Transformer for a watercraft, energy distribution system for a watercraft, and watercraft
Patent Information
- Application Number
- EP2022838807
- Authority / Receiving Office
- EP · EP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2021-12-17
- Filing Date
- 2022-12-16
- Publication Date
- 2024-10-23
AI Technical Summary
Current power distribution systems for watercraft are inefficient, costly, and complex due to the need for separate rectifiers and inverters for charging energy storage devices and supplying AC loads, lacking effective isolation from shore power grids.
A transformer-based power distribution system that converts AC voltages between multiple AC buses, integrating a bidirectional AC-DC converter to isolate the onboard network from the utility grid, reducing the need for separate AC-DC converters and enhancing efficiency by eliminating one conversion stage.
The solution simplifies power distribution, increases efficiency, reduces costs, and enhances reliability by providing galvanic isolation, allowing for peak shaving functions and efficient energy management between onboard loads and the utility grid.
Smart Images

Figure 1.1
Abstract
Description
[0001] Applicant: Torqeedo GmbH
[0002] Transformer for a watercraft, power distribution system for a watercraft and watercraft
[0003] Technical area
[0004] The present invention relates to a transformer for a watercraft, a power distribution system for a watercraft and a watercraft with such a transformer and a watercraft with such a power distribution system.
[0005] State of the art
[0006] Watercraft, such as ships, boats, or ferries, typically include electrical loads, such as an electric propulsion motor and one or more electrical auxiliary loads. These electrical loads are typically AC (alternating current) loads, meaning they are powered by alternating current or voltage. The propulsion motor and the auxiliary loads are typically powered by a three-phase alternating voltage, although the voltage level for the propulsion motor and the auxiliary loads may differ.
[0007] In order to operate the watercraft autonomously, i.e. independently of an external power grid, an electrical energy storage device, for example a battery or a battery bank, is also provided. The energy storage device typically supplies a direct voltage. In order to charge the energy storage device with energy from the external power grid, also referred to as the shore power grid or shore power for short, a charger or switched-mode power supply with a rectifier, hereinafter also referred to as an AC-DC (“DC”, “direct current”, direct voltage) converter, is required. On the other hand, in order to supply the AC loads with energy from the energy storage device while the watercraft is traveling, at least one inverter, hereinafter also referred to as an inverter or DC-AC converter, is required.
[0008] Typically, when connecting to the shore power grid, the energy storage device is first supplied with energy from the shore power grid to charge the energy storage device. The auxiliary loads are then supplied with energy from the energy storage device via the inverter to operate the auxiliary loads. The disadvantage of this solution is that a rectifier is required to charge the energy storage device with energy from the utility grid and an inverter is required to supply the AC loads with energy from the energy storage device. As a result, such a power distribution system has a relatively low overall efficiency, high costs, lower reliability, and high complexity. Furthermore, the AC loads and the power distribution system are not electrically isolated from the shore power grid.
[0009] Description of the invention
[0010] Based on the known prior art, it is an object of the present invention to eliminate the problems of the prior art. In particular, it is an object of the present invention to supply a watercraft with electrical energy in a simple, cost-effective, safe, reliable, and effective manner. Furthermore, it is an object of the present invention to provide a watercraft with improved electrical isolation between a supply network, in particular a shore supply network, and the on-board electrical system of the watercraft.
[0011] The problems are solved by the subject matter of the independent claims. Advantageous developments emerge from the corresponding subclaims, the description, and the figures.
[0012] According to a first aspect of the present disclosure, a transformer for a watercraft is provided. The transformer is configured to convert each of a first AC voltage from a first AC bus, a second AC voltage from a second AC bus, and a third AC voltage from a third AC bus into an AC voltage from each of the other first to third AC buses.
[0013] According to a second aspect of the present disclosure, a power distribution system for a watercraft is provided. The power distribution system comprises the first AC bus, the second AC bus for connecting to at least one second AC load, such as an auxiliary load of the watercraft, and the third AC bus for connecting to a supply network. The first AC bus can be configured for connecting to at least one first AC load, such as an electric propulsion motor of the watercraft. Alternatively or additionally, the DC bus can be configured for connecting to at least one DC load. The power distribution system further comprises the transformer according to embodiments of the present disclosure. The power distribution system, in particular the first and second AC buses and the DC bus, can also be referred to as the on-board power system of the watercraft.Furthermore, the energy storage system comprises a DC bus and an energy storage device connected to the DC bus and a bidirectional AC-DC power converter connected between the first AC bus and the DC bus.
[0014] According to another aspect of the present disclosure, a watercraft is provided. The watercraft may include a power distribution system and / or a transformer according to embodiments of the present disclosure.
[0015] The present invention is therefore based on the idea of providing a transformer in a watercraft. The transformer can be designed for a mains frequency, i.e., a frequency of an alternating voltage of the supply network. The transformer can comprise three winding systems for the first to third AC buses to convert the alternating voltages between the AC buses. The transformer enables galvanic isolation between the AC buses of the watercraft, in particular between the supply network and the first and second AC buses.
[0016] When the utility grid is available, for example when the vessel is in port, the power distribution system can be supplied with energy from the utility grid via the transformer. In particular, the energy storage device can be supplied with energy from the utility grid to charge the energy storage device, and the second AC load can be supplied with energy from the utility grid to operate the second AC load. Alternatively or additionally, the second AC load can also be supplied with energy from the energy storage device. More specifically, energy or DC voltage for charging the energy storage device can be provided via the transformer and the bidirectional AC-DC converter. The supply of the second AC load can also be supported via the bidirectional AC-DC converter and the transformer.
[0017] When the supply grid is unavailable, for example, when the vessel is at sea or away from a harbor, the first AC load and the second AC load can be supplied with energy from the energy storage device using the bidirectional AC-DC converter and the transformer. The electrical isolation between the supply grid and the on-board electrical system or the energy storage unit, the first load, and the second load is achieved by the transformer. Therefore, there is no need to use an AC-DC converter with electrical isolation; instead, an AC-DC converter that does not have the electrical isolation feature can be used. This can reduce costs compared to an AC-DC converter with electrical isolation.
[0018] The inventive solution also eliminates the need for a power converter or conversion stage compared to the prior art. This results in a significant advantage in overall efficiency when supplied via the utility grid, also known as shore power supply. Furthermore, the number of components of the power distribution system and their complexity can be reduced. This increases the reliability of the power distribution system while reducing costs. Furthermore, the power distribution system can perform a peak-shaving function when connected to the utility grid.
[0019] Aspects of the present disclosure may include one or more of the following optional features.
[0020] The transformer can further be configured to galvanically isolate each of the first to third AC buses from each of the other first to third AC buses. This means that the first to third AC buses can be galvanically isolated from one another by means of the transformer. Alternatively or additionally, the transformer can be configured to galvanically isolate the third AC bus, and thus the supply grid, from the first AC bus and the second AC bus, and vice versa. This means that the first AC bus and the second AC bus can be galvanically isolated from the third AC bus and the supply grid by means of the transformer.
[0021] The transformer can be configured to convert energy at each of the first to third alternating voltages into energy at each of the other first to third alternating voltages. Here, the transformer can be configured to convert the effective value of each of the first to third alternating voltages into the effective value of each of the other first to third alternating voltages.
[0022] The transformer can be configured to convert energy at the first alternating voltage into energy at the second alternating voltage, to convert energy at the first alternating voltage into energy at the second alternating voltage, to convert energy at the third alternating voltage into energy at the first alternating voltage, and to convert energy at the third alternating voltage into energy at the second alternating voltage. The transformer can also be configured to convert energy at the second alternating voltage into energy at the first alternating voltage and energy at the second alternating voltage into energy at the third alternating voltage.
[0023] The transformer may be configured to perform at least one of the following functions. The transformer may be configured to transfer power from the first AC bus to the second AC bus. The transformer may be configured to transfer power from the first AC bus to the third AC bus. The transformer may be configured to transfer power from the third AC bus to the first AC bus. The transformer may be configured to transfer power from the third AC bus to the second AC bus. The transformer may be configured to perform at least two of the aforementioned functions simultaneously.
[0024] Here, the transformer can be configured to receive energy at the first AC voltage from the first AC bus, convert it into energy at the second AC voltage, and supply the converted energy to the second AC bus. The transformer can be configured to receive energy at the first AC voltage from the first AC bus, convert it into energy at the third AC voltage, and supply the converted energy to the third AC bus. The transformer can be configured to receive energy at the third AC voltage from the third AC bus, convert it into energy at the first AC voltage, and supply the converted energy to the first AC bus. The transformer can be configured to receive energy at the third AC voltage from the third AC bus, convert it into energy at the first AC voltage, and supply the converted energy to the first AC bus.The transformer may be configured to receive energy at the third AC voltage from the third AC bus, convert it into energy at the second AC voltage, and supply the converted energy to the second AC bus.
[0025] The transformer may be connected to the first AC bus, the second AC bus, and the third AC bus. The transformer may have a first winding system connected to the first AC bus, a second winding system connected to the second AC bus, and a third winding system connected to the third AC bus. The first to third winding systems may be wound around a common core of the transformer. The transformer may be configured to receive power at the first AC voltage, power at the second AC voltage, and power at the third AC voltage, respectively, from the first AC bus via the first winding system, from the second AC bus via the second winding system, and from the third AC bus via the third winding system, and to output power thereto, respectively, to the first AC bus, the second AC bus, and the third AC bus.Thus, the first alternating voltage can be applied to the first winding system, the second alternating voltage to the second winding system, and the third alternating voltage to the third winding system.
[0026] The transformer can be designed in such a way that it enables load asymmetries, i.e., asymmetries in the sources and sinks, to be compensated for by using a special circuit, in particular a zigzag circuit. The transformer can therefore have a zigzag circuit. In particular, the second winding system of the transformer can have a zigzag circuit. This is because an asymmetrical load can occur in the connected subsystem, i.e., the second AC bus with possibly at least one second AC load. Transformer vector groups can preferably be used for this purpose, which are capable of compensating asymmetrical loads in the second AC bus compared to the first and third AC buses.
[0027] Each of the first to third AC buses can be configured as an AC voltage or AC current circuit or system. The DC bus can be configured as a DC voltage or DC current circuit or system. The supply network can also be configured as an AC voltage or AC current circuit or system and can therefore also be referred to as an AC supply network.
[0028] The first AC bus is configured to transmit energy using the first alternating voltage. The second AC bus is configured to transmit energy using the second alternating voltage. The third AC bus is configured to transmit energy using the third alternating voltage. "Alternating voltage of the first AC bus" here means that the first alternating voltage is present at the first AC bus. The same applies to the second AC bus and the third AC bus. The supply network can also be configured to transmit energy using the third alternating voltage. The DC bus is configured to transmit energy using a direct voltage.
[0029] The bidirectional AC-DC power converter can be configured to transfer power between the DC bus and the first AC bus. The AC-DC power converter can be configured to transfer power from the first AC bus to the DC bus. The AC-DC power converter can be configured to transfer power from the DC bus to the first AC bus. Here, the AC-DC power converter can be configured to receive power at the first AC voltage from the first AC bus and convert it into power at the DC voltage and output it to the DC bus. The AC-DC power converter can also be configured to receive power at the DC voltage from the DC bus and convert it into power at the first AC voltage and output it to the first AC bus.
[0030] The power distribution system may be configured to transfer power from the energy storage device to the first AC bus for powering the at least one first AC load with power from the energy storage device. The power distribution system may be configured to transfer power from the energy storage device to the second AC bus for powering the at least one second AC load with power from the energy storage device. The power distribution system may be configured to transfer power from the energy storage device to the DC bus for powering the at least one DC load with power from the energy storage device.
[0031] The power distribution system may be configured to transfer power from the energy storage device to the third AC bus, for feeding power from the energy storage device into the utility grid. The power distribution system may be configured to transfer power from the utility grid to the DC bus, for charging the energy storage device with power from the utility grid. The power distribution system may be configured to transfer power from the utility grid to the second AC bus, for operating the at least one second AC load with power from the utility grid.
[0032] The power distribution system may be configured to simultaneously transfer power from the energy storage device via the DC bus to the first AC bus and further to the first AC load for operating the at least one first AC load with power from the energy storage device, and to transfer power from the energy storage device via the DC bus and the first AC bus to the second AC bus and further to the second AC load for operating the at least one second AC load with power from the energy storage device.
[0033] Alternatively or additionally, the energy distribution system can be set up to simultaneously
[0034] To transfer energy from the energy storage device via the DC bus and to the at least one DC load, for supplying and operating the DC load with energy from the energy storage device, and to transfer energy from the energy storage device via the DC bus and the first AC bus to the second AC bus and further to the second AC load, for operating the at least one second AC load with energy from the energy storage device.
[0035] Alternatively or additionally, the energy distribution system may be configured to simultaneously transfer energy from the energy storage device via the DC bus, the first AC bus to the second AC bus and further to the second AC load, for operating the at least one second AC load with energy from the energy storage device, and to transfer energy from the energy storage device via the DC bus and the first AC bus to the third AC bus and further to the supply grid, for feeding energy from the energy storage device into the supply grid.
[0036] Alternatively or additionally, the power distribution system may be configured to simultaneously transfer power from the utility grid via the third AC bus and the first AC bus to the DC bus and further to the energy storage device for charging the energy storage device with power from the utility grid, and to transfer power from the utility grid via the third AC bus to the second AC bus and further to the at least one second AC load for operating the at least one second AC load with power from the utility grid.
[0037] Alternatively or additionally, the power distribution system may be configured to simultaneously transfer power from the utility grid via the third AC bus to the second AC bus and further to the second AC load, and to simultaneously transfer power from the energy storage device via the DC bus and the first AC bus to the second AC bus and further to the at least one second AC load, for simultaneously operating the at least one second AC load with power from the energy storage device and from the utility grid.
[0038] At least two of the first AC voltage of the first AC bus, the second AC voltage of the second AC bus, and the third AC voltage of the third AC bus can be different from one another. For example, the first AC voltage of the first AC bus can have a nominal or effective value of 100 V to 300 V, preferably 200 V, or can have a nominal or effective value of 300 V to 500 V, preferably 400 V. The second AC voltage of the second AC bus can have a nominal or effective value of less than 1 kV, preferably 300 V to 500 V, particularly preferably 400 V. The third AC voltage of the third AC bus can have a nominal or effective value of less than 1 kV, in particular 115 V, 230 V, 400 V, 500 V, 690 V, or 800 V.The third AC voltage of the third AC bus can have a nominal or effective value of 300 V to 500 V, preferably 400 V, or can have a nominal or effective value of 700 V to 900 V, preferably 800 V. An AC voltage of the supply network can also correspond to the third AC voltage of the third AC bus, ie the AC voltage of the supply network can have a nominal or effective value of 300 V to 500 V, preferably 400 V, or can have a nominal or effective value of 700 V to 900 V, preferably 800 V.
[0039] The effective values of the first to third alternating voltages can be substantially equal. For example, the first alternating voltage can have a nominal or effective value of 300 V to 500 V, preferably 400 V. The second alternating voltage can have a nominal or effective value of 300 V to 500 V, preferably 400 V. The third alternating voltage can have a nominal or effective value of 300 V to 500 V, preferably 400 V.
[0040] The first alternating voltage, the second alternating voltage, and / or the third alternating voltage can have a frequency in the range of 45 Hz to 65 Hz, preferably 50 Hz or 60 Hz, or a frequency in the range of 350 Hz to 450 Hz, preferably 400 Hz. In particular, the first alternating voltage, the second alternating voltage, and the third alternating voltage can have the same frequency, for example, a frequency in the range of 45 Hz to 65 Hz, preferably 50 Hz or 60 Hz, or a frequency in the range of 350 Hz to 450 Hz, preferably 400 Hz.
[0041] According to embodiments, the transformer can be designed as a three-phase transformer. The first to third AC buses can also each be designed as a three-phase alternating current system, i.e., as a three-phase system, and thus have three phases. Accordingly, the first alternating voltage, the second alternating voltage, and the third alternating voltage can each be a three-phase alternating voltage or three-phase alternating voltage and thus have three phases. Here, the first winding system of the transformer can have three first windings, which are correspondingly connected to the three phases of the first AC bus. The second winding system of the transformer can also have three second windings, which are correspondingly connected to the three phases of the second AC bus. Furthermore, the third winding system of the transformer can have three third windings, which are correspondingly connected to the three phases of the third AC bus.The AC-DC converter can also be three-phase or have three phases. In this case, the three phases of the AC-DC converter can be connected to the three phases of the first AC bus. Accordingly, the supply network can be configured as a three-phase alternating current system.
[0042] According to alternative embodiments, the transformer can be designed as a single-phase transformer. The first to third AC buses can also each be designed as a single-phase alternating current system and thus have one phase. Accordingly, the first alternating voltage, the second alternating voltage, and the third alternating voltage can each be a single-phase alternating voltage and thus have one phase. Here, the first winding system of the transformer can have a first winding connected to the one phase of the first AC bus. The second winding system of the transformer can also have a second winding connected to the one phase of the second AC bus. Furthermore, the third winding system of the transformer can have a third winding connected to the one phase of the third AC bus. Accordingly, the supply network can be designed as a single-phase alternating current system.
[0043] The third AC bus can be connected or connectable to the supply grid. The energy distribution system can further comprise a supply grid connection element. The supply grid connection element can be configured to connect the third AC bus to an AC supply grid. In other words, the third AC bus can be connectable or connected to the supply grid by means of the supply grid connection element. The third AC bus can in particular be connectable to the supply grid by means of the supply grid connection element. The third AC bus can be configured to receive energy at the third AC voltage from the supply grid and / or can be configured to deliver energy at the third AC voltage to the supply grid.
[0044] The second AC bus can be or be connectable to the at least one second AC load. The energy distribution system can comprise at least one load connection element. The load connection element can be configured to connect the second AC bus to at least one second AC load. In other words, the at least one second load can be or be connectable to the second AC bus by means of the load connection element. The second AC bus can in particular be connectable to one of the at least one second AC load by means of a corresponding load connection element, or the second AC load can be connectable to the second AC bus by means of the load connection element. Alternatively, the second AC bus can be or be connectable to one of the at least one second AC load directly, i.e. without a load connection element.
[0045] The energy storage device can be configured as a battery bank, battery, battery module, or battery cell, or comprise at least one of these elements. These elements can be lithium-based, in particular lithium-ion-based.
[0046] The AC-DC converter may include a line filter for filtering interference transmitted from the supply network to the power distribution system, in particular to the first AC bus, and / or for filtering interference, in particular clock-frequency interference, and / or harmonics generated by the AC-DC converter. The line filter may be configured as or include a low-pass filter.
[0047] The watercraft may further comprise at least one first AC load connected to the first AC bus. The first AC bus may be configured to supply power to the at least one first AC load. The at least one first AC load may be configured to receive power from the first AC bus for operation. The at least one first AC load may be configured as or include an electric motor, in particular an electric auxiliary motor or electric drive motor.
[0048] The watercraft may further comprise at least one DC load that is connected to the DC bus or connectable thereto. According to preferred embodiments, the at least one DC load is permanently connected to the DC bus. The DC bus may be configured to transmit and deliver energy to the at least one DC load. The at least one DC load is configured to receive energy from the DC bus and to be operated thereby. The at least one DC load may be configured as or comprise an electric motor, in particular as an auxiliary electric motor or electric drive motor for moving the watercraft on the water.
[0049] According to embodiments, the at least one DC load can comprise a DC-DC converter and an electrically controlled electric motor. According to further embodiments, the at least one DC load can comprise a DC-AC converter and an electric motor. The electric motor can be designed as a synchronous motor, preferably a permanently excited asynchronous motor, or a reluctance motor. The at least one DC load can have a control unit for controlling the DC-AC converter and / or the electric motor. The DC-AC converter can be configured to convert and exchange energy between the DC bus and the electric motor. More specifically, the DC-AC converter can be configured to transfer energy from the DC bus to the electric motor. Here, the DC-AC converter can be configured to receive energy with the DC voltage from the DC bus and convert it into energy with an AC voltage and deliver the converted energy to the electric motor.
[0050] The watercraft may further comprise at least one second AC load connected to the second AC bus. The second AC load may be, for example, a refrigerator or a stove. The at least one second AC load may be directly connected to the second AC bus. The second AC bus may be configured to supply power to the at least one second AC load. The at least one second AC load may be configured to receive power from the second AC bus for operation. The at least one second AC load may be connected to the second AC bus by means of a corresponding load connection element. According to embodiments, the watercraft comprises a plurality of second AC loads.
[0051] The at least one second AC load can be designed as or comprise an auxiliary consumer, in particular a high-performance auxiliary consumer, air conditioning system, heating, cooling, lighting system or energy supply unit for electrical devices of users on the watercraft.
[0052] The watercraft may further comprise an energy supply system. The energy supply system may be configured to supply energy to the energy distribution system. In particular, the energy supply system may be configured to supply energy to one of the first to third AC buses or the DC bus. The energy supply system may comprise at least one generator, for example a photovoltaic system, a solar generator, or a hydrogenerator. The energy supply system may further comprise an inverter, also referred to as a DC-AC converter. The inverter may be configured to convert energy at direct voltage provided by the generator into energy at the second alternating voltage.
[0053] The watercraft can be designed as a boat, ship or ferry.
[0054] The transformer and the power distribution system according to embodiments of the present
[0055] The disclosure is not limited to use with a watercraft. The transformer and power distribution system may be used with any vehicle having a DC load, a first AC load, and / or a second AC load to be powered by energy from the utility grid and / or energy from the energy storage device. For example, the transformer and power distribution system may be suitable for use with an electric vehicle, such as an electric car, an electric truck, an electric scooter, or an electric aircraft.
[0056] Furthermore, the power distribution system is not limited to a single first AC bus and a single second AC bus. The power distribution system may accordingly comprise a plurality of first AC buses, each with an energy storage device, a DC bus, an AC-DC converter connected between the first AC bus and the DC bus, and / or a plurality of second AC buses. The transformer may accordingly comprise a plurality of first winding systems for the plurality of first AC buses and a plurality of second winding systems for the plurality of second AC buses.
[0057] According to a further aspect of the present disclosure, a power distribution system for a watercraft is provided. The power distribution system comprises at least a first AC bus, at least a second AC bus for connecting to at least one corresponding second AC load, and the third AC bus for connecting to a utility grid. The at least one first AC bus can be configured for connecting to at least one corresponding first AC load. The power distribution system further comprises the transformer according to embodiments of the present disclosure. Furthermore, the energy storage system comprises, for each of the at least one first AC bus, a DC bus, an energy storage device connected to the DC bus, and a bidirectional AC-DC converter connected between the first AC bus and the DC bus.The transformer can therefore be connected to the at least one first AC bus, to the at least one second AC bus, and to the third AC bus. Brief description of the figures.
[0058] Preferred further embodiments of the invention are explained in more detail in the following description of the figures. In the figures:
[0059] Figure 1 illustrates a transformer and a power distribution system for a watercraft according to embodiments of the present disclosure; Figures 2A-2D illustrate a distribution of power by the power distribution system according to embodiments of the present disclosure for various cases;
[0060] Figure 3 shows a transformer and a power distribution system for a watercraft according to further embodiments of the present disclosure; and
[0061] Figure 4 shows a watercraft according to embodiments of the present disclosure.
[0062] Detailed description of preferred embodiments
[0063] Preferred embodiments are described below with reference to the figures. Identical, similar, or equivalent elements in the different figures are provided with identical reference numerals, and a repeated description of these elements is partially omitted to avoid redundancies.
[0064] Figure 1 shows a transformer and electrical power distribution system for a watercraft according to embodiments of the present disclosure.
[0065] The energy distribution system 100 comprises a first AC bus 111 for connecting the energy distribution system 100 to at least a first AC load 210 of the watercraft (see Figure 3), a second AC bus 112 for connecting the energy distribution system 100 to at least a second AC load 220 of the watercraft, and a third AC bus 113 for connecting the energy distribution system 100 to a supply network 230. The energy distribution system 100, in particular a DC bus 130, the first AC bus 111, and the second AC bus 112, can also be referred to as the on-board network of the watercraft.
[0066] The energy storage system 100 further includes the DC bus 130, an energy storage device 140, and a bidirectional AC-DC power converter 150, also referred to as an inverter. The energy storage device 140 is connected to the DC bus 130. The AC-DC power converter 150 is connected between the first AC bus 111 and the DC bus 130. In other words, the AC-DC power converter 150 is connected to the DC bus 130 and the first AC bus 111.
[0067] Each of the first to third AC buses 111, 112, 113 is designed as an alternating current system.
[0068] DC bus 130 is configured as a direct current circuit. The supply network 230 is also configured as an alternating current system. The supply network 230 can also be referred to as the shore power network or, for short, as shore power. The second AC load 220 can also be referred to as the vessel's "hotel load."
[0069] The first AC bus 111 is configured to receive, transmit, and deliver energy at a first alternating voltage. The second AC bus 112 is configured to receive, transmit, and deliver energy at a second alternating voltage. The third AC bus 113 is configured to receive, transmit, and deliver energy at a third alternating voltage. Likewise, the supply network 230 is configured to receive, transmit, and deliver energy at the third alternating voltage. The DC bus 130 is configured to receive, transmit, and deliver energy at the direct voltage. Thus, the first alternating voltage is present at the first AC bus 111, the second alternating voltage at the second AC bus 112, and the third alternating voltage at the third AC bus 113 and the supply network 230. The direct voltage is present at the DC bus 130.
[0070] The power distribution system 100 further includes a transformer 160. The transformer 160 is designed for the watercraft (see Figure 3). The transformer 160 is connected to the first AC bus 111, the second AC bus 112, and the third AC bus 113.
[0071] According to embodiments, the transformer 160 is configured to galvanically isolate the third AC bus 113, and thus the supply network 230, from the first AC bus 111 and from the second AC bus 112 as part of the vehicle electrical system, and vice versa. Alternatively or additionally, the transformer 160 is configured to galvanically isolate each of the first to third AC buses 111, 112, 113 from each of the other first to third AC buses. That is, the first to third AC buses 111, 112, 113 are galvanically isolated from one another by means of the transformer 160.
[0072] The transformer 160 is configured to convert energy at each of the first to third AC voltages into energy at each of the other first to third AC voltages, for example, by the transformer 160 converting the RMS value of each of the first to third AC voltages into the RMS value of each of the other first to third AC voltages.
[0073] The transformer 160 can be configured to convert energy at the first alternating voltage into energy at the second alternating voltage, to convert energy at the first alternating voltage into energy at the second alternating voltage, to convert energy at the third alternating voltage into energy at the first alternating voltage, and to convert energy at the third alternating voltage into energy at the second alternating voltage. The transformer 160 can also be configured to convert energy at the second alternating voltage into energy at the first alternating voltage and energy at the second alternating voltage into energy at the third alternating voltage.
[0074] The transformer 160 is configured to transfer power between the first to third AC buses 111, 112, 113. More specifically, the transformer 160 is configured to transfer power from the first AC bus 111 to the second AC bus 112. The transformer 160 is configured to transfer power from the first AC bus 111 to the third AC bus 113. The transformer 160 is configured to transfer power from the third AC bus 113 to the first AC bus 111. The transformer 160 is configured to transfer power from the third AC bus 113 to the second AC bus 112. The transformer 160 is configured to perform at least two or all of these functions simultaneously.
[0075] To this end, the transformer 160 is configured to convert each of the first AC voltage of the first AC bus 111, the second AC voltage of the second AC bus 112, and the third AC voltage of the third AC bus 113 into the AC voltage of each of the other first to third AC buses 111, 112, 113. In particular, the transformer 160 is configured to convert the effective value of each of the first to third AC voltages into the effective value of each of the other first to third AC voltages. Accordingly, the ratios between the effective values of the currents of the AC buses are reciprocal to the ratios between the effective values of the AC voltages of the AC buses.
[0076] More specifically, the transformer 160 is configured to receive energy at the first AC voltage from the first AC bus 111, convert it into energy at the second AC voltage, and deliver the converted energy to the second AC bus 112. The transformer 160 is configured to receive energy at the first AC voltage from the first AC bus 111, convert it into energy at the third AC voltage, and deliver the converted energy to the third AC bus 113.
[0077] The transformer 160 is further configured to receive energy at the third AC voltage from the third AC bus 113, convert it into energy at the first AC voltage, and deliver the converted energy to the first AC bus 111. The transformer 160 is further configured to receive energy at the third AC voltage from the third AC bus 113, convert it into energy at the second AC voltage, and deliver the converted energy to the second AC bus 112.
[0078] The transformer 160 includes a first winding system connected to the first AC bus 111, a second winding system connected to the second AC bus 112, and a third winding system connected to the third AC bus 113. The first to third winding systems are wound around a common core of the transformer 160.
[0079] The transformer 160 can be configured such that it enables load asymmetries, i.e., asymmetries in the sources and sinks, to be compensated for by using a special circuit, in particular a zigzag circuit. The transformer 160 can therefore have a zigzag circuit. In particular, the second winding system of the transformer 160 can have a zigzag circuit. This is because an asymmetrical load can occur in the subsystem connected to it, i.e., the second AC bus 112 with possibly at least one second AC load 220. Transformer switching groups can preferably be used for this purpose, which are capable of compensating for asymmetrical loads in the second AC bus 112 compared to the first and third AC buses 111 and 113.
[0080] In particular, the first winding system, the second winding system, and the third winding system can be galvanically isolated from one another to realize the galvanic isolation of the first to third AC buses 111, 112, 113 from one another. The transformer 160 is configured to receive energy at the first AC voltage, energy at the second AC voltage, and energy at the third AC voltage, respectively, from the first AC bus 111 via the first winding system, from the second AC bus 112 via the second winding system, and from the third AC bus via the third winding system, and to deliver it to the first AC bus 111, the second AC bus 112, and the third AC bus 113, respectively.
[0081] Thus, the first AC voltage is applied to the first winding system, the second AC voltage is applied to the second winding system, and the third AC voltage is applied to the third winding system. The AC-DC power converter 150 is configured to convert and exchange energy between the DC bus 130 and the first AC bus 111. More specifically, the AC-DC power converter 150 is configured to transfer energy from the first AC bus 111 to the DC bus 130. The AC-DC power converter 150 is configured to transfer energy from the DC bus 130 to the first AC bus. Here, the AC-DC power converter 150 is configured to receive energy with the first AC voltage from the first AC bus 111 and convert it into energy with the DC voltage and output the converted energy to the DC bus 130.The AC-DC power converter 150 is also configured to receive energy at the DC voltage from the DC bus 130, convert it into energy at the first AC voltage, and deliver the converted energy to the first AC bus 111.
[0082] The energy storage device 140 is an electrical energy storage device 140. The energy storage device 140 is configured to receive energy and to store the energy, thereby charging it, and to release the stored energy, thereby discharging it. The energy storage device 140 is or comprises a battery with one battery module or with several battery modules connected in series and / or parallel. The one battery module or the several battery modules each comprise one or more battery cells (not shown) connected in series and / or parallel. The one or more battery cells can be lithium-based, in particular lithium-ion-based. According to embodiments, the energy storage device 140 can comprise several batteries. In this case, the energy storage device 140 can be designed as a battery bank.
[0083] The energy distribution system 100, in particular the third AC bus 113, can be electrically connected or connectable to the supply network 230. According to preferred embodiments, the energy distribution system 100 or the third AC bus 113 is detachably connected or connectable to the supply network 230.
[0084] According to the embodiment shown in the figures, the energy distribution system 100 further comprises a supply network connection element 180. The supply network connection element 180 is configured to electrically connect the third AC bus 113 to an AC supply network 180. In other words, the third AC bus 113 can be electrically connectable or connected to the supply network 230 by means of the supply network connection element 180. In particular, the third AC bus 113 can be connectable to the supply network 230 by means of the supply network connection element. The third AC bus 113 is configured to receive energy at the third AC voltage from the supply network 230 and to output energy at the third AC voltage to the supply network 230.
[0085] As shown with reference to Figure 3, the supply network connection element 180 can be configured as a cable with a plug. According to alternative embodiments, the supply network connection element 180 is configured as a plug or socket for connecting to a cable of the supply network 230.
[0086] The power distribution system 100, in particular the second AC bus 112, is electrically connected to or connectable to the at least one second AC load 220 of the watercraft. According to embodiments, the power distribution system 100 or the second AC bus 112 is detachably connected to or connectable to the at least one second AC load 220. According to embodiments, the power distribution system 100 or the second AC bus 112 is directly connected to or connectable to at least one second AC load 220. In other words, the second AC load 220 is connected to the second AC bus 112.
[0087] Alternatively or additionally, the energy distribution system 100 comprises at least one load connection element 170. The load connection element 170 is configured to connect the second AC bus 112 to the at least one second AC load 220. In other words, the second AC load can be connected or connectable to the second AC bus 112 via the load connection element 170. In particular, the second AC bus 112 can be connectable to the second AC load 220 via the load connection element 112, or the second AC load 220 can be connectable to the second AC bus 112 via the load connection element 170.
[0088] In the power distribution system 100 shown in Figure 1, the second AC bus 112 is connected to a second AC load 220 by means of a load connection element 170. As shown with reference to Figure 3, the load connection element 170 can be configured as a cable that may have a plug. According to alternative embodiments, the load connection element 170 can be configured as a plug or socket for connecting to a cable of the second AC load 220.
[0089] The first AC load 210 is connected to or connectable to the first AC bus 111. According to preferred embodiments, the first AC load 210 is permanently connected to the first AC bus 111. The first AC bus 111 is configured to transmit and deliver power to the first AC load 210. The first AC load 210 is configured to receive power from the first AC bus 210 and to operate with it.
[0090] The first AC load 210 can be configured as or comprise an asynchronous motor. According to embodiments, the asynchronous motor can be directly connected to the first AC bus 111, i.e., can be directly connected to the first AC bus 111. This configuration of the asynchronous motor is possible, for example, when no speed control of the first AC load 210 or the asynchronous motor is required. According to further embodiments, the asynchronous motor can be doubly fed and / or the first AC load 210 can comprise a circuit for speed control of the asynchronous motor.
[0091] The first AC load 210 can be configured as or comprise an electric motor, in particular an auxiliary electric motor or electric drive motor for moving the watercraft on the water. The first AC load 210 can have a control unit for controlling the circuit and / or the electric motor.
[0092] According to embodiments, the at least one second AC load 220 is configured as an auxiliary consumer of the watercraft. For example, the at least one second AC load 220 can be an air conditioning system, a heating system, a cooling system, a lighting system, or an electrical power supply unit for electrical devices of users on the watercraft, or can comprise one of these. According to preferred embodiments, the watercraft comprises a plurality of, at least two, second AC loads 220.
[0093] The second AC bus 112 is configured to transmit and deliver power to the second AC load 220. The second AC load 220 is configured to receive power from the second AC bus 220 and to operate with it. For example, the power from the AC bus 112 is used to power the air conditioning system to cool or heat the vessel, or to generate light, for example, to illuminate the vessel, or to power the electrical devices.
[0094] The effective values of at least two of the first AC voltage, the second AC voltage, and the third AC voltage may be different from one another. According to embodiments, the first AC voltage has an effective value of approximately 200 V or 400 V, the second AC voltage has an effective value of approximately 400 V, and the third AC voltage has an effective value of less than 1 kV, in particular approximately 115 V, 230 V, 400 V, 500 V, 690 V, or 800 V. The effective values of the first to third AC voltages may be the same. According to embodiments, the first AC voltage has an effective value of approximately 400 V, the second AC voltage has an effective value of approximately 400 V, and the third AC voltage has an effective value of approximately 400 V.
[0095] The frequency of the first to third alternating voltages can be the same. According to embodiments, the first to third alternating voltages have a frequency of approximately 50 Hz. An alternating voltage of the supply network also corresponds to the third alternating voltage of the third AC bus. The alternating voltage of the supply network can therefore also have an effective value of less than 1 kV, in particular approximately 115 V, 230 V, 400 V, 500 V, 690 V, or 800 V.
[0096] As illustrated in Figure 1, the transformer can be configured as a three-phase transformer. In this case, the first to third AC buses 111, 112, 113 can each be configured as a three-phase alternating current system and thus have three phases. Accordingly, the first AC voltage, the second AC voltage, and the third AC voltage can each be a three-phase AC voltage and thus have three phases.
[0097] Here, the first winding system of the transformer 160 can have three first windings, which are connected to the three phases of the first AC bus 111, respectively. The second winding system of the transformer 160 can also have three second windings, which are connected to the three phases of the second AC bus 112, respectively. Furthermore, the third winding system of the transformer 160 can have three third windings, which are connected to the three phases of the third AC bus 113, respectively. The AC-DC converter 150 can also be three-phase and thus have three phases. Here, the three phases of the AC-DC converter 150 can be connected to the three phases of the first AC bus 111, respectively. The supply network 230 can also be designed as a three-phase alternating current system.
[0098] According to embodiments, the DC bus 130 can be configured for connection to a DC load (not shown). The DC load is connected to the DC bus 130 or connectable thereto. According to preferred embodiments, the DC load is permanently connected to the DC bus 130. The DC bus 130 is configured to transmit and deliver energy to the DC load. The DC load is configured to receive energy from the DC bus 130 and to be operated thereby. Here, the DC load can be configured as or comprise an electric motor, in particular as an electric auxiliary motor or electric drive motor for moving the watercraft on the water.
[0099] According to embodiments, the DC load may comprise a DC-DC converter and an electrically controlled electric motor. According to further embodiments, the DC load may comprise a DC-AC converter and an electric motor. The electric motor may be embodied as a synchronous motor, preferably permanently excited, an asynchronous motor, or a reluctance motor. The DC load may have a control unit for controlling the DC-AC converter and / or the electric motor.
[0100] The DC-AC converter may be configured to convert and exchange energy between the DC bus 130 and the electric motor. More specifically, the DC-AC converter may be configured to transfer energy from the DC bus 130 to the electric motor.
[0101] Here, the DC-AC converter can be configured to receive DC power from DC bus 130, convert it into AC power, and deliver the converted power to the electric motor. The AC power delivered to the electric motor can be a three-phase AC voltage. In other words, the DC-AC converter can have a three-phase AC side.
[0102] Figures 2A-2D show the distribution of power through the power distribution system according to embodiments of the present disclosure for various cases. Power losses of the buses, the AC-DC converter, and the transformer are not considered below.
[0103] A first case is illustrated in Figure 2A and may occur, for example, when the supply network 230 is not connected to the third AC bus 113, for example when the vessel is outside a port or at sea.
[0104] The energy distribution system 100 is configured to simultaneously transfer energy from the energy storage device 140 via the DC bus 130 and the bidirectional AC-DC power converter 150 to the first AC bus 111 and further to the first AC load 210, for supplying and operating the at least one first AC load 210 with energy from the energy storage device 140, and to transfer energy from the energy storage device 140 via the DC bus 130, the bidirectional AC-DC power converter 150, the first AC bus 111 and the transformer 160 to the second AC bus 112 and further to the second AC load 220, for supplying and operating the at least one second AC load 220 with energy from the energy storage device 140.
[0105] Here, the energy storage device 140 supplies energy 310 at the DC voltage to the DC bus 130, which receives the energy 310 and transfers it to the AC-DC power converter 150. The AC-DC power converter 150 receives the energy 310 at the DC voltage, converts this energy to the first AC voltage for the first AC bus 111, and supplies it thereto. The first AC bus 111 receives the energy 310 at the first AC voltage and transfers a first portion 321 of the energy 310 to the first AC load 210. The first AC load 210 receives this first portion 321 of the energy 310 for operation.
[0106] The first AC bus 111 transmits a second portion 322 of the energy 310 to the transformer 160. The transformer 160 receives the second portion 322 of the energy 310 at the first AC voltage, converts it into energy at the second AC voltage for the second AC bus 112, and outputs the second portion 322 thereto. The second AC bus 112 transmits it to the at least one second AC load 220. The at least one second AC load 220 receives the second portion 322 for operation. The energy 310 can also be transmitted entirely to the first AC load 210, i.e., no second portion 322 is transmitted to the second AC load 220, or the energy 310 can be transmitted entirely to the at least one second load 220, i.e., no first portion 321 is transmitted to the first AC load 210.
[0107] Here, energy distribution system 100 may alternatively or additionally be configured to simultaneously transfer energy from energy storage device 140 via DC bus 130 and to the DC load, for supplying and operating the DC load with energy from energy storage device 140, and to transfer energy from energy storage device 140 via DC bus 130, bidirectional AC-DC power converter 150, first AC bus 111, and transformer 160 to second AC bus 112 and further to second AC load 220, for supplying and operating the at least one second AC load 220 with energy from energy storage device 140.
[0108] A second case is illustrated in Figure 2B and can occur, for example, when the utility grid 230 is available and the third AC bus 113 is connected to it, for example, when the vessel is in a harbor. In this case, the first AC load 210 can be switched off. Here, the DC load can also be switched off. Here, the power distribution system 100 can fulfill a peak-shaving function for the utility grid.
[0109] Here, the energy distribution system 100 is configured to simultaneously transfer energy from the energy storage device 140 via the DC bus 130, the bidirectional AC-DC power converter 150, the first AC bus 111, and the transformer 160 to the second AC bus 112 and further to the second AC load 220, for supplying and operating the at least one second AC load 220 with energy from the energy storage device 140, and to transfer energy from the energy storage device 140 via the DC bus, the bidirectional AC-DC power converter 150, the first AC bus 111, and the transformer 160 to the third AC bus 113 and further to the utility grid 230, for feeding energy from the energy storage device 140 into the utility grid 230.
[0110] Here, the energy storage device 140 outputs energy 410 at the DC voltage to the DC bus 130, which transfers the energy 410 to the AC-DC power converter 150. The AC-DC power converter 150 receives the energy 410 at the DC voltage, converts it into energy 410 at the first AC voltage for the first AC bus 111, and transfers it there. The first AC bus 111 transfers the energy 410 to the transformer 160. The transformer 160 receives the energy 410 and converts a first portion 421 thereof into energy at the second AC voltage for the second AC bus 112 and outputs the first portion 421 thereto. The transformer 160 further converts a second portion 422 of the energy 410 into energy at the third AC voltage and outputs the second portion 422 thereto.
[0111] The second AC bus 112 transmits the first portion 421 to the at least one second AC load 220. The at least one second AC load 220 receives the first portion 421 for operation. The third AC bus 113 transmits the second portion 422 to the utility grid 230 for feeding it into the utility grid 230. Alternatively, the transformer 160 converts the energy 410 with the first AC voltage completely into energy with the second AC voltage for the second AC bus 112 or converts the energy with the first AC voltage completely into energy with the third AC voltage for the third AC bus 113. Accordingly, in the first case, the energy 410 is completely transferred to the second AC load 220, ie no second part 422 is transferred to the third AC bus 113 or the supply network 230, and in the second case, the energy 410 is completely transferred to the third AC bus 113 or the supply network 230, ieno first part 421 is transferred to the second AC load 220.
[0112] A third case is illustrated in Figure 2C and can occur, for example, when the supply grid 230 is available and the third AC bus 113 is connected to it, for example, when the vessel is in a harbor. Here, the first AC load 210 can be switched off. The DC load can also be switched off. This allows the energy storage device 140 to be charged and the second AC load 220, for example, an auxiliary load of the vessel, to be operated simultaneously. Here, the energy distribution system 100 can also fulfill a peak-shaving function for the supply grid.Here, the power distribution system 100 is configured to simultaneously transfer power from the utility grid 230 via the third AC bus 113, the transformer 160, the first AC bus 111, and the bidirectional AC-DC power converter 150 to the DC bus 130 and further to the energy storage device 140, for charging the energy storage device 140 with power from the utility grid 230, and to transfer power from the utility grid 230 via the third AC bus 113 and the transformer 160 to the second AC bus 112 and further to the at least one second AC load 220, for supplying and operating the at least one second AC load 220 with power from the utility grid 230.
[0113] Here, the utility grid 230 supplies energy 510 at the third AC voltage to the third AC bus 113. The third AC bus 113 transfers the energy 510 to the transformer 160. The transformer 160 receives the energy 510 at the third AC voltage from the third AC bus 113 and converts a first portion 521 of the energy 510 into energy at the second AC voltage for the second AC bus and supplies the first portion 521 thereto. Furthermore, the transformer 160 converts a second portion 522 of the energy 510 into energy at the first AC voltage and supplies the second portion 522 thereto. The second AC bus 112 transfers the first portion 521 to the at least one second AC load 220. The at least one second AC load 220 receives the first portion 522 of the energy 510 to be operated therewith. The first AC bus 111 transmits the second part 522 of the energy 510 to the AC-DC converter 130.The AC-DC converter 130 receives the second portion 522, converts the second portion 522 of the energy 510 into energy at the DC voltage for the DC bus 130, and outputs it thereto. The DC bus 130 transmits the second portion 522 to the energy storage device 140, which receives it for charging.
[0114] Alternatively, the transformer 160 converts the energy 510 with the third AC voltage completely into energy with the second AC voltage for the second AC bus 112 or converts the energy 510 with the third AC voltage completely into energy with the first AC voltage for the first AC bus 111. Accordingly, in the first case, the energy 510 is transferred completely to the second AC load 220, i.e. no second part 522 is transferred to the first AC bus 111 or to the energy storage device 140, and in the second case, the energy 510 is transferred completely to the first AC bus 111 or to the energy storage device 140, i.e. no first part 521 is transferred to the second AC load 220.
[0115] A fourth case is illustrated in Figure 2D and can occur, for example, when the utility grid 230 is available and the third AC bus 113 is connected to it, for example, when the vessel is in a harbor. This allows the second AC load 220 to be powered by both energy from the energy storage device 140 and energy from the utility grid 230. The energy storage device 140 can thus support the supply of the second AC load 220. Here, the first AC load 210 can be switched off. The DC load can also be switched off.
[0116] Here, the power distribution system 100 is configured to simultaneously transfer power from the utility grid 230 via the third AC bus 113 and the transformer 160 to the second AC bus 112 and further to the second AC load 220, and to simultaneously transfer power from the energy storage device 140 via the DC bus 130, the bidirectional AC-DC power converter 150, the first AC bus 111, and the transformer 160 to the second AC bus 112 and further to the at least one second AC load 220, for simultaneously supplying and operating the at least one second AC load 220 with power from the energy storage device 140 and from the utility grid 230.
[0117] Here, the energy storage device 140 supplies energy 611 as DC voltage to the DC bus 130, which transfers the energy 611 to the AC-DC converter 150. The AC-DC converter 150 receives the energy 611, converts it into the first AC voltage for the first AC bus 111, and transfers it there. The first AC bus 111 transfers the energy 611 to the transformer 160. At the same time, the utility grid 230 supplies energy 612 at the third AC voltage to the third AC bus 113. The third AC bus 113 transfers the energy 612 to the transformer 160.
[0118] The transformer 160 receives the energy 612 with the third AC voltage from the third AC bus 113 and the energy 611 with the first AC voltage from the first AC bus 111, and converts the sum 620 of the energy 612 and the energy 611 into energy with the second AC voltage for the second AC bus 112 and outputs it thereto. The second AC bus 112 transmits the sum 620 of the energies 611, 612 to the at least one second AC load 220. The at least one second AC load 220 receives the sum 620 of the energies 611, 612 for operation therewith.
[0119] Alternatively, only the energy storage device 140 outputs energy 611 with the direct voltage, i.e., the supply network 230 does not output energy 612, or only the supply network 230 outputs the energy 612 with the third alternating voltage, i.e., the energy storage device 140 does not output energy 611. In the first case, the at least one second AC load 220 is operated only with energy 611 from the energy storage device 140, and in the second case, the at least one second AC load 220 is operated only with energy 612 from the supply network 230.
[0120] The first AC load 210, the second AC load 220, and the DC load represent (energy) sinks because they are supplied with energy for their operation. The energy storage device 140 also represents a sink during charging. During discharging, the energy storage device 140 represents an (energy) source. The utility grid 230 also represents a source.
[0121] Figure 3 shows a schematic view of a transformer and a power distribution system for a watercraft according to further embodiments of the present disclosure. The power distribution system illustrated in Figure 3 does not differ substantially from the power distribution system illustrated in Figure 1 except for the differences presented below. Furthermore, further details of the power distribution system according to embodiments of the present disclosure are explained with reference to Figure 3. Figure 3 shows a schematic, highly simplified view of the transformer 160. In practice, a closed-circuit transformer 160 is preferably used.
[0122] The power distribution system 200 illustrated in Figure 3 is shown as a single-phase power distribution system. Here, the transformer 160 is embodied as a single-phase transformer. Accordingly, the first to third AC buses 111, 112, 113 are each embodied as a single-phase alternating current system and thus have one phase. Accordingly, the first alternating voltage, the second alternating voltage, and the third alternating voltage are each a single-phase alternating voltage. The first winding system 161 of the transformer 160 comprises a first winding connected to one phase of the first AC bus 111. The second winding system 162 of the transformer 160 comprises a second winding connected to one phase of the second AC bus 112. Furthermore, the third winding system 163 of the transformer 160 comprises a third winding connected to one phase of the third AC bus.Accordingly, the supply network (not shown) is designed as a single-phase AC system. The first to third winding systems 161, 162, 163 of the transformer 160 are wound around a common core 164. The AC-DC converter 150 is also designed as a single-phase system.
[0123] The AC-DC power converter 150 also includes a line filter 151 for filtering interference transmitted by the supply network to the energy distribution system 100, in particular to the third and first AC bus 111, 113, and / or for filtering clock-frequency interference and / or harmonics generated by the AC-DC power converter 150. The line filter 151 can thus eliminate or keep away from the supply network 230 interference due to a switching frequency of the AC-DC power converter 150, which can be in the range of 1 to 20 kHz for high-performance IGBT converters and even between 20 kHz and 100 kHz for converters with fast IGBTs, MOSFETs, or SiC-based power semiconductors. The line filter 150 can be designed as a low-pass filter or comprise one.
[0124] In Figure 3, the energy transfer from and to the supply network via the third AC bus 113, the energy transfer to the at least one second AC load via the second AC bus 112 and the energy transfer from and to the energy storage device 140 and to the first AC load 210 via the at least one first AC bus 111 are also illustrated by corresponding (double) arrows.
[0125] Figure 4 shows a watercraft according to embodiments of the present disclosure. The watercraft 1000 may be configured, for example, as a boat, ship, or ferry. Figure 4 shows the situation where the watercraft is located in the harbor 1100.
[0126] The supply network 230 is located on land, particularly in port 1100.
[0127] The watercraft 1000 includes a power distribution system 300 according to embodiments of the present disclosure, for example, the power distribution systems 100, 200 of Figures 1, 2A-2D, and 3. Here, the power distribution system 300 is arranged in the watercraft 1000. The watercraft 1000 includes, as a first AC load 210, an electric propulsion motor for propelling and moving the watercraft on the water. Alternatively, the watercraft may include, as a DC load, an electric propulsion motor for propelling and moving the watercraft on the water. Furthermore, the watercraft 1000 includes, as a second AC load 220, an air conditioning system.
[0128] The first AC load 210 is connected to the power distribution system 100 via the first AC bus 111. The second AC load 220 is connected directly to the power distribution system 100 via the second AC bus 112. Furthermore, the power distribution system 100 is connected to the power grid 230 via the power grid connection element 180. The power grid connection element 180 is designed here as a cable with a plug. The power distribution system 100, or more precisely its third AC bus 113, can be connected to the power grid 230 using the power grid connection element 180. The present disclosure therefore provides for arranging the transformer 160 in or on the watercraft 1000 according to embodiments of the present disclosure. The transformer 160 is designed for a grid frequency, i.e., the frequency of the AC voltage of the power grid 230.The transformer 160 comprises three winding systems 161, 162, 163 for the first to third AC buses 111, 112, 113, in order to convert the first to third alternating voltages between the AC buses 111, 112, 113. The transformer 160 galvanically isolates the first to third AC buses 111, 112, 113 from one another and, in particular, galvanically isolates the supply network 230 from the first AC bus 111 and the second AC bus 112. Furthermore, the AC-DC converter 150 is bidirectional.
[0129] When the supply grid 230 is available, for example, when the watercraft 1000 is located in a harbor 1100 as shown in Figure 4, the energy distribution system 100, 200, 300 can be supplied with energy from the supply grid 230 via the transformer 160. In particular, the energy storage device 140 can be supplied with energy from the supply grid 230 to charge the energy storage device 140, and the second AC load 220 can be supplied with energy from the supply grid 230 to operate the second AC load 220. Alternatively or additionally, the second AC load 220 can also be supplied with energy from the energy storage device 140. In this case, the energy storage device 140, the second AC load 220, and also the first AC load 210 or the DC load are galvanically isolated and thus electrically isolated from the supply grid 230.More specifically, energy for charging the energy storage device 140 can be provided via the transformer 160 and the bidirectional AC-DC power converter 150. The supply of the second AC load 220 can also be supported via the bidirectional AC-DC power converter 150 and the transformer 160. Supplying the at least one second AC load 220 with both energy from the utility grid 230 and energy from the energy storage device 140 can also be referred to as a bivalent hotel load supply.
[0130] If the supply network 230, i.e., shore power, is not available, for example, when the watercraft 1000 is traveling at sea or away from a harbor 1100, the first AC load 210 and the second AC load 220 can be supplied with energy from the energy storage device 140 by means of the bidirectional AC-DC power converter 150 and the transformer 160. Since the inverter 150 can operate bidirectionally, it can support the supply of the at least one second AC load 220, i.e., the auxiliary consumers, or can exclusively take over itself when no shore power is available. As a three-phase inverter, the inverter 150 can provide bidirectional DC voltage from the AC supply network via a line filter 151 for charging the energy storage device 140, for example, batteries, or AC voltage for supplying the first AC load 210, for example, an electric motor. The inverter 150 can be designed as a motor inverter.The inverter 150 comprising the line filter 151 can also be referred to as AFE (“Active Front End”).
[0131] This solution eliminates the need for a power converter or conversion stage. This results in a significant improvement in overall efficiency when supplied from the 230 grid. Furthermore, the number of components of the power distribution system 100, 200, 300 and their complexity can be reduced. This increases the reliability of the power distribution system 100, 200, 300 while reducing costs. Furthermore, the power distribution system 100, 200, 300 can perform a peak shaving function when connected to the 230 grid.
[0132] Where applicable, all individual features presented in the embodiments may be combined and / or exchanged without departing from the scope of the invention.
[0133] List of reference symbols
[0134] 100, 200, 300 power distribution system
[0135] 111, 112, 113 AC buses 130 DC bus
[0136] 140 Energy storage device
[0137] 150 AC-DC power converters
[0138] 151 line filters
[0139] 160 Transformer 161, 162, 163 Winding systems
[0140] 163 core
[0141] 170 Load connection element
[0142] 180 supply network connection element
[0143] 210 first AC load
[0144] 220 second AC load
[0145] 230 supply network
[0146] 1000 watercraft
[0147] 1100 Port
Claims
32 Claims 1. Power distribution system (100, 200, 300) for a watercraft (1000), the power distribution system (100, 200, 300) comprising: a first AC bus (111), a second AC bus (112) for connecting to at least one second AC load (220), a third AC bus (113) for connecting to a power supply network (230); a transformer (160) configured to convert an AC voltage from each of the first to third AC buses (111, 112, 113) into an AC voltage from each of the other first to third AC buses (111, 112, 113); a DC bus (130) and an energy storage device (140) connected to the DC bus (130), and a bidirectional AC-DC converter (150) connected between the first AC bus (111) and the DC bus (130).
2. Energy distribution system (100, 200, 300) according to claim 1, wherein the transformer (160) is further configured to galvanically isolate each of the first to third AC buses (111, 112, 113) from each of the other first to third AC buses (111, 112, 113), and / or wherein the transformer (160) is configured to galvanically isolate the third AC bus (113) from the first AC bus (111) and from the second AC bus (112).
3. Energy distribution system (100, 200, 300) according to one of the preceding claims, wherein the transformer (160) has a first winding system connected to the first AC bus (111), a second winding system connected to the second AC bus (112), and a third winding system connected to the third AC bus (113).
4. Energy distribution system (100, 200, 300) according to one of the preceding claims, wherein the energy distribution system (100, 200, 300) is configured to simultaneously transfer energy from the energy storage device (140) to the first AC bus (111) for operating at least one first AC load (210) connected to the first AC bus (111) with energy from the energy storage device (140), and to transfer energy from the energy storage device (140) to the second AC bus (112) for operating the at least one second AC load (220) with energy from the energy storage device (140), and / or 33 wherein the energy distribution system (100, 200, 300) is configured to simultaneously transfer energy from the energy storage device (140) to the DC bus (130) to operate at least one DC load connected to the DC bus (130) with energy from the energy storage device (140), and to transfer energy from the energy storage device (140) to the second AC bus (112) to operate the at least one second AC load (220) with energy from the energy storage device (140), and / or wherein the energy distribution system (100, 200, 300) is configured to simultaneously transfer energy from the energy storage device (140) to the second AC bus (112) to operate the at least one second AC load (220) with energy from the energy storage device (140), and to transfer energy from the energy storage device (140) to the third AC bus (113) to Feeding energy from the energy storage device (140) into the supply network (230),and / or wherein the power distribution system (100, 200, 300) is configured to simultaneously transfer energy from the supply network (230) to the DC bus (130) for charging the energy storage device (140) with energy from the supply network (230), and to transfer energy from the supply network (230) to the second AC bus (112) for operating the at least one second AC load (220) with energy from the supply network (230), and / or wherein the power distribution system (100, 200, 300) is configured to simultaneously transfer energy from the supply network (230) and energy from the energy storage device (140) to the second AC bus (112) for simultaneously operating the at least one second AC load (220) with energy from the energy storage device (140) and energy from the supply network (230).
5. Energy distribution system (100, 200, 300) according to one of the preceding claims, wherein at least two of a first AC voltage of the first AC bus, a second AC voltage of the second AC bus and a third AC voltage of the third AC bus are different from each other, or wherein the RMS values of the first to third AC voltages are essentially the same.
6. Energy distribution system (100, 200, 300) according to one of the preceding claims, wherein the transformer is designed as a three-phase transformer, and / or wherein the first to third AC buses are each designed as three-phase.
7. Energy distribution system (100, 200, 300) according to one of the preceding claims, further comprising a supply network connection element (180) configured to connect the third AC bus (113) to the supply network (230).
8. Energy distribution system (100, 200, 300) according to one of the preceding claims, further comprising a load connection element (170) configured to connect the second AC bus (112) to one of the at least one second AC load (220).
9. Energy distribution system (100, 200, 300) according to one of the preceding claims, wherein the energy storage device (140) is designed as a battery, battery module or battery cell or comprises at least one of these elements.
10. Energy distribution system (100, 200, 300) according to one of the preceding claims, wherein the AC-DC converter (150) has a mains filter (151) for filtering clock frequency disturbances and / or harmonics.
11. Power distribution system (100, 200, 300), wherein the RMS value of the first AC voltage of the first AC bus (111) is 200 V or 400 V, and / or wherein the RMS value of the second AC voltage of the second AC bus (112) is 400 V, and / or wherein the RMS value of the third AC voltage of the third AC bus (113) and / or the RMS value of the AC voltage of the supply network (230) is less than 1 kV, in particular approximately 115 V, 230 V, 400 V, 500 V, 690 V or 800 V, and / or wherein the RMS value of the first AC voltage of the first AC bus (111), the RMS value of the second AC voltage of the second AC bus (112) and the RMS value of the third AC voltage of the third AC bus (113) is 400 V.
12. Transformer (160) for a watercraft (1000), wherein the transformer (160) is configured to convert each of a first AC voltage from a first AC bus (111), a second AC voltage from a second AC bus (112), and a third AC voltage from a third AC bus (113) into an AC voltage from each of the other first to third AC buses (111, 112, 113), and wherein the transformer (160) is configured to galvanically isolate each of the first to third AC buses (111, 112, 113) from each of the other first to third AC buses (111, 112, 113). to separate and / or the transformer (160) is set up to galvanically isolate the third AC bus (113) from the first AC bus (111) and from the second AC bus (112).
13. Watercraft (1000), in particular boat, ship or ferry, comprising a power distribution system (100, 200, 300) or a transformer (160) according to any of the preceding claims.
14. Watercraft (1000) according to claim 13, further comprising at least one first AC load (210) connected to the first AC bus (111), and / or further comprising at least one DC load connected to the DC bus (130).
15. Watercraft (1000) according to claim 14, wherein the first AC load (210) and / or the DC load is configured as or comprises an electric motor, in particular an electric auxiliary motor or electric drive motor.
16. Watercraft (1000) according to one of claims 12 to 15, further comprising at least a second AC load (220) which is directly connected to the second AC bus (112) or which is connected to the second AC bus (112) by means of a corresponding load connection element of the power distribution system (100, 200, 300).
17. Watercraft (1000) according to claim 16, wherein the at least one second AC load (220) is configured as or comprises an air conditioning, heating, cooling, lighting system or power supply unit for electrical devices of users on the watercraft (1000).