By installing electrically controlled check valves and pressure sensors in the workshop's gas supply system, the nitrogen pipeline was made available as an emergency gas source, solving the problem of process gas supply interruption caused by air compressor failure and ensuring a stable supply of process gas.

CN224983920UActive Publication Date: 2026-11-17JINAN HONGWAN BIOTECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522808616.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-30
Publication Date
2026-11-17
Estimated Expiration
2035-12-30

AI Technical Summary

Technical Problem

In the existing workshop air supply system, there is a lack of emergency air source when the air compressor fails, resulting in the inability to guarantee the process air source.

Method used

By installing an electrically controlled check valve, a pressure sensor, and a flow meter between the first nitrogen pipeline and the compressed air pipeline, the nitrogen pipeline can be used as an emergency gas source to ensure the supply of process gas.

Benefits of technology

In the event of an air compressor failure, the nitrogen pipeline automatically switches to emergency gas source to ensure a continuous supply of process gas and prevent equipment downtime.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224983920U_ABST
    Figure CN224983920U_ABST
Patent Text Reader

Abstract

This utility model provides a workshop operation air supply system, belonging to the technical field of air supply systems. It includes an air compressor, a first nitrogen pipeline, and a compressed air pipeline. The input end of the air compressor is connected to an air source, and the output end of the air compressor is connected to the compressed air pipeline. A first pipeline is provided between the first nitrogen pipeline and the compressed air pipeline. An electrically controlled one-way valve is installed on the first pipeline. A pressure sensor and a gas flow meter are installed on the compressed air pipeline section after the connection point with the first pipeline. The pressure sensor is electrically connected to the electrically controlled one-way valve. When the air compressor malfunctions, this operation air supply system uses the first nitrogen pipeline as an emergency air source, with the nitrogen in the first nitrogen pipeline temporarily serving as the process air source, thus ensuring the supply of process air.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of gas supply system technology, specifically to a workshop operation gas supply system. Background Technology

[0002] In a factory workshop, many processes and equipment require air supply to function properly, necessitating a unified air supply system to provide air to the equipment. The existing workshop air supply system includes nitrogen pipelines, compressed air pipelines, and other gas pipelines, all operating independently. Currently, many pieces of equipment in the workshop commonly use compressed air as the process air source, making the compressed air pipeline the most frequently used. The air compressors in these pipelines often operate for extended periods; if a compressor malfunctions and there is no emergency pipeline, the process air supply cannot be guaranteed. Therefore, we propose a new workshop operation air supply system. Utility Model Content

[0003] The purpose of this invention is to provide a workshop operation air supply system to solve the problems mentioned in the background art.

[0004] To achieve the above objectives, the present invention adopts the following technical solution: This utility model provides a workshop operation air supply system, including an air compressor, a first nitrogen pipeline and a compressed air pipeline. The input end of the air compressor is connected to an air source, and the output end of the air compressor is connected to the compressed air pipeline. A first pipeline is provided between the first nitrogen pipeline and the compressed air pipeline. An electrically controlled one-way valve is provided on the first pipeline. The compressed air pipeline section after the connection between the compressed air pipeline and the first pipeline is provided with a pressure sensor and a gas flow meter. The pressure sensor is electrically connected to the electrically controlled one-way valve.

[0005] Furthermore, the section of the first nitrogen pipeline after the connection point between the first nitrogen pipeline and the first pipeline is equipped with a second pressure sensor and a second gas flow meter.

[0006] Furthermore, a second pipeline is connected to the first nitrogen pipeline before the connection point between the first nitrogen pipeline and the first pipeline. An electrically controlled flow valve is provided on the second pipeline, and the second pressure sensor is electrically connected to the electrically controlled flow valve. The end of the second pipeline away from the first nitrogen pipeline is connected to the second nitrogen pipeline.

[0007] Furthermore, the second nitrogen pipeline is equipped with a pressure sensor and a gas flow meter.

[0008] Compared with the prior art, the present invention has the following technical effects: 1. In this utility model, a first nitrogen pipeline and a compressed air pipeline are connected through a first pipeline. An electrically controlled check valve is installed on the first pipeline. The electrically controlled check valve allows nitrogen in the first nitrogen pipeline to flow to the compressed air pipeline, but prevents compressed air in the compressed air pipeline from flowing to the first nitrogen pipeline. A pressure sensor monitors the pressure in the compressed air pipeline in real time, and a gas flow meter monitors the gas flow in the compressed air pipeline in real time. When the air compressor malfunctions, the compressed air pipeline cannot provide process air. At this time, the pressure in the compressed air pipeline will change. The pressure sensor detects the pressure change in the compressed air pipeline and transmits the signal to the electrically controlled check valve. The electrically controlled check valve opens, and the first nitrogen pipeline becomes an emergency air source pipeline. Nitrogen in the first nitrogen pipeline flows to the compressed air pipeline to temporarily serve as a process air source, thereby ensuring the supply of process air.

[0009] 2. In this utility model, the second pressure sensor monitors the pressure in the first nitrogen pipeline in real time, and the second gas flow meter monitors the gas flow in the first nitrogen pipeline in real time. When part of the nitrogen in the first nitrogen pipeline flows to the compressed air pipeline as an emergency process gas source, the pressure in the first nitrogen pipeline will change. The second pressure sensor detects the pressure change in the first nitrogen pipeline and transmits the signal to the electrically controlled flow valve. The electrically controlled flow valve opens, and the nitrogen in the second nitrogen pipeline flows to the first nitrogen pipeline, thereby ensuring the nitrogen supply of the first nitrogen pipeline. Attached Figure Description

[0010] Figure 1 This is a schematic diagram of the workshop operation air supply system according to an embodiment of the present utility model.

[0011] In the diagram: 1. Air source, 2. Air compressor, 3. Compressed air pipeline, 4. Pressure sensor 1, 5. Gas flow meter 1, 6. First pipeline, 7. Electrically controlled check valve, 8. First nitrogen pipeline, 9. Pressure sensor 2, 10. Gas flow meter 2, 11. Second pipeline, 12. Electrically controlled flow valve, 13. Second nitrogen pipeline, 14. Pressure sensor 3, 15. Gas flow meter 3. Detailed Implementation

[0012] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0013] Please see Figure 1This embodiment provides a workshop operation air supply system, including an air compressor 2, a first nitrogen line 8, and a compressed air line 3. The input end of the air compressor 2 is connected to an air source 1, and the output end of the air compressor 2 is connected to the compressed air line 3. The compressed air line 3 is used to transport compressed air as a process air source. The first nitrogen line 8 is used to provide nitrogen. The air compressor 2 can compress the air provided by the air source 1 to provide compressed air to the compressed air line 3.

[0014] Specifically, the first nitrogen line 8 and the compressed air line 3 are connected via a first line 6. The first line 6 is equipped with an electrically controlled check valve 7. This valve directs nitrogen from the first nitrogen line 8 to the compressed air line 3, preventing compressed air from flowing from the compressed air line 3 to the first nitrogen line 8, thus avoiding cross-contamination of the compressed air line 8. The section of the compressed air line 3 downstream of the connection point with the first line 6 is equipped with a pressure sensor 4 and a gas flow meter 5. The pressure sensor 4 monitors the pressure in the compressed air line 3 in real time, and the gas flow meter 5 monitors the gas flow rate in the compressed air line 3 in real time, allowing operators to monitor the pressure and flow rate in the compressed air line 3 in real time. The pressure sensor 4 is electrically connected to the electrically controlled check valve 7. When the pressure sensor 4 detects a change in the pressure in the compressed air line 3, it transmits a signal to the electrically controlled check valve 7.

[0015] Specifically, the section of the first nitrogen pipeline 8 after the connection point with the first pipeline 6 is equipped with a pressure sensor 2 9 and a gas flow meter 2 10. The pressure sensor 2 9 monitors the gas pressure in the first nitrogen pipeline 8 in real time, and the gas flow meter 2 10 monitors the gas flow rate in the first nitrogen pipeline 8 in real time, so that the staff can understand the gas pressure and gas flow rate in the first nitrogen pipeline 8 in real time. The section of the first nitrogen pipeline 8 before the connection point with the first pipeline 6 is connected to a second pipeline 11. The second pipeline 11 is equipped with an electrically controlled flow valve 12. The pressure sensor 2 9 is electrically connected to the electrically controlled flow valve 12. When the pressure sensor 2 9 detects a change in the gas pressure in the first nitrogen pipeline 8, the pressure sensor 2 9 can transmit the signal to the electrically controlled flow valve 12. The end of the second pipeline 11 away from the first nitrogen pipeline 8 is connected to the second nitrogen pipeline 13. The nitrogen in the second nitrogen pipeline 13 flows to the first nitrogen pipeline 8 through the electrically controlled flow valve 12 to compensate for the nitrogen flowing from the first nitrogen pipeline 8 to the compressed air pipeline 3.

[0016] Specifically, the second nitrogen pipeline 13 is equipped with a pressure sensor 3 14 and a gas flow meter 3 15. The pressure sensor 3 14 monitors the gas pressure in the second nitrogen pipeline 13 in real time, and the gas flow meter 3 15 monitors the gas flow in the second nitrogen pipeline 13 in real time, so that the staff can understand the gas pressure and gas flow in the second nitrogen pipeline 13 in real time.

[0017] Specifically, the working principle of this utility model is as follows: When the air compressor 2 malfunctions, the air compressor 2 stops compressing air, and the compressed air pipeline 3 can no longer provide process air. At this time, the air pressure in the compressed air pipeline 3 will change. The pressure sensor 4 detects the change in air pressure in the compressed air pipeline 3 and transmits the signal to the electrically controlled one-way valve 7. The electrically controlled one-way valve 7 opens, and the first nitrogen pipeline 8 serves as an emergency air source pipeline. The nitrogen in the first nitrogen pipeline 8 flows to the compressed air pipeline 3 to temporarily serve as a process air source, ensuring the supply of process air. Part of the nitrogen in the first nitrogen line 8 flows to the compressed air line 3, causing a change in the air pressure in the first nitrogen line 8. The second pressure sensor 9 detects this change in air pressure in the first nitrogen line 8 and transmits the signal to the electrically controlled flow valve 12. The electrically controlled flow valve 12 opens, and the nitrogen in the second nitrogen line 13 flows to the first nitrogen line 8 to compensate for the nitrogen flowing from the first nitrogen line 8 to the compressed air line 3, thus ensuring the nitrogen supply to the first nitrogen line 8.

[0018] Specifically, in this utility model, the first nitrogen pipeline 8 and the compressed air pipeline 3 are connected through a first pipeline 6. The first pipeline 6 is equipped with an electrically controlled one-way valve 7. The electrically controlled one-way valve 7 can allow nitrogen in the first nitrogen pipeline 8 to flow to the compressed air pipeline 3, but cannot allow compressed air in the compressed air pipeline 3 to flow to the first nitrogen pipeline 8. The pressure sensor 4 monitors the pressure in the compressed air pipeline 3 in real time, and the gas flow meter 5 monitors the gas flow in the compressed air pipeline 3 in real time. When the air compressor 2 malfunctions, the compressed air pipeline 3 cannot provide process gas. At this time, the pressure in the compressed air pipeline 3 will change. The pressure sensor 4 detects the pressure change in the compressed air pipeline 3 and transmits the signal to the electrically controlled one-way valve 7. The electrically controlled one-way valve 7 opens, and the first nitrogen pipeline 8 becomes an emergency gas source pipeline. The nitrogen in the first nitrogen pipeline 8 flows to the compressed air pipeline 3 to temporarily serve as a process gas source, thereby ensuring the supply of process gas.

[0019] Specifically, in this invention, pressure sensor 29 monitors the pressure in the first nitrogen pipeline 8 in real time, and gas flow meter 20 monitors the gas flow in the first nitrogen pipeline 8 in real time. When part of the nitrogen in the first nitrogen pipeline 8 flows to the compressed air pipeline 3 as an emergency process gas source, the pressure in the first nitrogen pipeline 8 will change. Pressure sensor 29 detects the pressure change in the first nitrogen pipeline 8 and transmits the signal to the electrically controlled flow valve 12. The electrically controlled flow valve 12 opens, and the nitrogen in the second nitrogen pipeline 13 flows to the first nitrogen pipeline 8, thereby ensuring the nitrogen supply to the first nitrogen pipeline 8.

[0020] It will be apparent to those skilled in the art that this invention is not limited to the details of the exemplary embodiments described above, and that it can be implemented in other specific forms without departing from the spirit or essential characteristics of this invention. Therefore, the embodiments should be considered illustrative and non-limiting in all respects, and the scope of this invention is defined by the appended claims rather than the foregoing description. Thus, it is intended that all variations falling within the meaning and scope of equivalents of the claims be included within this invention. No reference numerals in the claims should be construed as limiting the scope of the claims.

Claims

1. A workshop operation gas supply system, characterized in that, The system includes an air compressor (2), a first nitrogen pipeline (8), and a compressed air pipeline (3). The input end of the air compressor (2) is connected to an air source (1), and the output end of the air compressor (2) is connected to the compressed air pipeline (3). A first pipeline (6) is provided between the first nitrogen pipeline (8) and the compressed air pipeline (3). An electrically controlled check valve (7) is provided on the first pipeline (6). A pressure sensor (4) and a gas flow meter (5) are provided on the compressed air pipeline (3) after the connection between the compressed air pipeline (3) and the first pipeline (6). The pressure sensor (4) is electrically connected to the electrically controlled check valve (7).

2. The workshop operation gas supply system according to claim 1, characterized in that, The first nitrogen pipeline (8) is provided with a second pressure sensor (9) and a second gas flow meter (10) after the first nitrogen pipeline (8) connects with the first pipeline (6).

3. The workshop operation gas supply system according to claim 2, characterized in that, The first nitrogen pipeline (8) before the first pipeline (6) is connected to the second pipeline (11). The second pipeline (11) is equipped with an electrically controlled flow valve (12). The second pressure sensor (9) is electrically connected to the electrically controlled flow valve (12). The end of the second pipeline (11) away from the first nitrogen pipeline (8) is connected to the second nitrogen pipeline (13).

4. The workshop operation gas supply system according to claim 3, characterized in that, The second nitrogen pipeline (13) is equipped with a pressure sensor (14) and a gas flow meter (15).