Machine tool control device, machine tool control method and machine tool control system

The machine tool control system addresses the need for separate adaptive control devices by integrating a cutting load detector and command divider to split machining commands, facilitating adaptive control with improved accuracy and efficiency.

DE102017110939B4Active Publication Date: 2024-11-28KOMATSU LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
DE102017110939
Authority / Receiving Office
DE · DE
Patent Type
Patents
Current Assignee / Owner
Priority Date
2017-02-15
Filing Date
2017-05-19
Publication Date
2024-11-28
Estimated Expiration
2037-05-19

AI Technical Summary

Technical Problem

Existing machine tool control systems require a separate control device for adaptive control, which complicates the implementation of adaptive machining conditions based on cutting load.

Method used

A machine tool control system that includes a cutting load detector, machining command divider, and control device to split machining commands into multiple periods, adjusting feed speed and target coordinates based on cutting load, allowing adaptive control without additional hardware.

Benefits of technology

Enables easy implementation of adaptive control by adjusting machining conditions automatically based on cutting load, improving accuracy and efficiency by efficiently approaching target loads and quickly eliminating excessive loads.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0001_ABST
    Figure 00000000_0001_ABST
  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

Machine tool control device (1) configured to control a cutting tool (14) based on an NC program (30), wherein the machine tool control device (1) comprises: a cutting load detector (21) configured to detect a cutting load applied to the cutting tool (14); a machining command divider (24) configured to split a machining command (Pa) contained in the NC program (30) into split machining commands (Pc; P1...P5) within a specified time interval (T;T1...T5); and a control device (25) configured to control the cutting tool (14) based on the split machining commands (Pc;P1...P5), wherein the split machining commands (Pc;P1...P5) have a first split machining command (P1) and a second split machining command (P2), each comprising target coordinates (G1X0.1, G1X0.2), a feed rate (F∇∇) and a main axis speed (S∇∇), the processing command divider (24) has an operating command setting part (26) and a cutting command setting part (27), the operating command setting part (26) is configured to set a feed rate (F∇∇) and main axis speed (S∇∇) of the second split machining command (P2) according to a cutting load during control according to at least the first split machining command (P1); and The operating command setting part (26) is configured to set a sum of the addition of the target coordinates (G1X0.1) of the first split machining command (P1) with a product of the multiplication of the feed rate (F∇∇) of the second split machining command (P2), which is set by the operating command setting part (26), with the specified time interval (T;T1...T5) as target coordinates (G1X0.2) of the second split machining command (P2).
Need to check novelty before this filing date? Find Prior Art

Description

BACKGROUND OF THE INVENTIONField of the invention

[0001] The present invention relates to a machine tool control apparatus, a machine tool control method and a machine tool control system. Description of the state of the art

[0002] There are known devices for controlling a computer numerical control machine tool (hereinafter referred to as a machine tool control device) that controls a cutting tool used for machining a work material into the desired shape according to an NC (numerical control) program.

[0003] Patent Literature 1 proposes a control in which the machining conditions when machining a work material according to an NC program are automatically changed according to the average cutting load in a predetermined time interval (hereinafter referred to as “adaptive control”). CITATION LISTPATENT LITERATURE

[0004] Patent Literature 1: Japanese Laid-Open Patent Application JP H04-138 504 A SUMMARY OF THE INVENTION PROBLEM TO BE SOLVED BY THE INVENTION

[0005] However, the method in Patent Literature 1 requires that a control device for performing adaptive control (such as an override control device) be provided separately for a machine tool control device.

[0006] The present invention has been conceived in view of the above situation, and its object is to provide a machine tool control apparatus, a machine tool control method, and a machine tool control system with which adaptive control can be easily performed. MEANS TO SOLVE THE PROBLEM

[0007] The object is achieved by a machine tool control device having the features of patent claim 1, by a machine tool control method having the features of patent claim 4, and by a machine tool control system having the features of patent claim 5. The machine tool control device relating to a first mode of the present invention comprises a cutting load detector that detects the cutting load exerted on the cutting tool, a machining command divider that divides a machining command to be divided, which is included in the NC program, into a plurality of divided machining commands at a predetermined time interval, and a controller that controls the cutting tool based on the plurality of divided machining commands.The plurality of split machining commands includes a first split machining command and a second split machining command, each including target coordinates, a feed rate, and a main axis rotation speed. The machining command splitter includes an operation command setting part and a cutting command setting part. The operation command setting part sets the feed rate and the main axis rotation speed of the second split machining command according to the cutting load during control according to at least the first split machining command.The operation command setting part sets the sum of the addition of the target coordinates of the first split machining command with the product of the multiplication of the feed rate of the second split machining command set by the operation command setting part with the predetermined time interval as the target coordinates of the second split machining command.

[0008] With the machine tool control device relating to the first mode of the present invention, the feed rate and the main axis rotational speed in the next machining period can be set based on the cutting load on the cutting tool during a given machining period, and the target coordinates in the next machining period can be set based on the feed rate thus set. Therefore, adaptive control in which the machining conditions are automatically changed can be easily implemented by appropriately modifying the NC program based on the cutting load.

[0009] The machine tool control device relating to a second mode of the present invention relates to the first mode, wherein the operation command setting part sets the feed rate of the second split machining command higher than the feed rate of the first split machining command when the cutting load is lower than a target load during control according to the first split machining command. Furthermore, the operation command setting part sets the feed rate of the second split machining command lower than the feed rate of the first split machining command when the cutting load is higher than the target load during control according to the first split machining command.

[0010] With the machine tool control device relating to the second mode of the present invention, the cutting load of the cutting tool can be efficiently approximated to the target load, so that the accuracy of the adaptive control can be improved.

[0011] The machine tool control device relating to a third mode of the present invention relates to the first or second mode, wherein the operation command setting part sets the feed direction relating to the second split machining command to be opposite to the feed direction relating to the first split machining command when the cutting load during control according to the first split machining command is at or above a predetermined threshold value which is higher than the target load.

[0012] With the machine tool control device relating to the third mode of the present invention, a cutting tool 14 can be quickly returned, which enables any excessive load applied to the cutting tool 14 to be quickly eliminated.

[0013] The machine tool control method relating to a fourth mode of the present invention includes the steps of setting the feed rate and the main axis rotation speed of the second split machining command following the first split machining command according to the cutting load during the control according to at least the first split machining command, and setting the sum of the addition of the command coordinates of the first split machining command to the product of multiplying the feed rate of the second split machining command by the time interval of the second split machining command as the command coordinates of the second split machining command.

[0014] With the machine tool control method relating to the fourth mode of the present invention, the feed rate and the main axis rotational speed in the next machining period can be set based on the cutting load on the cutting tool during a given machining period, and the target coordinates in the next machining period can be set based on the feed rate thus set. Therefore, adaptive control in which the machining conditions are automatically changed can be easily implemented by appropriately modifying the NC program based on the cutting load.

[0015] The machine tool control system relating to a fifth mode of the present invention includes a cutting load detector that detects the cutting load applied to the cutting tool, a machining command divider that divides a machining command to be divided, which is included in the NC program, into a plurality of divided machining commands at a predetermined time interval, and a controller that controls the cutting tool based on the plurality of divided machining commands. The plurality of divided machining commands includes a first divided machining command and a second divided machining command, each of which includes target coordinates, a feed rate, and a main axis rotation speed. The machining command divider includes an operation command setting part and a cutting command setting part.The operation command setting part sets the feed rate and the main axis speed of the second split machining command according to the cutting load during control according to at least the first split machining command. The operation command setting part sets the sum of the addition of the target coordinates of the first split machining command to the product of multiplying the feed rate of the second split machining command, which is set by the operation command setting part, by the predetermined time interval, as the target coordinates of the second split machining command.

[0016] With the machine tool control system relating to the fifth mode of the present invention, the feed rate and the main axis rotational speed in the next machining period can be set based on the cutting load on the cutting tool during a given machining period, and the target coordinates in the next machining period can be set based on the feed rate thus set. Therefore, adaptive control in which the machining conditions are automatically changed can be easily implemented by appropriately modifying the NC program based on the cutting load. EFFECTS OF THE INVENTION

[0017] The present invention provides a machine tool control apparatus, a machine tool control method, and a machine tool control system with which adaptive control can be easily performed. BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a block diagram of the configuration of the machine tool control system relating to an embodiment; Fig. 2A and Fig. 2B are simplified diagrams illustrating the function of the edit command splitter in one embodiment; and Fig. 3 is a block diagram of the configuration of the machine tool control system relating to another embodiment. DETAILED DESCRIPTION OF THE INVENTIONConfiguration of the machine tool control system 1

[0018] The configuration of the machine tool control system 1 concerning this embodiment will now be described by referring to the drawings. Fig. 1 is a block diagram of the configuration of the machine tool control system 1. The machine tool control system 1 includes a machine tool 10 and a CNC (computer numerical control) machine tool control device 20. 1. Machine tool 10

[0019] The machine tool 10 includes a motor amplifier 11, a main axis motor 12, a feed axis motor 13, and a cutting tool 14. The motor amplifier 11 drives the main axis motor 12 and the feed axis motor 13 based on machining commands output from the CNC machine tool controller 20. The main axis motor 12 rotates the main axis of the cutting tool 14. The feed axis motor 13 drives the table feed axis of the cutting tool 14.

[0020] The cutting tool 14 is, for example, a face mill, a drill, a drilling machine, a thread cutter, etc., but is not limited to these. 2. CNC machine tool control device 20

[0021] The CNC machine tool control device 20 includes a cutting load detector 21, a detection part 22, a detector 23 for a machining command to be divided, a machining command divider 24, and a controller 25. (1) Cutting load detector 21

[0022] The cutting load detector 21 detects the cutting load applied to the cutting tool 14. The cutting load detector 21 detects one or more of the following: the load measurement value, the current value, the voltage value, and the power value for the main axis motor 12; the load measurement value, the current value, the voltage value, and the power value for the feed axis motor 13; the main axis load of the cutting tool 14; and the cutting torque of the cutting tool 14. (2) Determination Part 22

[0023] The determination part 22 determines whether the cutting tool 14 is in the center of the cutting work based on the cutting load detected by the cutting load detector 21. The determination part 22 compares the detected cutting load with a target load, determines that cutting work is taking place when the cutting load is at or above the target load, and determines that cutting work is not taking place when the cutting load is below the target load. The determination part 22 outputs the determination result of whether the cutting tool 14 is in the center of the cutting work to the machining command splitter 24.

[0024] The determination part 22 determines whether an excessive load is being applied to the cutting tool 14 based on the cutting load detected by the cutting load detector 21. The determination part 22 compares the detected cutting load with a predetermined threshold value (> target load), determines that an excessive load is being applied when the cutting load is at or above the threshold value, and determines that no excessive load is being applied when the cutting load is less than the threshold value. The determination part 22 outputs the determination result of whether an excessive load is present to the machining command splitter 24. (3) Detector 23 for a processing command to be divided

[0025] The split machining command detector 23 analyzes an NC (numerical control) program 30 in block steps. The NC program 30 includes a plurality of machining commands (G-codes) for processing to move each axis in the machine tool 10, set coordinates, etc. These machining commands include the target coordinates and the feed rate (F-code) for moving the cutting tool 14 to these target coordinates.

[0026] The split machining command detector 23 stores, from among the plurality of machining commands, a machining command that is subjected to division by the machining command divider 24 (hereinafter referred to as the "split machining command Pa"). Upon detecting a split machining command Pa from the NC program 30, the split machining command detector 23 outputs the split machining command Pa to the machining command divider 24. The split machining command detector 23 outputs the machining commands other than the split machining command Pa (hereinafter referred to as the "normal machining commands Pb") to the controller 25. (4) Processing command divider 24

[0027] The machining command divider 24 detects the machining command Pa to be divided from the machining command detector 23. The machining command divider 24 divides the machining command Pa to be divided at a predetermined time interval to generate a plurality of short-term machining commands (hereinafter referred to as "divided machining commands Pc").

[0028] The machining command divider 24 has an operation command setting part 26, a cutting command setting part 27 and a machining command generation part 28. Fig. 2A and Fig. 2B are simplified diagrams of the functions of the operation command setting part 26 and the operation command setting part 27. (4-1) Operation command setting part 26

[0029] The operation command setting part 26 analyzes the machining command Pa to be divided after detecting the machining command Pa to be divided from the detector 23 for a machining command to be divided. As shown in Fig. 2A, the machining command Pa to be divided includes an operation command Q and a cutting command R. The operation command Q specifies the feed rate (F∇∇) and the main axis speed (S∇∇) of the cutting tool 14. The cutting command R specifies the command coordinates (G1X0.5) to which the cutting tool 14 is moved. The quotient obtained by dividing the distance to the command coordinates (G1X0.5) by the feed rate (F∇∇) is the total time T required for machining based on the machining command Pa to be divided.

[0030] When the detection part 22 detects that the cutting tool 14 is in the middle of machining, the operation command setting part 26 divides the total time T at predetermined time intervals as shown in Fig. 2B. In Fig. 2B, the operation command setting part 26 has divided the total time T into first to fifth division periods T1 to T5 (the time interval between all division periods is the same), but there are no particular restrictions on the length of the division periods T1 to T5 or the number of division periods.

[0031] The operation command setting part 26 first sets the feedrate (F∇∇) and the main axis speed (S∇∇) in the first division period T1. The feedrate (F∇∇) and the main axis speed (S∇∇) specified by the operation command Q of the machining command Pa to be divided can be used in this first division period T1.

[0032] The operation command setting part 26 generates a first divided operation command Q1 indicating the feed rate (F∇∇) and the main axis speed (S∇∇) in the first division period T1, and outputs it to the machining command generating part 28.

[0033] The machining command generation part 28 compares the first split operation command Q1 generated by the operation command setting part 26 with a first split cutting command R1 generated by the operation command setting part 27 (explained below) to generate the first split machining command P1, and outputs it to the controller 25. The controller 25 controls the cutting tool 14 based on the first split machining command P1.

[0034] As in Fig. 2B, the operation command setting part 26 acquires runtime data on the cutting load of the cutting tool 14 controlled based on the first split machining command P1 from the cutting load detector 21. The operation command setting part 26 sets the feed rate (F**) and the main axis speed (S**) in the second split period T2 based on the cutting load during the first split period T1. When the cutting load during the first split period T1 is lower than the desired target load, the operation command setting part 26 may increase the feed rate (F**) in the second split period T2 to be higher than the feed rate (F∇∇) in the first split period T1, and increase the main axis speed (S**) in the second split period T2 to be higher than the main axis speed (S∇∇) in the first split period T1.Such a control enables the cutting load of the cutting tool 14 to be brought closer to the target load.

[0035] Just as with the above-mentioned first split operation command Q1, the operation command setting part 26 generates a second split operation command Q2 specifying the feedrate (F**), the main axis rotational speed (S**), and the (forward) feed direction in the second split period T2, and outputs it to the machining command generation part 28. Thereafter, the operation command setting part 26 sequentially generates a third split operation command Q3, a fourth split operation command Q4, and a fifth split operation command Q5, in the same way as it generates the second split operation command Q2. The feedrates and main axis rotational speeds specified by the various split operation commands may be different from each other.

[0036] When the detection part 22 detects that an excessive load is applied to the cutting tool 14 during the first to fifth split periods T1 to T5, the operation command setting part 26 quickly generates a return operation command indicating a predetermined feed rate, main axis speed, and (reverse) feed direction and outputs it to the machining command generation part 28. The machining command generation part 28 generates a return command that compares the return operation command generated by the operation command setting part 26 with the return cutting command generated by the operation command setting part 27 (explained below) and outputs it to the controller 25.The controller 25 moves the cutting tool 14 in the opposite direction based on the return command, thereby eliminating the excessive load exerted on the cutting tool 14.

[0037] In addition, when the detecting part 22 detects that the cutting tool 14 is not in the center of the cutting work, the operation command setting part 26 directly outputs the operation command Q of the machining command Pa to be divided to the machining command generating part 28 without first dividing it. (4-2) Cutting command setting part 27

[0038] The operation command setting part 27 acquires the first split operation command Q1 from the operation command setting part 26 at the point where the operation command setting part 26 generates the first split operation command Q1. The operation command setting part 27 calculates the product of the first split period T1 and the feed rate (F∇∇) included in the first split operation command Q1. The operation command setting part 27 sets the sum of the addition of the initial coordinates of the cutting tool 14 to the product as the target coordinates (G1X0.1) of the first split machining command P1.

[0039] The operation command setting part 27 generates the first split cutting command R1 indicating the target coordinates (G1X0.1) and outputs it to the machining command generation part 28. As explained above, the machining command generation part 28 generates the first split machining command P1 by comparing the first split operation command Q1 generated by the operation command setting part 26 with the first split cutting command R1 generated by the operation command setting part 27, and outputs it to the controller 25. The controller 25 controls the cutting tool 14 based on the first split machining command P1.

[0040] The operation command setting part 27 acquires the second split operation command Q2 from the operation command setting part 26 at the point where the operation command setting part 26 generates the second split operation command Q2. The operation command setting part 27 calculates the product of the predetermined time interval T2 and the feedrate (F**) included in the second split operation command Q2. The operation command setting part 27 sets the sum of the addition of the target coordinates (G1×0.1) of the first split machining command P1 to the product as the target coordinates (G1×0.2) of the second split machining command P2.

[0041] The operation command setting part 27 generates a second split cutting command R2 specifying the target coordinates (G1X0.2) and outputs it to the machining command generation part 28. Thereafter, the operation command setting part 27 sequentially generates a third split cutting command R3, a fourth split cutting command R4, and a fifth split cutting command R5 in the same way as it generates the second split cutting command R2.

[0042] However, if the detection part 22 detects that an excessive load is applied to the cutting tool 14 during the first to fifth division periods T1 to T5, the operation command setting part 27 quickly generates a return cutting command indicating predetermined target coordinates and outputs it to the machining command generation part 28. As explained above, the machining command generation part 28 generates a return command by comparing the return operation command generated by the operation command setting part 26 with the return cutting command generated by the operation command setting part 27 and outputs it to the controller 25.

[0043] In addition, the operation command setting part 27 directly outputs the target coordinates (G1X0.5) specified by the cutting command R of the machining command Pa to be divided to the machining command generating part 28 when the determination part 22 determines that the cutting tool 14 is not in the center of the cutting work. Features

[0044] (1) In this embodiment, the machining command divider 24 of the CNC machine tool control device 20 includes the operation command setting part 26 and the operation command setting part 27. The operation command setting part 26 sets the feed rate (F**) and the main axis speed (S**) of the second split machining command P2 according to the cutting load during the control according to the first split machining command P1. The operation command setting part 27 sets the sum of the addition of the command coordinates (G1×0.1) of the first split machining command P1 and the product of multiplying the predetermined time interval T2 by the feed rate (F**) of the second split machining command P2 set by the operation command setting part 26 to be the command coordinates (G1×0.2) of the second split machining command P2.

[0045] Consequently, the feed rate and the main axis rotation speed for the next machining period can be set based on the cutting load on the cutting tool 14 in a given machining period, and the target coordinates in the next machining period can be set based on the feed rate thus set. Therefore, control for automatically changing the machining conditions (so-called adaptive control) can be easily implemented without providing a separate adaptive control device by appropriately changing (dividing) the NC program based on the cutting load.

[0046] (2) When the cutting load during the first split period T1 is lower than the desired target load, the operation command setting part 26 increases the feed rate (F**) in the second split period T2 to be higher than the feed rate (F∇∇) in the first split period T1, and increases the main axis speed (S**) in the second split period T2 to be higher than the main axis speed (S∇∇) in the first split period T1.

[0047] This enables the cutting load of the cutting tool 14 to be efficiently approximated to the target load, so that the accuracy of the adaptive control can be improved.

[0048] (3) When the cutting load is at or above a predetermined threshold value larger than the target load during the control according to the first split machining command P1, the operation command setting part 26 sets the feed direction concerning the second split machining command P2 to be in the opposite direction of the first split machining command P1.

[0049] This allows the cutting tool 14 to be returned quickly so that any excessive load applied to the cutting tool 14 can be quickly removed. Other embodiments

[0050] The present invention is not limited to or by the above embodiment, and various modifications or alterations are possible without departing from the scope of the present invention.

[0051] In the above embodiment, the operation command setting part 26 sets the feed rate and the main axis rotation speed in the next split period by precisely using the cutting load in the immediately preceding split period, but this is only an option. The operation command setting part 26 may set the feed rate and the main axis rotation speed in the next split period by using the cutting load in the two or more previous split periods, instead of using only the cutting load in the immediately preceding split period.

[0052] In the above embodiment, the operation command setting part 26 sets the feed rate and the main axis speed by using the cutting load in the immediately preceding split period for all split periods, but this is only an option. The operation command setting part 26 can set the feed rate and the main axis speed by using the cutting load in the immediately preceding split period for exactly one specific split period or periods. In this case, the feed rate (F∇∇) and the main axis speed (S∇∇) specified by the operation command Q of the machining command Pa to be split can be used for the feed rate and the main axis speed in the other split periods.

[0053] In the machine tool control system 1 relating to the above embodiment, it was stated that the CNC machine tool control device 20 includes the cutting load detector 21, the detection part 22, the detector 23 for a machining command to be divided, and the machining command divider 24, but this is only an option. The cutting load detector 21, the detection part 22, the detector 23 for a machining command to be divided, and the machining command divider 24 may be arranged externally of the CNC machine tool control device 20.

[0054] For example, in the machine tool control system 1a, which is Fig.3, an NC program analyzer 40 arranged at a location physically separated from the CNC machine tool control device 20 may be equipped with the cutting load detector 21, the detection part 22, the detector 23 for a machining command to be divided, and the machining command divider 24.

[0055] The machine tool control system 1a includes the machine tool 10, the CNC machine tool control device 20, the NC program analyzer 40, a data acquisition part 50, and a server 60. The data acquisition part 50 is connected to the machine tool 10, the CNC machine tool control device 20, and the server 60 via a network connection. The data acquisition part 50 detects the cutting load applied to the cutting tool 14 by the machine tool 10 and acquires the NC program 30 from the CNC machine tool control device 20. The data acquisition part 50 sends this information to the server 60. For example, a tablet computer can be used as the data acquisition part 50.

[0056] The server 60 is connected to the NC program analyzer 40 and the data acquisition part 50 via the network connection. The server 60 may be connected to the data acquisition part 50 via a portable high-speed connection (LTE) line. The server 60 stores information acquired by the data acquisition part 50 and sends the information acquired by the data acquisition part 50 to the NC program analyzer 40 in response to a request from the NC program analyzer 40.

[0057] In the NC program analyzer 40 described in the above embodiment, the split machining command detector 23 generates normal machining commands Pb, and the machining command divider 24 generates the first to fifth split machining commands P1 to P5. The normal machining commands Pb and the first to fifth split machining commands P1 to P5 generated by the NC program analyzer 40 are input to the controller 25 of the CNC machine tool control device 20 via a storage medium (such as a USB memory) or via a network connection.

[0058] Again, with this machine tool control system 1a, adaptive control can be easily performed by appropriately dividing the NC program based on the cutting load. LIST OF REFERENCE SYMBOLS 1 machine tool control system 10 Machine tool 14 Cutting tool 20 CNC machine tool control device 21 Cutting load detector 22 Determination part 23 Detector for a processing command to be split 24 editing command dividers 25 Control device 26 Operation command setting part 27 Cutting command setting part 28 Editing command generation part Pa editing command to be split Pb normal editing command PC split editing command P1 to P5 first to fifth split processing command Q1 to Q5 first to fifth split operating command R1 to R5 first to fifth split cutting command T1 to T5 first to fifth allocation period

Claims

[1] A machine tool control device (1) configured to control a cutting tool (14) based on an NC program (30), the machine tool control device (1) comprising: a cutting load detector (21) configured to detect a cutting load applied to the cutting tool (14); a machining command divider (24) configured to divide a machining command (Pa) to be divided, which is contained in the NC program (30), into divided machining commands (Pc; P1...P5) in a predetermined time interval (T; T1...T5); and a control device (25) configured to control the cutting tool (14) on the basis of the divided machining commands (Pc;P1...P5), wherein the split machining commands (Pc;P1...P5) comprise a first split machining command (P1) and a second split machining command (P2), each comprising target coordinates (G1X0.1, G1X0.2), a feed rate (F∇∇) and a main axis speed (S∇∇), the machining command divider (24) has an operation command setting part (26) and a cutting command setting part (27), the operation command setting part (26) is configured to set a feed rate (F∇∇) and main axis speed (S∇∇) of the second split machining command (P2) according to a cutting load during the control according to at least the first split machining command (P1); and the operation command setting part (26) is configured to set a sum of the addition of the target coordinates (G1X0.1) of the first split machining command (P1) with a product of multiplying the feed rate (F∇∇) of the second split machining command (P2) set by the operation command setting part (26) by the predetermined time interval (T;T1...T5) as the target coordinates (G1X0.2) of the second split machining command (P2). [2] The machine tool control device (1) according to claim 1, wherein the operation command setting part (26) is configured: to set the feed rate (F∇∇) of the second split machining command (P2) higher than the feed rate (F∇∇) of the first split machining command (P1) when the cutting load during the control according to the first split machining command (P1) is lower than a target load, and setting the feed rate (F∇∇) of the second split machining command (P2) lower than the feed rate (F∇∇) of the first split machining command (P1) when the cutting load is higher than the target load during the control according to the first split machining command. [3] The machine tool control device (1) according to claim 2, wherein the operation command setting part (26) is configured to set a feed direction concerning the second split machining command (P2) to be opposite to a feed direction concerning the first split machining command (P1) when the cutting load during control according to the first split machining command (P1) is at or above a predetermined threshold value which is higher than the target load. [4] A machine tool control method for controlling a cutting tool (14) based on an NC program (30), the machine tool control method comprising: Setting a feed rate (F∇∇) and a main axis speed (S∇ ∇) of a second split machining command (P2) following a first split machining command (P1) according to a cutting load during control according to at least the first split machining command (P1); and Setting a sum of the addition of target coordinates (G1X0.1) of the first split machining command (P1) with a product of multiplying the feed rate (S∇∇) of the second split machining command (P2) with a time interval (T2) of the second split machining command (P2) as target coordinates of the second split machining command (P2). [5] A machine tool control system configured to control a cutting tool (14) based on an NC program (30), the machine tool control system comprising: a cutting load detector (21) configured to detect a cutting load applied to the cutting tool (14); a machining command divider (26) configured to divide a machining command (Pa) to be divided, which is contained in the NC program (30), into divided machining commands (Pc;P1...P5) in a predetermined time interval (T;T1...T5); and a control device (25) configured to control the cutting tool (14) on the basis of the divided machining commands (Pc;P1...P5), wherein the split machining commands (Pc;P1...P5) comprise a first split machining command (P1) and a second split machining command (P2), each comprising target coordinates (G1X0.1, G1X0.2), a feed rate (F∇∇) and a main axis speed (S∇∇), the machining command divider (24) has an operation command setting part (26) and a cutting command setting part (27), the operation command setting part (26) is configured to set the feed rate (F∇∇) and the main axis speed (S∇∇) of the second split machining command (P2) according to a cutting load during the control according to at least the first split machining command (P1); and the operation command setting part (26) is configured to set a sum of the addition of the target coordinates (G1X0.1) of the first split machining command (P1) with a product of multiplying the feed rate (F∇∇) of the second split machining command (P2) set by the operation command setting part (26) by the predetermined time interval (T;T1...T5) as the target coordinates (G1X0.2) of the second split machining command (P2).

Citation Information

Patent Citations

  • Device for the adaptive control of numerically controlled, cutting machine tools

    DE3029962C2

  • Intelligent working system

    JP1992138504A

  • METHOD AND DEVICE FOR INFLUENCED THE OPERATION OF A MACHINE TOOL DEPENDING ON TORQUE

    DE3029962A1

  • JP000H04138504A