Method and device for operating an arrangement comprising an interlocking

By dividing railway track sections into virtual subsections and generating compatible status signals, the method enhances location accuracy and spatial resolution within railway track systems, addressing existing monitoring limitations without the need for additional devices.

EP4464571A1Inactive Publication Date: 2024-11-20SIEMENS MOBILITY GMBH
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
EP2023173840
Authority / Receiving Office
EP · EP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-17
Publication Date
2024-11-20
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Current railway track systems face limitations in location accuracy and spatial resolution due to the lack of precise monitoring of rail vehicle positions within track sections, which can be improved without increasing the number of monitoring devices or requiring additional installations.

Method used

Introducing a track control center that divides monitored track sections into virtual subsections, allowing for enhanced location accuracy by generating and processing subsection-related status signals, which are designed to be compatible with existing signal boxes and monitoring devices.

Benefits of technology

This approach increases the spatial resolution of rail vehicle location determination without additional devices, enabling conventional signal boxes to operate effectively with subsection-related status signals, and allows for efficient monitoring of railway track systems with improved accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IMGAF001_ABST
    Figure IMGAF001_ABST
Patent Text Reader

Abstract

The invention relates, inter alia, to a method for operating an arrangement comprising a railway track system (10) having track sections (11-15), a signal box (30) monitoring the operation of the railway track system (10) and at least one track section monitoring device (110, 120), wherein the signal box (30) operates section-related and controls the operation of the railway track system (10) using status signals that describe the occupancy status of sections of the railway track system (10).According to the invention, the method includes, among other things, the provision that a track control center (20) is connected between the signal box (30) and the at least one track section monitoring device (110, 120), which divides a track section (11, 12) monitored by the at least one track section monitoring device (110, 120) into virtual subsections (11a-12b) and generates a subsection-related status signal (Z11a-Z12b) for each of the subsections (11a-12b) that describes the occupancy state of the respective subsection (11a-12b).
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The invention relates to a method for operating an arrangement comprising a railway track system having track sections, a signal box monitoring the operation of the railway track system and at least one track section monitoring device, wherein the signal box operates on a section-related basis and controls the operation of the railway track system using status signals that describe the occupancy status of sections of the railway track system.

[0002] The invention is based on the object of further developing a method of the type described.

[0003] This object is achieved according to the invention by a method having the features according to claim 1. Advantageous embodiments of the method according to the invention are specified in subclaims.

[0004] According to the invention, a track control center is connected between the signal box and the at least one track section monitoring device, which divides a track section monitored by the at least one track section monitoring device into virtual sub-sections, the track control center receives and further processes a track section-related status signal which the at least one track section monitoring device generates for a track section assigned to it, by detecting the respective position of each rail vehicle located in the track section in the case of an occupancy status of the track section reported by the at least one track section monitoring device and determining the occupancy status of the sub-sections on the basis of the detected positions,and the control centre transmits to the signal box, instead of the track section-related status signal, a sub-section-related status signal for each of the sub-sections, which describes the occupancy status of the respective sub-section.

[0005] A significant advantage of the method according to the invention is that by interposing the track control center and defining virtual subsections, the location accuracy or spatial resolution when locating rail vehicles can be increased without having to increase the number of track section monitoring devices or provide for the subsequent installation of additional track section monitoring devices.

[0006] In the manner described, two or more track sections can also be divided into virtual subsections in order to increase the spatial resolution of the measurement or the accuracy of the location determination.

[0007] It is particularly advantageous if the sub-section-related status signals generated by the track control center correspond in terms of their signal design to the track-section-related status signal sent by the at least one track-section monitoring device to the track control center, and if the sub-section-related status signals are processed by the interlocking in the same way as track-section-related status signals sent directly to the interlocking. An advantage of the latter design is that conventional, existing track-section-related interlocking systems can be used without the need for adaptation, modification, or modernization.

[0008] It is therefore possible that the signal box is suitable for operation without a track control centre and could monitor the railway track system solely on the basis of track section-related status signals from a directly connected track section monitoring device.

[0009] In an advantageous development of the method, at least one further track section monitoring device is connected directly to the interlocking system without an intermediate track control center, the at least one further track section monitoring device transmits its track section-related status signal directly to the interlocking system, and the interlocking system monitors the operation of the railway track system using both the subsection-related status signals from the track control center and the track section-related status signal from the at least one further track section monitoring device. In the latter embodiment, the inclusion of the track control center can be dispensed with, for example, for short track sections where segmentation or the creation of subsections is not economically advantageous.

[0010] In the latter embodiment, it is advantageous if the interlocking system processes the sub-section-related status signals of the line control center and the track section-related status signal of the at least one further track section monitoring device in an identical manner.

[0011] In a further embodiment considered advantageous, the line control center is connected between the interlocking system and at least one additional track section monitoring device. The line control center forwards a track section-related status signal from the at least one additional track section monitoring device unchanged to the interlocking system. The interlocking system monitors the operation of the railway track system using the additional track section-related status signal from the at least one additional track section monitoring device. In the latter embodiment, it is possible for the line control center to observe what is happening in the track sections assigned to the additional track section monitoring devices and to perform plausibility checks.

[0012] The interlocking system preferably processes the sub-section-related status signals from the line control center and the passed-through track-section-related status signal from the at least one additional track section monitoring device in an identical manner.

[0013] The interlocking system preferably has a plurality of input ports implemented in hardware or software (e.g. by destination addresses for data telegrams), each of which is designed to receive a track section-related status signal from a track section monitoring device.

[0014] Each subsection is preferably individually assigned one of the input ports; the control center preferably transmits a status signal for each subsection to an input port individually assigned to the respective subsection.

[0015] The invention further relates to a track control center. According to the invention, the track control center is suitable for connection both to a section-based signal box and to at least one track section monitoring device. The track control center is designed to divide a track section monitored by the at least one track section monitoring device into virtual subsections, receive and further process a track section-based status signal generated by the at least one track section monitoring device for a track section assigned to it,by detecting the respective position of each rail vehicle located in the track section in the event of an occupancy status of the track section reported by the at least one track section monitoring device and determining the occupancy status of the sub-sections on the basis of the detected positions, and transmitting a sub-section-related status signal to the signal box for each of the sub-sections, which describes the occupancy status of the respective sub-section, wherein the line control centre generates the sub-section-related status signals in such a way that their signal design corresponds to the track section-related status signal of the at least one track section monitoring device.

[0016] Regarding the advantages of the inventive track control center and advantageous embodiments of the inventive track control center, reference is made to the above statements in connection with the inventive method and its advantageous embodiments. The described embodiment has, among other things, the advantage that the interlocking system can process the status signals indiscriminately, and even interlocking systems originally designed for direct connection to track section monitoring devices can process the sub-section-related status signals, namely in the same way as track section-related status signals.

[0017] It is advantageous if the track control centre has a radio facility or is connected to one that enables radio operation with the rail vehicles located in the sub-sections.

[0018] The control center preferably comprises a computing device and a memory; the memory preferably stores a computer program product which, when executed by the computing device, determines or at least co-determines the operation of the control center.

[0019] The invention further relates to a computer program product. In this regard, the invention provides that the computer program product comprises program instructions which, when executed by a computing device, in particular the computing device of the above-described track control center, cause the computer to subdivide a track section monitored by at least one track section monitoring device into subsections, to receive and further process a track section-related status signal generated by the at least one track section monitoring device for the track section assigned to it, by detecting the respective position of each rail vehicle located in the track section in the event of an occupancy status of the track section reported by the at least one track section monitoring device, and to determine the occupancy status of the subsections based on the detected positions,and to transmit to the interlocking system a sub-section-related status signal for each of the sub-sections, which describes the occupancy status of the respective sub-section, wherein the computing device generates the sub-section-related status signals in such a way that, in terms of signal design, they correspond to the track section-related status signal of the at least one track section monitoring device and can be processed by the interlocking system in the same way as track section-related status signals sent directly to the interlocking system.

[0020] With regard to the advantages of the computer program product according to the invention and advantageous embodiments of the computer program product according to the invention, reference is made to the above statements in connection with the method according to the invention and its advantageous embodiments.

[0021] The invention also relates to an arrangement comprising a track control center, a signal box that monitors the operation of a railway track system comprising track sections, and at least one track section monitoring device. The signal box operates on a section-by-section basis and controls the operation of the railway track system using status signals that describe the occupancy status of sections of the railway track system. With regard to the arrangement, the invention provides that the track control center is a track control center as described above, and that the arrangement is operated according to a method as described above.

[0022] The invention is explained in more detail below using exemplary embodiments, which show, for example: Figure 1 shows an embodiment of a railway track system, based on which a first embodiment of a method according to the invention is explained, Figure 2 shows an embodiment of a railway track system, based on which a second embodiment of a method according to the invention is explained, Figure 3 shows an embodiment of a railway track system, based on which a third embodiment of a method according to the invention is explained, Figure 4 shows an embodiment of a railway track system, based on which a fourth embodiment of a method according to the invention is explained, and Figure 5 shows an embodiment of a track control center, which is used to carry out the Figures 1 to 4 explained procedure is suitable.

[0023] For the sake of clarity, the same reference symbols are always used in the figures for identical or comparable components.

[0024] The Figure 1shows a railway track system 10 having track sections 11 and 12. Each of the track sections 11 and 12 is monitored by a track section monitoring device 110 and 120, respectively.

[0025] The track section monitoring devices 110 and 120 each generate a track section-related status signal Z11 or Z12, which indicates the respective occupancy status of the monitored track section 11 or 12. In the representation according to Figure 1 For example, the status signal Z11 indicates an occupied state because a rail vehicle 50 is located in track section 11. The status signal Z12 also indicates an occupied state.

[0026] The track section monitoring devices 110 and 120 are connected to a track control center 20 via individual connecting lines or a data transmission network (e.g., an Ethernet network or the Internet). The track control center 20, in turn, is connected to a signal box 30 via individual connecting lines or via the aforementioned or another data transmission network. The track control center 20 is connected, with respect to data signals, between the signal box 30 and the track section monitoring devices 110 and 120.

[0027] The order according to Figure 1Preferably, the track control center 20 subdivides the track sections 11 and 12 monitored by the track section monitoring devices 110 and 120 into virtual subsections 11a, 11b, 11c, 12a, and 12b. For each of the virtual subsections 11a, 11b, 11c, 12a, and 12b, the track control center 20 generates a subsection-related status signal that indicates the occupancy status of the respective virtual subsection.

[0028] If the status signal Z11 of the track section monitoring device 110 indicates, for example, that track section 11 is occupied, the track control center 20 records the respective position of each rail vehicle located in track section 11, in this case rail vehicle 50. The position recording can be carried out, for example, via a radio connection F11, via which the track control center 20 communicates with each of the rail vehicles located in track section 11, in this case rail vehicle 50, and queries the respective position from the rail vehicles. Based on the position information received from rail vehicle 50, the track control center 20 determines the occupancy status of the virtual subsections 11a, 11b, and 11c of track section 11 and establishes that the virtual subsection 11b is occupied and the other two virtual subsections 11a and 11c are unoccupied.

[0029] For the occupied subsections, in this case subsection 11b, the route control center 20 generates a subsection-related status signal Z11b, which indicates that subsection 11b is occupied; for the unoccupied subsections, in this case subsections 11a and 11c, the route control center 20 generates a subsection-related status signal Z11a or Z11c, which indicates that subsection 11a or 11c is free.

[0030] If, however, the status signal Z11 of the track section monitoring device 110 indicates that the track section 11 is unoccupied, the track control center 20 transmits a sub-section-related status signal Z11a, Z11b or Z11c for the sub-sections 11a, 11b and 11c, respectively, which indicates that the respective sub-section is unoccupied.

[0031] The same applies to the track section 12, which is monitored by the track section monitoring device 120: If the status signal Z12 of the track section monitoring device 12 indicates, for example, that the track section 12 is occupied, the track control center 20 records the respective position of each rail vehicle located in the track section 12, in this case the rail vehicles 51 and 52.

[0032] Position detection can be carried out, for example, via a radio connection F12, via which the track control center 20 communicates with each of the rail vehicles located there, in this case, rail vehicles 51 and 52, and queries the respective position of the rail vehicles 51 and 52. Based on the position information received from the rail vehicles 51 and 52, the track control center 20 determines the occupancy status of the virtual subsections 12a and 12b of track section 12 and determines that both subsections 12a and 12b are occupied.

[0033] For the two occupied subsections 12a and 12b, the route control center 20 generates a subsection-related status signal Z12a or Z12b, respectively, which indicates that the respective subsection is occupied.

[0034] If, however, the status signal Z12 of the track section monitoring device 120 indicated that the track section 12 is unoccupied, the track control center 20 would transmit a sub-section-related status signal Z12a and Z12b for the sub-sections 12a and 12b to the signal box 30, which would indicate that the respective sub-section is unoccupied.

[0035] Interlocking system 30 operates on a section-by-section basis and controls the operation of railway track system 10 based on the occupancy status, as is generally known for interlocking systems operating on a section-by-section basis. To simplify this, or to allow for no adaptation of interlocking system 30, the sub-section-related status signals Z11a to Z12b generated by line control center 20 correspond in terms of signal design to the track-section-related status signals Z11 and Z12 sent by track-section monitoring devices 110 and 120 to line control center 20. This allows the sub-section-related status signals to be processed by interlocking system 30 in the same way as track-section-related status signals sent directly to interlocking system 30.

[0036] The signal box 30 can therefore be a signal box that is suitable for operation without a line control center 20 and could carry out the monitoring of the railway track system 10 solely on the basis of the track section-related status signals Z11 and Z12 if the track section monitoring devices 110 and 120 were directly connected to the signal box 30.

[0037] For receiving the track section-related status signals Z11 and Z12 or the subsection-related status signals Z11a to Z12b, the interlocking system 30 has a plurality of input ports, each configured to receive a track section-related status signal from a track section monitoring device. The input ports can be configured in hardware or purely in software as a receive address for data telegrams, with the respective receive address defining the respective track section or the respective virtual subsection for which a status signal is to be received.

[0038] The Figure 2 shows a railway track system 10, which has track sections 11 and 12 according to Figure 1and also has a further track section 13. The track sections 11 and 12 are monitored by the track section monitoring devices 110 and 120 with subdivision into virtual subsections, as described above in connection with the Figure 1 was explained. The one further track section 13 is monitored by a further track section monitoring device 130, which is connected directly to the signal box 30 without the intermediary of the line control center 20.

[0039] The one further track section monitoring device 130 transmits its track section-related status signal Z13 directly to the signal box 30. The signal box 30 monitors the operation of the railway track system 10 using both the sub-section-related status signals Z11a to Z12b of the track control center 20 and the track section-related status signal Z13 of the one further track section monitoring device 130. In addition, the above statements in connection with the Figure 1 for the embodiment according to Figure 2 accordingly.

[0040] The Figure 3 shows a railway track system 10, the track sections 11 and 12 according to Figure 1 , another track section 13 according to Figure 2and also has an additional track section 14. The track sections 11 and 12 are monitored by the track section monitoring devices 110 and 120 with subdivision into virtual subsections, as described above in connection with the Figure 1 The further track section 13 is monitored by a further track section monitoring device 130, as described above in connection with the Figure 2 was explained.

[0041] The one additional track section 14 is monitored by an additional track section monitoring device 140, which is only indirectly connected to the signal box 30 due to the interposition of the line control center 20.

[0042] The one additional track section monitoring device 140 transmits its track section-related status signal Z14 to the signal box 30 with the involvement of the track control center 20 or only indirectly; the track control center 20 acts merely as an intermediate station, passing the track section-related status signal Z14 to the additional track section monitoring device 140.

[0043] The signal box 30 monitors the operation of the railway track system 10 using the sub-section-related status signals Z11a to Z12b of the track control center 20, the further status signal Z13 which is bypassed by the track control center 20 and the additional or forwarded track section-related status signal Z14 of the additional track section monitoring device 140. In addition, the above statements apply in connection with the Figures 1 and 2 for the embodiment according to Figure 3 accordingly.

[0044] The Figure 4 shows a railway track system 10, the track sections 11 and 12 according to Figure 1 , another track section 13 according to Figure 2 , an additional track section 14 according to Figure 3 and has an additional track section 15.

[0045] The track sections 11 and 12 are monitored by the track section monitoring devices 110 and 120 with subdivision into virtual subsections, as described above in connection with the Figure 1 The further track section 13 is monitored by the further track section monitoring device 130, as described above in connection with the Figure 2 The one additional track section 14 is monitored by the additional track section monitoring device 140, as described above in connection with the Figure 3 was explained.

[0046] The one additional track section 15 is monitored by the track control center 20 – without involving a track section monitoring device – through communication with the rail vehicles located there, for example, via radio link F15. The track control center 20 transmits its track section-related status signal Z15 to the signal box 30.

[0047] The signal box 30 monitors the operation of the railway track system 10 using the sub-section-related status signals Z11a to Z12b of the line control center 20, the passed-through track section-related status signal Z14, the status signal Z13 bypassing the line control center and the track section-related status signal Z15 generated independently of track section monitoring devices and solely by the line control center 20.

[0048] In the Figure 4Also shown is an example of a data transmission network 40, which may be an Ethernet network or the Internet and which enables the transmission of the status signals described above.

[0049] Furthermore, the above statements apply in connection with the Figures 1 to 3 for the embodiment according to Figure 4 accordingly.

[0050] The number and arrangement of track sections, each monitored by a track section monitoring device and for which the track control center 20 generates sub-section-related status signals, of further track sections that send their status signals to the interlocking system 30 without involving the track control center 20, of additional track sections monitored by a track section monitoring device and for which the track control center 20 merely forwards the status signals, and of supplementary track sections directly monitored by the track control center 20 without involving a track section monitoring device, is arbitrary; thus, all combinations are conceivable. The track section monitoring devices can be, for example, axle counting devices that determine the occupancy status by counting the number of axles entering and exiting.

[0051] The Figure 5shows an embodiment of a control center 20, which is used for the operation of the Figures 1 to 4 shown railway track system 10.

[0052] The track control center 20 comprises a computer system 21 and a radio device 22, which enables radio operation with rail vehicles and thus the operation of the radio links F11, F12 and F15 in accordance with Figure 4 enabled.

[0053] The computer system 21 also includes a computing device 21a and a memory 21b. A computer program product CPP is stored in the memory 21b, which includes a first software module SW1, a second software module SW2, and a third software module SW3.

[0054] The first software module SW1 comprises program instructions which, when executed by the computing device 21a, cause the computing device 21a to subdivide track sections 11 and 12 monitored by the track section monitoring devices 110 and 120 into subsections 11a to 12b, and to receive and further process the track section-related status signals Z11 and Z12 by detecting the respective position of each rail vehicle located in the respective track section 11 or 12 in the event of a reported occupancy status and determining the occupancy status of the subsections based on the detected positions. For this purpose, the first software module SW1 is designed to operate the radio links F11 and F12 together with the radio device 22.

[0055] For each of the subsections, the computer system 21 transmits to the signal box 30 a subsection-related status signal Z11a to Z12b, which describes the occupancy status of the respective subsection.

[0056] The computing device 21a generates the sub-section-related status signals in such a way that, in terms of signal design, they correspond to the track section-related status signals of the track section monitoring devices 110 and 120 and can be processed by the interlocking system 30 in the same way as track section-related status signals sent directly to the interlocking system 30, such as the further status signal Z13.

[0057] The second software module SW2 comprises program instructions which, when executed by the computing device 21a, cause the computing device 21a to pass the status signal Z14 received from the track section monitoring device 140 to the interlocking system 30 unchanged in content, at least with regard to the occupancy information contained therein.

[0058] The third software module SW3 comprises program instructions which, when executed by the computing device 21a, cause the computing device 21a to operate the radio connection F15 together with the radio device 22 and to form the track section-related status signal Z15.

[0059] Finally, it should be mentioned that the features of all embodiments described above can be combined with each other in any way to form further other embodiments of the invention.

[0060] All features of subclaims can also be combined individually with each of the independent claims, either individually or in any combination with one or more other subclaims, in order to obtain further other embodiments.

[0061] Regardless of the grammatical gender of a particular term, persons with male, female or other gender identities are included.

Claims

1. A method for operating an arrangement, - which comprises a railway track system (10) having track sections (11-15), a signal box (30) monitoring the operation of the railway track system (10) and at least one track section monitoring device (110, 120), - wherein the signal box (30) operates on a section-by-section basis and controls the operation of the railway track system (10) using status signals that describe the occupancy status of sections of the railway track system (10), characterized in that- a track control center (20) is connected between the signal box (30) and the at least one track section monitoring device (110, 120), which divides a track section (11, 12) monitored by the at least one track section monitoring device (110, 120) into virtual sub-sections (11a-12b), - the track control center (20) receives and further processes a track section-related status signal (Z11, Z12) which the at least one track section monitoring device (110, 120) generates for a track section (11, 12) assigned to it, by detecting the respective position of each rail vehicle (50, 51, 52) located in the track section (11, 12) in the case of an occupancy status of the track section (11, 12) reported by the at least one track section monitoring device (110, 120) and, based on the detected Positions determine the occupancy status of the subsections (11a-12b),and - the line control centre (20) transmits to the signal box (30) instead of the track section-related status signal (Z11, Z12) a sub-section-related status signal (Z11a-Z12b) for each of the sub-sections (11a-12b), which describes the occupancy status of the respective sub-section (11a-12b).

2. Method according to claim 1, characterized in that - the sub-section-related status signals (Z11a-Z12b) generated by the track control center (20) correspond in terms of signal design to the track section-related status signal (Z11, Z12) sent by the at least one track section monitoring device (110, 120) to the track control center (20), and - the sub-section-related status signals (Z11a-Z12b) are processed by the signal box (30) in the same way as track section-related status signals sent directly to the signal box (30).

3. Method according to one of the preceding claims, characterized in thatthe signal box (30) is suitable for operation without a track control center (20) and could carry out the monitoring of the railway track system (10) solely on the basis of track section-related status signals from a directly connected track section monitoring device (110, 120).

4. Method according to one of the preceding claims, characterized in that- at least one further track section monitoring device (130) is connected directly to the signal box (30) without an intermediate line control center (20), - the at least one further track section monitoring device (130) transmits its track section-related status signal (Z13) directly to the signal box (30), and - the signal box (30) monitors the operation of the railway track system (10) using both the sub-section-related status signals (Z11a-Z12b) of the line control center (20) and the track section-related status signal (Z13) of the at least one further track section monitoring device (130).

5. Method according to claim 4, characterized in that the signal box (30) processes the sub-section-related status signals (Z11a-Z12b) of the line control center (20) and the track section-related status signal (Z13) of the at least one further track section monitoring device (130) in an identical manner.

6. Method according to one of the preceding claims, characterized in that - the line control center (20) is connected between the signal box (30) and at least one additional track section monitoring device (140), - the line control center (20) passes a track section-related status signal (Z14) of the at least one additional track section monitoring device (140) unchanged to the signal box (30), and - the signal box (30) monitors the operation of the railway track system (10) with additional use of the passed-through track section-related status signal (Z14) of the at least one additional track section monitoring device (140).

7. Method according to claim 6, characterized in thatthe signal box (30) processes the sub-section-related status signals (Z11a-Z12b) of the line control center (20) and the passed-through track-section-related status signal (Z14) of the at least one additional track section monitoring device (140) in an identical manner.

8. Method according to one of the preceding claims, characterized in that the signal box (30) has a plurality of input ports, each of which is designed to receive a track section-related status signal from a track section monitoring device (130, 140).

9. Method according to claim 8, characterized in that - each subsection (11a-12b) is individually assigned one of the input ports and - the route control center (20) transmits a status signal (Z11a-Z12b) for each subsection (11a-12b) to an input port individually assigned to the respective subsection (11a-12b).

10. Route control center (20), characterized in thatthe track control center (20) is suitable both for connection to a section-related signal box (30) and for connection to at least one track section monitoring device (110, 120), wherein the track control center (20) is designed to - divide a track section (11, 12) monitored by the at least one track section monitoring device (110, 120) into virtual sub-sections (11a-12b), - receive and further process a track section-related status signal (Z11, Z12) generated by the at least one track section monitoring device (110, 120) for a track section (11, 12) assigned to it, by, in the event of an occupancy status of the track section (11, 12) reported by the at least one track section monitoring device (110, 120), Rail vehicle (50, 51,52) detects the respective position and determines the occupancy status of the subsections (11a-12b) based on the detected positions, and - for each of the subsections (11a-12b) to transmit to the signal box (30) a subsection-related status signal (Z11a-Z12b) describing the occupancy status of the respective subsection (11a-12b), - wherein the line control center (20) generates the subsection-related status signals (Z11a-Z12b) such that their signal configuration corresponds to the track section-related status signal (Z11, Z12) of the at least one track section monitoring device (110, 120).

11. Route control center (20) according to claim 10, characterized in that the track control center (20) has or is connected to a radio device (22) which enables radio operation (F11, F12) with the rail vehicles (50, 51, 52) which are located in the subsections (11a-12b).

12. Route control center (20) according to claim 10 or 11, characterized in that - the control center (20) comprises a computing device (21a) and a memory (21b), and - a computer program product (CPP) is stored in the memory (21b) which, when executed by the computing device (21a), determines or at least co-determines the mode of operation of the control center (20).

13. Computer program product, characterized in thatthe computer program product (CPP) comprises program instructions which, when executed by a computing device, in particular the computing device (21a) of the track control center (20) according to claim 12, cause the latter to - divide a track section (11, 12) monitored by at least one track section monitoring device (110, 120) into subsections (11a-12b), - receive and further process a track section-related status signal (Z11, Z12) which the at least one track section monitoring device (110, 120) generates for the track section (11, 12) assigned to it, by detecting the respective position of each rail vehicle (50, 51, 52) located in the track section (11, 12) in the case of an occupancy status of the track section (11, 12) reported by the at least one track section monitoring device (110, 120) and using of the recorded positions determines the occupancy status of the subsections (11a-12b),and - for each of the subsections (11a-12b), to transmit to the interlocking system (30) a subsection-related status signal (Z11, Z12) describing the occupancy status of the respective subsection (11a-12b), - wherein the computing device (21a) generates the subsection-related status signals (Z11a-Z12b) in such a way that, in terms of signal configuration, they correspond to the track section-related status signal (Z11, Z12) of the at least one track section monitoring device (110, 120) and can be processed by the interlocking system (30) in the same way as track section-related status signals sent directly to the interlocking system (30).

14. Arrangement with a line control center (20), a signal box (30) which monitors the operation of a railway track system (10) comprising track sections (11-15), and at least one track section monitoring device (110, 120), wherein the signal box (30) operates on a section-related basis and controls the operation of the railway track system (10) using status signals which describe the occupancy status of sections of the railway track system (10), characterized in that the control center (20) is a control center (20) according to one of the preceding claims 10 to 12 and the operation of the arrangement takes place according to a method according to one of the preceding claims 1 to 9.

Citation Information

Patent Citations

  • Virtual block control system for railway vehicle

    EP0638469A2

  • Method and route control centre for operating a railway track

    EP3782870A1