A wireless joint monitoring device for tunnels passing under railway bridges

By collecting real-time information about the railway bridge and tunnel perimeter using a wireless joint monitoring device, the problem of insufficient monitoring during the construction of shield tunnels passing under railway bridges has been solved, thereby improving railway operation safety and enabling efficient operation of wireless monitoring.

CN224984869UActive Publication Date: 2026-11-17TONGJI UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522600070.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-08
Publication Date
2026-11-17
Estimated Expiration
2035-12-08

AI Technical Summary

Technical Problem

During the construction of shield tunnels passing under railway bridges, existing technologies make it difficult to achieve real-time and accurate monitoring of railway bridges, which may lead to structural damage and safety accidents, affecting train operation and passenger safety.

Method used

The system employs a wireless joint monitoring device, including wireless monitoring of wheel-rail forces, bridge pier displacement and tilt, and sensors for tunnel displacement and earth pressure. The device connects the monitoring box and the terminal server via wireless communication, enabling the collection of multiple types of information and real-time status awareness during the construction process.

Benefits of technology

It enables real-time and accurate monitoring of railway bridges, avoiding the need for track laying required by traditional monitoring methods, ensuring uninterrupted train operation for testing, and improving the integration and responsiveness of the monitoring system. It is suitable for intelligent monitoring and risk prevention in high-risk areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224984869U_ABST
    Figure CN224984869U_ABST
Patent Text Reader

Abstract

This utility model relates to a wireless joint monitoring device for tunnels passing under railway bridges, applicable to shield tunnel projects. A wireless wheel-rail force monitoring device installed on the railway track acquires the stress on the track structure during train operation. Pier displacement and tilt monitoring sensors installed on the railway piers collect real-time data on pier deformation responses caused by tunnel construction. Tunnel displacement and earth pressure sensors installed in the surrounding soil monitor the response of the soil and rock media caused by construction disturbance. The use of wireless monitoring technology avoids the need for laying tracks as in traditional monitoring methods, ensuring uninterrupted train operation for on-the-go monitoring. Integrating multiple types of sensors and wireless communication technologies improves the integration and responsiveness of the monitoring system, possessing good engineering applicability and promotional value, especially suitable for intelligent monitoring and risk control needs in high-risk and sensitive underpass projects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to a wireless joint monitoring device for tunnels passing under railway bridges, which is applicable to shield tunnel projects passing under railway bridges. Background Technology

[0002] Shield tunneling technology has been widely used in rail transit and infrastructure construction, especially in urban underground space development and projects crossing railway and highway lines. However, tunneling under existing railway bridges is an extremely challenging engineering task. As vital transportation infrastructure, the operational safety of railway bridges directly impacts the normal operation of trains and the safety of passengers' lives and property. During the tunneling process, if the railway bridge is not monitored in real-time and accurately, unexpected events such as ground deformation, settlement, or displacement caused by tunnel construction could damage the bridge structure, leading to serious accidents such as train derailment and track misalignment. This would not only cause enormous economic losses but also endanger lives. Therefore, rigorous monitoring of the construction process of shield tunnels under existing railway bridges is a crucial step in ensuring railway operational safety. Summary of the Invention

[0003] The purpose of this invention is to provide a wireless joint monitoring device for tunnels passing under railway bridges. By constructing a multi-source joint monitoring device on-site to collect various types of information, it enables comprehensive perception of the structural response status during the tunnel construction process and improves the level of railway operation safety assurance.

[0004] To achieve the above objectives, the technical solution adopted by this utility model is as follows: A wireless joint monitoring device for tunnels passing under railway bridges, characterized in that it is installed in shield tunnel and railway bridge scenarios; It includes The wheel-rail force wireless monitoring device installed on the railway track is used to obtain the stress on the track structure during train operation; The bridge pier displacement and tilt monitoring sensors installed on the railway bridge piers are used to collect the bridge pier deformation response caused by tunnel construction in real time. Tunnel displacement monitoring sensors and earth pressure sensors installed in the soil surrounding the tunnel are used to monitor the response of the soil and rock media caused by construction disturbance. The monitoring box is wirelessly connected to the aforementioned sensors; A terminal server that communicates with the monitoring box.

[0005] The monitoring box includes a photoelectric conversion module, a battery, a cooling fan, a PLC controller, a rain and temperature sensor data conversion module, a wireless communication receiving and transmitting module, and a storage device.

[0006] The external structure of the monitoring box includes: a solar panel for powering the monitoring box; a heat dissipation window for the monitoring box; a fault indicator light and a status display screen; a camera; a rain sensor and a temperature sensor.

[0007] Both the displacement sensor and the earth pressure sensor are deployed wirelessly, and the collected data is uploaded to the monitoring box via a 4G communication gateway.

[0008] The internal structure of the monitoring box is divided into upper and lower chambers by an insulating partition. The lower chamber is equipped with a battery and some cooling fans, while the remaining modules are located in the upper chamber.

[0009] The PLC controller is a Siemens S7-1200. The PLC controller is connected to the photoelectric conversion module, the battery, the wireless communication receiving and transmitting module and the storage, the fault indicator, the status display, the camera, the rain and temperature sensor data conversion module and the cooling fan through wires.

[0010] The advantages of this utility model are as follows: 1. This utility model adopts wireless monitoring technology, which avoids the need to lay lines as in traditional monitoring methods, and ensures the train inspection requirements without stopping the train.

[0011] 2. This utility model integrates multiple types of sensors and wireless communication technologies, which improves the integration and response capability of the monitoring system. It has good engineering applicability and promotion value, and is especially suitable for the intelligent monitoring and risk prevention and control needs of underpass projects in high-risk and sensitive areas (such as high-speed railways, intercity railways, etc.). Attached Figure Description

[0012] Figure 1 This is a schematic diagram of a wireless joint monitoring device for tunnels passing under railway subgrade according to the present invention; Figure 2 This is a schematic diagram of the external structure of the monitoring box of this utility model; Figure 3 This is a schematic diagram of the internal structure of the monitoring box of this utility model; Figure 4 This is a block diagram of the internal structure of the monitoring box of this utility model; Explanation of markings in the diagram: 1-Shield tunnel, 2-Railway bridge pier, 3-Wheel-rail force wireless monitoring device, 4-Pier displacement and tilt monitoring vibrating wire sensor, 5-Tunnel displacement monitoring sensor, 6-Tunnel earth pressure sensor, 7-Monitoring box, 8-Terminal server, 9-Solar panel, 10-Monitoring box heat dissipation window, 11-Fault indicator light, status indicator, 12-Display screen, 13-Camera, 14-Rain sensor, 15-Temperature sensor, 16-Photoelectric conversion module, 17-Battery, 18-Cooling fan, 19-PLC controller, 20-Rain and temperature sensor data conversion module, 21-Wireless communication receiving and transmitting module and storage. Detailed Implementation The specific embodiments of this utility model patent are described in detail below with reference to specific examples. It should be understood that the specific embodiments described herein are only for illustration and explanation of this utility model. Obviously, the described embodiments are only a part of the embodiments of this utility model, and not all of the embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of this utility model.

[0013] The specific embodiments of this utility model will be described in detail below with reference to the accompanying drawings. It should be understood that the described embodiments are only for illustrating this utility model and are not intended to limit the scope of protection of this utility model.

[0014] like Figure 1 As shown, this utility model provides A wireless joint monitoring device for tunnels passing under railway bridges, characterized in that it is installed in the scenario of shield tunnel 1 and railway bridge 2; It includes The wheel-rail force wireless monitoring device 3, installed on the railway track, is used to obtain the stress on the track structure during train operation. The bridge pier displacement and tilt monitoring sensor 4, installed on the railway bridge pier, is used to collect the bridge pier deformation response caused by tunnel construction in real time. The tunnel displacement monitoring sensor 5 and the earth pressure sensor 6, installed in the soil surrounding the tunnel, are used to monitor the response of the soil and rock media caused by construction disturbance. Monitoring box 7 is wirelessly connected to the aforementioned sensors; Terminal server 8 is connected to the monitoring box 7 for communication.

[0015] Several wireless wheel-rail force monitoring devices 3 are installed on the railway track structure to collect data on the vertical and lateral forces generated by the train operation in real time; multiple displacement and tilt monitoring sensors 4 are set at the piers of the railway bridge to sense the settlement and tilting behavior of the piers; tunnel displacement monitoring sensors 5 and earth pressure sensors 6 are buried around the shield tunnel to monitor the ground response during the shield tunneling process.

[0016] Preferably, both the displacement sensor and the soil pressure sensor are deployed wirelessly, and the collected data is uploaded to the monitoring box via a 4G wireless communication gateway. The monitoring box integrates a wireless communication module, a sensor status indication system (including a fault indicator light 11 and a status display screen 12), and interacts with a remote terminal server in real time.

[0017] The external structure of the monitoring box includes a solar panel 9, a monitoring box heat dissipation window 10, a fault indicator light 11, a status display screen 12, a camera 13, a rain sensor 14, and a temperature sensor 15. The internal structure includes a photoelectric conversion module 16, a battery 17, a cooling fan 18, a PLC controller 19, a rain and temperature sensor data conversion module 20, and a wireless communication receiving and transmitting module and a storage device 21. The wireless receiving and transmitting module establishes a data transmission channel with the terminal server 8 through a local area network or a public network.

[0018] Furthermore, the internal structure of the monitoring box is divided into upper and lower chambers by an insulating partition. The lower chamber includes the battery 17 and part of the cooling fan 18. The remaining modules are all located in the upper chamber.

[0019] Furthermore, the PLC controller is a Siemens S7-1200, which includes a central processing unit and memory. The wireless communication receiving and transmitting module and memory 21, fault indicator light 11, status display screen 12, camera 13, rain and temperature sensor data conversion module 19, photoelectric conversion module 16, battery 17, and cooling fan 18 are all connected to the PLC controller via wires.

[0020] The sensor is preferably a sensor with wireless communication capabilities, and the data it collects is transmitted to the monitoring box 7 via a 4G gateway module. The external structure of the monitoring box 7 includes a solar panel 9 for powering the entire monitoring device; a heat dissipation window 10 for cooling the monitoring box; a fault indicator light 11 and a status display screen 12 for alerting to monitoring anomalies; a camera 13 for monitoring the site and facilitating the detection of potential intrusion risks not detected by the sensors; and a rain sensor 14 and a temperature sensor 15 for monitoring environmental conditions, enabling timely intervention in extreme weather conditions. The internal structure includes a photoelectric conversion module 16, a battery 17, a cooling fan 18, a PLC controller 19, a rain and temperature sensor data conversion module 20, and a wireless communication receiving and transmitting module and a storage device 21. The wireless receiving and transmitting module establishes a data transmission channel with the terminal server 8 via a local area network or public network.

[0021] The model of the bridge pier displacement and tilt monitoring sensor is TY-WY75; the model of the tunnel displacement monitoring sensor is HDP201; and the model of the tunnel earth pressure sensor is YT-DG-0600.

[0022] The system automatically adjusts the sampling frequency and sends alarm information to monitoring box 7. The flashing frequency of the indicator lights changes synchronously to assist on-site personnel in carrying out differentiated engineering reinforcement measures.

Claims

1. A wireless joint monitoring device for tunneling under a railway bridge, characterized in that, Set in the scenarios of shield tunnel (1) and railway bridge (2); It includes The wheel-rail force wireless monitoring device (3) installed on the railway track is used to obtain the stress on the track structure during train operation; The bridge pier displacement and tilt monitoring sensor (4) installed on the railway bridge pier is used to collect the bridge pier deformation response caused by tunnel construction in real time. The tunnel displacement sensor (5) and earth pressure sensor (6) are installed in the soil around the tunnel to monitor the response of the soil and rock media caused by construction disturbance. The monitoring box (7) is wirelessly connected to the above sensors. Terminal server (8) that communicates with the monitoring box (7); Both the displacement sensor (5) and the earth pressure sensor (6) are deployed wirelessly, and the collected data is uploaded to the monitoring box (7) via a 4G communication gateway. The PLC controller (19) is a Siemens S7-1200. The PLC controller (19) is connected to the photoelectric conversion module (16), the battery (17), the wireless communication receiving and transmitting module and the storage (21), the fault indicator (11), the status display (12), the camera (13), the rain and temperature sensor data conversion module (20) and the cooling fan (18) via wires.

2. The wireless co-monitoring device of claim 1, wherein, The monitoring box (7) includes a photoelectric conversion module (16), a battery (17), a cooling fan (18), a PLC controller (19), a rain and temperature sensor data conversion module (20), a wireless communication receiving and transmitting module, and a storage device (21).

3. The wireless joint monitoring device according to claim 1, characterized in that, The external structure of the monitoring box (7) includes: a solar panel (9) for powering the monitoring box; a monitoring box heat dissipation window (10); a fault indicator light (11) and a status display screen (12); a camera (13); a rain sensor (14) and a temperature sensor (15).

4. The wireless joint monitoring device according to claim 1, characterized in that, The internal structure of the monitoring box (7) is divided into upper and lower chambers by an insulating partition. The lower chamber is equipped with a battery (17) and some cooling fans (18), while the remaining modules are located in the upper chamber.