Biomass drying system
The integrated biomass drying system addresses inefficiencies in construction time by pre-assembling fuel storage, boiler, and water tanks, enhancing efficiency through efficient heat exchange and rapid deployment.
Patent Information
- Application Number
- JP2023083026
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-19
- Publication Date
- 2024-11-29
Smart Images

Figure 2024166723000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a biomass drying system used for drying an object to be dried, which is made of biomass. [Background technology]
[0002] A power generation system has been known in the past that includes a container mounted on the loading platform of a mobile body, and inside the container, a raw material supply unit for transporting biomass raw material provided outside the mobile body into the container, and an energy generation unit that generates power by receiving the biomass raw material transported by the raw material supply unit (for example, Patent Document 1).
[0003] In the configuration of Patent Document 1, since a storage facility for storing the biomass raw materials to be supplied to the container is not provided inside the container, the storage facility must be assembled at the installation site. This causes the inconvenience of taking a long time before the system can start operating, and the inability to efficiently construct the system at the installation site. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2021-155519 A Summary of the Invention [Problem to be solved by the invention]
[0005] Therefore, an object of the present invention is to provide a biomass drying system that can improve the efficiency of system construction at the installation site. [Means for solving the problem]
[0006] The biomass drying system of the present invention is used for drying a drying object consisting of biomass, and comprises a housing, a fuel tank provided inside the housing for storing fuel consisting of biomass, a boiler provided inside the housing for burning the fuel supplied from the fuel tank, and a first water tank provided inside the housing for accumulating heat generated by combustion in the boiler in stored water.
[0007] The above configuration makes it possible to store and burn fuel inside the housing, and to store the heat generated by combustion. Therefore, by installing the housing at the installation site, the time required to build the system can be reduced compared to assembling each element separately.
[0008] In addition, the biomass drying system of the present invention may include a heat exchanger that transfers the thermal energy stored in the first water tank to air, and the air intake of the heat exchanger may open to the inside of the housing.
[0009] With the above-described configuration, the efficiency of heat exchange in the heat exchanger can be improved by utilizing the air inside the housing that is heated as a result of combustion in the boiler.
[0010] The biomass drying system of the present invention may also include a blower that converts the air warmed by the heat exchanger into hot air for drying the object to be dried.
[0011] With the above configuration, the air is turned into hot air, so that heat can be efficiently supplied to the object to be dried.
[0012] In addition, the biomass drying system of the present invention may be configured such that the material to be dried is contained in a plurality of drying containers, the hot air path is connected to the plurality of drying containers, the blower is configured to send hot air to each of the plurality of drying containers, and the hot air path between the heat exchanger and the blower is provided with a switching valve that can switch the drying container to which the hot air is directed.
[0013] With the above-described configuration, it is possible to select the drying container in which drying is performed via the blower by using the switching valve.
[0014] In addition, the biomass drying system of the present invention may be configured such that the fuel tank has a rectangular shape when viewed from above, the fuel tank is equipped with an agitation device that agitates the fuel inside, and the agitation device rotates around an axis of rotation extending in the vertical direction, in a position along the bottom surface of the fuel tank, with a diameter smaller than the diagonal dimension of the rectangle.
[0015] With the above configuration, there are areas in the corners of the rectangular bottom surface of the fuel tank when viewed in a plan view that the stirring device cannot reach, so by placing other components of the biomass drying system in these areas (dead space), the internal space of the housing can be used effectively.
[0016] The biomass drying system of the present invention may be configured so that the thermal energy stored in the first water tank is continuously transferred to air.
[0017] With the above configuration, the thermal energy in the first water tank can be continuously extracted, preventing breakdowns in the boiler and first water tank due to excessive heat storage, and the actual volume of the first water tank can be made smaller than the volume required based on the boiler.
[0018] In addition, the biomass drying system of the present invention may be configured such that, during transportation, in addition to each component that is placed inside the housing when the system is in operation, each component at least a portion of which is placed outside the housing when the system is in operation is housed inside the housing.
[0019] With the above-mentioned configuration, each component can be transported together with the housing, reducing the transportation burden.
[0020] In addition, the biomass drying system of the present invention may be configured so that a sub-housing different from the housing is used, and a second water tank is provided inside the sub-housing in parallel with the first water tank to store hot water generated by the heat produced by combustion in the boiler.
[0021] With the above configuration, a system for generating hot water that can be used for various purposes can be constructed simply by transporting the sub-housing in addition to the housing.
[0022] The biomass drying system of the present invention may further include an incineration ash treatment device that discharges incineration ash generated in the boiler during combustion to the outside of the housing.
[0023] With the above configuration, the incineration ash can be automatically discharged outside the housing.
[0024] The biomass drying system of the present invention may also include a solar panel on the upper surface of the housing.
[0025] With the above configuration, the power generated by the solar panel can be used by the system. Effect of the Invention
[0026] The present invention can provide a biomass drying system that can improve the efficiency of system construction at the installation site by providing a fuel tank, a boiler, and a first water tank inside a housing. [Brief description of the drawings]
[0027] [Figure 1] FIG. 1 is a perspective view showing an outline of a biomass drying system according to one embodiment of the present invention. [Diagram 2] FIG. 2 is a cross-sectional plan view showing the inside of a shipping container that constitutes the biomass drying system. [Diagram 3] FIG. 2 is a side view showing the inside of the marine container. [Figure 4] FIG. 1 is a front view of a shipping container. [Diagram 5]FIG. 2 is a left side view of a shipping container. [Figure 6] FIG. 2 is a right side view of the shipping container. [Figure 7] FIG. 2 is a side view showing a fuel supply device that supplies fuel to a shipping container. [Figure 8] FIG. 2 is an explanatory diagram showing a state in which fuel is poured from a fuel transport vehicle into a marine container via a fuel supply device. [Figure 9] FIG. 1 is a plan view showing the inside of a shipping container in which an air intake of a heat exchanger is opened to the inside of the shipping container. [Figure 10] FIG. 2 is a plan view showing the inside of a shipping container in which a heat exchanger is disposed inside the shipping container. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0028] Hereinafter, a biomass drying system 1 according to an embodiment of the present invention will be described with reference to the accompanying drawings. The term "biomass" used in the present invention refers to a substance derived from an animal or plant, a solid having a certain form, and a material that can be burned by drying to reduce the amount of moisture contained therein. Examples of such materials include wood (scrap wood, sawdust, etc.), plant residues (straw, removed weeds, etc.), combustible waste (food waste, etc.), animal excrement, and sewage sludge. In this embodiment, wood chips made by chipping wood (thinned wood, pruned trees, construction waste, etc.) are used. For this reason, the biomass in this embodiment has fluidity in a state where multiple (multiple) pieces are gathered together, and can be transported using the fluidity. Note that the "object to be dried (C1)" and "fuel (C2)" below have different amounts of moisture contained therein, but are the same object. Note that, for convenience of explanation, the following directional expressions are based on the directions shown in FIG. 1.
[0029] As shown in Fig. 1, the biomass drying system 1 includes a marine container 2 as a housing for accommodating equipment capable of storing and burning a fuel C2 made of biomass and accumulating heat generated by the burning, and a hot air supply mechanism 5 for converting the thermal energy accumulated by burning in the marine container 2 into hot air to dry wood chips (objects to be dried) C1 in a drying container 3 provided outside the marine container 2. At least a part of the dried wood chips C1 is supplied to the marine container 2 (fuel storehouse 6 described later in detail) as fuel C2. In this embodiment, a general-purpose marine container (for example, a 20-foot container) is used as the housing, but other containers such as a cast container may be used, or a box body without a container function may be used.
[0030] 2 and 3, the shipping container 2 is provided with a fuel storehouse 6 for storing fuel, a boiler 7 for burning fuel supplied from the fuel storehouse 6, and two (two in this embodiment, but one or three or more) first water tanks 8 and 9 for storing heat from the boiler 7 in the stored water. Since the shipping container 2 is provided with the fuel storehouse 6, the boiler 7, and the first water tanks 8 and 9, it is possible to store fuel, burn the fuel, and store heat generated by combustion inside the shipping container 2, and therefore by installing the shipping container 2 at the installation site, the time required for system construction can be shortened compared to assembling each element separately.
[0031] If the boiler 7 and the first water tanks 8, 9 are not only fixed in place and installed inside the shipping container 2, but the piping (not shown) connecting the boiler 7 to the first water tanks 8, 9 is also installed, then it becomes possible to simply transport the shipping container 2 to the installation site, eliminating the need for assembly work inside the shipping container 2, thereby further reducing the time required to build the system.
[0032] The marine container 2 is configured in a generally rectangular parallelepiped shape that is long in the front-rear direction, and includes a bottom wall 21, left and right walls 22, 23, front and rear walls 24, 25, and a top wall 26, as shown in Figs. 2 and 3. The rear wall 25 is provided with a pair of double-door doors 25A, 25A (see Fig. 2). The right wall 23 is provided with a pair of double-door doors 23A, 23A (see Fig. 6) near the rear side. The left wall 22 is provided with one opening and closing door 22A (see Fig. 5) near the rear side. The front wall 24 is provided on one of the left and right sides (the right side) with a transparent window 24A (see Fig. 4) that is long in the vertical direction, through which the amount of fuel inside the fuel vault 6 can be seen.
[0033] When the biomass drying system 1 is in operation, a chimney 10 for exhausting smoke generated in the boiler 7 and a duct 11 for intake and exhaust into the boiler room are attached to the marine container 2.
[0034] As shown in Figures 4 and 6, the chimney 10 is attached to the right wall 23 at a position closer to the front than the center in the front-rear direction, and is equipped with a long, cylindrical main body 10A extending straight upward, and an intake part 10B extending horizontally from the lower end of the main body 10A. The lower end of the main body 10A is inserted and fixed into a receiving member 12 fixed to the right wall 23. The intake part 10B is fixed to the right wall 23 in a state where it is inserted into a through hole (not shown) that penetrates the upper end of the right wall 23, and sucks in smoke from within the boiler room through the intake part 10B and discharges it to the outside from the upper end of the main body 10A.
[0035] The duct 11 includes a duct body including a first vertical cylinder portion 11A having an opening 11a for intake and exhaust, which is open at the bottom, and extending upward, and a second horizontal cylinder portion 11B extending horizontally from the top end of the first vertical cylinder portion 11A, and a fan (not shown) provided in the second horizontal cylinder portion 11B. An opening (not shown) at the end of the second horizontal cylinder portion 11B is connected to a through hole (not shown) formed at the top end of the left wall 22 and in a position forward of the center in the front-rear direction, and the fan is driven to rotate in one direction to supply outside air into the boiler room, and is driven to rotate in the other direction to exhaust air from the boiler room to the outside.
[0036] The fuel vault 6 is divided by a partition wall 13 at the front part of the marine container 2 to form a storage space having a substantially square shape in a plan view for storing fuel. The fuel vault 6 is provided with an agitator 14 as an agitator for agitating the stored fuel. The agitator 14 is flexible with a tip portion made of an elastic material, and is provided with a plurality of (two in FIG. 1) blades 14A, 14A that are disposed substantially at the center of the fuel vault 6 and rotate around a rotation axis X that extends in the up-down direction (a direction inclined with respect to the vertical direction) at a position along the bottom surface of the fuel vault 6, and an electric motor 14C for rotating the blades 14A, 14A. The agitator 14 is provided with a circular cover member 14B that covers the center portion of the blades 14A, 14A. The diameter of each blade 14A from the center of rotation to the tip is set to be longer than the distance from the center of rotation to the left and right walls 22, 23, the front wall 24, and the partition wall 13. Therefore, by driving the electric motor 14C, the blades 14A, 14A rotate while remaining in a curved state in contact with the wall surface (side surface) of the marine container 2. Also, at the four corners of the marine container 2, the diameter from the rotation center to the tip of each blade 14A is set to a dimension shorter than the diagonal dimension of the rectangle (more specifically, a dimension longer than the short side of the rectangle and shorter than the diagonal dimension), so that a region (dead space) S that does not reach (does not contact) the wall surface is generated. As a result, at the four corners of the fuel storehouse 6, each blade 14A rotates while drawing an arc. In the area (dead space) S, other components used in the biomass drying system, for example, a control device (not shown) for controlling each part of the system (for example, driving and stopping the electric motor 14C of the agitator 14 described below, driving and stopping the transport device 15 described below, combustion control and combustion stop of the boiler 7, solenoid valves provided in the first water tanks 8 and 9 described below, solenoid valves of the expansion tank 17 described below, and driving and stopping of the heat exchanger 18 described below) can be placed. Therefore, the internal space of the sea container 2 can be effectively utilized.
[0037] Below the agitator 14, that is, at the bottom of the fuel vault 6, there is provided a conveying device 15 for conveying the fuel in the fuel vault 6 to the inlet 7A of the boiler 7. The conveying device 15 is, for example, a narrow belt conveyor (a screw conveyor is also acceptable). The blades 14A, 14A of the agitator 14 rotate, so that fuel is supplied to the conveying direction starting end of the conveying device 15. In addition, the blades 14A, 14A of the agitator 14 rotate to agitate the fuel stored in the fuel vault 6, so that the fuel does not form a bridge. The partition wall 13 is formed with a through hole (not shown) for passing the conveying device 15 to the boiler 7 side. In addition, the conveying device 15 is arranged in an inclined position that is located upward toward the terminal end side. An angle adjustment means 16 is provided for changing the inclination angle of this inclined position. The angle adjustment means 16 comprises a fixed member 16A fixed to the bottom wall 21 and having a plurality of through holes 16a of different heights in the front-to-rear direction, and an adjustment member 16B fixed to the conveying device 15 and having a plurality of through holes 16b of different heights in the front-to-rear direction, and capable of adjusting the angle by overlapping any one of these through holes 16a with any one of the through holes 16b of the fixed member 16A and inserting a pin 16c therethrough.
[0038] The boiler 7 is installed near the right wall 23 and close to the fuel tank 6. The fuel transported from the fuel tank 6 by the transport device 15 is supplied from the inlet 7A of the boiler 7 into the combustion chamber, and the fuel in the combustion chamber is burned by a burner (ignition unit) to generate heat. The heat is used to heat the pipe D3 from the first water tank 8, which is introduced into the combustion chamber, and the warm water in the pipe D3 is returned to the first water tanks 8, 9 through the pipe D4. By repeating this, the water temperature in the first water tanks 8, 9 can be increased to a set temperature. The air in the boiler room is heated as the boiler 7 burns, and the first water tanks 8, 9 are heated by the heated air, thereby increasing the efficiency of increasing the temperature of the water in the first water tanks 8, 9. Although not shown, pipes from the first water tank 9 on the other side are connected to the pipes D3, D4 of the first water tank 8 on the other side.
[0039] The two first water tanks 8, 9 are arranged side by side near the rear wall 25, and are tanks for storing the water supplied to the boiler 7 through a pipe (not shown) as described above, which is heated by the heat generated in the boiler 7 and the heated hot water returned. In addition, when the water in the two first water tanks 8, 9 is heated by the boiler 7 and changes in volume (expands), an expansion tank 17 is connected to the two first water tanks 8, 9 through a pipe (not shown) to absorb the volume change. The expansion tank 17 is installed near the left wall and near the fuel tank 6. As shown in FIG. 2, by arranging the boiler 7 and the first water tanks 8, 9 close to each other in the marine container 2, which has a limited internal space, the pipe connecting the boiler 7 and the first water tanks 8, 9 can be shortened, and therefore the energy loss when the heat from the boiler 7 is transferred to the first water tanks 8, 9 can be kept small.
[0040] Further, a heat exchanger 18 is provided on the outside of the marine container 2, which exchanges heat with the hot water from the first water tanks 8 and 9 to convert the hot water into hot air. In this embodiment, the temperature of the hot air to be heat exchanged by the heat exchanger 18 is set to, for example, 70°C. The heat exchanger 18 includes a portion (called a tube bundle) 18A in which a supply-side heat transfer tube D1 that supplies hot water from the first water tanks 8 and 9 is wound in a spiral or vortex shape. The hot water that has been heat exchanged from the end of the tube bundle 18A to the first water tanks 8 and 9 is returned by a return-side heat transfer tube D2 (see FIG. 1). In FIG. 1, outside air (for example, outside air at 20°C) is taken in through an air intake 18K of the heat exchanger 18 as indicated by an arrow Y. In contrast, in FIG. 9, the air intake 18K of the heat exchanger 18 is opened into the boiler room through a through hole 22a formed in the left wall 22 of the marine container 2. This has the advantage that the thermal efficiency of the heat exchanger 18 can be improved by sucking in warm air (e.g., 50°C) in the boiler room with the fans 19 and 20 and passing through the tube bundle 18A. The warm air from the heat exchanger 18 is guided to the intake port (not shown) of the fans 19 and 20 by the first piping 27 described later. Also, in FIG. 10, if the heat exchanger 18 is installed in the shipping container 2, the air (e.g., 50°C) in the shipping container 2 that is warmed by the combustion of the boiler 7 is sucked in by the fans 19 and 20 and passes through the tube bundle 18A, thereby improving the thermal efficiency of the heat exchanger 18. The warm air from the heat exchanger 18 is led to the outside through the through hole 22a formed in the left wall 22 and guided to the intake port (not shown) of the fans 19 and 20 by the first piping 27 described later. As described above, the time required to reach 70°C using air at 50°C is shorter than the time required to reach 70°C using air at 20°C, thereby reducing energy loss.
[0041] In this embodiment, the thermal energy stored in the first water tanks 8, 9 is configured to be continuously transferred to the air undergoing heat exchange in the heat exchanger 18. This allows the thermal energy in the first water tanks 8, 9 to be continuously extracted, thereby preventing breakdowns in the boiler 7 and the first water tanks 8, 9 due to excessive heat storage, and also allows the actual volume of the first water tanks 8, 9 to be smaller than the volume required based on the boiler 7.
[0042] The hot air supply mechanism 5 includes the heat exchanger 18, a plurality of drying containers 3 (only one is shown in FIG. 1) in which wood chips C1 to be dried are housed, and a plurality of (two in this embodiment) blowers 19, 20 that supply air heated by the heat exchanger 18 as hot air to the wood chips C1 in each drying container 3, 3 (only one is shown in FIG. 1). By supplying hot air to the wood chips C1, heat can be efficiently supplied to the wood chips C1.
[0043] The hot air supply mechanism 5 also includes a first pipe 27 that guides the hot air from the heat exchanger 18 outside the shipping container 2 to the intake ports (not shown) of the two blowers 19, 20. The first pipe 27 is used to connect the outlet (not shown) of the heat exchanger 18 to the intake ports (not shown) of the two blowers 19, 20. The hot air supply mechanism 5 also includes flexible second hoses 28, 28 as second pipes that guide the hot air from the outlets (not shown) of the two blowers 19, 20 to the drying containers 3, 3 (only one blower is shown in FIG. 1). The second hoses 28, 28 form a hot air path for guiding the hot air from the blowers 19, 20 to the drying containers 3, 3. The second hoses 28, 28 are used to connect between the air outlets (not shown) of the blowers 19, 20 and the air outlets (not shown) of the drying containers 3, 3, and are configured to be detachable from the air outlets of the drying containers 3, 3. Since only one drying container 3 is shown in FIG. 1, one of the second hoses 28 is attached to the drying container 3, and the other of the second hoses 28 is detached. The first piping 27 includes a pipe body 27A that extends from the outlet of the heat exchanger 18 and is connected to the intake port of the other blower 20 (diagonally downward right in FIG. 1), and a branch pipe 27B that branches from the middle of the pipe body 27A and is connected to the intake port of one of the blowers 19 (diagonally upward left in FIG. 1). A switching valve 29 that can switch the drying container 3 to which the hot air is directed is provided at a position corresponding to the branch pipe 27B in the pipe body 27A, that is, in the hot air path between the heat exchanger 18 and one of the blowers 19. This switching valve 29 is configured to be switchable between a state in which hot air is supplied to both drying containers 3, 3 and a state in which hot air is supplied to only one of the drying containers 3 of the two blowers 19, 20.
[0044] The switching valve 29 may be automatically switched when a predetermined drying time is reached using a timer, or may be manually switched in some cases. In the case of automatic switching, a detection means for detecting humidity may be provided in each drying container 3, and when the detection means detects that a certain level of drying has been completed, hot air may be supplied to the other drying container 3. Also, as shown in FIG. 1, hot air may be supplied to the other drying container 3 based on a weight change from a load cell 4 provided on the ground at the installation position of the drying container 3. In other words, the drying container 3 alone or the transport vehicle M with the drying container 3 mounted thereon may be placed with a load applied to the load cell 4, and the weight may be measured to measure the moisture content of the object C1 to be dried based on the weight change over time, and the switching may be performed when the moisture content reaches a predetermined value. FIG. 1 shows a state in which hot air is supplied only to one blower 19 (diagonally above left in FIG. 1).
[0045] Each drying container 3 is substantially rectangular like a typical vehicle-mounted container, and is configured as a box-like container with an open top, and includes a container body 3A having an air outlet (not shown) for supplying hot air from the outside to the inside, and a deck (not shown) provided at a certain height from the top of the bottom wall 3T of the container body 3A. Wood chips are fed into the drying container 3 from the top. A large number of through holes are formed in the deck, and the wood chips are dried by blowing hot air through the through holes onto the large number of wood chips stored on the deck. The drying container 3 may be configured to be mounted on a vehicle, or may not be configured to be mounted on a vehicle.
[0046] The biomass drying system further includes a fuel supply device 30 that supplies fuel from the outside to the fuel storehouse 6 of the shipping container 2, an incineration ash treatment device (not shown) that discharges the incineration ash generated in the boiler 7 during combustion to the outside of the shipping container 2, and a solar panel (not shown) for generating electricity to be used in the system.
[0047] As shown in Fig. 7 and Fig. 8, the fuel supply device 30 includes a horizontal conveying device (e.g., a screw conveyor) 30A that receives fuel loaded in a loading container 31 of a fuel transport vehicle and conveys it horizontally to the marine container 2 side, a vertical conveying device (e.g., an air conveying device) 30B that is connected to the end of the horizontal conveying device 30A and conveys the fuel from the horizontal conveying device 30A upward, and a cylindrical guide member (e.g., a chute) 30C that is connected to the upper end of the vertical conveying device 30B and drops and supplies the fuel from the vertical conveying device 30B to the fuel storehouse 6 of the marine container 2. An opening (not shown) into which the tip of the guide member 30C can be inserted is formed in the top wall 26 of the marine container 2, and a closing member (not shown) that closes the opening when the guide member 30C is not inserted is provided. Fig. 8 shows a state in which the loading container 31 of the fuel transport vehicle is tilted downward from the rear and fuel (not shown) is poured into the horizontal conveying device 30A from the rear end of the loading container 31. In Figures 7 and 8, the fuel supply device 30 is shown to be arranged on the rear side of the shipping container 2, but it may also be arranged on one side of the rear end of the shipping container 2, as shown in Figure 1.
[0048] Although not shown, the incineration ash treatment device is equipped with a storage section at the bottom of the boiler 7 for storing the incineration ash after combustion in the boiler 7, and a transport device (e.g., a screw conveyor) that is disposed directly below the storage section and transports the stored incineration ash to the outside of the marine container 2 when the amount of incineration ash stored in the storage section reaches a preset amount. The incineration ash transported to the outside of the marine container 2 by the transport device is collected, for example, in a sealed container.
[0049] The solar panels are installed on the upper surface of the top wall 26 of the shipping container 2 and can generate some or all of the electricity used in the biomass drying system.
[0050] Although one embodiment of the present invention has been described above, the present invention is not limited to the above embodiment.
[0051] For example, in the above embodiment, only the marine container 2, which is one housing, is provided, but it is also possible to provide a sub-housing different from the marine container 2. Inside the sub-housing, one or more second water tanks (not shown) may be provided in parallel with the first water tanks 8, 9 to accumulate hot water generated by heat generated by the combustion of the boiler 7. "In parallel with the first water tanks 8, 9" means that the first water tanks 8, 9 and the second water tank are connected in parallel with piping, and hot water generated by heat generated by the combustion of the boiler 7 is accumulated in the first water tanks 8, 9 and the second water tank. In this case, a system that generates hot water that can be used for various purposes can be constructed by simply transporting the sub-housing in addition to the housing. The second water tank can also transfer heat from the heat transfer tube of hot water returning from the heat exchanger 18 to the first water tanks 8, 9, in addition to the heat generated by the combustion of the boiler 7. This makes it possible to improve thermal efficiency by utilizing the residual heat of the hot water heat transfer tube. Furthermore, the second tank may be a purified water tank. In this case, hot water obtained by heating the purified water is supplied outside the system and can be used for cooking or bathing.
[0052] In the above embodiment, the components arranged inside the marine container (housing) 2 during system operation to operate the biomass drying system include the fuel tank 6, the boiler 7, and the first water tanks 8 and 9, but may also include a heat exchanger 18 and a control device that controls each part of the system. In addition, the components arranged outside the marine container 2 during system operation to operate the biomass drying system include the fans 19 and 20, the chimney 10, the duct 11, and the fuel supply device 30, but may also include the control device. If all of these components are stored inside the marine container 2, all of the components can be transported together simply by transporting the marine container 2 to the installation location where the system is operated.
[0053] In addition, in the above embodiment, the blowers 19, 20 are provided outside the shipping container (housing) 2, but the blowers 19, 20 may be provided inside the shipping container 2, or the blowers 19, 20 may be provided outside the shipping container 2 with the air intakes of the blowers 19, 20 arranged in a state in which they are connected to the inside of the shipping container 2.
[0054] In the above embodiment, the number of blowers (blowers) 19, 20 is two, but it may be one or three or more. In the case of one blower, the second hose 28 is appropriately branched to blow air to a plurality of drying containers 3. In this case, a switching valve 29 can be provided at a portion where the second hose 28 branches toward the drying container 3, and the blower can be arranged upstream of the switching valve 29. On the other hand, in the case of three or more blowers, the switching valve 29 can be provided in a pipe corresponding to the branch pipe 27B in the above embodiment, or the switching valve 29 can be provided in the second hose 28 from the blower toward the drying container 3. That is, by appropriately arranging the blower and the switching valve 29 in the path of the hot air from the heat exchanger 18 to the drying container 3, a desired drying operation can be performed in the drying container 3.
[0055] In the above embodiment, the fuel supply device 30 is configured with two devices, the horizontal conveying device 30A and the vertical conveying device 30B, but it may be configured with one oblique conveying device that conveys the fuel obliquely upward. The fuel conveyed to the upper part by the oblique conveying device is dropped and supplied by a guide member. [Explanation of symbols]
[0056] Reference Signs List 1...Biomass drying system, 2...Sea container (housing), 3...Drying container, 3A...Container body, 3T...Bottom wall, 4...Load cell, 5...Hot air supply mechanism, 6...Fuel tank, 7...Boiler, 7A...Inlet, 10...Chimney, 10A...Main body, 10B...Suction section, 11...Duct, 11a...Opening, 11A...First vertical cylinder section, 11B...Second horizontal cylinder section, 12...Receiving member, 13...Partition wall, 14...Agitator (mixing device), 14A...Blade, 14B...Cover member, 14C...Electric motor, 15...Conveying device, 16...Angle adjustment means, 16A...Fixing member, 16B...Adjusting member, 16a, 16b...Through hole, 16c...Pin, 17...Expansion tank K, 18... heat exchanger, 18A... tube bundle, 18K... air intake, 19, 20... blower, 21... bottom wall, 22, 23... left and right walls, 22A... opening and closing door, 22a... through hole, 23A... door, 24, 25... front and rear walls, 24A... window, 25A... door, 26... top wall, 27... first pipe, 27A... pipe body, 27B... branch pipe, 28... second hose (second pipe), 29... switching valve, 30... fuel supply device, 30A... horizontal conveying device, 30B... vertical conveying device, 30C... guide member, 31... loading container, C1... wood chips (object to be dried), C2... fuel, D1, D2... heat transfer tube, D3, D4... pipe, S... area (dead space), X... rotation axis
Claims
1. It is used to dry a drying object made of biomass, A housing and A fuel tank provided inside the housing and configured to store a fuel made of biomass; a boiler provided inside the housing and configured to combust the fuel supplied from the fuel tank; a first water tank provided inside the housing and configured to accumulate heat generated by combustion in the boiler in stored water; A biomass drying system equipped with
2. a heat exchanger that transfers the thermal energy stored in the first water tank to air, The biomass drying system according to claim 1 , wherein the heat exchanger has an air intake opening into the interior of the housing.
3. The biomass drying system according to claim 2 , further comprising a blower that converts the air warmed by the heat exchanger into hot air for drying the object to be dried.
4. The objects to be dried are accommodated in a plurality of drying containers, and the hot air path is connected to the plurality of drying containers; The blower is configured to blow hot air to each of the plurality of drying containers, The biomass drying system according to claim 3 , further comprising a switching valve in a path of the warm air between the heat exchanger and the blower, the switching valve being capable of switching the drying container to which the warm air is directed.
5. The fuel tank has a rectangular shape in a plan view, The fuel tank includes a stirring device that stirs the fuel therein, The biomass drying system of claim 1 , wherein the agitator rotates around a rotation axis extending in a vertical direction, at a position along the bottom surface of the fuel tank, and with a diameter smaller than a diagonal dimension of the rectangle.
6. The biomass drying system according to claim 2 or 3, wherein the thermal energy stored in the first water tank is continuously transferred to air.
7. The biomass drying system of claim 1, wherein during transportation, in addition to each component that is placed inside the housing during system operation, each component that is at least partially placed outside the housing during system operation is housed inside the housing.
8. A sub-housing different from the housing is used, The biomass drying system according to claim 7, wherein a second water tank is provided inside the sub-housing in parallel with the first water tank and stores hot water generated by heat generated by combustion in the boiler.
9. The biomass drying system according to claim 1 , further comprising an incineration ash treatment device that discharges incineration ash generated in the boiler during combustion to the outside of the housing.
10. The biomass drying system of claim 1 , further comprising a solar panel on an upper surface of the housing.