Method of constructing a buried wall using a prefabricated concrete brick and a prefabricated concrete brick for this purpose

FR3149916B1Active Publication Date: 2025-08-29NGE FONDATIONS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
FR2023006116
Authority / Receiving Office
FR · FR
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-06-15
Publication Date
2025-08-29
Estimated Expiration
2043-06-15

AI Technical Summary

Technical Problem

The construction of buried walls using reinforced concrete panels is prone to excavation collapse, leading to structural defects, increased concrete consumption, high costs, and safety risks for workers, while the use of bentonite mud affects adhesion and requires significant water and wastewater management.

Method used

A method involving prefabricated concrete bricks with longitudinal channels and auger sections is used to form excavations by drilling and driving the bricks into place, reducing the need for bentonite mud and allowing for quicker, safer construction of walls with reduced concrete usage.

Benefits of technology

This method minimizes excavation collapse risks, eliminates structural defects, and decreases concrete consumption, while ensuring safer working conditions and lower costs by simplifying the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000021_0000
    Figure 00000021_0000
  • Figure 00000021_0001
    Figure 00000021_0001
  • Figure 00000021_0002
    Figure 00000021_0002
Patent Text Reader

Abstract

The invention relates to a method for constructing a buried structure (20), the method comprising steps of: providing a prefabricated brick B2) comprising a longitudinal through channel (11, 12) in which is engaged a worm section comprising a lower end equipped with a retractable drilling head configured to have a retracted position in which the drilling head with the worm section can slide in the channel; and rotating the drilling head into an extended position about an axis of rotation, in order to form an excavation and to drive the brick into the excavation as it is formed, the excavation having a section in a first plane perpendicular to the axis of rotation, determined by the width of the extended drilling head, the brick having a section in the first plane, inscribed in the section of the excavation. Figure 1