Basement structure considering buoyancy, temperature regulation, and irrigation efficiency
By installing a water storage system and a waterproof layer in the basement trench, the problems of complex backfilling of foundation pits and large amount of pile foundations in basement construction are solved, achieving the effects of simple construction, high efficiency, energy saving and environmental protection.
Patent Information
- Application Number
- CN202522578742.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-04
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-04
AI Technical Summary
In existing technologies, basement construction suffers from problems such as complex backfilling of foundation pits and trenches, large quantities and high costs of pile foundations, and low efficiency in energy and water resource utilization.
A water storage system is installed in the trenches on both sides of the basement. The buoyancy of the water reduces the number of pile foundations. Combined with the waterproof layer, a closed circulating water system is formed to achieve seepage prevention and moisture prevention functions. The temperature is regulated by the heat capacity of the water body to form a comprehensive temperature regulation effect.
It reduced the amount of pile foundations used and construction costs, improved construction efficiency and impermeability, achieved energy conservation and temperature regulation and water resource recycling, and simplified the foundation pit backfilling process.
Smart Images

Figure CN224982237U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of underground structure construction technology, and in particular relates to basement structures that take into account water buoyancy, temperature regulation, and irrigation efficiency. Background Technology
[0002] In recent years, with the continuous increase in the number of high-rise and super high-rise buildings, the development and utilization of underground space has become increasingly widespread. Basements, as an important component of high-rise buildings, not only serve functions such as equipment placement, parking, and storage, but also play a crucial role in the overall stability of the building. However, basement engineering still faces the following prominent problems during construction and use: (1) The problem of backfilling the foundation pit and trench is complex. During basement construction, a certain width of space, known as a backfill trench, typically exists between the basement exterior walls and the foundation pit slope. After the foundation pit excavation and main structure construction are completed, the backfill trench needs to be filled. Currently, backfill trenches are mostly filled with plain soil or plain concrete, offering advantages such as on-site soil disposal, economic efficiency, and relative environmental friendliness. However, with the continuous expansion of project scale and the increasing complexity of construction environments, traditional foundation pit backfill methods suffer from cumbersome construction processes, low construction efficiency, difficulty in controlling backfill compaction, and difficulty in simultaneously achieving drainage and waterproofing functions.
[0003] (2) The foundation piles are used in large quantities and are costly. High-rise buildings are characterized by numerous stories, large size, and high loads, placing higher demands on the bearing capacity and stability of the foundation. In existing projects, pile foundations are a commonly used foundation type for high-rise buildings. To ensure the overall stability of the building, a large number of piles are typically required to distribute and transfer the enormous load from the superstructure. While this design can meet the load-bearing requirements, it results in a large number of piles, extended construction periods, and significantly increased costs, which is detrimental to the project's economic efficiency and construction effectiveness.
[0004] (3) Low efficiency in energy and water resource utilization The basement area is an enclosed environment, and temperature and humidity control relies on mechanical ventilation and air conditioning systems, which consumes a lot of energy and does not meet the requirements of green building and sustainable development. Utility Model Content
[0005] The purpose of this utility model is to provide a basement structure that takes into account buoyancy, temperature regulation, and water storage efficiency, so as to solve the above problems and achieve the goals of simple construction, high engineering efficiency, and drainage and energy-saving functions.
[0006] To achieve the above objectives, this utility model provides the following solution: a basement structure considering buoyancy, temperature regulation, and irrigation efficiency, comprising: The basement is located within the foundation pit and includes a basement structural floor slab. The top edge of the basement structural floor slab is vertically fixed to the basement exterior wall. The water connection mechanism includes a trough formed between the basement exterior wall and the foundation pit sidewall. A waterproof layer is laid on the inner wall of the trough. A basement cushion layer is provided between the bottom of the basement structural floor slab and the bottom of the foundation pit. The basement cushion layer is connected to the bottom of the trough. The trough and the basement cushion layer form a water storage system surrounding the basement. The pile foundation structure includes several piles, which penetrate the basement cushion layer and abut against the bottom of the basement structural slab.
[0007] Preferably, a foundation pit support pile is provided in the foundation pit near the side wall of the foundation pit, and the trench is formed between the basement exterior wall and the foundation pit support pile.
[0008] Preferably, the waterproof layer is laid on the outer wall of the basement exterior wall and the side wall of the foundation pit support piles.
[0009] Preferably, the waterproof layer is made of polyurethane waterproof coating or composite self-healing coating.
[0010] Preferably, the basement subbase includes a sand subbase, a concrete subbase, and a bottom waterproof layer laid sequentially from bottom to top, wherein the bottom waterproof layer is connected to the bottom of the basement structural slab.
[0011] Preferably, the sand cushion layer is formed by laying graded sand and gravel to achieve water communication between the fertilizer tanks on both sides of the basement.
[0012] Preferably, the concrete subbase is laid with plain concrete.
[0013] Preferably, the fertilizer tank is equipped with a support mechanism for supporting and separating the space inside the fertilizer tank. The support mechanism includes a plurality of lattice columns, and the two ends of the plurality of lattice columns are respectively fixedly connected between the basement exterior wall and the foundation pit support piles.
[0014] Preferably, the fertilizer tank is connected to a water storage tank via a connecting pipe, and the water storage tank is used to maintain a high degree of stability of the water in the fertilizer tank.
[0015] Compared with the prior art, the present invention has the following advantages and technical effects: (1) Reduce the amount of pile foundation and construction cost. This utility model stores water in the troughs on both sides of the basement and connects it with the basement cushion layer. The buoyancy of the water storage system is used to offset the load of the upper structure, which effectively reduces the stress on the pile foundation, thereby reducing the number of pile foundations, reducing construction costs, and shortening the construction period.
[0016] (2) A stable waterproof and water circulation system is formed. The inner wall of the fertilizer tank of this utility model is provided with a waterproof layer, so that after the fertilizer tank is filled with water, it can form a closed circulating water system with the basement foundation, realizing the integration of seepage prevention, moisture prevention and structural stability. In addition, by lowering the water level of the fertilizer tank, more convenient and effective seepage replenishment treatment can be carried out on the outside, thereby effectively improving the seepage resistance and service life of the basement and building structure.
[0017] (3) Use the heat capacity of water to regulate the temperature of the basement. Through the high specific heat capacity of the water storage system in the fertilizer tank, heat is stored or released in different seasons, which can regulate the temperature of the basement, reduce energy consumption, and improve the indoor thermal environment.
[0018] (4) Wide range of applications. This utility model is not only applicable to basement projects of high-rise and super high-rise buildings, but can also be extended to various underground space projects such as subway stations, underground garages, and underground commercial streets, and has broad market application prospects. Attached Figure Description
[0019] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0020] Figure 1 This is a schematic diagram of the basement structure of this utility model; Figure 2 This is a schematic diagram of the stress state of the basement of this utility model; The components are: 1. Basement exterior wall; 2. Foundation pit support piles; 3. Basement cushion layer; 4. Basement structural floor slab; 5. Sand cushion layer; 6. Concrete cushion layer; 7. Bottom waterproof layer; 8. Lattice column; 9. Waterproof layer; 10. Pile foundation; 11. Water storage tank; 12. Basement; 13. Connecting pipes. Detailed Implementation
[0021] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0022] To make the above-mentioned objectives, features and advantages of this utility model more apparent and understandable, the utility model will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0023] Example 1: Reference Figures 1-2 This utility model provides a basement structure that takes into account buoyancy, temperature regulation, and irrigation efficiency, including: Basement 12 is located in the foundation pit. Basement 12 includes a basement structural base slab 4. The top edge of the basement structural base slab 4 is vertically fixed to the basement exterior wall 1. The water connection mechanism includes a trough formed between the basement exterior wall 1 and the foundation pit sidewall. A waterproof layer 9 is laid on the inner wall of the trough. A basement cushion layer 3 is provided between the bottom of the basement structural floor slab 4 and the bottom of the foundation pit. The basement cushion layer 3 is connected to the bottom of the trough. The trough and the basement cushion layer 3 form a water storage system surrounding the basement 12. The pile foundation structure includes several piles 10, which penetrate the basement cushion layer 3 and abut against the bottom of the basement structural slab 4.
[0024] The main function of the waterproof layer 9 is to form a closed waterproof interface between the basement exterior wall 1 and the foundation pit sidewall, preventing external groundwater from seeping into the foundation pit and preventing water leakage inside the foundation pit. The main function of the basement cushion layer 3 is to connect with the foundation pit structure around the basement to form a water storage system. After the foundation pit is filled with water to the design height, the water in the foundation pit is connected through the basement cushion layer 3 to form a closed water circulation channel. The buoyancy generated by the water storage system on the basement reduces the bearing capacity of the pile foundation 10, thereby reducing the number of pile foundations and saving construction costs. At the same time, by forming a water storage system around the basement, the high specific heat capacity of water can be used to buffer the temperature of the underground space. In winter, a relatively warm environment can be maintained, and in summer, ground temperature fluctuations can be reduced, achieving passive energy-saving temperature regulation and reducing energy consumption. Overall, this utility model achieves integrated functions of basement structure temperature regulation, waterproofing, seepage prevention, and rainwater recycling by coating waterproof material in the foundation pit and forming a water storage system connected to the basement subbase within the foundation pit. This not only simplifies the foundation pit backfilling construction process and improves backfill density and construction efficiency, but also reduces the number of pile foundations used and the project cost, thereby improving project benefits. At the same time, it optimizes the utilization of basement energy and water resources, improving energy conservation and environmental protection levels.
[0025] The scheme was further optimized by installing foundation pit support piles 2 near the side wall of the foundation pit, forming a trench between the basement exterior wall 1 and the foundation pit support piles 2.
[0026] Further optimization of the solution allows for convenient and effective external seepage repair by lowering the water level in the grouting tank. Specifically, "external" refers to the surrounding areas directly related to the basement's main structure, including the backwater area of the basement's exterior wall protective layer, equipment trenches, and surrounding spaces with water inlets or inspection wells. When basement leakage occurs or structural moisture regulation is required, this invention lowers the water level in the grouting tank, creating a water level difference or a construction space to accommodate external grouting. Then, based on the leakage location and seepage path, a suitable grouting point and grouting pipe layout are selected. Pressure grouting is then performed at the leakage site through the grouting pipes, allowing the grout to diffuse along the structural interface and cover the leakage area, achieving a dense filling and sealing effect. Compared to traditional backfilling methods, the grouting tank formed by this invention eliminates the need for construction inside the basement, effectively solving the problem of leakage sources that traditional internal seepage repair methods cannot reach. It offers a wide seepage repair range while avoiding damage to the structure or decoration, thus reducing maintenance costs.
[0027] The plan was further optimized so that the waterproof layer 9 was laid on the outer wall of the basement exterior wall 1 and the side wall of the foundation pit support pile 2.
[0028] To further optimize the solution, the waterproof layer 9 is made of polyurethane waterproof coating, which has good extensibility and water resistance. A composite self-healing coating can also be used to deal with minor cracks. The waterproof layer 9 is applied evenly to the outer wall of the basement exterior wall 1 and the side wall of the foundation pit support pile 2 by manual or equipment application.
[0029] The scheme is further optimized. The basement subbase 3 includes a sand subbase 5, a concrete subbase 6 and a bottom waterproof layer 7 laid from bottom to top. The bottom waterproof layer 7 is connected to the bottom of the basement structural slab 4.
[0030] The scheme was further optimized by laying graded sand and gravel in layer 5 to enable water connection between the two sides of the basement drainage channel.
[0031] In this embodiment, the sand cushion layer 5 is laid with a thickness of 200-300mm. Its good permeability forms a highly permeable layer, ensuring water connectivity between the fertilizer tank and the sand cushion layer 5.
[0032] The plan was further optimized by using plain concrete for the concrete subbase 6.
[0033] In this embodiment, the concrete cushion layer 6 uses C15 or C20 strength concrete, with a thickness of 100-150mm, serving to level and bear load, thus facilitating the construction and laying of the basement structural slab 4. The solution was further optimized by using a polymer waterproof membrane for the bottom waterproof layer 7, which was laid on the surface of the concrete cushion layer 6 and overlapped with the bottom of the waterproof layer 9 of the basement exterior wall 1 to form a continuous waterproof system.
[0034] Reinforcing bars are tied to the bottom waterproof layer 7 and poured to form the basement structural slab 4. The basement structural slab 4 is fixedly connected to the basement exterior wall 1, and is also connected to the top of the pile foundation 10 through anchoring or bearing platform to form an overall load-bearing system.
[0035] To further optimize the design, a support mechanism is installed inside the fertilizer tank to support and divide the fertilizer tank space. The support mechanism includes several lattice columns 8, with both ends of the lattice columns 8 fixedly connected between the basement exterior wall 1 and the foundation pit support piles 2.
[0036] In this embodiment, the two ends of the lattice column 8 are welded or bolted to the basement exterior wall 1 and the foundation pit support pile 2, respectively, to support and divide the trough space. By rationally arranging the spacing and height of the lattice columns, not only can the overall structure be effectively stabilized and the stress transmitted, but it can also provide the necessary supporting foundation for the construction of the water flow channel. The lattice column support system has good mechanical properties, which can ensure the stability and safety of the trough during use.
[0037] In a further optimized design, the fertilizer tank is connected to a water storage tank 11 via a connecting pipe 13. The water storage tank 11 is used to maintain a high degree of stability of the water in the fertilizer tank.
[0038] In this embodiment, the water storage tank 11 can be directly selected from the building's water storage area. The fertilizer tank can be connected to the building's roof rainwater collection system and municipal pipe network, with rainwater introduced into the water storage tank 11 through pipes to achieve rainwater collection and storage. After simple filtration, the stored water can be used for community greening irrigation, road washing, or landscape water replenishment, achieving water resource recycling and urban water conservation goals. At the same time, the water storage tank 11 allows the water level in the fertilizer tank to be adjusted as needed for height and pressure balance to maintain buoyancy stability, and also allows for temperature transfer.
[0039] In this embodiment, the construction method for the basement structure that considers buoyancy, temperature regulation, and irrigation efficiency includes the following construction process: S1. Construct several pile foundations at the bottom of the foundation pit; At the bottom of the foundation pit, construct pile foundation 10 according to the pile location diagram, and control the top elevation of the pile to be aligned with the bottom surface of the basement structure slab 4.
[0040] S2. Lay a basement cushion layer 3 at the bottom of the foundation pit, and construct a basement structural slab 4 on top of the basement cushion layer 3, connecting it with the pile foundation 10. A sand cushion layer 5 and a concrete cushion layer 6 are laid sequentially at the bottom of the foundation pit. A bottom waterproof layer 7 is constructed on the concrete cushion layer 6, and the basement floor slab reinforcement is tied. Concrete is poured to form the basement structural floor slab 4, which is reliably connected to the pile foundation 10.
[0041] S3. Construct basement exterior wall 1 in the foundation pit, forming a trench between basement exterior wall 1 and the side wall of the foundation pit; Construct the basement exterior wall according to the drawings, forming a trench between the two. The bottom of the trench should be flat and compacted, and a lattice column 8 should be installed between the basement exterior wall 1 and the foundation pit support pile 2.
[0042] S4. Lay a waterproof layer 9 on the side wall of the fertilizer tank to connect the edge of the basement subbase 3 with the bottom of the fertilizer tank. A waterproof layer 9 is evenly applied to the outer wall of the basement exterior wall 1 and the side wall of the foundation pit support pile 2, and overlapped and sealed with the waterproof layer 9 of the foundation pit.
[0043] S5. After the main structure is completed, water is stored in the fertilizer tank until the water body is connected between the fertilizer tank and the basement sub-layer 3, forming a water storage system around the basement and forming the basement structural system.
[0044] Water is injected into the fertilizer tank to the designed water level, and the water level is maintained stable through the water storage tank 11 to form a complete basement structural system.
[0045] Example 2: The only difference between this embodiment and Embodiment 1 is that the support mechanism uses a seismic damper system. Utilizing the seismic damper system's ability to effectively protect the structure from earthquakes, the impact of seismic forces on the basement structure is reduced. By adjusting the operating state of the seismic damper system, the lateral pressure on the basement's exterior walls and the foundation pit's sidewalls can be flexibly controlled, ensuring uniform stress distribution across the entire foundation pit and further improving the stability and safety of the spatial structure. This technology not only enhances seismic performance but also optimizes the stress and stability of the foundation pit under different working conditions.
[0046] In the description of this utility model, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.
[0047] The embodiments described above are merely preferred embodiments of the present utility model and are not intended to limit the scope of the present utility model. Various modifications and improvements made to the technical solutions of the present utility model by those skilled in the art without departing from the spirit of the present utility model should fall within the protection scope defined by the claims of the present utility model.
Claims
1. A basement structure taking into account water buoyancy, temperature adjustment, and water storage and irrigation efficiency, characterized in that, include: Basement (12), the basement (12) is located in the foundation pit, the basement (12) includes a basement structural base slab (4), and the top edge of the basement structural base slab (4) is vertically fixedly connected to the basement exterior wall (1). The water connection mechanism includes a trough formed between the basement exterior wall (1) and the foundation pit sidewall. A waterproof layer (9) is laid on the inner wall of the trough. A basement cushion layer (3) is provided between the bottom of the basement structural slab (4) and the bottom of the foundation pit. The basement cushion layer (3) is connected to the bottom of the trough. The trough and the basement cushion layer (3) form a water storage system surrounding the basement (12). The pile foundation structure includes a plurality of piles (10), wherein the plurality of piles (10) penetrate the basement cushion layer (3) and abut against the bottom of the basement structural slab (4).
2. The basement structure considering water buoyancy, temperature adjustment, and water storage and irrigation efficiency according to claim 1, characterized in that: The foundation pit is provided with foundation pit support piles (2) near the side wall of the foundation pit, and the trench is formed between the basement exterior wall (1) and the foundation pit support piles (2).
3. The basement structure considering buoyancy, temperature regulation, and irrigation efficiency according to claim 2, characterized in that: The waterproof layer (9) is laid on the outer wall of the basement exterior wall (1) and the side wall of the foundation pit support pile (2).
4. The basement structure considering buoyancy, temperature regulation, and irrigation efficiency according to claim 3, characterized in that: The waterproof layer (9) is made of polyurethane waterproof coating or composite self-healing coating.
5. The basement structure considering buoyancy, temperature regulation, and irrigation efficiency according to claim 1, characterized in that: The basement subbase (3) includes a sand subbase (5), a concrete subbase (6) and a bottom waterproof layer (7) laid from bottom to top. The bottom waterproof layer (7) is connected to the bottom of the basement structural slab (4).
6. The basement structure considering buoyancy, temperature regulation, and irrigation efficiency according to claim 5, characterized in that: The sand cushion layer (5) is formed by laying graded sand and gravel to achieve water communication between the fertilizer tanks on both sides of the basement.
7. The basement structure considering buoyancy, temperature regulation, and irrigation efficiency according to claim 5, characterized in that: The concrete cushion layer (6) is laid with plain concrete.
8. The basement structure considering buoyancy, temperature regulation, and irrigation efficiency according to claim 2, characterized in that: The fertilizer tank is equipped with a support mechanism for supporting and separating the space inside the fertilizer tank. The support mechanism includes several lattice columns (8), and the two ends of the several lattice columns (8) are respectively fixedly connected between the basement exterior wall (1) and the foundation pit support pile (2).
9. The basement structure considering buoyancy, temperature regulation, and irrigation efficiency according to claim 1, characterized in that: The fertilizer tank is connected to a water storage tank (11) via a connecting pipe (13), and the water storage tank (11) is used to maintain the high stability of the water in the fertilizer tank.