A tunnel TBM sprayed concrete feeding system and a TBM including the system

By setting up an independent shotcrete feeding system in the tunnel TBM, the problem of pipe blockage caused by excessive concrete pumping distance in the L1 zone shotcrete operation was solved, enabling synchronous operation in the L1 and L2 zones and improving tunnel excavation efficiency and safety.

CN224982899UActive Publication Date: 2026-11-17CHINA RAILWAY CONSTR HEAVY IND +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522670237.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-17
Publication Date
2026-11-17
Estimated Expiration
2035-12-17

AI Technical Summary

Technical Problem

During tunnel excavation, the excessively long concrete pumping distance in the L1 zone can easily cause pipe blockage, resulting in discontinuous spraying and affecting the construction progress. Furthermore, the L1 and L2 zones cannot be sprayed simultaneously, which restricts the tunnel excavation efficiency.

Method used

A tunnel TBM shotcrete feeding system is set up between the connecting bridge and the shotcrete bridge, including a first group and a second group of independent concrete conveying systems. The concrete is directly conveyed to the spraying position through the concrete conveying pump and shotcrete manipulator on the first trailer, reducing the pumping distance and realizing synchronous operation of L1 and L2 zones.

Benefits of technology

It effectively reduced the phenomenon of concrete blockage in pipes, improved the reliability and safety of support operations in L1 zone, enabled synchronous operations in L1 and L2 zones, and significantly improved tunnel excavation efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224982899U_ABST
    Figure CN224982899U_ABST
Patent Text Reader

Abstract

This utility model belongs to the technical field of tunnel boring machine (TBM) equipment, specifically providing a TBM shotcrete loading system and a TBM including the system. The system includes a first concrete hopper, a first concrete pump, a first conveying pipe, a first crane, and a first shotcrete manipulator. The first concrete hopper is used to transport concrete to the first concrete pump. The first concrete pump is mounted on a first trailer. The first conveying pipe connects the first concrete pump and the first shotcrete manipulator, which is mounted on the TBM main unit. The first crane is mounted on the first trailer. This utility model, by placing the TBM shotcrete loading system between the connecting bridge and the shotcrete bridge, and by mounting the first concrete pump on the first trailer, reduces the pumping distance of the first concrete pump, thereby reducing pipe blockage and enabling rapid shotcreting in the L1 zone, thus improving the reliability and safety of the L1 zone support operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the technical field of tunnel boring equipment, and relates to a tunnel TBM spraying and feeding system and a TBM containing the system. Background Technology

[0002] In tunnel boring machines (TBMs), shotcrete support is typically divided into L1 zone initial support and L2 zone secondary support. L1 zone is a specific construction area located behind the TBM's main drive system, immediately adjacent to the cutterhead cutting face. This zone is usually defined as a ring-shaped space extending 5m to 10m backward from the cutterhead edge. Within this zone, the surrounding rock is newly exposed and is in its most unstable "face" state. This zone is the first line of defense against rock loosening and spalling, as well as controlling surface settlement. Rapid shotcreting in this zone allows for immediate sealing and reinforcement of the exposed surrounding rock, playing a crucial role in tunnel safety.

[0003] During the shotcrete operation in Zone L1, the concrete transported to the first concrete tank 6 behind the shotcrete bridge is unloaded into the first concrete delivery pump 7. It is then pumped through the delivery pipeline to the connecting bridge relay pump, and then pumped through the delivery pipeline to the input end of the first shotcrete robot 9 in Zone L1. The first shotcrete robot 9 in Zone L1 sprays concrete onto the tunnel wall to complete the support.

[0004] Shotcrete in Zone L1 is typically located at the tail of the shield. Due to its distance from the concrete unloading port, pipe blockage is prone to occur during material delivery, leading to discontinuous concrete spraying and affecting construction progress. Furthermore, since the shotcrete in Zones L1 and L2 uses the same feed material, shotcrete operations in Zones L1 and L2 cannot be carried out simultaneously, severely restricting the improvement of tunnel excavation efficiency. Utility Model Content

[0005] This invention optimizes the existing conventional shield tunneling machine / TBM rear support space layout, and provides a direct feeding system and method for shotcrete in the L1 zone, which shortens the pumping distance of shotcrete in the L1 zone, reduces pipe blockage, and enables simultaneous shotcreting of concrete in the L1 and L2 zones for support.

[0006] This utility model provides a tunnel TBM shotcrete feeding system, including a first set of tunnel TBM shotcrete feeding systems disposed between a connecting bridge and a shotcrete bridge. The first set of tunnel TBM shotcrete feeding systems includes a first concrete hopper, a first concrete delivery pump, a first delivery pipeline, a first crane, and a first shotcrete manipulator. The first concrete hopper is used to transport the mixed concrete to the first concrete delivery pump; The first concrete pump is mounted on the first trailer; The first delivery pipe is used to connect the first concrete delivery pump and the first spraying robot, which is mounted on the TBM host. The first crane is mounted on the first trailer; Initially, the first concrete hopper is located outside the tunnel. When it is necessary to spray concrete in the L1 area of ​​the tunnel, the first concrete hopper is transported to the first trailer by a material trolley. It is then lifted to the unloading position by the first concrete crane installed above the first trailer. At this time, the discharge port of the first concrete hopper corresponds to the receiving port of the first concrete pump. The concrete placed in the first concrete hopper flows into the first concrete pump and is then transported into the first spraying robot through the first conveying pipe. The first spraying robot then sprays the concrete.

[0007] Furthermore, the first spraying manipulator is mounted on the drilling rig support beam in the TBM main unit; The drilling rig support beam is equipped with a travel track; The first spraying manipulator includes a crawling trolley and a spraying arm and a nozzle mounted on the crawling trolley; the crawling trolley moves on a travel track; one end of the spraying arm is fixedly connected to the crawling trolley, and the other end of the spraying arm is equipped with a nozzle, through which concrete is sprayed.

[0008] Furthermore, the travel track is configured as a toothed ring structure; The crawling trolley includes a trolley body and a drive assembly for driving the trolley body to move; the drive assembly includes a drive motor and a gear, the drive end of the drive motor is connected to the gear, and the gear is fixedly connected to the trolley body and meshes with the travel track.

[0009] Furthermore, the crawler is also equipped with guide wheels, which are in contact with the side end face of the walking track.

[0010] Furthermore, the nozzle is connected to the spray arm via a universal joint.

[0011] Furthermore, the first spraying manipulator is provided in two sets, with the two sets of first spraying manipulators arranged at intervals along the drilling rig support beam.

[0012] Furthermore, the tunnel TBM sprayed concrete feeding system also includes a second set of tunnel TBM sprayed concrete feeding systems mounted on the second trailer; The second set of tunnel TBM shotcrete feeding system includes a second concrete hopper, a second concrete delivery pump, a second delivery pipeline, a second crane, and a second shotcrete robot. The second concrete hopper is used to transport the mixed concrete to the second concrete delivery pump; The second concrete pump is mounted on the second trailer; The second conveying pipe is used to connect the second concrete conveying pump and the second spraying robot, which is mounted on the spraying rotating frame at both ends of the spraying bridge.

[0013] As a further embodiment of this utility model, this utility model also provides a TBM, including a TBM main unit, a rear-mounted trailer system disposed behind the TBM main unit, and a tunnel TBM spray mixing and feeding system as described above. The rear trailer system includes a connecting bridge, a first trailer, a spray mixing bridge, and a second trailer connected in sequence.

[0014] Compared with the prior art, the present invention has the following beneficial effects: (1) The present invention provides a tunnel TBM sprayed concrete feeding system, which sets the tunnel TBM sprayed concrete feeding system between the connecting bridge and the sprayed concrete bridge, and sets the first concrete conveying pump on the first trailer in front of the sprayed concrete bridge (in the tunnel excavation direction) to reduce the pumping distance of the first concrete conveying pump to the concrete, thereby reducing the pipe blockage phenomenon, realizing rapid spraying in the L1 area, and improving the reliability and safety of the L1 area support operation.

[0015] (2) The TBM provided by this utility model sets up a first set of tunnel TBM sprayed concrete feeding system between the connecting bridge and the sprayed concrete bridge, and sets up a second set of tunnel TBM sprayed concrete feeding system on the second trailer, so that the first set of tunnel TBM sprayed concrete feeding system corresponding to tunnel L1 area and the second set of tunnel TBM sprayed concrete feeding system corresponding to tunnel L2 area both have independent concrete supply sources and independent pumping systems, which can realize synchronous operation of sprayed concrete in L1 area and sprayed concrete in L2 area, and greatly improve tunneling efficiency.

[0016] In addition to the objectives, features, and advantages described above, this utility model has other objectives, features, and advantages. The present utility model will now be described in further detail with reference to the figures. Attached Figure Description

[0017] The accompanying drawings, which form part of this application, are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an undue limitation of the present invention. In the drawings: Figure 1 This is a schematic diagram of the structure of a TBM according to an embodiment of the present invention; Figure 2 yes Figure 1 A schematic diagram showing the interconnection of the TBM main unit, connecting bridge, and first trailer. Figure 3 yes Figure 1 A schematic diagram showing the interconnection of the central injection hybrid bridge and the second trailer; Figure 4 yes Figure 1 A structural schematic diagram of the first trailer in the middle; Figure 5 yes Figure 1 A schematic diagram of the structure of the crawling vehicle; Figure 6 yes Figure 5 Schematic diagram of direction B in the middle.

[0018] in: 1. TBM main unit, 2. Connecting bridge, 3. First trailer, 4. Shotcrete bridge, 5. Second trailer, 6. First concrete hopper, 7. First concrete pump, 8. First crane, 9. First shotcrete robot, 9.1. Crawler trolley, 9.2. Drive assembly, 9.3. Spraying arm, 9.4. Nozzle, 10. Drilling rig support beam, 11. Second concrete hopper, 12. Second concrete pump, 13. Second crane, 14. Second shotcrete robot. Detailed Implementation

[0019] To make the above-mentioned objectives, features, and advantages of this utility model clearer and easier to understand, the specific embodiments of this utility model will be described in detail below with reference to the accompanying drawings. It should be noted that the accompanying drawings of this utility model are all in a simplified form and use non-precise proportions, and are only used to facilitate and clearly assist in illustrating the implementation of this utility model; the "several" mentioned in this utility model are not limited to the specific number shown in the examples in the drawings; the directions or positional relationships indicated by "front," "middle," "rear," "left," "right," "up," "down," "top," "bottom," and "middle" mentioned in this utility model are all based on the directions or positional relationships shown in the accompanying drawings of this utility model, and do not indicate or imply that the device or component referred to must have a specific orientation, nor should they be construed as limitations on this utility model.

[0020] Example 1: See Figures 1 to 6 As shown, this utility model also provides a TBM, including a TBM main unit 1, a rear-mounted trailer system installed behind the TBM main unit 1, and a tunnel TBM spray mixing and feeding system installed in the rear-mounted trailer system. The rear trailer system includes a connecting bridge 2, a first trailer 3, a spray mixing bridge 4, and a second trailer 5 connected in sequence. The tunnel TBM shotcrete loading system includes a first set located between the connecting bridge 2 and the shotcrete bridge 4, and a second set located on the second trailer 5. The first set of the tunnel TBM shotcrete loading system includes a first concrete tank 6, a first concrete pump 7, a first conveying pipeline, and a first shotcrete manipulator 9. The first concrete hopper 6 is used to transport the mixed concrete to the first concrete delivery pump 7; The first concrete pump 7 is mounted on the first trailer 3; The first conveying pipe is used to connect the first concrete conveying pump 7 and the first spraying robot 9, and the first spraying robot 9 is located on the side of the TBM host 1 near the connecting bridge 2; Initially, the first concrete hopper 6 is located outside the tunnel. When spraying is required in tunnel L1 area, the first concrete hopper 6 is transported to the first trailer 3 by a material trolley, and then lifted to the unloading position by the first concrete crane 8 installed above the first trailer 3. At this time, the discharge port of the first concrete hopper 6 corresponds to the receiving port of the first concrete pump 7. The concrete placed in the first concrete hopper 6 flows into the first concrete pump 7, and then flows into the first spraying robot 9 through the first conveying pipe. The first spraying robot 9 then sprays the concrete. In this invention, by using the first conveying pipe to pump the concrete to the first spraying robot 9 for spraying, the pumping distance is shortened by more than 30 meters and no secondary pumping is required, effectively reducing the occurrence of pipe blockage.

[0021] Preferably, the first jet mixing robot 9 is mounted on the drilling rig support beam 10 on the TBM host 1, and the drilling rig support beam 10 is provided with a travel track. The first jet mixing robot 9 shares the travel track with the advanced drilling rig, and works alternately, making full use of space and having a compact structure.

[0022] Preferably, the first spraying manipulator 9 is provided in two sets, with the two sets of first spraying manipulator 9 arranged at intervals along the circumference of the drilling rig support beam 10.

[0023] More preferably, the single first spray mixing robot 9 includes a crawling trolley 9.1 and a spray arm 9.3 and a nozzle 9.4 disposed on the crawling trolley 9.1; The crawling trolley 9.1 is matched and connected to the walking track so as to drive the entire first spray mixing robot 9 to move along the walking track; One end of the spraying arm 9.3 is fixedly connected to the crawling trolley 9.1, and the other end of the spraying arm 9.3 is equipped with a nozzle 9.4, through which concrete is sprayed.

[0024] More preferably, the crawling trolley 9.1 includes a trolley body and a drive assembly 9.2 for driving the trolley body to move. The drive assembly 9.2 includes a drive motor and a gear. The drive end of the drive motor is connected to the gear. The gear is fixedly connected to the main body of the trolley and meshes with the travel track (specifically, in this embodiment, the travel track is preferably set as a gear ring structure) to drive the main body of the trolley to move along the travel track.

[0025] As a further embodiment of this utility model, in order to ensure that the crawling trolley 9.1 moves smoothly on the walking track, guide wheels are also provided on the crawling trolley 9.1; preferably, two sets of guide wheels are provided, and the two sets of guide wheels are respectively connected to the two side end faces of the walking track in contact.

[0026] As a further embodiment of this utility model, in order to enable the nozzle 9.4 to adapt to the spraying requirements of different angles, the nozzle 9.4 is connected to the spraying arm 9.3 through a universal joint, so that the nozzle 9.4 can adjust the spraying direction according to the actual construction requirements.

[0027] Preferably, the second set of tunnel TBM shotcrete feeding system includes a second concrete hopper 11, a second concrete pump 12, a second conveying pipeline, a second crane 13, and a second shotcrete manipulator 14; The second concrete hopper 11 is used to transport the mixed concrete to the second concrete delivery pump 12; The second concrete pump 12 is mounted on the second trailer 5; The second conveying pipe is used to connect the second concrete conveying pump 12 and the second spraying robot 14. The second spraying robot 14 is set on the spraying rotating frame at both ends of the spraying bridge 4. In this invention, the first set of tunnel TBM sprayed concrete feeding systems and the second set of tunnel TBM sprayed concrete feeding systems are set up independently and without affecting each other, so as to realize that the first set of tunnel TBM sprayed concrete feeding systems and the second set of tunnel TBM sprayed concrete feeding systems can operate synchronously or alternately, so as to be adjusted according to the actual construction needs.

[0028] The above description is merely a preferred embodiment of this utility model and is not intended to limit the utility model. Various modifications and variations can be made to this utility model by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this utility model should be included within the protection scope of this utility model.

Claims

1. A tunnel TBM sprayed concrete feeding system, characterized in that, The first set of tunnel TBM sprayed concrete feeding system is set between the connecting bridge (2) and the sprayed concrete bridge (4). The first set of tunnel TBM sprayed concrete feeding system includes a first concrete tank (6), a first concrete pump (7), a first conveying pipeline, a first crane (8) and a first sprayed concrete robot (9). The first concrete hopper (6) is used to transport the mixed concrete to the first concrete delivery pump (7); The first concrete pump (7) is mounted on the first trailer (3); The first conveying pipeline is used to connect the first concrete conveying pump (7) and the first spraying robot (9), and the first spraying robot (9) is mounted on the TBM host (1); The first crane (8) is mounted on the first trailer (3); Initially, the first concrete hopper (6) is located outside the tunnel. When it is necessary to spray concrete in the L1 area of ​​the tunnel, the first concrete hopper (6) is transported to the first trailer (3) by a material trolley and then lifted to the unloading position by the first concrete crane (8) installed above the first trailer (3). At this time, the discharge port of the first concrete hopper (6) corresponds to the receiving port of the first concrete pump (7). The concrete placed in the first concrete hopper (6) flows into the first concrete pump (7) and is then transported into the first spraying robot (9) through the first conveying pipe. The first spraying robot (9) sprays the concrete.

2. The tunnel TBM sprayed concrete feeding system according to claim 1, characterized in that, The first jet mixing robot (9) is mounted on the drilling rig support beam (10) in the TBM host (1); The drilling rig support beam (10) is equipped with a travel track; The first spraying robot (9) includes a crawling trolley (9.1) and a spraying arm (9.3) and a nozzle (9.4) mounted on the crawling trolley (9.1); the crawling trolley (9.1) moves on a travel track; one end of the spraying arm (9.3) is fixedly connected to the crawling trolley (9.1), and the other end of the spraying arm (9.3) is equipped with a nozzle (9.4), through which concrete is sprayed.

3. The tunnel TBM sprayed concrete feeding system according to claim 2, characterized in that, The travel track is configured as a toothed ring structure; The crawling trolley (9.1) includes a trolley body and a drive assembly (9.2) for driving the trolley body to move; the drive assembly (9.2) includes a drive motor and a gear, the drive end of the drive motor is connected to the gear, the gear is fixedly connected to the trolley body and meshes with the travel track.

4. The tunnel TBM sprayed concrete feeding system according to claim 3, characterized in that, The crawler (9.1) is also equipped with guide wheels, which are in contact with the side end face of the walking track.

5. The tunnel TBM sprayed concrete feeding system according to claim 2, characterized in that, The nozzle (9.4) is connected to the spray arm (9.3) via a universal joint.

6. The tunnel TBM sprayed concrete feeding system according to any one of claims 1-5, characterized in that, The first spraying manipulator (9) is provided in two sets, and the two sets of first spraying manipulators (9) are arranged at intervals along the drilling rig support beam (10).

7. The tunnel TBM sprayed concrete feeding system according to claim 6, characterized in that, It also includes a second set of tunnel TBM spray mixing and feeding systems installed on the second trailer (5); The second set of tunnel TBM shotcrete feeding system includes a second concrete hopper (11), a second concrete delivery pump (12), a second delivery pipeline, a second crane (13), and a second shotcrete robot (14). The second concrete hopper (11) is used to transport the mixed concrete to the second concrete delivery pump (12); The second concrete pump (12) is mounted on the second trailer (5); The second conveying pipe is used to connect the second concrete conveying pump (12) and the second spraying robot (14), which is mounted on the spraying rotating frame at both ends of the spraying bridge (4).

8. A TBM, characterized in that, Includes a TBM main unit (1), a rear-mounted trailer system located behind the TBM main unit (1), and a tunnel TBM spray mixing and feeding system as described in claim 7; The rear trailer system includes a connecting bridge (2), a first trailer (3), a spray mixing bridge (4), and a second trailer (5) connected in sequence.