A static thrust limiting device for a test bench based on steel wire rope
By designing a static thrust limiting device for the test bench based on steel wire rope, the load borne by the foundation in the ship propulsion simulation test is transformed into an internal force, solving the problem of shear force failure of the laboratory foundation and realizing safe and reliable force transmission and foundation protection.
Patent Information
- Application Number
- CN202522582838.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-04
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-04
AI Technical Summary
In existing ship propulsion simulation tests, laboratory-scale materials are subjected to shear force failure due to the enormous loads transmitted by the loading device and the compartment, posing a safety hazard.
Design a static thrust limiting device for a test bench based on steel wire rope. Through steel wire rope, double-row pulley block, bow stop, stern stop, tensioning mechanism and stern stop sliding structure, the force balance between the loading device and the compartment is transformed into internal force, avoiding excessive shear force on the foundation.
It significantly reduced the shear force requirements of the laboratory foundation, achieved internal balance in force transmission, improved the safety, reliability, and stability of the device, and protected the safety of the foundation.
Smart Images

Figure CN224985071U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of ship propulsion force simulation test technology, and particularly relates to a static thrust limiting device for a test bench based on a steel wire rope. This device is mainly used in ship propulsion force simulation tests to solve the foundation bearing capacity problem caused by axial loading force transmission, and is particularly suitable for static thrust balancing and limiting under high load conditions (such as hundreds of tons). Background Technology
[0002] During ship propulsion simulation tests, simulated mechanical loading tests must be conducted, with simulated loading forces applied to the shafting system reaching hundreds of tons. The transmission paths of this simulated loading force are mainly two: one is through the loading device—shafting system—base—section to the foundation; the other is through its reaction force directly to the foundation via the loading device. This places extremely high demands on the bearing capacity of the laboratory foundation, especially in terms of shear force bearing.
[0003] However, the bearing capacity, especially the shear capacity, of laboratory foundations is usually relatively low, making it difficult to directly withstand the enormous loads and reactions from the hundreds of tons of loading forces mentioned above. Without effective limiting and balancing measures, excessive loads can lead to significant additional shear forces on the foundation, easily causing damage and hindering the smooth conduct of experiments, and potentially even posing safety hazards.
[0004] In existing ship propulsion simulation test systems, without a dedicated static thrust limiting device, such as Figure 2 As shown, the hundreds of tons of axial load (F1) and its reaction force (F2) generated by the loading device will be directly transmitted to the laboratory foundation (i.e., F3 and F4) through the section support and the loading device base, respectively. This requires the laboratory foundation to withstand enormous shear stress, and since laboratory foundations typically have limited shear bearing capacity, this can easily lead to foundation failure and poses a serious safety hazard.
[0005] Therefore, it is urgent to design a special structure to achieve the limiting balance of the experimental static thrust, reduce the bearing pressure on the foundation, and ensure the safe and stable conduct of the ship propulsion simulation test. Utility Model Content
[0006] (I) Purpose of the utility model
[0007] To address the problem of shear force damage to laboratory grounds caused by the enormous loads transmitted between the loading device and the test section in existing ship propulsion simulation tests, this invention provides a static thrust limiting device for the test bench based on a steel wire rope. This device achieves force balance between the loading device and the test section, transforming the external forces originally acting on the foundation into internal interaction forces within the device. This avoids generating large additional shear forces on the foundation, protects the laboratory foundation from damage, and ensures the safe and reliable conduct of the test.
[0008] (II) Device Composition
[0009] The static thrust limiting device for the test bench of this utility model consists of six core components: a wire rope, a double-row pulley block, a bow stop, a stern stop, a tensioning mechanism, and a stern stop sliding structure. The specific structure and connection relationship of each component are as follows:
[0010] (1) Steel wire rope: It is the core load-bearing component of the device. Each steel wire rope needs to share the internal static thrust during the test. Two steel wire ropes are symmetrically arranged on each double-row pulley block. When one of them fails, the other can still meet the ultimate load requirements, forming a double load-bearing structure. At the same time, strain gauges are attached to each steel wire rope to monitor the stress state of the steel wire rope.
[0011] (2) Double-row pulley block: As the installation carrier of wire rope, it is symmetrically and evenly arranged on the bow stop and stern stop, and is evenly distributed along the circumference of the compartment. Compared with the traditional tie rod structure, it can increase the number in a limited space to achieve multiple points of uniform contact between the limiting device and the bow and stern stops.
[0012] (3) Bow stop: It is fixedly connected to the bow end of the compartment and is a key component for connecting the device and the compartment; a tensioning mechanism is integrated on it, which can cooperate with the double-row pulley block on the bow stop side to complete the adjustment operation of the wire rope.
[0013] (4) Stern stop: It is connected to the shaft loading device and can be designed as an integral part according to actual needs. It is a key component for connecting the device and the loading device. Its bottom is connected to the top of the stern stop sliding structure and can slide freely in one direction with the sliding structure.
[0014] (5) Tensioning mechanism: It is only set on the bow stop. Its core function is to cooperate with the double-row pulley block on the side of the bow stop to adjust the initial length and preload of the wire rope. At the same time, it can be used to redistribute the load during the test to ensure that the wire rope is subjected to uniform force.
[0015] (6) Stern stop sliding structure: The bottom is fixedly connected to the laboratory foundation, and the top is connected to the stern stop; the structure is further composed of a large base, two guide rail bases, two sets of dovetail sliding structures, and a return jack structure. The large base is connected to the foundation by anchor bolts. The two guide rail bases are symmetrically arranged on the large base. Each set of guide rail bases is equipped with a dovetail sliding structure. The dovetail sliding structure is connected to the stern stop. The return jack structure is arranged on the large base and located between the two guide rail bases.
[0016] (III) Principle
[0017] The core principle of this invention is to transform the external load originally borne by the foundation in the test system into an internal force between the loading device and the chamber section through the structural design of the limiting device, using the tension of the steel wire rope as the core transmission carrier, thereby achieving a cyclic balance of forces. The specific principle is as follows:
[0018] (1) Core Force Balance and Transmission Transformation Principle: Addressing the problem described in the background art where "existing test systems directly transmit loads to the foundation, resulting in excessive shear force," this utility model achieves internal force balance through a unique structural design. Specifically, without this limiting device, the axial load (F1) transmitted from the loading device to the compartment, the axial load reaction force (F2) of the loading device, the axial load (F3) transmitted from the loading device to the foundation through the bottom base, and the axial load (F4) transmitted from the compartment to the foundation through the compartment support all satisfy the relationship F1=F2=F3=F4, and are all borne by the foundation. This device, through the stable connection between the stern stop and the loading device, and the bow stop and the compartment, allows the reaction force generated by the loading device to be transmitted sequentially through the stern stop and the double-row pulley system to the wire rope. The wire rope then transmits the tension to the bow stop side, ultimately canceling out the axial thrust transmitted to the bow stop through the shaft system and the compartment. This approach transforms the loads corresponding to F3 and F4, which would normally be borne by the foundation, into an internal force circulation between the loading device and the compartment, thereby significantly reducing the shear force bearing requirements of the foundation.
[0019] (2) Structural optimization principle: The design of the double-row pulley block evenly distributed along the circumference of the compartment can increase the number of contact points between the limiting device and the bow and stern stops, realize multi-point uniform contact, avoid excessive local structural deformation and stress concentration caused by the small local contact area, ensure that the tension of the wire rope can be stably and evenly transmitted to the bow and stern stops, and improve the overall load-bearing stability of the device; at the same time, the design of symmetrically arranging two wire ropes in each double-row pulley block is based on the principle of redundancy design. Even if a single wire rope fails due to accident, the other wire rope can still maintain the tension transmission function, meet the ultimate load-bearing requirements, and greatly improve the safety and reliability of the device.
[0020] (3) Force adjustment principle: In order to ensure uniform tension of the wire rope and avoid damage to a single wire rope due to overload, this device adjusts the initial length and preload of the wire rope through the tensioning mechanism. Combined with the force monitoring data collected in real time by the strain gauges on the wire rope, the tension of the wire rope can be dynamically adjusted. When the tension difference between different wire ropes is too large, the preload state of the corresponding wire rope is changed through the tensioning mechanism, so that the load is redistributed among the wire ropes, ensuring that the tension of each wire rope remains uniform, effectively reducing the risk of damage to a single wire rope due to tension overload, and ensuring the stability of the force transmission path.
[0021] (4) Displacement adaptation principle: During the test, the wire rope will gradually be stretched under tension, resulting in a larger relative distance between the bow stop and the stern stop; the dovetail groove sliding structure in the stern stop sliding structure can realize the unidirectional free sliding of the stern stop, and adjust its position synchronously with the stretching of the wire rope to adapt to the above displacement changes, avoid the device from generating additional stress due to displacement limitation, and ensure that the tension transmission is not affected by displacement; after the test, the tension of the wire rope disappears, and the stern stop can be pushed back to the initial position by the return jack structure, which is ready for the tension balance of the next test.
[0022] (IV) Work Process
[0023] The working process of the static thrust limiting device for the test bench of this utility model is divided into three stages: pre-test preparation, in-test operation, and post-test reset, as detailed below:
[0024] (1) Pre-experiment preparation stage
[0025] 1. Component installation and connection: Install the double-row pulley blocks symmetrically and evenly on the bow stop and stern stop. Fix the bow stop to the bow end of the compartment. Connect the stern stop to the shaft loading device (if an integrated design is adopted, complete the integrated assembly directly). Fix the large base of the stern stop sliding structure to the laboratory foundation with anchor bolts. Connect the dovetail groove sliding structure to the bottom of the stern stop to ensure that the stern stop can slide unidirectionally along the dovetail groove direction.
[0026] 2. Wire Rope Installation and Pre-tensioning: Install two wire ropes symmetrically on each double-row pulley block to ensure the wire ropes are securely installed; adjust the initial length of each wire rope using the tensioning mechanism on the bow stop in conjunction with the double-row pulley block, and apply appropriate pre-tensioning force to ensure that the initial stress state of each wire rope is uniform; check the installation status of the strain gauges and monitoring circuits on each wire rope to ensure that the stress monitoring system is working properly.
[0027] (3) Operation phase during the test
[0028] 1. Force Transmission and Conversion: Initiate the ship propulsion simulation test, and the loading device applies simulated loading force to the shafting system. At this time, the reaction force generated by the loading device is transmitted to the double-row pulley block through the stern stop, and then to the double-row pulley block on the bow stop side through the wire rope. Finally, it is transmitted to the bow stop and the compartment connected to it, forming an internal force transmission between the loading device and the compartment, avoiding the transmission of reaction force to the foundation. At the same time, the loading force on the compartment is transmitted to the loading device through the bow stop, wire rope, double-row pulley block, and stern stop, and is also converted into internal force, ensuring that the foundation does not bear this part of the load.
[0029] 2. Stress Monitoring and Adjustment: During the test, strain data of each wire rope is collected in real time by strain gauges on the wire ropes. The stress state of each wire rope is calculated and judged based on the strain data. If the stress difference between different wire ropes is too large (exceeding the preset safety range), the tensioning mechanism is activated. By adjusting the initial length and preload of the corresponding wire ropes, the load is redistributed among the wire ropes until all wire ropes are uniformly stressed, meeting the test safety requirements.
[0030] 3. Displacement adaptation: As the test continues, the wire rope gradually stretches under the load, causing the relative distance between the bow stop and the stern stop to increase. At this time, the stern stop slides freely in one direction along the dovetail groove sliding structure in the stern stop sliding structure under the action of tension, adapting to the above displacement changes, avoiding additional stress on the device, and ensuring the normal progress of the test.
[0031] (3) Post-test reset phase
[0032] 1. Load unloading: After the test, stop the loading operation of the loading device and gradually unload the simulated loading force on the shaft system until the load is completely eliminated; at this time, the tension on the wire rope gradually decreases and returns to the initial tension state.
[0033] 2. Stern stop reset: Activate the return jack mechanism in the stern stop sliding structure. Through the thrust of the jack, push the stern stop, which is sliding along the dovetail groove sliding structure, back to its initial position before the test; close the return jack mechanism to complete the reset of the stern stop.
[0034] 3. Equipment Inspection and Maintenance: Inspect the condition of components such as wire rope, double-row pulley block, tensioning mechanism, and stern stop sliding structure to confirm that there are no damaged or abnormally worn components. If the next test is required, proceed directly to the preparation stage before the next test. If the equipment is not used for a long period of time, clean and rust-proof each component and store it properly.
[0035] (V) Beneficial Effects
[0036] Compared with the prior art, the present invention has the following significant advantages:
[0037] Internal force balance, protecting the foundation: The external load is cleverly transformed into internal forces of the system, which fundamentally reduces the shear force requirements of the laboratory foundation.
[0038] Uniform stress distribution: The circumferentially distributed double-row pulley system design enables uniform force transmission at multiple points, effectively improving the problems of local stress concentration and excessive structural deformation.
[0039] High safety redundancy: Two steel wire ropes are symmetrically arranged on each pulley block to form redundant protection, ensuring the safety function of the device even if a single rope fails.
[0040] Good adjustability and adaptability: The tensioning mechanism facilitates adjustment of the wire rope force, and the sliding structure allows the equipment to adapt to displacement under load, improving the practicality and reliability of the device.
[0041] Real-time monitoring and strong controllability: Through the strain monitoring system, the stress state of the wire rope can be monitored in real time, and adjustments can be made accordingly, thus achieving active safety control. Attached Figure Description
[0042] Figure 1 This is a schematic diagram of the structure of this utility model.
[0043] Figure 2 This is a schematic diagram of axial load transfer when the test system has no limit device.
[0044] Figure 3 This is a schematic diagram of the stern stop sliding structure of this utility model. Figure 1 .
[0045] Figure 4 This is a schematic diagram of the stern stop sliding structure of this utility model. Figure 2 .
[0046] Reference numerals in the attached drawings: wire rope (1), double-row pulley block (2), bow stop (3), stern stop (4), tensioning mechanism (5), stern stop sliding structure (6), large base (6-1), guide rail base (6-2), dovetail groove sliding structure (6-3), return jack structure (6-4), anchor bolt (7). Detailed Implementation
[0047] The following detailed description of a static thrust limiting device for a test bench based on a steel wire rope, in conjunction with the accompanying drawings and specific embodiments, further illustrates the present invention. This embodiment is only used to explain the present invention and is not intended to limit the scope of protection of the present invention.
[0048] I. Overview of Implementation Examples
[0049] This embodiment addresses the static thrust limiting requirement for axial loading forces of hundreds of tons in ship propulsion force simulation tests by constructing a static thrust limiting device based on a wire rope test bench. This device is compatible with ship propulsion force simulation test systems with a shaft diameter of 1.2m and a peak loading force of 300 tons. This embodiment verifies the force balance effect, structural stability, and operational feasibility of the device.
[0050] II. Specific parameters and selection of each component of the device
[0051] like Figure 1 As shown, the static thrust limiting device for a test bench based on a wire rope according to this utility model is mainly composed of a wire rope (1), a double-row pulley block (2), a bow stop (3), a stern stop (4), a tensioning mechanism (5), and a stern stop sliding structure (6).
[0052] (a) Steel wire rope (1)
[0053] High-strength galvanized steel wire rope (1) is selected, with a material of 6×19S+FC-16mm and a nominal tensile strength of 1960MPa. In this embodiment, a total of 10 sets of double-row pulley groups (2) are set up, with 2 steel wire ropes (1) arranged in each double-row pulley group (2), for a total of 20 steel wire ropes (1). According to the calculation of a peak load of 300 tons, the maximum load shared by a single steel wire rope (1) is 300 tons ÷ 20 ropes = 15 tons; considering a safety factor of 1.5 (the conventional safety factor requirement for ship test equipment), the minimum breaking tensile force that a single steel wire rope (1) needs to meet is 15 tons × 1.5 = 22.5 tons (i.e., 220.5kN). The actual breaking tensile force of the selected 16mm diameter steel wire rope (1) is 221kN (verified by the manufacturer's parameters, which meets the GB / T20118-2017 "General Technical Conditions for Steel Wire Ropes" standard), which meets the load-bearing requirements. Each wire rope (1) has a strain gauge attached to the middle section and both ends near the double-row pulley block (2). The strain gauge has an accuracy grade of 0.1 and an operating temperature range of -20℃ to 80℃. It is connected to a dynamic signal acquisition instrument through a shielded cable to realize real-time acquisition of force data.
[0054] (II) Double-row pulley system (2)
[0055] The double-row pulley block (2) is made of cast steel. Each double-row pulley block (2) contains two pulleys arranged in parallel. The pulley diameter is 110mm and the groove width is 18mm, which can be used with 16mm diameter steel wire rope (1). The double-row pulley block (2) is evenly arranged around the circumference of the compartment to ensure that the contact points with the bow stop (3) and stern stop (4) are evenly distributed. The double-row pulley block (2) is fixed to the bow stop (3) and stern stop (4) respectively by M20 high-strength bolts. The bolt preload torque is 650N·m to ensure the connection strength.
[0056] (III) Bow stop (3) and stern stop (4)
[0057] Both the bow stop (3) and the stern stop (4) are welded from Q355B steel plates, and the overall structure is plate-shaped. The inner side of the bow stop (3) is bolted to the bow end of the compartment via a flange; the inner side of the stern stop (4) is integrally welded to the output end of the shaft loading device, and non-destructive testing (UT+MT) is performed after welding to ensure that there are no welding defects; the bow stop (3) and the stern stop (4) are both reserved with mounting holes that match the double-row pulley block (2), a total of 10 sets of mounting holes, with a hole position tolerance of ±0.5mm and an error of the included angle between the centers of adjacent holes ≤±0.5°, to ensure the circumferential uniformity of the double-row pulley block (2).
[0058] (iv) Tensioning mechanism (5)
[0059] The tensioning mechanism (5) adopts a spiral tensioning structure. The main body consists of an adjusting screw, a locking nut, and a bearing seat. The bearing seat adopts a self-aligning roller bearing to ensure smooth rotation of the screw. The tensioning mechanism (5) is fixed to the outer end face of the bow stop (3) by welding. Each double-row pulley block (2) corresponds to one set of tensioning mechanism (5), for a total of 10 sets. The preload of the corresponding wire rope (1) can be adjusted independently. The preload adjustment range is 0 to 4 tons, which is suitable for the maximum load requirement of 15 tons for a single wire rope (1) and avoids premature fatigue of the wire rope (1) due to excessive preload.
[0060] (v) Stern stop sliding structure (6)
[0061] (1) Large base (6-1): It is made of Q355B steel plate splicing and welding. The bottom is reserved with anchor bolt installation holes. It is fixed to the laboratory foundation by anchor bolts. The anchor bolts are buried at a depth of 1.5m and fixed by secondary grouting process to ensure that the pull-out force is not less than 500kN, so as to meet the overall load-bearing stability requirements of the device.
[0062] (2) Guide rail base (6-2): The material is gray cast iron. Two guide rail bases (6-2) are symmetrically arranged on the large base (6-1). The top of the guide rail base (6-2) is machined with dovetail groove guide rail to ensure smooth sliding of the stern stop (4).
[0063] (3) Dovetail groove sliding structure (6-3): It is welded and fixed to the bottom of the stern stop (4). The sliding part is made of tin bronze and has a clearance of 0.05~0.1mm with the dovetail groove guide rail. It can achieve free sliding in one direction (axial direction). The sliding stroke is ±120mm (due to the increase in the number of steel wire ropes (1), the total tension is slightly increased, and the sliding stroke is appropriately expanded). The sliding friction is ≤5kN.
[0064] (4) Return jack structure (6-4): Select a single-acting hydraulic jack with a rated thrust of 100kN, a stroke of 150mm, and a working pressure of 31.5MPa; it is connected to the hydraulic pump through a high-pressure oil pipe, and the operating pressure range is 0~31.5MPa. It can realize the smooth reset of the stern stop (4). The reset speed can be controlled by the hydraulic pump regulating valve to avoid the impact of the component due to too fast reset.
[0065] III. Installation and Commissioning Procedures
[0066] (I) Basic Preparation
[0067] Level the laboratory foundation installation area, with a flatness error ≤2mm / m; drill holes and install rebar at the anchor bolt installation locations, with an implantation depth of 1.5m. After the rebar adhesive strength reaches the design requirements (≥30MPa), install the large base (6-1).
[0068] (II) Component Installation
[0069] (1) Installation of stern stop sliding structure (6): Place the large base (6-1) in the preset position of the foundation, adjust the level of the large base (6-1) with a level (level error ≤ 0.1 mm / m), then tighten the anchor bolts and perform secondary grouting; after the grouting layer strength reaches the standard (cured for 7 days, strength ≥ C30), fix the guide rail base (6-2) on the large base (6-1), use a dial indicator to calibrate the parallelism of the guide rail base (6-2), and ensure that the parallelism error of the two guide rail bases (6-2) is ≤ 0.1 mm / m; then install the dovetail groove sliding structure (6-3), manually push the sliding structure to verify the smoothness of sliding, and there is no jamming phenomenon; finally install the return jack structure (6-4), adjust the jack axis to be consistent with the sliding direction, and the axis deviation is ≤ 0.5 mm.
[0070] (2) Installation of bow stop (3) and stern stop (4): Weld the bottom of the stern stop (4) to the top of the dovetail groove sliding structure (6-3). During the welding process, use a dial indicator to monitor the coaxiality of the stern stop (4) to ensure that the coaxiality error between the axis of the stern stop (4) and the sliding direction is ≤0.5mm. Fix the bow stop (3) to the bow end of the compartment through the flange. According to the installation requirements of 10 sets of double-row pulley groups (2), adjust the axial distance between the bow stop (3) and the stern stop (4) appropriately to avoid interference between the wire rope (1) and other components.
[0071] (3) Installation of double-row pulley block (2): Install 10 double-row pulley blocks (2) symmetrically and evenly on the outer end faces of the bow stop (3) and stern stop (4), and tighten them with M20 high-strength bolts. The bolt pre-tightening torque is 650 N·m (tighten in stages with a torque wrench to avoid bolt overload); after installation, rotate the pulleys to verify the rotation flexibility of the double-row pulley block (2). The rotation resistance torque of each pulley is ≤5 N·m, and there is no jamming or abnormal noise.
[0072] (4) Installation of wire rope (1) and tensioning mechanism (5): Two wire ropes (1) are symmetrically installed on each double-row pulley block (2), for a total of 20. The two ends of the wire rope (1) are fixed to the double-row pulley blocks (2) of the bow stop (3) and the stern stop (4) respectively. The fixing method is to use wedge joints for clamping. After clamping, a tensile test is performed to ensure that the clamping strength is not less than 90% of the breaking tensile force of the wire rope (1). The initial length of each wire rope (1) is adjusted by the tensioning mechanism (5) to make the wire rope (1) taut. Then, a pre-tightening force of 1.5 tons is applied (the pre-tightening force is 10% of the maximum load-bearing capacity to avoid insufficient pre-tightening force causing sudden changes in the force of the wire rope (1) in the early stage of the test). The pre-tightening force deviation of each wire rope (1) is confirmed to be ≤±5% by monitoring the strain gauge data to ensure uniform initial force.
[0073] (III) Debugging
[0074] (1) Stress monitoring system debugging: Start the dynamic signal acquisition instrument, set the sampling frequency to 100Hz, and perform zero-point calibration on the strain gauges on the 20 steel wire ropes (1). The calibration error is ≤±0.5με. By manually applying three loads of 5 tons, 10 tons and 15 tons, verify the signal transmission stability between the strain gauges and the acquisition instrument. The stress data measurement error is ≤±1%, ensuring accurate data acquisition during the test.
[0075] (2) Sliding structure debugging: Start the return jack structure (6-4), control the extension and retraction of the jack through the hydraulic pump, push the stern stop (4) to the maximum sliding stroke (120mm) in 5 times, and then reset it to the initial position. After each sliding, measure the reset accuracy of the stern stop (4). The reset accuracy is ≤±1mm. During the sliding process, monitor the contact state between the guide rail and the sliding structure. There is no abnormal wear or heat generation.
[0076] (3) Pre-tension adjustment and debugging: The pre-tension of a single wire rope (1) is adjusted by 10 sets of tensioning mechanisms (5) from 1 ton to 4 tons. The changes in the force data displayed by the data acquisition instrument are observed to confirm that the linearity of the pre-tension adjustment is good and that the mutual influence of the forces on adjacent wire ropes (1) is ≤±3%, so as to avoid the overall force imbalance caused by the adjustment of a single rope.
[0077] IV. Trial Operation Process
[0078] (I) Loading Test
[0079] The ship propulsion simulation test system was started, and the axial loading force was gradually applied to the shaft system according to the loading curve from 0 to 300 tons, with a loading rate of 10 tons / min. During the test, the force data of 20 steel wire ropes (1) was monitored in real time by a dynamic signal acquisition instrument, and the data was recorded once every 10 seconds. At the same time, the sliding displacement of the stern stop (4) was recorded by a displacement sensor to ensure that the force and displacement changes were synchronized during the loading process.
[0080] (II) Force Adjustment
[0081] When the loading force reaches 150 tons, the monitoring data shows that the force difference of some wire ropes (1) reaches 7% (exceeding the preset safety range of 5%). The tensioning mechanism (5) of the corresponding wire rope (1) is started, and the screw rotation angle is adjusted (each rotation corresponds to a change of about 0.4 tons in preload). The adjustment is carried out in 3 stages, and the force data is monitored again after each adjustment for 5 minutes. Finally, the force difference of each wire rope (1) is reduced to within 2.5%, which meets the safety requirements and avoids local overload of wire ropes (1).
[0082] (III) Displacement Adaptation
[0083] As the loading force increases to 300 tons, the wire rope (1) is stretched, with a total elongation of about 95 mm, which causes the relative distance between the bow stop (3) and the stern stop (4) to increase. At this time, the stern stop (4) slides freely in one direction along the dovetail groove sliding structure (6-3) in the stern stop sliding structure (6) under the action of tension. The actual sliding displacement is 92 mm, which matches the total elongation of the wire rope (1). During the sliding process, the device has no abnormal vibration (vibration acceleration ≤ 0.1g). By monitoring the connection between the double-row pulley block (2) and the bow stop (3) and the stern stop (4) through stress test pieces, the maximum stress value is 180 MPa, which is less than the yield strength of Q355B steel (235 MPa). There is no local stress concentration phenomenon.
[0084] (iv) Unloading and Reset
[0085] After the test, the loading force was gradually unloaded at a rate of 10 tons / min until the load was completely eliminated. During the unloading process, the stress change of the wire rope (1) was monitored in real time to ensure that the stress decreased evenly and without sudden changes. Finally, the stress of the wire rope (1) was restored to the pre-tension state of 1.5 tons. The stern stop (4) was stopped at a sliding position 92mm away from the initial position. The return jack structure (6-4) in the stern stop sliding structure (6) was activated, and the stern stop (4) was slowly pushed along the guide rail by the hydraulic pump. The reset time was 4 minutes. After reset, the stern stop (4) returned to the initial installation position with a position deviation of ≤0.8mm, which met the installation accuracy requirements of the next test.
[0086] V. Verification of Implementation Results
[0087] This embodiment was verified through a 300-ton axial loading force test, and the device operated stably. The specific results are as follows:
[0088] Force transmission and conversion effect: The loads (F3, F4) transmitted to the foundation by the loading device and the compartment are reduced to less than 4 tons. Compared with the 300-ton load when there is no device, the shear force bearing requirement of the foundation is reduced by more than 98.7%, which is far below the conventional shear force bearing limit (50 tons) of the laboratory foundation, effectively protecting the laboratory foundation.
[0089] Structural stability: During the test, the 10 sets of double-row pulleys (2) made uniform contact with the bow stop (3) and stern stop (4). The temperature of each contact part was monitored by an infrared thermal imager. The highest temperature was 32℃ (ambient temperature 25℃), and there was no abnormal heating. The maximum deformation of the structure was 2.8mm, which was less than the design allowable deformation (5mm), and the structural stability requirements were met.
[0090] Safety and reliability: By simulating the failure of a single wire rope (1) (human-induced disconnection of 1 wire rope (1)), the average force on the remaining 19 wire ropes (1) increased from 15 tons to 15.79 tons, and the maximum force on a single wire rope was 16.2 tons, which is less than the breaking tensile force of 221kN of the wire rope (1). The device can still maintain the load-bearing requirement of 300 tons, and the safety redundancy meets the design requirements.
[0091] Operational feasibility: The 10 sets of tensioning mechanisms (5) are easy to adjust, and the adjustment time of a single mechanism is ≤5min; the force monitoring system has strong real-time data acquisition and the data update interval is ≤0.1 seconds; the stern stop (4) slides and resets smoothly without jamming, which is fully compatible with the operation process of ship propulsion simulation test and can meet the use requirements of continuous test (8 hours a day).
[0092] The above embodiments are only preferred embodiments of this utility model. In practical applications, the diameter of the wire rope (1) (e.g., 12mm, 16mm), the number of double-row pulley blocks (2) (e.g., 8 sets, 12 sets), the material and size of the components can be adjusted according to parameters such as the magnitude of the test loading force (e.g., 200 tons, 400 tons), the size of the compartment (e.g., shaft diameter 1.0m, 1.5m), etc. As long as it meets the core technical solution of "the wire rope (1) transmits tension to balance the loading reaction force, the double-row pulley blocks (2) transmit force evenly in the circumference, the tensioning mechanism (5) adjusts the force, and the sliding structure adapts to the displacement", it is within the protection scope of this utility model.
Claims
1. A steel cable based test bench static thrust limiter device, characterized in that, The system includes a wire rope (1), a double-row pulley block (2), a bow stop (3), a stern stop (4), a tensioning mechanism (5), and a stern stop sliding structure (6). The double-row pulley block (2) is symmetrically and evenly arranged on the bow stop (3) and the stern stop (4), and is evenly distributed along the circumference of the compartment section, for installing the wire rope (1). The bow stop (3) is fixedly connected to the bow end of the compartment section, and the stern stop (4) is connected to the shaft loading device. The bottom of the stern stop (4) is connected to the top of the stern stop sliding structure (6); the tensioning mechanism (5) is set on the bow stop (3) and cooperates with the double-row pulley group (2) on the side of the bow stop (3) to adjust the initial length and preload of the wire rope (1); the bottom of the stern stop sliding structure (6) is fixedly connected to the laboratory foundation to realize the unidirectional free sliding of the stern stop (4) and the reset after the test.
2. The static thrust limiting device for a test bench based on a steel wire rope according to claim 1, characterized in that, Two steel wire ropes (1) are symmetrically arranged on each of the double-row pulley blocks (2). When one of the steel wire ropes (1) fails, the other steel wire rope (1) can meet the ultimate load requirements. The steel wire rope (1) is wound on the double-row pulley block (2), and its two ends are connected to the bow stop (3) and the stern stop (4) respectively.
3. The static thrust limiting device for a test bench based on a steel wire rope according to claim 1, characterized in that, Each of the steel wire ropes (1) is fitted with a strain gauge, which is connected to a signal acquisition instrument via a shielded cable.
4. The static thrust limiting device for a test bench based on a steel wire rope according to claim 1, characterized in that, The stern stop sliding structure (6) includes a large base (6-1), a guide rail base (6-2), a dovetail groove sliding structure (6-3), and a return jack structure (6-4). The large base (6-1) is fixedly connected to the laboratory foundation by anchor bolts. Two guide rail bases (6-2) are symmetrically arranged on the large base (6-1). Each set of guide rail bases (6-2) is equipped with a dovetail groove sliding structure (6-3). The dovetail groove sliding structure (6-3) is connected to the stern stop (4). The return jack structure (6-4) is arranged on the large base (6-1) and located between the two guide rail bases (6-2).
5. The static thrust limiting device for a test bench based on a steel wire rope according to claim 4, characterized in that, The large base (6-1) is made of Q355B steel plate splicing and welding, the anchor bolts are buried at a depth of not less than 1.5m, and are fixed by secondary grouting process. The pull-out force of the large base (6-1) is not less than 500kN.
6. The static thrust limiting device for a test bench based on a steel wire rope according to claim 4, characterized in that, The top of the guide rail base (6-2) is machined with a dovetail groove guide rail.
7. The static thrust limiting device for a test bench based on a steel wire rope according to claim 4, characterized in that, The dovetail sliding structure (6-3) is made of tin bronze, with a fitting clearance of 0.05~0.1mm with the dovetail guide rail, a sliding stroke of ±120mm, and a sliding friction force ≤5kN.
8. The static thrust limiting device for a test bench based on a steel wire rope according to claim 4, characterized in that, The return jack structure (6-4) is a single-acting hydraulic jack with a rated thrust of not less than 100kN, a stroke of not less than 150mm, and a working pressure range of 0~31.5MPa. It is connected to a hydraulic pump through a high-pressure oil pipe.
9. The static thrust limiting device for a test bench based on a steel wire rope according to claim 1, characterized in that, The tensioning mechanism (5) is a spiral tensioning structure, including an adjusting screw, a locking nut and a bearing seat. The bearing seat adopts a self-aligning roller bearing. The pre-tension state of the wire rope (1) is changed by rotating the adjusting screw. The pre-tension force adjustment range of the tensioning mechanism (5) is 0 to 4 tons.
10. The static thrust limiting device for a test bench based on a steel wire rope according to claim 1, characterized in that, The double-row pulley block (2) is fixedly connected to the bow stop (3) and stern stop (4) by high-strength bolts.