A sewage treatment structure combining a filled tunnel and a working face

By setting up retaining walls and water-passing walls in the filled roadway to form clear water pools and sewage pools, the problems of poor sedimentation effect and material waste in coal mine sewage treatment are solved, achieving efficient sedimentation and material reuse, reducing costs and labor intensity for workers.

CN224982929UActive Publication Date: 2026-11-17SHANXI JINMEI GRP TECH RESEACH INST
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202522455697.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-19
Publication Date
2026-11-17
Estimated Expiration
2035-11-19

AI Technical Summary

Technical Problem

In existing coal mine wastewater treatment systems, the sedimentation effect of the wastewater tanks is poor, which easily clogs the drainage pumps, increases the labor intensity of workers, and the sediment in the wastewater tanks affects the passage of mine shafts. Traditional designs waste slurry and weaken the sedimentation and filtration effect, making it difficult to efficiently treat and discharge wastewater.

Method used

Water-retaining walls and water-passing walls are set up in the filling tunnel to form clear water pools and sewage pools. Water is pumped out of the clear water pools, and the sediment in the sewage pools is used as filling material to reduce material waste and improve sedimentation effect.

Benefits of technology

It simplified the construction of sewage treatment facilities, increased the capacity of sewage tanks, reduced material costs, improved sedimentation efficiency, reduced the labor intensity of workers, avoided slurry waste, and ensured mine passage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224982929U_ABST
    Figure CN224982929U_ABST
Patent Text Reader

Abstract

The purpose of this utility model is to provide a wastewater treatment structure for a filling roadway combined with a working face, belonging to the field of coal mine wastewater treatment technology. It includes a return airway, an intake airway, and an auxiliary transport roadway distributed within the coal mining body, with a filling roadway located between the return airway and the intake airway. Within the filling roadway, from the return airway to the intake airway, a first water-retaining wall, a second water-passing wall, and a third water-retaining wall are sequentially arranged. A clear water pool is formed between the first water-retaining wall and the second water-passing wall, and a wastewater pool is formed between the second water-passing wall and the first water-retaining wall. A water pump is installed at the top of the first water-retaining wall, and a wastewater inlet pipe is installed at the top of the wastewater pool. This utility model solves the problem of waste slurry discharge generated during working face washing, while also avoiding slurry waste.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of coal mine wastewater treatment technology, specifically relating to a wastewater treatment structure for a filling roadway combined with a working face. Background Technology

[0002] With the advancement of coal mining technology, backfilling mining has gained increasing attention. Common backfilling mining technologies used in Chinese coal mines include solid face backfilling, solid roadway backfilling, paste face backfilling, overburden separation grouting backfilling, and high-water material backfilling. A typical technology, such as solid roadway backfilling, involves mixing the gangue generated during underground rock roadway excavation with auxiliary materials such as fly ash and loess to form backfill material. This material is directly transported to the working face via a continuous conveying system for post-mining backfilling, and then compacted using a compaction device to achieve dense backfilling of the goaf. This technology features a simple system, low investment cost, and superior backfilling effect.

[0003] For example, the paste-filling mining technology for working faces involves processing solid wastes such as coal gangue, power plant fly ash, and industrial slag generated during coal mining into a slurry-like filling material on the surface using special processes. This material is then pressurized by a dedicated filling pump and transported to the working face underground via a filling pipeline system. Currently, this technology has been applied in several mining areas in my country.

[0004] The conveying system from the surface to the mine involves long pipelines. To prevent the filling material from solidifying during intermittent work, it needs to be flushed immediately after shutdown to keep the system clean. Directly discharging wastewater from flushing the conveying system underground wastes the filling material, and the large amount of flushing water has nowhere to go, affecting subsequent production at the working face. Coal mining faces are typically narrow and cannot accommodate large amounts of wastewater in a short time. Therefore, a dedicated drainage system needs to be established within the working face area to promptly discharge wastewater and avoid disrupting operations. Water tanks are generally built at lower levels at the working face to collect wastewater from various locations. This wastewater is then subjected to sedimentation and filtration. After initial sedimentation, the impurities in the wastewater are reduced before further discharge treatment.

[0005] The traditional design of existing working face sewage tanks involves excavating a mother-daughter type tank of a certain volume on one side of the working face roadway. The tank is divided into two parts: a sedimentation tank and a filtration tank. Due to the large amount of filling in the working face, waste slurry is easily silted up when discharged into the sewage tank, resulting in high cleaning frequency and difficulty. This not only wastes slurry, but also, as the sedimentation and filtration effect of the sewage tank gradually weakens, sewage is prone to flow into the mine water sump and cause pollution.

[0006] To improve wastewater treatment and discharge efficiency, CN201721302074.6 discloses an automatic sedimentation and reuse system for mine water. This system includes a water tank located at the lower mining level and a wastewater tank located at the upper mining level. The outlet of the water tank is connected to the inlet of the wastewater tank via a drainage pipe. A sedimentation tank and a clear water tank are also located at the upper mining level. The wastewater tank and sedimentation tank are connected via a filter wall, as are the sedimentation tank and clear water tank. The outlet of the clear water tank is connected to the mining face at the lower mining level via a water supply pipe. This existing system utilizes the underground sedimentation tank for sedimentation, and the filtered water is directly transported to the next level's production and dust control areas, achieving rational utilization of mine water.

[0007] CN202110562287.7 discloses a connecting roadway-type underground wastewater treatment system and its construction method, relating to the field of underground coal mine wastewater treatment technology. The wastewater treatment system includes roadways, connecting roadways, coal pillars, a primary filter, a secondary filter, a sedimentation tank, a storage and drainage tank, an injection pipe, and a drainage pipe. The primary filter is located in the middle or lower part of the coal pillar sidewall in the belt conveyor roadway and is connected to the secondary filter. The secondary filter is located in the floor of the connecting roadway formed by the auxiliary transport roadway, the belt conveyor roadway, and the coal pillar. The secondary filter is sequentially connected to the sedimentation tank and the storage and drainage tank. The secondary filter and the storage and drainage tank are adjacent to the coal pillar in the connecting roadway. The sedimentation tank is located between the secondary filter and the storage and discharge tank. This system utilizes the connecting roadway between two roadways to construct a wastewater treatment system, making full use of the underground excavation space, purifying the wastewater from the coal mining face twice, and improving drainage efficiency.

[0008] In particular, the patent background technology points out that a section of abandoned alleyway or connecting alleyway can be blocked as a sewage pool. This method has the following two problems: (1) The sewage has poor sedimentation effect and cannot effectively remove suspended solids in the sewage, which can easily clog the drainage pump and affect the discharge efficiency; (2) The transfer drainage pump is directly placed at the bottom of the sewage pool for drainage or the pump is suspended in the sewage pool by the chain hoist on the top plate. In the former case, the pump hole is close to the bottom of the pool. As the sediment sludge increases, the pump hole is easily blocked. In the latter case, the pump needs to be taken out of the pool regularly to deal with the floating debris such as belt lint that clogs the pump hole. This increases the drainage process, wastes a lot of workers' time, has low work efficiency, and increases the labor intensity of workers. In addition, factors such as pump vibration disturb the flow of surrounding sewage, which is not conducive to sewage sedimentation.

[0009] This plan merely treats the abandoned tunnels as sewage ponds without any technological improvements to enhance sewage treatment efficiency. Furthermore, abandoning tunnels or working faces after mining can cause surface subsidence.

[0010] During the advancement of the working face, a large amount of sediment will be generated in the sewage treatment ponds of the coal mine. Most of these sediments will be gradually abandoned as the working face advances, and the coal sludge formed after sedimentation in the sewage ponds will also affect the passage in the mine. Utility Model Content

[0011] The purpose of this invention is to provide a sewage treatment structure for filling roadways combined with working faces, which can solve the problem of reuse of sewage treatment structures used for filling roadways combined with working faces.

[0012] The present invention adopts the following technical solution: A wastewater treatment structure combining a filling roadway with a working face includes a return airway, an intake airway, and an auxiliary transport roadway distributed within the coal mining body. A filling roadway is provided between the return airway and the intake airway. In the filling roadway, from the return airway to the intake airway, a first water-retaining wall, a second water-passing wall, and a third water-retaining wall are arranged in sequence. A clear water pool is formed between the first water-retaining wall and the second water-passing wall, and a wastewater pool is formed between the second water-passing wall and the third water-retaining wall. A water pump is provided at the top of the first water-retaining wall, and a wastewater inlet pipe is provided at the top of the wastewater pool.

[0013] Furthermore, the heights of the first and second retaining walls are the same.

[0014] Furthermore, the height of the water-passing wall is lower than the height of the first and second water-retaining walls.

[0015] Furthermore, the water-passing wall is made of sandbags stacked together, and its cross-section is trapezoidal.

[0016] Furthermore, one end of the water pump is connected to a pumping pipe, and the other end is connected to a drain pipe. The pumping pipe is located in the clear water tank, and the drain pipe is located in the return air tunnel.

[0017] Furthermore, the outlet of the sewage inlet pipe is located at the top of the sewage tank, and the other end of the sewage inlet pipe is connected to the filling and conveying system.

[0018] The beneficial effects of this utility model are as follows: Compared to directly excavating a sewage tank on the foundation slab, this invention constructs a sewage tank and a clear water tank within the filling tunnel by building two retaining walls. This method is simple to construct and allows the volume of the sewage tank to be increased as required, accommodating a larger amount of flushing wastewater from the filling system. The sludge after sedimentation is solidified and can be used as part of the filling material in the filling tunnel, saving filling materials such as cement and sand, and reducing costs. Attached Figure Description

[0019] Figure 1 This is a top view of the wastewater treatment system of this utility model. Figure 2 This is a cross-sectional view of the wastewater treatment system of this utility model; Wherein: 1-Return airway; 2-Intake airway; 3-Auxiliary transport airway; 4-Filling airway; 5-Water retaining wall one; 6-Water passage wall; 7-Water retaining wall two; 8-Water pump; 9-Sewage inlet pipe; 10-Pumping pipe; 11-Drainage pipe; 12-Filling material; 13-Exhaust pipe. Detailed Implementation

[0020] The present invention will be further described with reference to the accompanying drawings.

[0021] As shown in the figure, a sewage treatment system for a filling roadway combined with a working face includes a return airway 1, an intake airway 2, and an auxiliary transport roadway 3 distributed within the coal mining body. A filling roadway 4 is provided between the return airway 1 and the intake airway 2. In the filling roadway 4, from the direction of the return airway 1 to the intake airway 2, a water retaining wall 1 5, a water-passing wall 6, and a water retaining wall 2 7 are arranged in sequence. A clear water pool is formed between the water retaining wall 1 5 and the water-passing wall 6, and a sewage pool is formed between the water-passing wall 6 and the water retaining wall 2 7. A water pump 8 is installed at the top of the clear water tank, and a sewage inlet pipe 9 is installed at the top of the sewage tank. The sewage inlet pipe 9 is connected to the filling and conveying system.

[0022] The pumping pipe 10 of the water pump 8 is located in the clear water tank, and the drain pipe 11 of the water pump 8 is located in the return airway 1.

[0023] The height of the water-passing wall 6 is lower than the height of the first water-retaining wall 5 and the second water-retaining wall 7.

[0024] The cross-section of the water-passing wall 6 is trapezoidal.

[0025] The water-passing wall 6 is made of sandbags.

[0026] The ground filling material preparation system includes raw material bin 1, raw material bin 2, raw material bin 3, crusher, mixing and stirring device, filling pump, filling boreholes are set in the stratum, and the filling and conveying system reaches the working face through the filling boreholes and is connected to the sewage inlet pipe 9.

[0027] During normal filling operations, filling material is continuously introduced into the filling area. When work is stopped, water is injected on the ground to flush the delivery pipeline. The wastewater generated during flushing is guided into the sewage inlet pipe 9 and then into the sewage tank. After sedimentation, the upper part of the clear water overflows through the water wall 6 and enters the clear water tank, and is then pumped out for reuse by the water pump 8.

[0028] This utility model underwent an application test of a mining area-type sewage treatment plant. Based on the layout of the mining area roadways, the second mining area roadway was selected for the test. After all roadways in the second mining area were connected, a 1.5m high water-retaining wall was constructed 5m inside the entrance of the central transport roadway (i.e., the intake airway) and the return airway. A 1m high trapezoidal water-passing wall was constructed using sandbags 17m inside the return airway entrance. The width of the sandbag water-passing wall was required to ensure that it would not be damaged during the use of the sewage treatment plant. One side of the water-passing wall served as the sewage treatment plant, and the other side as the clear water reservoir. Based on a water storage capacity of 6 × 1 × 32.5m³, an effective volume of 195m³ could be achieved. 3 The sewage tank is 129m² 3 Clear water pool 66 m 3 A water pump is suspended in a low-lying area one mile from the retaining wall to extract the settled clear water.

[0029] The wastewater treatment tank in the mining roadway effectively solves the problem of waste slurry discharge generated during working face washing, while also preventing slurry waste. The solid components in the waste slurry are "filled" at the bottom of the mining roadway, and the clean water overflowing from the other end via sandbags flows into the clean water tank, which can be directly used by the working face, resulting in significant water savings.

Claims

1. A sewage treatment structure for filling a roadway junction with a working face, characterised in that: The coal mining structure includes a return airway (1), an intake airway (2), and an auxiliary transport airway (3) distributed within the coal mining area. A filling airway (4) is provided between the return airway (1) and the intake airway (2). In the filling airway (4), from the return airway (1) to the intake airway (2), a first water retaining wall (5), a second water retaining wall (6), and a third water retaining wall (7) are provided in sequence. A clear water pool is formed between the first water retaining wall (5) and the second water retaining wall (6), and a sewage pool is formed between the second water retaining wall (6) and the third water retaining wall (7). A water pump (8) is provided at the top of the first water retaining wall (5), and a sewage inlet pipe (9) is provided at the top of the sewage pool.

2. A sewage treatment structure for filling a roadway junction with a working face according to claim 1 characterised in that: The first (5) and the second (7) water-retaining walls are at the same height.

3. A sewage treatment structure for filling a roadway junction with a working face according to claim 1 characterised in that: The height of the water-passing wall (6) is lower than the height of the first water-retaining wall (5) and the second water-retaining wall (7).

4. A sewage treatment structure for filling a roadway junction with a working face according to claim 1 characterised in that: The water-passing wall (6) is made of sandbags and has a trapezoidal cross-section.

5. A sewage treatment structure for filling a roadway junction with a working face according to claim 1 characterised in that: One end of the water pump (8) is connected to the water pumping pipe (10), and the other end is connected to the drain pipe (11). The water pumping pipe (10) is located in the clear water pool, and the drain pipe (11) is located in the return airway (1).

6. A sewage treatment structure for filling a roadway junction with a working face according to claim 1 characterised in that: The outlet of the sewage inlet pipe (9) is located at the top of the sewage tank, and the other end of the sewage inlet pipe (9) is connected to the filling and conveying system.

Citation Information

Patent Citations

  • Connection roadway type underground transfer sewage treatment system and construction method thereof

    CN113336346A

  • Automatic system of recycling that deposits of pit water

    CN207537247U