Setting energy measuring device, setting energy measuring system and measuring instrument
The setting energy measuring device and system address the challenge of measuring and compensating for GF operations by calculating the influence of active power fluctuations on frequency, ensuring stable frequency stabilization and timely compensation in power transmission and distribution systems.
Patent Information
- Application Number
- DE102019001915
- Authority / Receiving Office
- DE · DE
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2019-01-16
- Filing Date
- 2019-03-19
- Publication Date
- 2024-11-14
- Estimated Expiration
- 2039-03-19
AI Technical Summary
The challenge in power transmission and distribution systems is the inability to accurately measure and compensate for setting energy supplied via Governor Free (GF) operations, which are crucial for stabilizing frequency fluctuations due to short-term demand changes, as these operations are not currently accounted for in the existing compensation schemes.
A setting energy measuring device and system that calculates the setting energy supplied by power sources and consumers using a combination of measuring instruments and a processor to determine the influence of active power fluctuations on frequency, enabling compensation for energy supplied through GF operations.
Enables accurate measurement and compensation for setting energy supplied via GF operations, stabilizing frequency fluctuations and ensuring timely payment to power generation companies, thereby improving the stability and efficiency of power transmission and distribution systems.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
[0001] The present application claims priority from Japanese patent application JP 2018 - 55 184 A filed on March 22, 2018 and Japanese patent application JP 2019 - 5 480 A filed on January 16, 2019.
[0002] The present invention relates to an adjustment energy measuring device, an adjustment energy measuring system and a measuring instrument.
[0003] Frequencies of power transmission and distribution systems are maintained by combining "regulating energy" (defined below) from energy sources based on (1) governor-free operation (GF), (2) load frequency control (LFC), and (3) economic load dispatching control (EDC) depending on fluctuation cycles of energy demand. Due to electricity liberalization and deregulation, it is generally assumed that power generation companies supply regulated energy to power transmission and distribution companies through public offering or on the market.
[0004] Energy demand in offices, factories, and general households can fluctuate at any given moment. If energy demand exceeds energy supply, the frequency of the power transmission and distribution system drops below a reference value (e.g., 50 Hz or 60 Hz). Conversely, if energy supply exceeds energy demand, the frequency increases above the reference value. A "regulating energy" balances such fluctuations in supply and demand. When a regulated energy supply is ideally supplied, the frequency matches the reference value.
[0005] Load Frequency Control (LFC) is generally used for fluctuations lasting more than a few minutes but less than 30 minutes. LFC can supply adjustment energy depending on frequency fluctuations in the power transmission and distribution system. Thus, if the frequency of the power transmission and distribution system does not reach the reference value, the general power transmission and distribution company controlling the system receives positive adjustment energy from the power generation companies. On the other hand, if the frequency of the power transmission and distribution system reaches or exceeds the reference value, the general power transmission and distribution company receives negative adjustment energy from the power generation companies.With the LFC, the power generation company supplies an adjustment energy by adjusting an output of the energy source in response to instructions received from the general power transmission and distribution company.
[0006] To ensure a stable energy supply with LFC, power generation companies must supply the regulated energy exactly according to the instructions of the general transmission and distribution company. For this reason, electricity liberalization and deregulation introduced a scheme in which the transmission and distribution company pays the power generation company for the regulated energy actually supplied (regulating the supply of the regulated energy).
[0007] However, if the general power transmission and distribution company instructs the power generation company to supply a highly fluctuating set power within a very short period of time (e.g., a few seconds), the power generation company may not be able to respond to the instruction in a timely manner. In such a case, the power generation company may be penalized. Furthermore, the frequency varies for each location in the power transmission and distribution system. Although it is desirable to provide detailed instructions for each location in the power transmission and distribution system, such an approach is impractical for fluctuations that occur within a short period of time (e.g., 3 to 5 seconds).
[0008] For this reason, adjustments to short-term demand fluctuations are generally made through control-free (CFC) operations, which are autonomously performed by energy sources (including turbines and generators) owned by power generation companies. CFC refers to an operation for controlling the amount of fuel supplied to the turbine to maintain a generator's rotation speed despite fluctuations in rotation speed due to load fluctuations.
[0009] A power source that uses a turbine device as the driving force stores inertial energy during its operation. This inertial energy is automatically transferred to and from the load according to load fluctuations, contributing to stable operation by buffering against load fluctuations.
[0010] Japanese patent JP 5 886 400 B1 discloses a system and method for price formation in an electricity market.
[0011] A GF operation (and / or supply of adjustment energy by inertia) is performed autonomously by each of the energy sources regardless of instructions from the power transmission and distribution system, and it is not measured by the power transmission and distribution system.
[0012] Thus, while the tuning energy supplied via the LFC requires the payment of compensation (regulation), the tuning energy supplied via a GF operation or inertia does not. Therefore, there is a need to measure the tuning energy actually supplied by a tuning energy supply source and to include the tuning energy supplied via a GF operation.
[0013] DE 12 47 452 A discloses a grid characteristic controller for combined frequency-power control in interconnected grids, comprising two or more separate manipulated variable outputs with separately adjustable manipulated variable functions for the control power plants of different control capabilities, and an analog multiple controller in which the proportional and integral components of the individual control signals can be adjusted independently of one another, both within the same control channel and relative to the components in other control channels. The multiple controller includes an integral element with multiple outputs for the different integral components. In particular, this document shows a calculation of a first adjustment energy coefficient, which indicates the degree of influence that a fluctuation in active power exerts on a fluctuation in frequency.
[0014] The invention relates to a setting energy measuring device according to claim 1 or claim 7, a setting energy measuring system according to claim 10, and a measuring instrument according to claim 12. The dependent claims relate to further advantageous aspects of the invention. Fig. 1 is a diagram illustrating an overall structure of an adjustment energy measurement system according to one or more embodiments. Fig. 2 is a first diagram detailing the structure of the adjustment energy measurement system according to one or more embodiments. Fig. 3 is a block diagram illustrating a hardware configuration of an adjustment energy measuring device according to one or more embodiments. Fig. 4 is a block diagram illustrating a functional composition of the adjustment energy measuring device according to one or more embodiments. Fig. 5 is a flowchart illustrating processing by the adjustment energy measuring device according to one or more embodiments. Fig. 6 is a diagram for explaining a function of the adjustment energy measuring device according to one or more embodiments. Fig. 7 is a second diagram detailing the structure of the adjustment energy measurement system according to one or more embodiments. Fig. 8 is a third diagram detailing the structure of the adjustment energy measurement system according to one or more embodiments. Fig. 9 is a diagram for explaining a function of an adjustment energy measuring device according to variations of one or more embodiments. Fig. 10 is a diagram illustrating in detail a structure of an adjustment energy measurement system according to one or more embodiments. Fig. 11 is a block diagram illustrating a hardware configuration of a measuring instrument according to one or more embodiments. Fig. 12 is a block diagram illustrating a functional composition of the measuring instrument according to one or more embodiments. Fig. 13 is a flowchart illustrating processing by the measuring instrument according to one or more embodiments. Fig. 14 is a block diagram illustrating a functional composition of the adjustment energy measuring device according to one or more embodiments. Fig. 15 is a flowchart illustrating processing by the adjustment energy measuring device according to one or more embodiments. Fig. 16 is a diagram illustrating examples of weighting coefficients according to one or more embodiments. Fig. 17 is a diagram illustrating in detail a structure of an adjustment energy measuring system according to one or more embodiments. Fig. 18 is a diagram illustrating examples of weighting coefficients according to variations of one or more embodiments. Fig. 19 is a block diagram illustrating a functional composition of the adjustment energy measuring device according to one or more embodiments.
[0015] Embodiments of the present invention will now be described by way of example with reference to the drawings. Those skilled in the art will recognize that many alternative embodiments can be achieved using the teachings of the present invention, and that the present invention is not limited to the embodiments presented herein for illustrative purposes.
[0016] First, a setting energy measuring device of one or more embodiments and a setting energy measuring system with the device are described with reference to Fig. 1-8 described.
[0017] Fig. 1 is a diagram illustrating the overall structure of the adjustment energy measurement system according to one or more embodiments.
[0018] Fig. 1 shows: a power generation company G that performs power generation; a general power transmission and distribution company ("transmission and distribution company") T that performs transmission and distribution of the generated power; and a consumer C that consumes the transmitted and distributed power. In one or more embodiments, the power generation company G and the consumer C are connected to an electricity supply network ("target power supply network N1") managed by the transmission and distribution company T. The energy generated by the power generation company G is supplied to the consumer C via the target power supply network N1.The target electricity supply network N1 is also connected to an electricity supply network (“non-targeted electricity supply network N2”) managed by another general energy transmission and distribution company (“other transmission and distribution company”).
[0019] As in Fig. 1, a setting energy measuring system 1 of one or more embodiments comprises a setting energy measuring device 10 and measuring instruments 50.
[0020] The adjustment energy measuring device 10 is managed (operated) by the transmission and distribution company T. The adjustment energy measuring device 10 is capable of measuring the "adjustment energy" actually supplied by the power generation company G in order to maintain or stabilize the energy demand and supply balance in the target power grid N1. The specific functional composition of the adjustment energy measuring device 10 and the processing performed by the adjustment energy measuring device 10 are described below.
[0021] The measuring instrument 50 is installed at a connection point between the target power grid N1 and each of the adjustment power supply sources managed by the power generation company G or the like, and is capable of measuring active power exchanged at the connection point and a frequency at the connection point. The "adjustment power supply sources" refer to devices / systems capable of supplying the adjustment power that adjusts demand and supply balance to the power grid (target power grid N1). Specifically, the adjustment power supply sources include: a power source managed by the power generation company G; a stabilizing device; a load managed by the consumer C; and a power grid (non-target power grid N2) not managed by the transmission and distribution company T.
[0022] The measuring instrument 50 of one or more embodiments may be a general power meter with a frequency measurement function.
[0023] Fig. 2 is a first diagram detailing the structure of the adjustment energy measurement system according to one or more embodiments.
[0024] As in Fig. As shown in Figure 2, the energy production company G manages a variety of energy sources 21, 22, 23, etc.
[0025] Hereinafter, a power source 21 is explained as an example of the power sources 21, 22, 23, etc. managed by the power generation company G. Other power sources 22, 23, etc. have the same structures and functions as the power source 21.
[0026] The energy source 21 includes a controller 210, a turbine device 211 (e.g., a gas turbine and a steam turbine) and a generator 212.
[0027] The controller 210 controls the operation of the turbine device 211 and the generator 212. For example, the controller 210 continuously monitors the rotation speed (corresponding to the output frequency) of the generator 212 and automatically adjusts the amount of fuel or steam supplied to the turbine device 211 to maintain the rotation speed constant. This automatic adjustment is called governor-free (GF) operation. According to this operation, when the load (power demand) increases within a short period of time and the rotation speed of the generator 212 decreases, the controller 210 increases the amount of fuel supplied to the turbine device 211 to restore the rotation speed to its original state.The output increment required for generator 212 to maintain its original rotation speed corresponds to the "adjustment energy" supplied by power source 21 to match the increase in load (energy demand). For variations in energy demand within a short period of time (approximately 3-5 seconds), the adjustment energy is supplied sequentially by power source 21 through a GF operation.
[0028] In the GF operation executed by the controller 210, the output (adjustment energy ΔP) that the power source 21 generates corresponding to a variation amount (frequency shift Δf) of the rotation speed of the generator 212 is defined as the following formula (1) using a permanent speed fluctuation (droop) δ. [Formula 1] ΔP=1δPnΔffn
[0029] In formula (1), "Δf" indicates a frequency shift Δf[Hz], which is a deviation of an output frequency of the power source 21 with respect to a reference value (e.g., 50Hz), "fn" indicates a reference value (e.g., 50Hz) of the target power grid N1, and "Pn" indicates a rated output [W] of the power source 21. This relational formula is ideal and indicates a static balance state of the frequency and output, but errors occur due to a time delay of the output of the power source 21. The time delay may be caused by the inertia of the turbine device 211 and / or the control delay of the controller 210.
[0030] The energy source 21 is connected to the target power grid N1. The measuring instrument 50 is installed at the connection point between the energy source 21 and the target power grid N1.
[0031] The measuring instrument 50, installed at the connection point between the power source 21 and the target power grid N1, obtains an active power measurement value P1 of the active power output from the power source 21 to the target power grid N1 and a frequency measurement value f1. The measuring instrument 50 transmits the active power measurement value P1 and the frequency measurement value f1 to the adjustment energy measurement device 10 managed by the transmission and management company T through a predetermined communication network (e.g., Internet connection).
[0032] Similarly, the measuring instruments 50 installed at connection points between other energy sources 22, 23, etc., and the target power grid N1 receive active power measurement values P2, P3, etc. output from the energy sources 22, 23, etc. to the target power grid N1. The measuring instruments 50 also receive frequency measurement values f2, f3, etc. Then, the measuring instruments 50 transmit the obtained active power measurement values and frequency measurement values to the adjustment energy measuring device 10. (Hardware configuration of a setting energy measuring device)
[0033] Fig. 3 is a block diagram illustrating a hardware configuration of an adjustment energy measuring device according to one or more embodiments.
[0034] As in Fig. 3, the adjustment energy measuring device 10 comprises a processor (CPU) 100, a memory 101, a communication interface 102 and a storage 103.
[0035] The memory 101 is a main memory in which instructions and data for the CPU 100 are contained to operate according to programs.
[0036] The communication interface 102 is an interface device for exchanging information with an external device (in particular, the measuring instrument 50). In one or more embodiments, the communication devices and methods implemented by the communication interface are not particularly limited. For example, the communication interface 102 of one or more embodiments is a wired connection interface for implementing wired communication, or a wireless communication module for implementing wireless communication.
[0037] The storage 103 is an auxiliary storage device. The storage 103 of one or more embodiments is a hard disk drive (HDD), a solid state drive (SSD), or the like.
[0038] Fig. 4 is a block diagram illustrating a functional composition of the adjustment energy measuring device according to one or more embodiments.
[0039] As in Fig. 4, the CPU 100 of the adjustment energy measuring device 10 is operated according to the programs and functions as a measured value acquisition unit 1000, an adjustment energy coefficient calculation unit 1001, an adjustment energy calculation unit 1002, an integrated value calculation unit 1003, and a regulation processing unit 1004.
[0040] The measured value acquisition unit 1000 acquires the active power measured values P1, P2, etc. and the frequency measured values f1, f2, etc., which are stored in Fig. 2, via the measuring instruments 50 installed at the connection points.
[0041] The adjustment energy coefficient calculation unit 1001 calculates first adjustment energy coefficients k p1 ,k p2, etc. based on the active power measured values P1, P2, etc. and the frequency measured values f1, f2, etc. acquired by the measured value acquisition unit 1000. The first setting energy coefficients k p1 , k p2 , etc. are values indicating a degree of influence (contribution) that a fluctuation in active power (exchanged at the connection points between the energy sources 21, 22, etc. and the target power grid N1) has on a fluctuation in frequency.
[0042] The setting energy calculation unit 1002 calculates setting energy values ΔP GF1 , ΔP GF2 , etc., supplied from the energy sources 21, 22, etc. to the target power grid N1, based on the first setting energy coefficients k p1 , k p2 , etc. calculated by the setting energy coefficient calculation unit 1001 and frequency fluctuation measurement values Δf1, Δf2, etc.
[0043] The integrated value calculation unit 1003 calculates integrated setting energy values S1, S2, etc. by calculating each of the setting energy values ΔPGF1, ΔP GF2 , etc., which are successively calculated by the setting energy calculation unit 1002, are integrated over a predetermined unit time period (e.g., 24 hours).
[0044] The regulation processing unit 1004 calculates compensation for the integrated setting energy values S1, S2, etc. supplied by the energy sources 21, 22, etc. by multiplying the calculated integrated setting energy values S1, S2, etc. by predefined contract unit prices γ1, γ2, etc., respectively.
[0045] The setting energy calculation unit 1002 is an example of a setting energy measuring unit.
[0046] Fig. 5 is a flowchart illustrating processing by the adjustment energy measuring device according to one or more embodiments.
[0047] Fig. 6 is a diagram for explaining the function of the adjustment energy measuring device according to one or more embodiments.
[0048] The specific processing performed by the adjustment energy measuring device 10 according to one or more embodiments will be described with reference to Fig. 5 and Fig. 6 is described in detail. In the following description, the processing by the energy source 21 is explained as an example of the processing by the energy sources 21, 22, etc. managed by the power generation company G.
[0049] The Fig. The processing flow shown in Fig. 5 is continuously executed by the adjustment energy measuring device 10 (CPU 100) having the functions described above.
[0050] First, the measurement value acquisition unit 1000 acquires the active power measurement values P1 and the frequency measurement values f1 at the connection point between the power source 21 and the target power grid N1 via the measuring instrument 50 (step S00). The measuring instrument 50 samples the active power exchanged at the connection point and the frequency at the connection point with a predetermined sampling period (e.g., a period of several hundred milliseconds). The measurement value acquisition unit 1000 sequentially acquires, as time-series data, the active power measurement values P1 and the frequency measurement values f1 acquired by the measuring instrument 50 with the sampling period. In the following description, the active power measurement value P1 and the frequency measurement value f1 acquired at time "t" are represented as active power measurement value P1(t) and frequency measurement value f1(t), respectively.
[0051] Then, the adjustment energy coefficient calculation unit 1001 calculates the first adjustment energy coefficient k P1 based on (i) a plurality of active power measurement values P1(t), each acquired at each time point (each time point "t") in the past within a predetermined time period (e.g., 30 minutes) from the present time, and (ii) a plurality of frequency measurement values f1(t), each acquired at each time point "t" in the past within the predetermined time period from the present time. Specifically, the adjustment energy coefficient calculation unit 1001 calculates the following formula (2) to obtain the first adjustment energy coefficient k p1 to obtain. [Formula 2] kp1=∫ΔP1(t)⋅Δf1(t)dt∫Δf1(t)2dt
[0052] In formula (2), "ΔP1(t)" indicates an active power fluctuation measurement value, and "Δf1(t)" indicates a frequency fluctuation measurement value. The active power fluctuation measurement value ΔP1(t) and the frequency fluctuation measurement value Δf1(t) are obtained by calculating formulas (3) and (4) using the active power measurement values P1(t) and the frequency measurement values f1(t), respectively. [Formula 3] ΔP1(t)=P1(t)−E[P1] [Formula 4] Δf1(t)=f1(t)−E[f1]
[0053] In formula (3), "E[P1]" indicates an average value of the active power measured values P1(t) acquired at each time point "t" in the past within a predetermined period (e.g., 30 minutes) from the present time. Thus, the adjustment energy coefficient calculation unit 1001 obtains, as the active power fluctuation measured value ΔP1(t), a deviation between the average value E[P1] of the active power measured values P1(t) acquired within the predetermined period and a newly acquired active power measured value P1(t).
[0054] In formula (4), "E[f1]" indicates an average value of the frequency measurement values f1(t) acquired at each time point "t" in the past within a predetermined period (e.g., 30 minutes) from the present time. Thus, the adjustment energy coefficient calculation unit 1001 obtains, as the frequency fluctuation measurement value Δf1(t), a deviation between the average value E[f1] of the frequency measurement values f1(t) acquired within the predetermined period and a newly acquired frequency measurement value f1(t).
[0055] The first setting energy coefficient k calculated by formula (2) p1 is made with reference to Fig. 6 described.
[0056] The Fig. The graph shown in Figure 6 is a scatter diagram in which combinations of the active power fluctuation measurement value ΔP1(t) and the frequency fluctuation measurement value Δf1(t), each acquired at the same time within the predetermined time period, are plotted.
[0057] According to the GF operation, the relationship between the frequency fluctuation and the active power fluctuation (adjustment power) should ideally conform to formula (1). However, errors occur due to a time delay in the output from the power source 21 and the like, as described above.
[0058] Meanwhile, a slope of a regression line W of the graphical representation (actual values), namely the first adjustment energy coefficient k obtained by the formula (2) p1[W / Hz] is a quantity indicating the extent to which the frequency fluctuation at the connection point is influenced by the fluctuation of the active power actually generated by the power source 21 at the connection point between the power source 21 and the target power grid N1. In other words, the adjustment power actually supplied by the power source 21 to the target power grid N1 can be acquired by applying the frequency fluctuation actually occurring at the connection point to the regression line W obtained based on the actual values at the connection points.
[0059] With reference to Fig. 5, the setting energy calculation unit 1002 then calculates a setting energy value ΔP GF1(t) which the energy source 21 actually supplies to the target power grid N1, based on the first setting energy coefficient k calculated by the setting energy coefficient calculation unit 1001 p1 and the frequency fluctuation measurement value Δf1(t) (step S02). Specifically, the adjustment energy calculation unit 1002 calculates the formula (5) to obtain the adjustment energy value ΔP GF1 (t) to obtain. [Formula 5] ΔPGF1(t)=kp1|Δf1(t)|
[0060] In Fig. 5 shows “ΔP GF1 (t)” indicates the setting energy value which the energy source 21 supplies to the target power grid N1, and which is an estimated value of the active power fluctuation obtained by substituting the frequency fluctuation measurement value Δf1(t) for the Fig. 6 is obtained. If the frequency exceeds the reference value, then the reduction (change in the negative direction) of the active power, which contributes to the change in the frequency in the negative direction, is also considered as the adjustment energy. For this reason, the first adjustment energy coefficient k p1 multiplied by an absolute value of Δf1(t) in formula (5).
[0061] Then, the integrated value calculation unit 1003 calculates the integrated setting energy value S1 for a predetermined unit time period (e.g., 24 hours) by calculating the setting energy values ΔP GF1 (t). The setting energy values ΔP GF1 (t) are sequentially calculated using formula (5) by the adjustment energy calculation unit 1002 over the predetermined unit time period (step S03). Specifically, the integrated value calculation unit 1003 calculates formula (6). [Formula 6] S1=∫initialtterminalΔPGF1(t)dt
[0062] In the formula (6), “S1” shows the integrated value (integrated setting energy value) of the setting energy values ΔP GF1 (t) generated by the energy source 21 within a period of time from the time t Anfang until time t Ende In one or more embodiments, t Anfang 0:00 on a given working day of Energy Source 21, and t Ende is 24:00 (0:00 the next day) on the working day. In this case, the integrated setting energy value S1 is the total amount of setting energy supplied by energy source 21 during the working day.
[0063] Then, the adjustment processing unit 1004 calculates the compensation for the integrated adjustment energy value S1 calculated by the integrated value calculation unit 1003 (step S04). Specifically, the adjustment processing unit 1004 calculates Formula (7). [Formula 7] Y1=γ1kS1
[0064] In formula (7), "κ" indicates a coefficient for converting the integrated set energy value S1, calculated in [J] (joule), into [kWh] (kilowatt-hour), and "γ1" indicates the contract unit price according to the agreement between the transmission and distribution company T and the power generation company G, which is an amount of compensation per unit set energy. The contract unit price γ1 refers to a contract unit price with respect to the set energy supplied by the energy source 21. "Y1" indicates a total compensation for the set energy supplied by the energy source 21 of the transmission and distribution company T during the working day (from 0:00 to 24:00).
[0065] The setting energy measuring device 10 also performs the same above process (steps S00-S04) with respect to other energy sources 22, 23, etc. owned by the power generation company G. The contract unit prices γ1, γ2, γ3, etc. corresponding to the energy sources 21, 22, 23, etc., may be determined differently from each other depending on the standards / specifications of the energy sources 21, 22, 23, etc.
[0066] The adjustment energy measuring device 10 can notify an information processing device of each of the power generation companies G of the compensation for the adjustment energy supplied by the power generation companies G. The transmission and distribution company T pays the compensation for the adjustment energy supplied within the predetermined period of time according to a contract between the transmission and distribution company T and each of the power generation companies G.
[0067] According to one or more embodiments, the adjustment energy measuring device 10 with the above-described structure and functions directly monitors the active power fluctuation and frequency fluctuation occurring at the connection points between the energy sources 21, 22, etc., managed by the power generation companies G and the target power grid N1. The adjustment energy measuring device 10 also calculates, as the first adjustment energy coefficient k p1, the degree of influence that the active power fluctuation occurring at the connection point exerts on the frequency fluctuation. Consequently, the magnitude of an active power fluctuation (i.e., the tuning energy supplied by the power sources 21, 22, etc., which causes the frequency fluctuation actually occurring at the connection point) can be estimated. The estimated tuning energy includes the tuning energy supplied by the GF operation performed autonomously by the power sources (power sources 21, 22, etc.) in turbine systems and / or inertia.
[0068] As described above, the adjustment energy measuring device 10 of one or more embodiments and the adjustment energy measuring system 1 including the device 10 can measure the adjustment energy actually supplied by the adjustment energy supply source (energy sources 21, 22, etc.).
[0069] Although the adjustment energy measuring device 10 of the above-described embodiments is managed by the transmission and distribution company T, the device 10 may be managed by other companies.
[0070] Fig. 7 is a second diagram detailing the structure of the adjustment energy measurement system according to one or more embodiments.
[0071] With reference to Fig. 7 describes a measurement of the setting energy supplied by the consumer C to the target power supply network N1.
[0072] As in Fig. 7, the consumer C manages a plurality of loads 31, 32, 33, etc. In one or more embodiments, the consumer C is a factory and the loads 31, 32, 33, etc. are motors or the like.
[0073] The loads 31, 32, etc. consume the active power supplied by the target power grid N1 to drive equipment owned by the consumer C.
[0074] The measuring instrument 50 is installed at a connection point between the target power grid N1 and each of the loads 31, 32, etc., and is capable of measuring active power measurement values P1, P2, etc. of the active power exchanged at the connection point and frequency measurement values f1, f2, etc. at the connection point. The active power measurement values P1, P2, etc. and the frequency measurement values f1, f2, etc. obtained by the measuring instrument 50 are sequentially transmitted to the adjustment energy measuring device 10 via a predetermined communication network.
[0075] The setting energy measuring device 10 carries out the Fig. 5 (steps S00-S04) based on the active power measured values P1, P2, etc. and the frequency measured values f1, f2, etc., which are determined by the Fig. 7. Then, the adjustment energy measuring device 10 calculates the adjustment energy supplied by the loads 31, 32, etc. to the target power grid N1, and the compensation amount therefor.
[0076] Thus, the adjustment energy supplied by load C to the target power grid N1 is calculated according to the operation of loads 31, 32, etc. In this case, the adjustment energy supplied by load C unintentionally is also measured. By obtaining the active power measurement values P1, P2, etc. exchanged between the loads 31, 32, etc. managed by load C and the target power grid N1, and the frequency measurement values f1, f2, etc., and performing a calculation in steps S01-S04, the compensation for the supplied adjustment energy can be paid not only by the power generation company G but also by the consumer driving the loads. (Measurement of adjusting energy supplied by another transmission and distribution company)
[0077] Fig. 8 is a third diagram detailing the structure of the adjustment energy measurement system according to one or more embodiments.
[0078] With reference to Fig. Figure 8 describes a measurement of the setting energy supplied by another transmission and distribution company to the target power supply network N1.
[0079] As in Fig. As shown in Figure 8, the electricity supply network managed by another transmission and distribution company (non-targeted electricity supply network N2) is connected to the target electricity supply network N1 at one or more points and forms a transmission and distribution network.
[0080] The measuring instrument 50 is installed at the connection point between the target power grid N1 and each of the loads 31, 32, etc., and is capable of measuring active power measurement values P1, P2, etc. of the active power exchanged at the connection point and frequency measurement values f1, f2, etc. at the connection point. The active power measurement values P1, P2, etc. and the frequency measurement values f1, f2, etc. obtained by the measuring instrument 50 are sequentially transmitted to the adjustment energy measuring device 10 via a predetermined communication network.
[0081] The setting energy measuring device 10 carries out the Fig. 5 (steps S00-S04) based on the active power measurement values P1, P2, etc. and the frequency measurement values f1, f2, etc. determined by the Fig. 8. Then, the adjustment energy measuring device 10 calculates the adjustment energy supplied from the non-target power grid N2 to the target power grid N1 and a compensation amount therefor.
[0082] Thus, the adjustment energy supplied from the transmission and distribution company managing the non-targeted power grid N2 to the target power grid N1 is measured. By obtaining the active power measurement values P1, P2, etc. exchanged between an overall power grid (non-targeted power grid N2) managed by another transmission and distribution company and the target power grid N1, and the frequency measurement values f1, f2, etc., and performing the calculations in steps S01-S04, the compensation for the supplied adjustment energy can be paid not only to the power generation company G and the consumers C, but also to the other transmission and distribution company.
[0083] The adjustment energy measuring device 10 and the adjustment energy measuring system 1 according to one or more embodiments have been described above, but details thereof are not limited to the above-described embodiments, and various design changes may be added without departing from the gist of the present invention.
[0084] With reference to Fig. 9, variations of one or more embodiments are described.
[0085] Fig. 9 is a diagram for explaining a function of an adjustment energy measuring device according to variations of one or more embodiments.
[0086] The adjustment energy coefficient calculation unit 1001 according to the variations calculates a second adjustment energy coefficient k I1 based on the active power measurement value P1(t) and the frequency measurement value f1(t) in the processing of step S01 in Fig. 5. Specifically, the adjustment energy coefficient calculation unit 1001 of the variations calculates the formula (8) to calculate the second adjustment energy coefficient k I1 to obtain. [Formula 8] kI1=∫(ΔP1(t)⋅∫Δf1(t)dt)dt∫(∫Δf1(t)dt)2dt
[0087] In formula (8), “∫Δf1(t)dt” indicates an integrated frequency fluctuation value of the frequency fluctuation measured value Δf1(t). The second adjustment energy coefficient k obtained by formula (8) I1 indicates a degree of influence that the active power fluctuation occurring at the connection point (each of positions where the measuring instruments 50 are installed) exerts on “the integrated value of the frequency fluctuation” at the connection point.
[0088] The setting energy calculation unit 1002 according to the variations calculates a setting energy value ΔP GFI1(t) based on the energy coefficient calculated by the setting energy coefficient calculation unit 1001 in the processing of step S02 in Fig. 5 calculated second setting energy coefficient k I1 Specifically, the setting energy calculation unit 1002 calculates the formula (9) to obtain the setting energy value ΔP GFI1 (t) to obtain. [Formula 9] ΔPGFI1(t)=kI1|Δf1(t)dt|
[0089] The adjustment energy measuring device 10 of the variations calculates the adjustment energy based on the formula (8) and the formula (9), and thus obtains effects described below.
[0090] For example, it is assumed that the frequency shift Δf fluctuates stepwise with the amplitude ‘a’ and the time duration ‘T’ at a certain connection point (see Fig. 9). It is also assumed that the active power fluctuation ΔP at the specific connection point increases with the amplitude ‘b’ and the time period ‘T’ in response to the frequency shift Δf (see Fig. 9) changes. Furthermore, the Fig. 9 shows the active power fluctuation ΔP on an integral control (I-control) with respect to the frequency shift Δf.
[0091] The calculation result of the first setting energy coefficient k p1 (Formula (2)) with reference to the Fig. 9, as shown in formula (10), becomes zero (k p1 =0). [Formula 10] kp1=a⋅(−b+b)⋅T2−a⋅(b−b)⋅T2∫0T2a2dt+∫T2T(−a)2dt=0
[0092] Meanwhile, the calculation result of the second adjustment energy coefficient k I1 (Formula (8)) with reference to the Fig. 9, as shown in formula (11), to a finite value (k I1 =b / a). [Formula 11] kI1=∫0T24aT(t−T4)⋅4bT(t−T4)dt+∫T2T4aT(3T4−t)⋅4bT(3T4−t)dt∫0T2(4aT(t−T4))2dt+∫T2T(4aT(3T4−t))2dt=ba
[0093] Thus, the method for measuring the adjustment energy based on the first adjustment energy coefficient k p1 (Formula (2)) cannot accurately measure the adjustment energy generated by the adjustment energy supply source (e.g., the energy source 21) based on the integrated control with respect to the frequency shift Δf. However, it is also possible to measure the adjustment energy using the second adjustment energy coefficient k I1 accurate measurement of the tuning energy generated by the tuning energy supply source based on the integrated control with respect to the frequency shift Δf.
[0094] The measuring instrument of one or more embodiments and the adjustment energy measuring system comprising the measuring instrument are described with reference to Fig. 10-13 described.
[0095] Fig. 10 is a diagram illustrating in detail a structure of an adjustment energy measurement system according to one or more embodiments.
[0096] As in the embodiments described above, the measuring instrument 50 of one or more embodiments is installed at the connection point between the adjustment power supply source (e.g., the power source 21) and the target power grid N1. In this regard, however, the measuring instrument 50 of one or more embodiments performs calculation processing on the obtained actual values (active power fluctuation measurement values ΔP1, ΔP2, etc. and frequency fluctuation measurement values Δf1, Δf2, etc.) and outputs the adjustment power values ΔPGF1 , ΔP GF2 , etc. as the calculation results to the transmission and distribution company T.
[0097] The adjustment energy measuring device 10 of one or more embodiments may only include the integrated value calculation unit 1003 and the regulation processing unit 1004 in Fig. 4. The setting energy measuring device 10 of one or more embodiments integrates the setting energy values ΔP GF1 , ΔP GF2 , etc. received from the measuring instrument 50, and performs the regulation processing based on the integrated result.
[0098] Fig. 11 is a block diagram illustrating a hardware configuration of a measuring instrument according to one or more embodiments.
[0099] As in Fig. As shown in Figure 11, the measuring instrument 50 comprises a processor (CPU) 500, a memory 501, a communication interface 502, a storage 503 and a sensor 504.
[0100] The CPU 500 is a processor that controls the overall operation of the measuring instrument 50.
[0101] The memory 501 is a main memory in which instructions and data for the CPU 500 are contained to operate according to programs.
[0102] The communication interface 502 is an interface device for exchanging information with an external device (in particular, the adjustment energy measuring device 10). In one or more embodiments, the communication devices and methods implemented by the communication interface 502 are not particularly limited.
[0103] The storage (recording medium) 503 is an auxiliary storage device included in the measuring instrument 50 and may be a hard disk drive (HDD), a solid state drive (SSD), or the like.
[0104] The sensor 504 is a measuring element that measures the active power and the frequency at the connection point between the setting power supply source (e.g., the power source 21) and the target power supply network N1, as shown in Fig. 10 shown, measures.
[0105] Fig. 12 is a block diagram illustrating a functional composition of the measuring instrument according to one or more embodiments.
[0106] As in Fig. 12, the CPU 500 of the measuring instrument 50 is operated according to programs to function as a measured value acquisition unit 5000, a setting energy coefficient calculation unit 5001, a setting energy calculation unit 5002, a setting energy transfer processing unit 5003, and a recording processing unit 5004.
[0107] Since the measured value acquisition unit 5000, the adjustment energy coefficient calculation unit 5001 and the adjustment energy calculation unit 5002 have the same functions as the measured value acquisition unit 1000, the adjustment energy coefficient calculation unit 1001 and the adjustment energy calculation unit 1002, a detailed description thereof is omitted.
[0108] The setting energy transmission processing unit 5003 transmits the setting energy values ΔP GF1 , ΔP GF2, etc., calculated by the setting energy calculation unit 1002, successively to the setting energy measuring device 10.
[0109] The recording processing unit 5004 records, in addition to the active power measurement values P1, P2, etc. and the frequency measurement values f1, f2, etc., the first adjustment energy coefficients k calculated by the adjustment energy coefficient calculation unit 5001 p1 , k p2 , etc. and the setting energy values ΔP calculated by the setting energy calculation unit 5002 GF1 , ΔP GF2 , etc. in the memory 503 to collect them there.
[0110] Fig. 13 is a flowchart illustrating processing by the measuring instrument according to one or more embodiments.
[0111] The Fig. The processing shown in Figure 13 is continuously executed by the measuring instrument 50 (CPU 500) having the functions described above. The energy source 21 will be explained below as an example of the energy sources 21, 22, 23, etc., managed by the power generation company.
[0112] Since the processing of steps S10-S12 in Fig. 13 the same as the processing (steps S00-S02 in Fig. 5) by the setting energy measuring device 10 of the above-described embodiments, a detailed description thereof will be omitted.
[0113] After the processing of step S12, the setting energy transmission processing unit 5003 transmits the setting energy value ΔP calculated in step S12 GF1 (t) to the setting energy measuring device 10 (step S13).
[0114] The recording processing unit 5004 records the active power measurement values P1(t) and the frequency measurement values f1(t) acquired in step S10, the first adjustment energy coefficient k calculated in step S11 p1 and the setting energy value ΔP calculated in step S12 FG1 (t) in the storage 503 (step S14).
[0115] As described above, the measuring instrument 50 of one or more embodiments has the function of successively calculating the setting energy values ΔP GF1 , ΔP GF2 , etc., and the function of sequentially recording these setting energy values to exit the history of the same. By maintaining the record of the calculated setting energy values, the setting energy values can be measured even if a problem occurs in communication with the setting energy measuring device 10.
[0116] Although the measuring instrument 50 calculates and transmits the adjustment energy values, and the adjustment energy measuring device 10 integrates the adjustment energy values and performs the regulation processing (calculation of the compensation amount for the supply of the adjustment energy) in the above-described embodiments, the present invention is not limited to these embodiments.
[0117] For example, in one or more embodiments, the measuring instrument 50 may perform all of the processing (steps S00-S04 in Fig. 5) including regulatory processing.
[0118] In the following, the adjustment energy measuring device of one or more embodiments and the adjustment energy measuring system comprising the device are described with reference to Fig. 14-17 described.
[0119] Fig. 14 is a block diagram illustrating a functional composition of the adjustment energy measuring device according to one or more embodiments.
[0120] As in Fig. As shown in Figure 14, the CPU 100 of the adjustment energy measuring device 10 operates according to programs to function as a measured value acquisition unit 1000, an adjustment energy calculation unit 1002, an integrated value calculation unit 1003, a regulation processing unit 1004, and a weighting coefficient changing unit 1005. Since the measured value acquisition unit 1000, the integrated value calculation unit 1003, and the regulation processing unit 1004 have the same functions as those of the above-described embodiments, a description thereof will be omitted. In one or more embodiments, the adjustment energy coefficient calculation unit 1001 of the above-described embodiments may be omitted.
[0121] The setting energy calculation unit 1002 calculates the setting energy values dP GF1 , dP GF2, etc. supplied from the power sources 21, 22, etc. to the target power grid N1, based on the active power measurement values P1, P2, etc. and the frequency measurement values f1, f2, etc. acquired by the measurement value acquisition unit 1000, and weighting coefficients “w” described below stored in advance in the storage 103.
[0122] The weighting coefficient changing unit 1005 changes weighting coefficients “w” stored in the storage 103 based on values input by a manager of the transmission and distribution company T or the like via an unillustrated input device of the setting energy measuring device 10.
[0123] Fig. 15 is a flowchart illustrating processing by the adjustment energy measuring device according to one or more embodiments.
[0124] Fig. 16 is a diagram illustrating examples of weighting coefficients according to one or more embodiments.
[0125] The specific processing performed by the adjustment energy measuring device 10 of one or more embodiments will be described with reference to Fig. 15-16. Energy source 21 is described below as an example of energy sources 21, 22, 23, etc., managed by power generation company G.
[0126] Since the processing of step S20 in Fig. 15 of processing (step S00 in Fig. 5) by the setting energy measuring device 10 of the embodiments described above, a detailed description thereof will be omitted.
[0127] The setting energy calculation unit 1002 calculates the setting energy value dP GF1(t) actually supplied from the energy source 21 to the target power grid N1 based on the active power measurement value P1(t) and the frequency measurement value f1(t) acquired in step S20 (step S21).
[0128] Specifically, the adjustment energy calculation unit 1002 calculates the formula (12) to first calculate a frequency fluctuation quantity df 1w (t) to obtain. [Formula 12] dt1w(t)=∑tD=(0,1,2,3,4,…,3600)w(tD)(f1(t−tD)−f1(t−tD−1))
[0129] In formula (12) “df 1w(t)" represents a sum of values each obtained by multiplying a predetermined weighting coefficient "w" by each fluctuation amount between two frequency measurement values f1 acquired sequentially among a plurality of frequency measurement values f1(t) each acquired at each time point "t" in the past within a predetermined time period (e.g., 1 hour) from the present time point. The weighting coefficient "w" is a coefficient for weighting a response (output setting) with respect to a frequency fluctuation of the power source 21. For example, as shown in Fig. As shown in Figure 16, the storage 103 of the adjustment energy measuring device 10 stores a weighting coefficient table D1 in advance. In the weighting coefficient table D1 of one or more embodiments, the weighting coefficients "w" for the delay times tD are set so that the weighting with respect to the response of the energy source 21 becomes largest at the current time (delay time tD=0) and decreases as time moves backward from the current time, namely, when the delay time tD becomes greater than zero (0).
[0130] The adjustment power calculation unit 1002 also calculates an output fluctuation amount dP1(t) of the power source 21 based on the active power measurement value P1(t) acquired at the current time and the active power measurement value P1(t-1) acquired in advance. Specifically, the adjustment power calculation unit 1002 calculates Formula (13) to obtain the output fluctuation amount dP1(t). [Formula 13] dP1(t)=P1(t)−P1(t−1)
[0131] Then, the adjustment energy calculation unit 1002 obtains the adjustment energy of the power source 21 based on the frequency fluctuation quantity df 1w (t) and the output fluctuation quantity dP1(t). Specifically, the adjustment energy calculation unit 1002 determines that the output fluctuation quantity dP1(t) acts in a direction that cancels the frequency fluctuation when a product of the frequency fluctuation quantity df 1w(t) and the output fluctuation quantity dP1(t) is a "negative value." In this case, the adjustment energy calculation unit 1002 calculates the formula (14) to obtain the adjustment energy of the power source 21. Meanwhile, the adjustment energy calculation unit 1002 determines that the output fluctuation quantity dP1(t) acts in a direction that increases the frequency fluctuation when a product of the frequency fluctuation quantity df 1w (t) and the output fluctuation quantity dP1(t) is a "positive value." In this case, the adjustment energy calculation unit 1002 calculates Formula (15) to obtain the adjustment energy of the power source 21. [Formula 14] dPGF1(t)=|dP1(t)| [Formula 15] dPGF1(t)=−|dP1(t)|
[0132] For example, when the frequency of the target power grid N1 decreases, a positive active power as the adjustment power is required to maintain the frequency. If the power source 21 responds (supplies the positive active power) without delay from a time point at which the frequency decreases, then this is effective and useful for suppressing the frequency fluctuation in the target power grid N1. However, if the power source 21 responds with a long delay (e.g., a delay of 1 hour) from the time point at which the frequency decreases, then there is a possibility that a degree of influence for suppressing the frequency fluctuation is low. Thus, high responsiveness of the power source 21 is important for maintaining the frequency of the target power grid N1.
[0133] Therefore, the adjustment energy calculation unit 1002 of one or more embodiments makes the weight of the adjustment energy in the calculation large when the delay in the response by the power source 21 to the frequency fluctuation is small (i.e., the responsiveness is high), and makes the weight of the adjustment energy in the calculation small when the delay is large (i.e., the responsiveness is low), using the weighting coefficient "w." Accordingly, the adjustment energy calculation unit 1002 can improve the value of the adjustment energy when the responsiveness of the power source 21 is high.
[0134] With reference to Fig. 15, the integrated value calculation unit 1003 calculates the integrated setting energy value S1 by the setting energy value dP GF1(t), which has been calculated by the setting energy calculation unit 1002 using the formula (14) or (15) in sequence, is integrated over a predetermined unit time period (e.g., 1 hour) (step S22). This processing corresponds to the processing of step S03 in Fig. 5 in the embodiments described above.
[0135] The regulation processing unit 1004 calculates the compensation for the integrated adjustment energy value S1 calculated by the integrated movement calculation unit 1003 (step S23). This processing corresponds to the processing of step S04 in Fig. 5 in the embodiments described above.
[0136] The setting energy measuring device 10 successively carries out a series of Fig. 15, and thereby a power of the setting energy of the energy source 21 can be calculated in real time.
[0137] As described above, in the adjustment power measuring device 10 of one or more embodiments, the adjustment power calculation unit 1002 calculates the adjustment power supplied from the adjustment power supply source (the power sources 21, 22, etc.) to the target power grid N1 based on the fluctuation amount of the active power measurement value and the sum of the values respectively obtained by multiplying the predetermined weighting coefficient "w" by each fluctuation amount between the two continuous (i.e., temporally sequential) frequency measurement values among the frequency measurement values acquired within the predetermined period of time. This allows the adjustment power measuring device 10 to calculate the adjustment power taking into account the delay time (responsiveness) of the response of the power sources 21, 22, etc.The adjustment energy measuring device 10 can also easily determine the value of the adjustment energy using the weighting coefficient “w” stored in advance in the storage 103.
[0138] According to the adjustment energy measuring device 10 of one or more embodiments and the adjustment energy measuring system 1 including the device 10, the adjustment energy actually supplied by the adjustment energy supply source (the energy sources 21, 22, etc.) can be appropriately calculated depending on the responsiveness of the adjustment energy supply source.
[0139] The values of the weighting coefficients "w" in the weighting coefficient table D1 can be arbitrarily changed by the manager of the transmission and distribution company T or the like through the weighting coefficient changing unit 1005. For example, with respect to the target power grid N1 that truly requires high responsiveness, the degree of influence of responsiveness on the setting energy can be increased by further increasing the weighting coefficient "w" with respect to an area where the delay time tD is short. This can result in prompt participation of the power sources with high responsiveness.
[0140] The setting energy measuring device 10 of one or more embodiments carries out the Fig. 15 (steps S20-S23) based on the active power measurement values P1, P2, etc. and the frequency measurement values f1, f2, etc. determined by the Fig. 7, and calculates the adjustment energy supplied by the loads 31, 32, etc. managed by the load C to the target power supply network N1, and the amount of compensation for the adjustment energy.
[0141] Thereby, the adjustment energy measuring device 10 of one or more embodiments and the adjustment energy measuring system 1 comprising the device 10 can also calculate the adjustment energy supplied by the loads 31, 32, etc. managed by the consumer C depending on the responsiveness in a suitable manner.
[0142] The adjustment energy measuring device 10 of one or more embodiments carries out the Fig. 15 shown processing (steps S20-S23) based on the active power measured values P1, P2, etc. and the frequency measured values f1, f2, etc., which are determined by the Fig. 8, and calculates the adjustment energy supplied from the non-targeted power supply network N2 to the target power supply network N1 and the compensation amount for the adjustment energy.
[0143] Thereby, the adjustment energy measuring device 10 of one or more embodiments and the adjustment energy measuring system 1 comprising the device 10 can also appropriately calculate the adjustment energy supplied from the non-targeted power grid N2 managed by another transmission and distribution company depending on the responsiveness.
[0144] Fig. 17 is a diagram illustrating in detail a structure of an adjustment energy measuring system according to one or more embodiments.
[0145] With reference to Fig. 17 describes a measurement of the adjustment energy supplied by the stabilizing devices 61, 62, 63, etc.
[0146] As in Fig. 17, the power generation company G further operates a plurality of stabilizing devices 61, 62, 63, etc. In one or more embodiments, the power generation company G does not own any energy sources and only manages the stabilizing devices. The stabilizing devices 61, 62, 63, etc. include: a synchronous generator having a power system stabilizer (PSS); an adjustable distributed output energy source or energy storage device; a static synchronous compensator (STATCOM); a series capacitor; a static Var compensator (SVC); and interphase modification equipment. The stabilizing devices 61, 62, 63, etc. improve synchronization stability of the power system by output adjustment of active and reactive power.
[0147] The measuring instrument 50 is capable of measuring the active power measurement values P1, P2, etc. of the active power exchanged at the connection points between the target power grid N1 and the stabilizing devices 61, 62, 63, etc., and the frequency measurement values f1, f2, etc. at the connection points. The active power measurement values P1, P2, etc. and the frequency measurement values f1, f2, etc. acquired by the measuring instruments 50 are sequentially transmitted to the adjustment energy measuring device 10 via a predetermined communication network.
[0148] The adjustment energy measuring device 10 of one or more embodiments carries out the Fig. 15 shown processing (steps S20-S23) based on the active power measured values P1, P2, etc. and the frequency measured values f1, f2, etc., which are determined by the Fig. 17, and calculates the adjustment energy supplied from the stabilizing devices 61, 62, 63, etc. to the target power supply network N1 and the compensation amount for the adjustment energy.
[0149] As a result, the adjustment energy measuring device 10 of one or more embodiments and the adjustment energy measuring system 1 comprising the device 10 can also calculate the adjustment energy supplied by the stabilizing devices 61, 62, 63, etc. in a suitable manner as a function of the responsiveness.
[0150] Although the adjustment energy measuring device 10 and the adjustment energy measuring system 1 of one or more embodiments have been described in detail above, the specific structures thereof are not limited thereto, and various design changes and / or modifications may be added without departing from the spirit of the present invention.
[0151] With the advancement of technologies such as artificial intelligence (AI), some adjusting power supply sources (power sources 21, 22, etc.) predict the frequency fluctuation in the target power grid N1 and perform output adjustment before a future frequency fluctuation. For example, assume that power source 21 predicts that the frequency will decrease at a certain time "t+α" and provides a positive force that gradually increases the active power from time "t" to time "t+α".
[0152] The adjustment energy calculation unit 1002 of variations of one or more embodiments also includes the output adjustment performed by the energy source 21 based on the prediction of the future frequency fluctuation in a calculation of the adjustment energy. Specifically, the adjustment energy calculation unit 1002 calculates the formula (16) to determine the frequency fluctuation quantity df. 1w (t) at a specific time “t”. [Formula 16] df1w(t)=∑tD=(−10,−9,…,0,1,2,3,4,…,3600)w(tD)(f1(t−tD)−f1(t−tD−1))
[0153] Fig. 18 is a diagram illustrating examples of weighting coefficients according to variations of one or more embodiments.
[0154] In formula (16) “df 1w (t)” is a sum of values each obtained by applying a predetermined weighting coefficient “w” ( Fig. 18) is multiplied by each fluctuation quantity between two frequency measurement values f1 acquired successively in time, among a plurality of frequency measurement values f1(t) each acquired at each second in the past within a predetermined time period (e.g., one hour ago) from a specific time "t", and among a plurality of frequency measurement values f1(t) each acquired at each second in the future within a predetermined time period (e.g., 10 seconds after) from the predetermined time "t".
[0155] In the Fig. In the weighting coefficient table D2 shown in FIG. 18, a weighting coefficient "w" corresponding to each second during a period from a future time point, which is a predetermined time point after (e.g., 10 seconds after) a certain time point "t" as a reference (0), to a past time point, which is a predetermined time point before (e.g., 1 hour before) the certain time point "t" is set in advance. As in the above-described embodiments, the weighting coefficients "w" may be set so that the weight related to the response (the fluctuation amount of the frequency measurement value f1) of the power source 21 is greatest at the time point "t" (delay time tD=0), and the weight related to the response of the power source 21 becomes smaller as time moves backward from the time point "t," namely, as the delay time tD becomes greater than zero (0).The weighting coefficients w are also set so that the weight of the response of the energy source 21 becomes smaller as time passes after the time “t”, namely when the delay time tD becomes smaller than zero (0).
[0156] Since the subsequent processing by the setting energy calculation unit 1002 corresponds to the embodiments described above, a detailed description thereof will be omitted.
[0157] As described above, the adjustment power calculation unit 1002 of variations of one or more embodiments calculates the adjustment power using a weighting coefficient "w" corresponding to each second during the period from the future time to the past time, with the specific time "t" as a reference. This allows the output adjustment performed based on the prediction of the future frequency fluctuation at the specific time "t" to be included in the calculation as the adjustment power supplied by the power source 21 at time "t."
[0158] According to the adjustment energy measuring apparatus 10 of variations of one or more embodiments and the adjustment energy measuring system 1 including the apparatus 10, when the adjustment energy supply source (energy sources 21, 22, etc.) predicts the frequency fluctuation and performs the output adjustment, the adjustment energy can be measured while receiving such output adjustment.
[0159] The adjustment energy measuring device 10 of one or more embodiments and the adjustment energy measuring system 1 comprising the device 10 are described with reference to Fig. 19 described.
[0160] Fig. 19 is a block diagram illustrating a functional composition of the adjustment energy measuring device according to one or more embodiments.
[0161] As in Fig. As shown in FIG. 19, the CPU 100 of the adjustment energy measuring device 10 of one or more embodiments is operated according to programs to function as a measured value acquisition unit 1000, an adjustment energy coefficient calculation unit 1001, an adjustment energy calculation unit 1002, an integrated value calculation unit 1003, a regulation processing unit 1004, and a weighting coefficient changing unit 1005. Since the measured value acquisition unit 1000, the integrated value calculation unit 1003, the regulation processing unit 1004, and the weighting coefficient changing unit 1005 have the same functions as the above-described embodiments, a detailed description thereof will be omitted.
[0162] The adjustment energy coefficient calculation unit 1001 of one or more embodiments calculates the first adjustment energy coefficient k p1based on the active power measured value P1(t), the frequency measured value f1(t) and the weighting coefficient “w” ( Fig. 16 or Fig. 18) in the processing of step S01 in Fig. 5. Specifically, the adjustment energy coefficient calculation unit 1001 of one or more embodiments calculates the formula (17) instead of the formula (2) to calculate the first adjustment energy coefficient k p1 to obtain. [Formula 17] kp1=∫dP1(t)dfw1(t)dt∫dfw1(t)2dt
[0163] Since the subsequent processing by the setting energy measuring device 10 of the processing (steps S02-S04 in Fig. 5) of the embodiments described above, a detailed description thereof will be omitted.
[0164] As described above, the adjustment power coefficient calculation unit 1001 of one or more embodiments calculates the first adjustment power coefficient based on the fluctuation amount of the active power measurement value and the sum of values each obtained by multiplying the predetermined weighting coefficient by each fluctuation amount between two frequency measurement values acquired among the frequency measurement values sequentially within the predetermined period of time. Accordingly, when the response delay to the frequency fluctuation by the adjustment power supply source (the power sources 21, 22, etc.) is small, the output of the adjustment power supply source is included in the calculation of the adjustment power to a greater extent than when the response delay is large.
[0165] According to the adjustment energy measuring device 10 of one or more embodiments and the adjustment energy measuring system 1 comprising the device 10, the adjustment energy actually supplied by the adjustment energy supply source (energy sources 21, 22, etc.) can be appropriately measured depending on the responsiveness of the adjustment energy supply source.
[0166] In one or more embodiments, various processes executed by the adjustment energy measuring device 10 or the measuring instrument 50 are stored in the form of programs in a computer-readable recording medium, and the various processes are carried out by reading and executing the programs. The computer-readable recording medium includes a magnetic disk, a magneto-optical disk, a CD-ROM, a DVD-ROM, and a semiconductor memory. The computer programs can be distributed to a computer via a communication line and executed by the computer that has received the distributed programs.
[0167] The programs can be used to implement some of the functions described above. Furthermore, the programs can be used to implement the functions described above together with programs already recorded in a computer system—namely, they can form a difference file (difference program).
[0168] In one or more embodiments, another computer connected to the adjustment energy measuring device 10 of one or more embodiments (and variations thereof) or the measuring instrument 50 of one or more embodiments may be provided with a portion of the functions of the adjustment energy measuring device 10 or the functions of the measuring instrument 50.
[0169] Although the power sources 21, 22, etc. perform power generation using the turbine device 211 and the generator in the above-described embodiments, the present invention is not limited to these embodiments. In one or more embodiments, the power sources 21, 22, etc. perform photoelectric solar generation using a solar cell.
Claims
[1] Setting energy measuring device (10), comprising: a processor (100) that: acquires an active power measurement value (P1, P2, ...) of an active power exchanged at a connection point between a target power supply network (N1) and a setting energy supply source (21, 22) which supplies a setting energy to the target power supply network (N1), acquires a frequency measurement value (f1, f2, ...) of a frequency at the connection point, based on the active power measured value (P1, P2, ...) and the frequency measured value (f1, f2, ...) a first setting energy coefficient (k p1 ) which indicates the degree of influence that a fluctuation in active power has on a fluctuation in frequency, based on the first adjustment energy coefficient and a fluctuation measurement value of the fluctuation of the frequency, calculates the adjustment energy supplied from the adjustment energy supply source (21, 22) to the target power supply network (N1), and based on the calculated adjustment energy, a compensation is determined to be paid to an owner of the adjustment energy supply source (21, 22). [2] Adjustment energy measuring device (10) according to claim 1, wherein the processor (100) determines the first adjustment energy coefficient (k p1 ) based on a fluctuation quantity of the active power measured value (P1, P2, ...) and a sum of values each obtained by multiplying a predetermined weighting coefficient (w) by each fluctuation quantity between two frequency measured values (f1, f2, ...) acquired consecutively within a predetermined period of time. [3] Adjustment energy measuring device (10) according to claim 1, wherein the processor (100) further generates an integrated adjustment energy value (ΔP GFI1 (t)) is calculated by integrating successively calculated setting energy values over a predetermined unit time. [4] Adjustment energy measuring device (10) according to claim 3, wherein the processor (100) calculates the compensation by dividing the integrated adjustment energy value (ΔP GFI1 (t)) is multiplied by a predefined contract unit price. [5] Adjustment energy measuring device (10) according to claim 1, wherein the processor (100) calculates as the fluctuation of the active power a deviation between an average value of the active power measured value (P1, P2, ...) acquired within a predetermined period of time and the newly acquired active power measured value (P1, P2, ...); and the processor (100) calculates as the fluctuation of the frequency a deviation between an average value of the frequency measurement value (f1, f2, ...) acquired within a predetermined period of time and the newly acquired frequency measurement value (f1, f2, ...). [6] Adjustment energy measuring device (10) according to claim 1, wherein the processor (100) further calculates a second adjustment energy coefficient (k I1 ) which indicates a degree of influence exerted by the fluctuation of the active power on an integrated value of the fluctuation of the frequency. [7] Setting energy measuring device (10), comprising: a processor (100) that: acquires an active power measurement value (P1, P2, ...) of an active power exchanged at a connection point between a target power supply network (N1) and a setting energy supply source (21, 22) which supplies a setting energy to the target power supply network (N1), acquires a frequency measurement value (f1, f2, ...) of a frequency at the connection point, the adjustment energy supplied from the adjustment energy supply source (21, 22) to the target power supply network (N1) is calculated based on a fluctuation amount of the active power measured value (P1, P2, ...) and a sum of values each obtained by multiplying a predetermined weighting coefficient (w) by each fluctuation amount between two frequency measured values (f1, f2, ...) acquired consecutively within a predetermined period of time, and based on the calculated adjustment energy, a compensation is determined to be paid to an owner of the adjustment energy supply source (21, 22). [8] Adjustment energy measuring device (10) according to claim 7, wherein the processor (100) further generates an integrated adjustment energy value (ΔP GFI1 (t)) is calculated by integrating successively calculated setting energy values over a predetermined unit time. [9] Adjustment energy measuring device (10) according to claim 8, wherein the processor (100) calculates the compensation by dividing the integrated adjustment energy value (ΔP GFI1 (t)) is multiplied by a predefined contract unit price. [10] Setting energy measuring system (1), comprising: the setting energy measuring device (10) according to claim 1; and a measuring instrument (50) installed at the connection point between the target power supply network (N1) and the setting power supply source (21, 22) and capable of measuring the active power exchanged at the connection point and the frequency at the connection point, and wherein the processor (100) of the adjustment energy measuring device (10) acquires the active power measured value (P1, P2, ...) and the frequency measured value (f1, f2, ...) via the measuring instrument (50). [11] The setting power measuring system (1) according to claim 10, wherein the measuring instrument (50) is installed at the connection point between the target power grid (N1) and the setting power supply source (21, 22) comprising at least one of a power source, a load, a stabilizing device, and a non-target power grid. [12] A measuring instrument (50) installed at a connection point between a target power supply network (N1) and an adjustment power supply source (21, 22) that supplies adjustment power to the target power supply network (N1), the measuring instrument (50) comprising: a sensor (504) that measures an active power exchanged at the connection point and a frequency at the connection point, a processor (100) that: an active power measurement value (P1, P2, ...) and a frequency measurement value (f1, f2, ...) are acquired via the sensor (504); based on the active power measured value (P1, P2, ...) and the frequency measured value (f1, f2, ...) a first setting energy coefficient (k p1 ) which indicates the degree of influence that a fluctuation in active power has on a fluctuation in frequency, based on the first setting energy coefficient (k p1) and a fluctuation measurement value of the fluctuation of the frequency, calculates the setting energy supplied from the setting energy supply source (21, 22) to the target power supply network (N1), and based on the calculated setting energy, a compensation to be paid to a holder of the setting energy supply source (21, 22) is determined.
Citation Information
Patent Citations
Drive control device for electric chain block with electric trolley
JP2008195480A
Image forming apparatus and program
JP2018055184A
Grid characteristic controller for combined frequency-power control in interconnected grids with control power plants with different control capabilities
DE1247452B
Electricity market pricing system and method
JP5886400B1
JP000005886400B1