A segmented tower assembly for a mountain wind power project
By adopting a segmented tower assembly scheme and utilizing fixing and connecting mechanisms to improve the stability and safety of the device, the problem of limited space for tower assembly in mountain wind power projects has been solved, achieving efficient and safe construction and improved structural stability.
Patent Information
- Application Number
- CN202522651238.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-15
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-15
AI Technical Summary
Mountain wind power projects with segmented towers face limited space for stacking and assembly in narrow sites, making it difficult to operate large-scale equipment, control welding quality, and carry high risks of high-altitude operations, as well as high construction costs, which affect the safety and durability of the tower structure.
The modular tower assembly scheme utilizes fixing and connecting mechanisms to enhance the stability and safety of the device. Hydraulic rods and threaded rods enable convenient fixing and unloading, while the rollers facilitate movement, thus optimizing the construction process.
It improves the construction efficiency and safety of mountain wind power projects, reduces transportation and construction costs, enhances the stability and durability of tower structures, and reduces the risks of working at heights.
Smart Images

Figure CN224983010U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of mountain wind power technology, specifically to a segmented tower assembly for mountain wind power projects. Background Technology
[0002] The segmented tower assembly method for mountain wind power projects refers to a construction method that addresses the challenges of complex mountain terrain, inconvenient transportation, and the difficulty of transporting large, integral towers. The tower is divided into several arc-shaped segments along its circumference. These segments are transported to the mountaintop or a suitable installation site via road or cableway. On-site, specialized equipment is used for splicing, welding, and anti-corrosion treatment to ultimately form a complete tower structure. This method is suitable for complex mountain transportation conditions, solving the problem of transporting integral towers through narrow mountain roads or steep terrain, thus reducing transportation costs and safety risks. Furthermore, it can be customized according to… The flexible adjustment of segment size and assembly sequence within the mountain site enhances on-site construction adaptability and reduces damage to mountain vegetation and terrain. Furthermore, segmented assembly disperses the weight and volume of individual components, facilitating installation with small hoisting equipment, reducing the requirements for access to large lifting equipment, improving construction efficiency, and shortening the construction period. Standardized segmented production also ensures component processing precision, enhancing the overall structural stability and durability of the tower, ensuring the smooth installation of towers in mountain wind power projects under complex terrain, and providing a reliable foundation for the safe and stable operation of subsequent wind turbine units.
[0003] Existing mountain wind power projects use segmented towers, but the narrow and uneven terrain of the mountain site limits the space for stacking and assembling the segmented components. This makes it difficult to place and operate large-scale equipment, resulting in a large amount of on-site welding work, high-altitude working environment risks, and difficulty in controlling welding quality, which can easily lead to weld defects and affect the safety and durability of the tower structure. At the same time, the labor and material costs are high, and logistical support for construction in mountainous areas is difficult. Therefore, we propose a segmented tower assembly method for mountain wind power projects. Utility Model Content
[0004] The purpose of this utility model is to provide a segmented tower assembly method for mountain wind power projects, in order to solve the problems mentioned in the background art regarding the existing segmented towers for mountain wind power projects. These problems include the narrow space and insufficient flatness of the mountain site, which restricts the space for stacking and assembling segmented components, makes it difficult to place and operate large tooling equipment, results in a large amount of on-site welding work and high-altitude working environment risks, makes it difficult to control welding quality, and easily causes weld defects, affecting the safety and durability of the tower structure. At the same time, the labor and material costs are high, and the logistical support for construction in mountainous areas is difficult.
[0005] To achieve the above objectives, this utility model provides the following technical solution: a segmented tower assembly for a mountain wind power project, comprising: a main board, with a cover plate on the top of the main board;
[0006] It also includes: a fixing mechanism, which is located inside the motherboard and is used to fix the device. The fixing mechanism includes a second connecting plate fixedly connected inside the motherboard, a locking plate fixedly connected to the bottom of the second connecting plate, a locking groove fixedly connected inside the motherboard, and a first fixing rod slidably connected inside the locking groove.
[0007] The connection mechanism is located inside the motherboard and is used for connecting the internal components of the device.
[0008] The main board has a fixed block on one side, a hydraulic rod on one side of the fixed block, a sliding rod inside the hydraulic rod, a fixed seat on one side of the sliding rod, and a third connecting plate on the periphery of the fixed seat.
[0009] The fixing block has a second fixing rod fixedly connected inside, and the second fixing rod is fixedly connected to the motherboard.
[0010] The connecting mechanism includes a fourth connecting plate fixedly connected inside the motherboard. The fourth connecting plate has a threaded rod connected internally, and a threaded bolt is installed on the outer thread of the threaded rod. A connecting seat is fixedly connected to one side of the fourth connecting plate.
[0011] Among them, a hook is fixedly connected to one side of the fourth connecting plate, and an anti-slip post is fixedly connected to one side of the hook.
[0012] The motherboard has a rotating wheel at its bottom, a base plate at the bottom of the rotating wheel, and a base at the bottom of the base plate.
[0013] The motherboard has a first connecting plate fixedly connected inside, and a connecting rod is rotatably connected inside the first connecting plate.
[0014] This utility model has at least the following beneficial effects:
[0015] In use, this utility model features a fixed mechanism that allows the device to cover the top of the main board with a cover plate. At this time, a locking plate can be engaged with the locking groove, and the locking plate is fixed by the first fixing rod, improving the stability of the device. Additionally, the device can be fixed by a third connecting plate and a fixing block, enhancing its safety. Through the connecting mechanism, when the device is in use, a threaded rod can be inserted laterally into the main board to fix the fourth connecting plate. Furthermore, the device can be installed and removed using a hook and anti-slip posts, improving its ease of use. Attached Figure Description
[0016] Figure 1 This is a schematic diagram of the overall structure of this utility model;
[0017] Figure 2 This is a schematic diagram of the fixing mechanism of this utility model;
[0018] Figure 3 This is a schematic diagram of the structure of the hydraulic rod of this utility model;
[0019] Figure 4 This is a schematic diagram of the connection mechanism of this utility model.
[0020] In the diagram: 1. Main board; 101. Rotary wheel; 102. Base plate; 103. Base; 104. Cover plate; 105. First connecting plate; 106. Connecting rod; 2. Fixing mechanism; 201. Second connecting plate; 202. Engaging plate; 203. Engaging groove; 204. First fixing rod; 205. Fixing block; 206. Second fixing rod; 207. Hydraulic rod; 208. Sliding rod; 209. Fixing seat; 210. Third connecting plate; 3. Connecting mechanism; 301. Fourth connecting plate; 302. Hook; 303. Anti-slip column; 304. Threaded rod; 305. Threaded bolt; 306. Connecting seat. Detailed Implementation
[0021] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0022] Example 1
[0023] Please see Figures 1 to 4 This utility model provides a technical solution: a segmented tower assembly for a mountain wind power project, including: a main board 1, with a cover plate 104 on the top of the main board 1;
[0024] It also includes: a fixing mechanism 2, which is disposed inside the main board 1. The fixing mechanism 2 is used to fix the device. The fixing mechanism 2 includes a second connecting plate 201 fixedly connected inside the main board 1. A locking plate 202 is fixedly connected to the bottom of the second connecting plate 201. A locking groove 203 is fixedly connected inside the main board 1. A first fixing rod 204 is slidably connected inside the locking groove 203.
[0025] Connection mechanism 3 is located inside the motherboard 1 and is used to connect the internal components of the device.
[0026] During use, the device covers the top of the main board 1 with the cover plate 104. At this time, the locking plate 202 can be locked into the locking groove 203 and fixed by the first fixing rod 204, which improves the stability of the device. In addition, the device can be fixed by the third connecting plate 210 and the fixing block 205, which improves the safety of the device. Through the set connecting mechanism 3, when the device is in use, the device can be fixed by the threaded rod 304 extending laterally through the fourth connecting plate 301 into the main board 1. In addition, the device can be loaded and unloaded by the hook 302 and the anti-slip column 303, which improves the convenience of the device.
[0027] The fixing mechanism 2 includes a second connecting plate 201 fixedly connected inside the main board 1. A locking plate 202 is fixedly connected to the bottom of the second connecting plate 201. A locking groove 203 is fixedly connected inside the main board 1. A first fixing rod 204 is slidably connected inside the locking groove 203. A fixing block 205 is fixedly connected to one side of the main board 1. A hydraulic rod 207 is fixedly connected to one side of the fixing block 205. A sliding rod 208 is slidably connected inside the hydraulic rod 207. A fixing seat 209 is fixedly connected to one side of the sliding rod 208. The fixing seat 209 has an outer... The device is fixedly connected to a third connecting plate 210, and a second fixing rod 206 is fixedly connected inside the fixing block 205. The second fixing rod 206 is fixedly connected to the main board 1. During use, the device covers the top of the main board 1 with the cover plate 104. At this time, the locking plate 202 can be locked into the locking groove 203. The locking plate 202 is fixed by the first fixing rod 204, which improves the stability of the device. In addition, the device can be fixed by the third connecting plate 210 and the fixing block 205, which improves the safety of the device.
[0028] The connecting mechanism 3 includes a fourth connecting plate 301 fixedly connected inside the main board 1. The fourth connecting plate 301 has a threaded rod 304 internally threaded, and a threaded bolt 305 is installed on the outer thread of the threaded rod 304. A connecting seat 306 is fixedly connected to one side of the fourth connecting plate 301, and a hook 302 is fixedly connected to one side of the fourth connecting plate 301. An anti-slip post 303 is fixedly connected to one side of the hook 302. When the device is in use, the device can extend into the main board 1 through the threaded rod 304 to fix the fourth connecting plate 301. In addition, the device can be installed and removed through the hook 302 and the anti-slip post 303, which improves the convenience of using the device.
[0029] Example 2
[0030] In this second embodiment, all other structures remain unchanged, but the difference from the first embodiment is:
[0031] A rotating wheel 101 is rotatably connected to the bottom of the main board 1. A base plate 102 is fixedly connected to the bottom of the rotating wheel 101. A base 103 is fixedly connected to the bottom of the base plate 102. The device can be disassembled and moved through the rotating wheel 101 and the base plate 102, which improves the ease of use of the device. A first connecting plate 105 is fixedly connected inside the main board 1. A connecting rod 106 is rotatably connected inside the first connecting plate 105. The device can be installed through the first connecting plate 105 and the connecting rod 106, which improves the ease of use of the device.
[0032] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.
[0033] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A mountain wind project fragmented tower assembly, comprising: A motherboard, wherein a cover plate is provided on the top of the motherboard; The feature is that it further includes: a fixing mechanism, which is disposed inside the motherboard and is used to fix the device. The fixing mechanism includes a second connecting plate fixedly connected inside the motherboard, a locking plate fixedly connected to the bottom of the second connecting plate, a locking groove fixedly connected inside the motherboard, and a first fixing rod slidably connected inside the locking groove. A connection mechanism is disposed inside the motherboard and is used to connect the internal components of the device.
2. The mountain wind project fragmented tower assembly of claim 1, wherein: A fixing block is fixedly connected to one side of the main board, a hydraulic rod is fixedly connected to one side of the fixing block, a slide rod is slidably connected inside the hydraulic rod, a fixing seat is fixedly connected to one side of the slide rod, and a third connecting plate is fixedly connected to the periphery of the fixing seat.
3. The mountain wind project fragmented tower assembly of claim 2, wherein: The fixing block is internally fixedly connected to a second fixing rod, which is fixedly connected to the motherboard.
4. The segmented tower assembly for mountain wind power projects according to claim 1, characterized in that: The connecting mechanism includes a fourth connecting plate fixedly connected inside the motherboard. The fourth connecting plate has a threaded rod internally connected to it, and a threaded bolt is installed on the outer thread of the threaded rod. A connecting seat is fixedly connected to one side of the fourth connecting plate.
5. The segmented tower assembly for mountain wind power projects according to claim 4, characterized in that: A hook is fixedly connected to one side of the fourth connecting plate, and an anti-slip post is fixedly connected to one side of the hook.
6. The segmented tower assembly for mountain wind power projects according to claim 1, characterized in that: The bottom of the motherboard is rotatably connected to a wheel, the bottom of the wheel is fixedly connected to a base plate, and the bottom of the base plate is fixedly connected to a base.
7. The segmented tower assembly for mountain wind power projects according to claim 1, characterized in that: The motherboard is internally fixedly connected to a first connecting plate, and the first connecting plate is internally rotatably connected to a connecting rod.