, and the other end is connected to the outside of the cavern. The movable water trough is detachably installed in the drainage ditch on one side near the tunnel wall to collect clean water from the secondary lining section of the tunnel. The movable water trough is also provided with a water-blocking head at one end near the working face to separate the movable water trough from the water collection pit. The other end of the movable water trough is connected to the outside of the tunnel.

[0006] As a further improvement to the above technical solution: A booster pump station is installed at one end of the cavern near the working face to discharge sewage from the sump into the drainage ditch.

[0007] As a further improvement to the above technical solution: The ends of the drainage ditch and the movable water tank near the working face are both set higher than the ends near the outside of the tunnel.

[0008] As a further improvement to the above technical solution: The cavern is also equipped with a relay pumping station, which is used to discharge the drainage from the drainage ditch and / or movable water tank to the outside of the cavern. The booster pump station and / or relay pump station uses submersible pumps or centrifugal pumps.

[0009] As a further improvement to the above technical solution: The movable water tank is composed of multiple tank sections joined together. The grooves are detachably connected by overlapping tongue and groove joints. The trough is also detachably connected to the side wall of the drainage ditch via a sliding slot or mechanical anchoring method.

[0010] As a further improvement to the above technical solution: The water collection pit is a low-lying area inside the cave or is constructed by pouring concrete. The drainage ditch is made of concrete, and its grade is consistent with that of the concrete used to pour the cavern.

[0011] As a further improvement to the above technical solution: The connections between the tank body and the water-blocking head, as well as between the tank bodies, are sealed.

[0012] As a further improvement to the above technical solution: The drainage ditch is equipped with a detachable cover.

[0013] As a further improvement to the above technical solution: The drainage ditch is 300-500mm wide and 400-500mm deep.

[0014] Compared with the prior art, the advantages of this utility model are: This utility model discloses a drainage and wastewater separation structure for a water conservancy and hydropower engineering tunnel, comprising: a sump pit located at the bottom of the tunnel face for collecting wastewater generated from the tunnel face and the primary lining of the tunnel; a drainage ditch located along the tunnel direction on both sides of the tunnel, one end of which is connected to the sump pit and the other end of which is connected to the outside of the tunnel; and a movable water trough detachably located within the drainage ditch on the side near the tunnel wall for collecting clean water from the secondary lining section of the tunnel. The movable water trough also has a water-blocking head at one end near the tunnel face, which separates the movable water trough from the sump pit, and the other end of the movable water trough is connected to the outside of the tunnel. The drainage and sewage separation structure for water conservancy and hydropower engineering caverns of this utility model realizes the separate collection of clean water and sewage in the caverns. It can effectively reduce the scale and construction difficulty of the drainage and sewage separation facilities in the caverns. The solution is simple and feasible, can improve the utilization rate of wastewater and other resources, and significantly reduce the construction cost and treatment cost of this part. It has high application value for caverns in mountainous areas with abundant water or caverns with large water inflow. Attached Figure Description

[0015] Figure 1 This is a plan view of a drainage and sewage separation structure for a water conservancy and hydropower engineering cavern, according to an embodiment of the present invention. Figure 2 for Figure 1 A three-dimensional structural diagram of the drainage and sewage separation structure of a water conservancy and hydropower project cavern; Figure 3 This is a cross-sectional schematic diagram of the drainage ditch and movable water tank according to an embodiment of the present utility model; Figure 4 This is a schematic diagram of the connection relationship of the tank body in an embodiment of this utility model; Figure 5 This is a cross-sectional schematic diagram of the U-shaped drainage ditch used in an embodiment of this utility model.

[0016] In the diagram: 1. Sump; 2. Drainage ditch; 3. Movable water tank, 3.1. Tank body; 3.2. Overlapping tongue and groove joint; 3.3. Sliding groove; 4. Water-retaining head; 5. Booster pump station; 6. Cover plate; 6.1. Water-retaining plate; 7. Sewage area; 8. Clear water area; 9. Cavern; 10. Working face; 11. Cavern exterior. Detailed Implementation

[0017] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0018] like Figure 1-5 As shown in the figure, this embodiment provides a drainage and sewage separation structure for caverns in water conservancy and hydropower projects, including: A water collection pit 1 is located at the bottom of the working face 10 and is used to collect sewage generated from the working face 10 and the primary lining of the tunnel 9. A drainage ditch 2 is located along the direction of the tunnel 9 on both sides of the tunnel 9. One end of the drainage ditch 2 is connected to the water collection pit 1, and the other end is connected to the outside of the tunnel 11. A movable water trough 3 is detachably installed inside the drainage ditch 2 on the side near the side wall of the tunnel 9 and is used to collect clean water from the secondary lining section of the tunnel 9. The movable water trough 3 is also provided with a water-blocking head 4 at the end near the working face 10. The water-blocking head 4 is used to separate the movable water trough 3 from the water collection pit 1. The other end of the movable water trough 3 is connected to the outside of the tunnel 11.

[0019] In this embodiment, a movable water trough 3 is installed within the drainage ditch 2, dividing the ditch 2 into a sewage zone 7 and a clean water zone 8. Construction wastewater from the excavation of the tunnel face 10 and concrete pouring flows out of the tunnel through the sump pit 1 and the sewage zone 7 of the drainage ditch 2 by gravity or through a booster pump station 5. The clean water zone 8 of the drainage ditch 2 collects clean water from the secondary lining section, and a water-blocking head 4 is installed at the beginning of the clean water zone 8 to achieve independent collection and separation of construction wastewater and clean water from the secondary lining section. After construction is completed, the movable water trough 3 can be removed, and the drainage ditch 2 can be used to form a permanent drainage ditch without needing to be demolished, thus saving resources.

[0020] The sump pit 1 is naturally located in a low-lying area within the tunnel or constructed using concrete. It is used to collect construction water from the tunnel face 10 and construction wastewater generated in low-lying areas of the initial lining section during construction. Due to different construction terrains, the construction of the tunnel 9 is divided into forward slope and reverse slope sections. Drainage in the drainage ditch 2 and movable water channel 3 along the forward slope section can flow naturally under gravity. In the reverse slope section, a booster pump station 5 is required at one end of the tunnel 9 near the tunnel face 10 to discharge wastewater from the sump pit 1 into the drainage ditch 2. When the drainage volume is large in the forward slope section, the booster pump station 5 can also accelerate wastewater discharge.

[0021] When this embodiment is applied to the downslope or horizontal section of a tunnel in a water conservancy and hydropower project, the end of the drainage ditch 2 and the movable water channel 3 near the working face 10 can be set higher than the end near the tunnel exterior 11. This arrangement allows for natural drainage flow by gravity as much as possible, reducing the need for the booster pump station 5 and thus saving costs. When located on a reverse slope, the above arrangement is selectively implemented considering factors such as cost and construction difficulty, with the pump station playing a primary role.

[0022] The tunnel 9 is also equipped with a relay pumping station, which is used to further discharge the drainage in the drainage ditch 2 and / or the movable water tank 3 to the outside of the tunnel 11; to realize the strong drainage of the reverse slope section or accelerate the drainage of the forward slope section. In this embodiment, the sewage generated at the working face 10 and the clear water seeping from the tunnel are collectively referred to as drainage. The discharged sewage and clear water can be further treated and / or reused as needed, saving water resources and energy.

[0023] The booster pump station 5 and / or relay pump station adopt submersible pumps or centrifugal pumps.

[0024] The movable water tank 3 is composed of multiple tank bodies 3.1 assembled together; the tank bodies 3.1 are detachably connected by overlapping tongue-and-groove joints 3.2; the tank bodies 3.1 are also detachably connected to the side wall of the drainage ditch 2 via sliding grooves 3.3. With the above configuration, the movable water tank 3 can be installed along with the drainage ditch 2 and its length can be adjusted at any time, while also facilitating quick disassembly after subsequent construction. The tank bodies 3.1 are detachably installed on the side of the drainage ditch 2 near the side wall of the cavern 9, facilitating the drainage of clear water seeping from the cavern 9 into the movable water tank 3.

[0025] The cross-section of the groove 3.1 is square, inverted trapezoidal, U-shaped, or V-shaped, such as... Figure 3 The image shown is a square, as... Figure 5 The diagram shows a U-shape.

[0026] The water collection pit 1 is a low-lying area inside the cavern 9 or is constructed by pouring concrete. The drainage ditch 2 is made of concrete, and its grade is consistent with that of the concrete used in the pouring chamber 9.

[0027] The connections between the tank body 3.1 and the water-blocking head 4, as well as between each tank body 3.1, are sealed to prevent water leakage.

[0028] The drainage ditch 2 is detachably equipped with a cover plate 6. The cover plate 6 is a square grid plate with an inverted T-shaped cross section, and a water baffle plate 6.1 is provided above the cover plate 6 at the side wall of the movable drainage ditch.

[0029] The drainage ditch 2 has a width of 300-500mm and a depth of 400-500mm. With the above settings, after the subsequent construction is completed, the drainage ditch 2 can be used directly as a permanent drainage ditch.

[0030] The construction method of the sewage and clean water separation structure in the cavern of the water conservancy and hydropower project in this embodiment includes the following steps: S1: As tunnel 9 is excavated, drainage ditches 2 are gradually constructed on both sides of tunnel 9; S2: Connect the trough 3.1 along the drainage ditch 2 step by step through the overlapping tongue and groove 3.2 to form a movable water trough 3, and install the trough 3.1 onto the side of the drainage ditch 2 near the side wall of the cave 9 through the sliding groove 3.3; S3: Seal the connection of the groove 3.1; S4: Install a water-blocking head 4 at one end of the active water tank 3 near the working face 10, and set the water-blocking head 4 at a distance from the working face 10 to ensure that the sewage in the early stage of the excavation of the tunnel 9 does not enter the active water tank 3. S5: A water collection pit 1 is set up to collect sewage from the working face 10, and the sewage in the water collection pit 1 is discharged into the drainage ditch 2 through the lifting pump station 5. The clear water seeping out of the cavern 9 flows into the movable water tank 3. Wastewater generated from the excavation work face and related construction activities enters the drainage ditch 2. Due to the blocking effect of the water-blocking head 4, it does not enter the clean water zone 8, but enters the sewage zone 7. The clean water seeping from the wall of the tunnel 9 flows independently through the clean water zone 8 separated by the movable water trough 3.

[0031] S6: The clean water in the active water tank 3 and the sewage in the drainage ditch 2 flow out naturally to the outside of the cave 11, or are forcibly discharged to the outside of the cave 11 through the relay pump station.

[0032] In the downslope excavation section of tunnel 9, wastewater and clean water in sewage area 7 of drainage ditch 2 flow out of the tunnel by gravity. In the upslope excavation section of tunnel 9, submersible pumps or centrifugal pumps are used to pump water from drainage ditch 2 to the outside of the tunnel.

[0033] In this embodiment, the construction of the cavern 9 is further divided into the cavern 9 construction period (road, construction adit or water conveyance cavern 9, etc.) and the structural cavern 9 construction period (underground powerhouse, main transformer room or underground gate room, etc.).

[0034] During the construction of tunnel 9, a sump pit 1 and a mobile pumping station 5 are installed at the working face 10 of the reverse slope construction section to pump construction wastewater to the outside of the tunnel 11. Simultaneously, a movable water trough 3 is installed within the drainage ditch 2 of the secondary lining section, with a water-retaining head 4 at the beginning of the movable water trough 3, forming a clear water zone 8 in the drainage ditch 2 to collect seepage. The mobile pumping station 5 is used to pump the clear water to the outside of the tunnel 11. At the working face 10 of the forward slope construction section, a sump pit 1 is installed, and drainage ditches 2 on both sides are constructed simultaneously. A movable water trough 3 is installed within the drainage ditch 2 of the secondary lining section, with a water-retaining head 4 at the beginning of the clear water zone 8 in the drainage ditch 2, forming a sewage zone 7 and a clear water zone 8 in the drainage ditch 2. Construction wastewater from the working face 10 and the primary lining section flows by gravity to the outside of the tunnel 11 through the sump pit 1 and the sewage zone 7 of the drainage ditch 2. Seepage (clear water) from the secondary lining section flows by gravity to the outside of the tunnel 11 through the clear water zone 8 of the drainage ditch 2.

[0035] The construction period of the structural cavern 9 includes an early stage and a later stage. The early stage involves excavation and lining of the structural cavern 9, while the later stage involves concrete pouring and electromechanical structure installation within the structural cavern 9. In the early stage of construction, a sump pit 1 and a temporary drainage ditch 2 are installed at the bottom of the excavation section to collect wastewater from the working face 10 and the initial lining area. This wastewater is then collected in the sump pit 1 and the temporary drainage ditch 2 and discharged into the drainage ditch 2 of the cavern 9 via gravity or a booster pump station 5, before being discharged outside the cavern. In the later stage of construction, a movable water trough 3 is installed inside the drainage ditch 2, forming a wastewater zone 7 and a clean water zone 8 within the drainage ditch 2. The wastewater zone 7 of the drainage ditch 2 collects construction wastewater from surface roughening, concrete curing, etc., and flows into the wastewater zone 7 of the drainage ditch 2 of the cavern 9, before being discharged outside the cavern via gravity or a booster pump. The drainage ditch 2 clear water area 8 of the structural cavern 9 collects seepage water from the surrounding area of ​​the structural cavern 9, which flows into the drainage ditch 2 clear water area 8 of the cavern 9, and is then discharged to the outside of the cavern by gravity or a lift pump.

[0036] During the construction of both the tunnel 9 and the structural tunnel 9, wastewater and clean water are discharged uniformly through the tunnel 9. On the positive slope section, construction wastewater and clean water from the tunnel 9 flow by gravity out of the tunnel via the sewage area 7 and the clean water area 8 of the drainage ditch 2, respectively. On the reverse slope section, construction wastewater from the tunnel 9 is discharged out of the tunnel via the lifting pump station 5. If the water volume is too large or the required lifting head is too high, an intermediate wastewater pool and a relay pump station are installed inside the tunnel to gradually lift the wastewater from the mobile lifting pump to the outside of the tunnel.

[0037] The above description is merely a preferred embodiment of this utility model, and the protection scope of this utility model is not limited to the above embodiments. For those skilled in the art, improvements and modifications obtained without departing from the technical concept of this utility model should also be considered within the protection scope of this utility model.

Claims

1. A drainage and sewage separation structure for caverns in water conservancy and hydropower projects, characterized in that, include: A water collection pit is provided at the bottom of the working face to collect wastewater generated from the working face and the initial lining of the tunnel. A drainage ditch is provided on both sides of the cavern along the cavern's orientation. One end of the drainage ditch is connected to a sump pit, and the other end is connected to the outside of the cavern. The movable water trough is detachably installed in the drainage ditch on one side near the tunnel wall to collect clean water from the secondary lining section of the tunnel. The movable water trough is also provided with a water-blocking head at one end near the working face to separate the movable water trough from the water collection pit. The other end of the movable water trough is connected to the outside of the tunnel.

2. The drainage and sewage separation structure for water conservancy and hydropower engineering caverns according to claim 1, characterized in that, A booster pump station is installed at one end of the tunnel near the working face to discharge sewage from the sump into the drainage ditch.

3. The drainage and sewage separation structure for water conservancy and hydropower engineering caverns according to claim 1, characterized in that, The ends of the drainage ditch and the movable water tank near the working face are both set higher than the ends near the outside of the tunnel.

4. The drainage and sewage separation structure for water conservancy and hydropower engineering caverns according to claim 2, characterized in that, The cavern is also equipped with a relay pumping station, which is used to discharge the drainage from the drainage ditch and / or movable water tank to the outside of the cavern. The booster pump station and / or relay pump station uses submersible pumps or centrifugal pumps.

5. The drainage and sewage separation structure for water conservancy and hydropower engineering caverns according to claim 4, characterized in that, The movable water tank is composed of multiple tank sections joined together. The grooves are detachably connected by overlapping tongue and groove joints. The trough is also detachably connected to the side wall of the drainage ditch via a sliding slot or mechanical anchoring method.

6. The drainage and sewage separation structure for water conservancy and hydropower engineering caverns according to claim 5, characterized in that, The water collection pit is a low-lying area inside the cave or is constructed by pouring concrete. The drainage ditch is made of concrete, and its grade is consistent with that of the concrete used to pour the cavern.

7. The drainage and sewage separation structure for water conservancy and hydropower engineering caverns according to claim 6, characterized in that, The connections between the tank body and the water-blocking head, as well as between the tank bodies, are sealed.

8. The drainage and sewage separation structure for water conservancy and hydropower engineering caverns according to claim 1, characterized in that, The drainage ditch is equipped with a detachable cover.

9. The drainage and sewage separation structure for water conservancy and hydropower engineering caverns according to claim 1, characterized in that, The drainage ditch is 300-500mm wide and 400-500mm deep.