A thermal storage peak-shaving operation system for gas generator sets in steel enterprises
By introducing a thermal storage peak-shaving operation system into the gas generator sets of steel enterprises, the spatial and temporal transfer of energy is realized, which solves the problem of limited load of gas generator sets and improves power generation capacity and economic benefits during peak hours.
Patent Information
- Application Number
- CN202522238084.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-22
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-10-22
AI Technical Summary
The operating load of gas-fired power generation units in steel enterprises is limited by the amount of gas, making it impossible to flexibly adapt to peak and off-peak electricity prices, thus failing to maximize economic benefits.
A thermal energy storage and peak-shaving operation system is introduced, including a coal gas power generation system, a thermal energy storage and exchange subsystem, a fuel supply subsystem, a water supply subsystem, a main steam subsystem, and a flue gas subsystem. Energy is transferred in time and space through a molten salt heater and a molten salt heat exchanger, and intelligent scheduling is carried out in conjunction with the grid electricity price signal.
Without increasing gas consumption, the power generation capacity of the unit during peak hours can be significantly improved, power generation revenue can be maximized, the cost of purchased electricity can be reduced, and the efficiency and economic benefits of the energy system can be improved.
Smart Images

Figure CN224984672U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of energy dispatching and optimization technology for steel enterprises, specifically to a peak-shaving operation system for a gas generator set that combines thermal storage technology, which is suitable for the efficient utilization of surplus gas in steel enterprises and economic operation under the peak-valley electricity price of the power grid. Background Technology
[0002] Steel enterprises are typical high-energy-consuming and high-carbon-emission industries, producing large amounts of coal gas as a byproduct of their production processes, such as blast furnace gas and converter gas. This gas is typically used to drive generator sets, enabling the enterprises to achieve partial self-sufficiency in electricity. However, the consumption of coal gas in the main steelmaking processes fluctuates, resulting in an unstable surplus of coal gas for power generation, which restricts the output and efficiency of the generator sets. Existing coal gas generator sets mostly employ a scheme of coal gas boilers combined with steam turbine generators. Their operating load is directly limited by the coal gas supply, making it difficult to play a greater role during peak grid periods and limiting the enterprises' ability to obtain higher profits through grid peak shaving.
[0003] Especially during peak electricity consumption periods such as summer, the power grid implements time-of-use pricing policies, with peak-hour electricity prices significantly higher than off-peak prices. Traditional gas-fired power generating units, due to limitations on the total amount of gas available, cannot flexibly adjust their power generation load. This results in insufficient power generation capacity during periods of high electricity prices, while during periods of low prices, excess gas may lead to emissions or inefficient utilization, causing energy waste and economic losses. Therefore, there is an urgent need for an operating scheme that can increase unit output and optimize power generation revenue during peak hours while maintaining a constant total gas supply. Utility Model Content
[0004] The technical problem to be solved by this utility model is to overcome the shortcomings of existing steel enterprises' gas generator sets, which are limited by the amount of gas, cannot flexibly adapt to the peak and valley electricity prices of the power grid, and fail to maximize economic benefits. The present invention provides a thermal storage peak-shaving operation system with a reasonable system structure, flexible operation mode, and can significantly improve peak power generation capacity and reduce the cost of purchased electricity.
[0005] To solve the above-mentioned technical problems, the technical solution provided in this application is as follows: This application provides a thermal storage and peak-shaving operation system for gas-fired power generation units in steel enterprises, comprising:
[0006] A gas-fired power generation system, which includes a gas boiler unit and a steam turbine power generation unit;
[0007] A heat storage and exchange subsystem is connected in parallel with the gas boiler unit. The heat storage and exchange subsystem includes a molten salt heater, a dual-tank heat storage unit, and a molten salt heat exchanger unit. It is used to store the chemical energy of gas during periods of low electricity price and to release the stored heat energy during periods of high electricity price to assist in power generation.
[0008] A fuel supply subsystem, which is connected via pipeline to the input of the gas boiler unit and the molten salt heater, is used to supply gas;
[0009] The water supply subsystem is connected to the input terminals of the gas boiler unit and the molten salt heat exchanger unit via pipelines;
[0010] The main steam subsystem connects the steam output terminals of the gas boiler unit and the molten salt heat exchanger unit, and is then connected to the steam input terminal of the steam turbine generator unit.
[0011] The flue gas subsystem connects the flue gas output terminals of the gas boiler unit and the molten salt heater, and collects the flue gas into the chimney.
[0012] The fuel supply subsystem is equipped with a fuel regulating valve group on the connecting pipeline between the gas boiler unit and the molten salt heater, which is used to regulate the amount of gas entering the gas boiler unit and the molten salt heater, thereby controlling the system to switch between the two operating modes of energy storage and energy release.
[0013] Preferably, the molten salt heating furnace includes a burner, a furnace chamber, and molten salt heat exchange coils arranged in the furnace chamber, through which the molten salt flows to absorb the chemical energy released by the combustion of coal gas.
[0014] Preferably, the dual-tank thermal storage unit includes a high-temperature storage tank, a low-temperature storage tank, a high-temperature molten salt circulation pump, and a low-temperature molten salt circulation pump;
[0015] The outlet of the cryogenic storage tank is connected to the molten salt inlet of the molten salt heater via a cryogenic molten salt circulation pump, and the molten salt outlet of the molten salt heater is connected to the inlet of the high-temperature storage tank, thus forming a heat storage circuit.
[0016] The molten salt heat exchanger unit has its molten salt inlet connected to the outlet of the high-temperature storage tank via a high-temperature molten salt circulation pump, and its molten salt outlet connected to the inlet of the low-temperature storage tank, forming a heat release loop.
[0017] Preferably, the molten salt heat exchanger unit includes a preheater, a heater, and a superheater that sequentially preheat, heat, and superheat the feedwater, for generating steam with parameters consistent with those produced by the gas boiler unit.
[0018] Preferably, the steam turbine generator unit includes a steam turbine generator set, a condenser, a circulating cooler, a condensate pump, a regenerative deaerator, and a feedwater pump;
[0019] The exhaust steam output terminal of the turbine generator set is connected to the exhaust steam input terminal of the condenser; the circulating cooler is coupled to the condenser and is used to condense the exhaust steam in the condenser; the condensate output terminal of the condenser is connected to the regenerative deaerator through the condensate pump and the exhaust port of the turbine generator set is connected to the regenerative deaerator; the feedwater output terminal of the regenerative deaerator is connected to the feedwater subsystem through the feedwater pump.
[0020] Preferably, the fuel regulating valve assembly includes a first gas valve disposed on the pipeline leading to the gas boiler unit and a second gas valve disposed on the pipeline leading to the molten salt heating furnace.
[0021] Preferably, the main steam subsystem is provided with a steam regulating valve group, which includes a first steam valve installed in the steam output pipeline of the gas boiler unit and a second steam valve installed in the steam output pipeline of the molten salt heat exchanger unit.
[0022] Preferably, the water supply subsystem is provided with a water supply regulating valve group, which includes a first water supply valve provided in the water supply pipeline leading to the gas boiler unit and a second water supply valve provided in the water supply pipeline leading to the molten salt heat exchanger unit.
[0023] Preferably, the flue gas subsystem is provided with a tail gas regulating valve group, which includes a first flue gas valve installed in the flue gas output pipeline of the gas boiler unit and a second flue gas valve installed in the flue gas output pipeline of the molten salt heater.
[0024] This application also provides a method for thermal storage and peak-shaving operation of gas-fired generator sets in steel enterprises. The method is divided into energy storage mode operation during low-price periods and energy release mode operation during high-price periods based on grid electricity price signals. Specifically, it includes the following steps:
[0025] The operation of the energy storage mode specifically includes the following steps:
[0026] S1. Fuel distribution regulation: Regulate the fuel regulation valve group, specifically by closing the first gas valve and opening the second gas valve to distribute most of the gas to the molten salt heater of the heat storage and heat exchange subsystem for combustion.
[0027] S2, Thermal Storage Circulation: Start the low-temperature molten salt circulation pump to pump the low-temperature molten salt in the low-temperature storage tank into the molten salt heating furnace to absorb the heat released by the combustion of coal gas. The heated high-temperature molten salt flows into the high-temperature storage tank for storage, thus completing the thermal energy storage.
[0028] S3. Steam-water system isolation and low-load power generation: Adjust the steam-water pipeline valves, close the second steam valve and the second feedwater valve, and at the same time adjust the opening of the first feedwater valve; so that the steam generated by the combustion of a small amount of gas entering the gas boiler unit is completely introduced into the steam turbine generator unit through the opening of the first steam valve, driving the steam turbine generator set to maintain operation near the minimum load rate.
[0029] S4. Flue gas treatment: Keep the first flue gas valve and the second flue gas valve in the open position to ensure that the flue gas generated by the two systems can be discharged into the chimney.
[0030] The energy release mode operation specifically includes the following steps:
[0031] S5. Fuel Distribution Switching: Adjust the fuel regulating valve group, specifically by opening the first gas valve to almost full opening and closing the second gas valve to allow most of the gas to enter the gas boiler unit for combustion, and only supplying the molten salt heating furnace with the minimum amount of gas required to keep its burner from going out.
[0032] S6. Heat release and steam generation: Start the high-temperature molten salt circulation pump to pump the high-temperature molten salt stored in the high-temperature storage tank into the molten salt heat exchanger unit.
[0033] S7. Parallel connection of steam and water system and high-load power generation: Adjust the valves of the steam and water pipeline, open the second feedwater valve and the second steam valve, and at the same time adjust the opening of the first feedwater valve; so that the feedwater enters the gas boiler unit and the molten salt heat exchanger unit respectively to generate steam. The steam generated by the two paths is combined by opening the first steam valve and the second steam valve, and then introduced into the steam turbine generator unit to drive the steam turbine generator set to full load or near full load operation.
[0034] S8. Flue gas treatment adjustment: Keep the first flue gas valve fully open and adjust the opening of the second flue gas valve to ensure that all flue gas is collected and discharged into the chimney.
[0035] Compared with the prior art, the beneficial effects of this utility model are as follows:
[0036] 1. It breaks through the rigid constraint of total gas supply on generator output, and realizes the spatial and temporal transfer of energy through the thermal storage subsystem. Without increasing gas consumption, it significantly improves the generator's power generation capacity during periods of high electricity prices, which is equivalent to expanding the generator's capacity.
[0037] 2. By intelligently scheduling gas distribution and heat storage / release processes, the operating strategy of the generator set is perfectly matched with the peak and off-peak electricity prices of the power grid, maximizing the power generation revenue during peak hours and effectively reducing the external power purchase costs of steel enterprises.
[0038] 3. The system has a high degree of integration. By retrofitting the existing gas generator set in parallel and adding a thermal storage system, the modifications are minimal, the implementation is convenient, and the operation mode switching is flexible and reliable.
[0039] 4. Molten salt is selected as the heat storage medium, which has the advantages of large heat capacity, wide temperature range, good stability and economy, and is particularly suitable for the large-scale, medium and high temperature heat storage needs of steel enterprises.
[0040] 5. It has improved the utilization efficiency of the entire energy system and the economic benefits of enterprises, and provided an effective technical path for steel enterprises to achieve green and low-carbon transformation and participate in grid demand-side response. Attached Figure Description
[0041] Figure 1 This is a schematic diagram of the structure of a heat storage and peak-shaving operation system for a gas generator set in a steel enterprise, as described in this application.
[0042] As shown in the figure: 1. Fuel supply subsystem; 2. Gas boiler unit; 3. Heat storage and exchange subsystem; 3-1. Molten salt heater; 3-2. Dual-tank heat storage unit; 3-2-1. High-temperature storage tank; 3-2-2. Low-temperature storage tank; 3-2-3. High-temperature molten salt circulating pump; 3-2-4. Low-temperature molten salt circulating pump; 3-3. Molten salt heat exchanger unit; 4. Steam turbine generator unit; 4-1. Steam turbine generator set; 4-2. Condenser; 4-3. Circulating cooler; 4-4. Condensate pump; 4-5. Regenerative deaerator; 4-6. Feedwater pump; 5. Chimney; 6-1. First gas valve; 6-2. Second gas valve; 7-1. First steam valve; 7-2. Second steam valve; 8-1. First feedwater valve; 8-2. Second feedwater valve; 9-1. First flue gas valve; 9-2. Second flue gas valve. Detailed Implementation
[0043] The present invention will now be described in further detail with reference to the accompanying drawings.
[0044] The specific embodiments of this utility model will be further described below with reference to the accompanying drawings. Identical components are indicated by the same reference numerals.
[0045] It should be noted that the terms “front,” “back,” “left,” “right,” “up,” and “down” used in the following description refer to the directions shown in the attached diagram, while the terms “inside” and “outside” refer to the directions toward or away from the geometric center of a specific component, respectively.
[0046] To make the content of this utility model easier to understand, the technical solutions in the embodiments of this utility model will be clearly and completely described below with reference to the accompanying drawings.
[0047] This utility model relates to a thermal storage peak-shaving operation system for gas generator sets in steel enterprises, belonging to the field of energy conservation and energy dispatching technology in the steel industry. Specifically, it relates to an operation scheme that enables gas generator sets to increase output during periods of high electricity prices through a thermal storage system.
[0048] Combined with appendix Figure 1This application provides a heat storage and peak-shaving operation system for gas generator sets in steel enterprises. The system mainly includes a gas generator system, a heat storage and exchange subsystem, a fuel supply subsystem, a water supply subsystem, a main steam subsystem, and a flue gas subsystem. The gas-fired power generation system includes a gas boiler unit 2 and a steam turbine power generation unit 4. The heat storage and exchange subsystem 3 is connected in parallel with the gas boiler unit 2 and further includes a molten salt heater 3-1, a dual-tank heat storage unit 3-2, and a molten salt heat exchanger unit 3-3. It is used to store the chemical energy in the gas as thermal energy in high-temperature molten salt during periods of low electricity price and to release the stored thermal energy during periods of high electricity price to heat feedwater and generate steam, thus assisting the gas boiler in increasing the power generation load of the steam turbine unit. The fuel supply subsystem 1 is connected to the gas boiler unit 2 and the molten salt heater 3-1 through pipelines and is responsible for the supply and distribution of gas. The feedwater subsystem supplies water to the gas boiler unit 2 and the molten salt heat exchanger unit 3-3 through pipelines. The main steam subsystem collects the steam from the gas boiler and the molten salt heat exchanger and transports it to the steam turbine power generation unit 4. The flue gas subsystem is connected to the exhaust ports of each combustion device and finally flows into the chimney 5 for emission.
[0049] In one specific embodiment of this system, the molten salt heater 3-1 includes a dedicated burner, a furnace chamber, and a built-in molten salt heat exchange coil. Its structural design ensures complete combustion of the gas within the furnace chamber, and the released chemical energy is efficiently transferred to the flowing molten salt medium through the coil wall. The molten salt is a nitrate mixture with a wide liquid phase temperature range and high thermal stability, allowing for long-term stable operation at high temperatures. The dual-tank thermal storage unit 3-2 consists of a high-temperature storage tank 3-2-1, a low-temperature storage tank 3-2-2, a high-temperature molten salt circulation pump 3-2-3, and a low-temperature molten salt circulation pump 3-2-4. The low-temperature molten salt is pumped from the low-temperature storage tank into the molten salt heater, absorbs heat, becomes high-temperature molten salt, and is stored in the high-temperature storage tank, completing the thermal storage cycle. During the heat release phase, the high-temperature molten salt is pumped from the high-temperature storage tank into the molten salt heat exchanger unit 3-3, exchanges heat with the feedwater, cools down, and returns to the low-temperature storage tank. Molten salt heat exchanger unit 3-3 typically adopts a modular design, including a preheater, evaporator, and superheater. It can gradually heat the feedwater into main steam with a certain degree of superheat. Its steam parameters are designed to be consistent with the steam parameters at the outlet of the gas boiler, ensuring that the thermodynamic parameters are matched when the two steam streams are mixed, and preventing uneven thermal stress at the turbine inlet end.
[0050] The steam turbine generator unit 4 includes a steam turbine generator set 4-1, a condenser 4-2, a circulating cooling system 4-3, a condensate pump 4-4, a regenerative deaerator 4-5, and a feedwater pump 4-6. The exhaust steam, after performing work, is condensed into water in the condenser and pumped into the regenerative deaerator 4-5. After multi-stage extraction for reheating and deoxygenation, the steam is pressurized by the feedwater pump and resupplyed to the gas boiler and molten salt heat exchanger. The exhaust port of the steam turbine generator set 4-1 is connected to the regenerative deaerator 4-5 and used to heat the condensate within it.
[0051] To enable flexible switching between two operating modes, the system is equipped with several key valve groups. The fuel regulating valve group includes a first gas valve 6-1 and a second gas valve 6-2, used to allocate gas flow; the steam regulating valve group includes a first steam valve 7-1 and a second steam valve 7-2, used to control the convergence and isolation of two steam paths; the feedwater regulating valve group includes a first feedwater valve 8-1 and a second feedwater valve 8-2, used to regulate the feedwater supply to the two heat exchange systems; and the exhaust gas regulating valve group includes a first flue gas valve 9-1 and a second flue gas valve 9-2, used to regulate the flue gas emission path. All valve groups can be driven by electric or pneumatic actuators and connected to a central control unit to achieve automatic adjustment according to preset strategies or real-time electricity price signals.
[0052] This application provides a method for thermal energy storage and peak-shaving operation of gas-fired power generating units in steel enterprises. Based on the aforementioned system, this method intelligently responds to time-of-use electricity price signals from the power grid, dividing the operation into an energy storage mode during low-price periods and an energy release mode during high-price periods. The core of this method lies in achieving the spatiotemporal transfer of gas energy by adjusting multiple key valve groups and subsystems. This significantly increases the unit's power output during high-price periods, maximizing power generation revenue, while maintaining a constant total gas consumption. The specific steps for the two operation modes are described in detail below.
[0053] The energy storage mode operation specifically includes the following steps:
[0054] S1. Fuel Distribution Regulation: The fuel regulating valve group is adjusted by partially closing the first gas valve 6-1 and fully opening the second gas valve 6-2, distributing most of the gas to the molten salt heater 3-1 in the heat storage and exchange subsystem 3 for combustion. During periods of low electricity prices, the grid's demand for electricity is relatively low. At this time, the gas supply to the gas boiler unit 2 is reduced, decreasing its power generation output, and more gas is directed to the molten salt heater 3-1. This allows the gas energy originally intended for direct power generation to be stored without increasing total gas consumption, thus reserving energy for power generation during periods of high electricity prices.
[0055] S2. Thermal Storage Circulation: The cryogenic molten salt circulation pump 3-2-4 is started, pumping the cryogenic molten salt from the cryogenic storage tank 3-2-2 into the molten salt heater 3-1 to absorb the heat released by the combustion of coal gas. The heated high-temperature molten salt then flows into the high-temperature storage tank 3-2-1 for storage, completing the thermal energy storage. Molten salt has a wide liquid phase temperature range and high thermal stability, enabling it to operate stably at high temperatures for extended periods. The coal gas is fully combusted in the molten salt heater 3-1, releasing a large amount of chemical energy. This energy is transferred to the flowing molten salt medium through the molten salt heat exchange coils within the furnace. After absorbing heat, the cryogenic molten salt becomes high-temperature molten salt and is stored in the high-temperature storage tank 3-2-1, thus realizing the storage of the chemical energy in the coal gas as thermal energy.
[0056] S3. Steam-Water System Isolation and Low-Load Power Generation: Adjust the steam-water pipeline valves, close the second steam valve 7-2 and the second feedwater valve 8-2, and simultaneously adjust the opening of the first feedwater valve 8-1; this allows the steam generated from the combustion of a small amount of gas entering the gas boiler unit 2 to be entirely directed into the turbine generator unit 4 through the opening of the first steam valve 7-1, driving the turbine generator set 4-1 to maintain operation near the minimum load rate. Since most of the gas is allocated to the molten salt heater 3-1 for heat storage, the gas supply to the gas boiler unit 2 is reduced, and the amount of steam generated is correspondingly reduced. By closing the second steam valve 7-2 and the second feedwater valve 8-2, the steam-water connection between the molten salt heat exchanger unit 3-3 and the turbine generator unit 4 is severed, ensuring that the small amount of steam generated by the gas boiler unit 2 can be entirely used to drive the turbine generator set 4-1 to operate near the minimum load rate, guaranteeing the basic operating condition of the unit while reducing unnecessary energy consumption.
[0057] S4. Flue Gas Treatment: Keep the first flue gas valve 9-1 and the second flue gas valve 9-2 open to ensure that the flue gas generated by both systems can be discharged into the chimney 5. In energy storage mode, both the gas boiler unit 2 and the molten salt heater 3-1 are operating and will generate flue gas. Keeping both flue gas valves open allows the flue gas generated by both systems to be smoothly discharged into the chimney 5, ensuring the environmentally friendly operation of the system and preventing the accumulation of flue gas from affecting equipment and the environment.
[0058] The energy release mode operation specifically includes the following steps:
[0059] S5. Fuel Distribution Switching: Adjust the fuel regulating valve group, specifically by opening the first gas valve 6-1 to near full opening and closing the second gas valve 6-2, so that most of the gas enters the gas boiler unit 2 for combustion, supplying only the minimum amount of gas required to keep the burner of the molten salt heater 3-1 from extinguishing. During periods of high electricity prices, the grid's demand for electricity is higher, requiring an increase in the unit's power output. Distributing most of the gas to the gas boiler unit 2 allows it to generate more steam, increasing power generation. Simultaneously, supplying the minimum amount of gas to the molten salt heater 3-1 keeps its burner from extinguishing, ensuring a rapid start-up of the heat release process when needed.
[0060] S6. Heat Release and Steam Generation: Start the high-temperature molten salt circulation pump 3-2-3 to pump the high-temperature molten salt stored in the high-temperature storage tank 3-2-1 into the molten salt heat exchanger unit 3-3. The high-temperature molten salt stores the heat released by the combustion of coal gas during periods of low electricity prices. After starting the high-temperature molten salt circulation pump 3-2-3, the high-temperature molten salt flows into the molten salt heat exchanger unit 3-3 and exchanges heat with the feedwater. The high-temperature molten salt transfers its stored heat energy to the feedwater, causing the feedwater to gradually heat up and generate steam, thus realizing the release and conversion of heat energy.
[0061] S7. Parallel Operation of Steam-Water Systems and High-Load Power Generation: Adjust the steam-water pipeline valves, open the second feedwater valve 8-2 and the second steam valve 7-2, and simultaneously adjust the opening of the first feedwater valve 8-1; this allows feedwater to enter the gas boiler unit 2 and the molten salt heat exchanger unit 3-3 respectively to generate steam. The steam generated by the two streams merges after opening the first steam valve 7-1 and the second steam valve 7-2, and is then introduced into the turbine generator unit 4, driving the turbine generator set 4-1 to operate at full load or near full load. Opening the second feedwater valve 8-2 and the second steam valve 7-2 creates a steam-water circulation path between the molten salt heat exchanger unit 3-3 and the turbine generator unit 4. The gas boiler unit 2 and the molten salt heat exchanger unit 3-3 simultaneously generate steam, and the two streams of steam merge before entering the turbine generator set 4-1, increasing the steam flow and energy, thereby driving the turbine generator set 4-1 to operate at full load or near full load, improving the unit's power output, and meeting the grid's electricity demand during periods of high electricity prices.
[0062] S8. Flue Gas Treatment Adjustment: Keep the first flue gas valve 9-1 fully open and adjust the opening of the second flue gas valve 9-2 to ensure that all flue gas is collected and discharged into chimney 5. In energy release mode, the operating status of the gas boiler unit 2 and the molten salt heater 3-1 changes, and the amount of flue gas produced may also differ. Keep the first flue gas valve 9-1 fully open to ensure smooth discharge of flue gas from the gas boiler unit 2; adjust the opening of the second flue gas valve 9-2 to reasonably control the emission of flue gas from the molten salt heater 3-1 according to its operating conditions, so that the flue gas generated by the two systems can be collected and stably discharged into chimney 5, ensuring the environmentally friendly and safe operation of the system.
[0063] Taking the actual application of a 40MW gas-fired power plant generator set in a steel plant as an example, this utility model solution will be specifically explained. The unit was originally designed as a conventional gas-fired boiler generator set. After undergoing thermal storage and peak-shaving modifications, the system added features such as... Figure 1 The heat storage and exchange subsystem is shown. During off-peak electricity hours at night (typically 16 hours), the system enters energy storage mode. Approximately 75% of the gas is switched to the molten salt heater for heating and storing the molten salt; the remaining gas is used by the gas boiler, and the unit's power generation load drops to 33% of its rated output, approximately 13.2 MW. During this period, the combustion system of the molten salt heater maintains stable operation, ensuring efficient heat absorption and storage by adjusting the combustion air distribution and molten salt flow rate, with the high-temperature molten salt temperature reaching over 565℃. Simultaneously, the gas boiler maintains stable operation under low-temperature and low-pressure conditions by adjusting the feedwater flow rate and combustion air distribution. The generated steam is only used to maintain the turbine's minimum load operation, avoiding frequent start-ups and shutdowns or excessively low efficiency under low load conditions.
[0064] During peak electricity pricing periods on the grid during the daytime (assuming 8 hours), the system switches to energy release mode. At this time, approximately 90% of the gas is allocated to the gas boiler, rapidly increasing its load to over 40MW of rated output. Simultaneously, the molten salt heat exchanger unit operates, releasing heat from the high-temperature molten salt to heat the feedwater into superheated steam with parameters consistent with the boiler's main steam (e.g., pressure 9.8MPa, temperature 540℃). The two steam streams mix and enter the turbine, jointly driving the generator unit to operate at 72MW, significantly increasing the unit's output. It is important to note that during high-load operation, the pressure and temperature of the main steam must be monitored in real time to ensure parameter matching during the mixing of the two steam streams, avoiding additional thermal stress on the turbine rotor or cylinder due to parameter deviations. Meanwhile, in this mode, the molten salt heater only supplies a small amount of gas to maintain a low-fired burner, ensuring the system can respond to mode switching again at any time.
[0065] In terms of economic benefits, taking Jiangsu's electricity pricing policy as an example, assuming a peak electricity price of 0.9 yuan / kWh and an off-peak price of 0.3 yuan / kWh, before the upgrade, the unit operated continuously at its rated output of 40MW, generating 960MWh per day, with electricity revenue of approximately 590,000 yuan. After the upgrade, it operates at 72MW for 8 hours during peak hours, generating 576MWh, and at 13.2MW for 16 hours during off-peak hours, generating 211.2MWh. The total daily power generation remains 787.2MWh, but the electricity revenue increases to approximately 740,000 yuan. After deducting the increased costs of equipment depreciation, maintenance, and molten salt replacement due to the investment in the thermal storage system, the estimated net increase in revenue for 330 days of operation per year is approximately 50 million yuan, with an investment payback period of 2-3 years, demonstrating significant economic benefits.
[0066] Furthermore, the system offers significant environmental benefits. By enhancing the peak-shaving capacity of the generator units, it strengthens the steel plant's responsiveness to grid demands, enabling it to effectively participate in demand response or ancillary services markets. During periods of fluctuating gas supply, the thermal storage system can also act as a buffer, appropriately absorbing gas pressure fluctuations and improving the overall operational stability of the power generation system. The molten salt system operates at atmospheric pressure, ensuring high safety, and its molten components are environmentally friendly inorganic salts, generating no additional pollutants during operation.
[0067] In summary, this invention, by introducing a thermal storage subsystem and integrating it in parallel with an existing gas-fired generator set, successfully achieves a significant increase in peak-hour output without increasing gas consumption. Furthermore, it optimizes production plans based on electricity price signals, demonstrating high economic efficiency and engineering application value. Those skilled in the art can, under the guidance of this invention, adapt and adjust system parameters or optimize local structures, such as selecting different types of thermal storage media, adjusting the form of the thermal storage tank, or changing the system layout. These modifications should also fall within the protection scope of this invention.
[0068] The above is a detailed description of the system and method of this utility model, including its composition, operation mode, typical embodiments, and benefit analysis. This utility model is particularly suitable for steel enterprises with abundant coal gas energy, and can be used for energy-saving and efficiency-improving retrofits of existing generator sets, as well as for design optimization of new projects, and has broad prospects for promotion and application.
[0069] In conclusion, if any person skilled in the art, inspired by this invention, designs a similar structure and embodiment without departing from the spirit of this invention, such design should fall within the protection scope of this invention.
Claims
1. A heat storage peak shaving operation system for a steel enterprise coal gas generator unit, characterized in that, include: The gas-fired power generation system includes a gas boiler unit (2) and a steam turbine power generation unit (4). The heat storage and exchange subsystem (3) is connected in parallel with the gas boiler unit (2). The heat storage and exchange subsystem (3) includes a molten salt heater (3-1), a dual-tank heat storage unit (3-2), and a molten salt heat exchanger unit (3-3), which is used to store the chemical energy of gas during periods of low electricity price and release the stored heat energy during periods of high electricity price to assist in power generation. A fuel supply subsystem (1), which is connected via pipeline to the input of the gas boiler unit (2) and the molten salt heater (3-1), is used to supply gas; The water supply subsystem is connected to the input terminals of the gas boiler unit (2) and the molten salt heat exchanger unit (3-3) via pipelines; The main steam subsystem connects the steam output terminals of the gas boiler unit (2) and the molten salt heat exchanger unit (3-3), and is connected to the steam input terminal of the steam turbine generator unit (4). The flue gas subsystem connects the flue gas output terminals of the gas boiler unit (2) and the molten salt heater (3-1), and is collected and connected to the chimney (5). The fuel supply subsystem (1) is connected to the gas boiler unit (2) and the molten salt heater (3-1) by a fuel regulating valve group, which is used to regulate the amount of gas entering the gas boiler unit (2) and the molten salt heater (3-1), thereby controlling the system to switch between the two operating modes of energy storage and energy release.
2. The heat storage peak shaving operation system for a steel enterprise gas power generating unit according to claim 1, characterized in that, The molten salt heating furnace (3-1) includes a burner, a furnace chamber, and molten salt heat exchange coils arranged in the furnace chamber. The molten salt flows through the molten salt heat exchange coils to absorb the chemical energy released by the combustion of coal gas.
3. The heat storage peak shaving operation system for a steel enterprise gas power generating unit according to claim 2, characterized in that, The dual-tank thermal storage unit (3-2) includes a high-temperature storage tank (3-2-1), a low-temperature storage tank (3-2-2), a high-temperature molten salt circulation pump (3-2-3), and a low-temperature molten salt circulation pump (3-2-4). The outlet of the cryogenic storage tank (3-2-2) is connected to the molten salt inlet of the molten salt heater (3-1) via a cryogenic molten salt circulation pump (3-2-4), and the molten salt outlet of the molten salt heater (3-1) is connected to the inlet of the high-temperature storage tank (3-2-1), thus forming a heat storage circuit. The molten salt heat exchanger unit (3-3) has its molten salt inlet connected to the outlet of the high-temperature storage tank (3-2-1) via a high-temperature molten salt circulation pump (3-2-3), and its molten salt outlet connected to the inlet of the low-temperature storage tank (3-2-2), forming a heat release circuit.
4. A thermal storage and peak-shaving operation system for a gas generator set in an iron and steel enterprise according to claim 1, characterized in that, The molten salt heat exchanger unit (3-3) includes a preheater, a heater, and a superheater that sequentially preheat, heat, and superheat the feedwater, and is used to generate steam with the same steam parameters as those produced by the gas boiler unit (2).
5. A thermal storage and peak-shaving operation system for a gas generator set in an iron and steel enterprise according to claim 1, characterized in that, The steam turbine generator unit (4) includes a steam turbine generator set (4-1), a condenser (4-2), a circulating cooler (4-3), a condensate pump (4-4), a regenerative deaerator (4-5), and a feedwater pump (4-6). The exhaust steam output of the turbine generator set (4-1) is connected to the exhaust steam input of the condenser (4-2); the circulating cooler (4-3) is coupled to the condenser (4-2) and is used to condense the exhaust steam in the condenser (4-2); the condensate output of the condenser (4-2) is connected to the regenerative deaerator (4-5) through the condensate pump (4-4), and the exhaust port of the turbine generator set (4-1) is connected to the regenerative deaerator (4-5); the feedwater output of the regenerative deaerator (4-5) is connected to the feedwater subsystem through the feedwater pump (4-6).
6. A thermal storage and peak-shaving operation system for a gas generator set in an iron and steel enterprise according to claim 1, characterized in that, The fuel regulating valve group includes a first gas valve (6-1) installed on the pipeline leading to the gas boiler unit (2) and a second gas valve (6-2) installed on the pipeline leading to the molten salt heater (3-1).
7. A thermal storage and peak-shaving operation system for a gas generator set in an iron and steel enterprise according to claim 1, characterized in that, The main steam subsystem is equipped with a steam regulating valve group, which includes a first steam valve (7-1) installed in the steam output pipeline of the gas boiler unit (2) and a second steam valve (7-2) installed in the steam output pipeline of the molten salt heat exchanger unit (3-3).
8. A thermal storage and peak-shaving operation system for a gas-fired generator set in an iron and steel enterprise according to claim 1, characterized in that, The water supply subsystem is equipped with a water supply regulating valve group, which includes a first water supply valve (8-1) installed on the water supply pipeline leading to the gas boiler unit (2) and a second water supply valve (8-2) installed on the water supply pipeline leading to the molten salt heat exchanger unit (3-3).
9. A thermal storage and peak-shaving operation system for a gas generator set in an iron and steel enterprise according to claim 1, characterized in that, The flue gas subsystem is equipped with a tail gas regulating valve group, which includes a first flue gas valve (9-1) installed in the flue gas output pipeline of the gas boiler unit (2) and a second flue gas valve (9-2) installed in the flue gas output pipeline of the molten salt heater (3-1).