AI Technical Summary

Technical Problem

In 3D printing processes, the melted building material often exceeds its critical residence time in the nozzle, leading to degradation and thermal preloading, resulting in poor quality components due to inefficient material usage and prolonged thermal stress.

Method used

A method that optimizes building material consumption and quality by calculating and adjusting the resulting residence time to be below the critical residence time for each material, using an additive manufacturing process, where materials are melted only when needed, and additional elements are introduced to reduce thermal stress, allowing for continuous use of fresh material.

Benefits of technology

This approach significantly reduces material degradation, optimizes material usage, and ensures the production of high-quality components by maintaining building materials within their non-degraded state throughout the process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 1.1
    Figure 1.1
Patent Text Reader

Abstract

In a method for producing, by means of an additive manufacturing method or a 3D printing process, at least one component comprising at least two build materials each having a critical residence time T_x_max, data for producing the component are provided and the component is divided into at least one build portion having corresponding build portion information. After deriving at least one build material volume and at least one average removal rate per build portion from the build portion information, at least one build time per build portion and at least one resulting residence time t_x for each build material are calculated from the build material volume and the removal rate. The resulting residence times t_x are compared with the respective critical residence times T_x_max of the corresponding build materials. By virtue of the fact that at least one adaptation of the data is carried out, such that the respective resulting residence times t_x are less than the respective critical residence times T_x_max of the corresponding build materials, if at least one resulting residence time t_x exceeds the respective critical residence time T_x_max of the corresponding build material, this results in an optimization with regard to the consumption of the required build material and the quality of the component.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] Method for producing at least one component

[0002] Description

[0003] Reference to related applications

[0004] The present application relates to and claims the priority of German patent application 10 2021 128 639.5, filed on November 3, 2021 , the disclosure content of which is hereby expressly incorporated in its entirety into the subject matter of the present application.

[0005] Field of the invention

[0006] The invention relates to a method for producing at least one component according to the preamble of claim 1, a machine control according to the preamble of claim 14, a machine according to the preamble of claim 15 and a computer program product according to the preamble of claim 16.

[0007] To explain the invention, some terms are first defined as follows:

[0008] For the purposes of this application, a "resulting residence time" is understood to mean the period of time during which a construction material, e.g., a plastic, a thermoplastic material, or a support material, is melted in a machine under thermal stress. For example, in a machine, e.g., a machine for processing plastics and other plasticizable materials, a production machine, or a 3D printing machine, a certain amount of construction material is melted and remains in a heated nozzle at a certain temperature until the construction material is discharged.

[0009] In the context of this application, a "critical residence time" is understood to be the period of time during which degradation or thermal pre-stressing of the building material as a result of the residence time does not yet occur. If this critical residence time is exceeded, degradation or thermal pre-stressing of the building material occurs. Depending on the temperature and the residence time, degradation or thermal pre-stressing of the building material and thus a physical and chemical structural change in the building material, e.g. a plastic, a thermoplastic material or a support material, can occur. This can, for example, cause changes in the flow properties and / or negative effects on the mechanical properties of the manufactured components. The longer the building material is exposed to this temperature, i.e. with long residence times, the lower the temperatures, the lower the degradation or thermal pre-stressing begins.Since the degradation rate increases exponentially with temperature, the critical residence time is shortened at higher temperatures. Overall, low and high temperatures result in long and short critical residence times, respectively. Furthermore, the critical residence time can depend on the material itself, the chemistry, and / or the pressure.

[0010] State of the art

[0011] Nowadays, a wide variety of components, for example for prototypes or small series, can be produced using a 3D printing process, for example in extruding or melting 3D printing processes such as FDM (e.g. EP 1 886 793 B1). For this purpose, a certain amount of build material, e.g. a plastic, a thermoplastic material or a support material, is melted and fed into a heated nozzle of a machine, e.g. a machine for processing plastics and other plasticizable masses, a production machine or a 3D printing machine. The molten build material is initially subjected to thermal stress in a heated nozzle. The component is then produced layer by layer using a 3D printing machine, for example, by extruding build material from the nozzle.Depending on the size of the component, its production takes a certain amount of time, with the production time generally scaling with the size of the component. For example, if the building material remains at too high a temperature for too long, degradation or thermal pre-stressing of the building material can occur, which can result in a physical and / or chemical structural change of the building material. This can, for example, lead to changes in the flow properties and / or negative effects on the mechanical properties of the manufactured components.

[0012] DE 10 2013 004 845 A1 discloses a condition monitoring device for a resin, wherein the condition monitoring device comprises a temperature detection unit and a resin deterioration state calculation unit. A warning output unit issues a warning if the deterioration state determined by the resin deterioration state calculation unit exceeds a predetermined limit. In the prior art, in 3D printing processes, the molten build material provided is flushed out regardless of the actual residence time, thereby unnecessarily increasing the demand for build material. For example, it may happen that a certain build material is only needed for a short time for a small volume of a large component, so that the build material remaining in the nozzle exceeds the critical residence time due to a long waiting time and thus leads to poor results when used, e.g.This can lead to deterioration of the component's quality. For example, if a large volume of a different build material is dispensed, the build material also remains in the nozzle for a long time, which can result in the critical residence time being exceeded.

[0013] US 2020 / 0 005 224 A1 discloses oxidation induction times and residence times, as well as various heating temperatures for the various materials, from a database to prevent material deterioration. When injection settings are made, the residence times and oxidation induction times from the database are compared, and the injection settings or conditions can be automatically corrected.

[0014] Document JP 2016 159481 A discloses, for injection molding machines not intended for additive manufacturing or 3D printing, an injection molding machine with a controller. The controller is configured to set a first dwell time for regulating the dwell time of the resin material in the heating cylinder and a second dwell time that is longer than the first dwell time. Furthermore, the injection molding machine includes a timer that counts a standby time from the time the previous injection process is executed to the time the next injection process is executed.When the standby time reaches the first dwell time, the controller is configured to drive a notification device to notify the operator that the standby time is approaching the second dwell time and to control the notification device to flush the resin material retained in the heating cylinder in front of the operator and to prohibit the operation of the injection molding machine until the flushing operation is completed.

[0015] JP 2004001 403 A also discloses, in the field of injection molding machines, an injection molding machine for molding a molded product in which at least two types of resin materials with different compositions and color tones are integrated.

[0016] Document EP 3 970 945 A1 discloses 3D printing feedstocks containing filaments with separate layers or sections, which can be produced by co-extrusion, micro-layer co-extrusion, or multi-component / fractal co-extrusion. The filaments enable the simultaneous deposition or combination of different materials through one or more nozzles during the 3D printing process and enable smaller layer sizes in the milli-, micro-, and nanoscale.

[0017] Document WO 2021 / 049935 A1 discloses a dispensing head for additive manufacturing with continuous fiber-reinforced fused filaments. The dispensing head is configured to dispense a material onto a substrate support platform and includes one or more outlets for receiving a strand of meltable solid material and a reinforcing fiber, and a material passage extending from the receiving inlets to a dispensing outlet. The dispensing head further includes a material heating unit for liquefying the material into a drive device for propelling the material through the material passage.

[0018] Summary of the invention

[0019] Based on this prior art, the present invention is based on the object of providing a method for producing at least one component which is optimized with regard to the consumption of the required construction material and the quality of the component.

[0020] This object is achieved by a method for producing at least one component having the features of claim 1, a machine control having the features of claim 14, a machine having the features of claim 15 and by a computer program product having the features of claim 16.

[0021] Advantageous further developments are the subject of the dependent patent claims. The features listed individually in the patent claims can be combined with one another in a technologically expedient manner and can be supplemented by explanatory facts from the description and details from the figures, thereby demonstrating further embodiments of the invention.

[0022] The method for producing at least one component comprising at least two construction materials, e.g., plastics, thermoplastic materials, or support materials, each with a critical residence time T_x_max, comprises the following steps. The component is produced using an additive manufacturing process or a 3D printing process, e.g., a layer-by-layer printing process. The support materials can be removed from the component after the manufacturing process, e.g., a 3D printing process, for example, by breaking them away (mechanical detachment) and / or by treatment with water and / or chemicals.

[0023] First, data for manufacturing the component is provided, such as CAD data, geometry data, machine data, peripheral device data, temperature data, number of build materials, build material temperature data, and / or build material data. Furthermore, the data may also contain information about the machine used, e.g., a machine for processing plastics and other plasticizable materials, a production machine, or a 3D printing machine, peripheral devices used, or information about, for example, the size and settings of the discharge nozzles. The data may, for example, be provided as a data set, in particular as a CAD data set, e.g., for data processing. However, the data may also, for example, be provided in whole or in part separately for data processing.

[0024] The component is broken down into at least one construction section, e.g. into one layer or several layers with corresponding construction section information. The construction section information can contain similar information to the data for manufacturing the component, e.g. information regarding the construction material, the construction material volume, the construction material temperature, the construction strategy, the manufacturing process and / or the machine used. The breakdown can, for example, be carried out automatically by the data preparation using the data provided or following a selection by the operator. For example, it is preferably possible for the operator to first select a construction strategy and then the component is broken down into at least one corresponding construction section with corresponding construction section information. It is also possible for the construction strategy to be selected automatically depending on the component.Furthermore, it is possible that when the component is divided into construction sections, the requirement for construction material, e.g. support material, is also calculated.

[0025] At least one construction material volume and at least one average discharge rate per construction section, e.g., per shift, are derived from the construction section information. Preferably, the at least one construction material volume and the at least one average discharge rate per construction section are derived for each construction material. Preferably, the construction material volume and the average discharge rate per construction section depend on the selected construction strategy.

[0026] From the construction material volume and the discharge rate per construction section, at least one construction time per construction section and at least one resulting residence time t_x per construction material are calculated. For example, the construction material volume per construction section is required for construction-section-specific dosing. To advantageously avoid providing an unnecessarily large amount of construction material and thus reduce the resulting residence time of the construction material in the heated state, at least one, preferably each, construction material is melted shortly before the construction material is deposited, only in accordance with the volume of construction material required in the construction section.

[0027] Preferably, it is also possible for the construction material to be melted and / or provided discontinuously. The construction material can, for example, be processed discontinuously in a plasticizing unit, preferably according to a corresponding specification regarding the volume, for example from a data set, and provided as a mass cushion. Preferably, it can be provided that only a corresponding volume of construction material is to be melted for a specific construction phase. The mass cushion is then emptied during discharge. After that, "new" construction material can be provided and / or melted again. The molten construction material can then be fed into the nozzle as soon as construction material has been discharged from the nozzle. The nozzle is thus always filled with construction material.

[0028] In a comparison, the resulting residence times are compared with the respective critical residence times of the corresponding building materials.

[0029] In order to advantageously achieve an optimization with regard to the consumption of the required building material and the quality of the component, at least one adjustment of the data is carried out so that the respective resulting residence times t_x are below the respective critical residence times T_x_max of the corresponding building materials if at least one resulting residence time t_x exceeds the respective critical residence time T_x_max of the corresponding building material.

[0030] The adaptation can, for example, be implemented in the form of an adapted data set. For example, the adapted data set can be sent to the machine as a machine-readable code, e.g., as a G-code, for process-specific production. For example, the G-code contains the relevant NC data for moving the axes and the instructions for depositing the construction material. Furthermore, the calculated data for the construction phase-related volume and the calculated dwell time can be included. The adapted data can, for example, be transferred to a machine control system and / or the machine, whose control system then continues the corresponding construction progress with the adapted data. The data is then used to manufacture the component.

[0031] Preferably, at least one of the above-mentioned steps takes place before the first production of the component, which advantageously allows the manufacturing process to be better planned and construction material to be saved. For an advantageously effective saving in the consumption of construction materials, the adaptation is preferably carried out in such a way that at least one construction section and / or the corresponding construction section information is changed. For example, the size of the layers and / or construction sections can be changed, disassembled, or divided differently. The adaptation can be carried out, for example, by the data preparation. It is also possible for the data preparation to perform the adaptation automatically, or for the operator to select and / or adapt a construction section to be adapted and the corresponding construction section information.

[0032] If, for example, it is not possible to change the temperature of the building materials and advantageously prevent degradation or thermal pre-stressing of the building materials, the adjustment is preferably carried out by changing at least one resulting residence time t_x. Preferably, the resulting residence times t_x of all building materials are changed. For example, this can be achieved by discharging the building material at a less relevant point in and / or on the component or at a different point so that the building material cannot remain there for too long and, advantageously, degradation or thermal pre-stressing does not occur. By discharging the building material, “fresh” or thermally unstressed building material is provided and made available earlier. By discharging the building material from the nozzle, “fresh” orThermally unstressed build material is melted and delivered to the nozzle, and the thermally prestressed build material is further utilized to advantage. The resulting residence time t_x is reduced in this case, preferably set to zero.

[0033] When a component is manufactured, it may happen that a certain construction material is only needed at the beginning and then again towards the end of the manufacturing process. However, the construction material is under thermal stress the entire time, so that the construction material could show degradation or pre-thermal stress at least towards the end because it was not used and / or discharged for a longer period of time, in the middle of the manufacturing process. The residence time is therefore correspondingly long. In order to advantageously reduce or prevent the degradation or pre-thermal stress, the resulting residence time t_x is preferably changed, preferably reduced, by producing at least one additional element. The additional element has at least one construction material, but can also be made from several construction materials. By producing the additional element, construction material is used or removed at shorter intervals.discharged so that "fresh" or thermally unstressed building material is available at shorter intervals and thus the resulting residence time t_x is reduced because the building material is discharged "faster" or more frequently. Preferably, the additional element is at least one further component, which more preferably is at least partially inverse to the component to be manufactured. If, for example, for the sake of simplicity, a component constructed in layers consists of a building material A and a building material B, where, for example, the building material B can also be a support material and where only the building material A is used at the beginning and towards the end, the corresponding component would, for example, look like this: ABA. In this example, the first layer consists of the building material A, the second layer of the building material B and the third layer again of the building material A.A corresponding additional (inverse) component BAB is produced so that the building material A is also used between the beginning and the end of the manufacturing process, which advantageously prevents degradation or thermal pre-stressing of the building material A.

[0034] Preferably, the construction materials have a resulting residence time t_x of essentially zero, since they are used throughout the entire construction period, either on the component itself or on the additional element or the additional component. This advantageously results in essentially no degradation or pre-thermal stress on the construction material.

[0035] In order to advantageously ensure that, in the event of degradation or pre-thermal stress on the building material, that the component is constructed exclusively from non-thermally (pre-stressed) building material, the building material is preferably deposited in at least one construction phase, preferably first at the additional element in each construction phase. In the event of degradation or pre-thermal stress on the building material, the degraded or thermally pre-stressed building material is used first at the additional element, so that "fresh" or non-degraded or thermally pre-stressed building material is available again for the "correct" component. Degraded or thermally pre-stressed building material can therefore preferably be used or removed from the additional element to make room for "fresh" or non-thermally stressed building material.

[0036] The additional element can preferably be designed as at least a part of the component. More preferably, the additional element can be implemented in the component. Advantageously, this means that no further or additional component is produced, which saves time. Advantageously, less construction material is thus removed and the construction time and the residence time of all construction materials are accordingly not increased. More advantageously, this also means that the resulting residence time of the other construction materials is not increased. For example, the additional element can be added in the region of a support structure or a support geometry, or the additional element can be implemented in the support structure or the support geometry or form it, wherein the additional element has at least one construction material. In order to advantageously obtain the desired component, the additional element is preferably removed after the component has been manufactured.For example, it is possible to remove the support structure made with a support material and the additional element embedded in it together after the manufacturing process. The additional element can be removed, for example, by treatment with water and / or chemicals and / or by breaking it away (mechanical removal).

[0037] During a manufacturing process, e.g. a 3D printing process, it may happen that no additional element and / or further component can be manufactured because this would, for example, represent excessive consumption of building materials. In order to advantageously prevent degradation or thermal pre-stress, the adjustment is preferably carried out in such a way that at least one critical residence time T_x_max is changed, preferably increased. In principle, it is preferably conceivable that all critical residence times of all building materials are changed. The critical residence time T_x_max of the building material depends, among other things, on the building material itself, on the chemistry and on the temperature. For example, a different building material could be used, chemical additives and / or stabilizers could be added to the building material or the temperature of the building materials could be varied.For example, in the case of excessively varied build material distributions and long build jobs, the respective nozzle temperature can be lowered to a non-critical temperature, thus achieving a longer critical dwell time T_x_max without degradation or thermal pre-stress. For example, it is also possible to heat a build material to a correspondingly high temperature shortly before it is deposited, for example, in an upper layer of the component. In addition, the temperature of a build material can be lowered after the first few layers, when the build material is no longer needed for subsequent layers.

[0038] The critical residence time T_x_max depends, among other things, on the temperature. If the temperature of the respective construction material is preferably lowered, the critical residence time advantageously becomes longer overall or, for certain temperatures, approaches infinity. This means that, at this specific temperature, degradation or thermal pre-stressing of the construction material advantageously does not occur. The critical residence time T_x_max is preferably changed, preferably increased, by changing, preferably reducing, the temperature of at least one construction material for at least a specific period of time. More preferably, the temperature change occurs during, before, and / or after the production of the component.In order to avoid having to provide an unnecessarily large amount of building material and thus to reduce the resulting residence time in the heated state, each building material is preferably provided and melted only in accordance with the volume required in the construction phase shortly before the building material is deposited.

[0039] To advantageously reduce the consumption of building materials, several adjustments are preferably combined. For example, in the case of an unfavorable distribution of building materials in a multi-building material component, the temperature of the building materials of the component can be changed, resulting in a longer critical residence time T_x_max. At the same time, at least one additional element can be added and / or implemented, for example, in the support structure of the component, resulting in a shorter resulting residence time t_x. Preferably, at least two adjustments can take effect simultaneously.

[0040] To advantageously prevent degradation or thermal pre-stress during component production, at least one monitoring of the resulting residence times t_x and / or the flow properties of the construction materials, e.g., the process pressure or the construction material viscosity, is carried out during the manufacturing process. For example, the actual machine data is continuously compared with the target data from the data processing using a controller and adjusted if necessary. It is also conceivable that several different monitoring processes are carried out.

[0041] Preferably, if at least one resulting residence time is exceeded compared to the corresponding critical residence time of at least one building material and / or if the flow properties, e.g. the process pressure or the building material viscosity, of at least one building material change, the corresponding building material is discharged and / or new building material is provided and / or processed.

[0042] If, for example, it is detected that of the building materials A, B and C, building materials A and C each have a longer resulting residence time than the corresponding critical residence time and / or their flow properties change, for example compared to the flow properties at the beginning of the manufacturing process, building materials A and C are discharged and new or thermally unstressed building materials A and C are provided and / or processed. The resulting residence time t_x is advantageously reduced in this way or preferably starts again at zero (t_x = 0). For example, the building material can be discharged and new building material can be provided and / or processed by a machine control. Preferably, the thermally pre-stressed building material is discharged before the new building material is provided and / or processed. For example, the construction process can preferably be interrupted for this purpose.It is further preferred, however, also possible that the thermally pre-stressed building material is removed during the use of another building material, thereby advantageously saving time.

[0043] Preferably, at least one flushing process is initiated if at least one resulting residence time exceeds the corresponding critical residence time of a building material and / or if the flow properties change. The flushing process can be carried out, for example, automatically using a flushing station or manually by discharging the material into a suitable collecting container.

[0044] The problem is also solved by a machine control system for a machine for processing plastics and other plasticizable materials, in particular for a 3D printing machine. For advantageous optimization with regard to the consumption of the required construction material and the quality of the component, the machine control system is configured, designed, and / or constructed to carry out the previously described process.

[0045] The problem is also solved by a machine for processing plastics and other plasticizable materials, in particular a 3D printing machine. For advantageous optimization with regard to the consumption of the required construction material and the quality of the component, the machine is set up, designed, and / or constructed to carry out the process described above.

[0046] The problem is also solved by a computer program product. For advantages regarding optimization of the consumption of the required construction material and the quality of the component, the computer program product is stored on a computer-readable medium with a program code for implementing the method described above.

[0047] Further advantages emerge from the dependent claims and the following description of a preferred embodiment. The features listed individually in the claims can be combined with one another in a technologically expedient manner and can be supplemented by explanatory facts from the description and details from the figures, whereby further embodiments of the invention are shown.

[0048] Short description of the characters

[0049] The invention will be explained in more detail below using an exemplary embodiment illustrated in the accompanying figures. They show:

[0050] Fig. 1 is a flow chart,

[0051] Fig. 2 - 4 Alternatives of a component and another component (inverse component), Fig. 5 a component and a component with additional elements,

[0052] Fig. 6 a component,

[0053] Fig. 7 a component and a component with additional elements, Fig. 8a, 8b flow diagrams.

[0054] Description of preferred embodiments

[0055] The invention will now be explained in more detail by way of example with reference to the accompanying drawings. However, these embodiments are merely examples and are not intended to limit the inventive concept to a specific arrangement.

[0056] Before describing the invention in detail, it should be noted that it is not limited to the specific components of the device and the specific method steps, as these components and methods may vary. The terms used herein are intended solely to describe particular embodiments and are not intended to be limiting. Furthermore, when the singular or indefinite articles are used in the description or claims, this also refers to the plural of these elements, unless the overall context clearly indicates otherwise.

[0057] Fig. 1 shows a flow chart 100 illustrating the sequence of a method according to the invention for producing at least one component in an additive process or in a 3D printing process, comprising at least two construction materials, e.g., plastics, thermoplastic materials, or support materials, each with a critical residence time T_x_max. In a data preparation 102, in a step 106, data 104 for producing the component, such as, e.g., CAD, geometry, machine, peripheral device, temperature, number of construction materials, construction material temperature, or construction material data, are provided. Furthermore, the data can also include information about the machine used, e.g., a machine for processing plastics and other plasticizable materials, a production machine, or a 3D printing machine, peripheral devices, or information about, e.g., the size of the discharge nozzles. The data 104 can, for example, be provided as a data set, e.g.,as a CAD data set to a data processor 102, a machine controller, and / or a machine. However, the data 104 can also be provided separately to the data processor 102, for example.

[0058] In a step 108, the component is broken down by the data preparation into at least one construction section, e.g. into one layer or several layers n with corresponding construction section information. The breakdown can, for example, be carried out automatically by the data preparation or depending on a selection by the operator. Preferably, in a further exemplary embodiment, it is also possible for the operator to first select a construction strategy and then the component is broken down into at least one corresponding construction section with corresponding construction section information. It is also possible for the construction strategy to be selected automatically depending on the component. Furthermore, in a further preferred exemplary embodiment, it is possible for a requirement S for construction material, e.g. support material, to be calculated when the component is broken down into construction sections.

[0059] In a step 110, at least one construction material volume and at least one average discharge rate per construction section, e.g., per layer, are derived from the construction section information. Preferably, the corresponding construction material volume (e.g., V_A_n, V_B_n, V_C_n, ..., V_S_n) and the corresponding average discharge rate (e.g., Q_A_n, Q_B_n, Q_C_n, ..., Q_S_n) per construction section are derived for each construction material. The construction material volume and the average discharge rate per construction section are preferably dependent on the selected construction strategy.

[0060] The calculation of at least one construction time (e.g., T_A_n, T_B_n, T_C_n, ..., T_S_n) per construction section and at least one resulting residence time t_x per construction material (e.g., t_A, t_B, t_C, ..., t_S) from the construction material volume and the discharge rate is carried out in a step 112. The construction material volume per construction section is required, for example, for construction-section-related dosing. In order to advantageously avoid providing an unnecessarily large amount of construction material and thus reduce the resulting residence time of the construction material in the heated state, the construction material is melted only shortly before the construction material is deposited, in accordance with the volume of construction material required in the construction section.

[0061] In a step 114, the resulting residence times t_x (e.g., t_A, t_B, t_C, ..., t_S) are compared with the respective critical residence times T_x_max of the corresponding building materials (e.g., T_A_max, T_B_max, T_C_max, ..., T_S_max). If the comparison shows that the resulting residence times t_x of the respective building materials are below the respective critical residence times T_x_max, the manufacturing process is not adjusted. The data can then be passed on in a step 119, e.g., from data preparation to a machine control system or to a machine, e.g., a machine for processing plastics and other plasticizable materials, a production machine, or a 3D printing machine. The data can then be used to manufacture the component.

[0062] If the comparison shows that at least one resulting residence time t_x exceeds the respective critical residence time T_x_max of the corresponding construction material, the data 104 is adjusted in step 116 such that the respective resulting residence times t_x are below the respective critical residence times T_x_max of the corresponding construction materials. The data are then used in step 118 to manufacture the component.

[0063] In a preferred embodiment, the adaptation of the data 104 is carried out such that at least one construction section and / or the corresponding construction section information, e.g., is adapted by the data preparation 102.

[0064] The data set can therefore be advantageously adapted accordingly, or machine commands can be added to change the construction stage information. However, if the data available still makes it impossible to exceed the residence time - e.g. because a material is not discharged over several shifts - a temperature reduction can also be specified. This requires that the residence time of the material is calculated not just for one shift, but across several shifts. Finally, if the specified residence time on the machine is unexpectedly exceeded during production despite the measures initiated beforehand, a flushing process can be initiated. In the construction stage information, the required quantity of material that must be provided per shift can preferably be specified in addition to the travel commands.

[0065] To advantageously prevent degradation or thermal pre-stressing of the building material, in a preferred embodiment, the data 104 is adapted such that at least one resulting residence time t_x is changed. Due to the preferably shortened resulting residence time t_x, the building material is subjected to thermal stress for a shorter period of time, thereby preventing degradation.

[0066] In the preferred embodiments in Figs. 2 to 5, the resulting residence time t_x is changed, preferably reduced, by producing at least one additional element 210.

[0067] In the exemplary embodiment in Fig. 2, a component 200 is shown on the left side, which is constructed from two building materials 206 (S), 208 (A). The resulting residence time t_x is changed in Fig. 2 such that at least one additional element 210 is produced. In Fig.

[0068] 2, the additional element 210 is a further component 202 (inverse component) which is at least partially inverse to the component 200. The further component 202 (inverse component) is shown on the right-hand side in Fig. 2. In principle, the left-hand component in Fig. 2 could also represent the further component 202 (inverse component). In this case, the component on the right-hand side would then be the “correct” component. Preferably, both construction materials are discharged in Fig. 2. Advantageously, therefore, neither of the construction materials “stands” for longer, which would increase the critical residence time. For example, in the exemplary embodiment in Fig. 2, the production of the component 200 and the further component 202 is preferably carried out such that, for example, at least one construction section, for example a layer 204, preferably a plurality of layers, is discharged layer by layer from bottom to top. It can be seen from Fig. 2 that in a first (lower) layer both building materials 208 (A) and 206 (S) are of equal length orwere discharged frequently, or the same volume was discharged for each of the building materials 208 (A) and 206 (S). Once, the building material 208 (A) was discharged in the first (lowest) layer of the component 200 (left side), and once, the building material 206 (S) was discharged just as frequently in the first (lowest) layer of the further component 202 (right side). The discharged volumes of the two building materials 208 (A) and 206 (S) in Fig. 2 are thus preferably the same for the component 200 and for the further component 202 taken together. In principle, however, the discharged volumes can also be different. Essentially, it is a matter of both building materials being discharged, and neither of the building materials "stands" for longer, thereby increasing the residence time. For example, the building materials can be discharged with different frequencies at different critical residence times.

[0069] Preferably, during the production of component 200 and further component 202, the total volume of component 200 is consumed per build material. The volume of build material 206 (S) of component 200 and further component 202 corresponds to the volume of build material 208 (A) of component 200 and further component 202, which, assuming an equal average discharge rate per layer in Fig. 2, also results in an equal build time for each build material 206 (S) and 208 (A). The resulting residence time t_x of build materials 206 (S) and 208 (A) is also equal or essentially zero in the case of parallel production of components 200 and 202 in the exemplary embodiment in Fig. 2, since both build materials 206 (S) and 208 (A) are continuously in use throughout the entire production process.

[0070] In the exemplary embodiment in Fig. 2, the construction material is preferably deposited in at least one construction phase, preferably in each construction phase first on the additional element 210 or on the further component 202. First, the first layers with the construction material 206 (S) for the further component 202 are discharged until the construction material 208 (A) for the further component 202 has been discharged at least once in the manufacturing process for a certain time. After a certain time or after a certain discharge of the construction material 208 (A) for the further component 202, e.g. after a layer 204, the component 200 or, in Fig. 2, the first layer 204 of the component 200 with the construction material 208 (A) is then discharged. This can advantageously ensure that the component 200 is constructed exclusively from construction material that has not been subjected to thermal pre-stress.The additional component 202 essentially serves to remove thermally pre-stressed construction material, so that the component 200 can be constructed from non-thermally pre-stressed construction material. Therefore, the shape of the additional component 202 is, in principle, arbitrary.

[0071] In a further preferred embodiment, the discharge of the construction materials 206 (S) and 208 (A) can also take place simultaneously or in parallel, since, for example, a separate discharge nozzle can be provided for each construction material 206 (S) and 208 (A). Further preferably, the component 200 and the further component 202 can be manufactured simultaneously. In this case, the component 200 and the further component 202 are preferably manufactured at a distance from one another, since the discharge nozzles are spaced apart from one another.

[0072] In a further embodiment according to Fig. 3, a component 300 is shown on the left side, which is constructed from three building materials 206 (S), 208 (A) and 310 (B). On the right side, the corresponding further component 302 (inverse component) is shown, which in Fig. 3 is approximately twice as large as the component 300. In principle, the further component 302 can also be divided into several components. Here, too, the component 300 and / or the further component 302 can be made from at least one layer 204, preferably from several layers, e.g.

[0073] Layer 204 by layer 204. The respective discharged volumes of the three construction materials 206 (S), 208 (A) and 310 (B), i.e. the component 300 and the further component 302 taken together, are overall the same and correspond in Fig. 3 to the volume of the component 300, so that, assuming an equal average discharge rate per layer, the same construction time results for the three construction materials 206 (S), 208 (A) and 310 (B). Also, in the case of parallel production of the components 300 and 302 in the embodiment according to Fig. 3, the resulting residence time t_x of the build materials 206 (S), 208 (A) and 310 (B) is equal to or substantially equal to zero, since the build materials 206 (S), 208 (A) and 310 (B) are continuously in use throughout the entire 3D printing process.

[0074] 2 and 3, the same applies to a further preferred embodiment according to Fig. 4. In Fig. 4, on the left-hand side, a component 400 is shown, which is constructed from four building materials 208 (A), 206 (S), 310 (B) and 412 (C). On the right-hand side, the additional element 210 or a further component 402 is shown, which is approximately three times as large as the component 400. Here, too, the component 400 and / or the further component 402 can be constructed layer by layer from at least one layer 204, preferably from several layers. As in the embodiments in Fig. 2 and Fig. 3, the embodiment according to Fig.4, the volumes of the four build materials 208 (A), 206 (S), 310 (B), and 412 (C) taken together are equal, so that, assuming an equal average discharge rate per layer, the same build time results for each of the four build materials 208 (A), 206 (S), 310 (B), and 412 (C). In the case of parallel production of the components 400 and 402 in the embodiment according to Fig. 4, the resulting residence time t_x of the build materials 208 (A), 206 (S), 310 (B), and 412 (C) is equal or essentially zero, since the build materials 208 (A), 206 (S), 310 (B), and 412 (C) are continuously in use throughout the entire 3D printing process. In principle, the component can have any number of build materials. If more building materials are used in further embodiments, the size of the additional component increases accordingly.

[0075] In a further preferred embodiment according to Fig. 5, a component 500 is shown on the left-hand side, which is constructed from two construction materials 206 (S) and 208 (A) and corresponds to the component 200 from Fig. 2. The construction material 206 (S) can, for example, be a support material that can be removed after the manufacturing process. The component 500 is constructed from at least one layer 204, preferably from several layers, in an additive manufacturing process or a 3D printing process, e.g. in a layer-by-layer printing process. At least one additional element 210 is implemented in Fig. 5 in the component 500, e.g. in a support structure consisting of the construction material 206 (S). The result is shown on the right-hand side in Fig. 5 as component 502 with two additional elements 210. In Fig.In Fig. 5, two additional elements 210 consisting of the construction material 208 (A) were implemented on the left side of the component 500, which can be removed together with the construction material 206 (S) after the manufacturing process. The construction material 208 (A) is thus used or removed more frequently by implementing the additional elements 210, advantageously resulting in a shorter overall residence time of the construction material 208 (A). The additional elements 210 in Fig. 5 also advantageously serve as a support structure during the manufacturing process, as they stabilize the entire component 502.

[0076] In principle, the shape of the additional elements 210 is arbitrary. It is important that the corresponding build material is used or removed, thus shortening the resulting residence time t_x. In other words, in the exemplary embodiment in Fig. 5, only the build material 208 (A) is used in the lower layers of the component 500. In the middle region of the component 500, less build material 208 (A) and more build material 206 (S) is used. Therefore, it can happen that the build material 208 (A) "stands" for a long time and the resulting residence time of the build material 208 (A) increases accordingly and becomes longer than the critical residence time. The reason for this is that little material is removed and thus remains in the thermally stressed state for longer, whereby the resulting residence time of the build material 208 (A) increases. Therefore, in the exemplary embodiment in Fig.5, on the right side, two additional elements 210 are implemented into the construction material 206 (S) of the component 502. This reduces the dwell time of the construction material 208 (A), since the construction material 208 (A) is used at shorter intervals. Furthermore, the construction material 208 (A) is advantageously also used in a useful way, e.g., as a support structure.

[0077] In a further preferred embodiment according to Fig. 5, the additional element 210 is removed after the production of the component 502. In Fig. 5, the construction material 206 (S) surrounding the additional elements 210 is a support material that can be removed after the manufacturing process, for example, by treatment with water and / or chemicals and / or by breaking away (mechanical removal). By removing the construction material 206 (S), the additional elements 210 embedded therein are also removed.

[0078] In a further preferred embodiment, the adjustment is carried out such that at least one critical residence time T_x_max is changed. The critical residence time T_x_max of the building material depends, among other things, on the building material itself, the chemistry, and the temperature. For example, a different building material could be used, chemical additives and / or stabilizers could be added to the building material, or the temperature could be varied. If, for example, the temperature of the respective building material is lowered, the critical residence time T_x_max increases. Preferably, this time approaches infinity for a corresponding temperature so that no degradation or thermal pre-stress can occur.

[0079] In a further embodiment according to Fig. 6, the critical residence time T_x_max is changed by changing, preferably lowering, the temperature of at least one build material for at least a specific period of time. Fig. 6 shows a component 600 which is constructed from four build materials 310 (B), 412 (C), 206 (S) and 208 (A) and corresponds to the component 400 from Fig. 4. The component 600 in Fig. 6 is constructed from several layers, layer by layer from bottom to top. In Fig. 6, at a time 610, the temperature of the build material 208 (A) is lowered because the build material 208 (A) is no longer required for the remainder of the 3D printing process. Preferably, the temperatures of the build materials 412 (C) and 206 (S) are previously increased to a corresponding temperature because these build materials were not required previously.

[0080] For example, if the build material distributions are too different and the build orders are long, the respective temperature of the build material or the corresponding nozzle can be lowered to a non-critical temperature, so that a longer resulting residence time is achieved without material degradation or the critical residence time is longer, preferably approaching infinity. At a time 614, the temperatures of the build materials 412 (C) and 206 (S) are lowered, since they are also no longer needed. The temperatures are correspondingly low, so that the critical residence time T_x_max is correspondingly long, preferably approaching infinity. At a time 612, the temperature of the build material 310 (B) is preferably increased, since the build material 310 (B) was not needed previously but was only needed later in the production of the component 600.Since the building material 310 (B) is subsequently used for the entire remaining time, despite the temperature increase of the building material 310 (B), the resulting residence time of the building material 310 (B) is preferably less than the critical residence time T_x_max of the building material 310 (B), so that no degradation or thermal pre-stress of the building material 310 (B) occurs.

[0081] In a further embodiment according to Fig. 7, several adaptations are combined with one another. In Fig. 7, on the left-hand side, a component 700 is shown which is constructed from three construction materials 208 (A), 206 (S) and 310 (B) and corresponds to the component 300 from Fig. 3. Like the component 300 from Fig. 3, the component 700 in Fig. 7 is also constructed from several layers or layer by layer from bottom to top. An adaptation to the component 700 takes place in such a way that, as already explained above with reference to Fig. 5, at least one additional element 210 is added to the component 700. The result is shown on the right-hand side in Fig. 7 as component 702. The component 702 has two additional elements 210 consisting of the construction material 208 (A). Preferably, the construction material 206 (S) surrounding the additional elements 210 is a support material that can be removed after the manufacturing process with the additional elements 210 embedded therein.A further adjustment, corresponding to the right-hand side in Fig. 7, is performed by, for example, only increasing the temperature of the building material 206 (S) or the temperature of the building material 310 (B) at a time 710 or 712, respectively, since these are no longer needed (see also the exemplary embodiment according to Fig. 6). At a time 714, the temperatures of the no longer needed building materials 208 (A) and 206 (S) are lowered so that their critical residence time T_x_max is increased, preferably approaching infinity.

[0082] In Fig. 7, two adjustments are thus made on the right-hand side. First, additional elements 210 are added to component 700, which changes or shortens the resulting residence time t_x of build material 208 (A) because it is discharged at shorter intervals due to the additional elements 210. Second, the critical residence times T_x_max are changed, for example, by increasing the temperature of build material 310 (B) only at time 712 or by lowering the temperatures of build materials 208 (A) and 206 (S) at times 710 and 714, respectively, thus changing or increasing the critical residence times.

[0083] In order to advantageously prevent degradation or thermal pre-stress during production, different process monitoring systems are preferably in place. ACTUAL data from the machine is continuously compared with the TARGET data from the data processing using a controller and adjusted if necessary. In a further preferred embodiment, at least one monitoring of the resulting residence times and / or the flow properties of the construction materials, e.g. process pressures or construction material viscosity, is carried out during production of the component. For example, the actual construction time of the construction materials for each construction phase is compared with the construction time per construction phase calculated from the data processing. If there is degradation or thermal pre-stress of the material, the flow properties change and deviations or fluctuations occur, e.g. in the process pressure, which can be detected by the machine or its measuring sensors.

[0084] If at least one resulting residence time exceeds the corresponding critical residence time of a building material and / or if the flow properties, e.g. the process pressure or the building material viscosity of at least one building material, change, the corresponding resulting residence time t_x is reduced in a further preferred embodiment by providing and / or processing new building material.

[0085] In a further preferred embodiment, if at least one resulting residence time exceeds the corresponding critical residence time of a building material and / or if the flow properties change, the corresponding building material is discharged, e.g., in an additional element 210, and / or new building material is provided and / or processed. The processing and / or provision of the new building material preferably takes place following the discharge.

[0086] In a further preferred embodiment, at least one rinsing process is initiated if at least one resulting residence time exceeds the corresponding critical residence time of a building material and / or if the flow properties change.

[0087] If, for example, deviations are detected during the construction process, e.g., in the construction time per construction phase, in the process pressure, or in the viscosity of the construction material, different methods are used depending on the machine's equipment. If, for example, a rinsing station is present, a rinsing process is initiated so that degraded or thermally pre-stressed construction material can be rinsed out. If there is no rinsing station, the construction process is interrupted, for example, and the operator is asked to manually collect the thermally pre-damaged construction material in an appropriate container. In principle, it is also possible for the construction process not to be interrupted, and for the thermally pre-stressed construction material to be rinsed out while other construction materials are in use. This can preferably take place automatically, e.g., controlled by the machine control system. In one embodiment, a flow chart 800 is shown in Fig. 8a. A machine 806, e.g.,In a machine for processing plastics and other plasticizable materials, a production machine, or a 3D printing machine, data, e.g., regarding the build material volume, the build material temperature, and / or the build time per construction phase, is provided by a data processor 804 in a step 808. In principle, other data, e.g., CAD, geometry, machine, peripheral device, temperature, build material quantity, build material temperature, or build material data, can also be provided. In Fig. 8a, the data is transmitted to the machine 806 as machine instructions 820.

[0088] In Fig. 8b, a flow chart 802 is shown according to a further embodiment. The machine 806 starts the production of the component in a step 810, for example with the data 808 and / or machine instructions 820 provided in Fig. 8a. In a step 812, the construction material is metered based on the data regarding the construction material volume per construction section. In a step 814, the construction material is deposited accordingly in order to manufacture the component. During the production of the component, in a step 816, the actual construction times T_x, n, real per construction section of the individual construction materials are preferably monitored with the calculated construction times per construction section and / or the process pressure p. This can, for example, compare and / or monitor the actual construction time per construction section with the calculated construction time per construction section. If there is degradation orIf the material is subjected to thermal pre-stress, the flow properties change and deviations or fluctuations occur, e.g. in the process pressure.

[0089] If there is no significant deviation, e.g. if the actual construction times essentially correspond to the calculated construction times and the process pressure is constant, production is completed in a step 818.

[0090] However, if a deviation occurs, for example due to different actual construction times or a non-constant process pressure, various options are provided in Fig. 8b depending on the machine's equipment. In a step 822, if at least one resulting residence time t_x exceeds the corresponding critical residence time T_x_max of a construction material and / or if the flow properties of a construction material change, the resulting residence time t_x is reduced by providing and / or processing new construction material.

[0091] In a further preferred embodiment, the corresponding building material is removed before the provision and / or processing of the new building material. If, for example, a flushing station is present, in a further preferred embodiment, at least one flushing process can be initiated so that degraded or thermally pre-stressed building material can be flushed out.

[0092] If no rinsing station is present, in a further preferred embodiment the rinsing process can be carried out manually or, for example, the machine instructions 820 can be processed and the provided building material can be discharged, for example, in an additional element 210, e.g. implemented as a support geometry.

[0093] In a further embodiment, a machine control system for a machine for processing plastics and other plasticizable masses, in particular for a 3D printing machine, is disclosed, which is configured, designed and / or constructed to carry out at least one of the previously described methods while achieving the stated advantages.

[0094] A machine for processing plastics and other plasticizable masses, in particular a 3D printing machine, is disclosed in a further embodiment, which is arranged, designed and / or constructed to carry out at least one of the previously described methods while achieving the stated advantages.

[0095] A further embodiment forms a computer program product with a program code stored on a computer-readable medium for carrying out at least one of the methods described above while achieving the aforementioned advantages.

[0096] It is to be understood that this description is susceptible to various modifications, changes and adaptations which come within the range of equivalents to the appended claims.

[0097] List of reference symbols

[0098] 100 Flowchart 502 Component

[0099] 102 Data preparation 600 Component

[0100] 104 Data 610 Time

[0101] 106 Step 612 Time

[0102] 108 Step 614 Time

[0103] 110 Step 700 Component

[0104] 112 Step 702 Component

[0105] 114 Step 710 Time

[0106] 116 Step 712 Time

[0107] 118 Step 714 Time

[0108] 119 Step 800 Flowchart

[0109] 200 Component 802 Flowchart

[0110] 202 additional component (inverse component) 804 data processing

[0111] 204 Shift 806 Machine

[0112] 206 Building Material (S) 808 Step

[0113] 208 Building Material (A) 810 Step

[0114] 210 Additional element 812 Step

[0115] 300 Component 814 Step

[0116] 302 additional component (inverse component) 816 step

[0117] 310 Building Material (B) 818 Step

[0118] 400 Component 820 Machine Instructions

[0119] 402 additional component (inverse component) 822 step

[0120] 412 Building material (C) 824 step

[0121] 500 components

Claims

- 24 - Patent claims 1. Method for manufacturing at least one component using an additive manufacturing process or a 3D printing process, comprising at least two building materials, each with a critical residence time T_x_max, and comprising the steps: Provision of data for the manufacture of the component, Breaking down the component into at least one construction phase with corresponding construction phase information, - Deriving at least one building material volume and at least one average discharge rate per construction phase from the construction phase information, Calculate at least one construction time per construction phase and at least one resulting residence time t_x per building material from the building material volume and the discharge rate, - Comparison of the resulting residence times t_x with the respective critical residence times T_x_max of the corresponding building materials, Make at least one adjustment to the data so that the respective resulting residence times t_x are below the respective critical residence times T_x_max of the corresponding building materials, if at least one resulting residence time t_x exceeds the respective critical residence time T_x_max of the corresponding building material, Using the data to manufacture the component.

2. Method according to claim 1, characterized in that the adaptation is carried out in such a way that at least one construction phase and / or the corresponding construction phase information is changed.

3. Method according to claim 1 or 2, characterized in that the adjustment is carried out such that at least one resulting residence time t_x is changed.

4. Method according to claim 3, characterized in that the resulting residence time t_x is changed, preferably reduced, by producing at least one additional element.

5. Method according to claim 4, characterized in that the additional element is at least one further component which is at least partially inverse to the component.

6. Method according to claim 4 or 5, characterized in that in at least one construction phase, the deposition of building material first takes place at the additional element. A method according to any one of claims 4 to 6, characterized in that the additional element is implemented in the component and / or the additional element is removed after the component has been manufactured. A method according to any one of the preceding claims, characterized in that the adjustment is carried out such that at least one critical residence time T_x_max is changed. A method according to claim 8, characterized in that the critical residence time T_x_max is changed, preferably increased, by changing, preferably decreasing, the temperature of at least one building material for at least a certain period of time. A method according to any one of the preceding claims, characterized in that several adjustments are combined.A method according to any of the preceding claims, characterized in that at least one monitoring of the resulting residence times t_x and / or the flow properties of the building materials is carried out during the production of the component. A method according to claim 11, characterized in that if at least one resulting residence time t_x exceeds the corresponding critical residence time T_x_max of a building material and / or if the flow properties of at least one building material change, the corresponding building material is discharged and / or new building material is provided and / or processed. A method according to claim 11 or 12, characterized in that if at least one resulting residence time t_x exceeds the corresponding critical residence time T_x_max of a building material and / or if the flow properties change, at least one rinsing process is initiated.Machine control for a machine for processing plastics and other plasticizable materials, in particular for a 3D printing machine, characterized in that the machine control is set up, implemented and / or designed to carry out the method according to one of claims 1 to 13. Machine for processing plastics and other plasticizable materials, in particular a 3D printing machine, characterized in that the 3D printing machine is set up, designed and / or constructed to perform the method according to one of the claims 1 to 13. Computer program product comprising program code stored on a computer-readable medium for carrying out the method according to one of claims 1 to 13.