A leak-proof pipeline connection device for hydrogen transportation
By designing an axially movable adjusting sleeve and a pressure-bearing inclined surface structure in the hydrogen delivery system, combined with an elastic reset component and a trigger assembly, the problem of insufficient sealing performance of pipeline quick connectors under high-pressure pulses was solved, achieving leakage prevention and safety improvement in the hydrogen delivery process.
Patent Information
- Application Number
- CN202522800523.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-30
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-30
AI Technical Summary
Existing quick-connect fittings for pipelines cannot effectively cope with high-frequency, high-amplitude pressure pulses in hydrogen energy transmission systems, leading to a decline in sealing performance, leakage risks, and difficulty in meeting the safety and reliability requirements under high-pressure pulse conditions.
A leak-proof pipeline connection device was designed, which adopts an axially movable adjusting sleeve and a pressure-bearing inclined surface structure. The adjusting sleeve is driven to slide by hydrogen pressure to increase the sealing and clamping force. Combined with an elastic reset component and a trigger assembly, adaptive compensation of dynamic sealing effect is achieved.
It significantly improves the reliability and safety of leak prevention during hydrogen transportation and is suitable for high-frequency pressure fluctuation scenarios such as the compressor outlet of hydrogen refueling stations and on-board hydrogen storage systems.
Smart Images

Figure CN224983703U_ABST
Abstract
Description
Technical Field
[0001] This disclosure generally relates to the field of hydrogen transportation technology, and more specifically to a leak-proof pipeline connection device for hydrogen transportation. Background Technology
[0002] In hydrogen energy transportation systems, pipeline connections must maintain reliable sealing performance under steady-state pressure to meet the routine transportation needs of hydrogen from compressor units to hydrogen storage systems. However, in practical applications, especially at the compressor outlet of hydrogen refueling stations and in the connection pipelines between the on-board hydrogen storage system and the fuel cell stack in fuel cell vehicles, frequent system starts and stops and valve actions generate high-frequency, high-amplitude pressure pulses. Under this dynamic condition, the instantaneous impact force of the medium on the sealing interface far exceeds the steady-state level, posing a severe challenge to the sealing performance of the connection devices.
[0003] Currently, widely used pipeline quick couplings are mainly designed based on static sealing or pre-tightening sealing principles, which perform well under constant pressure. However, when faced with the aforementioned periodic pressure shocks, the sealing structure of these couplings cannot respond effectively or adaptively compensate. They are prone to sealing performance degradation due to insufficient instantaneous sealing specific pressure, posing a potential leakage risk and failing to meet the stringent safety and reliability requirements of the hydrogen energy field under high-pressure pulse conditions. Utility Model Content
[0004] In view of the above-mentioned defects or deficiencies in the prior art, it is desirable to provide a leak-proof pipeline connection device for hydrogen transportation to solve the above problems.
[0005] This application provides a leak-proof pipeline connection device for hydrogen transportation, including a first connector and a second connector for connecting two pipeline sections; The first docking member has two connected ends and is provided with an axially movable first valve stem inside. One end of the first docking member forms a first docking portion, and an adjusting sleeve is provided inside the first docking portion. The adjusting sleeve is provided inside the first docking portion and can slide relative to the first docking portion. The sliding direction is along the axial direction of the first docking member. The inner circumference of the adjusting sleeve is provided with a pressure-bearing portion, and the side of the pressure-bearing portion near the first valve stem is provided with a pressure-bearing inclined surface. The second docking member is connected at both ends and has an axially movable second valve stem inside. One end of the second docking member forms a second docking part, which is used to insert into the first docking part to achieve docking. After the first and second docking parts are docked, the adjusting sleeve abuts against the end face of the second docking part.
[0006] According to the technical solution provided in the embodiments of this application, the inner sidewall of the first docking part is further provided with a guide groove, the guide groove is annular and coaxially arranged with the first docking member; a first elastic reset member is provided in the guide groove, one end of the first elastic reset member is fixed in the guide groove, and the other end is connected to the adjusting sleeve; the position where the adjusting sleeve is connected to the first elastic reset member is slidably installed in the guide groove.
[0007] According to the technical solution provided in the embodiments of this application, a first elastic sealing ring is provided at the end of the adjusting sleeve away from the first valve stem.
[0008] According to the technical solution provided in the embodiments of this application, the first valve stem is installed in the first docking member through the first positioning block, the first valve stem passes through the first positioning block and is slidably connected to the first positioning block, and a second elastic reset member is also connected between the first positioning block and the first valve stem; the second valve stem is installed in the second docking member through the second positioning block, the second valve stem passes through the second positioning block and is slidably connected to the second positioning block, and a third elastic reset member is also connected between the second positioning block and the second valve stem.
[0009] According to the technical solution provided in the embodiments of this application, a triggering component is also included. The triggering component is disposed inside the second docking portion. When the first docking member and the second docking member are docked, the triggering component triggers the first valve stem and the second valve stem to make the first docking member and the second docking member conduct. When the first docking member and the second docking member are separated, the triggering component disengages from the first valve stem and the second valve stem to reset the first valve stem and the second valve stem.
[0010] According to the technical solution provided in the embodiments of this application, the triggering component includes: A sliding sleeve, which is fixedly installed on the inner wall of the second mating part by a connecting rod; A sliding rod passes through the sliding sleeve and is slidably connected to the sliding sleeve. The sliding direction is along the axial direction of the second mating member. The two ends of the sliding rod are respectively used to abut against the first valve stem and the second valve stem. A fourth elastic reset element is provided, which connects the slide rod and the slide sleeve, and is used to reset the slide rod.
[0011] According to the technical solution provided in the embodiments of this application, the inner wall of the first docking member is provided with a first sealing part, and the first valve stem abuts against the first sealing part after resetting to block the first docking member (1); the inner wall of the second docking member is provided with a second sealing part, and the second valve stem abuts against the second sealing part after resetting to block the second docking member.
[0012] According to the technical solution provided in the embodiments of this application, a locking component is also included, the locking component comprising: Multiple positioning grooves are formed on the outer wall of the second docking part, and the multiple positioning grooves are evenly distributed along the circumference of the second docking part; Multiple locking balls, each corresponding to a positioning groove, are used to prevent the first docking member and the second docking member from moving relative to each other along the axial direction; A locking sleeve is slidably connected to the outer wall of the first docking part, and the sliding direction is along the axial direction of the first docking part; the locking sleeve includes a locked state and an unlocked state, and when it is in the locked state, it restricts the locking ball within the positioning groove.
[0013] According to the technical solution provided in the embodiments of this application, a retaining ring is also installed on the outer wall of the first docking part. The retaining ring is located on the side of the positioning groove away from the opening of the first docking part, and is used to limit the axial displacement of the locking sleeve.
[0014] According to the technical solution provided in the embodiments of this application, the inner wall of the first docking part and the outer wall of the second docking part are provided with corresponding stepped surfaces.
[0015] Compared with existing technologies, the advantages of this application are as follows: By providing an axially sliding adjusting sleeve inside the first docking portion of the first docking component, and a pressure-bearing portion with a pressure-bearing inclined surface on the inner circumference of the adjusting sleeve, the adjusting sleeve abuts against the end face of the second docking portion after the first docking component is docked with the second docking component. Under normal gas transmission conditions, the adjusting sleeve and the second docking portion form a stable seal; when encountering a high-pressure pulse, the gas pressure impact acts on the pressure-bearing inclined surface, driving the adjusting sleeve to slide axially, further increasing the clamping force on the sealing surface, thereby dynamically enhancing the sealing effect. This adaptive sealing mechanism effectively overcomes the defect of insufficient sealing performance of traditional quick connectors under high-pressure pulses, significantly improving the reliability and safety of leak prevention during hydrogen transmission, and is especially suitable for high-frequency pressure fluctuation scenarios such as the compressor outlet of hydrogen refueling stations and on-board hydrogen storage systems. Attached Figure Description
[0016] Other features, objects, and advantages of this application will become more apparent from the following detailed description of non-limiting embodiments with reference to the accompanying drawings: Figure 1 A schematic diagram of the structure of the leak-proof pipeline connection device for hydrogen transportation provided in this application; Figure 2 for Figure 1 A schematic diagram of the structure of the first mating member in the connecting device shown; Figure 3 for Figure 1 A schematic diagram of the structure of the second docking member in the connecting device shown.
[0017] Reference numerals: 1. First mating part; 2. Second mating part; 3. First valve stem; 4. First mating section; 5. Adjusting sleeve; 6. Pressure-bearing section; 7. Pressure-bearing inclined surface; 8. Second valve stem; 9. Second mating section; 10. Guide groove; 11. First elastic reset component; 12. First elastic sealing ring; 13. First positioning block; 14. Second elastic reset component; 15. Second positioning block; 16. Third elastic reset component; 17. Sliding sleeve; 18. Sliding rod; 19. Fourth elastic reset component; 20. First sealing section; 21. Second sealing section; 22. Positioning groove; 23. Locking ball; 24. Locking sleeve; 25. Retaining ring; 26. Second elastic sealing ring; 27. Third elastic sealing ring; 28. Fifth elastic reset component; 29. Connecting rod. Detailed Implementation
[0018] The present application will now be described in further detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and not intended to limit it. Furthermore, it should be noted that, for ease of description, only the parts relevant to the invention are shown in the accompanying drawings.
[0019] It should be noted that, unless otherwise specified, the embodiments and features described in this application can be combined with each other. This application will now be described in detail with reference to the accompanying drawings and embodiments.
[0020] Please refer to Figures 1-3 This application provides a leak-proof pipeline connection device for hydrogen transportation, including a first connecting member 1 and a second connecting member 2 for connecting two pipeline sections; The first docking member 1 has two ends connected and has an axially movable first valve stem 3 inside. One end of the first docking member 1 forms a first docking part 4. An adjusting sleeve 5 is provided inside the first docking part 4. The adjusting sleeve 5 is located inside the first docking part 4 and can slide relative to the first docking part 4. The sliding direction is along the axial direction of the first docking member 1. A pressure-bearing part 6 is provided on the inner circumference of the adjusting sleeve 5. A pressure-bearing inclined surface 7 is provided on the side of the pressure-bearing part 6 near the first valve stem 3. The second docking member 2 is connected at both ends and has an axially movable second valve stem 8 inside. One end of the second docking member 2 forms a second docking part 9, which is used to insert into the first docking part 4 to achieve docking. After the first docking member 1 and the second docking member 2 are docked, the adjusting sleeve 5 abuts against the end face of the second docking part 9.
[0021] Specifically, the first connecting piece 1 is designed as a tubular structure with both ends connected. An internal thread is formed on the inner wall of the end furthest from the first connecting portion 4. This internal thread is adapted to the external thread of the end of the pipe to be connected, achieving a stable connection between the first connecting piece 1 and the pipe through thread engagement. A first valve stem 3 is inserted inside the first connecting piece 1, and the first valve stem 3 can move along the axial direction of the first connecting piece 1, providing basic structural support for the on / off control of the pipe. One end of the first connecting piece 1 has an integrally formed first connecting portion 4, which is an inwardly recessed cylindrical structure. Its inner cavity is used to accommodate the insertion of the second connecting portion 9. An adjusting sleeve 5 is fitted inside the first connecting portion 4, and the adjusting sleeve 5 and the inner wall of the first connecting portion 4 are fitted with a clearance fit, allowing the adjusting sleeve 5 to slide relative to the first connecting portion 4 along the axial direction of the first connecting piece 1. An annular pressure-bearing part 6 is integrally provided on the inner circumference side of the adjusting sleeve 5. The pressure-bearing part 6 is machined to form a pressure-bearing inclined surface 7 on the side facing the first valve stem 3. The pressure-bearing inclined surface 7 is set at a preset angle with the axis of the adjusting sleeve 5, which can convert the axial pressure into a force that pushes the adjusting sleeve 5 to slide under the action of hydrogen pressure.
[0022] The second docking piece 2 is also a tubular structure with both ends connected. Its inner wall at the end furthest from the second docking portion 9 is also threaded. This internal thread matches the external thread at the end of the other pipe to be connected, thus fixing the second docking piece 2 to the corresponding pipe through threaded connection. A second valve stem 8 is correspondingly provided inside the second docking piece 2. The second valve stem 8 can move axially along the second docking piece 2, cooperating with the first valve stem 3 to control the flow of the pipe after docking. One end of the second docking piece 2 forms a second docking portion 9, which is an outwardly extending boss structure. Its outer diameter matches the inner diameter of the inner cavity of the first docking portion 4, allowing for precise insertion into the inner side of the first docking portion 4, thereby achieving initial docking and positioning of the first docking piece 1 and the second docking piece 2.
[0023] When connecting two hydrogen delivery pipelines, the first and second connecting parts 1 and 2 are screwed onto the two pipelines to be connected via their internal threads at the ends furthest from the connecting portion. Then, the second connecting part 9 is pushed towards the first connecting part 4, inserting it into the inner chamber of the first connecting part 4 until the first connecting part 1 and the second connecting part 2 are fully connected. At this point, the end face of the adjusting sleeve 5 furthest from the first valve stem 3 will tightly abut against the end face of the second connecting part 9, and the first valve stem 3 and the second valve stem 8 will be activated to connect the first connecting part 1 and the second connecting part 2. This abutment structure provides initial sealing at the connection point. Furthermore, when a high-pressure pulse occurs during hydrogen delivery, the hydrogen pressure acts on the pressure-bearing inclined surface 7 of the pressure-bearing part 6, driving the adjusting sleeve 5 to slide axially towards the second connecting part 9, further increasing the clamping force between the adjusting sleeve 5 and the end face of the second connecting part 9. This dynamically enhances the sealing effect and effectively reduces the risk of hydrogen leakage.
[0024] Furthermore, the inner sidewall of the first docking part 4 is also provided with a guide groove 10, the guide groove 10 is annular and coaxially arranged with the first docking member 1; a first elastic reset member 11 is provided in the guide groove 10, one end of the first elastic reset member 11 is fixed in the guide groove 10, and the other end is connected to the adjusting sleeve 5; the adjusting sleeve 5 is slidably installed in the guide groove 10 at the position where it is connected to the first elastic reset member 11.
[0025] Specifically, such as Figure 1 and Figure 2 As shown, to ensure smoother sliding of the adjusting sleeve 5 within the first mating portion 4 and automatic return to its initial position after pressure changes, an annular guide groove 10 is machined on the inner wall of the first mating portion 4. The central axis of the guide groove 10 is perfectly aligned with the axis of the first mating member 1, preventing the adjusting sleeve 5 from shifting during sliding. A first elastic reset member 11 is installed inside the guide groove 10. One end of the reset member is fixed to the inner wall of the guide groove 10 or a pre-designed fixing structure, while the other end is connected to the outer wall of the adjusting sleeve 5. The connection method is chosen to suit the high-pressure conditions of hydrogen transportation, such as a fixed connection or a snap-fit connection, ensuring it will not easily detach under pressure impact. Optionally, the first elastic reset member 11 is a spring.
[0026] Correspondingly, on the outer wall of the adjusting sleeve 5, at the position corresponding to the guide groove 10, sliding protrusions or sliding sections matching the contour of the guide groove 10 are designed. These structures are precisely embedded in the guide groove 10, allowing the adjusting sleeve 5 to slide smoothly along the extension direction of the guide groove 10, and the sliding direction is always consistent with the axial direction of the first docking member 1. In actual use, when a high-pressure pulse occurs during hydrogen transportation, the adjusting sleeve 5 will be pushed by the pressure to slide towards the second docking part 9. At this time, the first elastic reset member 11 will be stretched and store elastic potential energy. When the pressure pulse subsides and the system returns to steady state, the first elastic reset member 11 will release the stored energy, driving the adjusting sleeve 5 to slide back to its original position along the guide groove 10, ensuring that the adjusting sleeve 5 can always maintain a stable fit with the end face of the second docking part 9, further reducing the sealing gap caused by the positional deviation of the adjusting sleeve 5, and improving the overall anti-leakage effect.
[0027] Furthermore, the end of the adjusting sleeve 5 away from the first valve stem 3 is provided with a first elastic sealing ring 12.
[0028] Specifically, such as Figure 1 and Figure 2 As shown, to further improve the sealing reliability when the adjusting sleeve 5 and the second docking part 9 abut their end faces and to prevent hydrogen leakage from the gap between them, a first elastic sealing ring 12 is fixedly installed on the end face of the adjusting sleeve 5 away from the first valve stem 3. The outer side of the first elastic sealing ring 12 extends beyond the end face of the adjusting sleeve 5 to ensure full contact with the end face of the second docking part 9 during subsequent docking. When the first docking part 1 and the second docking part 2 are docked and the end face of the adjusting sleeve 5 abuts against the end face of the second docking part 9, the first elastic sealing ring 12 will be squeezed and deformed elastically, thereby tightly filling any tiny gaps that may exist between the adjusting sleeve 5 and the second docking part 9, forming the first high-efficiency sealing barrier.
[0029] Furthermore, the first valve stem 3 is installed in the first docking member 1 via the first positioning block 13, the first valve stem 3 passes through the first positioning block 13 and is slidably connected to the first positioning block 13, and a second elastic reset member 14 is also connected between the first positioning block 13 and the first valve stem 3; the second valve stem 8 is installed in the second docking member 2 via the second positioning block 15, the second valve stem 8 passes through the second positioning block 15 and is slidably connected to the second positioning block 15, and a third elastic reset member 16 is also connected between the second positioning block 15 and the second valve stem 8.
[0030] Specifically, such as Figure 2As shown, to ensure that the first valve stem 3 can move stably axially within the first mating part 1 and accurately reset when needed, a first positioning block 13 is fixed inside the first mating part 1. This positioning block can be fixed to the inner wall of the first mating part 1 by welding, interference fit, or bolt connection, ensuring that it will not loosen during high-pressure hydrogen transportation. The first valve stem 3 passes through the central hole of the first positioning block 13, and the outer wall of the first valve stem 3 and the inner wall of the central hole of the first positioning block 13 are precisely clearance-fitted, allowing the first valve stem 3 to slide smoothly axially while preventing a large amount of hydrogen from leaking out through the clearance. Simultaneously, a second elastic reset member 14 is also assembled between the first positioning block 13 and the first valve stem 3. This reset member is typically sleeved on the outside of the first valve stem 3, with one end connected to the side of the first positioning block 13 facing the first mating part 4, and the other end connected to the limiting step or protruding ring on the first valve stem 3, thereby providing a stable reset force for the first valve stem 3. Optionally, the second elastic reset member 14 is a spring.
[0031] like Figure 3 As shown, a second positioning block 15 is fixed inside the second docking part 2. The second valve stem 8 passes through the central hole of the positioning block and forms a sliding fit to ensure the stability of the second valve stem 8 moving axially. Simultaneously, a third elastic reset member 16 is connected between the second positioning block 15 and the second valve stem 8. This reset member can also be sleeved on the outside of the second valve stem 8, with one end connected to the side of the second positioning block 15 facing the second docking part 9, and the other end connected to the limiting structure of the second valve stem 8. Optionally, the third elastic reset member 16 is a spring.
[0032] This design not only ensures that the valve stems of the two connected pipelines move in a consistent manner, but also ensures that the first valve stem 3 and the second valve stem 8 can return to their initial positions when not triggered by external forces through the action of the second elastic reset member 14 and the third elastic reset member 16. This provides a reliable basis for the on / off control of the subsequent pipelines and further enhances the stability of the overall structure under high pressure conditions.
[0033] Furthermore, it also includes a triggering component, which is disposed inside the second docking part 9. When the first docking member 1 and the second docking member 2 are docked, the triggering component triggers the first valve stem 3 and the second valve stem 8 to make the first docking member 1 and the second docking member 2 conduct; when the first docking member 1 and the second docking member 2 are separated, the triggering component disengages from the first valve stem 3 and the second valve stem 8 to reset the first valve stem 3 and the second valve stem 8.
[0034] Specifically, to ensure automatic pipeline connection when the first docking part 1 and the second docking part 2 are docked and automatic pipeline sealing when they are separated, thus preventing hydrogen leakage during docking or separation, a trigger component is installed inside the second docking part 9. The installation position of this component corresponds to the axis of the first valve stem 3 and the second valve stem 8, ensuring precise engagement with the two valve stems during docking, while not interfering with the docking action of the first docking part 4 and the second docking part 9.
[0035] When the first docking member 1 and the second docking member 2 approach each other and complete docking, the triggering component, along with the insertion of the second docking part 9, gradually contacts and applies a thrust to the first valve stem 3 in the first docking member 1 and the second valve stem 8 in the second docking member 2. Under this thrust, the first valve stem 3 overcomes the elastic force of the second elastic reset member 14 and moves axially, while the second valve stem 8 overcomes the elastic force of the third elastic reset member 16 and moves synchronously. The channel originally blocked by the two valve stems is thus opened, allowing the interiors of the first docking member 1 and the second docking member 2 to connect, and hydrogen can be transported normally. When it is necessary to separate the first docking member 1 and the second docking member 2, as the second docking part 9 is pulled out from the first docking part 4, the triggering component will detach from the first valve stem 3 and the second valve stem 8 along with the second docking part 9, and will no longer apply a thrust to the two valve stems. At this time, the second elastic reset member 14 will release elastic potential energy, driving the first valve stem 3 back to the initial position; the third elastic reset member 16 will also drive the second valve stem 8 to reset synchronously, re-blocking their respective channels, thereby preventing hydrogen from leaking from the end of the pipeline during the separation process, and further improving the safety and reliability of the device.
[0036] Furthermore, the triggering component includes: Sliding sleeve 17, which is fixedly installed on the inner wall of the second docking part 9 by connecting rod 29; The slide rod 18 passes through the sliding sleeve 17 and is slidably connected to the sliding sleeve 17. The sliding direction is along the axial direction of the second docking member 2. The two ends of the slide rod 18 are respectively used to abut against the first valve stem 3 and the second valve stem 8. The fourth elastic reset member 19 is connected to the slide rod 18 and the slide sleeve 17 and is used to reset the slide rod 18.
[0037] Specifically, such as Figure 1 and Figure 3 As shown, the triggering component includes three core parts: a sliding sleeve 17, a sliding rod 18, and a fourth elastic reset component 19. The installation position of each component is consistent with the axis of the first docking component 1 and the second docking component 2 to ensure that there is no deviation during the operation.
[0038] The sliding sleeve 17 is fixed to the inner wall of the second docking part 9 by multiple evenly distributed connecting rods 29. One end of the connecting rod 29 can be fixed to the inner wall of the second docking part 9 by welding or threading, and the other end is connected to the outer wall of the sliding sleeve 17. This ensures the stability of the sliding sleeve 17 in the second docking part (9) and avoids the connecting rod 29 from blocking the hydrogen delivery channel, thus not affecting the flow of the medium. The sliding rod 18 passes through the central hole of the sliding sleeve 17, and the outer wall of the sliding rod 18 slides and engages with the hole wall of the sliding sleeve 17, so that the sliding rod 18 can move smoothly along the axial direction of the second docking part 2. At the same time, the two ends of the sliding rod 18 are processed into smooth pushing structures, corresponding to the ends of the first valve stem 3 and the second valve stem 8 respectively, to ensure that they can accurately abut against the two valve stems during docking.
[0039] The fourth elastic reset member 19 is assembled between the sliding sleeve 17 and the sliding rod 18, sleeved on the outside of the sliding rod 18. One end of its assembly is connected to the inner wall step of the sliding sleeve 17, and the other end is connected to the limiting protrusion in the middle of the sliding rod 18. Optionally, the fourth elastic reset member 19 is a spring. When the first docking member 1 and the second docking member 2 dock, the second docking part 9 drives the sliding sleeve 17 and the sliding rod 18 to move towards the first docking member 1. One end of the sliding rod 18 first contacts the first valve stem 3 and pushes it to move. At the same time, the sliding rod 18 is subjected to a reaction force and slides along the sliding sleeve 17 towards the second valve stem 8, thereby pushing the second valve stem 8 to move. At this time, the fourth elastic reset member 19 is compressed and stores elastic potential energy. When the two separate, the fourth elastic reset member 19 releases potential energy and pushes the sliding rod 18 back to the initial position, preparing for the valve stem triggering during the next docking, and also assisting the first valve stem 3 and the second valve stem 8 to reset more smoothly.
[0040] Furthermore, the inner wall of the first docking member 1 is provided with a first sealing part 20, and the first valve stem 3 abuts against the first sealing part 20 after resetting to block the first docking member 1; the inner wall of the second docking member 2 is provided with a second sealing part 21, and the second valve stem 8 abuts against the second sealing part 21 after resetting to block the second docking member 2.
[0041] Specifically, such as Figure 1 and Figure 2 As shown, an annular first sealing portion 20 is provided on the inner wall of the first docking member 1, corresponding to the end position of the first valve stem 3 after reset. This sealing portion is integrally formed with the inner wall of the first docking member 1, and its end face is flat and smooth, which can form a tight fit with the end of the first valve stem 3. When the first docking member 1 separates from the second docking member 2, the second elastic reset member 14 will release elastic potential energy, pushing the first valve stem 3 to reset axially until the end of the first valve stem 3 completely abuts against the end face of the first sealing portion 20. At this time, the internal conveying channel of the first docking member 1 is completely blocked, and even if the first docking member 1 is connected to a pipeline, hydrogen cannot leak from the docking end.
[0042] like Figure 1 and Figure 3 As shown, on the inner wall of the second docking member 2, corresponding to the position of the reset end of the second valve stem 8, a ring-shaped second sealing part 21 is also provided. Its structural design is consistent with the first sealing part 20, ensuring the sealing and compatibility of the end face. When the two docking members separate, the third elastic reset member 16 drives the second valve stem 8 to reset, so that the end of the second valve stem 8 tightly abuts against the second sealing part 21, thereby blocking the internal channel of the second docking member 2. This sealing design not only ensures the sealing reliability of the two docking members in independent states, but also precisely coordinates with the reset action of the valve stem. Even under high-pressure hydrogen conditions, the tight fit between the valve stem and the sealing part can completely cut off the leakage path, further improving the safety protection level of the device.
[0043] To further improve the sealing effect of the first valve stem 3 and the second valve stem 8, a second elastic sealing ring 26 is provided at the front end of the first valve stem 3, and a third elastic sealing ring 27 is provided at the front end of the second valve stem 8.
[0044] Furthermore, it also includes a locking assembly, the locking assembly comprising: Multiple positioning grooves 22 are formed on the outer wall of the second docking part 9, and the multiple positioning grooves 22 are evenly distributed along the circumference of the second docking part 9; Multiple locking balls 23, each corresponding to a positioning groove 22, are used to prevent the first docking member 1 and the second docking member 2 from moving relative to each other along the axial direction. The locking sleeve 24 is slidably connected to the outer wall of the first docking part 4, and the sliding direction is along the axial direction of the first docking part 1; the locking sleeve 24 includes a locked state and an unlocked state, and when it is in the locked state, it restricts the locking ball 23 within the positioning groove 22.
[0045] Specifically, in order to ensure that the first docking part 1 and the second docking part 2 will not be axially misaligned due to high-pressure hydrogen impact or external vibration after docking, thereby affecting the sealing effect, a locking assembly consisting of a positioning groove 22, a locking ball 23 and a locking sleeve 24 is added.
[0046] like Figures 1-3As shown, multiple positioning grooves 22 are uniformly machined along the circumference on the outer wall of the second docking part 9. The openings of these positioning grooves 22 are adapted to the installation of the locking ball 23, which facilitates the subsequent insertion of the locking ball 23. At the same time, the depth of the positioning grooves 22 is calculated to ensure that the locking ball 23 can effectively restrict axial movement after insertion, and will not be too deep to make it difficult to disengage during unlocking. The locking sleeve 24 is sleeved on the outer wall of the first docking part 4 and maintains a smooth sliding fit with the outer wall, and can move flexibly along the axial direction of the first docking part 1. A fifth elastic reset member 28 is also provided between the locking sleeve (24) and the first docking part (4). The fifth elastic reset member 28 adopts a spring structure, with one end connected to the locking sleeve 24 and the other end connected to the annular protrusion on the outer wall of the first docking part 4. Under normal conditions, it will apply a pushing force towards the second docking part 9 to the locking sleeve 24, so that the locking sleeve 24 always covers the annular groove on the outer wall of the first docking part 4, forming a radial constraint on the locking ball 23.
[0047] When docking and locking are required, first pull the locking sleeve 24 away from the second docking part 9. At this time, the fifth elastic reset member 28 is compressed and stores elastic potential energy. The locking sleeve 24 will move away from the annular groove of the first docking part 4, releasing the radial compression on the locking ball 23, and the locking ball 23 is no longer constrained. Then, insert the second docking part 9 into the first docking part 4 until the two docking parts are fully docked. At this time, install the locking ball 23 into the positioning groove 22 on the outer wall of the second docking part 9. Then, release the locking sleeve 24. The fifth elastic reset member 28 releases elastic potential energy, pushing the locking sleeve 24 to slide along the outer wall of the first docking part 4 towards the second docking part 9, and compressing the locking ball 23. Under the pressure of the inner wall of the locking sleeve 24, the locking ball 23 will be stably placed in the positioning groove 22 of the second docking part 9, and finally simultaneously stuck at the end of the first docking part 4, forming a firm axial limit, completely preventing the first docking part 1 and the second docking part 2 from relative axial movement.
[0048] Furthermore, a retaining ring 25 is also installed on the outer wall of the first docking part 4. The retaining ring 25 is located on the side of the positioning groove 22 away from the opening of the first docking part 4, and is used to limit the axial displacement of the locking sleeve 24.
[0049] Specifically, such as Figure 1 and Figure 3As shown, to prevent the locking sleeve 24 from sliding excessively away from the second mating part 9 under the action of the fifth elastic reset member 28, or from deviating from the preset locking position due to external vibration or pressure impact, a retaining ring 25 is fixedly installed on the outer wall of the first mating part 4. This retaining ring 25 is located on the side of the positioning groove 22 away from the opening of the first mating part 4 (i.e., away from the direction of insertion of the second mating part 9), and is fixed to the outer wall of the first mating part 4 by an interference fit or snap-fit method, ensuring its own positional stability. When the locking sleeve 24 slides along the outer wall of the first mating part 4, the retaining ring 25 can abut against the end face of the locking sleeve 24, limiting its maximum sliding distance and ensuring that the locking sleeve 24 always compresses the locking ball 23 within the effective range, maintaining a reliable locking state.
[0050] Furthermore, the inner wall of the first docking part 4 and the outer wall of the second docking part 9 are provided with corresponding stepped surfaces.
[0051] Specifically, such as Figures 1-3 As shown, to ensure rapid and accurate positioning of the first docking part 4 and the second docking part 9 during docking, and to prevent insertion misalignment that could damage internal components or affect the sealing effect, matching stepped surfaces are machined on the inner wall of the first docking part 4 and the outer wall of the second docking part 9. These stepped surfaces are perpendicular to the axis of the docking parts, and the height and width of the steps correspond perfectly. When the second docking part 9 is inserted into the first docking part 4, the stepped surfaces on both sides will fit precisely. This structure can quickly calibrate the docking position, prevent the second docking part 9 from being over-inserted and squeezing the adjusting sleeve 5 or the triggering component, and increase the contact area at the docking point through the fit of the stepped surfaces, helping to block the lateral leakage of high-pressure hydrogen from the docking gap, further improving the stability and sealing of the overall connection.
[0052] The above description is merely a preferred embodiment of this application and an explanation of the technical principles employed. Those skilled in the art should understand that the scope of the invention involved in this application is not limited to technical solutions formed by specific combinations of the above-described technical features, but should also cover other technical solutions formed by arbitrary combinations of the above-described technical features or their equivalents without departing from the inventive concept. For example, technical solutions formed by substituting the above features with (but not limited to) technical features with similar functions disclosed in this application.
Claims
1. A leak-proof line connection device for hydrogen gas delivery, characterized by, Includes a first connector (1) and a second connector (2) for connecting two sections of pipeline; The first docking member (1) is connected at both ends and has an axially movable first valve stem (3) inside. One end of the first docking member (1) forms a first docking part (4). An adjusting sleeve (5) is provided inside the first docking part (4). The adjusting sleeve (5) is located inside the first docking part (4) and can slide relative to the first docking part (4). The sliding direction is along the axial direction of the first docking member (1). A pressure-bearing part (6) is provided on the inner circumference side of the adjusting sleeve (5). A pressure-bearing inclined surface (7) is provided on the side of the pressure-bearing part (6) near the first valve stem (3). The second docking member (2) is connected at both ends and has an axially movable second valve stem (8) inside. One end of the second docking member (2) forms a second docking part (9), which is used to insert into the first docking part (4) to achieve docking. After the first docking part (1) and the second docking part (2) are docked, the adjusting sleeve (5) abuts against the end face of the second docking part (9).
2. The leak-tight line connection device for hydrogen delivery of claim 1, wherein, The inner sidewall of the first docking part (4) is also provided with a guide groove (10), the guide groove (10) is annular and coaxially arranged with the first docking part (1); a first elastic reset member (11) is provided in the guide groove (10), one end of the first elastic reset member (11) is fixed in the guide groove (10), and the other end is connected to the adjusting sleeve (5); the position where the adjusting sleeve (5) is connected to the first elastic reset member (11) is slidably installed in the guide groove (10).
3. The leak-proof line connection device for hydrogen delivery of claim 1, wherein, The adjusting sleeve (5) is provided with a first elastic sealing ring (12) at the end away from the first valve stem (3).
4. The leak-proof line connection device for hydrogen delivery of claim 1, wherein, The first valve stem (3) is installed in the first docking member (1) through the first positioning block (13). The first valve stem (3) passes through the first positioning block (13) and is slidably connected to the first positioning block (13). A second elastic reset member (14) is also connected between the first positioning block (13) and the first valve stem (3). The second valve stem (8) is installed in the second docking member (2) through the second positioning block (15). The second valve stem (8) passes through the second positioning block (15) and is slidably connected to the second positioning block (15). A third elastic reset member (16) is also connected between the second positioning block (15) and the second valve stem (8).
5. The leak-proof pipeline connection device for hydrogen transportation according to claim 4, characterized in that, It also includes a triggering component, which is located inside the second docking part (9). When the first docking part (1) and the second docking part (2) are docked, the triggering component triggers the first valve stem (3) and the second valve stem (8) to make the first docking part (1) and the second docking part (2) conduct; when the first docking part (1) and the second docking part (2) are separated, the triggering component disengages from the first valve stem (3) and the second valve stem (8) to reset the first valve stem (3) and the second valve stem (8).
6. The leak-proof pipeline connection device for hydrogen transportation according to claim 5, characterized in that, The triggering component includes: Sliding sleeve (17), the sliding sleeve (17) is fixedly installed on the inner wall of the second docking part (9) by connecting rod (29); The slide rod (18) passes through the sliding sleeve (17) and is slidably connected to the sliding sleeve (17). The sliding direction is along the axial direction of the second docking member (2). The two ends of the slide rod (18) are respectively used to abut against the first valve stem (3) and the second valve stem (8). The fourth elastic reset member (19) connects the slide rod (18) and the slide sleeve (17) and is used to reset the slide rod (18).
7. The leak-proof pipeline connection device for hydrogen transportation according to claim 6, characterized in that, The inner wall of the first docking member (1) is provided with a first sealing part (20), and the first valve stem (3) abuts against the first sealing part (20) after resetting, so as to block the first docking member (1); the inner wall of the second docking member (2) is provided with a second sealing part (21), and the second valve stem (8) abuts against the second sealing part (21) after resetting, so as to block the second docking member (2).
8. The leak-proof pipeline connection device for hydrogen transportation according to claim 1, characterized in that, It also includes a locking assembly, the locking assembly comprising: Multiple positioning grooves (22) are formed on the outer wall of the second docking part (9), and the multiple positioning grooves (22) are evenly distributed along the circumference of the second docking part (9); Multiple locking balls (23) are provided, each corresponding to a positioning groove (22), to prevent the first docking member (1) and the second docking member (2) from moving relative to each other along the axial direction; Locking sleeve (24) is slidably connected to the outer wall of the first docking part (4), and the sliding direction is along the axial direction of the first docking part (1); the locking sleeve (24) includes a locked state and an unlocked state, and when it is in the locked state, it restricts the locking ball (23) in the positioning groove (22).
9. The leak-proof pipeline connection device for hydrogen transportation according to claim 8, characterized in that, A retaining ring (25) is also installed on the outer wall of the first docking part (4). The retaining ring (25) is located on the side of the positioning groove (22) away from the opening of the first docking part (4) and is used to limit the axial displacement of the locking sleeve (24).
10. The leak-proof pipeline connection device for hydrogen transportation according to claim 1, characterized in that, The inner wall of the first docking part (4) and the outer wall of the second docking part (9) are provided with corresponding stepped surfaces.
