CONSTRUCTION SITE MONITORING METHOD, WORK MACHINE AND CONSTRUCTION SITE MONITORING SYSTEM

DE502016016806D1Active Publication Date: 2024-12-05LIEBHERR WERK BIBERACH GMBH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
DE502016016806
Authority / Receiving Office
DE · DE
Patent Type
Patents
Current Assignee / Owner
Priority Date
2015-08-17
Filing Date
2016-08-16
Publication Date
2024-12-05
Estimated Expiration
2036-08-16

AI Technical Summary

Technical Problem

Current construction site monitoring methods are inefficient and lack automation, relying heavily on manual processes and paper documents, failing to effectively monitor collisions between work machines and objects, especially for machines that do not communicate with each other.

Method used

A method for real-time monitoring using monitoring devices installed on work machines that generate and transmit observation data to a computing unit for evaluation, incorporating cameras, scanners, and transponder technologies to provide a digital overview of the site, enabling automated collision detection and remote monitoring.

Benefits of technology

Enables efficient, automated monitoring and collision prevention, allowing for remote management and optimization of construction site operations, improving safety and productivity by providing a digital, real-time representation of the site's status and progress.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The invention relates to a method for real-time monitoring of the current status of a construction site with one or more work machines.

[0002] Today, construction sites are mostly created and planned digitally by all trades. However, once work begins on the site, the use of digital technologies diminishes. During construction, paper documents such as drawings, orders, delivery notes, and verbal communication are primarily used. Monitoring and controlling construction progress is therefore done manually by comparing available documents.

[0003] An important aspect of construction site monitoring is the implementation of anti-collision monitoring to prevent dangerous collisions between work machines and with any objects on the construction site or within the building trades. Until now, collision monitoring for individual work machines has been implemented on their individual machine control systems. The machines can or must communicate their operating movements with each other. Machines or, in particular, trades that do not meet such communication requirements are not included in the collision monitoring system.The document DE112012000169T5 discloses a method for real-time monitoring of the current status of a construction site with one or more work machines, wherein a monitoring means installed on at least one work machine observes the work machine in real time and generates corresponding observation data, and the generated observation data are transmitted from the monitoring means to a computing unit for real-time evaluation of the current construction site status.

[0004] However, current construction site monitoring no longer appears appropriate in the age of increasing technology. The present invention therefore sets out to find a suitable solution for automated construction site monitoring.

[0005] This object is achieved by the method according to the features of claim 1. Advantageous embodiments of the method are the subject of the dependent subclaims.

[0006] According to the invention, a method for real-time monitoring of the current status of a construction site with one or more work machines is proposed. For this purpose, a monitoring device installed on at least one work machine observes the surroundings of the work machine in real time and generates corresponding observation data for subsequent processing. This generated observation data is transmitted from the monitoring device to at least one computing unit for real-time evaluation of the current construction site status.

[0007] The monitoring device(s) records any buildings in the vicinity of the work machine in real time. The recording and generation of observation data can be done continuously, cyclically, or manually upon user request. By monitoring over a specific period of time, the resulting observation data can provide insight into the progress on the construction site. The current construction progress is monitored and reviewed by comparing it with a digitized site plan.

[0008] The installed monitoring device can, for example, be a camera or a scanner device installed on a suitable work machine on the construction site. The use of transponder / transceiver technology for monitoring is also conceivable, whereby the work machine or its components and / or building components are equipped with corresponding transponder or transceiver modules. Suitable work machines are those that allow a high installation position so that the monitoring device has a good overview of at least part of the construction site. In this case, construction cranes are particularly suitable, i.e. tower cranes that allow the monitoring device to be installed at a high altitude, for example in the area of ​​the tower top or on the boom system. The ability of the boom system to pivot at high altitudes in particular leads to a wide observation radius.

[0009] Ideally, monitoring of the surrounding area can be carried out without restricting site operations during the regular operation of the work machine. The monitoring device generates observation data that represents details of the surrounding area of ​​the work machine, for example, one or more other work machines on the construction site and their movements, and / or building structures and their conditions, and / or other objects on the construction site and people on the construction site.

[0010] The transmission of the observation data to at least one computer unit allows for subsequent evaluation of the current construction site status. This step no longer needs to be performed manually using written documents, but can be performed fully or at least partially automatically at the push of a button. In the simplest case, the computer unit simply displays the recorded observation data, for example, as image information, allowing at least a remote inspection of the construction site status by a responsible specialist.

[0011] The observation data provides a two- or three-dimensional visual representation of the machine environment.

[0012] To represent the machine environment and model buildings, a method for optimized planning, execution, and management of buildings is used with the help of software. Well-known methods include "Building Information Modeling" (BIM). In this process, all relevant building data is digitally recorded, combined, and networked. The building can also be geometrically visualized as a virtual building model (computer model).

[0013] A laser scanner with three-dimensional scanning of the construction site environment is used as a monitoring tool. Alternatively or additionally, radar and / or a transceiver-transponder solution, such as RFID or RuBee, is also conceivable.

[0014] It is conceivable that the processing unit is either a central processing unit or part of the machine control system of the observing work machine. The advantage of outsourcing the processing unit to a central processing unit is that it can be responsible for one or more work machines or monitoring devices located on the construction site. It is conceivable that several work machines are equipped with corresponding monitoring devices so that the observation data generated by different work machines can be consolidated in the central processing unit and evaluated together. This results in optimized coverage of the observable construction site area. The arrangement of monitoring devices on other objects, e.g. on building trades themselves, is also conceivable. The evaluation and display of the current construction site status can be carried out, for example, on user request or cyclically.

[0015] It is also conceivable for the central processing unit to perform anti-collision monitoring of one or more work machines based on the received observation data. This observation data can be used to detect certain hazardous situations early on, possibly predict them through advance calculations, and, if necessary, send warnings to the respective machine control systems of the work machines. Direct intervention in the control systems of the respective work machines by the central processing unit is also conceivable.

[0016] If the processing unit is part of the machine control system of the observing machine, this observation data can be directly taken into account for controlling the machine actuators. This is particularly useful when implementing anti-collision monitoring. A distributed system consisting of a local machine control system and a central processing unit can also be used to implement the processing unit.

[0017] Controlling one or more work machines via the processing unit, either as part of the machine control system or as a central processing unit, can be useful not only for collision prevention purposes but also for fully automated construction site management. For example, it is conceivable that one or more work machines on the construction site could be remotely controlled fully automatically by the central processing unit, allowing progress on the site to be planned, monitored, and executed automatically.

[0018] In addition to the method according to the invention, the present object is also achieved by a work machine, in particular a crane, with at least one monitoring means for real-time monitoring of the work machine's environment. In addition to the monitoring means, communication means are available that enable the observation data generated by the monitoring means to be transmitted to a central processing unit and / or a local machine control system of the work machine. Such a work machine is suitable for implementing the method according to the invention. The advantages and properties of the method according to the invention thus also apply without restriction to the work machine according to the invention.

[0019] The monitoring device can comprise a laser scanner, in particular a 3D laser scanner, or alternatively, another camera device for generating visual observation data. The scanning method used by the laser scanner unit can be based on "airborne laser scanning" or alternatively "terrestrial laser scanning." The laser scanner unit is preferably mounted at a high-altitude mounting point on the work machine. In the case of a crane, this can be arranged near the tower top or the crane boom, or on the trolley or load hook. The monitoring device can be powered, for example, via the trolley's regular power supply. The integration of a separate power supply or energy supply from other loads on the crane is of course conceivable.

[0020] In addition to the scanner unit, the monitoring device can also comprise at least one radar module consisting of a radar transmitter and radar receiver. The additional radar module also allows the acquisition of additional spatial information; for example, distance measurements can be used to create a three-dimensional model of the environment, particularly in conjunction with the data from the laser scanner.

[0021] It is also conceivable that the monitoring device could alternatively or additionally include a transponder / transceiver solution. Work machines or their components, as well as other construction site objects or building components, can be equipped with corresponding transponders that can be detected by a receiver module of the monitoring device. These could be integrated into the existing monitoring devices, just like the laser scanners, or even installed additionally.

[0022] An RFID system could be used as a transponder / transceiver solution. Since RFID systems have the disadvantage of being severely limited in their reception capability by metals, standardized LWID (Long Wave IDentification) technology, also known as RuBee technology, could be used as an alternative or in addition. This technology also enables 3D scanning of work machines, especially cranes, construction components, or all building components equipped with such transceiver modules / units. The units used can capture and store objects, and incorporate them into the BIM (3D building information) data used in the building planning process.

[0023] RFID is often used for transponder technology, but this technology has serious disadvantages when used with metals. We would like to use a new technology called LWID (Long Wave ID), or RuBee, in the future.

[0024] In addition to the work machine, the invention also encompasses a system comprising at least one such work machine according to the present invention. The system is suitable for carrying out the method according to the invention, which is why the system is characterized by the same advantages and properties as the method or the work machine. A repetitive description is therefore considered unnecessary.

[0025] Further advantages and features of the invention will be briefly outlined below.

[0026] The core idea of ​​the invention is to digitally simulate, pre-plan, and monitor construction sites in the future, and optionally even operate them automatically. In this context, construction cranes, in particular, are to be remotely controlled in an automated or at least semi-automated manner. To achieve this, future systems will be required that can record and communicate construction progress three-dimensionally in real time. This is considered a basic prerequisite for the subsequent automation of construction site operations. Optionally, a system is desired that effectively prevents potential collisions between individual construction machines on the construction site and can even predict them in advance.

[0027] For this reason, monitoring equipment is required for construction site surveillance. These must be placed at suitable locations on the construction site to obtain the best possible overview of the entire process. Construction cranes typically cover all areas of the construction site and can thus record information on the geometry and condition without obstruction. For this reason, a laser scanner is installed on a construction crane, which systematically scans the construction site even during regular construction operations. This information is transmitted to the construction site operators. This provides the operator with an up-to-date picture of the construction status regularly or at the push of a button, without having to be on site themselves.

[0028] This data transmission can occur either daily or cyclically at specific intervals. The laser scanner unit is installed on the construction crane near the tower or on the boom system. The laser scanner unit can be installed on the boom system or directly on the trolley or load hook. The power supply to the trolley or load hook can be used to power the laser scanner unit. The scanner module can also be equipped with a radar sensor and receiver to obtain additional spatial information and thus avoid collisions if necessary.

[0029] The crane's observation data is transmitted to a central processing unit, which evaluates the received data and, based on this, enables monitoring of construction site operations. In addition to purely monitoring construction progress, collision monitoring of individual work machines can also be carried out, based on the images provided by the laser scanner or radar system.

[0030] Remote control of the work machines, especially the construction cranes, by the central processing unit based on the provided observation data is also conceivable. This approach enables fully automated construction site operations.

[0031] For this purpose, it can be provided, for example, that the central processing unit communicates with the individual machine controls of the construction cranes.

[0032] Further advantages and features of the invention are explained in more detail below with reference to an embodiment shown in the figures.

[0033] They show: Figure 1: a sketch of a construction site scenario with the cranes according to the invention in a plan view and Figure 2: the scenario according to Figure 1 in a page view.

[0034] The two Figures 1 , 2 outline a possible construction site scenario for the use of the system according to the invention. In the illustrated embodiment, this comprises two independently operating construction site cranes 10, 11, each designed as a tower crane. With the help of the two construction cranes 10, 11, a construction site monitoring system is set up, which allows monitoring of the progress on the construction site, for example, monitoring the progress of the buildings 20, 21 shown as examples.

[0035] For this purpose, both cranes are equipped with suitable monitoring devices 30, 31 in the form of three-dimensional laser scanners. A first sensor 30 is mounted in the area of ​​the load hook 12. The necessary power supply for the sensor 30 is provided via the power supply of the trolley 13. The figures indicate a lateral and downward detection of the sensor 30; however, the invention is not intended to be limited to a specific detection range or detection angle; however, the construction site area below and next to the crane boom is usually of interest.

[0036] A further sensor system 31 is mounted on both cranes 10 and 11 in the area of ​​the boom counterballast 15, which scans the area behind the counterballast. As previously stated, the 3D laser scanner sensor system 31 is not necessarily limited to a specific detection range.

[0037] Both laser scanner sensors 30, 31 move with the boom rotation movement so that a large area of ​​the construction site can be scanned during crane work. Figure 1 shows the working radii 40, 41 of the crane booms and illustrates the detectable area of ​​the integrated sensors 30, 31. This allows a complete image of the construction site to be generated during crane work with appropriate crane movement. In combination with the boom height of cranes 10, 11, the entire construction site can be recorded almost seamlessly.

[0038] The two 3D laser scanner sensors 30, 31 communicate with their respective crane control systems 16 of the two cranes 10, 11 and transmit their acquisition data to the respective control system 16 continuously or upon request. A central processing unit 40 is provided for central construction site monitoring, which communicates with the two crane control systems 16 for exchanging the sensor signals from the sensors 30, 31. A direct connection between the processing unit 40 and the respective sensors 30, 31 is also conceivable. The communication between the central processing unit 40 and the cranes 10, 11 is bidirectional.

[0039] The central processing unit 40 can determine the current status on the construction site based on the sensor signals. The sensors 30, 31 not only record the buildings 20, 21 and their construction progress, but can also be used to monitor other work machines on the construction site and their movements. Based on this, the sensor data can be used to implement collision monitoring, which detects potential collisions between the cranes 10, 11 at an early stage and takes countermeasures if necessary. In this context, it is conceivable, for example, for the central unit 40 to directly influence the respective crane control systems 16 and transmit control commands for remote control of the cranes 10, 11 to the machines.For example, if an impending collision between the two machines 10, 11 is detected by the processing unit 40, a corresponding stop signal is transmitted to one or both cranes 10, 11, and an immediate machine stop is initiated. Furthermore, the two crane control systems 16 can also be linked to each other for mutual information exchange.

[0040] The evaluation of the sensor data received by the central processing unit 40 can be performed either continuously or upon manual user request. The system according to the invention thus creates possibilities for continuously monitoring the current status of the construction site electronically, even during operation. A particularly advantageous feature is that monitoring does not have to take place on-site, but can also be performed remotely by the processing unit 40 from any location, such as the construction manager's headquarters.

Claims

1. Method for real time monitoring of the current status of a construction site that includes one or more work machines (10, 11), wherein a monitoring means (30, 31) installed on at least one work machine (10, 11) monitors the environment of the work machine (10, 11) in real time and generates corresponding monitoring data, and the generated monitoring data are transmitted by the monitoring means (30, 31) to a processing unit (40) for real time evaluation of the current construction site status, the monitoring means (30, 31) detects and monitors buildings (20, 21) in the machine environment, the processing unit (40) evaluates the current construction progress of the buildings (20, 21) in accordance with a construction schedule by comparing the collected monitoring data with a digital construction site schedule, and the monitoring data comprise a two-dimensional or three-dimensional visual representation of the machine environment, wherein the detected buildings (20, 21) are modeled using a Building-Information-Modeling Software (BIM).

2. Method in accordance with Claim 1, characterized in that the processing unit (40) is a central processing unit (40) that receives monitoring data from one or more work machines (10, 11) located on the construction site, evaluates them, and optionally represents the current construction site status, preferably in response to a manual user query or automatically at cyclic intervals.

3. Method in accordance with one of the preceding claims, characterized in that the monitoring means (30, 31) further detect(s) and monitor(s) construction equipment and / or construction site objects and / or persons and / or other work machines (10,11) in the machine environment, and the processing unit (40) performs anti-collision monitoring between one or more work machines (10, 11) and construction site objects and / or further work machines (10, 11) stationed on the construction site using the received monitoring data.

4. Method in accordance with one of the preceding claims, characterized in that the processing unit (40) is a component of the machine control of the monitoring work machine (10, 11), with the machine control taking account of supplied monitoring data for the control of the one or more machine actuators.

5. Method in accordance with one of the preceding claims, characterized in that the processing unit (40) is a central processing unit (40) and the monitoring data of the at least one work machine (10, 11) serve the remote control of one or more work machines (10, 11) on the construction site.

6. System for performing the method in accordance with one of claims 1 to 5, comprising a central processing unit (40) and at least one work machine (10, 11), wherein the work machine (10, 11) has at least one monitoring means (30, 31) for real time monitoring of the work machine environment and has a communication means for transmitting the generated monitoring data to the central processing unit (40).

7. System in accordance with Claim 6, wherein the monitoring means (30, 31) comprises a laser scanner device, in particular a 3D laser scanner, and / or a transceiver / transponder technology such as preferably RFID and / or RuBee.

8. System in accordance with one of the claims 6 or 7, characterized in that the monitoring means (30, 31) is arranged at the boom of the work machine (10, 11), with the power supply of the monitoring means (30, 31) preferably being provided via an existing energy supply of the boom, for example the power supply of a trolley.

9. System in accordance with one of the claims 6 to 8, wherein the monitoring means (30, 31) additionally comprises a radar module consisting of a radar sensor and a radar receiver for the detection of additional spatial information.