An enlarged cast-in-place pile

By setting up grouting bodies around the main pile of the cast-in-place pile and forming expanded cast-in-place piles with cement grout composite foundation materials, the problem of insufficient bearing capacity of single piles under poor transportation conditions in mountainous areas is solved, and efficient and low-cost pile foundation construction is achieved.

CN224982163UActive Publication Date: 2026-11-17HENNAN ELECTRIC POWER SURVEY & DESIGN INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202521142357.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-06-05
Publication Date
2026-11-17
Estimated Expiration
2035-06-05

AI Technical Summary

Technical Problem

In mountainous construction, due to poor transportation conditions, large equipment cannot be used. The single pile bearing capacity and pull-out bearing capacity of traditional manually excavated cast-in-place piles are poor, and the traditional post-grouting method is not applicable, posing construction safety hazards.

Method used

A grouting body is set around the main pile of the cast-in-place pile. Cement grout is injected under high pressure and combined with the foundation material to form an expansion body. The composite body is then integrated with the retaining wall and the cast-in-place pile body, thereby improving the reinforcement effect of the soil around the pile.

Benefits of technology

It significantly improves the compressive, tensile, and horizontal bearing capacity of single piles, reduces the amount of reinforced concrete and construction costs, enhances the stability of pile foundations, reduces construction safety risks, and yields significant economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224982163U_ABST
    Figure CN224982163U_ABST
Patent Text Reader

Abstract

This utility model provides an enlarged-body cast-in-place pile, relating to the field of pile foundation technology. The enlarged-body cast-in-place pile includes a main pile and at least three grouting bodies surrounding it. By placing grouting bodies around the main pile, the cement slurry in the grouting bodies permeates into the foundation material to form a composite, which solidifies with the retaining wall and the pile body to form an enlarged-body cast-in-place pile. This significantly improves the compressive, tensile, and horizontal bearing capacity of a single pile. Under the same bearing capacity, the diameter of the cast-in-place pile can be reduced, decreasing the amount of steel reinforcement and concrete used, thus lowering costs. The soil around the cast-in-place pile is reinforced, increasing the stability of the pile foundation, especially in mountainous and sloping areas, preventing soil erosion around the pile and resisting damage caused by localized landslides. Under the same conditions, this utility model's enlarged-body cast-in-place pile can reduce the hole depth and pile diameter, greatly reducing the safety risks during manual excavation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of pile foundation technology, and in particular relates to an enlarged cast-in-place pile. Background Technology

[0002] Currently, the commonly used foundation types for building construction in mountainous areas include natural foundations, excavated foundations, bored pile foundations, and rock anchor foundations. The specific foundation type to be adopted generally depends on factors such as the type and scale of the building, topography, elevation difference, transportation conditions, geotechnical engineering conditions, and construction costs.

[0003] Due to the unique characteristics of mountainous terrain, transportation conditions are generally poor, especially for small-scale or linear projects. Construction conditions are even worse, making it impossible to invest heavily in building roads that can accommodate large machinery (e.g., network signal towers, high-voltage transmission line towers, wind turbines, etc.). This results in a limited range of foundation options, particularly when the soil properties in mountainous sites are poor. There are no readily available, mature foundation types to choose from, necessitating the significant cost of constructing construction roads and transporting large mechanized construction equipment to the site. For example, in some mountainous areas of Northwest my country... The surface is covered with a thick layer of loess, generally several meters to tens of meters thick. The soil is relatively loose, being slightly dense loess. The construction of high-voltage transmission line towers requires the use of bored pile foundations. Due to the lack of construction roads, the excavation is mostly done manually. This excavation technique poses significant safety hazards to personnel. Generally, design units are not allowed to design the depth of manually excavated holes to exceed 16 meters. Some regions or industries have imposed very strict restrictions on the hole depth, diameter, and support measures for manually excavated holes. Meanwhile, mechanized construction equipment cannot reach the construction site, which greatly restricts the construction project.

[0004] Traditionally, the method to improve the bearing capacity of cast-in-place piles involves post-grouting a certain period after pile construction. Grouting pipes are pre-installed on the reinforcing cage of the pile, and post-grouting is performed on the pile sides and ends after pile completion to increase side and end resistance, thereby improving the single pile bearing capacity. However, for manually excavated cast-in-place piles, to prevent the borehole wall from collapsing and threatening the lives of construction workers, segmented wall protection is required during excavation. The wall protection material is generally reinforced concrete, with a thickness of about 10 centimeters. After excavation, the entire borehole wall needs to be protected, and the wall protection is not removed during the pouring of the cast-in-place pile. Therefore, the traditional post-grouting method is not suitable for manually excavated cast-in-place piles because the grout cannot penetrate the wall protection to strengthen the soil around the pile. Although grouting at the pile bottom can increase the compressive bearing capacity of a single pile, the pile foundations of power transmission towers are controlled by tensile strength, with lower requirements for compressive strength.

[0005] In response to the challenges posed by mountainous construction sites with poorly compacted soils such as loess, silt, and sand, and poor transportation conditions, traditional manually excavated cast-in-place piles suffer from poor uplift bearing capacity. Even with design calculations showing that some piles are 16 meters long and have a diameter of over two meters, the single pile bearing capacity still cannot meet design requirements. This utility model provides a composite pile type—the expanded-body cast-in-place pile—that is low-cost, easy to construct, has high single pile bearing capacity, and good stability. Utility Model Content

[0006] The technical problem to be solved by this utility model is: how to solve the problem of poor single pile bearing capacity and pull-out bearing capacity of existing cast-in-place piles under the condition of poor transportation conditions and inability to use large equipment; in order to solve the above problem, this utility model provides an enlarged cast-in-place pile.

[0007] This utility model is achieved through the following technical solution: An enlarged cast-in-place pile includes a main pile, and at least three grouting bodies are provided around the main pile. The grouting bodies are surrounded by a composite body, which is formed by combining high-pressure cement grout with foundation materials.

[0008] Preferably, a large circle of grouting holes is provided on the outer side of the main pile of the cast-in-place pile, and the large circle of grouting holes is a concentric circle of the main pile of the cast-in-place pile. The radius D of the large circle of grouting holes is greater than the radius R of the main pile of the cast-in-place pile. The grouting body is cylindrical, and the center P of the grouting body is on the large circle of grouting holes. The grouting body is evenly distributed on the large circle of grouting holes. The midpoint of the line connecting the centers P of two adjacent grouting bodies is H. The line connecting H and the center O of the main pile of the cast-in-place pile is HO. The intersection of HO and the outer circumference of the main pile of the cast-in-place pile is Q. The radius of the cement grouting range around the grouting body is r≥PQ.

[0009] Preferably, the main pile of the cast-in-place pile includes a pile body, and the pile body is provided with a protective wall around its circumference.

[0010] Preferably, the radius of the cast-in-place pile body is 0.3~1.0m; the thickness of the retaining wall is 8~12cm; and the radius R of the main pile of the cast-in-place pile is 0.38~1.12m.

[0011] Preferably, the radius D of the large circle of the grouting hole is 0.8~2.0m, and the radius of the grouting body is 4~6cm.

[0012] Preferably, the depth of the grouting body is greater than that of the main pile of the cast-in-place pile.

[0013] Compared to existing technologies, this invention, by setting up a grouting body around the main pile of the cast-in-place pile, and having the cement slurry in the grouting body penetrate into the foundation material to form a composite, which solidifies with the retaining wall and the pile body to form an enlarged cast-in-place pile, can significantly improve the compressive, tensile, and horizontal bearing capacity of a single pile. Under the same bearing capacity, the diameter of the cast-in-place pile can be reduced, significantly reducing the amount of steel reinforcement and concrete used. Since the cost of cement slurry is low and the construction cost is low, the enlarged cast-in-place pile of this invention can significantly reduce the cost of pile foundations. Because the soil around the cast-in-place pile is reinforced, and the diameter of the reinforced cement-soil composite can generally reach 2 to 3 times the diameter of the cast-in-place pile, the stability of the pile foundation is greatly increased. Especially in mountainous and sloping sites, it can prevent soil erosion around the pile and resist the damage caused by local landslides around the pile. Under the same conditions, the enlarged-body cast-in-place pile of this utility model can reduce the hole depth and pile diameter of the cast-in-place pile, which greatly reduces the safety risks during manual excavation. In addition, for mountainous sites where the cost of using mechanized construction is very high, the manual excavation enlarged-body cast-in-place pile of this utility model can greatly reduce the construction cost of the pile foundation, and the economic benefits are more obvious. Attached Figure Description

[0014] Figure 1 This is the front view of the enlarged cast-in-place pile.

[0015] Figure 2 This is a top view of an enlarged cast-in-place pile.

[0016] Figure 3 It is Figure 2 Top view of the circularized outer contour of the complex Among them, 1 is the enlarged cast-in-place pile; 2 is the main pile of the cast-in-place pile; 3 is the pile body of the cast-in-place pile; 4 is the retaining wall; 5 is the grouting body; 6 is the cement-soil composite; 7 is the large circle of the grouting hole; and 8 is the grouting hole. Detailed Implementation

[0017] The present invention will be further described below with reference to specific embodiments, and the advantages and features of the present invention will become clearer with the description. However, unless otherwise specified, the specific experimental methods involved in the following embodiments are conventional methods or implemented according to the conditions recommended in the manufacturer's instructions.

[0018] like Figure 1 , 2 As shown in Figure 3, an enlarged cast-in-place pile 1 includes a main pile 2. At least three grouting bodies 5 are provided around the main pile 2. The grouting bodies are cylindrical cement slurry solids formed after the cast-in-place pile is poured and initially solidified, and after grouting each grouting hole is injected with grout using high-pressure grouting equipment. The grouting holes are generally formed by manual excavation with a small Luoyang shovel, with a diameter of about 10 centimeters and a length that is generally 2 to 3 meters longer than the cast-in-place pile body.

[0019] Furthermore, the grouting body 5 is surrounded by a composite body 6, which is formed by high-pressure cement grout and foundation material. Cement grout is injected under high pressure into the grouting hole. Under the action of high-pressure grouting, the cement grout is forced into the foundation material around the grouting body. After solidification, a high-strength cement grout and foundation material composite body is formed. Due to the uneven distribution of porosity, permeability differences and randomness of grout diffusion path of the foundation material, the formed composite body exhibits a non-uniform distribution.

[0020] The foundation material is loess, sand, silt, etc., surrounding the cast-in-place piles. In this embodiment, the foundation material is slightly dense loess.

[0021] like Figure 2 As shown, a large circle 7 of grouting holes is provided on the outer side of the main pile of the cast-in-place pile, and the large circle 7 of grouting holes is a concentric circle of the main pile of the cast-in-place pile. The radius D of the large circle 7 of grouting holes is greater than the radius R of the main pile of the cast-in-place pile. The center P of the grouting body 5 is on the large circle 7 of grouting holes. The grouting body 5 is evenly distributed on the large circle 7 of grouting holes. The midpoint of the line connecting the center P of two adjacent grouting bodies 5 is H. The line connecting H and the center O of the main pile 2 of the cast-in-place pile is HO. The intersection of HO and the outer circumference of the main pile 2 of the cast-in-place pile is Q. The radius of the cement grouting range around the grouting body 5 is r≥PQ. The cement grout penetrates into the outer circumference of the main pile 2 of the cast-in-place pile, so that after the composite solidifies, it is integrated with the retaining wall and the pile body. During the grouting process, based on experience and the properties of the foundation materials, the grouting pressure and volume are controlled to ensure that the cement grout can penetrate the foundation materials surrounding the main pile 2 of the cast-in-place pile. This allows the cement grout to form a composite material with the surrounding foundation materials. After the composite material solidifies, it bonds to the retaining wall and the pile body, forming a unified whole. Figure 3 As shown, Figure 2 The outer contour of the composite body is rounded, forming a composite body 6 around the main pile 2 with a diameter that is 2 to 3 times the diameter of the main pile 2, which greatly increases the stability of the pile foundation. In addition, the composite body also strengthens the foundation material around the main pile, especially in mountainous and sloping sites, which can prevent soil loss around the pile and resist the damage caused by local landslides around the pile.

[0022] Furthermore, the main pile of the cast-in-place pile includes a pile body 3, with a retaining wall 4 circumferentially arranged around the pile body 3. The pile body is a typical cast-in-place pile cast after excavation and retaining wall construction, with a pile diameter generally between 0.6 and 2.0 meters. The retaining wall is a reinforced concrete cylinder that is gradually constructed from top to bottom as the excavation depth increases, fitting snugly against the borehole wall. The thickness of the retaining wall cylinder is generally around 10 centimeters, used to prevent the borehole wall from slabs falling off or collapsing, causing injury or death to the excavation workers. Existing retaining walls can also be used, but in areas with inconvenient transportation, cast-in-place reinforced concrete retaining walls are generally used to reduce transportation costs.

[0023] Furthermore, the radius of the pile body 3 of the cast-in-place pile is 0.3~1m; the thickness of the retaining wall 4 is 8~12cm, that is, the radius R of the main pile of the cast-in-place pile is 0.38~1.12m.

[0024] The radius D of the large circle 7 of the grouting hole is 0.5 to 1.0 m larger than the radius of the cast-in-place pile body, and D is 0.8 to 2 m. The radius of the grouting body is 4 to 6 cm. The depth of the grouting body 5 is greater than that of the main pile of the cast-in-place pile, generally 2 to 3 meters greater. It can form a composite body at the bottom of the main pile of the cast-in-place pile, thereby increasing the bearing capacity of the cast-in-place pile.

[0025] Furthermore, the diameter of the enlarged cast-in-place pile 1 is larger than the diameter of the grouting hole's large circle 7. The enlarged cast-in-place pile diameter is approximately 2m larger than the grouting hole's large circle diameter, which significantly improves the compressive, tensile, and horizontal bearing capacity of a single pile. Under the same bearing capacity, the pile diameter can be reduced, significantly decreasing the amount of steel reinforcement and concrete used. Due to the low cost of cement grout and lower construction costs, the enlarged cast-in-place pile of this invention can significantly reduce the cost of pile foundations. Under the same conditions, the enlarged cast-in-place pile of this invention can reduce the hole depth and pile diameter, greatly reducing the safety risks during manual excavation. In addition, for mountainous sites where mechanized construction is very costly, the manually excavated enlarged cast-in-place pile of this invention can significantly reduce pile foundation construction costs, resulting in even more obvious economic benefits.

[0026] A construction method for manually excavated and enlarged cast-in-place piles, the steps of which are as follows: S1: At the designated location of the manually excavated cast-in-place pile, the hole is excavated manually. When the hole reaches a certain depth, such as 3 meters, the retaining wall is constructed in sections. After the retaining wall reaches the design strength, the hole is excavated downward until the design depth is reached and the retaining wall is completed. S2: Lower the steel cage of the cast-in-place pile, install the guide pipe, pour concrete, and form the main pile of the cast-in-place pile; S3: Set a circle concentric with the main pile of the cast-in-place pile and with a radius greater than that of the main pile of the cast-in-place pile 2 as the grouting hole large circle 7. Arrange grouting holes evenly along the circumference of the grouting hole large circle 7 at a spacing of about 1.0m. The grouting holes are manually excavated using a small Luoyang shovel. In the actual construction process, the deepest hole can be excavated by the small Luoyang shovel to 24 meters. S4: Two to three days after the cast-in-place pile is poured, the pile will initially solidify. High-pressure grouting will be performed on each grouting hole one by one. The cement grout will penetrate into the foundation material around the grouting hole. During the grouting process, based on experience and the properties of the foundation material, the grouting pressure and grouting volume will be controlled to allow the cement grout to enter the foundation material around the main pile 2 of the cast-in-place pile and come into contact with the retaining wall of the cast-in-place pile. S5: After all grouting holes are filled, a grouting body is formed in the grouting holes. The foundation material around the cast-in-place pile and the grouting holes, including the bottom, forms a composite of cement grout and foundation material. After the composite solidifies, it is bonded together with the retaining wall and the cast-in-place pile body, thus forming an enlarged cast-in-place pile with a diameter about 2m larger than the large circle diameter of the grouting hole. This enlarged cast-in-place pile is 2 to 3 times larger in diameter than the main pile of the cast-in-place pile and 2 to 3 meters longer.

[0027] In this embodiment, the radius D of the large circle of the grouting hole is 2m, the radius of the cast-in-place pile body is 1.0m, the wall thickness is 10cm, and eight grouting holes are evenly arranged. According to geometric calculations, the distance PQ between the center P of the grouting hole and point Q on the circumference of the cast-in-place pile is 1.05m. The foundation material is slightly dense loess, the grouting pressure reaches 2MPa, the grouting volume is 0.5t, and the radius r of the cement grout penetration range can reach more than 1.1m, allowing the cement grout to enter the foundation material around the main pile 2 of the cast-in-place pile and form a composite of cement grout and foundation material with the foundation material around the cast-in-place pile. After the composite solidifies, it solidifies into one with the wall and the cast-in-place pile body. Compared to ordinary cast-in-place piles dug manually, the bearing capacity of a single pile dug with enlarged body obtained by the above construction method can be increased by two times.

[0028] A pile cap is installed above the expanded cast-in-place pile to improve the pile's stress performance and increase its bearing capacity.

[0029] This invention's expanded-body cast-in-place pile exhibits strong site adaptability, particularly advantageous in sites with poor geotechnical conditions. It significantly improves the compressive, tensile, and horizontal bearing capacity of a single pile, allowing for a smaller pile diameter while maintaining the same bearing capacity. This drastically reduces the amount of steel reinforcement and concrete required. Due to the low cost of cement grout and construction, the expanded-body cast-in-place pile of this invention can significantly reduce the cost of pile foundations. Because the soil around the pile is reinforced, and the diameter of the reinforced cement-soil composite is generally 2-3 times the diameter of the pile, the stability of the pile foundation is greatly increased. Especially in mountainous and sloping sites, it prevents soil erosion around the pile and resists damage caused by localized landslides. Under the same conditions, this invention's expanded-body cast-in-place pile can reduce the hole depth and pile diameter, significantly reducing the safety risks associated with manual excavation. Furthermore, for mountainous sites where mechanized construction is costly, this invention's manually excavated expanded-body cast-in-place pile can significantly reduce pile foundation construction costs, resulting in even greater economic benefits. This invention is reasonably designed, easy to construct, and has significant benefits. After practical testing, it is expected to form a unified and universal technical solution, fully tapping the potential of the bearing capacity of cast-in-place piles.

[0030] The above description is only a preferred embodiment of the present utility model. It should be noted that those skilled in the art can make several changes and improvements without departing from the overall concept of the present utility model, and these should also be considered within the protection scope of the present utility model.

Claims

1. A bulid-up pile, the bulid-up pile (1) comprising a pile main pile (2), characterized in that, At least three grouting bodies (5) are provided around the main pile of the cast-in-place pile. The grouting body (5) is surrounded by a composite body (6). The composite body (6) is formed by high-pressure cement grout and foundation material. The foundation material is any one of loess, sand, or silt surrounding the cast-in-place pile.

2. The body of claim 1, wherein The main pile of the cast-in-place pile is provided with a large circle of grouting holes (7) on the outside, and the large circle of grouting holes (7) is a concentric circle of the main pile of the cast-in-place pile. The radius D of the large circle of grouting holes (7) is greater than the radius R of the main pile of the cast-in-place pile. The grouting body (5) is cylindrical. The center P of the grouting body (5) is on the large circle of grouting holes (7). The grouting bodies (5) are evenly arranged on the large circle of grouting holes (7). The midpoint of the line connecting the center P of two adjacent grouting bodies (5) is H. The line connecting H and the center O of the main pile of the cast-in-place pile (2) is HO. The intersection of HO and the outer circumference of the main pile of the cast-in-place pile (2) is Q. The radius of the cement grouting range around the grouting body (5) is r≥PQ.

3. The augered filled pile of claim 2, wherein, The radius D of the large circle (7) of the grouting hole is 0.8~2.0m, and the radius of the grouting body is 4~6cm.

4. The body of claim 1, wherein The main pile (2) of the cast-in-place pile includes the pile body (3), and the pile body (3) is provided with a protective wall (4) around its circumference.

5. The augered filled pile of claim 4, wherein, The radius of the pile body (3) of the cast-in-place pile is 0.3~1.0m; the thickness of the retaining wall (4) is 8~12cm; and the radius R of the main pile (2) of the cast-in-place pile is 0.38~1.12m.

6. The augered filled pile of claim 1 wherein, The depth of the grouting body (5) is greater than that of the main pile of the cast-in-place pile.