Altitude-optimized device for the heat treatment of mineral materials
Patent Information
- Application Number
- DE502022001925
- Authority / Receiving Office
- DE · DE
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2021-02-24
- Filing Date
- 2022-02-09
- Publication Date
- 2024-10-31
- Estimated Expiration
- 2042-02-09
AI Technical Summary
The existing heat treatment devices for mineral substances face challenges due to their large overall height, which poses implementation issues in areas with earthquake risks, strong winds, or local regulations, and the short residence time in the calciner, which limits the adaptation of product properties.
A device with a preheater, calciner, and cooler arranged side by side, utilizing co-current and countercurrent entrained flow heat exchangers, reducing overall height while allowing for extended residence time through additional components like residence containers and material returns, and optimizing gas flow to maintain efficiency.
This configuration reduces the structural complexity and cost of the load-bearing steel construction, allows for a more compact design, and extends the residence time of mineral substances, enhancing the adaptation of product properties without increasing the overall height.
Description
[0001] The invention relates to a device for the heat treatment of fine-grained mineral substances, for example mineral carbonates, clays or metallic ores.
[0002] Such devices comprise a preheater, a calciner, and a cooler. In principle, the solids flow and the gas flow run countercurrently, although in some sections a cocurrent flow is usually present with separators, particularly cyclone separators, interposed. While the gas flows through the system from bottom to top, the feed material passes through the system by gravity from top to bottom. Therefore, the preheater, calciner, and cooler are typically arranged one above the other. Since preheaters and coolers, in particular, are usually designed in multiple stages, the resulting height is the sum of the heights of the individual components or process stages. However, this height is often difficult to implement due to earthquake risks, strong winds, or local regulations, which in some cases makes the use of this technology impossible.
[0003] Another weakness of entrained-flow technology, in addition to its height, is the relatively short residence time in the calciner. It is known that extending the process time allows the product properties to be further adapted to future requirements. If a corresponding device, such as a retention tank or material recirculation system, is integrated to extend the residence time, the height increases further.
[0004] EP 0 125 973 B1 discloses a device for the thermal treatment of minerals in powder form with gases.
[0005] A cyclone heat exchanger is known from US 6,574,885 B1.
[0006] A device for heat treatment of powder is known from WO 98 / 55418 A1.
[0007] EP 1 060 146 B1 discloses a kiln plant and a process for cement production.
[0008] DE 10 2013 006236 A1 discloses a plant for the production of cement clinker with a gasification reactor for difficult building materials.
[0009] DE 10 2012 016361 A1 discloses a plant for the production of cement clinker with a combustion device for difficult fuels.
[0010] From DE 10 2013 006237 A1 a method for operating a plant for producing cement is known.
[0011] From DE 196 49 922 A1 a method and a device for the heat treatment of fine-grained material is known.
[0012] From DE 10 2014 012396 A1 a process and a plant for the production of cement clinker with deacidification in a fluidized bed plant is known.
[0013] DE 10 2012 020300 A1 discloses a process for utilizing the waste heat from a cement production plant.
[0014] WO 2011 / 029690 A1 discloses a process for producing cement with a separation of carbon dioxide.
[0015] From DE 25 23 737 A1 a method for burning cement clinker and a device for carrying out this method are known.
[0016] DE 101 50 097 A1 discloses a multi-strand plant for the production of cement clinker from raw meal.
[0017] WO 2015 / 197372 A1 discloses a process for utilising waste heat in a cement production plant and a cement production plant.
[0018] Due to the comparatively high height, the supporting steel structure is very complex and costly for structural reasons. In some places, the construction of such a facility is completely unthinkable due to local height restrictions or the dangers of earthquakes or strong winds.
[0019] The object of the invention is to create a device that can also be implemented under these boundary conditions.
[0020] This object is achieved by a device having the features specified in claim 1. Advantageous further developments emerge from the subclaims, the following description, and the drawings.
[0021] The device according to the invention is used for the heat treatment of mineral materials, in particular fine-grained mineral materials, such as, for example, roasting, calcination, dehydration, or phase changes. For example, the mineral materials are selected from the group comprising mineral carbonates, gypsum, limestone, magnesite, dolomite, phosphate ore, clays, metal ores, or a mixture thereof. The device comprises three assemblies, a first assembly being a preheater, a second assembly being a calciner, and a third assembly being a cooler. The preheater is an entrained-flow preheater, preferably a cascade of entrained-flow preheaters. The or each individual entrained-flow preheater comprises a cocurrent heat exchanger in which the mineral material and the gas are conducted in cocurrent flow, the mineral material being transported in the gas flow.At the end of this cocurrent heat exchanger, a separation cyclone is located. In the entrained-flow heat exchanger or the cascade of entrained-flow heat exchangers, material and gas flow in countercurrent. Here, the material flows from top to bottom and the gas from bottom to top. The calciner is an entrained-flow calciner. An entrained-flow calciner has an energy source, such as a burner. The mineral material is introduced into this area. The mineral material is carried through the calciner in the gas stream. At the end of the calciner, a separation cyclone is located. The calciner is directly connected to the cooler to transfer the material flow. The direct connection means, in particular, that there is no additional kiln, especially no rotary kiln, between the calciner and the cooler. The entire thermal treatment with the addition of energy is thus completed within the calciner.Although a chemical reaction can take place until complete cooling, for example in a holding tank, due to the inherent temperature of the mineral material, further energy input, such as in a rotary kiln, no longer occurs.
[0022] The assemblies are typically arranged one above the other, so that the material flows through the device from top to bottom. In individual sections of the device, the material is lifted by the gas flow against gravity, but overall, the material flows through the system from top to bottom, driven by gravity. To reduce the resulting considerable height, two of the three assemblies are arranged side by side. For example, the calciner and cooler are arranged one above the other and thus next to the preheater. Alternatively, and preferably, the preheater and calciner are arranged one above the other and thus next to the cooler.
[0023] In a further embodiment of the invention, all three assemblies are arranged side by side. Thus, the preheater, calciner, and cooler are arranged side by side.
[0024] While arranging them side by side increases the required floor space on the one hand, it reduces the height on the other. Where floor space is limited, for example when expanding existing plants, placing two assemblies next to each other, such as the cooler and the calciner, can already have an advantage in terms of height. It has proven advantageous that in one embodiment in which the cooler and calciner are arranged side by side, a combustion device arranged at the lower end of the calciner comprising a combustion chamber and at least one burner, which accounts for a comparatively high proportion of the overall plant weight, can be mounted at a lower height. This allows the use of a lighter steel structure. In addition, the low arrangement facilitates assembly and subsequent maintenance work on the combustion chamber and the burner.It can also be advantageous to locate the preheater next to the calciner. For plants where the footprint is not structurally limited, placing all three components side by side shows that the reduction in height has a positive impact on the supporting steel structure compared to the increase in footprint, allowing for a simpler and more cost-effective design.
[0025] A further advantage of this design is that it significantly reduces the assembly time for the entire system, as several prefabricated cyclone units for different process stages can be installed on one platform level. Furthermore, the crane units for assembly and subsequent overhauls can be significantly smaller.
[0026] In a system in which the preheater is located next to the calciner, it has proven advantageous that the discharge point of the calciner product can be moved upwards without correspondingly increasing the absolute height of the preheater above the ground. This allows the calciner discharge point to be positioned in an optimized manner to meet the other requirements of the plant design without increasing the overall height of the system. For example, by moving the calciner discharge point upwards, additional components, such as retention reactors or material flow dividers with recirculation into the calciner, can be installed in the material path between the calciner and cooler without increasing the overall height.
[0027] In a further embodiment of the invention, the preheater consists of a cascade of three to nine cyclone heat exchangers.
[0028] In a further embodiment of the invention, the cooler consists of a cascade of two to six, preferably two to four, cyclone heat exchangers.
[0029] In a further embodiment of the invention, the preheater has a first material inlet and a first material outlet. The first material outlet is also called the preheater discharge point. The calciner also has a second material inlet and a second material outlet. The second material outlet is also called the calciner discharge point. The cooler also has a third material inlet and a third material outlet. The third material outlet is also called the cooler discharge point. Advantageously, the first material outlet is arranged above the second material inlet and the second material outlet is arranged above the third material inlet. In this way, a low installation height is achieved, but at the same time, material is prevented from being conveyed against gravity.
[0030] According to the invention, the preheater has a first gas inlet and a first gas outlet. The calciner further has a second gas inlet and a second gas outlet. The cooler further has a third gas inlet and a third gas outlet. Advantageously, the second gas outlet is connected to the first gas inlet via a first gas line, and the third gas outlet is connected to the second gas inlet via a second gas line. The first gas line and the second gas line each have a falling gas line section and a lower deflection on the underside. The falling gas line section evens out the gas flow. Optionally and preferably, the first gas line and the second gas line each have an upper deflection.Since the components are no longer arranged one above the other as usual, the hot gas must now be redirected and guided to a lower level through a falling section of the gas line so that the gas flow enters the subsequent assembly from below. This does extend the gas flow path and at the same time creates more surface area, which leads to heat loss; however, this is compensated for by the lower height of the overall structure. Optionally, these connecting gas lines can be used as a process space to condition the gas flow. For example, additional energy can be introduced into the first gas line between the cooler and the calciner by adding hot gas using a hot gas supply from other processes or a hot gas generator, or by directly supplying fuels or electrical energy. The route of the second gas line promotes the mixing of the gas flows.In another embodiment, additives, for example and in particular for NO x minimization, can be introduced into the first gas line between the calciner and the preheater. The length of the gas line increases the residence time for the reaction between the additive, for example, ammonia, and NO x .
[0031] In a further embodiment of the invention, at least one lower deflection is designed as a U-shaped deflection.
[0032] In a further embodiment of the invention, at least one lower deflection is designed as a U-shaped deflection with a tapered profile. This creates a jet effect and accelerates the gas at the end, which is advantageous for reducing deposits in the lower deflection.
[0033] In a further embodiment of the invention, the lower deflection device comprises an inlet chamber, a settling chamber, or a vortex chamber. The first gas line or the second gas line are laterally connected to the inlet chamber, the settling chamber, or the vortex chamber via the lower deflection device. Preferably, the inlet chamber, the settling chamber, and the vortex chamber have a material discharge for removing deposits.
[0034] In a further embodiment of the invention, the second lower deflection of the second gas line has a second outlet for solids. Preferably, the solids discharged here are returned via the third material inlet of the cooler. Alternatively, the solids can also be discharged directly and, depending on their composition, added to the product or discarded.
[0035] In a further embodiment, the first lower deflection of the first gas line has a first outlet for a solid. Preferably, the solid discharged here is returned via the third material inlet of the cooler. Otherwise, the solid can also be discharged directly and, depending on its composition, added to the product or discarded.
[0036] In a further embodiment of the invention, a fan is arranged in at least one falling gas line part.
[0037] In a further embodiment of the invention, a retention tank is arranged between the second material outlet and the third material inlet. The second material outlet is arranged above the retention tank, and the third material inlet is arranged below the retention tank. The retention tank serves to maintain the material to be treated at the elevated temperature for a certain period of time to allow for further reactions. The retention tank can be a pipe with a slight incline, but can also be designed, for example, according to DE 10 2019 201 763 A1.
[0038] In a further embodiment of the invention, a material flow divider is arranged between the second material discharge and the third material inlet. The material flow divider has a first partial flow outlet and a second partial flow outlet. The first partial flow outlet is connected to the third material inlet, and the second partial flow outlet is connected to the calciner. Thus, part of the material flow is returned to the calciner. This increases the stochastic residence time of the material in the calciner. The feed can take place via the second material inlet or, alternatively, via another optional separate material inlet into the calciner, which can be located at a higher position in the riser depending on the temperature profile of the calciner.
[0039] In a further embodiment of the invention, the calciner has at least one ascending calciner section. Optionally, the calciner can have a descending calciner section. If the calciner has a descending calciner section, the descending calciner section is shorter than the ascending calciner section. The descending calciner section allows the height of the second material outlet to be optimally adapted to the requirements of the device.
[0040] In a further embodiment of the invention, an additive feed for supplying further additives for conditioning the gas flow is arranged in the first gas line and / or the second gas line.
[0041] In a further embodiment of the invention, a heating device for supplying thermal energy is arranged in the first gas line and / or the second gas line.
[0042] This arrangement of the components allows different burner chamber geometries or burner installations to be installed in the lower area of the calciner without influencing the height of the inlets and outlets of the material and gas flows of the device.
[0043] The device according to the invention is explained in more detail below using an embodiment shown in the drawings. Fig. 1Exemplary embodiment without retention tank Fig. 2Exemplary embodiment with retention tank Fig. 3Detailed illustration
[0044] In Fig. 1 A first heat treatment device according to the invention is schematically shown. The device comprises a preheater 10, a calciner 20, and a cooler 30, which are arranged side by side. Although this requires more space, the overall height can be reduced.
[0045] The material to be processed enters the preheater through a reactant feed 60 at the first material inlet 12, is heated by the calciner's exhaust gas stream, and exits heated again through a first material outlet 14. From here, the material enters the second material inlet 22 of the calciner 20, where it undergoes thermal conversion. The material exits the calciner via a second material outlet 24 and enters the cooler 30 via the third material inlet 32. Here, the material is cooled and exits the cooler through the material outlet 34 via the product discharge 70.
[0046] Overall, the gas flow is counter-current. Cool gas enters the cooler 30 via the gas supply 80 and is heated by the material there. The heated gas exits the cooler 30 via the third gas outlet 38. Since the second gas inlet 26 of the calciner 20 is located significantly lower due to the adjacent design, the device has a second gas line 50, which has a second lower deflection 52 at its lower end.
[0047] Typically, a burner chamber for supplying the necessary thermal energy is located in the immediate vicinity of the second gas inlet 26. The preheated gas stream from the cooler 30, entering from below, serves as the main combustion air. The gas flows through the calciner 20, which, for example and preferably, has a separation cyclone at its end to separate gas and material. The gas is then led through the second gas outlet 28 into the first gas line 40, to be led again to a lower level of the first gas inlet 16 of the preheater 10. For this purpose, the first gas line also has a first lower deflection 42 at the bottom. In the preheater 10, the hot gas entering from below heats the cold material entering from above and is itself cooled in the process. The cool gas is then led through the first gas outlet 18 to the gas outlet 90. The gas outlet 90 can, for example, have a dust separator.
[0048] The Fig. 2 The second heat treatment device according to the invention shown in Figure 1 differs from the one shown in Figure 1 Fig. 1 shown first device according to the invention for heat treatment in that it additionally has a residence time container 100 between the second material outlet 24 and the third material inlet 32.
[0049] In Fig. 3 A more exemplary embodiment of the second heat treatment device according to the invention is shown in more detail. It can be seen that in the Fig. 3In the embodiment shown, both the preheater 10 and the cooler 30 are each formed by three cyclone stages, each cyclone stage having a riser and a cyclone separator connected to it, as well as a material chute with a gas closure device and dispersion device. In addition to the reactant feed 60, a further material feed 110 is shown, for example for the return of filter dust. Within the risers of the individual cyclone stages, the material flow and the gas flow move in cocurrent, but overall the gas and material flow pass through the device in countercurrent. The individual assemblies, calciner 20, preheater 10 and cooler 30, are connected by gas lines 40, 50, the lower connection in the embodiment shown being a U-shaped lower deflection 42, 52.The material outlets 14, 24 of the individual assemblies are connected to the material inlets 22, 32, allowing material to be fed via chutes without the need for additional conveying devices (vertical or horizontal). Furthermore, an additional retention tank 100 is provided to increase the time the material remains at process temperature. The advantage of the embodiment shown here is that, through a clever vertical orientation of the lower deflectors 42, 52, the solid material streams emerging here can be fed back to the cooler 30.
[0050] In this exemplary embodiment, the advantages of the invention are further evident: in a device according to the invention, the installation height can be significantly reduced compared to a device according to the prior art, in which all cyclone stages are arranged one above the other. This allows, for example, a shorter conveyor element to be used for the material feed 60 to the preheater stage compared to the prior art. Due to the inventive arrangement of the modules next to one another, the center of gravity of the individual modules is at a significantly lower height level compared to the prior art. Modifications to the arrangement, sizes, number of cyclone stages, lengths of the risers, and the installation of additional modules, such as a retention tank 100 shown here, only affect the height of a single module, in this case the calciner, and not the installation height and design of the other two modules. Reference symbol
[0051] 10 Preheater 12 First material inlet 14 First material outlet 16 First gas inlet 18 First gas outlet 20 Calciner 22 Second material inlet 24 Second material outlet 26 Second gas inlet 28 Second gas outlet 30 Cooler 32 Third material inlet 34 Third material outlet 36 Third gas inlet 38 Third gas outlet 40 First gas line 42 First lower deflection 50 Second gas line 52 Second lower deflection 60 Educt feed 70 Product discharge 80 Gas feed 90 Gas discharge 100 Retention tank 110 Further material feed
Claims
1. Apparatus for the heat treatment of mineral materials, wherein the apparatus has three assemblies, wherein the first assembly is a preheater (10), wherein the second assembly is a calciner (20) and wherein the third assembly is a cooler (30) , wherein the preheater is an entrained flow preheater, wherein the calciner is an entrained flow calciner, wherein the calciner (20) is directly connected to the cooler, characterised in that at least two of the three assemblies are arranged next to each other, wherein the preheater (10) has a first gas inlet (16) and a first gas outlet (18), wherein the calciner (20) has a second gas inlet (26) and a second gas outlet (28), wherein the cooler (30) has a third gas inlet (36) and a third gas outlet (38), wherein the second gas outlet (28) is connected to the first gas inlet (16) via a first gas line (40), wherein the third gas outlet (38) is connected to the second gas inlet (26) via a second gas line (50), wherein the first gas line (40) and the second gas line (50) each have a falling gas line section and a lower deflection (42, 52) on the underside.
2. Device according to claim 1, characterised in that the three assemblies are arranged next to each other.
3. Device according to one of the preceding claims, characterised in that the preheater consists of a cascade of three to eight cyclone heat exchangers.
4. Device according to one of the preceding claims, characterised in that the cooler consists of a cascade of two to six cyclone heat exchangers.
5. Device according to one of the preceding claims, characterised in that the preheater (10) has a first material inlet (12) and a first material outlet (14), wherein the calciner (20) has a second material inlet (22) and a second material outlet (24), wherein the cooler (30) has a third material inlet (32) and a third material outlet (34), wherein the first material outlet (14) is arranged above the second material inlet (22), wherein the second material outlet (24) is arranged above the third material inlet (32).
6. Device according to one of claims 1 to 5, characterised in that at least one lower deflection (42, 52) is designed as a U-shaped deflection with a tapering course.
7. Device according to one of claims 1 to 5, characterised in that the at least one lower deflector (42, 52) has an inflow chamber or a settling chamber below the downstream riser.
8. Device according to one of claims 1 to 5, characterised in that at least one lower deflector (42, 52) has a vortex pot below the downstream riser.
9. Device according to one of the preceding claims, characterised in that the second lower deflection (52) of the second gas line (50) has a second outlet for solids, the solids removed from the second outlet being fed to the product stream coming from the third material outlet (34).
10. Device according to one of the preceding claims, characterised in that the first lower deflection (42) of the first gas line (40) has a first extraction point for solid material, the first extraction point being arranged above the third material inlet (32), the solid material extracted from the first extraction point being fed to the third material inlet (32).
11. Device according to one of the preceding claims, characterised in that a fan is arranged in at least one falling gas line section.
12. Device according to one of the preceding claims, characterised in that a dwell time container (100) is arranged between the second material outlet (24) and the third material inlet (32), wherein the second material outlet (24) is arranged above the dwell time container (100), wherein the third material inlet (32) is arranged below the dwell time container (100).
13. Device according to one of the preceding claims, characterised in that a material flow divider is arranged between the second material output (24) and the third material input (32), wherein the material flow divider has a first partial flow output and a second partial flow output, wherein the first partial flow output is connected to the third material input (32), wherein the second partial flow output is connected to the calciner (20).
14. Device according to one of the preceding claims, characterised in that the calciner (20) has at least one ascending calciner section, wherein the calciner (20) can have a descending calciner section, wherein the descending calciner section is shorter than the ascending calciner section.
15. Device according to one of the preceding claims, characterised in that an additive supply for supplying further additives for conditioning the gas stream is arranged in the first gas line (40) and / or the second gas line (50).
16. Device according to one of the preceding claims, characterised in that a heating device for supplying thermal energy is arranged in the first gas line (40) and / or the second gas line (50).