Method and devices for operating railway vehicles

By assigning section-specific maximum speed information and determining distance-dependent speed curves for rail vehicles, the method facilitates faster travel through track sections with external system failures, overcoming operational limitations caused by unknown switch positions and component failures.

EP4470873A1Active Publication Date: 2024-12-04SIEMENS MOBILITY GMBH
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
EP2023176281
Authority / Receiving Office
EP · EP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-31
Publication Date
2024-12-04
Estimated Expiration
2043-05-31

AI Technical Summary

Technical Problem

Conventional rail vehicle operation methods are hindered by failures in external track system components, particularly when switch positions are unknown, leading to restricted driving operations and reduced speeds, which impede rapid travel through affected sections.

Method used

Assigning section-specific maximum speed information and determining possible routes within the track system section, with a maximum speed curve based on distance traveled, allowing the rail vehicle to operate at permissible speeds, even in failure scenarios, by utilizing section-specific maximum speed information and excluding critical routes if known switch positions restrict travel.

Benefits of technology

Enables rail vehicles to traverse affected track sections at higher speeds compared to conventional methods, reducing operational restrictions and allowing for quicker passage by dynamically adjusting speed profiles based on route conditions and available information.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IMGAF001_ABST
    Figure IMGAF001_ABST
Patent Text Reader

Abstract

The invention relates, inter alia, to a method for operating a rail vehicle (10) in a track section (20) comprising at least two subsections (T1-T7) in the event of a failure of an external system of the track section (20). According to the invention, the method provides that each of the subsections (T1-T7) is assigned a subsection-specific maximum speed specification (Vmax1-Vmax7), that if the switch positions of the switches (24, 25) located in the track section (20) are unknown or incomplete, it is determined which routes (F1, F2) within the track section (20) the rail vehicle (10) could possibly travel, and that a maximum speed profile (Vmax(s)) is determined based on the possible routes (F1, F2) and on the subsection-specific maximum speed specifications (Vmax1-Vmax7) of the subsections (T1-T7) belonging to the possible routes (F1, F2).which specifies the permissible maximum speed for the journey through the track section (20) from a given reference point, depending on the distance traveled from the reference point, and the rail vehicle (10) is operated taking into account the maximum speed profile (Vmax(s)).
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The invention relates to a method for operating a rail vehicle in a track section.

[0002] In the event of a failure of the external system, i.e., track components, of a section of track, it is often impossible to maintain normal operations. If, for example, the positions of switches or the occupancy of the track section with rail vehicles are unknown due to technical errors, such as a failure of communication components, significant restrictions on operations are common under conventional operating procedures.

[0003] The invention is based on the object of further developing a method for operating a rail vehicle in such a way that, even in the event of a failure of track components, it is often possible to travel quickly through the affected track section.

[0004] This object is achieved according to the invention by a method having the features according to claim 1. Advantageous embodiments of the method according to the invention are specified in subclaims.

[0005] According to the invention, each section of the track section is assigned a section-specific maximum speed information, if there is no or incomplete knowledge of the switch positions of switches located in the track section, it is determined which routes within the track section the rail vehicle could possibly travel, based on the possible routes and on the section-specific maximum speed information of the sections belonging to the possible routes, a maximum speed profile is determined which specifies the permissible maximum speed for travel through the track section from a predetermined reference point as a function of the distance, i.e. as a function of the distance traveled from the reference point, and the rail vehicle is operated taking the maximum speed profile into account.

[0006] A key advantage of the method according to the invention is that the section-related assignment of maximum speed information to sections, the determination of possible routes, and the specification of a maximum speed profile dependent on the distance traveled can, for example, enable a rail vehicle - compared to conventional operating procedures - to travel through the track section at a comparatively high speed in the event of a failure of the external system, provided that the possible or conceivable routes determined in the respective case permit this. Unlike previously known methods, therefore, the same reduced speed is not always specified for traveling through the track section affected by the failure, but rather an individual specification is created that utilizes the knowledge or at least residual knowledge of switch positions.For example, if a known switch position provides information that a particularly critical route, which could only be safely negotiated at minimal speed, cannot actually be negotiated due to the known switch position, but instead only less critical routes can be negotiated, less restrictive specifications or a less restrictive maximum speed profile can be set accordingly. This approach can, in many cases, enable a comparatively rapid passage through the section of track affected by the failure.

[0007] It is advantageous if the maximum speed profile is determined depending on the route in such a way that in none of the sections belonging to the possible routes does the maximum speed exceed the respective section-specific maximum speed specification.

[0008] In other words, the maximum speed profile can be set depending on the route in such a way that the maximum speed at each route point corresponds to the maximum speed for each section of the section which has the lowest maximum speed for each section of all sections that may be travelled at the respective route point.

[0009] The rail vehicle is preferably signalled by a signal located in front of the track section or at an entry point into the track section that it should proceed taking the maximum speed into account.

[0010] It is advantageous if the rail vehicle ignores the signaling of other signals located within the track section after passing the signal.

[0011] If the presence of other rail vehicles in the track section can be ruled out, the rail vehicle shall preferably be operated in compliance with the maximum speed profile.

[0012] In the event that the presence of other rail vehicles in the track section cannot be ruled out, the rail vehicle can be operated in a supervised mode.

[0013] The supervisory driving style is preferably assigned a supervisory speed which the rail vehicle must not exceed.

[0014] It is advantageous if the rail vehicle is operated in compliance with the maximum speed defined by the maximum speed profile if this is lower than the supervisory speed, and otherwise is operated in compliance with the supervisory speed.

[0015] In the event of a failure of the external system, a signal box assigned to the track section preferably transmits a warning signal to a line control center assigned to the signal box and the track section. The line control center preferably determines the maximum speed curve and transmits this to the rail vehicle.

[0016] If the signal box is unaware of the switch positions of all points, the signal box preferably informs the line control center of the lack of knowledge of the switch positions, for example, implicitly by not transmitting any switch positions. In this case, the line control center preferably determines all adjustable routes within the track section and sets the maximum speed curve based on all adjustable routes and the section-specific maximum speed information for the sections belonging to the determined possible routes.

[0017] If the signal box knows the point positions of a subset of points and the point positions of the remaining points are unknown, the signal box preferably communicates the known point positions to the line control center. In the latter case, the line control center preferably excludes those routes that the rail vehicle cannot use due to the known point positions when determining the maximum speed profile.

[0018] The control center communicates the maximum speed to the rail vehicle, preferably by radio.

[0019] The route point is preferably determined depending on the entry point into the track section and can, for example, correspond to this.

[0020] The failure of the external system is preferably determined - e.g. from the signal box - if at least one track component of the track section is defective or if communication with at least one track component is not possible.

[0021] The invention also relates to a track control center for the operation of a track section comprising at least two subsections.According to the invention, the track control center is designed to determine, in the event of a failure of an external system of the track section and in the event of missing or incomplete knowledge of the switch positions of switches located in the track section, which routes within the track section a rail vehicle entering the track section could possibly travel on, to determine a maximum speed profile based on the possible routes and on section-specific maximum speed information assigned to the sections belonging to the possible routes, which maximum speed profile specifies the permissible maximum speed for travel through the track section from a predetermined reference point as a function of the distance, i.e. as a function of the distance traveled from the predetermined reference point, and to transmit the maximum speed profile to the rail vehicle.

[0022] With regard to the advantages of the route control center according to the invention and advantageous embodiments of the route control center according to the invention, reference is made to the above statements in connection with the method according to the invention and its advantageous embodiments.

[0023] The track control center preferably comprises, among other things, a computing device and a memory. A computer program product is preferably stored in the memory, which, when executed by the computing device, determines or at least co-determines the operation of the computing device and thus that of the track control center. The computer program product preferably comprises a track control center software module that enables the conventional operation of a track control center, i.e., an operation as is known for track control centers. The computer program product preferably also comprises a special operation software module that enables special operation of the track section, as explained above by way of example. If the special operation software module receives the above-mentioned warning signal from the interlocking system, the special operation software module preferably determines the route-dependent maximum speed profile, as described above.The special operating software module preferably takes into account the known switch position, if a corresponding switch position information is available. The special operating software module preferably initiates radio transmission as soon as the distance-dependent maximum speed curve has been determined.

[0024] The invention also relates to a signal box for operating a track section comprising at least two subsections. According to the invention, the signal box is designed to transmit a warning signal to a track control center assigned to the signal box and the track section in the event of a failure of an external system of the track section, to transmit information about the respective point position, if known, of points located in the track section to the track control center, and, if the signal box does not know the point position of one or more points, to inform the track control center of the lack of knowledge of these point positions.

[0025] With regard to the advantages of the signal box according to the invention and advantageous embodiments of the signal box according to the invention, reference is made to the above statements in connection with the method according to the invention and its advantageous embodiments.

[0026] The interlocking system preferably comprises, among other things, a computing device and a memory. A computer program product is preferably stored in the memory, which, when executed by the computing device, determines or at least co-determines the operation of the computing device and thus that of the interlocking system. The computer program product preferably comprises an interlocking software module that enables the conventional operation of an interlocking system. The computer program product preferably also comprises a special operating software module that enables special operation of the track section. If the special operating software module detects a failure of the external system of the track section or at least a failure of individual track components of the track section, it generates a warning signal and initiates its transmission to the track control center.In addition, the special operating software module preferably checks whether information about the respective switch positions of the switches located in the track section is available; if this is the case, it initiates the transmission of the information about the switch positions to the track control center in the form of a switch position indication.

[0027] The invention also relates to an arrangement with a track section, wherein a signal box as described above and a track control center as described above are assigned to the track section.

[0028] The invention is explained in more detail below using exemplary embodiments, which show, for example: Figure 1 shows an embodiment of an arrangement according to the invention, which comprises a track section, an embodiment of a signal box according to the invention and an embodiment of a line control center according to the invention, wherein the figure shows a normal operation of the track section, Figure 2 shows the arrangement according to Figure 1 in a special operation due to a failure in the event that only one rail vehicle is in the track section, Figure 3 the arrangement according to Figure 1 in a special operation due to a failure in the event that the occupancy status of the track section is unknown and more than one rail vehicle could be in the track section, Figure 4 the arrangement according to Figure 1 in a failure-related special operation in the event that the switch position of at least one switch is known and routes can be excluded, Figure 5 shows a preferred embodiment of the signal box according to the Figures 1 to 4in more detail, and Figure 6 shows a preferred embodiment of the route control center according to the Figures 1 to 4 in more detail.

[0029] For the sake of clarity, the same reference symbols are always used in the figures for identical or comparable components.

[0030] The Figure 1 shows a rail vehicle 10 traveling along the direction of arrow P from left to right before entering a track section 20 comprising a plurality of subsections T1 to T7. Each of the subsections T1 to T7 is assigned a subsection-specific maximum speed specification Vmax1 to Vmax7.

[0031] Of the track section 20, Figure 1a signal 23 arranged in the area of ​​the entry point 21 into the track section 20, a first switch 24 and a second switch 25 are shown. Further track components such as additional signals, axle counting devices and trackside radio components that enable a radio connection with the rail vehicle 10 may be present in the track section 20; these further track components are shown in the Figure 1 not further shown.

[0032] A signal box 30 and a track control center 40 are assigned to track section 20. The signal box 30 is connected via signal lines 26 (only indicated) to all or at least some of the track components of track section 20, but at least to signal 23 and the two switches 24 and 25, and to the track control center 40. The track control center 40 can communicate with the rail vehicle 10 via radio.

[0033] The order according to Figure 1 can be operated as follows: Error-free normal operation of the external layer:

[0034] During fault-free normal operation of the outdoor system of track section 20, i.e. when all line components of track section 20 classified as relevant by the signal box are working correctly and communicating correctly with signal box 30, signal box 30 operates signal 23 and switches 24 and 25 in the known manner.

[0035] The signal box 30 indicates to the rail vehicle 10 the error-free normal operation preferably in front of the track section or at the entry point 21 into the track section 20, for example with the signal 23 located there, as in the Figure 1 This is shown by a white circle. Among other things, this preferably also signals to the rail vehicle 10 that, taking into account the signal positions of the other vehicles located in the track section 20 and in the Figure 1For reasons of clarity, the signals not shown further should go to exit point 22. Special operation:

[0036] If the external system of track section 20 is defective or is considered defective by interlocking 30, track section 20 and thus also rail vehicle 10 are operated in a special operating mode. Interlocking 30 determines that the external system has failed, for example, if at least one track component of track section 20 connected to interlocking 30 is defective or if communication with at least one of the track components is not possible.

[0037] In the event of a detected defect in the external system, the signal box 30 transmits a warning signal WS to the control center 40, which indicates a failure of the external system.

[0038] When the warning signal WS is present, the route control center 40 determines which routes within the track section 20 the rail vehicle 10 could possibly travel. Since in the present example the route control center 40 has no information regarding the switch positions of the two switches 24 and 25, the route control center 40 will therefore determine two possible routes, namely one in the Figure 1 upper guideway F1, which includes sections T1 to T5, and one in the Figure 2 lower route F2, which includes sections T1, T6, T7, and T5. The following applies to routes F1 and F2: F1 = T 1 + T2 + T3 + T4 + T5 F2 = T 1 + T6 + T7 + T5

[0039] In the exemplary embodiment, due to the exemplary assumed axial symmetry of the track section 20, the travel paths F1 and F2 are of equal length but segmented differently.

[0040] Based on the possible routes F1 and F2 and the section-specific maximum speed information Vmax1 to Vmax7 of the sections T1 to T7 belonging to the possible routes, the track control center 40 defines a maximum speed profile Vmax(s) that specifies the permissible maximum speed for travel through track section 20 from a specified reference point, i.e., depending on the distance traveled or the distance traveled s or the length of the route from the reference point. The reference point can be, for example, entry point 21.

[0041] The route control center 40 determines the maximum speed profile Vmax(s) taking into account the possible routes, i.e. route-dependent, in such a way that in none of the sections T1 to T7 belonging to the possible routes does the maximum speed exceed the respective section-specific maximum speed information Vmax1 to Vmax7.

[0042] In other words, the route control center 40 sets the maximum speed profile Vmax(s) depending on the route such that the maximum speed at each route point corresponds to the section-specific maximum speed information of the section which has the smallest section-specific maximum speed information Vmax1 to Vmax7 of all sections T1 to T7 possibly traveled at the respective route point.

[0043] For simplification, the following numerical example is assumed: V1max = 85 km / h V2max = 80 km / h V3max = 7 0 km / h V4max = 6 0 km / h V5max = 5 0 km / h V6max = 9 0 km / h V7max = 3 0 km / h

[0044] For this numerical example and for the one in the Figure 1 In the example shown, the maximum speed curve Vmax(s) results in a speed sequence P according to P = Vmax1 , Vmax2 , Vmax3 , Vmax7 , Vmax5 P = 85 km / h , 80 km / h , 70 km / h , 30 km / h , 50 km / h Due to the unpredictability of the route, the speed changes are triggered by the distance s traveled by the rail vehicle 10. The rail vehicle 10 can measure the distance s, for example, using an odometer or odometer from the specified reference point.

[0045] After the track control center 40 has determined the maximum speed profile Vmax(s) over the distance s, it transmits this, preferably by radio, to the rail vehicle 10, which controls the journey through the track section 20 on the basis of the maximum speed profile Vmax(s) specified by the track control center 40. Special operation of the first type (only one rail vehicle 10 in track section 20):

[0046] If the signal box 30 knows, based on a functioning axle counting device or from other sources, that there is no other rail vehicle in the track section 20 into which the rail vehicle 10 is entering or has already entered, the signal box 30 indicates to the rail vehicle 10 a driving operation on the basis of the maximum speed curve Vmax(s) specified by the track control center 40, preferably in front of the track section 20 or at the entry point 21 into the track section 20, for example with the signal 23 located there, as shown in the Figure 2 represented by a black circle. This signals to rail vehicle 10 that it will travel taking into account the route-dependent maximum speed curve Vmax(s), which the route control center 40 has already transmitted or will transmit by radio.

[0047] The signaling also tells the rail vehicle 10, for example, that after passing signal 23, it should ignore the signal indications of other signals located within the track section 20 because their indication is not reliable due to the failure of the external system. Special operation of the second type (unknown number of rail vehicles in track section 20):

[0048] In the event that the signal box 30 cannot exclude the presence of other rail vehicles in the track section 20, for example due to a failure of axle counting devices, it indicates to the rail vehicle 10 with the signal 23 a monitoring mode of operation, as shown for example in the Figure 3 is indicated by a black ring; the warning signal WS is again transmitted to the route control center 40 due to the failure of the external system, as is the case in connection with the Figure 2 was explained.

[0049] The on-sight driving style is preferably assigned a supervisory speed Vasg known to the rail vehicle 10, which the rail vehicle 10 may not exceed.

[0050] Depending on the level of the supervisory speed Vasg, it is conceivable that the maximum speed profile Vmax(s) determined by the track control center 40 could fall below the supervisory speed Vasg. For such a case, it is preferably provided that the rail vehicle 10 should travel both in compliance with the maximum speed defined by the maximum speed profile Vmax(s) and in compliance with the supervisory speed Vasg, i.e., in such a way that it travels in compliance with the maximum speed profile Vmax(s) if this falls below the supervisory speed Vasg, and otherwise travels in compliance with the supervisory speed Vasg.

[0051] For the exemplary case that the maximum speed Vmax7 in section T7 is lower than the supervised speed Vasg and the maximum speeds of the remaining sections T1-T6 are higher than the supervised speed Vasg, the following results for the Figure 3 In the example shown, a speed sequence P according to P = Vasg , Vmax 7 , Vasg where the maximum speed Vmax7 is specified for the section of the route which would correspond to the section T7 when travelling on the lower track F2. Advantageous variant to the special operations of the first and second type:

[0052] The explanations in connection with the Figures 1 to 3assume the exemplary case that the switch positions of all switches 24 and 25 are unknown to the signal box 30 and the line control center 40 determines all adjustable routes within the track section 20 and determines the maximum speed profile Vmax(s) using all adjustable routes and based on the section-specific maximum speed information of all possible routes.

[0053] However, if the signal box 30 knows the point position of all or at least one of the points 24 and / or 25 of the track section 20, it preferably transmits the known point positions to the track control center 40 by means of a point position indication WSA in addition to the warning signal WS, as for example the Figure 4 shows.

[0054] In such a case, the route control center 40 can exclude those routes that the rail vehicle 10 cannot travel due to the known switch positions when determining the maximum speed curve Vmax(s).

[0055] For example, is the course set by the Figure 1 left switch 24 is known and is positioned so that the rail vehicle 10, when traveling from left to right, Figure 4 the upper track F1, and the switch position of the Figure 4 right switch 25 is unknown, so when driving from left to right the switch in the Figure 4 upper track F1 can be used and the control center 40 can set a speed sequence P according to P = Vmax1 , Vmax 2 , Vmax 3 , Vmax 4 , Vmax 5 generate, whereby the maximum speed curve Vmax(s) is again specified as a function of the distance s.

[0056] Since in the latter scenario the position of the Figure 4right switch 25 is unknown, when traveling from right to left both the possible upper route F1 and the possible lower route F2 must be taken into account, as described above in connection with the Figures 1 to 3 was explained, so that for example for a journey from right to left a speed sequence P results according to P = V 5 max , Vmax 7 , Vmax 3 , Vmax 2 , Vmax 1

[0057] The Figure 5 shows an embodiment of an advantageous construction of the signal box 30 according to the Figures 1 to 4 in more detail. The interlocking system 30 comprises, among other things, a computing device 31 and a memory 32. A computer program product CPP1 is stored in the memory 32, which, when executed by the computing device 31, determines or at least co-determines the operation of the computing device 31 and thus that of the interlocking system 30.

[0058] The computer program product CPP1 comprises an interlocking software module SWM1 which enables the conventional operation of an interlocking 30, i.e. an operation which is known for interlocking systems.

[0059] The computer program product CPP1 also includes a special operation software module SWM2, which enables special operation of the track section 20, as explained above by way of example.

[0060] If the special operating software module SWM2 detects a failure of the external system of track section 20 or at least a failure of individual track components of track section 20, it generates the warning signal WS and initiates its transmission to the track control center 40.

[0061] In addition, the special operating software module SWM2 checks whether information about the respective switch positions of switches 24 and 25 located in track section 20 is available; if this is the case, it initiates the transmission of the information about the switch positions to the track control center 40 in the form of the switch position information WSA.

[0062] The Figure 6 shows an embodiment of an advantageous structure of the control center 40 according to the Figures 1 to 4 in more detail. The control center 40 includes, among other things, a radio device (not shown), a computing device 41, and a memory 42. A computer program product CPP2 is stored in the memory 42, which, when executed by the computing device 41, determines or at least co-determines the operation of the computing device 41 and thus that of the control center 40.

[0063] The CPP2 computer program product includes a track control center software module SWM3, which enables the conventional operation of a track control center 40, i.e., a mode of operation familiar to track control centers. The track control center software module SWM3 can, for example, enable ETCS (European Train Control System) operation and transmit corresponding ETCS radio signals.

[0064] The computer program product CPP2 also includes a special operation software module SWM4, which enables special operation of track section 20, as explained above by way of example.

[0065] If the special operation software module SWM4 receives the warning signal WS from interlocking 30, the special operation software module SWM4 determines the distance-dependent maximum speed curve Vmax(s) as described above. The special operation software module SWM4 takes into account the known point position of the points, if a corresponding point position indication WSA is available. The special operation software module SWM4 initiates the radio transmission as soon as the distance-dependent maximum speed curve Vmax(s) has been determined.

[0066] Finally, it should be mentioned that the features of all embodiments described above can be combined with each other in any way to form further other embodiments of the invention.

[0067] All features of subclaims can also be combined individually with each of the independent claims, either individually or in any combination with one or more other subclaims, in order to obtain further other embodiments.

[0068] Regardless of the grammatical gender of a particular term, persons with male, female or other gender identities are included. List of reference symbols

[0069] 10Rail vehicle 20Track section 21Entry point 22Exit point 23Signal 24First switch 25Second switch 26Signal lines 30Interlocking 31Computer device 32Memory 40Line control center 41Computer device 42Memory CPP1Computer program product CPP2Computer program product F1Track F2Track PPDirection sDistance SWM1Interlocking software module SWM2Special operation software module SWM3Line control center software module SWM4Special operation software module T1-T7Subsections VasgSupervision speed Vmax1-Vmax7Maximum speed indication Vmax(s)Maximum speed progression WSWarning signal WSASwitch position indication

Claims

1. Method for operating a rail vehicle (10) in a track section (20) comprising at least two subsections (T1-T7) in the event of a failure of an external system of the track section (20), characterized in that- each of the sub-sections (T1-T7) is assigned a sub-section-specific maximum speed information (Vmax1-Vmax7), - if there is no or incomplete knowledge of the switch positions of switches (24, 25) located in the track section (20), it is determined which routes (F1, F2) within the track section (20) the rail vehicle (10) could possibly travel, - based on the possible routes (F1, F2) and based on the sub-section-specific maximum speed information of the sub-sections (T1-T7) belonging to the possible routes (F1, F2), a maximum speed profile (Vmax(s)) is determined, which specifies the permissible maximum speed for travel through the track section (20) from a predetermined reference point as a function of the distance, i.e. as a function of the distance traveled from the reference point, and - the rail vehicle (10) is operated taking the maximum speed profile (Vmax(s)) into account.

2. Method according to claim 1, characterized in that - the maximum speed profile (Vmax(s)) is determined depending on the route in such a way that in none of the sections (T1-T7) belonging to the possible routes (F1, F2) the maximum speed exceeds the respective section-specific maximum speed information (Vmax1-Vmax7), and / or - the maximum speed profile (Vmax(s)) is determined depending on the route length in such a way that the maximum speed at each route point corresponds to the section-specific maximum speed information (Vmax1-Vmax7) of the section (T1-T7) which has the smallest section-specific maximum speed information (Vmax1-Vmax7) of all the sections (T1-T7) possibly traveled at the respective route point.

3. Method according to one of the preceding claims, characterized in that- the rail vehicle (10) is signalled by a signal (23) located in front of the track section (20) or at an entry point (21) into the track section (20) that it will travel taking into account the maximum speed profile (Vmax(s)), and - the rail vehicle (10) ignores the signalling of signals located within the track section (20) after passing the signal (23).

4. Method according to one of the preceding claims, characterized in that in the event that the presence of other rail vehicles in the track section (20) can be excluded, the rail vehicle (10) is operated in compliance with the maximum speed profile (Vmax(s)).

5. Method according to one of the preceding claims, characterized in thatin the event that the presence of other rail vehicles in the track section (20) cannot be excluded, the rail vehicle (10) is operated in a supervisory mode.

6. Method according to claim 5, characterized in that - the supervisory driving style is assigned a supervisory speed (Vasg) which the rail vehicle (10) may not exceed, and - the rail vehicle (10) is operated in compliance with the maximum speed defined by the maximum speed profile (Vmax(s)) if this is lower than the supervisory speed (Vasg), and is otherwise operated in compliance with the supervisory speed (Vasg).

7. Method according to one of the preceding claims, characterized in that- in the event of failure of the external system, a signal box (30) assigned to the track section (20) transmits a warning signal (WS) to a line control center (40) assigned to the signal box (30) and the track section (20), and - the line control center (40) determines the maximum speed curve (Vmax(s)) dependent on the route length (s) and transmits this to the rail vehicle (10).

8. Method according to claim 7, characterized in that- in the event that the signal box (30) does not know the point positions, the signal box (30) informs the line control centre (40) of the lack of knowledge of the point positions and - the line control centre (40) determines all adjustable routes (F1, F2) within the track section (20) and sets the maximum speed profile (Vmax(s)) using all adjustable routes (F1, F2) and the maximum speed information (Vmax1-Vmax7) for the sections (T1-T7) belonging to the determined possible routes (F1, F2).

9. Method according to one of the preceding claims 7 to 8, characterized in that- in the event that the signal box (30) knows the point positions of a subgroup of points (24, 25) and the point positions of the remaining points (24, 25) are unknown, the signal box (30) informs the line control center (40) of the known point positions and - the line control center (40) excludes those routes (F1, F2) which the rail vehicle (10) cannot travel on due to the known point positions when determining the maximum speed profile (Vmax(s)).

10. Method according to one of the preceding claims 7 to 9, characterized in that the track control center (40) communicates the maximum speed curve (Vmax(s)) to the rail vehicle (10) by radio.

11. Method according to one of the preceding claims, characterized in that the route point is determined depending on the entry point (21) into the track section (20) or corresponds to it.

12. Method according to one of the preceding claims, characterized in thatthe failure of the external system is concluded if at least one track component of the track system section (20) is defective or no communication with at least one track component is possible.

13. Line control center (40) for the operation of a track section (20) comprising at least two sections (T1-T7), characterized in thatthe track control center (40) is designed to - in the event of a failure of an external system of the track section (20) and in the event of missing or incomplete knowledge of the switch positions of switches (24, 25) located in the track section (20), determine which routes (F1, F2) within the track section (20) a rail vehicle (10) entering the track section (20) could possibly travel, - based on the possible routes (F1, F2) and on section-specific maximum speed information assigned to the sections (T1-T7) belonging to the possible routes (F1, F2), determine a maximum speed profile (Vmax(s)) which specifies the permissible maximum speed for travel through the track section (20) from a predetermined reference point, depending on the distance traveled, i.e. depending on the distance traveled from the predetermined reference point,and - to transmit the maximum speed curve (Vmax(s)) to the rail vehicle (10).

14. Signal box (30) for the operation of a track section (20) comprising at least two sections (T1-T7), characterized in that the signal box (30) is designed to - in the event of the failure of an external system of the track section (20) transmit a warning signal (WS) to a track control center (40) assigned to the signal box (30) and the track section (20), - to transmit the information about the respective point position, if known, of points (24, 25) located in the track section (20) to the track control center (40) and - in the event that the signal box (30) does not know the point position of one or more points (24, 25), to inform the track control center (40) of the lack of knowledge of these point positions.

15. Arrangement with a track section (20), characterized in thatthe track section (20) is assigned a signal box (30) according to claim 14 and a line control center (40) according to claim 13.

Citation Information

Patent Citations

  • Train operation control method, device and equipment under specific guiding function and medium

    CN116062007A

  • Method for operating a track system and signal box for a track system

    DE102017208490A1

  • Vehicle management system

    US20190360158A1