By designing a railway electrical turnout training platform that includes steel sleepers and fault simulation circuits, the problem of low simulation accuracy of existing equipment has been solved. This enables comprehensive training and fault simulation of the turnout switching process, thereby improving trainees' practical skills.

CN224985891UActive Publication Date: 2026-11-17HENAN SALEM TRAFFIC TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522653756.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-15
Publication Date
2026-11-17
Estimated Expiration
2035-12-15

AI Technical Summary

Technical Problem

The existing railway electrical turnout training equipment has low simulation accuracy and cannot simulate turnout circuit faults in real operation scenarios. This makes it difficult for trainees to conduct targeted fault diagnosis and maintenance training, and cannot comprehensively improve their practical ability to cope with complex working conditions.

Method used

A railway electrical turnout training platform was designed, comprising the training equipment body and a fault training module. The training equipment body includes stock rails, switch rails, sleepers, slide plates, limit switches, anti-jump devices, and turnout switching equipment. Combined with steel sleepers and fault simulation circuits, the system uses a controller to control relay modules to simulate open-circuit and short-circuit faults, thus simulating a real railway turnout system.

Benefits of technology

It enabled comprehensive practical training exercises on the turnout switching process, simulating turnout circuit faults in real operational scenarios, improving trainees' fault diagnosis and maintenance capabilities, and enhancing their practical skills.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224985891U_ABST
    Figure CN224985891U_ABST
Patent Text Reader

Abstract

This utility model relates to a railway signaling turnout training platform, comprising a training equipment body and a fault training module. The training equipment body includes core components such as stock rails, switch rails, sleepers, and slide plates. Sleeper ① is equipped with a roller-equipped slide plate, sleeper ⑦ with an anti-jump device, and sleeper ⑩ with a limit switch. The slide plate on sleeper ① is a roller-equipped slide plate with an elastic clamp at the bottom of its slide plate. The others use ordinary slide plates, replicating a real turnout system. This allows for hands-on observation and practice of the entire turnout switching process, and integrates the slide plate structures of both ordinary and high-speed rail tracks, providing railway signaling staff with more comprehensive training content. The turnout switching equipment's switch machine terminal box is equipped with a fault simulation circuit, including multiple open-circuit and two short-circuit fault points, with states switched via relay modules. This allows the training platform to conduct normal turnout operation and daily maintenance training, as well as simulate switch machine circuit faults and perform troubleshooting training, providing comprehensive training and comparative learning capabilities.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the technical field of railway electrical signaling training devices, specifically a railway electrical turnout training platform. Background Technology

[0002] The rapid development of my country's railway industry has made turnouts, as core equipment, crucial to the safety and efficiency of train operations. Approximately 30% of track faults are related to turnout problems. However, traditional hands-on training is limited by time, environment, and high equipment costs. Given the current management situation in the railway industry, uncertified young workers cannot gain practical experience on the production floor, leading to reduced opportunities for hands-on practice and a lack of fault simulation training, thus hindering the improvement of their professional skills.

[0003] However, existing railway electrical turnout training equipment includes multiple discrete sleepers, stock rails, switch rails, and turnout switching devices. Its core functions are limited to observation and basic maintenance practice, resulting in low simulation levels. This prevents trainees from fully grasping the linkage logic, operating principles, and power transmission mechanisms of each component during turnout switching. Furthermore, existing railway electrical turnout training equipment cannot set circuit faults in the turnout switching devices, nor can it simulate common turnout circuit faults in real-world operating scenarios. This makes it difficult for trainees to conduct targeted fault diagnosis and maintenance training, and hinders their ability to comprehensively improve their practical skills in handling complex operating conditions. Utility Model Content

[0004] The purpose of this utility model is to overcome the above-mentioned technical defects and provide a railway electrical turnout training platform.

[0005] To achieve the above objectives, this utility model adopts the following technical solution: a railway electrical turnout training platform, comprising a training equipment body and a fault training module. The training equipment body includes a stock rail, a switch rail, sleepers, a slide plate, a limit switch, an anti-jump device, and a turnout switching device. The sleepers include sleepers ①-⑩, and each sleeper is fixedly equipped with two slide plates. Two stock rails and two switch rails are provided. The stock rail is fixed to the base plate of the slide plate. The switch rail is slidably mounted on the slide plate's slide platform. An alloy plating layer is added to the surface of the slide plate to reduce the friction generated when the switch rail moves. The tip of the switch rail is located above sleeper ①, and the heel is located above sleeper ⑩. Turnout switching devices are provided between sleepers ① and ②, and between sleepers ⑧ and ⑨. The turnout switching devices are connected to the switch rails to drive the switch rails to move between the stock rails. In the current turnout switching, the slide plate on sleeper ① is a slide plate with rollers. The rollers slide in contact with the bottom of the switch rail to reduce repulsive force and reduce the vibration of the switch rail on the slide plate. The slide plate on sleeper ⑦ is equipped with an anti-jump device to prevent abnormal vertical displacement of the switch rail when the train passes. The slide plate on sleeper ⑩ is equipped with a limit switch to prevent forward and backward displacement of the switch rail and to assist in the lateral movement of the switch rail. The fault training module includes a fault simulation circuit, a controller, and a relay module. The switch machine terminal box of the turnout switching equipment is equipped with a fault simulation circuit. The fault simulation circuit is equipped with multiple open circuit fault points and two short circuit fault points. The corresponding open circuit fault points and short circuit fault points in the fault simulation circuit are connected to the relay module. The controller controls the relay module to realize the open circuit fault and short circuit fault.

[0006] Furthermore, the sleepers are made of steel. Traditional wooden sleepers are prone to rotting after prolonged use, and ash sleepers have a pungent odor, making them unsuitable for indoor environments. This invention uses steel sleepers, which are lightweight, easy to install and maintain, environmentally friendly, and have a long service life.

[0007] Furthermore, the height of the rollers on the slide plate with rollers on the No. 1 sleeper can be infinitely adjusted, and the roller height can be adjusted to ensure that the rollers slide in contact with the bottom of the switch rail.

[0008] Furthermore, the bottom of the slide plate of the slide plate on the No. 1 sleeper is provided with an elastic clamp, which is used to clamp the slide plate to the inside of the basic rail.

[0009] Furthermore, the limiter has an L-shaped structure, with its vertical part fixedly connected to the switch rail, and two pulleys rotatably provided below the horizontal part. The two pulleys are located on both sides of the slide plate of the slide bed and are in rolling contact with the side walls of the slide plate of the slide bed.

[0010] Furthermore, the two ends of the open circuit fault point are respectively connected to the moving contact and normally closed stationary contact of a relay unit in the relay module, and the two ends of the short circuit fixed point are respectively connected to the moving contact and normally open stationary contact of a relay unit in the relay module. The controller is connected to the coil terminals of each relay unit in the relay module through multiple control lines.

[0011] The beneficial effects of this utility model are as follows: This utility model comprehensively imitates the real railway turnout system. It adds core components such as slide plates, limiters, anti-jump devices, and elastic clamps to the turnout switching training equipment for stock rails, switch rails, and sleepers. The slide plates include two types: a roller-equipped slide plate installed on sleeper ① and a regular slide plate installed on other sleepers. This integrates various equipment elements commonly found in real turnout equipment, allowing for comprehensive training exercises and enabling railway signal workers to gain a more complete understanding of the working principles and mechanisms of each component. Furthermore, the slide plate on sleeper ① has an elastic clamp at the bottom, incorporating the slide plate structure used in high-speed rail tracks. This allows for a more comprehensive understanding of the different equipment used in different turnouts on a single training device, facilitating comparison and differentiation.

[0012] This invention incorporates a fault simulation circuit within the switch machine terminal box of a turnout switching device. By switching between fault and normal states via a relay module, this device not only enables normal turnout switching operation, daily maintenance operation, and observation, but also allows for setting faults in the switch machine circuit, simulating training exercises, and conducting fault handling training. Attached Figure Description

[0013] Figure 1 This is a schematic diagram of the structure of a railway electrical turnout training platform according to this utility model; Figure 2 It is the slide plate structure on sleeper No. 7 in this utility model; Figure 3 It is the slide board structure on sleeper No. 1 in this utility model; Figure 4 It is the slide plate structure on the sleepers other than sleepers No. 1 and No. 7 in this utility model; Figure 5 This is a schematic diagram of the limit switch in this utility model. Figure 6 This is the fault simulation circuit in this utility model.

[0014] 1. Stock rail; 2. Switch rail; 3. Sleeper; 4. Slide plate; 5. Limit switch; 6. Anti-jump device; 7. Turnout switching equipment tie rod; 8. Roller; 9. Limit switch; 10. Elastic clamp; 11. Pulley. Detailed Implementation

[0015] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present utility model are within the protection scope of the present utility model.

[0016] An embodiment of this utility model: a railway electrical turnout training platform, comprising the training equipment body and a fault training module.

[0017] like Figure 1 As shown, the training equipment body includes turnout equipment and turnout switching equipment. The turnout equipment includes a main rail 1, a switch rail 2, a sleeper 3, a slide plate 4, a limit switch 5, an anti-jump device 6, and matching accessories. It is suitable for training, employee education, and skill practice of railway double-locomotive traction.

[0018] (1) Basic rail 1: It is made of black I-beam with a rail height of 176mm, a bottom width of 150mm, a head width of 73mm, a web thickness of 16.5mm, a head thickness of 34mm, and a bottom thickness of 15.25mm. It weighs 60kg / m and has a length of 6000mm. In the training platform, the basic rail 1 and the switch rail 2 work together to ensure the positional stability of the switch rail 2 during the conversion process.

[0019] (2) Switch 2: A black I-beam with a maximum rail height of 176mm, a bottom width of 150mm, a head width of 73mm, a web thickness of 16.5mm, a rail head thickness of 34mm, a rail bottom thickness of 15.25mm, and a length of 5800mm is used to simulate the opening of the turnout in the straight or side direction.

[0020] (3) Sleeper 3: Sleeper 3 is made of steel and includes sleepers ①-⑩, which are composed of two types of rectangular steel with lengths of 2400mm and 2800mm. Sleepers ①, ②, ⑧ and ⑨ are 2800mm long, and the other sleepers are 2400mm long. All sleepers are 300mm wide and 150mm thick, and are used to support the weight of the turnout and maintain its geometric position. Traditional wooden sleepers are prone to rotting after long-term use, and ash sleepers have a pungent odor and are not suitable for indoor environments. This utility model uses steel sleepers, which are lightweight, easy to install and maintain, environmentally friendly, and have a long service life.

[0021] (4) Slide board 4, each sleeper 3 is provided with two slide boards 4 arranged opposite each other, the slide board 4 includes ordinary slide boards (such as Figure 2 , 4 The slide plate shown is without rollers. Slide plates without rollers are further divided into two types, one of which is... Figure 2 The slide bed with anti-jump device on the No. 7 steel sleeper shown is another type. Figure 4The slide plates on the steel sleepers shown (excluding No. ① and No. ⑦) cannot have elastic elements installed, and slide plates with rollers (such as...) Figure 3 As shown), ① the slide plate 4 on the sleeper uses a slide plate with rollers, while the slide plates 4 on other sleepers use ordinary slide plates. The height of the rollers on the slide plate with rollers is infinitely adjustable, ensuring that the rollers slide in sliding contact with the bottom of the switch rail by adjusting the roller height. The slide plate 4 on sleeper ① has an elastic clamp at the bottom of its slide platform, which is used to clamp the slide platform to the inside of the main rail. It is worth noting that an alloy plating layer is added to the surface of the slide platform 4 to reduce the friction generated when the switch rail moves.

[0022] (5) Limiter 5 (e.g.) Figure 5 As shown): The training platform has a limiter 5 installed on the slide plate 4 corresponding to sleeper ⑩. The side of the limiter is fixed to the switch rail 2, and the bottom has a pulley 11 to limit the front and rear displacement of the switch rail 2 and assist the left and right movement of the switch rail 2.

[0023] (6) Anti-jump device 6 (e.g.) Figure 2 As shown): Installed on the slide plate 4 corresponding to sleeper ⑦, it is tightly fastened to the bottom of switch rail 2. It simulates the abnormal vertical displacement of switch rail 2 caused by vibration when an actual train passes by, and the high degree of simulation eliminates the risk of derailment.

[0024] The turnout switching equipment adopts the turnout switching equipment on real railway tracks, which includes a switch machine, external locking and installation device. The switch machine, as the core and main body of the switching equipment, together with the external locking device and various rods and installation devices, completes the switching, locking and indication of the turnout. The external locking function is to fix the switch rail in a specific open position to ensure that the position is not changed by external forces when the train passes through in the actual field. The specific structure of the above-mentioned turnout switching equipment is existing technology and will not be described in detail.

[0025] The turnout switching device tie rod 7 is provided with two sets, which are respectively set between sleepers No. 1 and No. 2, and between sleepers No. 8 and No. 9.

[0026] The fault training module includes fault simulation circuits, controllers, and relay modules.

[0027] The difference between this patented turnout switching device and existing technologies lies in the fact that a fault simulation circuit is installed inside the turnout terminal box. This fault simulation circuit includes multiple open-circuit fault points and two short-circuit fault points (e.g., ...). Figure 6As shown in the diagram, the circled fault points are the fault points, the fault points marked with red lines are short-circuit faults, and the others are open-circuit faults. In the fault simulation circuit, the corresponding open-circuit fault points and short-circuit fault points are connected to the relay module. The controller controls the relay module to realize the open-circuit fault and short-circuit fault. The two ends of the open-circuit fault point are respectively connected to the moving contact and normally closed stationary contact of a relay unit in the relay module. The two ends of the short-circuit fault point are respectively connected to the moving contact and normally open stationary contact of a relay unit in the relay module. The controller is connected to the coil terminals of each relay unit in the relay module through multiple control lines.

[0028] The controller can be a PLC controller, a microcontroller, or a dedicated relay controller.

[0029] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.

[0030] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

[0031] The present invention and its embodiments have been described above. This description is not restrictive, and the accompanying drawings are only one embodiment of the present invention; the actual structure is not limited thereto. In conclusion, if those skilled in the art are inspired by this description and design similar structures and embodiments without departing from the inventive spirit of the present invention, such designs should fall within the protection scope of the present invention.

Claims

1. A railway electrical turnout training platform, characterized in that: The training equipment includes the main body and a fault training module. The main body comprises a base rail, switch rail, sleepers, slide plates, limit switches, anti-jump devices, and turnout switching devices. The sleepers are numbered 1-10, and each sleeper has two slide plates fixedly mounted on it. Both the base rail and switch rail have two slide plates. The base rail is fixed to the base plate of the slide plate, and the switch rail slides on the slide plate's platform. An alloy plating is added to the surface of the slide plate to reduce friction during switch rail movement. The tip of the switch rail is located above sleeper 1, and the heel is located above sleeper 10. Turnout switching devices are installed between sleepers 1 and 2, and between sleepers 8 and 9. These devices connect to the switch rails to move them between the base rails, thus enabling switch switching. The slide plate on sleeper 1 uses... The slide plate with rollers slides in contact with the bottom of the switch rail to reduce repulsive force and vibration of the switch rail on the slide plate. The slide plate on sleeper ⑦ is equipped with an anti-jump device to prevent abnormal vertical displacement of the switch rail when a train passes. The slide plate on sleeper ⑩ is equipped with a limit switch to prevent forward and backward displacement of the switch rail and to assist in lateral movement of the switch rail. The fault training module includes a fault simulation circuit, a controller, and a relay module. The switch machine terminal box of the turnout switching equipment contains a fault simulation circuit. The fault simulation circuit has multiple open-circuit fault points and two short-circuit fault points. The corresponding open-circuit and short-circuit fault points in the fault simulation circuit are connected to the relay module. The controller controls the relay module to realize open-circuit and short-circuit faults.

2. The railway electric signal turnout practical training platform according to claim 1, characterized in that: The sleepers are made of steel.

3. The railway electric signal turnout practical training platform according to claim 1, characterized in that: The height of the rollers on the slide plate with rollers on sleeper No. 1 can be adjusted steplessly.

4. The railway electric signal turnout practical training platform according to claim 3, characterized in that: The bottom of the slide board of the No. 1 sleeper is equipped with an elastic clamp.

5. The railway electric signal turnout practical training platform according to claim 1, characterized in that: The limiter has an L-shaped structure. Its vertical part is fixedly connected to the switch rail, and two pulleys are rotatably provided below the horizontal part. The two pulleys are located on both sides of the slide plate of the slide bed and are in rolling contact with the side walls of the slide plate of the slide bed.

6. The railway electric signal turnout practical training platform according to claim 1, characterized in that: The two ends of the open circuit fault point are respectively connected to the moving contact and normally closed stationary contact of a relay unit in the relay module. The two ends of the short circuit fixed point are respectively connected to the moving contact and normally open stationary contact of a relay unit in the relay module. The controller is connected to the coil terminals of each relay unit in the relay module through multiple control lines.