HARD ROCK TUNNEL MACHINE

The hard rock tunnel boring machine employs surfactant-laden spray points and dual-flow ventilation to effectively capture and retain particles, addressing health and environmental risks, enhancing safety and work conditions.

FR3143655B3Active Publication Date: 2024-11-29SPIE BATIGNOLLES GÉNIE CIVIL
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
FR2022013678
Authority / Receiving Office
FR · FR
Patent Type
Utility models
Current Assignee / Owner
Filing Date
2022-12-16
Publication Date
2024-11-29
Estimated Expiration
2032-12-16

AI Technical Summary

Technical Problem

Existing hard rock tunnel boring machines face challenges in effectively removing fine and hydrophobic particles, leading to health risks for operators and environmental dispersion, despite the use of water misting and airlocks with filters.

Method used

A hard rock tunnel boring machine equipped with multiple spray points for aqueous solutions containing surfactants at the cutting wheel, shield, and debris evacuation system, combined with a dual-flow ventilation system and additional misting points in the airlock, to capture and retain particles.

Benefits of technology

Significantly reduces particle dispersion and improves particle removal, allowing for reduced operator protection requirements and enhanced work efficiency by minimizing airborne particle concentrations, including asbestos fibers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000014_0000
    Figure 00000014_0000
  • Figure 00000015_0000
    Figure 00000015_0000
  • Figure 00000016_0000
    Figure 00000016_0000
Patent Text Reader

Abstract

Hard rock tunnel boring machine comprising a first assembly (S1), a second assembly, and an airlock located between the two assemblies, the first assembly being equipped with at least: a cutter wheel (10) for cutting the hard rock; a shield (12) for the cutter wheel; a hard rock spoil removal system (20); and a particle removal system for particles generated during hard rock cutting, said removal system comprising at least: a series of water misting points (33) located at the shield; a first plurality of spray points (35) for an aqueous solution with a surfactant, located at the cutter wheel; and a second plurality of spray points for an aqueous solution with a surfactant, located at the spoil removal system. Figure for the abbreviation: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

Title of the invention: HARD ROCK COASTER Technical field of the invention

[0001] The present invention relates to a hard rock tunnel boring machine comprising, in particular, a particle removal system. Technological background

[0002] Tunnels are engineering structures whose construction is complex and which require the use of specific equipment adapted to the conditions of the ground to be excavated. Thus, depending on the geological nature of the soils, i.e., whether they are loose, soft or hard, the type of tunnel boring machine used for tunnel excavation varies.

[0003] In the present case, we are particularly interested in hard rock. Generally, under such conditions, a tunnel boring machine, known as a hard rock tunnel boring machine (TBM), is used to excavate the tunnel. Typically, this TBM is open-face, meaning it does not have a containment system, and is composed of excavation components and spoil removal components, also called spoil removal components, for the excavated rock. The excavation components include a cutter head or cutter wheel on which the cutting tools, such as rollers, are mounted. These tools break up the rock as the TBM advances. The cutter wheel is also equipped with scrapers or buckets, located around its periphery, which collect the excavated rock simultaneously with the excavation and discharge it into a central hopper that feeds a hard rock spoil removal system.The excavated material is then transported to the outside of the tunnel for processing. The tunnel boring machine also includes a follower train composed of different platforms that handle the logistical aspects of the construction site.

[0004] In certain applications, an aqueous solution containing a lubricating agent can be injected at the cutting wheel in order to moisten the excavated ground and to lubricate the cutting tools to reduce wear.

[0005] However, during the passage through geological formations, the rocks may generate dust or particles that could pose health risks, particularly respiratory risks, to operators working in the tunnel and especially near the cutterhead. This is particularly relevant in the case of passing through asbestos-bearing geological formations, which, as their name suggests, contain deposits of naturally occurring asbestos.

[0006] In order to limit the exposure of operators to these dusts or particles emitted into the air, appropriate collective protective measures are put in place. In addition to protecting the operators, these measures also aim to prevent the dispersion of dust outside of the work area and lower their concentration to the lowest possible level.

[0007] Under these conditions, it is required that the means implemented include dust suppression, dust extraction at the source and appropriate decontamination means.

[0008] For this particular type of construction project, namely tunnel excavation, it is known in the field that dust suppression can be improved by water spraying or misting. However, it has been observed that some particles, particularly the finest and hydrophobic particles, can remain suspended in the air. This process therefore does not guarantee complete suppression of airborne particles.

[0009] Also, to enhance safety, the tunnel boring machine is equipped with an airlock that separates it into a first section, located in a so-called dirty or contaminated zone, where potentially hazardous particles remain suspended, and a second section, located in a so-called clean zone. This airlock is equipped with air filters to capture the remaining suspended particles.

[0010] Nevertheless, these safety measures are restrictive both for the operators who have to wear uncomfortable protective equipment, for example a full suit or a breathing apparatus, and for the organization of work because each operator is only allowed to work in the so-called contaminated area for a limited time, which leads to a fragmentation of tasks and an increase in the risk of unfinished operations.

[0011] Also, an objective of the invention is to propose a hard rock tunnel boring machine that does not have, at least, one of the aforementioned disadvantages.

[0012] Another objective of the invention is to propose a hard rock tunnel boring machine which ensures reduced dispersion of particles in the air so as to allow a reduction of constraints for operators. Summary of the invention

[0013] A hard rock tunnel boring machine is therefore proposed comprising a first assembly, a second assembly and an airlock located between the first and second assemblies, the airlock being configured to hermetically seal the two assemblies, the first assembly being equipped with at least: - a cutting wheel for cutting hard rock; - a shield for the cutting wheel; - a system for removing excavated rock; and - a system for removing particles generated during the cutting of hard rock, the particle suppression system comprising: - at least a first series of water misting points, located at a free end of the shield, the free end being the end of the shield that is opposite the cutting wheel; - at least one plurality of spray points for an aqueous solution containing a surfactant, located at the cutting wheel; and - at least a second plurality of spray points for an aqueous solution containing a surfactant, located at the level of the hard rock spoil removal system.

[0014] Thus, thanks to the invention, optimal retention and suppression of particles generated during the cutting of the hard rock in the tunnel boring machine are ensured. On the one hand, fine, non-hydrophobic particles, which we will call dust, are suppressed by water misting, which by definition is composed of fine droplets. On the other hand, finer, hydrophobic particles that are not captured by the water droplets of the misting system are retained by spraying a solution containing a surfactant. The addition of the surfactant thus modifies the surface tension of these particles so that they can be captured by the water droplets. This addition of surfactant is carried out at different spray points installed on the tunnel boring machine. The redundancy of the spray points, in conjunction with the misting system, then allows for a significant reduction in the dispersion of particles in the air.

[0015] The tunnel boring machine, according to the invention, may comprise one or more of the following features, taken individually or in combination with each other: - the particle suppression system includes at least a second series of water misting points, located at the airlock level; - the hard rock spoil removal system includes at least one top conveyor located at the rear of the cutter wheel and an intermediate conveyor positioned after the top conveyor, and the second plurality of spray points includes spray points distributed along the intermediate conveyor and / or spray points distributed along the top conveyor; - the surfactant has a volume concentration in water between 0.5% and 1.5%; - the tunnel boring machine includes a dual-flow ventilation system configured to place the first assembly under negative pressure relative to the second assembly; - the airlock comprises at least one partition equipped with an annular structure having a plurality of flexible strips circumferentially distributed around the annular structure, each flexible strip of the plurality of flexible strips being configured to partially overlap a flexible strip adjacent, the plurality of flexible strips being configured to be in contact with the walls of an excavated gallery. Brief description of the figures

[0016] The invention will be better understood with the aid of the following description, given solely by way of example and made with reference to the accompanying drawings in which:

[0017] Figure [1] represents a schematic perspective view of a hard rock tunnel boring machine according to the invention,

[0018] Figure [Fig.2] represents a schematic profile view of the first assembly of the tunnel boring machine of Figure [Fig.1],

[0019] Figure 3 represents a schematic perspective view of a shield equipped with a misting circuit of the first set of Figures 1 and 2,

[0020] Figure 4 represents a schematic perspective view of the spoil removal system for the first assembly of the tunnel boring machine according to the invention, in particular an intermediate conveyor,

[0021] Figure [Fig. 5] represents a schematic profile view of the tunnel boring machine chamber of Figure [1],

[0022] Figure 6 represents a schematic front view of the airlock of Figure 5, in particular equipped with a series of water misting points;

[0023] Fig. 7 represents a very schematic view of another embodiment of the tunnel boring machine, in particular the ventilation system. Detailed description of the invention

[0024] We are interested in [Fig.1] which shows a perspective view of a hard rock tunnel boring machine according to the invention.

[0025] The hard rock tunnel boring machine 1 comprises a first set SI, a second set S2 and a chamber S3. This chamber S3 is located between the first set SI and the second set S2 and is configured to hermetically separate the two sets SI, S2.

[0026] Typically, this type of tunnel boring machine 1 can reach a total length of more than 150 meters, and all the management of digging, support and dust suppression is carried out in front of the tunnel boring machine 1, in the first assembly SL. The second assembly S2 generally includes the follower train which ensures, among other things, a logistical aspect.

[0027] With reference to figures 2 to 4, the first assembly SI is equipped with at least one cutting wheel 10 for cutting hard rock, a shield 12 for the cutting wheel 10, a hard rock spoil removal system 20 and a system for removing particles generated during hard rock cutting.

[0028] The particle suppression system further comprises at least a first series of misting points 33, located at a free end of the shield 12. This free end of the shield 12 is the end of the shield 12 that is opposite the wheel cutting width 10.

[0029] The particle suppression system also includes at least a first plurality of spray points 35 for an aqueous solution containing a surfactant. This first plurality of spray points 35 is located at the cutting wheel 10.

[0030] The particle removal system also includes at least a second plurality of spray points 36, 36' for an aqueous solution containing a surfactant. This second plurality of spray points 36, 36' is located at the level of the hard rock spoil removal system 20.

[0031] For the purposes of this entire description, the term "surfactant" means, in a simplified manner, a product which is itself a surfactant or a mixture based on at least one surfactant.

[0032] The cutter wheel 10 for cutting hard rock includes digging elements such as rollers 14 and scrapers 16. The rollers 14 are configured to break the rock as the tunnel boring machine 1 advances while the scrapers 16, placed on the periphery of the cutter wheel 10, collect, simultaneously with the digging, the spoil from the broken rock to subsequently discharge it onto the spoil disposal system 20.

[0033] As described previously, the cutting wheel 10 includes a first plurality of spray points 35 for an aqueous solution containing a surfactant. These spray points 35 can be located at the rollers 14. At this location, the aqueous solution containing the surfactant serves, firstly, to cool and lubricate the rollers 14, thus reducing their wear. This also allows the crushed rock to be moistened, which represents a first means of retaining particles potentially suspended in the air during the cutting process. In other words, a first means of reducing the concentration of airborne particles is achieved directly at their potential source of emission.

[0034] Each of these spraying points 35 are supplied with aqueous solution containing the surfactant by a circuit of pipes 31, connected to a surfactant distribution system, the description of which will be given later.

[0035] The shield 12 is placed downstream of the cutter wheel 10 to provide minimal support for the newly excavated tunnel. With reference to Figures 2 and 3, the shield 12 is a hollow cylindrical structure through which the evacuation system 20 receives the cuttings generated by the cutter wheel 10.

[0036] The shield 12 is also equipped, at its free end, with a first series of water misting points 33 which make up the particle suppression system. This first series of misting points 33 is configured to mist water towards the rear of the tunnel boring machine 1, i.e. towards the lock S3. The misting points The misting points 33 can be distributed around a circumference of the shield 12, as shown in [Fig. 2], so that in use, the water misted by a misting point 33A covers an area that overlaps, at least partially, with that covered by an adjacent misting point 33B. Each of these misting points 33 is supplied with water by a water circuit 32, connected to an adjustable pump. The flow rate delivered by the pump and the pressure in the circuit 32 allow for the definition of an optimal size of the water droplets dispersed by the misting points 33 and enable the generation of fog over a distance of at least one meter, which represents a second means of reducing the concentration of airborne particles.

[0037] The water misting generates fine droplets over a wide area behind the shield 12, thereby suppressing non-hydrophobic particles, known as dust. The effect of the misting is further maximized when the droplet concentration in the covered area is high.

[0038] The first series of misting points 33 may include at least 5 misting points 33 and preferably at least 9 misting points 33. It is understood that the first series of misting points 33 may include more in order to generate a denser mist. However, this would require an adaptation of the misting nozzles used.

[0039] The rock spoil removal system 20 can be a belt conveyor on which the spoil is transported towards the tunnel opening. In the present embodiment of the tunnel boring machine 1, the removal system 20 can comprise at least one top conveyor 22 and one intermediate conveyor 24, mounted in series, i.e., one after the other. The top conveyor 22 is located behind the cutterhead 10 so that the scrapers 16 collecting the rock spoil can discharge it onto the top conveyor 22, after first passing through a hopper, not shown.

[0040] The intermediate conveyor 24 is positioned, according to the direction of movement of the excavated material, following the top conveyor 22 and transports the excavated material towards the tunnel opening. Furthermore, the intermediate conveyor 24 is positioned relative to the top conveyor 22 so as to define a jetty 26. This jetty 26 implies, in particular, that a difference in height exists between the top conveyor 22 and the intermediate conveyor 24, which can be a source of dust emissions and thus the suspension of new particles in the air.

[0041] In order to limit, or even prevent, this further resuspension in the air, the exhaust system 20 includes at least a second plurality of spray points 36, 36' for an aqueous solution containing a surfactant. This second plurality of spray points 36, 36' includes spray points 36 distributed along the intermediate conveyor 24 and / or spray points 36 distributed along the summit conveyor 22, as described below.

[0042] With reference to [Fig. 4], this second plurality of spray points 36, 36' can be located after the jetty 26, i.e. at the level of the intermediate conveyor 24. The spray points 36 are thus distributed along the intermediate conveyor 24 while spray points 36' can be positioned transversely to the belt 25 of the intermediate conveyor 24. Each of these spray points 36, 36' is supplied with a solution containing the surfactant by a circuit of pipes 34, connected to the surfactant distribution system mentioned above.

[0043] Alternatively, the second plurality of spraying points 36, 36' can be located before the jetty 26, i.e. at the level of the top conveyor 22 between the cutter wheel 10 and the jetty 26. In such a case, the arrangement of the spraying points 36, 36' is similar to that described previously, i.e. the spraying points 36 are distributed along the top conveyor 22 and other spraying points 36' can be positioned transversely to the top conveyor 22.

[0044] In another variant, shown in [Fig.2], the second plurality of spraying points 36, 36' can be located both at the level of the upper conveyor 22 and at the level of the intermediate conveyor 24. In such a case, it is understood that the second plurality of spraying points 36, 36' comprises an upper part 36A and a lower part 36B, these two parts 36A, 36B being connected to each other and integrated into the piping circuit 34.

[0045] In practice, the spray points 36, 36' can be spray nozzles and can be spaced approximately 10 cm to 20 cm apart. The spray points 36, 36' are configured so that the solution containing the surfactant circulating in the piping circuit 34 is sprayed towards the excavated material being transported on the conveyor belt 25, thereby re-wetting it.

[0046] In general, the installation of this second plurality of spray points 36, 36' of an aqueous solution containing a surfactant at the level of the hard rock spoil removal system 20 represents another means of retaining particles. In other words, a third means of reducing the concentration of particles suspended in the air.

[0047] As mentioned previously, the piping circuit 31 and the piping circuit 34 are connected to a surfactant distribution system, not shown. It should be noted that the circuits 31 and 34 may both be part of a single circuit. This distribution system may be a proportional metering pump, or equivalent, which allows for the continuous and proportional injection and mixing of a liquid or water-soluble concentrate. This type of system is well known and notably marketed by DOSATRON®.

[0048] In the present invention, the surfactant may have a volume concentration in water of between 0.5% and 2%. Advantageously, the volume concentration in water of the surfactant is between 0.5% and 1.5%, and preferably between 0.7% and 1.2%.

[0049] The surfactant may, for example, be a mixture of an anionic surfactant with a polymer. The surfactant can also be a foaming agent.

[0050] This surfactant is stable over time and, by coating the excavated rock over the spoil, reduces friction between the rock fragments. In this way, the dispersion of particles into the air is minimized.

[0051] It should be noted, however, that the compounds that generally constitute a surfactant are classified as products that can cause skin or eye irritation, or even respiratory problems when inhaled. In other words, a surfactant represents a potential risk for an operator. However, the personal protective equipment worn by operators against this risk remains relatively unrestrictive compared to that required when dealing with substances hazardous to health.

[0052] Also, it will be easily understood that it is not recommended to use such a surfactant in the form of a mist or fog.

[0053] In the present invention, direct spraying of the excavated material with the solution containing the surfactant is preferred to avoid its dispersion in the air. Similarly, a low concentration of the surfactant is preferred to limit risks to the operator and the environment.

[0054] With reference to what has been described previously, it is understood that the conditioning, i.e. the suppression and retention, of particles suspended in the air is improved thanks to the multiple misting / spraying points.

[0055] With reference to Figures 5 and 6, the particle suppression system may include at least a second set of water misting points 33'. Advantageously, this second set of misting points 33' is located at the level of the airlock S3, in particular mounted on a partition 40 of the airlock S3.

[0056] This second set of misting points 33' is configured to diffuse a water mist towards the front of the tunnel boring machine 1, i.e., towards the cutterhead 10. The misting points 33' can be distributed around a circumference of the partition 40 of the lock S3, as shown in [Fig. 6], so that in operation, the water misted by each misting point 33' covers an area that overlaps, at least partially, with that covered by the adjacent misting point 33'. As with the misting points 33 located at the shield, each of the misting points 33' is supplied with water by a pipe circuit 32', connected to a variable-speed pump.

[0057] Advantageously, the second series of misting points 33' has at least 7 misting points 33' and preferably at least 11 misting points 33'.

[0058] This second series of misting points 33' represents a fourth means of reducing the concentration of airborne particles. Combined with the other means mentioned above, this second water mist, generated by the second series of misting points 33', further improves the suppression of non-hydrophobic airborne particles.

[0059] Returning to [Fig. 5], this shows the airlock S3 which separates the first assembly SI from the second assembly S2. The airlock S3 comprises at least one partition 40 which may be provided with an annular structure 42 having a plurality of flexible strips 44 circumferentially distributed around the annular structure 42. This plurality of flexible strips 44 is configured to be in contact with the walls of the excavated gallery so as to ensure a seal between the first assembly SI and the second assembly S2. To this end, each flexible strip 44 of the plurality of flexible strips 44 is configured to partially overlap an adjacent flexible strip 44.

[0060] We now turn to [Fig. 7], which schematically illustrates another embodiment of the tunnel boring machine 1 according to the invention, comprising a dual-flow ventilation system 50. This dual-flow ventilation system 50 is configured to place the first assembly S1 under negative pressure relative to the second assembly S2. That is to say, the pressure is lower in the first assembly than in the second assembly.

[0061] The double flow ventilation system 50 includes a suction duct 51 and an inlet duct 54.

[0062] The suction duct 51 has a suction outlet located in the first assembly SI as close as possible to the source of particle emission, i.e. at the cutting wheel 10. Air is drawn in there, as symbolized by arrow 52 on [Fig.7], to be evacuated by an evacuation outlet (arrow 53) in the second assembly S2, after passing through a dust collector 57 with an absolute filter which captures suspended particles, and in particular fibers whose dimensions are less than 3 pm, unlike conventional filters.

[0063] The inlet duct 54 allows a supply of "fresh" air into the first assembly SL. "Fresh" air is defined as air free of suspended particles resulting from the hard rock cutting process. Air is drawn from the second assembly S2 (arrow 55) to the first assembly SI (arrow 56). This air movement is achieved through the pressure difference between the two assemblies SI and S2. Since the first assembly SI is under negative pressure relative to the second assembly S2, the "fresh" air is drawn towards the first assembly SL.

[0064] The air entering the first assembly S1 thus prevents any remaining suspended particles from passing into the second assembly S2. In this way, the dust / particles remain confined in the first SI set.

[0065] Case of the removal of fibrous particles of the asbestos type:

[0066] It may happen that the geological formations to be crossed by the tunnel boring machine 1 are These areas may contain asbestos deposits, meaning naturally occurring asbestos. The term asbestos generally refers to fibrous minerals belonging to the silicate group. Chrysotile, actinolite, tremolite, anthophyllite, amosite, and crocidolite are examples of minerals that fall under the definition of asbestos because they can be asbestos-like.

[0067] It is well known today that asbestos is a highly carcinogenic compound and that its inhalation represents a high risk to health, particularly that of workers who are exposed to it on construction sites.

[0068] The World Health Organization (WHO) defined in a 1998 report a type of asbestos, called regulatory, which includes fibers of length greater than or equal to 5 pm (micrometers), of diameter less than or equal to 3 pm and whose length-to-diameter ratio is greater than or equal to 3.

[0069] Several countries have regulated occupational exposure limits for asbestos. In particular, in the United States and the European Union, it is recommended that the average concentration of asbestos fibers received by a worker over an 8-hour period not exceed 100 fibers per liter. Other countries are even more stringent, such as France, Germany, and Switzerland, which recommend a limit of 10 fibers per liter over 8 hours.

[0070] In this context, the hard rock tunnel boring machine 1 according to the invention is used in the excavation of a gallery in an asbestos deposit.

[0071] The tunnel boring machine 1 is equipped with a particle suppression system which includes a first series of water misting points 33 located at the rear of the shield 12, a second series of water misting points 33' located on the airlock S3, a first plurality of spraying points 35 of the aqueous solution containing the surfactant located at the cutter wheel 10 and a second plurality of spraying points 36, 36' of the aqueous solution containing the surfactant located at the intermediate conveyor 24. These misting / spraying points are as described above.

[0072] In this embodiment, the surfactant used is a product marketed by MAPEI® under the name Polyfoamer eco 100. This surfactant is also used with a volume concentration of approximately 1% in water.

[0073] Asbestos is a hydrophobic compound. Therefore, spraying the solution containing the surfactant allows a modification of the surface tension of the asbestos fibers so that they can be captured by the water droplets.

[0074] The hard rock tunnel boring machine according to the invention makes it possible to reduce the concentration The average asbestos fiber concentration was below the most stringent threshold, i.e., 10 fibers per liter over an 8-hour exposure period. Dust measurements even revealed that no asbestos fibers were detected during excavation in the asbestos deposit.

[0075] In light of the foregoing, it is clear that the hard rock tunnel boring machine according to the invention enables, on the one hand, a reduction in the dispersion in the air of hydrophobic and non-hydrophobic particles / dust generated by the cutting of the hard rock and, on the other hand, an improvement in the removal of any particles that may be suspended in the air. The combined action of the various spraying / misting points, particularly in the first assembly of the tunnel boring machine, makes it possible to achieve this objective.

[0076] Another advantage is that it allows for a relaxation of working constraints for operators. Indeed, since the concentration of particles in the air is negligible, collective protection measures can be lifted, which improves operator comfort while also improving work organization, particularly with an improvement in work rates that approach those of excavation under normal conditions.

Claims

Claims

1. Hard rock tunnel boring machine (1) comprising a first assembly (SI), a second assembly (S2) and an airlock (S3) located between the first assembly and the second assembly, said airlock (S3) being configured to separate the two assemblies (SI, S2) in a sealed manner, the first assembly (SI) being provided with at least: - a cutting wheel (10) for cutting the hard rock; - a shield (12) for the cutting wheel; - a system (20) for removing spoil from the hard rock; and - a system for removing particles generated during the cutting of the hard rock, said particle removing system comprising: - at least a first series of water misting points (33), located at a free end of the shield (12), said free end being the end of the shield which is opposite the cutting wheel (10);- at least a first plurality of spraying points (35) of an aqueous solution containing a surfactant, located at the cutting wheel (10); and - at least a second plurality of spraying points (36, 36') of an aqueous solution containing a surfactant, located at the hard rock cuttings removal system (20).;

2. Tunnel boring machine (1) according to claim 1, in which the particle removal system comprises at least a second series of water misting points (33'), located at the level of the airlock (S3).

3. Tunnel boring machine (1) according to any one of claims 1 or 2, in which the system (20) for removing spoil from the hard rock comprises at least one top conveyor (22) located at the rear of the cutting wheel (10) as well as an intermediate conveyor (24) positioned after the top conveyor (22), and in which the second plurality of spray points (36, 36') comprises spray points (36) distributed along the intermediate conveyor (24) and / or spray points (36) distributed along the top conveyor (22).

4. Tunnel boring machine (1) according to any one of claims 1 to 3, wherein the surfactant has a volume concentration in water of between 0.5% and 1.5%.

5. Tunnel boring machine (1) according to any one of claims 1 to 4, comprising a double-flow ventilation system (50) configured to place the first assembly (SI) in depression relative to the second assembly (S2).

6. Tunnel boring machine (1) according to any one of claims 1 to 5, wherein the airlock (S3) comprises at least one partition (40) provided with an annular structure (44) comprising a plurality of flexible strips (44) circumferentially distributed around said annular structure, each flexible strip (44) of the plurality of flexible strips being configured to partially overlap an adjacent flexible strip, said plurality of flexible strips being configured to be in contact with walls of a dug gallery.