Passive nuclear steam supply system

The passive nuclear steam supply system with a reactor core design and dedicated safety facilities addresses the limitations of existing systems by enhancing power generation and safety indicators, achieving 1500 MWe with 93% availability and improved economic efficiency.

GB2645529APending Publication Date: 2026-11-11SHANGHAI NUCLEAR ENGINEERING RESEARCH & DESIGN INSTITUTE CO LTD
View PDF 18 Cites 0 Cited by

Patent Information

Application Number
GB2026007040
Authority / Receiving Office
GB · GB
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-09-13
Filing Date
2024-08-12
Publication Date
2026-11-11

AI Technical Summary

Technical Problem

Existing nuclear steam supply systems face challenges in scaling up power generation capacity while maintaining safety and economic efficiency, as they are constrained by factors such as safety, economy, component manufacturing, and passive cooling capacity, particularly in third-generation nuclear power plants.

Method used

A passive nuclear steam supply system with a reactor core design incorporating 193 fuel assemblies, two coolant loops, and dedicated safety facilities, including a pressurizer, surge line, and passive core cooling systems, enhances power generation capacity and safety indicators by leveraging natural characteristics and reducing reliance on external components.

Benefits of technology

The system achieves a rated power of 1500 MWe with 93% availability, significantly improving economic efficiency and safety by increasing power generation capacity and reducing the frequency of core damage and radioactive material release.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

A passive nuclear steam supply system (100), comprising a reactor body (1), the reactor body (1) comprising a reactor pressure vessel (11); and a reactor coolant system (2), the reactor coolant system
Need to check novelty before this filing date? Find Prior Art

Description

CROSS-REFERENCE TO RELATED APPLICATION

[0001] This application claims the priority to Chinese patent application No. 202311184945.9, filed on September 13, 2023 and entitled “Passive Nuclear Steam Supply System'’, which is incorporated herein by reference in its entirety. TECHNICAL FIELD

[0002] This application relates to the field of nuclear power technologies, and in particular to a passive nuclear steam supply system. BACKGROUND

[0003] In the early stages of the development of the third-generation nuclear power reactor model, the European Pressurized-Water Reactor (EPR) developed by Electricite De France (EDF) and the API000 developed by Westinghouse Electric Corporation of USA are representative examples.

[0004] For the EPR model, an active redundancy technology roadmap is adopted in its safety concept and system configuration: AC power, power component (main pump), ventilation and refrigeration, and external water sources are utilized to mitigate accidents and improve the reliability of performing the expected functions under accident conditions, that is, the system's multiplicity is increased by "adding" more components to improve the system reliability. Although this approach can significantly reduce the probability of random failures, it cannot improve the ability to resist common cause failures, nor can it fundamentally reduce human error or extend the operator's non-intervention time.

[0005] For the API000 model, a passive simplification technical approach is adopted: it achieves safety functions solely by relying on natural characteristics such as natural convection, gravity, pre-pressurization, evaporation and condensation, without relying on external triggers or power sources. Although the simplified design concept is adopted in the API000 model, the rated power of the units thereof is only 1000MW, which are still considered as medium-sized units with high cost per unit power. This results in poor economic efficiency for its construction in areas with high electricity demand.

[0006] Although the API000 provides a relatively mature nuclear steam supply system, increasing electrical power is not the simple scaling-up of various system parameters. The number of loops determines the number of steam generators, main pumps, and main pipelines, as well as the number of interfaces on the pressure vessel. However, the number of loops is directly related to the heat transfer capacity of the loops. Constrained by factors such as safety, economy, component manufacturing, and waste discharge, as well as the limitations of passive cooling capacity, it is necessary to conduct a redesign of the nuclear steam supply system. SUMMARY

[0007] To address the shortcomings in the prior art, this application provides a passive nuclear steam supply system and a nuclear power plant based on a reactor core with 193 fuel assemblies, which significantly increases the power generation capacity of the passive system, reduces the damage frequency of the core and the release frequency of large-scale radioactive materials in the safety evaluation indicators, and meets the requirements for third-generation nuclear power.

[0008] A first aspect of the present application provides a passive nuclear steam supply system, including: a reactor body, which includes a reactor pressure vessel; and a reactor coolant system, which includes two coolant loops, a pressurizer and a surge line, wherein each coolant loop includes a steam generator, two mam pumps, a hot leg main pipeline and two cold leg main pipelines;

[0009] wherein the hot leg mam pipeline is connected at both ends to the reactor pressure vessel and the steam generator, respectively, the main pump is connected to a lower end of the steam generator, the cold leg mam pipeline is connected at both ends to the reactor pressure vessel and the corresponding main pump, respectively; a reactor coolant enters a primary side of the steam generator through the hot leg main pipeline after being heated in the reactor pressure vessel, and returns to the reactor pressure vessel through the main pump and the cold leg main pipeline after undergoing heat exchange in the steam generator, one end of the surge line is connected to the hot leg main pipeline of one of the coolant loops, and another end of the surge line is connected to a bottom of the pressurizer; and the hot leg main pipeline is provided with a first liquid level pressure tapping and a second liquid level pressure tapping, the first liquid level pressure tapping being located at a bottom of the hot leg main pipeline, and the second liquid level pressure tapping being adjacent to the steam generator and located at a top of the hot leg main pipeline.

[0010] Preferably, a top of the pressurizer is provided with two sets of pressure relief lines, each set of pressure relief lines includes a pressure relief header pipe connected to the pressurizer and three parallel pressure relief branch pipes arranged at downstream of die pressure relief header pipe; the pressure relief header pipe is provided with a spring-loaded safety valve, and a short pipe with a rupture disk is arranged at the downstream of the spring-loaded safety valve; the three pressure relief branch pipes are provided with automatic pressure relief valves respectively, and downstream ends of the three pressure relief branch pipes converge into a single exhaust line on which a vacuum breaker is provided; and the pressure rel ief lines are arranged in a downward direction from the pressurizer to the automatic pressure relief valves.

[0011] Preferably, the passive nuclear steam supply system further includes a normal residual heat removal system, winch includes a normal residual heat removal pump and a normal residual heat removal heat-exchanger, and the normal residual heat removal system has one end connected to one hot leg mam pipeline and the other end connected to the reactor pressure vessel.

[0012] Preferably, the passive nuclear steam supply system further includes an in-containment refueling water tank, which stores refueling water that submerges a cylinder section of the reactor pressure vessel during refueling.

[0013] Preferably, the m-containment refueling water tank is provided with a bubbler therein, and an end of the exhaust line is connected to the bubbler.

[0014] Preferably, one hot leg main pipeline is further connected with a fourth-stage pressure relief line, and a fourth-stage automatic pressure relief valve is provided on the fourth-stage pressure relief line, the fourth-stage automatic pressure relief valve is a rupture valve.

[0015] Preferably, the passive nuclear steam supply system further includes dedicated safety-facilities which include a passive core cooling system, the passive core cooling system includes a passive safety injection subsystem which includes a core makeup water tank, a safety injection tank, and the in-containment refueling water tank, the core makeup water tank, the safety injection tank and the in-containment refueling water tank are connected to a nozzle of the reactor pressure vessel through a shared pressure vessel direct-injection line.

[0016] Preferably, a first safety water source is stored in the core makeup water tank, a second safety water source is stored in the safety injection tank, and refueling water in the in-containment refueling water tank is a third safety water source, a sequence of acti vation thereof after an accident is as follows: the first safety water source, the second safety water source, and the third safety water source.

[0017] Preferably, the passive core cooling system further includes a passive residual heat removal subsystem, which includes a passive residual heat removal heat-exchanger located in the in-containment refueling water tank, and a hot side of the passive residual heat removal heatexchanger has an inlet end connected to one hot leg main pipeline and an outlet end connected to one steam generator.

[0018] Preferably, the dedicated safety facilities further include a containment system and a passive containment cooling system, the containment system includes a steel containment that houses the nuclear steam supply system, and the passive containment cooling system includes a passive containment cooling water tank, an air duct, and a water distribution hopper located outside the steel containment; the passive containment cooling water tank stores a fourth safety water source and is higher than the steel containment, the water distribution hopper is connected to the passive containment cooling water tank through pipes and is able to provide spray water to the steel containment, and the air duct is located circumferentially outside the steel containment and is able to introduce air into it.

[0019] Preferably, the passive containment cooling system further includes a passive containment cooling auxiliary water tank and a recirculation loop, and the passive containment cooling auxiliary water tank replenishes water to the passive containment cooling water tank through the recirculation loop.

[0020] In die nuclear steam supply system according to this application, 193 fuel assemblies each with an active zone height of 14 feet are arranged in the reactor core and cooled by two coolant loops, which can enable the rated power of the reactor core to reach 4040 MWt, the gross electrical power of the power plant to reach 1500 MWe, and the availability of the power plant to reach 93%, significantly improving the economic efficiency of the nuclear power reactor model. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to illustrate the -technical solutions of the embodiments of the present application more clearly, the accompanying drawing that needs to be used in the embodiments of the present application will be briefly introduced below.

[0022] FIG. 1 is a schematic structural diagram of a nuclear steam supply system according to a specific embodiment of the present application;

[0023] FIG. 2 is a schematic diagram of a reactor body of a nuclear steam supply system according to a specific embodiment of the present application;

[0024] FIG. 3 is a schematic diagram of a process flow diagram of a nuclear steam supply system according to a specific embodiment of the present application;

[0025] FIG. 4 is a schematic diagram of a process flow diagram of a passive safety injection subsystem according to a specific embodiment of the present application;

[0026] FIG. 5 is a schematic diagram of a process flow diagram of a passive core decay heat removal subsystem according to a specific embodiment of the present application; and

[0027] FIG. 6 is a schematic diagram of a process flow diagram of a. passive containment cooling system according to a specific embodiment of the present application.

[0028] Reference numerals: 100-Nuclear steam supply system; 1-Reactor body; 11-Reactor pressure vessel; 111-Lower head; 112-Cylinder; 113-Upper head; 12-Integrated reactor-top assembly; 13-Reactor internal; 131-Lower reactor internal; 132-Upper reactor internal; 14-Core component; 15-Control rod drive mechanism; 16-Leakage extracting line; 17-Direct injection nozzle; 2-Reactor coolant system; 21-Coolant loop; 2la-First loop; 21b-Second loop; 22-Pressurizer; 221 -Pressurizer upper-head; 2211-Spray pipe; 2212-Two safety pressure relief pipes; 222-Pressurizer cylinder; 223-Pressurizer lower-head; 224-Sprayer; 23-Surge line; 24-Steam generator; 241-Water chamber head; 242-Lower cylinder; 243-Upper cylinder; 244-Steam generator upper-head; 245-First nozzle; 246-Second nozzle; 247-Steam outlet; 248-Feedwater inlet; 25-Main pump; 251-Inlet nozzle; 252-Vibration monitoring device; 26-Hot leg main pipeline; 261-First liquid level pressure tapping; 262-Second liquid level pressure tapping; 27-Cold leg main pipeline; 271-Spray branch pipe; 272-Spray valve; 273-Spray main-pipe; 274-Needle valve; 28-Pressure relief line; 281-Short pipe; 282-Pressure relief branch pipe; 283-Automatic pressure relief valve; 283a-First-level automatic pressure relief valve; 283b-Second-level automatic pressure relief valve; 283c-Third-level automatic pressure relief valve; 284-Exhaust line; 285-Safety valve; 286-Vacuum breaker; 29-Fourth-stage pressure relief line; 291-Rupture valve; 3-Normal residual heat removal system; 31-Normal residual heat removal pump; 4-In-containment refueling water tank; 41-Bubbler; 42-In-containment refueling water tank filter; 5-Passive core cooling system; 51-Passive safety injection subsystem; 511-Core makeup water tank; 512-Safety injection tank; 52-Passive core decay heat removal subsystem; 521-Passive residual heat removal heat-exchanger; 53-Reactor pressure vessel direct-injection line; 54-Recirculation injection line; 6-Containment system; 61-Steel containment; 7-Passive containment cooling system; 71-Passive containment cooling water tank; 72-Air duct; 73-Water distribution hopper; 74-Passive containment cooling auxiliary water tank; 75-Recirculation line. DETAILED DESCRIPTION

[0029] In order to better understand the technical solutions of the present application, the embodiments of the present application will be described in detail below in conjunction with the accompanying drawings.

[0030] This application provides a passive nuclear steam supply system based on the reactor core with 193 fuel assemblies. By adopting a design concept of passive accident mitigation, on the premise of ensuring the passive cooling capacity after an accident, it is significantly improves the thermal power of the nuclear steam supply system and the electrical power of the nuclear power plant through the integration of fuel design, nuclear design of core, thermal-hydraulic design, component design, and system design, thereby enhancing the economics of the nuclear power reactor model and significantly improving the reactor's safety indicators compared to traditional second-generation nuclear power plants and existing third-generation nuclear power plants.

[0031] The passive nuclear steam supply system of the following embodiments is described in detail based on the reactor core with 193 fuel assemblies.

[0032] FIG. 1 is a schematic structural diagram of a nuclear steam supply system 100 according to a specific embodiment of the present application.

[0033] As shown in FIG. 1, the passive nuclear steam supply system 100 according to this embodiment includes a reactor body 1 and a reactor coolant system 2. The reactor body 1 is loaded with nuclear fuels therein, which continuously generate heat through a controlled chain fission reaction. The reactor coolant system 2 is loaded with a reactor coolant therein and cools the nuclear fuel and removes heat from the reactor body 1 through the circulation of the reactor coolant, and the heat carried away by the reactor coolant is then used to heat the circulating writer on the secondary side to generate steam. The nuclear steam supply system 100 according to the present application uses light water as the reactor coolant.

[0034] The reactor body 1 includes the reactor pressure vessel 11 and the integrated reactor-top assembly 12. Hie reactor pressure vessel 11 provides a high-integrity pressure boundary' to contain the reactor coolant, tire core generating heat and fuel fission products, and is specifically cylindrical. The integrated reactor-top assembly' 12. is installed on. the upper end of the reactor pressure vessel I L and is lifted, transferred and stored as a whole through integrated operation during shutdown and refueling of the reactor, thereby simplifying the refueling operation, shortening the refueling time and improving the availability of the nuclear power plant.

[0035] FIG. 2 is a schematic diagram of the reactor body 1 of the nuclear steam supply system 100 according to a specific embodiment of the present application.

[0036] As shown in FIG. 2, the reactor body 1 consists of at least the reactor pressure vessel 1J, the reactor internals 13, the core components 14, the control rod drive mechanism 15, and the integrated reactor-top assembly 12.

[0037] The reactor pressure vessel 11 includes three parts: the lower head 111, the cylinder 112, and the upper head 113. Both the lower head 111 and the upper head i 13 are hemispherical. The lower head 1 11 and the cylinder 112 are integrally forged, and the upper head 113 and the cylinder 112 are connected with each other by a flange. Both the cylinder 112 and the upper head 113 are provided with flanges, which are sealed by sealing rings after the cylinder 112 and the upper head 113 are connected. The sealing rings include two sets of sealing rings which are concentrically arranged, with one set arranged internally and the other set arranged externally. In this embodiment, the inner diameter of the cylinder 112 of the reactor pressure vessel is ‘1430 mm.

[0038] The core component 14 include fuel assemblies and fuel-related assemblies that cooperate with the fuel assemblies.

[0039] Tire fuel assembly generates heat through nuclear reaction, and provides good heat transfer conditions to export the heat. The fuel assembly is supported by the reactor internal 13 and remains stable during nuclear reaction. In this embodiment, the reactor pressure vessel 11 contains atotal of 1S>3 foci assemblies arranged in. a 15x15 pattern within the core component 14, the height of the active zone of the fuel assembly is 426.72 cm, or 14 feet, and the average linear power density of the fuel assembly is 181.0 W / cm2.

[0040] Each fuel assembly consists of 264 fuel rods and a fuel assembly frame, arranged in a 1'7x17 square pattern. Tire fuel assembly frame consists of an upper base, a lower base, 8 intermediate grids, 4 intermediate mixing grids, one top grid, one bottom grid, one protective grid, 24 control rod guide tubes, and one instrument tube. The fuel rod consists of Z1RLO cladding tubes and Zr-4 end plugs encapsulated uranium dioxide ceramic pellets. The pellets are cylindrical and are made by cold pressing and sintering low-enriched uranium dioxide powder to the required density. The fuel rods have a structure of integral fuel-combustible poison, with boride coated on the surface of the fuel pellets.

[0041] Tire fuel-related assemblies specifically include control rod assemblies, combustible poison assemblies, neutron source assemblies, and flow plug assemblies, and are used to control the reactivity of the fuel assemblies. The fuel assemblies and fuel-related assemblies constitute the reactor core, with an equivalent diameter of 337.10 cm for the active region and a core height-to-diameter ratio of 1.27.

[0042] In this embodiment, the reactor body 1, in addition to loading uranium dioxide fuel assemblies, can further load uranium-plutonium mixed oxide fuel, enabling the reactor core to have MOX loading capability.

[0043] In the nuclear steam supply system 100 according to the present application, 193 fuel assemblies with an active zone height of 14 feet are used in the reactor core, which are cooled by two coolant loops. This allow s the rated power of the reactor core to reach 4040 MWt, the gross electrical power of the power plant to reach 1500 MWe, and the availability of the power plant to reach 93%, significantly improving the economic efficiency of the nuclear power reactor model.

[0044] In the nuclear steam supply system 100 according to the present application, the core design margin is not less than 15%, the core damage frequency is less than 4.02xl0'7 / reactor-year, and the probability of releasing a large amount of radioactive material is less than 5.07 10' 5 / reactor-year. thus further enhancing safely performance.

[0045] The reactor internal 13 is located inside the reactor pressure vessel 11 and consists of the lower reactor internal 131, the upper reactor internal 132, and the flow guide baffle. "Die reactor internal 13 provides support and positioning for the fuel assemblies and related components, guidance and flow distribution for the coolant, radiation shielding for the reactor pressure vessel 11, and support and guidance for In-reactor measurement components, ensuring the safe and reliable operation of the reactor. Compared with existing nuclear reactor models, the neutron shield is eliminated in the reactor internal 13 in this embodiment, thereby reducing the risk of loose components within the reactor; and instead of the flow distribution skirt in the structure of the lower chamber, a replaceable flow equalization plate is adopted, thereby optimizing the flow distribution performance. In this embodiment, the availability of the reactor internal 13 is not less than 93%.

[0046] The integrated reactor-top assembly 12 is installed on the upper head 113 of the reactor pressure vessel 11. During shutdown and refueling of the reactor, the reactor-top assembly 12 can be lifted, transferred and stored as a whole in conjunction with the upper head 113 through integrated operation, thereby simplifying the refueling operation, shortening the refueling time and improving the availability of the nuclear power plant. The integrated reactor-top assembly 12 mainly consists of a shroud assembly, a. control rod drive mechanism, a ventilation and cooling system, a cantilever crane component, a seismic support structure for the control rod drive mechanism, a top cover lifting device, and a blowoff-system support for the top cover of the pressure vessel, etc,

[0047] The control rod drive mechanism 15 is arranged on the integrated reactor-top assembly 12 and passes through the upper head 113. Ihe control rod drive mechanism 15 is used to connect with the control rod assembly, so as to control the average core temperature by controlling the insertion and lifting of the control rod assembly, thereby enabling safe startup of reactor, reactor power regulation, and reactor shutdown. In this embodiment, the control rod drive mechanism 15 is of a magnetic lifting type.

[0048] The fuel assemblies are loaded in the core in the manner of high burnup and low leakage in both the initial cycle and the rcfuehng cycle. This loading manner can improve neutron economy and extend the service life of the reactor pressure vessel 11. During operation, the refueling cycle is 18-24 months, and the alternation between a refueling cycle of 18~month and a refueling cycle of 16 / 20-month can be achieved, so as to adapt to different requirements for refueling time of power plants. By adopting different refueling strategies, the average burnup of the fuel element after unloading is no less than 50,000 MW-d / t-U, and can reach a maximum value of 62,000 MW-d / t-U.

[0049] The control rod assembly meets the reactive control requirements under various modes, including base load, load following, initial startup, shutdown and restart, and rapid power reduction, and can achieve daily load tracking operation with the operating strategy of mechanical compensation. This operating strategy can significantly reduce the number of boron adjustments in the base-load operating mode and the amount of boron-containing waste water in the load-following operating mode, achieving load tracking without boron adjustment at or above a certain power level for most of the cycle life.

[0050] Two leakage monitoring and extracting lines 16 are provided between the flanges of the cylinder and the upper head of the reactor pressure vessel 11, with one line arranged between the inner and outer sealing rings and the other line arranged outside the outer sealing ring. The trvo leakage extracting lines share a common header pipe. A high-temperature alarm temperature detector is installed on the header pipe to monitor leakage of the flange sealing of the reactor pressure vessel. When the monitored temperature is higher than the ambient temperature, it indicates a leakage in the sealing and a high-temperature alarm is triggered.

[0051] FIG. 3 is a schematic diagram of a process flow' diagram of a nuclear steam supply system 100 according to a specific embodiment of the present application.

[0052] As shown in FIGS. 1 and 3, the reactor coolant, system 2 is connected to the reactor pressure vessel J1 to remove the decay heat generated by the reactor core by driving the coolant to circulate between the reactor coolant system 2 and the reactor pressure vessel 11.

[0053] The reactor coolant system 2 includes two coolant loops 21, one pressurizer 22, and the surge line 23. Each of said coolant loops 21 includes the steam generator 24, two main pumps 25, the hot leg main pipeline 26, and two cold leg main pipelines 27.

[0054] As shown in FIG. 3, the two coolant loops 21 are the first loop 21a and the second loop 21b, respectively. The first loop 21a includes the steam generator 24a, two main pumps 25a, the hot leg main pipeline 26a, and two cold leg main pipelines 27a, and the second loop 21b includes the steam generator 24b, two main pumps 25b, the hot leg main pipeline 26b, and two cold leg main pipelines 27b.

[0055] The reactor coolant flows on the primaiy side of the steam generator 24. The two ends of the hot leg main pipeline 26 are connected to the reactor pressure vessel 11 and die steam generator 24, respectively. Two mam pumps 25 are connected to the lower end of the corresponding steam generator 24. Two ends of the cold leg main pipeline 27 are connected to the reactor pressure vessel 11 and the corresponding mam pump 25, respectively. The reactor coolant enters the primary side of the steam generator 24 through the hot leg main pipeline 26 after being heated in the reactor pressure vessel 11, and returns to the reactor pressure vessel 11 through the main pump 2.5 and the cold leg main pipeline 27 after heat exchange in the steam generator 24, thus achieving circulation. The main pump 25 provides the driving force for the circulation of the reactor coolant. After absorbing heat at the primary side of the steam generator 24, the secondary side of the steam generator 24 produces steam for driving a steam turbine to do work.

[0056] As shown in FIG. 1, the steam generator 24 is a steam generating device that integrates a vertical shell, a U-shaped tube, and a moisture separation device. The cylinder of tire steam generator 24 includes the water chamber head 241, the lower cylinder 242, the upper cylinder 243, and the steam generator upper-head 244 connected in sequence. Inside the cylinder of the steam generator 24, a tube sheet, a water chamber baffle, a tube bundle and a moisture separation device (not shown) are arranged. The tube sheet is located inside the steam generator near the connection between the water chamber head 241 and the lower cylinder 242 for dividing the internal space of the steam generator 24 into upper and lower parts. Tire tube bundle is a U-shaped tube, and the ports thereof pass through the tube sheet. The water chamber baffle is located between the water chamber head 241 and the tube sheet for dividing the space of the water chamber head 241 into left and right parts, and for separating two ports of each U-shaped tube into the two compartments of the water chamber head 2.41 respectively.

[0057] One side compartment of the water chamber head 2.41 is provided with the first nozzle 245 connected to the hot leg main pipeline 26, and the other side compartment thereof is provided with two second nozzles 246 connected to the main pump 25. In this way, the reactor coolant flowing in from the hot leg main pipeline 26 enters one side of the water chamber head 241, enters the other side of the water chamber head 241 after passing through the U-shaped tube bundle, and returns after passing through the mam pump 25 and the cold leg main pipeline 27. The moisture separation device is located on tire secondary side of the tube bundle and includes a primary separator and a dryer, and is used to separate the steam and water generated on the secondary side. The top of the upper head 244 of the steam generator is provided with the steam outlet 247. and a side of the upper cylinder 243 is provided with the feedwater inlet 248, so as to realize the steam-water circulation of the secondary side.

[0058] The steam generator 24 further includes auxiliary components such as tube support plates and anti-vibration stops (not shown) to maintain the stability of the tube bundle within the steam generator 24.

[0059] In this embodiment, the heat transfer area of one steam generator 24 reaches 14666.5 m2, the allowable tube blockage rate is 10%, the operating gauge pressure of the primary' side is 15,4 MPa, and the thermal design flow rate of the reactor coolant of the primary side is 41206 m3 / h, thereby achieving a heat transfer capacity of 2029 MW for one steam generator 24.

[0060] The mam pump 25 is used to pump the reactor coolant to circulate between the reactor core, the coolant loop 21 and the steam generator 24. The water chamber head 241 of each steam generator 24 is connected to two main pumps 25. The inlet nozzle 251 of the main pump 25 is directly connected to the second nozzle 246 of the steam generator 24. The two mam pumps 25 on each steam generator 24 operate in the same direction. Tire main pump 25 is of a vertical type and can be either a canned motor pump or a wet-winding motor pump. As the optimal estimated flow rate, the flo w rate of one main pump is 21642 m3 / h.

[0061] The motor and all rotating parts of the canned motor pump are enclosed in one pressure vessel which consists of a pump casing, heat shield ring, stator top cover, stator flange and shell assembly, stator bottom cover, as well as pipes, flanges, and external heat exchanger tubes. Hie drive motor of the canned motor pump is a vertical, water-cooled, squirrel-cage induction motor with a canned rotor and stator, and a flywheel is provided on the motor side thereof. The motor and all rotating parts of the w'et-winding motor pump are enclosed in one pressure vessel which consists of a pump casing, heat shield, main flange bolts and nuts, motor casing, bearing bracket, thrust bearing housing, as well as pipes, flanges, and external heat exchanger tubes. The stator and rotor of the wet-winding motor pump are in direct contact with the reactor coolant. The motor of the wet-winding pump is a vertical, water-cooled, squirrel-cage wet-winding induction motor with a flywheel arranged on the motor side thereof.

[0062] Tire main pump 25 is suspended below the water chamber head 241 of the steam generator 24, and will generate a certain amount of vibration during operation. Therefore, a vibration monitoring device 252 is installed on each main pump 25. Specifically, the vibration monitoring device 252 includes 5 velocity sensors and 1 phase sensor. The 5 velocity sensors are used to measure radial vibration in the X direction (two), radial vibration in the Y direction (two), and axial vibration in the Z direction (one), respectively. Ilie phase sensor is used to output the rotational frequency and is used in conjunction with the velocity sensors. When the speed sensor detects different vibration values, different alarms are triggered, thereby ensuring the safe operation of the main pump 25.

[0063] Relative to the reactor pressure vessel 11, both coolant loops 21 are configured in the manner of two-m-one-out, that is, the reactor coolant enters the reactor pressure vessel 11 through two coki leg main pipelines 27 and flows out of the reactor pressure vessel 11 through one hot leg main pipeline 26, and the two coolant loops 21 are arranged symmetrically relative to the reactor pressure vessel 11. On each coolant loop 21, the hot leg main pipeline 26 is located between the cold leg main pipelines 27, and the center elevation of the cold leg main pipeline 27 is 445 mm higher than the center elevation of the hot leg main pipeline 26. In this way, when the reactor coolant in the cold leg main pipeline 27 enters the reactor pressure vessel 11, it will naturally sink due to the density difference, which facilitates the mixing of the reactor coolant. Tire hot leg main pipeline 26 has an outer diameter of 1088 mm, a wall thickness of 94 mm, a normal operation gauge pressure of 15.7 MPa, and an operating temperature of 324°C. The cold leg main pipeline 27 has an outer diameter of 795 mm, a wall thickness of 72.5 mm, a normal operation gauge pressure of 16.2 MPa, and an operating temperature of 291°C. Under the optimal estimated flow rate, the flow velocity in the hot leg main pipeline 26 and the cold leg main pipeline 27 is reduced, which alleviates the problem of accelerated corrosion caused by the flow velocity in the pipes during long-term operation.

[0064] As shown in FIGS. I and 3, the surge line 23 and the pressurizer 22 are connected to the hot leg main pipeline 26 of one of the two coolant loops 21. One end of the surge line 23 is connected to the hot leg main pipeline 26 of one of the coolant loops 21, and the other end of the surge line 23 is connected to the bottom of the pressurizer 22. For example, the surge line 23 and the pressurizer 22 are connected to tire hot leg main pipeline 26a of the first loop 21a.

[0065] The pressurizer 22 serves as die equilibrium point for maintaining the liquid and steam of the reactor coolant system 2 in a saturated state. The pressurizer 22 controls the pressure of the reactor coolant system 2 during steady-state operation and instantaneous operation of the power plant. In accident conditions, the pressurizer 22 cooperates with other facilities to control the pressure changes of the reactor coolant system 2 within the allowable range. In major accident conditions, the pressurizer 22 provides over-pressure or under-pressure protection to prevent damage to the reactor core or other components.

[0066] As shown in FIG. 1, the pressurizer 22 is a cylindrical pressure vessel, consisting of the pressurizer upper-head 221, the pressurizer cylinder 222, and the pressurizer lower-head 223. The pressurizer upper-head 221 is a hemispherical shell, is provided with one spray pipe 2211 and two safety pressure relief pipes 2212, and is further provided with the sprayer 224 (see FIG. 3) therein. The pressurizer lower-head 223 is a hemispherical shell with the centrally connected surge line 23. Electric heaters (not shown) are arranged around the surge line 23, and each electric heater can be replaced individually.

[0067] As shown in FIG. 3, each of the two cold leg main pipelines 27a of the first loop 21a is connected with one spray branch pipe 271, and each spray branch pipe 271 is provided with one spray valve 272. The spray branch pipes 271 are merged into the spray main pipe 273 which is connected to the spray pipe 2211 of the pressurizer upper-head 221, thus forming the pressurizer spray subsystem. When the main pump 25 is running, the pressure difference generated at the connection between the cold leg main pipeline 27a and the spray branch pipe 271 and the connection between the hot leg main pipeline 26a and the surge line 23 serves as the driving force to drive the spray flow from the cold leg main pipeline 26a into the pressurizer upper-head 221 through the sprayer 224, so that the subcooled atomized water is sprayed into the pressurizer 22 to suppress the raise of the pressure. Each of the two spray branch pipes 271 is provided with one needle valve 274 connected in parallel with the spray valve 272. When the spray valve 272 is closed, the needle valve 274 allows a continuous small bypass flow to pass through and flow to the spray pipe 2211 of the pressurizer and the surge line 23, In this way, the following operation can be achieved: the spray line and surge line 23 are prevented from becoming too cold when spraying is not required, to control the pressure during normal operation; thermal stress and thermal shock are reduced when the spray valve 272 is opened or when the coolant transiently surges into and out of the surge line 23; and the maintaining of the uniformity of water chemistry and temperature in the pressurizer 22 can be facilitated. A water seal (not shown) is provided on the spray main-pipe 273 to prevent steam from accumulating and returning to the spray valve 272.

[0068] As shown in FIG. 1, two pressure tapings are provided on the hot leg main pipeline 26 for connecting a liquid level transmitter to monitor the liquid level of the reactor coolant system during the half water-filling period after reactor shutdown. The two pressure tappings include the first liquid level pressure tapping 261 which is located at the bottom of the hot leg main pipeline 26, and the second liquid level pressure tapping 262 which is located at the top of the hot leg main pipeline 26 and as close as possible to the steam generator 24.

[0069] Tire first liquid level pressure tapping 261 and the second liquid level pressure tapping 262 are provided on the hot leg main pipeline 26 so that the liquid level of the reactor coolant can be continuously monitored during half-pipe operation, thereby improving the reliability of monitoring.

[0070] The two safety pressure relief pipes 2212 of the pressurizer upper-head 221 are respectively' connected to the pressure relief line 28, and each of the two pressure relief lines 28 is provided with one safety’ valve 285 to provide overpressure protection for the reactor coolant system 2. The safety valve 285 is a spring-loaded safety valve 285, which is opened to release pressure when the pressure in the pressurizer 22 exceeds the set value of the safety valve. The downstream line of the outlet of safety valve 285 is provided with tire short pipe 281 with a rupture disk to provide a closed collection space for the condensate leaked from the valve. Compared to operating nuclear power plants, the safety valve inlet pipe in this embodiment does not have a water seal, thereby avoiding the drift of the set value of pressure. The pressure relief line 28 is provided with three parallel pressure relief branch pipes 282, and each of the three pressure relief branch pipes 282 is provided with the automatic pressure relief valve 283, namely the first-level automatic pressure relief valve 283a, the second-level automatic pressure relief valve 283b, and the third-level automatic pressure relief valve 283c. The downstream of the three levels of automatic pressure relief valves 283 are merged and connected to the exhaust line 284. The vacuum breaker 286 is provided on the exhaust line 284 to ensure that, the pressure in an exhaust pipe remains at atmospheric pressure after the valve is opened for release, and to avoid the siphonage of water caused by the vacuum generated by condensing the steam in the pipe after the valve is opened for release. The pressure relief line 28 is arranged downwards from the pressurizer 22 to the automatic pressure relief valve 283 on the pressure relief line 28, so as to form a cold water seal before the automatic, pressure relief valve 283, so as to minimize steam leakage during normal power operation.

[0071] As shown in FIG. 1, the surge line 23 connects the hot leg main pipeline 26 and the pressurizer 22. When the coolant density in the reactor coolant system 2 changes, the expanding or contracting reactor coolant flows into or out of the pressurizer 22 through the surge line 23 An electric heater heats the subcooled liquid entering the pressurizer 22, causing some of the water in the pressurizer 22 to vaporize, 'thereby controlling the drop of the pressure. The surge line 23 has an approximately spiral structure to make it flexible enough to adapt to changes in temperature of the reactor coolant. The surge line 23 has a continuous downward slope from the pipe connector of the pressurizer 22 to the hot leg main pipeline 26, thereby minimizing thermal stratification within the surge line 23 and preventing the accumulation of wastewater in the pipe.

[0072] In order to reduce the high thermal stress caused by rapid changes in fluid temperature during normal operation transients, heat sleeves (not shown) are provided at the nozzle of the surge line 23 at the bottom of the pressurizer 22 and the nozzle of the spray pipe 2211 of the pressurizer, so as to avoid excessive thermal stress.

[0073] The reactor pressure vessel 11 is provided with a blowoff line at the top thereof, and a reactor-top blowoff" valve is installed on the blowoff line. The reactor coolant is discharged through the reactor-top blowoff valve to prevent the pressurizer 22 from overflowing due to a large amount of coolant being injected into the reactor pressure vessel 11.

[0074] In this embodiment, the pressurizer 22 has an inner diameter of 2696 mm, a height of approximately 14574 mm, a minimum internal volume of 70.8 m3, a rated total power of 1950 kW for the electric heater, a designed spray flow rate of 205 m3 / h, and a gauge pressure of 17.2 MPa as a set pressure for tire safety 'valve 285. Including the 'volume of the pressurizer 22 and the surge line 23 in the cold state, the total volume of the reactor coolant system 2 is 390 m3 when a wet-winding pump is configured, surd is 386 m3 when a canned pump is configured.

[0075] Ilie above-mentioned nuclear steam supply system 100, which has 193 fuel assemblies of 14 feet and is cooled by two cooling loops 21, has core power of over 4000 MWt and rated power of 4040 MWt. The core design margin is greater than or equal to 15%, which significantly improves the core power, and the reactor coolant system 2 with the two loops also reduces the number of components and the space occupied by the components, which significantly improves the economics of the reactor model.

[0076] FIG. 4 is a schematic diagram of a process flow' diagram of a security system according to a specific embodiment of the present application.

[0077] As shown in FIG. 4, in order to cool the reactor core during reactor shutdown, the nuclear steam supply system 100 according to this embodiment is provided with the normal residual heat removal system 3. Ilie normal residual heat removal system 3 includes the normal residual heat removal pump 31, a normal residual heat removal heat-exchanger (not shown), and related pipes and valve components. The inlet end of the normal residual heat removal system 3 is connected to the hot leg main pipeline 26, and the outlet end thereof is connected to the reactor pressure vessel 11. During the reactor shutdown, the reactor coolant is transported to the normal residual heat removal heat-exchanger by means of the normal residual heat, removal pump 31 for cooling, and the cooled reactor coolant is then returned to the reactor pressure vessel 11. The normal residual heat removal system 3 is an active system that only cools the reactor core during the reactor shutdown.

[0078] The reactor pressure vessel 11 is located inside the reactor cavity. During refueling, the cylinder 112, the lower head 111, and the reactor internals 14 of the reactor pressure vessel 11 are submerged. To facilitate charging and refueling, the nuclear steam supply system 100 according to this embodiment is provided with the in-containment refueling water tank 4 which stores refueling water. When performing the refueling operation during refueling, the refueling water in the in-containment refueling water tank 4 is transported to the reactor cavity , so that die refueling water submerges the cylinder 112 of the reactor pressure vessel 11. After the refueling is completed, the refueling water is transported back to the in-containment refueling w ater tank 4.

[0079] Ilie in-contaimncnt refueling water tank 4 is provided with the bubbler 41, the exhaust pipe 284 after the first-level automatic pressure relief valve 283a, the second-level automatic pressure relief valve 283b, and the third-level automatic pressure relief valve 283c is connected to the bubbler 41, and water and steam are discharged into the in-containment refueling water tank 4 through the bubbler 41. By opening these automatic pressure relief valves 283, the steam and water in the pressunzer 22 are discharged to the outside, thereby gradually reducing the pressure of the reactor coolant system 2. The vacuum breaker 286 on the pressure relief line 28 can prevent water from being siphoned from the bubbler 41 in the in-containment refueling water tank 4.

[0080] The in-containment refueling water tank 4 is provided with the containment refueling water tank filter 42. There are 3 containment refueling water tank filters 42, with each refueling water tank injection line corresponding to one containment refueling water tank filter 42. The containment refueling water tank filters 42 are connected to each other by pipes.

[0081] The hot leg mam pipeline 26a of the first loop 21a is further connected with the fourthstage pressure relief line 29. The fourth-stage pressure relief line 29 is provided with the rupture valve 291, and the end of the fourth-stage pressure relief line 2.9 faces the atmospheric space. Following an accident, the rupture valve 291 of the fourth-stage pressure relief line 29 is opened, so as to reduce the pressure in the reactor coolant system 2. Tiw rupture valve 291 is a gunpowder-driven valve for one-action use, and is normally in a closed state. Upon receiving a start signal, the ignition of the gunpowder is triggered, causing the valve to open. The fourthstage pressure relief line 29 provides a function of pressure relief.

[0082] During normal shutdown, the decay heat of the reactor core is removed by die active normal residual heat removal system 3. In the event of an accident, dedicated safety facilities are used to limit, control, mitigate, and terminate the accident, maintain the safety of the reactor core, and keep the public's radiation exposure levels within the prescribed limits. The dedicated safety facilities implement functionality in a passive manner, without relying on active components to prevent or mitigate accidents. Specific passive measures include gravity, natural circulation, energy storage devices, check valves, and non-circulating power valves, and the like. The dedicated safety facilities include the passive core cooling system 5, the containment system 6 (see FIG. 6), the passive containment cooling system 7 (see FIG. 6), and an in-containment hydrogen control system (not shown).

[0083] The passive core cooling system 5 is used to remove the core decay heat after an accident, reduce the temperature of the fuel cladding, and reduce the release of radioactive materials into the environment. The passive core cooling system 5 may be specifically divided into the passive safety injection subsystem 51 and the passive core decay heat removal subsystem 52.

[0084] Ilie passive safety mj ection subsystem 51 consists of at least two core makeup water tanks 511, two safety injection tanks 512, the m-containment refueling water tank 4, and related pipes and valves. The core makeup water tanks 511, safety injection tanks 512. the incontainment refueling water tank 4, and the containment recirculation injection line 54 inject into the direct injection nozzle 17 (see FIG. 1) of the reactor pressure vessel through two common reactor pressure vessel direct-injection lines 53.

[0085] Following a hypothetical loss-of-coolant accident, the pressure in the reactor coolant system 2 drops, triggering safety facilities to cause the reactor shutdown and safety injection. The dedicated safety facility 10 triggers a signal to shut down the mam pump 25 and open the i solation valve at the outlet of the core makeup water tank 511, allowing the core makeup water tank 511 to provide high-pressure injection. Once the pressure drops to a certain level, the safety injection tank 512 begins injection. When the valve on the fourth-stage pressure relief line 29 is activated, the injection rapture valve .291 of the in-containment refueling water tank 4 is activated. Finally, the check valve on the injection line of the in -containment refueling water tank 4 is opened, allowing the in-containment refueling water tank 4 to provide injection flow under gravity. In tire event of a severe accident, the electric valve and the rupture valve on the recirculation injection line 54 are opened, thereby flooding the outer surface of the reactor pressure vessel 11 with water from the in-containment refueling water tank 4, pro viding cooling for the molten core inside the reactor pressure vessel 11.

[0086] The core makeup water tank 511 is provided as the first safe water source, and is a cylindrical vertical container with a total volume of 85m3 per tank. The safety injection tank 512 is provided as the second safe water source, and is a spherical container with a total volume of 78.6 m3 per tank and a water volume of 66.4 nr3. The refueling w'ater in the in-containment refueling water tank 4 is the third safety water source, with a minimum water volume of 2686.9 in3. The sequence in which safe water sources are put into operation after an accident is as follows: the first safe water source, the second safe water source, and the third safe water source.

[0087] FIG. 5 is a schematic diagram of a process flow diagram of the passive core decay heat removal subsystem 52 according to a specific embodiment of the present application.

[0088] Ilie passive core decay heat removal subsystem 52. includes the passive residual heat removal heat-exchanger 521 and related valves and pipes. The passive residual heat removal heat-exchanger 521 is located in the in-containment refueling water tank 4. and has an inlet, line connected to one hot leg main pipeline 26 and an outlet line connected to the cold leg chamber of the steam generator 24. After an accident, the passive residual heat removal heat-exchanger 521 starts up automatically, and operates in natural circulation conditions after the main pump 25 stopping operation to remove core decay heat. The passive residual heat removal heat-exchanger 521 is designed to have a heat exchange capacity of 75.9 MW.

[0089] This application employs a passive, dedicated safety facility, which simplifies system configuration and can mitigate accidents without human intervention 72 hours after the accident, thus reducing the probability of human error.

[0090] f IG. 6 is a schematic diagram of a process flow diagram of a passive containment cooling system according to a specific embodiment of the present application.

[0091] As shown in FIG. 6, the dedicated safety facilities further include the containment system 6 and the passive containment cooling system 7.

[0092] The containment system 6 consists of the steel containment 61 and mechanical penetration members, valves, pipes, etc. on the steel containment 61. The above-mentioned nuclear steam supply system 100, except for the normal residual heat removal pump 31, the normal residual heat removal heat-exchanger 32, and some pipes and valves of the normal residual heat removal system 3, is located inside the steel containment 61. The interior of the steel containment vessel 61 is formed as a sealed space to maintain its integrity under accident conditions, providing a barrier against the leakage of radioactive products. Even if both ends of the coolant pipe or secondary side pipe of the reactor breaks down, the peak pressure inside the steel containment system 6 will not exceed the design pressure value. The steel containment vessel 61 includes: a head having a thickness of 43 mm; and a cylinder having an inner diameter of 43 mm, a wall thickness of mostly 5 2 mm, and a thickness of the lowest ring of the cylinder of 55 mm. The free volume inside the steel containment vessel 61 is 7.5 x 104 m3.

[0093] The in-containment refueling water tank 4 is located inside the steel containment 61, and the passive residual heat removal heat-exchanger 521 is placed inside the in-containment refueling water tank 4. After an accident, when the passive residual heat removal heat-exchanger 521 is running, the coolant flowing through the reactor core enters the primary side of the passive residual heat removal heat-exchanger 521 and transfers heat to the secondary side thereof. The secondary side is in direct contact with the water in the in-containment refueling water tank 4, so that the water in the in-containment refueling water tank 4 evaporates after being heated, and the water vapor rises to the upper inner wall of the steel containment 61, liquefies by contacting the cold inner wall, and transfers heat, to the steel containment. 61. The steel containment 61 is provided with a condensation reflux device, which returns the condensate to the in-containment refueling water tank 4, thereby achieving long-term circulating cooling inside the steel containment 61.

[0094] The passive containment cooling system 7 transfers heat from the air in the steel containment 61 to the external environment, limiting and reducing the temperature and pressure inside the containment in a loss of coolant accident or a rupture of the main steam pipe or main feedwater pipe inside the steel containment 61, thereby maintaining the air pressure in the steel containment 61 within the design limits to ensure the integrity of the steel containment 61. The passive containment cooling system 7 includes at least one passive containment cooling water tank 71, the cooling water delivery channel 74 for delivering water to the containment, the air duct 72 located circumferentially around the outer side of the steel containment 61, and the cofferdam and water distribution hopper 73 tor water distribution to the steel containment 61. The air duct 72 is located circumferentially around the outer side of the steel containment 61, and air can be introduced into the air duct 72.

[0095] The passive containment cooling water tank 71 is positioned higher than the steel containment 61. The cofferdam and water distribution hopper 73 are located above the steel containment 61. The passive containment cooling water tank 71 is connected to the water distribution hopper 73 through pipes. The water distribution hopper 73 can provide spray water to the steel containment 61. Tire water in the passive containment cooling water tank 71 is sprayed onto the outer wall surface of the steel containment 61 through the water distribution hopper 73 under the action of gravity. After absorbing the heat transferred by the steel containment 61, the sprayed water is heated into steam and earned out with the air in the air duct, thereby cooling the steel containment 61.

[0096] The passive containment cooling water tank 71 stores the fourth safety w;ater source with a rated usable volume of 3700 m3. Within 72 hours after a design basis accident, the passive containment cooling system 7 passively dissipates heat from the containment, without intervention of external personals. In another embodiment, the passive containment cooling system 7 is further provided with the passive containment cooling auxiliary water tank 74 and the recirculation line 75. After the above 72 hours, the water in the passive containment cooling auxiliary water tank 74 is transported to the passive containment cooling water tank 71 through the recirculation line tor continuous cooling.

[0097] The in-containment hydrogen control system (not shown) includes a hydrogen monitoring subsystem, a hydrogen recombination subsystem, and a hydrogen ignition subsystem. The hydrogen monitoring subsystem includes three hydrogen sensors located in the dome area of the steel containment to monitor the hydrogen concentration. The hydrogen recombination subsystem includes a passive autocatalytic recombiner (PAR) for hydrogen to handle the slow-growing hydrogen expected in a design basis loss-of-coolant accident. The hydrogen ignition subsystem includes a hydrogen igniter, which is activated by the operator before the hydrogen concentration reaches the flammability limit.

[0098] The nuclear steam supply system 100, in which the above-mentioned dedicated safety facilities are adopted, achieves a power plant availability rate of 93%, a damage frequency of the core of less than 4.02 x 10‘7 / reactor-year, and a release frequency of large-scale radioactive materials of Jess than 5.07 * 10's / reactor-year, further improving the economic efficiency and safety of the reactor models.

[0099] The nuclear steam supply system 100 according to this embodiment further includes an instrumentation and control system (not shown). By collecting physical parameters such as temperature, pressure, flow rate, liquid level, and neutron fluence rate in the system, and after signal processing, mathematical calculation, and logical judgment, control commands are sent to the components. The measurement instruments include process measurement, ex-reactor nuclear measurement, and in-reactor measurement instruments; and the control systems include power plant control systems, reactor protection and safety monitoring systems, and diversified drive systems.

[00100] The process measurement instruments are used to measure most thermal parameters such as temperature, pressure, liquid level, and flow rate, depending on the needs of parameter monitoring. The collected data is transmitted to the power plant control system, the reactor protection and safety monitoring system, or the diversified drive system. The measurement channels are configured as multiple channels for redundancy.

[00101] 'The ex-reactor nuclear measurement instruments measure core power information to ensure continuous monitoring of reactor power. The ex-reactor nuclear measurement instruments provide neutron fluence rate signals to the reactor protection and safety monitoring system. When high neutron fluence rate and high change rate occur, the reactor protection and safety monitoring system triggers the reactor shutdown, providing startup and overpower protection for the reactor.

[00102] 'The in-reactor measurement system monitors the neutron fluence rate at various points in the core and the core outlet temperature. All neutron fluence rate signals are sent to the core online monitoring system to form a three-dimensional distribution of core power, so as to support the operation optimization of the core.

[00103] Hie power plant control system is used to maintain the normal operation of the power plant and prevent the reactor from deviating to an unsafe state. During power operation, the parameters of the reactor and reactor coolant system and the like are adjusted by controlling the status of components such as reactor control rods, valves, pumps, and heaters to maintain constant thermal power, to maintain the components and system operating under normal conditions, and to keep the power plant parameters stable or change smoothly within the specified limits, so as to prevent the power plant from needing an emergency shutdown.

[00104] Hie reactor protection and safety monitoring systems provide necessary protection and oversight for reactor control during normal operation, enabling the activation of safety functions and the maintenance of the safe shutdown state of the power plant in the event of anomalies, design basis events, and accident conditions. When power plant parameters reach the set value for shutdown, the reactor protection and safety monitoring system automatically triggers the emergency shutdown of the reactor, and activates dedicated safety facilities to mitigate the consequences of a design basis accident.

[00105] The diversified control system serves as a backup system for the reactor protection and safety monitoring system, and is physically separated from the protection and monitoring system, without using the same measuring instruments, computational processing devices, indicators, drive devices, and power supplies, and without circuits for interconnection therebetween. The diversified drive systems mitigate the consequences of anticipated transients from failure to shut down the reactor in an emergency, reduce the probability of core damage caused by hypothetical common failures of the protection and monitoring system in probabilistic safety assessments, and prevent containment overpressure failure following a core meltdown.

[00106] The present application further provides a nuclear power plant, in which the above-mentioned passive nuclear steam supply system 100 based on the reactor core with 193 fuel assemblies is adopted, and which is further provided with a steel plate-concrete containment, a steam turbine, and a. generator. The steel plate-concrete containment is located outside the steel containment 61, forming a double-layer containment structure. Ilie steam turbine has an air inlet and an air outlet respectively connected to the steam outlet and feedwater port of the steam generator 24. The steam turbine and the generator are coaxially connected. In this way, the steam generated on the secondary side of the steam generator 24 enters the steam turbine, drives the steam turbine to do work, and the steam turbine then drives the rotor of the generator to rotate, thereby generating electricity.

[00107] The steam turbine is a half-speed, single-shaft, four-cylinder, six-exhaust port, condensing steam turbine, provided with two moisture separation reheaters. The steam flow rate at the main steam valve inlet reaches 7733 t / h, the absolute steam pressure reaches 5.78 MPa, the steam temperature reaches 273.2°C, the rated speed of the unit is 1500 r / min, and the rated output of the unit is 1534 MW. thereby achieving a total gross power output of 1500 MWe for the power plant.

[00108] The steel plate-concrete containment is located outside the steel containment 61, with personnel passageways therebetween. The passive containment cooling water tank 71 is located on the top of the steel plate-concrete containment to enable gravity-driven spraying. Ilie steel plate-concrete containment has an air inlet located near the top thereof in the circumferential direction to introduce an into the air duct of the passive containment cooling system 7. Ilie steel plate-concrete containment has a thickness of 1.1m and has the ability to withstand the impact of large commercial aircraft.

[00109] T1ic nuclear power plant according to this embodiment is further provided with a main control room, which contains a digital instrumentation and control platform that integrates instrumentation and control systems such as the power plant control system, protection and safety monitoring system, and diversified drive system, thereby enabling the monitoring and control of the nuclear power plant. Hie main control room is provided with an emergency inhabitation system that provides breathable air to the personnel in the main control room and limits the rise in temperature in this area, thereby ensuring the habitability of tire main control room after an accident. The emergency inhabitation system consists of an emergency air storage tank and related pipes, valves and instruments, including an air supply storage tank module and mam and backup air supply lines leading to the main control room. The air supply storage tank holds enough compressed air to supply air to the main control room at a flow rate of 111 mTh for at least 72 hours.

[00110] The nuclear power plant according to this embodiment is further provided with a radioactive waste liquid treatment system. The radioactive waste liquid treatment system is provided with an ion exchange sequence and chemical flocculation process, thereby further reducing the concentration of the discharged radioactive waste liquid, so that the concentration of radioactive effluent at coastal sites does not exceed 1000 Bq / L and the concentration of radioactive effluent at inland sites does not exceed 100 Bq / L, which greatly reduces the amount of the discharged radioactive waste liquid.

[00111] The above are only preferred embodiments of the present application, and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of this application shall be included within the protection scope of this application.

Claims

What is claimed is:

1. A passive nuclear steam supply system, comprising:a reactor body, which comprises a reactor pressure vessel; anda reactor coolant system, which comprises two coolant loops, a pressurizer and a surge line, wherein each coolant loop comprises a steam generator, two main pumps, a hot leg main pipeline and two cold leg main pipelines;whereinthe hot leg main pipeline is connected at both ends to the reactor pressure vessel and the steam generator, respectively, the main pump is connected to a lower end of the steam generator, the cold leg main pipeline is connected at both ends to the reactor pressure vessel and a corresponding main pump, respectively; a reactor coolant enters a primary side of the steam generator through the hot leg main pipeline after being heated in the reactor pressure vessel, and returns to the reactor pressure vessel through the main pump and the cold leg main pipeline after undergoing heat exchange in the steam generator;one end of the surge Ime is connected to the hot leg main pipeline of one of the coolant loops, and another end of the surge line is connected to a bottom of the pressurizer; andthe hot leg main pipeline is provided with a first liquid level pressure tapping and a second liquid level pressure tapping, the first liquid level pressure tapping being located at a bottom of the hot leg main pipeline, and the second liquid level pressure tapping being close to the steam generator and located at a top of the hot leg main pipeline.

2. The passive nuclear steam supply system of claim 1, wherein a top of the pressurizer is provided with two sets of pressure relief lines, each set of pressure relief lines comprises a pressure relief header pipe connected to the pressurizer and three parallel pressure relief branch pipes arranged at downstream of the pressure relief header pipe; the pressure relief header pipe is provided with a spring-loaded safety valve, and a short pipe with a rupture disk is arranged at the downstream of the spring-loaded safety valve; the three pressure relief branch pipes are provided with automatic pressure relief valves respectively, and downstream ends of the three pressure relief branch pipes converge into a single exhaust line on which a vacuum breaker is provided; and the pressure relief lines are arranged in a downward direction from the pressurizer to the automatic pressure relief valves.

3. The passive nuclear steam supply system of claim 1, wherein the passive nuclear steam supply system further comprises a normal residual heat removal system, and the normal residual heat removal system has one end connected to one hot leg main pipeline and another end connected to the reactor pressure vessel.

4. The passive nuclear steam supply system of claim 2, wherein the passive nuclear steam supply system further comprises an in-containment refueling water tank, which stores refueling water that submerges a cylinder section of the reactor pressure vessel during refueling.

5. The passive nuclear steam supply system of claim 4, wherein the in-containment refueling water tank is provided with a bubbler therein, and an end of the exhaust line is connected to the bubbler.

6. The passive nuclear steam supply system of claim 2, wherein one hot leg main pipeline is further connected with a fourth-stage pressure relief line, and a fourth-stage automatic pressure relief valve is provided on the fourth-stage pressure relief line, the fourth-stage automatic pressure relief valve being a rupture valve.

7. The passive nuclear steam supply system of claim 4, wherein the passive nuclear steam supply system further comprises dedicated safety facilities which comprise a passive core cooling system, the passive core cooling system comprises a passive safety injection subsystem which comprises a core makeup water tank, a safety injection tank, and the in-containment refueling water tank, the core makeup water tank, the safety injection tank and the incontainment refueling water tank are connected to a nozzle of the reactor pressure vessel through a shared pressure vessel direct-injection line.

8. The passive nuclear steam supply system of claim 7, wherein a first safety water source is stored in the core makeup water tank, a second safety water source is stored in the safety injection tank, and refueling water in the in-containment refueling water tank is a third safety water source, a sequence of activation thereof after an accident being as follows: the first safety water source, the second safety water source, and the third safety water source.

9. The passive nuclear steam supply system of claim 7, wherein the passive core cooling system further comprises a passive residual heat removal subsystem, which comprises a passive residual heat removal heat-exchanger located in the in-containment refueling water tank, and ahot side of the passive residual heat removal heat-exchanger has an inlet end connected to one hot leg main pipeline and an outlet end connected to one steam generator.

10. The passive nuclear steam supply system of claim 7, wherein the dedicated safety facilities further comprise a containment system and a passive containment cooling system,the containment system comprises a steel containment that houses the nuclear steam supply system, andthe passive containment cooling system comprises a passive containment cooling water tank, an air duct, and a water distribution hopper located outside the steel containment; the passive containment cooling water tank stores a fourth safety water source and is higher than the steel containment, the water distribution hopper is connected to the passive containment cooling water tank through pipes and is able to provide spray water to the steel containment, and the air duct is located circumferentially outside the steel containment and is able to introduce air.

11. The passive nuclear steam supply system of claim 10, wherein the passive containment cooling system further comprises a passive containment cooling auxiliary water tank and a recirculation loop, and the passive containment cooling auxiliary water tank replenishes water to the passive containment cooling water tank through the recirculation loop.

Citation Information

Patent Citations

  • Active and passive nuclear steam supplying system based on 177 reactor core and nuclear power station thereof

    CN103985422A

  • Passive residual heat removal system for nuclear power plant

    CN105810256A

  • Pressure release condensation heat transfer system for passive nuclear power station

    CN105810257A

  • Passive pressurized water reactor nuclear power plant reactor coolant loop layout

    CN106098115A

  • Integrated nuclear reactor serious accident prevention and mitigation system and control method thereof

    CN116598028A