Wastewater treatment device

JP2023074178A5Active Publication Date: 2024-11-21FUJICLEAN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
JP2021186992
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2021-11-17
Publication Date
2024-11-21
Estimated Expiration
2041-11-17

AI Technical Summary

Technical Problem

Existing wastewater treatment systems face challenges in effectively separating solids from water, with issues such as difficulty in reducing the amount of solids entering aerobic treatment tanks and the risk of crushing solids, leading to inefficient solid capture and increased complexity.

Method used

The system includes a configuration with a first filtration tank followed by an aerobic treatment tank with a fixed bed, a second filtration tank with carriers of varying sizes, and a controlled transfer and agitation mechanism using air lift pumps and diffusers to manage solid matter, reducing the likelihood of solid crushing and enhancing separation efficiency.

Benefits of technology

This configuration effectively reduces the amount of solids entering aerobic tanks, improves solid capture in filtration tanks, and simplifies the system design by minimizing the need for additional tanks, thereby enhancing the overall separation of solids from water.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

To separate solids in treating wastewater.SOLUTION: A wastewater treatment device comprises a plurality of water treatment tanks including a first filtration tank, an aerobic treatment tank located downstream of the first filtration tank, and a second filtration tank located downstream of the aerobic treatment tank, where the aerobic treatment tank has a fixed bed. Alternatively, a wastewater treatment system comprises a plurality of water treatment tanks including a sedimentation tank and a storage tank, an agitating device configured to agitate water in the sedimentation tank, a transfer device configured to transfer water from the sedimentation tank to the storage tank, and a control unit configured to control the agitating device and the transfer device. The control unit is configured to execute specific processes including an agitation process, in which the agitating device agitates the water in the sedimentation tank, and a transfer process, in which the transfer device is configured to transfer water containing solids from the sedimentation tank to the storage tank after the agitation process.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0007] ,

[0001] This specification relates to a wastewater treatment apparatus.

Background Art

[0002] Conventionally, wastewater from ordinary households and the like has been treated by a wastewater treatment apparatus. The wastewater treatment apparatus may have various water treatment tanks for separating solid matter from water. For example, the wastewater treatment apparatus may have a filtration tank configured to filter solid matter or a sedimentation tank configured to sediment solid matter.

Prior Art Documents

Patent Documents

[0003]

Patent Document 1

Patent Document 2

Summary of the Invention

Problems to be Solved by the Invention

[0004] By the way, when treating wastewater, the separation of solid matter is not easy and there is room for improvement.

[0005] This specification discloses a technique for separating solid matter when treating wastewater.

Means for Solving the Problems

[0006] The technique disclosed in this specification can be realized as the following application examples.

[0007] [Application Example 1] A wastewater treatment apparatus, comprising a plurality of water treatment tanks including a first filtration tank, an aerobic treatment tank disposed downstream of the first filtration tank, and a second filtration tank disposed downstream of the aerobic treatment tank. The aerobic treatment tank has a fixed bed, Wastewater treatment equipment.

[0008] With this configuration, since the aerobic treatment tank is located downstream of the first filtration tank, the amount of solids flowing into the aerobic treatment tank is reduced. Also, since the aerobic treatment tank has a fixed bed, the possibility of crushing of the solids flowing into the aerobic treatment tank is reduced. Because the possibility of crushing of solids is reduced, the second filtration tank can easily capture the solids. In this way, the wastewater treatment system can properly separate solids from water.

[0009] [Application Example 2] The wastewater treatment apparatus described in Application Example 1, The aforementioned multiple water treatment tanks are A first target tank which is either the aerobic treatment tank or a water treatment tank located downstream of the aerobic treatment tank, The first filtration tank, the water treatment tank located upstream of the first filtration tank, the storage tank for storing solids, and the anaerobic treatment tank are all considered to be the second target tanks. Includes, The wastewater treatment device includes a target transfer device configured to transfer water from the first target tank to the second target tank. Wastewater treatment equipment.

[0010] With this configuration, the target transfer device can transfer solid matter along with water from the aerobic treatment tank, or a water treatment tank located downstream of the aerobic treatment tank, to the second target tank.

[0011] [Application Example 3] A wastewater treatment apparatus as described in Application Example 1 or 2, The plurality of water treatment tanks include a disinfection tank following the second filtration tank, Wastewater treatment equipment.

[0012] This configuration allows for a smaller wastewater treatment system compared to a case where a separate water treatment tank is provided between the second filtration tank and the disinfection tank.

[0013] [Application Example 4] A wastewater treatment device according to any one of Application Examples 1 to 3, wherein the first filtration tank has a first filtration section including a plurality of carriers, the second filtration tank has a second filtration section including a plurality of carriers, the carriers of the second filtration section are the same as those of the first filtration section, Wastewater treatment device.

[0014] If the carriers are different between the first filtration section and the second filtration section, incorrect carriers may be used in the manufacture of the first filtration section or the second filtration section. According to the above configuration, such problems can be avoided.

[0015] [Application Example 5] A wastewater treatment device according to any one of Application Examples 1 to 4, wherein the first filtration tank has a first filtration section including a plurality of carriers,​​​​​​​​​​​​​​​​​​​​​​​​​​​​​With this configuration, since the tops of the first and second filtration tanks are open, the complexity of manufacturing the first and second filtration tanks can be reduced. Also, since the specific gravity of the carrier in the first filtration section and the specific gravity of the carrier in the second filtration section are greater than 1, the possibility of carrier leakage from the top of the first filtration tank and the possibility of carrier leakage from the top of the second filtration tank are reduced.

[0019] [Application Example 7] A wastewater treatment apparatus according to any of Application Examples 1 to 6, A first transfer device configured to simultaneously transfer water from the first filtration tank to a water treatment tank different from the first filtration tank, and transfer water from the second filtration tank to a water treatment tank different from the second filtration tank, A stirring device configured to simultaneously stir the water in the first filtration tank and the water in the second filtration tank, A wastewater treatment device equipped with the following features.

[0020] With this configuration, the amount of solid matter in the first filtration tank and the amount of solid matter in the second filtration tank can be reduced. Furthermore, the complexity of the wastewater treatment system can be reduced.

[0021] [Application Example 8] The wastewater treatment apparatus described in Application Example 7, The wastewater treatment device has a blower pipe which is a pipe to be connected to a blower, The first transfer device is A first airlift pump having a first suction port is located inside the first filtration tank, A second airlift pump having a second suction port is located inside the second filtration tank, A pump connecting pipe, which is a pipe connecting the first airlift pump and the second airlift pump, A first connecting pipe that connects the blower pipe and the pump connecting pipe, A first valve provided on the flow path of the first connecting pipe, It has, The stirring device is, A first aeration device is placed inside the first filtration tank, A second aeration device is located inside the second filtration tank, A diffuser connecting pipe, which is a pipe connecting the first diffuser and the second diffuser, A second connecting pipe that connects the blower pipe and the aeration connecting pipe, A second valve provided on the flow path of the second connecting pipe, A wastewater treatment device having

[0022] With this configuration, the transfer of water from the first and second filtration tanks, and the stirring of the water in the first and second filtration tanks, can be easily controlled by the first and second valves.

[0023] [Application Example 9] A wastewater treatment apparatus according to any of Application Examples 1 to 6, A first airlift pump configured to transfer water from the first filtration tank to a water treatment tank different from the first filtration tank, A second airlift pump configured to transfer water from the second filtration tank to a water treatment tank different from the second filtration tank, A first aeration device configured to agitate the water in the first filtration tank, A second aeration device configured to agitate the water in the second filtration tank, The blower pipe is the pipe that should be connected to the blower, A first connecting pipe that connects the blower pipe and the first airlift pump, A first valve provided on the flow path of the first connecting pipe, A second connecting pipe that connects the blower pipe and the second airlift pump, A second valve provided on the flow path of the second connecting pipe, A third connecting pipe that connects the blower pipe and the first air diffuser, A third valve provided on the flow path of the third connecting pipe, A fourth connecting pipe connecting the blower pipe and the second air diffuser, A fourth valve provided on the flow path of the fourth connecting pipe, A wastewater treatment device equipped with the following features.

[0024] With this configuration, the transfer of water from the first filtration tank, the transfer of water from the second filtration tank, the agitation of the water in the first filtration tank, and the agitation of the water in the second filtration tank can be easily controlled by four valves.

[0025] [Application Example 10] A wastewater treatment system, A wastewater treatment apparatus as described in any of Application Examples 1 to 9, Control unit and Equipped with, The aforementioned multiple water treatment tanks are A sedimentation tank located upstream of the first filtration tank, configured to allow solid matter to settle without filtering, A storage tank configured for storing solids, Includes, The wastewater treatment apparatus is A sedimentation tank stirring device configured to stir the water in the sedimentation tank, A second transfer device configured to transfer water from the sedimentation tank to the storage tank, Equipped with, The control unit, The sedimentation tank stirring device performs a stirring process to stir the water in the sedimentation tank, After the stirring process, the second transfer device performs a transfer process to transfer water containing solid matter from the sedimentation tank to the storage tank, A wastewater treatment system configured to perform specific treatments, including those mentioned above.

[0026] With this configuration, the settled solids and floating solids in the sedimentation tank are stirred by a stirring process, and then a transfer process is carried out after the stirring process, so that the settled solids and floating solids can be properly transferred.

[0027] [Application Example 11] A wastewater treatment system, A plurality of water treatment tanks, including a sedimentation tank configured to settle the solids without filtering them, and a storage tank configured to store the solids, A stirring device configured to agitate the water in the sedimentation tank, A transfer device configured to transfer water from the sedimentation tank to the storage tank, A control unit configured to control the stirring device and the transfer device, Equipped with, The control unit, The stirring device performs a stirring process to stir the water in the sedimentation tank, After the stirring process, the transfer device is used to transfer water containing solid matter from the sedimentation tank to the storage tank. A wastewater treatment system configured to perform specific treatments, including those mentioned above.

[0028] With this configuration, the solid material that settles in the sedimentation tank and the solid material that floats to the surface are mixed by the stirring process, and then the transfer process is carried out after the stirring process, so that the solid material can be properly separated.

[0029] [Application Example 12] The wastewater treatment system described in Application Example 11, The transfer device has a suction port located in the lower part of the sedimentation tank, The aforementioned specific treatment is a treatment performed after the stirring treatment and before the transfer treatment, and includes a sedimentation treatment in which solid matter is settled in the sedimentation tank by stopping both the stirring by the stirring device and the transfer by the transfer device. Wastewater treatment system.

[0030] With this configuration, the transfer device can transfer water with a high concentration of solids during the transfer process.

[0031] [Application Example 13] A wastewater treatment system as described in Application Example 11 or 12, The control unit is configured to execute the specific process N times per day (where N is an integer greater than or equal to 1). Wastewater treatment system.

[0032] With this configuration, the amount of solid matter remaining in the sedimentation tank can be reduced compared to when the specific treatment is performed less frequently.

[0033] [Application Example 14] The wastewater treatment system described in Application Example 13, The control unit is configured to allow the user to change the number of times N in a day that the specific process is performed. Wastewater treatment system.

[0034] With this configuration, the user can adjust the number of times N a specific treatment is performed per day to match the inflow load of the wastewater treatment system.

[0035] [Application Example 15] A wastewater treatment system as described in any of Application Examples 11 to 14, The aforementioned specific treatment includes, before the stirring treatment, a process in which the transfer device transfers water from the sedimentation tank to the storage tank. Wastewater treatment system

[0036] With this configuration, the stirring process is performed with the water level in the sedimentation tank lowered by the transfer of water, thus reducing the possibility of solid material overflowing from the sedimentation tank during the stirring process.

[0037] [Application Example 16] A wastewater treatment system as described in any of Application Examples 11 to 15, The plurality of water treatment tanks include a target tank which is either the sedimentation tank or a water treatment tank located upstream of the sedimentation tank. The wastewater treatment apparatus has a flow path connecting the storage tank and the target tank. Wastewater treatment system.

[0038] This configuration reduces the possibility of water overflowing from the storage tank to the outside of the wastewater treatment system.

[0039] [Application Example 17] A wastewater treatment system according to any one of application examples 11 to 16, The plurality of water treatment tanks include an aerobic treatment tank located downstream of the sedimentation tank. Wastewater treatment system.

[0040] With this configuration, the aerobic treatment tank is located downstream of the sedimentation tank, thus reducing the amount of solid material flowing into the aerobic treatment tank. Consequently, the wastewater treatment system can properly treat the wastewater.

[0041] Furthermore, the technologies disclosed herein can be implemented in various forms, for example, as a filtration tank or sedimentation tank, a wastewater treatment apparatus having a filtration tank or sedimentation tank, a wastewater treatment method, a control device for a wastewater treatment apparatus, a control method for a wastewater treatment apparatus, a computer program, and the like. [Brief explanation of the drawing]

[0042] [Figure 1] This is a schematic diagram showing a wastewater treatment device as one embodiment. [Figure 2] This is a schematic diagram of the wastewater treatment system 1000. [Figure 3] This is a flowchart showing an example of control processing. [Figure 4] This is a timing chart showing the changes in the state of water treatment tanks 130-160. [Figure 5] (A)-(C) are schematic diagrams showing the respective states of water treatment tanks 130-160. [Figure 6] (A) and (B) are schematic diagrams showing the respective states of water treatment tanks 130 and 160. [Figure 7] This is a flowchart showing an example of the scheduling process. [Figure 8] This is a flowchart showing an example of a scheduled execution process. [Figure 9] This is a schematic diagram of another embodiment of the wastewater treatment system. [Figure 10] This is a timing chart showing the changes in the state of water treatment tanks 130, 140, and 160. [Figure 11] This is a schematic diagram showing another embodiment of the wastewater treatment device. [Figure 12] This is a schematic diagram of the wastewater treatment system 1000d in this embodiment. [Modes for carrying out the invention]

[0043] A. First Example: A1. Equipment configuration: Figure 1 is a schematic diagram showing a wastewater treatment device as one embodiment. The figure shows the wastewater treatment device 100 viewed from the side. The wastewater treatment device 100 of this embodiment treats wastewater from general households, etc. (such a device is also called a "septic tank"). The wastewater treatment device 100 has a body 200. The body 200 houses an aeration screen 110, a flow rate adjustment tank 120, a contaminant removal tank 130, a first filtration tank 140, an aerobic filter bed tank 150, a second filtration tank 160, a disinfection tank 170, a discharge pump tank 180, and a sludge storage tank 190. The body 200 has multiple walls (including partition walls 201-208) that form these water treatment tanks 110-190. The partition walls 201-208 each separate two adjacent water treatment tanks.

[0044] The wastewater flowing into the wastewater treatment device 100 flows into the aeration-type screen 110. The aeration-type screen 110 has a screen 111 with an aeration device that removes large solid objects. The water that has passed through the screen 111 flows into the flow rate adjustment tank 120 through an opening 113 formed in the first partition wall 201 between the water treatment tanks 110 and 120.

[0045] The flow rate adjustment tank 120 is a water treatment tank that adjusts the amount of water per unit time transferred to the downstream water treatment tank (in this case, the impurity removal tank 130). The flow rate adjustment tank 120 has a pump 121 (for example, an electric pump) and a metering and adjustment device 122. The pump 121 transfers the water in the flow rate adjustment tank 120 to the metering and adjustment device 122. A transfer pipe 123 is connected to the metering and adjustment device 122. The metering and adjustment device 122 supplies a metered portion of the transferred water to the transfer pipe 123. The transfer pipe 123 transfers water from the metering and adjustment device 122 to the impurity removal tank 130. In the embodiment shown in Figure 1, a sludge storage tank 190 is located between the flow rate adjustment tank 120 and the impurity removal tank 130. The transfer pipe 123 penetrates the second partition wall 202 between the water treatment tanks 120 and 190, and the third partition wall 203 between the water treatment tanks 190 and 130. Excess water from the water transferred to the metering and adjustment device 122 returns to the flow rate adjustment tank 120. The flow rate adjustment tank 120 is equipped with an agitator (not shown) for agitating the water inside the tank. The agitator may be, for example, an aeration device that discharges bubbles using air from a blower (not shown).

[0046] The impurity removal tank 130 is a water treatment tank that separates solid matter by sedimentation. Such a water treatment tank is also called a sedimentation tank. Hereafter, the impurity removal tank 130 will also be referred to as the sedimentation tank 130. The sedimentation tank 130 has an inlet baffle 131, an advection baffle 132, and an aeration device 139. The baffles 131 and 132 are fixed to the wall forming the sedimentation tank 130 (in this embodiment, the inlet baffle 131 is fixed to the third partition wall 203, and the advection baffle 132 is fixed to the fourth partition wall 204 between the water treatment tanks 130 and 140). Water from the transfer pipe 123 flows into the area surrounded by the inlet baffle 131. The inlet baffle 131 moves the water downward and guides it into the sedimentation tank 130. The advection baffle 132 moves the water in the sedimentation tank 130 upward and guides it to the downstream water treatment tank (in this embodiment, the first filtration tank 140). In this embodiment, the water in the area surrounded by the advection baffle 132 flows into the first filtration tank 140 through the opening 133 formed in the fourth partition wall 204. The inlet baffle 131 and the advection baffle 132 suppress the stirring of the water in the sedimentation tank 130 and the short-circuiting of the water passing through the sedimentation tank 130. Solid matter is separated by sedimentation in the sedimentation tank 130. The aeration device 139 has multiple holes for discharging bubbles and is located at the bottom of the sedimentation tank 130 (hereinafter also referred to as the sedimentation tank aeration device 139). The sedimentation tank aeration device 139 is used to stir the water in the sedimentation tank 130 (details will be described later).

[0047] The first filtration tank 140 is a water treatment tank for filtering and separating solid matter. The first filtration tank 140 includes an inlet baffle 141, a first filtration section 147, a first support section 146 that supports the first filtration section 147 from below, and a first aeration device 149 positioned lower than the first support section 146. The inlet baffle 141 is fixed to the wall forming the first filtration tank 140 (in this embodiment, the fourth partition wall 204). Water from the opening 133 flows into the area surrounded by the inlet baffle 141. The inlet baffle 141 directs the water to the portion of the first filtration tank 140 lower than the first support section 146. The water moves upward through the first support section 146 and the first filtration section 147. The first filtration section 147 captures solid matter contained in the water. The water that has passed through the first filtration section 147 flows into the aerobic filter bed tank 150 through an opening 143 formed in the fifth partition wall 205 between the water treatment tanks 140 and 150.

[0048] The first filtration section 147 includes a plurality of first filtration carriers 148 (also simply referred to as the first carrier 148). The first carrier 148 is a granular material. In this embodiment, the first carrier 148 is formed of a resin-containing material (for example, a polypropylene-containing material) and has a cylindrical shape. The first support section 146 is a plate member having a plurality of through holes smaller than the first carrier 148. The first support section 146 allows water to pass through but prevents the first carrier 148 from passing through. In this embodiment, the first support section 146 is a mesh formed of a resin-containing material (for example, polypropylene, polyethylene, fiber-reinforced plastic (FRP), dicyclopentadiene, etc.). The first support section 146 is fixed to the walls (partition walls 204, 205 in this embodiment) that form the first filtration tank 140.

[0049] In this embodiment, the specific gravity of the first carrier 148 is greater than 1. Therefore, multiple first carriers 148 descend in the water and accumulate on the first support portion 146. The entirety of the multiple first carriers 148 accumulated on the first support portion 146 forms the first filtration portion 147. When the water in the first filtration tank 140 flows, the first carriers 148 can flow with the water. For example, the specific gravity of the first carrier 148 is greater than 1.0 and less than or equal to 1.2.

[0050] The first aeration device 149 has multiple holes for discharging bubbles. The first aeration device 149 is used to agitate the water in the first filtration tank 140 with the multiple first carriers 148 (details will be described later). The first filtration tank 140 is not provided with any member (e.g., a mesh lid member) to prevent the multiple first carriers 148 from moving upward. That is, the top of the first filtration tank 140 is open. However, the openings 133 and 143 are provided with a member (e.g., a mesh) having multiple through holes smaller than the first carriers 148 to allow water to pass through but prevent the first carriers 148 from passing through (not shown).

[0051] The aerobic filter bed tank 150 is a water treatment tank that performs aerobic treatment of wastewater using aerobic microorganisms. The aerobic filter bed tank 150 has a filter bed 158 for holding aerobic microorganisms and an aeration device 159 positioned lower than the filter bed 158. The filter bed 158 is fixed to the walls forming the aerobic filter bed tank 150 (in this embodiment, the fifth partition wall 205 and the sixth partition wall 206 between the water treatment tanks 150 and 160). In this embodiment, the filter bed 158 is a mesh section having a three-dimensional mesh structure made of a resin-containing material (e.g., polypropylene, polyethylene, etc.) and has multiple intertwined wires. Note that the filter bed 158 is not limited to a mesh section and may include various shapes such as plate sections. The aeration device 159 has multiple holes for discharging bubbles. Air is supplied to the aeration device 159 by a blower (not shown). The bubbles discharged from the aeration device 159 agitate the water in the aerobic filter bed tank 150 and supply oxygen to the water. Aerobic microorganisms attached to the filter bed 158 use the oxygen to perform aerobic treatment. Hereinafter, the aeration device 159 will also be referred to as the aerobic aeration device 159. The aerobically treated water flows into the second filter tank 160 through the opening 153 formed in the sixth partition wall 206.

[0052] The second filtration tank 160 is a water treatment tank that filters and separates solid matter. The configuration of the second filtration tank 160 is similar to that of the first filtration tank 140. The second filtration tank 160 has an inlet baffle 161, a second filtration section 167, a second support section 166 that supports the second filtration section 167 from below, and a second aeration device 169 positioned lower than the second support section 166. The inlet baffle 161 is fixed to the wall (in this embodiment, the sixth partition wall 206) that forms the second filtration tank 160. Water from the opening 153 flows into the area surrounded by the inlet baffle 161. The inlet baffle 161 directs the water to the part of the second filtration tank 160 lower than the second support section 166. The water moves upward through the second support section 166 and the second filtration section 167. The second filtration section 167 captures solid matter contained in the water. The water that has passed through the second filtration section 167 flows into the disinfection tank 170 through an opening 163 formed in the seventh partition wall 207 between the water treatment tanks 160 and 170.

[0053] The second filtration section 167 includes a plurality of second filtration carriers 168 (also simply referred to as the second carrier 168). The second support section 166 is a plate member having a plurality of through holes smaller than the second carriers 168. The second support section 166 allows water to pass through but prevents the passage of the second carriers 168. In this embodiment, the second support section 166 is a mesh made of a resin-containing material, similar to the first support section 146. The second support section 166 is fixed to the walls (partition walls 206, 207 in this embodiment) that form the second filtration tank 160.

[0054] The second filtration section 167 is configured to capture finer solid particles compared to the first filtration section 147. In this embodiment, the second carrier 168 is the same as the first carrier 148. The volume V2 of the second filtration section 167 (i.e., the volume of the multiple second carriers 168) is larger than the volume V1 of the first filtration section 147 (i.e., the volume of the multiple first carriers 148). In other words, the total number of second carriers 168 forming the second filtration section 167 is greater than the total number of first carriers 148 forming the first filtration section 147. With this configuration, the first filtration tank 140 is capable of capturing relatively large solid particles, and the second filtration tank 160 is capable of capturing relatively small solid particles.

[0055] The second aeration device 169 has multiple holes for discharging bubbles. The second aeration device 169 is used to agitate the water in the second filtration tank 160 with the multiple second carriers 168 (details will be described later). The second filtration tank 160 is not provided with any member (e.g., a mesh lid member) to prevent the multiple second carriers 168 from moving upward. That is, the top of the second filtration tank 160 is open. However, the openings 153 and 163 are provided with a member (e.g., a mesh) having multiple through holes smaller than the second carriers 168 to allow water to pass through but prevent the second carriers 168 from passing through (not shown).

[0056] The disinfection tank 170 contains a disinfectant 171, which disinfects the water flowing into the disinfection tank 170. The disinfected water flows into the discharge pump tank 180 through an opening 173 formed in the eighth partition wall 208 between the water treatment tanks 170 and 180.

[0057] The discharge pump tank 180 has a discharge pump 181 (for example, an electric pump). The discharge pump 181 transfers the water in the discharge pump tank 180 to the outside of the wastewater treatment device 100.

[0058] The wastewater treatment device 100 has four airlift pumps 310-340. The first airlift pump 310 transfers water from the first filtration tank 140 to the sludge storage tank 190. The first suction port 311 of the first airlift pump 310 is located lower than the first filtration section 147 (i.e., the first support section 146) in the first filtration tank 140.

[0059] In this embodiment, the first airlift pump 310 extends from the first filtration tank 140 to the aerobic filter bed tank 150 by penetrating the fifth partition wall 205 at a first position P1 lower than the first support portion 146. The first airlift pump 310 then extends within the aerobic filter bed tank 150 from the first position P1 to a position higher than the water level WL5 (the water level WL5 is the water level in the aerobic filter bed tank 150 during normal operation). This is because if the first airlift pump 310 were to extend upward through the first support portion 146 within the first filtration tank 140, the manufacturing burden to make the gap between the first support portion 146 and the first airlift pump 310 smaller than the first carrier 148 would be significant. However, the first airlift pump 310 may be configured to penetrate the first support portion 146 without penetrating the fifth partition wall 205.

[0060] The second airlift pump 320 is a pump for transferring water from the second filtration tank 160 to the sludge storage tank 190. The second suction port 321 of the second airlift pump 320 is located lower than the second filtration section 167 (i.e., the second support section 166) in the second filtration tank 160.

[0061] In this embodiment, the second airlift pump 320 extends from the second filtration tank 160 to the aerobic filter bed tank 150 by penetrating the sixth partition wall 206 at a second position P2 lower than the second support portion 166. The second airlift pump 320 then extends within the aerobic filter bed tank 150 from the second position P2 to a position higher than the water level WL5. This is because if the second airlift pump 320 were to extend upward through the second support portion 166 within the second filtration tank 160, the manufacturing burden to make the gap between the second support portion 166 and the second airlift pump 320 smaller than the second carrier 168 would be significant. However, the second airlift pump 320 may be configured to penetrate the second support portion 166 without penetrating the sixth partition wall 206.

[0062] The airlift pump 330 is a pump for transferring water from the sedimentation tank 130 to the sludge storage tank 190 (also called the sedimentation tank airlift pump 330). The third suction port 331 of the sedimentation tank airlift pump 330 is located in the lower part 130L of the sedimentation tank 130. The lower part 130L is determined using the water level in the sedimentation tank 130 as follows: In the diagram, water level WL3 is the water level in the sedimentation tank 130 during normal operation. The intermediate water level WLM is half the water level of this water level WL3. The lower part 130L is the portion of the sedimentation tank 130 below the intermediate water level WLM.

[0063] The three airlift pumps 310, 320, and 330 are all connected to the transfer pipe 390. The transfer pipe 390 transfers water from the airlift pumps 310, 320, and 330 to the sludge storage tank 190.

[0064] The sludge storage tank 190 is a water treatment tank for storing solid matter. The sludge storage tank 190 has an inlet baffle 191 and an advection baffle 192. The baffles 191 and 192 are fixed to the walls forming the sludge storage tank 190 (in this embodiment, the inlet baffle 191 is fixed to the third partition wall 203, and the advection baffle 192 is fixed to the second partition wall 202). Water from the transfer pipe 390 flows into the area surrounded by the inlet baffle 191. The inlet baffle 191 moves the water downward and guides it into the sludge storage tank 190. The advection baffle 192 moves the water in the sludge storage tank 190 upward and guides it into another water treatment tank (in this embodiment, the flow rate adjustment tank 120). In this embodiment, water in the area surrounded by the advection baffle 192 flows into the flow rate adjustment tank 120 through the opening 193 formed in the second partition wall 202. The inflow baffle 191 and the advection baffle 192 suppress the stirring of water in the sludge storage tank 190 and the short-circuiting of water passing through the sludge storage tank 190. Solid matter is separated by sedimentation in the sludge storage tank 190.

[0065] The airlift pump 340 is a pump for transferring water from the aerobic filter bed tank 150 to the first filter tank 140. The airlift pump 340 circulates water between the first filter tank 140 and the aerobic filter bed tank 150 (it is also called a circulating airlift pump 340). The suction port 341 of the circulating airlift pump 340 is located in a part of the aerobic filter bed tank 150 that is lower than the filter bed 158. The circulating airlift pump 340 transfers the water pumped up from the aerobic filter bed tank 150 to the area of ​​the first filter tank 140 surrounded by the inlet baffle 141.

[0066] Figure 2 is a schematic diagram of the wastewater treatment system 1000. The wastewater treatment system 1000 includes a wastewater treatment device 100, a blower 700, and a control device 600. The blower 700 is a device that discharges air. The blower 700 may include various types of pumps, such as a diaphragm pump or a rotary pump. In addition to the configuration described in Figure 1, the wastewater treatment device 100 includes four valves 510-540 and pipes 511-513, 518, 519, 521-523, 528, 529, 535, 536, and 590.

[0067] Pipe 590 is a pipe that should be connected to the blower 700 (also called the blower pipe 590). The blower 700 is connected to the blower pipe 590 via an outer pipe 710 located outside the wastewater treatment device 100. The blower 700 supplies air to the blower pipe 590.

[0068] Airlift pumps 310, 320, and 330 are connected to pipes 511, 512, and 513, respectively (also called auxiliary pump air supply pipes 511, 512, and 513). The auxiliary pump air supply pipes 511, 512, and 513 are connected to pipe 518 (also called main pump air supply pipe 518). The main pump air supply pipe 518 and the blower pipe 590 are connected by a first connecting pipe 519. A first valve 510 (also called transfer valve 510) is provided in the flow path of the first connecting pipe 519.

[0069] The first aeration device 149, the second aeration device 169, and the sedimentation tank aeration device 139 are connected to pipes 521, 522, and 523, respectively (also called auxiliary aeration supply pipes 521, 522, and 523). The auxiliary aeration supply pipes 521, 522, and 523 are connected to pipe 528 (also called the main aeration supply pipe 528). The main aeration supply pipe 528 and the blower pipe 590 are connected by a second connecting pipe 529. A second valve 520 (also called a stirring valve 520) is provided in the flow path of the second connecting pipe 529.

[0070] A pipe 536 is connected to the aerobic diffuser 159 (also called the aerobic diffuser supply pipe 536). The aerobic diffuser supply pipe 536 is connected to the blower pipe 590. A valve 530 is provided in the flow path of the aerobic diffuser supply pipe 536 (also called the aerobic valve 530).

[0071] A pipe 535 (also called the aerobic pump supply pipe 535) is connected to the circulating airlift pump 340. The aerobic pump supply pipe 535 is connected to the portion of the aerobic diffuser supply pipe 536 between the aerobic diffuser 159 and the aerobic valve 530. A valve 540 (also called the circulation valve 540) is provided in the flow path of the aerobic pump supply pipe 535. The circulation valve 540 is a manual valve. The user (for example, the administrator of the wastewater treatment system 1000) can adjust the amount of water transferred per unit time by the circulating airlift pump 340 by adjusting the opening of the circulation valve 540.

[0072] Each of the valves 510, 520, and 530 has an electrically controllable actuator (e.g., a solenoid), and the state of the valves is controlled by the actuator. The valves 510, 520, and 530 are controlled by the control device 600. In this embodiment, the state of each of the valves 510, 520, and 530 is controlled to either a closed state or an open state.

[0073] The control device 600 is a device that electrically controls various devices, such as a PLC (Programmable Logic Controller). The control device 600 includes a processor 610, a volatile memory device 620, a non-volatile memory device 630, an output device 640, an input device 650, and an interface 690.

[0074] The processor 610 is a device configured to perform data processing, such as a CPU. The volatile memory device 620 is, for example, a DRAM, and the non-volatile memory device 630 is, for example, a flash memory. The non-volatile memory device 630 stores the control program 631. The output device 640 is a device configured to output information, such as a lamp, liquid crystal display, or organic EL display. The input device 650 is a device configured to receive user input, such as a button, lever, or touch panel. The interface 690 is an interface for connecting other devices. The interface 690 has, for example, a plurality of input terminals and a plurality of output terminals. In this embodiment, each actuator of the valves 510-530 is connected to an output terminal associated with the valve.

[0075] In this embodiment, the control device 600 controls the state of each of the valves 510-530. The blower 700 is assumed to operate continuously. Alternatively, the control device 600 may operate the blower 700 intermittently.

[0076] A2. Control processing: Figure 3 is a flowchart illustrating an example of the control process. Figure 4 is a timing chart showing the changes in the state of the water treatment tanks 130-160 (specifically, the states of transfer, stirring, aeration, and circulation). The hatched periods indicate the operating periods. The processor 610 of the control device 600 executes the process shown in Figure 3 according to the control program 631.

[0077] In S100, the processor 610 performs normal operation. Normal operation is an operating mode in which each of the water treatment tanks 110-190 continues to perform water treatment. In this embodiment, the processor 610 maintains the transfer valve 510 in a closed state, the stirring valve 520 in a closed state, and the aerobic valve 530 in an open state.

[0078] Figures 5(A)-5(C), 6(A), and 6(B) are schematic diagrams showing the respective states of water treatment tanks 130-160. Each figure shows a schematic diagram of water treatment tanks 130-160, similar to that in Figure 1. Water levels WL3-WL6 indicate the respective water levels in water treatment tanks 130-160.

[0079] Figure 5(A) shows the normal operating state. In normal operation, the state of each tank 130-160 is as follows: Since the transfer valve 510 (Figure 2) is in the closed state, the airlift pumps 310-330 are stopped. Since the stirring valve 520 is in the closed state, the diffusers 139, 149, and 169 are stopped. In the impurity removal tank 130, solid matter is separated from the water. Floating solid matter 431 may accumulate near the water surface in the impurity removal tank 130 (also called scum). Descending solid matter 432 may accumulate at the bottom of the impurity removal tank 130. The water treated in the sedimentation tank 130 flows into the first filtration tank 140.

[0080] In the first filtration tank 140, water passes through the first filter carrier 148. The first filter carrier 148 captures solid matter 441. The water treated in the first filtration tank 140 flows into the aerobic filter bed tank 150.

[0081] In the aerobic filter bed tank 150, the aerobic valve 530 is in the open position, so the aerobic diffuser 159 discharges bubbles, and the circulating airlift pump 340 transfers water from the aerobic filter bed tank 150 to the first filtration tank 140. The bubbles discharged by the aerobic diffuser 159 supply oxygen to the water in the aerobic filter bed tank 150 and cause the water in the aerobic filter bed tank 150 to flow. In this way, the aerobic filter bed tank 150 performs aerobic treatment on the water. In addition, solid matter in the aerobic filter bed tank 150 is transferred to the first filtration tank 140 along with the water by the circulating airlift pump 340. The water treated in the aerobic filter bed tank 150 flows into the second filtration tank 160.

[0082] In the second filtration tank 160, water passes through the second filtration carrier 168. The second filtration carrier 168 captures solid matter 461. The water treated in the second filtration tank 160 flows into the disinfection tank 170 (Figure 1).

[0083] The other water treatment tanks 110, 120, and 170-190 (Figure 1) perform their respective water treatments as explained in Figure 1. As described above, under normal operation, each of the water treatment tanks 110-190 continuously performs water treatment.

[0084] In this embodiment, the control device 600 is configured to continue normal operation. The control device 600 is also configured to periodically execute a specific process. The process S900 shown in Figure 3 is an example of a specific process. In this embodiment, the specific process S900 includes steps S110-S190. The first time T1 in Figure 4 is the start time of the specific process. In this embodiment, the control device 600 starts the specific process S900 at a predetermined first time T1 (the control device 600 executes the specific process S900 once a day).

[0085] In S110 (Figure 3), the processor 610 opens the transfer valve 510 and closes the aerobic valve 530. The stirring valve 520 is kept in the closed state. As a result, the processor 610 executes the first transfer process S120. Figure 5(B) shows the state during the first transfer process S120. Since the aerobic valve 530 is in the closed state, the aerobic diffuser 159 and the circulating airlift pump 340 of the aerobic filter bed tank 150 are stopped. Since the transfer valve 510 is in the open state, the airlift pumps 310, 320, and 330 transfer water from the water treatment tanks 140, 160, and 130 to the sludge storage tank 190. As a result, the water levels WL3, WL4, and WL6 in the water treatment tanks 130, 140, and 160 decrease, respectively.

[0086] The reasons for lowering the water levels WL3, WL4, and WL6 are as follows. As will be described later, after the first transfer process S120, a stirring process S140 is performed to agitate the water in the water treatment tanks 130, 140, and 160. Due to the agitation of the water, the water in the water treatment tanks 130, 140, and 160 may flow out to another water treatment tank through openings (for example, openings 133, 143, 153, and 163 (Figure 1)). Lowering the water levels WL3, WL4, and WL6 by the first transfer process S120 reduces the possibility of water leakage. As shown in Figure 4, the processor 610 continues the first transfer process S120 for a first duration DT1 from the first time T1 to the second time T2. The first duration DT1 is experimentally determined in advance so that the water levels WL3, WL4, and WL6 fall to a level where water does not leak out during the stirring process S140 (for example, 10 seconds or more and 5 minutes or less). The first duration DT1 is preferably determined such that water does not flow from the second filtration tank 160 to the disinfection tank 170 during the stirring process S140.

[0087] As the first duration DT1 elapses from the first time T1, the processor 610 operates the valves (S130 (Figure 3)). The processor 610 closes the transfer valve 510 and opens the stirring valve 520. The aerobic valve 530 is kept in the closed state. As a result, the processor 610 performs the stirring process S140. Figure 5(C) shows the state during the stirring process S140. Since the transfer valve 510 is in the closed state, the airlift pumps 310, 320, and 330 are stopped. Since the stirring valve 520 is in the open state, the diffusers 139, 149, and 169 agitate the water in the water treatment tanks 130, 140, and 160 by discharging bubbles. In the impurity removal tank 130, the flowing water agitates the solid matter 433. The solid matter 433 includes floating solid matter 431 (Figure 5(B)) and settled solid matter 432. In the first filtration tank 140, the flowing water agitates the multiple first carriers 148 and the captured solid matter 441. As the multiple first carriers 148 flow, the solid matter captured by the first carriers 148 separates from the first carriers 148. In the second filtration tank 160, the flowing water agitates the multiple second carriers 168 and the captured solid matter 461. As the multiple second carriers 168 flow, the solid matter captured by the second carriers 168 separates from the second carriers 168. The process of separating solid matter attached to components in a water treatment tank (e.g., carriers 148, 168) from those components by using a water flow in a direction different from the direction of water flow during normal operation is also called backwashing.

[0088] As shown in Figure 4, the processor 610 continues the stirring process S140 for a second duration DT2 from the second time T2 to the third time T3. The second duration DT2 is determined experimentally in advance to ensure that the solids 433, 441, and 461 in the water treatment tanks 130, 140, and 160 are sufficiently stirred (for example, between 10 seconds and 5 minutes).

[0089] As the second duration DT2 elapses from the second time T2, the processor 610 operates the valves (S150 (Figure 3)). The processor 610 closes the stirring valve 520 and opens the aerobic valve 530. The state of the transfer valve 510 is maintained in the closed state. As a result, the processor 610 performs the sedimentation treatment S160. Figure 6(A) shows the state during the sedimentation treatment S160. The airlift pumps 310-330 and the diffusers 139, 149, and 169 are stopped. Therefore, the water is left to stand in the impurity removal tank 130, the first filtration tank 140, and the second filtration tank 160. As a result, the stirred solids 433, 441, and 461 settle at the bottom of these water treatment tanks 130, 140, and 160. At the bottom of the water treatment tanks 130, 140, and 160, the concentrations of solids 433, 441, and 461 become higher. In the first filtration tank 140, multiple first carriers 148 accumulate on the first support portion 146. In the second filtration tank 160, multiple second carriers 168 accumulate on the second support portion 166. Since the aerobic valve 530 is in the open state, the blower 700 (Figure 2) can continue to operate properly (in this embodiment, aerobic treatment is performed in the aerobic filter bed tank 150 in the same manner as in Figure 5(A)).

[0090] As shown in Figure 4, the processor 610 continues the sedimentation process S160 for a third duration DT3, from the third time T3 to the fourth time T4. The third duration DT3 is determined experimentally in advance (for example, more than 1 minute and less than 1 hour) so that the solids 433, 441, and 461 in the water treatment tanks 130, 140, and 160 can settle sufficiently.

[0091] As the third duration DT3 elapses from the third time point T3, the processor 610 operates the valves (S170 (Figure 3)). The processor 610 opens the transfer valve 510 and closes the aerobic valve 530. The stirring valve 520 is maintained in the closed state. As a result, the processor 610 executes the second transfer process S180. Figure 6(B) shows the state during the second transfer process S180. Since the transfer valve 510 is in the open state, the airlift pumps 310-330 transfer the water from the water treatment tanks 140, 160, and 130 to the sludge storage tank 190. As a result, the solid matter 433, 441, and 461 settled at the bottom of the water treatment tanks 130, 140, and 160 is transferred to the sludge storage tank 190.

[0092] As shown in Figure 4, the processor 610 continues the second transfer process S180 for a fourth duration DT4 from the fourth time T4 to the fifth time T5. The fourth duration DT4 is determined experimentally in advance to allow for the transfer of a sufficient amount of solid material 433, 441, and 461 (for example, between 30 seconds and 5 minutes).

[0093] As explained in Figure 1, solid matter is separated by sedimentation in the sludge storage tank 190. Therefore, the sludge storage tank 190 can properly store the solid matter transferred from the water treatment tanks 130, 140, and 160. The water treated in the sludge storage tank 190 flows into the flow rate adjustment tank 120. The water in the flow rate adjustment tank 120 is transferred in small amounts to the impurity removal tank 130 via the metering and adjustment device 122. In this embodiment, during treatment S120-S180, the rise in water levels WL3, WL4, and WL6 in the water treatment tanks 130, 140, and 160 due to the water transferred from the flow rate adjustment tank 120 is small enough that the water in the water treatment tanks 130, 140, and 160 does not flow out of the openings (for example, openings 133, 143, 153, and 163 (Figure 1)).

[0094] As the fourth duration DT4 elapses from the fourth time point T4, the processor 610 operates the valves (S190 (Figure 3)). The processor 610 closes the transfer valve 510 and opens the aerobic valve 530. The stirring valve 520 remains in the closed state. As a result, the processor 610 completes the specific process S900 and starts normal operation (S200).

[0095] As described above, the wastewater treatment device 100 of this embodiment (Figure 1) has a plurality of water treatment tanks 110-190, including a first filtration tank 140, an aerobic filter bed tank 150 which is an example of an aerobic treatment tank located downstream of the first filtration tank 140, and a second filtration tank 160 located downstream of the aerobic filter bed tank 150. The aerobic filter bed tank 150 has a filter bed 158 which is an example of a fixed bed. Water from which solid matter has been separated by the first filtration tank 140 flows into the aerobic filter bed tank 150. That is, the amount of solid matter flowing into the aerobic filter bed tank 150 is reduced by the first filtration tank 140. In addition, since the aerobic filter bed tank 150 has a fixed bed (in this case, a filter bed 158), the possibility of crushing of solid matter flowing into the aerobic filter bed tank 150 is reduced. If the aerobic filter bed tank 150 has multiple carriers that flow with water, the flowing carriers may crush the solids upon contact. In this embodiment, the aerobic filter bed tank 150 does not have such carriers, so such crushing of solids is avoided. Furthermore, since the possibility of crushing of solids in the aerobic filter bed tank 150 is reduced, the second filtration tank 160 can easily capture solids contained in the water from the aerobic filter bed tank 150. If solids are crushed in the aerobic filter bed tank 150, the crushed and smaller solids may not be captured by the second filtration section 167 of the second filtration tank 160 and may flow downstream from the second filtration tank 160. In this embodiment, the possibility of solids flowing out of the second filtration tank 160 is reduced. In this way, the wastewater treatment device 100 can properly separate solids from water.

[0096] The wastewater treatment device 100 (Figure 1) includes a second airlift pump 320 and a circulating airlift pump 340. The second airlift pump 320 is configured to transfer water from the second filtration tank 160 to the sludge storage tank 190. The second filtration tank 160 is located downstream of the aerobic filter bed tank 150. The second filtration tank 160 is an example of a "first target tank which is either an aerobic treatment tank or a water treatment tank located downstream of the aerobic treatment tank." The sludge storage tank 190 is a storage tank for storing solids. The sludge storage tank 190 is an example of a "second target tank which is either a first filtration tank, a water treatment tank located upstream of the first filtration tank, a storage tank for storing solids, or an anaerobic treatment tank." The second airlift pump 320 is an example of a target transfer device configured to transfer water from the first target tank to the second target tank. Furthermore, the circulating airlift pump 340 is configured to transfer water from the aerobic filter bed tank 150 to the first filtration tank 140. The aerobic filter bed tank 150 is an example of the first target tank described above. The first filtration tank 140 is an example of the second target tank described above. The circulating airlift pump 340 is an example of a target transfer device configured to transfer water from the first target tank to the second target tank. Generally, a wastewater treatment device having an aerobic treatment tank discharges the water treated by the aerobic treatment tank to the outside of the wastewater treatment device. The target transfer devices 320 and 340 can transfer solid matter along with water from the aerobic filter bed tank 150, or a water treatment tank located downstream of the aerobic filter bed tank 150, to the second target tank. Therefore, the wastewater treatment device 100 can reduce the amount of solid matter contained in the water of the aerobic filter bed tank 150 or a water treatment tank located downstream of the aerobic filter bed tank 150, and consequently, the amount of solid matter contained in the water discharged outside the wastewater treatment device 100.

[0097] The wastewater treatment device 100 (Figure 1) has multiple water treatment tanks 110-190, which include a disinfection tank 170 following the second filtration tank 160. Thus, there is no other water treatment tank between the second filtration tank 160 and the disinfection tank 170. For example, there is no treated water tank for temporarily storing water from the second filtration tank 160. Therefore, the wastewater treatment device 100 can be miniaturized.

[0098] The first filtration tank 140 (Figure 1) has a first filtration section 147 containing a plurality of first carriers 148. The second filtration tank 160 has a second filtration section 167 containing a plurality of second carriers 168. The second carriers 168 of the second filtration section 167 are the same as the first carriers 148 of the first filtration section 147. If the carriers were different between the first filtration section 147 and the second filtration section 167, the wrong carrier could be used in the manufacture of either the first filtration section 147 or the second filtration section 167. For example, the second carrier 168 could be mistakenly placed in the first filtration tank 140. In this embodiment, since the same carrier forms both the first filtration section 147 and the second filtration section 167, such problems can be avoided.

[0099] The volume V2 of the multiple second carriers 168 in the second filtration section 167 (Figure 1) is larger than the volume V1 of the multiple first carriers 148 in the first filtration section 147. With this configuration, the first filtration tank 140 can capture relatively large solids, and the second filtration tank 160 can capture relatively small solids. Therefore, the wastewater treatment device 100 can properly separate solids.

[0100] The volume of multiple carriers can be measured as follows: Prepare a container that forms a rectangular prism-shaped containment space. Place this container so that the rectangular base that forms the bottom of the containment space is horizontal. Place multiple carriers into this container. Inside the container, the multiple carriers may form a peak portion with a higher height from the base and a valley portion with a lower height. Reduce the variation in height from the base by moving the multiple carriers in the peak portion to the valley portion. The variation in height may also be reduced by vibrating the container. As a result, the multiple carriers form an approximately horizontal top surface. Place a flat plate lid, which has an approximately rectangular shape the same as the rectangular base, on top of the multiple carriers inside the container. Place the flat plate lid on the multiple carriers while maintaining a state parallel to the base. In this state, the volume of the rectangular prism enclosed by the container and the flat plate lid can be used as the volume of the multiple carriers.

[0101] As explained in Figure 1, the top of the first filtration tank 140 is open, and the top of the second filtration tank 160 is also open. Therefore, the complexity of manufacturing the first filtration tank 140 and the second filtration tank 160 can be reduced. For example, the step of fixing lid members to the first filtration tank 140 and the second filtration tank 160 can be omitted. Also, the specific gravity of the first carrier 148 in the first filtration section 147 is greater than 1, and the specific gravity of the second carrier 168 in the second filtration section 167 is greater than 1. Therefore, the possibility of the first carrier 148 flowing out from the top of the first filtration tank 140 and the possibility of the second carrier 168 flowing out from the top of the second filtration tank 160 are reduced.

[0102] As shown in Figure 1, the first airlift pump 310 has a first suction port 311 located in the first filtration tank 140. The second airlift pump 320 has a second suction port 321 located in the second filtration tank 160. As shown in Figure 2, the first airlift pump 310 is connected to a first sub-pump air supply pipe 511, and the second airlift pump 320 is connected to a second sub-pump air supply pipe 512. These sub-pump air supply pipes 511 and 512 are connected to the main pump air supply pipe 518. These pump air supply pipes 511, 512, and 518 together are an example of a pump connecting pipe (referred to as pump connecting pipe 517) that connects the first airlift pump 310 and the second airlift pump 320. The first connecting pipe 519 connects the blower pipe 590 to the pump connecting pipe 517 (specifically, the main pump air supply pipe 518). A first valve 510 is provided in the flow path of the first connecting pipe 519. No valves are provided in the flow path of the pump connecting pipes 517 (511, 512, 518) from the first airlift pump 310 to the second airlift pump 320. Therefore, the first airlift pump 310 and the second airlift pump 320 cannot operate independently. The airlift pumps 310 and 320 simultaneously transfer water from the first filtration tank 140 and water from the second filtration tank 160. In this way, the transfer of water from the first filtration tank 140 and the transfer of water from the second filtration tank 160 proceed simultaneously. The airlift pumps 310 and 320, the pipes 517 (511, 512, 518) and 519, and the first valve 510 together constitute an example of a first transfer device (also called the first transfer device 910) configured to transfer water from both the first filtration tank 140 and the second filtration tank 160. Here, the destination of the water transferred from the first filtration tank 140 is a different water treatment tank (in this embodiment, a sludge storage tank 190). The destination of the water transferred from the second filtration tank 160 is a different water treatment tank (in this embodiment, a sludge storage tank 190).

[0103] As shown in Figure 1, the first aeration device 149 is located inside the first filtration tank 140. The second aeration device 169 is located inside the second filtration tank 160. As shown in Figure 2, the first aeration device 149 is connected to the first auxiliary aeration supply pipe 521, and the second aeration device 169 is connected to the second auxiliary aeration supply pipe 522. These auxiliary aeration supply pipes 521 and 522 are connected to the main aeration supply pipe 528. The entire set of these aeration supply pipes 521, 522, and 528 is an example of an aeration connecting pipe (referred to as the aeration connecting pipe 527) that connects the first aeration device 149 and the second aeration device 169. The second connecting pipe 529 connects the blower pipe 590 to the aeration connecting pipe 527 (specifically, the main aeration supply pipe 528). A second valve 520 is provided in the flow path of the second connecting pipe 529. No valves are provided in the flow path of the diffuser connecting pipes 527 (521, 522, 528) from the first diffuser 149 to the second filtration tank 160. Therefore, the first diffuser 149 and the second diffuser 169 cannot operate independently. The diffusers 149 and 169 simultaneously agitate the water in the first filtration tank 140 and the water in the second filtration tank 160. In this way, the agitation of the water in the first filtration tank 140 and the agitation of the water in the second filtration tank 160 proceed simultaneously. The entire system, comprising aeration devices 149 and 169, pipes 527 (521, 522, 528) and 529, and the second valve 520, is an example of a stirring device (also called stirring device 920) configured to simultaneously stir the water in the first filtration tank 140 and the water in the second filtration tank 160.

[0104] Thus, the wastewater treatment device 100 includes a first transfer device 910 and an agitator 920. Therefore, the wastewater treatment device 100 can reduce the amount of solids in the first filtration tank 140 and the second filtration tank 160 by agitation by the agitator 920 and transfer by the first transfer device 910. As a result, the filtration tanks 140 and 160 can continue to separate solids without the need for cleaning of the filtration tanks 140 and 160 by an operator (for example, by removing solids from the wastewater treatment device 100). Furthermore, by operating the first valve 510 and the second valve 520, the transfer of water from the first filtration tank 140 and the second filtration tank 160, and the agitation of the water in the first filtration tank 140 and the water in the second filtration tank 160 can be easily controlled. In addition, the complexity of the configuration of the wastewater treatment device 100 can be reduced. For example, in order to independently control the first airlift pump 310 and the second airlift pump 320, additional components such as a valve for the first airlift pump 310 and a valve for the second airlift pump 320 would be added. In this embodiment, such additional components can be omitted.

[0105] The wastewater treatment apparatus 100 (Figure 1) comprises several water treatment tanks 110-190, each including a sedimentation tank 130 and a sludge storage tank 190. The sedimentation tank 130 is configured to allow solid matter to settle without filtering (in this embodiment, the sedimentation tank 130 has an inlet baffle 131 and a transfer baffle 132). The sludge storage tank 190 is configured to store solid matter (in this embodiment, the sludge storage tank 190 has an inlet baffle 191 and a transfer baffle 192).

[0106] A sedimentation tank aeration device 139 is located inside the sedimentation tank 130 (Figure 1) to agitate the water inside the sedimentation tank 130. As shown in Figure 2, a third auxiliary aeration supply pipe 523 is connected to the sedimentation tank aeration device 139, and the third auxiliary aeration supply pipe 523 is connected to the main aeration supply pipe 528. The main aeration supply pipe 528 is connected to a second connecting pipe 529, and a second valve 520 is provided in the flow path of the second connecting pipe 529. The agitation of the water by the sedimentation tank aeration device 139 can be controlled by the second valve 520. The entire sedimentation tank aeration device 139, pipes 523, 528, 529, and the second valve 520 constitute an example of a sedimentation tank agitator configured to agitate the water inside the sedimentation tank 130 (also referred to as sedimentation tank agitator 930, or simply agitator 930).

[0107] The sedimentation tank airlift pump 330 (Figure 1) has a third suction port 331 located inside the sedimentation tank 130. As shown in Figure 2, a third auxiliary pump air supply pipe 513 is connected to the sedimentation tank airlift pump 330, and the third auxiliary pump air supply pipe 513 is connected to the main pump air supply pipe 518. The main pump air supply pipe 518 is connected to a first connecting pipe 519, and a first valve 510 is provided in the flow path of the first connecting pipe 519. The transfer of water by the sedimentation tank airlift pump 330 is controllable by the first valve 510. The entire sedimentation tank airlift pump 330, pipes 513, 518, 519, and the first valve 510 is an example of a second transfer device configured to transfer water from the sedimentation tank 130 to the sludge storage tank 190 (also referred to as the second transfer device 940, or simply the transfer device 940).

[0108] The wastewater treatment system 1000 (Figure 2) has a control device 600 configured to control the sedimentation tank agitator 930 and the second transfer device 940. As shown in Figure 3, the control device 600 is configured to perform a specific treatment S900. The specific treatment S900 includes an agitation treatment S140 and a second transfer treatment S180. The agitation treatment S140 includes an agitation treatment in which the sedimentation tank agitator 930 agitates the water in the sedimentation tank 130. The second transfer treatment S180, after the agitation treatment S140, includes a transfer treatment in which the second transfer device 940 transfers water containing solid matter from the sedimentation tank 130 to the sludge storage tank 190. With this configuration, the solid matter 432 that has settled in the sedimentation tank 130 (Figure 5(A)) and the solid matter 431 that has floated are agitated by the agitation treatment S140 (Figure 5(C)). Then, the second transfer treatment S180 (Figure 6(B)) is performed after the agitation treatment S140. Therefore, the sedimentation tank airlift pump 330 of the second transfer device 940 can properly transfer the solid matter 433, which includes the settled solid matter 432 and the floating solid matter 431. In addition, the sedimentation tank 130 can continue to separate the solid matter even without cleaning of the sedimentation tank 130 by an operator (for example, by drawing the solid matter out of the wastewater treatment device 100).

[0109] In this embodiment, the multiple water treatment tanks 110-190 include a first filtration tank 140. The sedimentation tank 130 is located upstream of the first filtration tank 140. The water from which solid matter has been separated by the sedimentation tank 130 flows into the first filtration tank 140. Therefore, the load on the first filtration tank 140 is reduced, and the first filtration tank 140 can perform filtration properly. For example, the possibility of blockage of the first filtration section 147 by solid matter is reduced.

[0110] In this embodiment, the control device 600 (Figure 2) is configured to control the first transfer device 910 and the stirring device 920, in addition to the sedimentation tank stirring device 930 and the second transfer device 940. The stirring process S140 (Figures 3 and 5(C)) includes a process in which the stirring device 920 stirs the water in the first filtration tank 140 and the water in the second filtration tank 160 simultaneously. The second transfer process S180 (Figure 6(B)) includes a process in which the first transfer device 910 transfers the water from the first filtration tank 140 and the water from the second filtration tank 160 simultaneously. Therefore, the air-lift pumps 310 and 320 of the first transfer device 910 can appropriately transfer the solid matter 441 from the first filtration tank 140 and the solid matter 461 from the second filtration tank 160. As a result, the filtration tanks 140 and 160 can continue to separate solids even without cleaning the filtration tanks 140 and 160 by an operator (for example, by drawing out solids from the wastewater treatment device 100).

[0111] The sedimentation tank airlift pump 330 (Figure 1) of the second transfer device 940 has a third suction port 331 located in the lower part 130L of the sedimentation tank 130. The specific treatment S900 (Figure 3) includes a sedimentation treatment S160 that is performed after the stirring treatment S140 and before the second transfer treatment S180. The sedimentation treatment S160 (Figure 6(A)) includes a sedimentation treatment that settles solid matter in the sedimentation tank 130 by stopping both the stirring by the sedimentation tank stirring device 930 and the transfer by the second transfer device 940. With this configuration, the sedimentation tank airlift pump 330 of the second transfer device 940 can transfer water with a high concentration of solid matter 433 in the second transfer treatment S180 (Figure 6(B)). Therefore, the total amount of water transferred by the sedimentation tank airlift pump 330 in one second transfer treatment S180 can be reduced. The water transferred to the sludge storage tank 190 by the sedimentation tank airlift pump 330 can generate a water flow within the sludge storage tank 190. A strong water flow can stir up settled solids into the water. These stirred-up solids, along with the water, can flow out of the sludge storage tank 190. When the total amount of water transferred is small, the water flow generated in the sludge storage tank 190 by the transferred water is weaker compared to when the total amount of water transferred is large. Consequently, the amount of solids flowing out of the sludge storage tank 190 is reduced.

[0112] The first airlift pump 310 (Figure 1) of the first transfer device 910 (Figure 2) has a first suction port 311 located in a part of the first filtration tank 140 that is lower than the first filtration section 147. The second airlift pump 320 has a second suction port 321 located in a part of the second filtration tank 160 that is lower than the second filtration section 167. The sedimentation treatment S160 (Figures 3 and 6(A)) includes a sedimentation treatment in which solid matter is settled in the filtration tanks 140 and 160 by stopping both the stirring by the agitator 920 and the transfer by the first transfer device 910. With this configuration, the airlift pumps 310 and 320 of the first transfer device 910 can transfer water with a high concentration of solid matter 441 and 461 in the second transfer treatment S180 (Figure 6(B)). Therefore, the total amount of water transferred by the airlift pumps 310 and 320 in one second transfer treatment S180 can be reduced. When the total amount of water transferred is small, the water flow in the sludge storage tank 190 generated by the transferred water becomes weaker compared to when the total amount of water transferred is large. Therefore, the amount of solid material flowing out of the sludge storage tank 190 is reduced.

[0113] As explained in Figure 4, in this embodiment, the control device 600 is configured to perform the specific treatment S900 once a day. Therefore, the amount of solid matter remaining in the sedimentation tank 130 can be reduced compared to when the specific treatment S900 is performed less frequently (for example, once every two days). Furthermore, in this embodiment, the amount of solid matter remaining in the filtration tanks 140 and 160 can be reduced.

[0114] As shown in Figure 3, the specific treatment S900 includes a first transfer treatment S120 which is performed before the stirring treatment S140. The first transfer treatment S120 includes a process of transferring water from the sedimentation tank 130 to the sludge storage tank 190 to the sedimentation tank airlift pump 330 of the second transfer device 940 (Figure 2). With this configuration, the stirring treatment of the sedimentation tank 130 (stirring treatment S140) is performed with the water level WL3 in the sedimentation tank 130 (Figure 5(C)) lowered by the transfer of water, so the possibility of solid material overflowing from the sedimentation tank 130 during the stirring treatment is reduced.

[0115] The first transfer process S120 includes a process in which the airlift pumps 310 and 320 of the first transfer device 910 (Figure 2) perform the transfer of water from the first filtration tank 140 and the transfer of water from the second filtration tank 160 simultaneously. With this configuration, the stirring process (stirring process S140) of the filtration tanks 140 and 160 (Figure 5(C)) is performed with the WL4 and WL6 of the filtration tanks 140 and 160 lowered by the transfer of water, thus reducing the possibility of solid matter overflowing from the filtration tanks 140 and 160 during the stirring process.

[0116] As shown in Figure 1, the wastewater treatment device 100 includes a flow rate adjustment tank 120 among its multiple water treatment tanks 110-190. The wastewater treatment device 100 has a second partition wall 202 that forms an opening 193. The opening 193 is an example of a flow path connecting the flow rate adjustment tank 120 and the sludge storage tank 190. Water transferred to the sludge storage tank 190 flows into the flow rate adjustment tank 120 through the opening 193 after the separation of solid matter. Therefore, the possibility of water overflowing from the sludge storage tank 190 to the wastewater treatment device 100 is reduced. The flow rate adjustment tank 120 is located upstream of the sedimentation tank 130. The flow rate adjustment tank 120 is an example of a "target tank which is either a sedimentation tank or a water treatment tank located upstream of the sedimentation tank". The opening 193 is an example of a "flow path which connects the storage tank and the target tank".

[0117] As shown in Figure 1, the wastewater treatment device 100 includes an aerobic filter bed tank 150 located downstream of the sedimentation tank 130, with the water treatment tanks 110-190 being located downstream of the sedimentation tank 130. Water from which solid matter has been separated by the sedimentation tank 130 flows into the aerobic filter bed tank 150. This reduces the load on the aerobic filter bed tank 150, allowing it to perform aerobic treatment properly. In this way, the wastewater treatment device 100 can treat wastewater properly.

[0118] B. Second example: Figure 7 is a flowchart showing an example of the schedule determination process. Figure 8 is a flowchart showing an example of the schedule execution process. The configuration of the wastewater treatment system in this embodiment is the same as that of the wastewater treatment system 1000 in the first embodiment, except that the control program 631 (Figure 2) is configured to execute these processes. In this embodiment, the control device 600 allows the user to determine a schedule that includes the number of times a specific process S900 (Figure 3) is executed per day N, and the start time for each of the N specific processes S900. The control device 600 then executes the specific process S900 according to the schedule determined by the user.

[0119] The user inputs instructions to determine the schedule by operating the input device 650 (Figure 2). In response to the instructions, the processor 610 starts the process shown in Figure 7 according to the control program 631.

[0120] In S310, the processor 610 accepts input for the number of executions N per day. The user inputs the number of executions N by operating the input device 650. The number of executions N may be any integer greater than or equal to 1. In S320, the processor 610 stores data indicating the input number of executions N in the volatile memory device 620.

[0121] In S330, the processor 610 initializes the number i to 1. In S340, the processor 610 accepts input for the start time of the i-th specific process S900. The user inputs the start time of the i-th specific process S900 by operating the input device 650. It is preferable that the specific process S900 be performed during a time when there is little wastewater flowing into the wastewater treatment device 100 (for example, from midnight to 5:00 in the morning). In S350, the processor 610 stores the data indicating the input start time in the volatile memory device 620.

[0122] In S360, the processor 610 determines whether all N start times have been determined. In this embodiment, when i = N, the determination result is Yes. When the determination result is No (i.e., i < N), the processor 610 adds 1 to the number i in S370 and proceeds to S340. Then, it executes the process for the start time of the new number i.

[0123] The start time of the i-th time is set to a time after the time obtained by adding the processing time, which is the time required for one specific process S900, to the start time of the (i - 1)-th time. For example, when the start time of the (i - 1)-th time is 00:00 and the processing time is 15 minutes, the start time of the i-th time is set to a time after 00:15. By increasing the difference in start times between the (i - 1)-th and i-th times, the precipitation of solids in the water treatment tanks 130, 140, and 160 can be promoted during the time between the specific processes S900 of the (i - 1)-th and i-th times. For example, when the processing time is about 15 minutes, the start time of the i-th time may be 1 hour after the start time of the (i - 1)-th time.

[0124] When i = N in S360 (S360: Yes), the processor 610 ends the process of FIG. 7.

[0125] The processor 610 executes each of the N specific processes S900 by repeatedly executing the schedule execution process of FIG. 8. In S410, the processor 610 obtains the current time. In this embodiment, the control device 600 has a timer (not shown). The processor 610 obtains the current time from the timer.

[0126] In S420, the processor 610 determines whether the current time is the same as any of the N start times. If the current time is different from all of the N start times (S420: No), the processor 610 proceeds to S410. If the current time is the same as any of the start times (S420: Yes), in S430, the processor 610 executes the specific process S900. The processor 610 executes the specific process S900 following the same procedure as described in Figures 3 and 4. In this embodiment, the first time T1 in Figure 4 represents the start time that was determined to be the same as the current time in S420.

[0127] As described above, in this embodiment, the control device 600 is configured to execute the specific process S900 N times per day (where N is an integer of 1 or more). Therefore, compared to the case where the specific process S900 is performed less frequently (for example, once every two days), the amount of solid matter remaining in the sedimentation tank 130 can be reduced. Furthermore, in this embodiment, the amount of solid matter remaining in the filtration tanks 140 and 160 can also be reduced.

[0128] Furthermore, the control device 600 is configured to allow the user to change the number of times N the specific treatment S900 is performed per day. The user can adjust the number of times N the specific treatment S900 is performed per day according to the status of the wastewater treatment device 100. For example, the user may reduce the number of executions N if the concentration of solids in the water treated by the wastewater treatment device 100 is sufficiently low. If the concentration of solids is high, the user may increase the number of executions N. As the concentration of solids, for example, the concentration of suspended solids (also called SS) may be used (the common unit is mg / L).

[0129] C. Third embodiment: Figure 9 is a schematic diagram of another embodiment of the wastewater treatment system. The difference from the wastewater treatment system 1000 in Figure 2 is that valves are provided for each of the three airlift pumps 310-330 and the three aeration devices 139, 149, and 169. The control program 631b of the control device 600 is configured to control these valves (details will be described later). The configuration of other parts of the wastewater treatment system 1000b is the same as the configuration of the corresponding parts of the wastewater treatment system 1000 in the first embodiment (the same parts are not shown or described).

[0130] The wastewater treatment system 1000b of this embodiment includes a wastewater treatment device 100b, a blower 700, and a control device 600. In addition to the configuration described in Figure 1, the wastewater treatment device 100b includes eight valves 510a-510c, 520a-520c, 530, and 540, and pipes 511-513, 521-523, 535, 536, and 590.

[0131] The aerobic pump air supply pipe 535, the aerobic diffuser air supply pipe 536, and the blower pipe 590 are the same as the pipes 535, 536, and 590 in the embodiment shown in Figure 2.

[0132] The airlift pumps 310, 320, and 330 are connected to auxiliary pump air supply pipes 511, 512, and 513, respectively. Unlike the embodiment in Figure 2, the main pump air supply pipe 518 is omitted. The auxiliary pump air supply pipes 511, 512, and 513 are each connected to the blower pipe 590. Transfer valves 510a, 510b, and 510c are provided in the flow paths of the auxiliary pump air supply pipes 511, 512, and 513, respectively.

[0133] The aeration devices 149, 169, and 139 are connected to auxiliary aeration supply pipes 521, 522, and 523, respectively. Unlike the embodiment in Figure 2, the main aeration supply pipe 528 is omitted. The auxiliary aeration supply pipes 521, 522, and 523 are each connected to the blower pipe 590. Agitation valves 520a, 520b, and 520c are provided in the flow paths of the auxiliary aeration supply pipes 521, 522, and 523, respectively.

[0134] The transfer valves 510a-510c, the stirring valves 520a-520c, and the aerobic valve 530 each have electrically controllable actuators (e.g., solenoids). The actuators of these valves 510a-510c, 520a-520c, and 530 are connected to the interface 690 of the control device 600. The valves 510a-510c, 520a-520c, and 530 are controlled by the control device 600. In this embodiment, the state of each valve 510a-510c, 520a-520c, and 530 is controlled to either a closed state or an open state.

[0135] Figure 10 is a timing chart showing the changes in the state of the water treatment tanks 130, 140, and 160 (specifically, the execution state of the specific treatment S900). The hatched periods indicate the period during which the specific treatment S900 is being executed. Unlike the embodiment in Figure 4, the processor 610 of the control device 600 executes the specific treatment S900 of the sedimentation tank 130, the specific treatment S900 of the first filtration tank 140, and the specific treatment S900 of the second filtration tank 160 at different timings.

[0136] The processor 610 starts a specific treatment S900 for the sedimentation tank 130 at a predetermined first start time T11. The specific treatment S900 for the sedimentation tank 130 is obtained by replacing the transfer valve 510 with a third transfer valve 510c and the stirring valve 520 with a third stirring valve 520c in the specific treatment S900 shown in Figure 3. The states of the transfer valves 510a and 510b and the stirring valves 520a and 520b for the filtration tanks 140 and 160 are maintained in the closed state. Through this specific treatment S900, the solids in the sedimentation tank 130 are transferred to the sludge storage tank 190, similar to the embodiments shown in Figures 5(A)-5(C), 6(A), and 6(C). The specific treatment S900 for the sedimentation tank 130 ends at the first end time T12 (Figure 10).

[0137] At the second start time T13, after a predetermined first waiting time DT11 has elapsed from the first end time T12, the processor 610 starts a specific treatment S900 for the first filtration tank 140. The specific treatment S900 for the first filtration tank 140 is a treatment obtained by replacing the transfer valve 510 with the first transfer valve 510a and the stirring valve 520 with the first stirring valve 520a in the treatment shown in Figure 3. The states of the transfer valves 510b and 510c and the stirring valves 520b and 520c for the second filtration tank 160 and the sedimentation tank 130 are maintained in a closed state. Through this specific treatment S900, the solids in the first filtration tank 140 are transferred to the sludge storage tank 190, similar to the embodiments shown in Figures 5(A)-5(C), 6(A), and 6(C). The specific treatment S900 for the first filtration tank 140 is completed at the second completion time T14 (Figure 10).

[0138] At the third start time T15, which is after a predetermined second waiting time DT12 has elapsed from the second end time T14, the processor 610 starts a specific treatment S900 for the second filtration tank 160. The specific treatment S900 for the second filtration tank 160 is a treatment obtained by replacing the transfer valve 510 with the second transfer valve 510b and the stirring valve 520 with the second stirring valve 520b in the treatment shown in Figure 3. The states of the transfer valves 510a and 510c and the stirring valves 520a and 520c for the first filtration tank 140 and the sedimentation tank 130 are maintained in the closed state. Through this specific treatment S900, the solids in the second filtration tank 160 are transferred to the sludge storage tank 190, similar to the embodiments shown in Figures 5(A)-5(C), 6(A), and 6(C). The specific treatment S900 for the second filtration tank 160 is completed at the third completion time T16 (Figure 10).

[0139] After the third end time T16, the processor 610 performs normal operation until the start time of the next specific treatment S900 for the sedimentation tank 130.

[0140] As described above, the wastewater treatment device 100b of this embodiment (Figure 9) includes airlift pumps 310 and 320, aeration devices 149 and 169, a blower pipe 590, auxiliary pump air supply pipes 511 and 512, transfer valves 510a and 510b, auxiliary aeration supply pipes 521 and 522, and stirring valves 520a and 520b. The first airlift pump 310 is configured to transfer water from the first filtration tank 140 to a different water treatment tank (in this embodiment, a sludge storage tank 190). The second airlift pump 320 is configured to transfer water from the second filtration tank 160 to a different water treatment tank (in this embodiment, a sludge storage tank 190). The first aeration device 149 is configured to stir the water in the first filtration tank 140. The second aeration device 169 is configured to agitate the water in the second filtration tank 160. The blower pipe 590 is a pipe to be connected to the blower 700. The first auxiliary pump air supply pipe 511 is an example of a first connecting pipe that connects the blower pipe 590 to the first airlift pump 310. The first transfer valve 510a is an example of a first valve provided on the flow path of the first connecting pipe (in this embodiment, the first auxiliary pump air supply pipe 511). The second auxiliary pump air supply pipe 512 is an example of a second connecting pipe that connects the blower pipe 590 to the second airlift pump 320. The second transfer valve 510b is an example of a second valve provided on the flow path of the second connecting pipe (in this embodiment, the second auxiliary pump air supply pipe 512). The first auxiliary diffuser air supply pipe 521 is an example of a third connecting pipe that connects the blower pipe 590 to the first aeration device 149. The first stirring valve 520a is an example of a third valve provided on the flow path of the third connecting pipe (in this embodiment, the first auxiliary aeration supply pipe 521). The second auxiliary aeration supply pipe 522 is an example of a fourth connecting pipe connecting the blower pipe 590 and the second aeration device 169. The second stirring valve 520b is an example of a fourth valve provided on the flow path of the fourth connecting pipe (in this embodiment, the second auxiliary aeration supply pipe 522). With this configuration, the transfer of water from the first filtration tank 140, the transfer of water from the second filtration tank 160, the stirring of water in the first filtration tank 140, and the stirring of water in the second filtration tank 160 can be easily and independently controlled by the four valves 510a, 510b, 520a, and 520b.

[0141] In this embodiment, the wastewater treatment device 100b further includes a sedimentation tank airlift pump 330, a sedimentation tank aeration device 139, a third auxiliary pump air supply pipe 513, a third transfer valve 510c, a third auxiliary aeration supply pipe 523, and a third stirring valve 520c. The sedimentation tank airlift pump 330 is configured to transfer water from the sedimentation tank 130 to a different water treatment tank (in this embodiment, a sludge storage tank 190). The sedimentation tank aeration device 139 is configured to stir the water in the sedimentation tank 130. The third auxiliary pump air supply pipe 513 connects the blower pipe 590 to the sedimentation tank airlift pump 330. The third transfer valve 510c is provided on the flow path of the third auxiliary pump air supply pipe 513. The third auxiliary aeration supply pipe 523 connects the blower pipe 590 to the sedimentation tank aeration device 139. The third stirring valve 520c is located on the flow path of the third auxiliary aeration supply pipe 523. Therefore, the transfer of water from the water treatment tanks 130, 140, and 160, and the stirring of the water in the water treatment tanks 130, 140, and 160, respectively, can be easily and independently controlled by the six valves 510a, 510b, 510c, 520a, 520b, and 520c.

[0142] In this embodiment, the entire sedimentation tank aeration device 139, pipe 523, and third stirring valve 520c is an example of a sedimentation tank stirring device configured to stir the water in the sedimentation tank 130 (also called sedimentation tank stirring device 930b). The entire sedimentation tank airlift pump 330, pipe 513, and third transfer valve 510c is an example of a second transfer device configured to transfer water from the sedimentation tank 130 to the sludge storage tank 190 (also called second transfer device 940b). The control device 600 is configured to control the sedimentation tank stirring device 930b and the second transfer device 940b. As described above, the control device 600 performs the specific treatment S900 (Figure 3). Therefore, the sedimentation tank airlift pump 330 of the second transfer device 940b can appropriately transfer solid matter including settled solids and floating solids.

[0143] Furthermore, as shown in Figure 10, the control device 600 executes the specific treatment S900 for each of the water treatment tanks 130, 140, and 160 at different times. The treatment times for the impurity removal tank 130 (T11-T12), the treatment times for the first filtration tank 140 (T13-T14), and the treatment times for the second filtration tank 160 (T15-T16) do not overlap. Therefore, compared to the case where the specific treatment S900 for two or more water treatment tanks is executed at the same time, the amount of water transferred to the sludge storage tank 190 per unit time is reduced. As a result, the water flow in the sludge storage tank 190 generated by the transferred water is weakened, and the amount of solid matter flowing out of the sludge storage tank 190 is reduced.

[0144] D. Fourth embodiment: Figure 11 is a schematic diagram showing another embodiment of the wastewater treatment device. The figure shows the wastewater treatment device 100d viewed from the side. The wastewater treatment device 100d of this embodiment has a body 200d. The body 200d houses a sedimentation tank 110d, a storage tank 120d, an anaerobic treatment tank 130d, an aerobic treatment tank 140d, a treated water tank 150d, and a disinfection tank 160d. In this embodiment, the water treatment tanks 110d-160d are arranged within the body 200d in the order of 120d, 110d, 130d, 140d, 150d, and 160d. The body 200d has multiple walls (including partition walls 201d-205d) that form these water treatment tanks 110d-160d.

[0145] The wastewater flowing into the wastewater treatment device 100d is guided to the sedimentation tank 110d by the transfer pipe 115d. The sedimentation tank 110d is a water treatment tank that separates solid matter by sedimentation. The sedimentation tank 110d has an inlet baffle 111d, an advection baffle 112d, and an aeration device 119d. The sedimentation tank 110d has a configuration similar to that of the sedimentation tank 130 in Figure 1. The water from the transfer pipe 115d flows into the area surrounded by the inlet baffle 111d. The advection baffle 112d moves the water in the sedimentation tank 110d upward and guides it to the downstream water treatment tank (anaerobic treatment tank 130d in this embodiment). In this embodiment, water in the area surrounded by the advection baffle 112d flows into the anaerobic treatment tank 130d through an opening 113d formed in the second partition wall 202d between the water treatment tanks 110d and 130d. Solid matter is separated by sedimentation in the sedimentation tank 110d. The aeration device 119d has multiple holes for discharging bubbles and is located at the bottom of the sedimentation tank 110d (hereinafter referred to as the sedimentation tank aeration device 119d). The sedimentation tank aeration device 119d is used to agitate the water in the sedimentation tank 110d (details will be described later).

[0146] The anaerobic treatment tank 130d is a water treatment tank that performs anaerobic treatment of wastewater using anaerobic microorganisms. The anaerobic treatment tank 130d has an inlet baffle 131d and an anaerobic filter bed 138d for retaining anaerobic microorganisms. The anaerobic filter bed 138d may have parts of various shapes, such as plate parts and mesh parts. Water from the opening 113d is guided by the inlet baffle 131d to a part lower than the anaerobic filter bed 138d. The water moves upward through the anaerobic filter bed 138d. The anaerobic microorganisms retained in the anaerobic filter bed 138d perform anaerobic treatment on the water passing through the anaerobic filter bed 138d. The anaerobic treated water flows into the aerobic treatment tank 140d through an opening 133d formed in the third partition wall 203d between the water treatment tanks 130d and 140d.

[0147] The aerobic treatment tank 140d is a water treatment tank that performs aerobic treatment of wastewater using aerobic microorganisms. The aerobic treatment tank 140d has an aerobic filter bed 148d for retaining aerobic microorganisms and an aeration device 149d positioned lower than the aerobic filter bed 148d. The aerobic filter bed 148d may have parts of various shapes, such as plate parts and mesh parts. The aeration device 149d has multiple holes for discharging bubbles. Air is supplied to the aeration device 149d by a blower (not shown). The bubbles discharged from the aeration device 149d agitate the water in the aerobic treatment tank 140d and supply oxygen to the water. Aerobic microorganisms attached to the aerobic filter bed 148d use oxygen to perform aerobic treatment. Hereinafter, the aeration device 149d will also be referred to as the aerobic diffuser 149d. The fourth partition wall 204d between water treatment tanks 140d and 150d forms an opening 143d located at the bottom. The aerobically treated water flows into the treated water tank 150d through the opening 143d.

[0148] The treated water tank 150d is a water treatment tank that temporarily stores water. Water flowing into the treated water tank 150d through the opening 143d moves upward within the treated water tank 150d. Solid matter contained in the water descends and accumulates at the bottom. The water that has risen to the water surface flows into the disinfection tank 160d through the opening 153d formed in the fifth partition wall 205d between the water treatment tanks 150d and 160d.

[0149] The disinfection tank 160d contains a disinfectant 161d, which disinfects the water flowing into the disinfection tank 160d. The disinfected water is transferred to the outside of the wastewater treatment device 100d through an opening 163d formed in the body 200d.

[0150] The wastewater treatment device 100d has two airlift pumps 310d and 320d. The transfer airlift pump 310d has a suction port 311d located in the lower part 110dL of the sedimentation tank 110d. The lower part 110dL is the part below the intermediate water level WLMd. The intermediate water level WLMd is half the water level WL1d during normal operation of the sedimentation tank 110d. The transfer airlift pump 310d transfers water from the bottom of the sedimentation tank 110d to the upper part of the storage tank 120d. Solid material accumulated at the bottom of the sedimentation tank 110d is transferred to the storage tank 120d by the transfer airlift pump 310d.

[0151] The circulating airlift pump 320d has a suction port 321d located at the bottom of the treated water tank 150d. The circulating airlift pump 320d transfers water from the bottom of the treated water tank 150d to the sedimentation tank 110d. The water from the circulating airlift pump 320d flows into the area surrounded by the inlet baffle 111d. Solid material accumulated at the bottom of the treated water tank 150d is transferred to the sedimentation tank 110d by the circulating airlift pump 320d.

[0152] The storage tank 120d has a filter medium 121d. The filter medium 121d may have parts of various shapes, such as plate parts and mesh parts. Solid matter contained in the water transferred to the storage tank 120d can descend and reach the filter medium 121d. The filter medium 121d can capture the solid matter. Solid matter not captured by the filter medium 121d can accumulate at the bottom of the storage tank 120d. In this way, solid matter is separated in the storage tank 120d. The first partition wall 201d between the water treatment tanks 110d and 120d forms an opening 123d located at the water surface of the storage tank 120d. The water from which the solid matter has been separated flows into the sedimentation tank 110d through the opening 123d. The water from the opening 123d flows into the area surrounded by the inflow baffle 111d.

[0153] Figure 12 is a schematic diagram of the wastewater treatment system 1000d of this embodiment. The wastewater treatment system 1000d includes a wastewater treatment device 100d, a blower 700d, and a control device 600. The blower 700d may include various pumps, similar to the blower 700 (Figure 2). In addition to the configuration described in Figure 11, the wastewater treatment device 100d includes four valves 510d-540d and pipes 513d, 523d, 535d, 536d, and 590d.

[0154] Pipe 590d is the pipe that should be connected to the blower 700d (also called the blower pipe 590d). The blower 700d is connected to the blower pipe 590d via an outer pipe 710d located outside the wastewater treatment device 100d. The blower 700d supplies air to the blower pipe 590d.

[0155] A pump air supply pipe 513d is connected to the transfer air lift pump 310d. The pump air supply pipe 513d is connected to the blower pipe 590d. A transfer valve 510d is provided in the flow path of the pump air supply pipe 513d.

[0156] An aeration supply pipe 523d ​​is connected to the sedimentation tank aeration device 119d. The aeration supply pipe 523d ​​is connected to the blower pipe 590d. A stirring valve 520d is provided in the flow path of the aeration supply pipe 523d.

[0157] An aerobic aeration supply pipe 536d is connected to the aerobic aeration diffuser 149d. The aerobic aeration supply pipe 536d is connected to the blower pipe 590d. An aerobic valve 530d is provided in the flow path of the aerobic aeration supply pipe 536d.

[0158] The circulating airlift pump 320d is connected to an aerobic pump supply pipe 535d. The aerobic pump supply pipe 535d is connected to the portion of the aerobic diffuser supply pipe 536d between the aerobic diffuser 149d and the aerobic valve 530d. A circulation valve 540d is provided in the flow path of the aerobic pump supply pipe 535d. The circulation valve 540d is a manual valve. The user (for example, the administrator of the wastewater treatment system 1000d) can adjust the amount of water transferred per unit time by the circulating airlift pump 320d by adjusting the opening of the circulation valve 540d.

[0159] Valves 510d, 520d, and 530d each have an electrically controllable actuator (e.g., a solenoid). Valves 510d, 520d, and 530d are controlled by the control device 600. The state of each valve 510d, 520d, and 530d is controlled to either a closed state or an open state.

[0160] The hardware configuration of the control device 600 is the same as that of the control device 600 shown in Figure 2. The non-volatile memory device 630 stores the control program 631d. The processor 610 controls the valves 510d, 520d, and 530d according to the control program 631d.

[0161] In this embodiment, the control process for valves 510d, 520d, and 530d is the process obtained by replacing valves 510, 520, and 530 with valves 510d, 520d, and 530d, respectively, in the control process shown in Figure 3.

[0162] During normal operation (S100), the aerobic diffuser 149d (Figures 11 and 12) and the circulating airlift pump 320d are in operation. The sedimentation tank diffuser 119d and the transfer airlift pump 310d are stopped.

[0163] In the first transfer process S120, the aerobic diffuser 149d, the circulating airlift pump 320d, and the sedimentation tank diffuser 119d are stopped. The transfer airlift pump 310d transfers water from the sedimentation tank 110d to the storage tank 120d. As a result, the water level in the sedimentation tank 110d may decrease. For example, if it takes a long time for the water to pass through the filter media 121d in the storage tank 120d, the water level in the sedimentation tank 110d will decrease. However, if the water transferred to the storage tank 120d can easily return to the sedimentation tank 110d, the change in water level will be small.

[0164] In the stirring process S140, the transfer airlift pump 310d is stopped. The sedimentation tank aeration device 119d stirs the water in the sedimentation tank 110d. As a result, the floating solids and settled solids in the water treatment tank 110d are stirred.

[0165] In the sedimentation process S160, the sedimentation tank aeration device 119d and the transfer airlift pump 310d are stopped. The water in the sedimentation tank 110d is left to stand. As a result, the agitated solids settle at the bottom of the sedimentation tank 110d. Since the aerobic valve 530d is in the open position, the blower 700d can continue to operate properly (the aerobic aeration device 149d and the circulating airlift pump 320d operate as in normal operation).

[0166] In the second transfer process S180, the transfer airlift pump 310d transfers water from the sedimentation tank 110d to the storage tank 120d. As a result, the solid material that has settled at the bottom of the sedimentation tank 110d is transferred to the storage tank 120d.

[0167] As described above, the wastewater treatment device 100d (Figure 11) of this embodiment has a plurality of water treatment tanks 110d-160d, including a sedimentation tank 110d configured to settle solids without filtering them, and a storage tank 120d configured to store solids.

[0168] A sedimentation tank aeration device 119d is located inside the sedimentation tank 110d (Figure 11) to agitate the water inside the sedimentation tank 110d. As shown in Figure 12, an aeration supply pipe 523d ​​is connected to the sedimentation tank aeration device 119d. An agitation valve 520d is provided in the flow path of the aeration supply pipe 523d. The agitation of the water by the sedimentation tank aeration device 119d can be controlled by the agitation valve 520d. The entire sedimentation tank aeration device 119d, the aeration supply pipe 523d, and the agitation valve 520d constitute an example of an agitation device configured to agitate the water inside the sedimentation tank 110d (also called an agitation device 930d).

[0169] The transfer airlift pump 310d (Figure 11) has a suction port 311d located inside the sedimentation tank 110d. As shown in Figure 12, the transfer airlift pump 310d is connected to a pump air supply pipe 513d. A transfer valve 510d is provided in the flow path of the pump air supply pipe 513d. The transfer of water by the transfer airlift pump 310d is controllable by the transfer valve 510d. The entire system, consisting of the transfer airlift pump 310d, the pump air supply pipe 513d, and the transfer valve 510d, is an example of a transfer device configured to transfer water from the sedimentation tank 110d to the storage tank 120d (also called a transfer device 940d).

[0170] The wastewater treatment system 1000d (Figure 12) has a control device 600 configured to control the agitator 930d and the transfer device 940d. As described above, the control device 600 is configured to execute a specific treatment S900 based on the flowchart in Figure 3. The specific treatment S900 includes an agitation treatment S140 and a transfer treatment S180. In this embodiment, the agitation treatment S140 includes an agitation treatment in which the agitator 930d agitates the water in the sedimentation tank 110d. The transfer treatment S180 includes a transfer treatment in which the transfer device 940d transfers the water containing solid matter from the sedimentation tank 110d to the storage tank 120d after the agitation treatment S140. With this configuration, the solid matter that has settled and the solid matter that has floated in the sedimentation tank 110d are agitated by the agitation treatment S140. Then, the transfer treatment S180 is performed after the agitation treatment S140. Therefore, the transfer device 940d can appropriately transfer solid matter including settled and floating solid matter. Furthermore, the sedimentation tank 110d can continue to separate solid matter even without cleaning of the sedimentation tank 110d by an operator (for example, by removing solid matter from the wastewater treatment device 100d).

[0171] In this embodiment, the control of the agitator 930d and the transfer device 940d is performed in the same manner as in the first embodiment. Therefore, the wastewater treatment system 1000d of this embodiment has various advantages, similar to the wastewater treatment system 1000. For example, the transfer airlift pump 310d of the transfer device 940d has a suction port 311d located in the lower part 110dL of the sedimentation tank 110d. The specific treatment S900 includes a sedimentation treatment S160 performed after the agitation treatment S140 and before the second transfer treatment S180. The sedimentation treatment S160 includes a sedimentation treatment in which solid matter is settled in the sedimentation tank 110d by stopping both the agitation by the agitator 930d and the transfer by the transfer device 940d. With this configuration, the transfer airlift pump 310d of the transfer device 940d can transfer water with a high concentration of solid matter in the second transfer treatment S180. Therefore, the total amount of water transferred by the transfer airlift pump 310d in one second transfer process S180 can be reduced. When the total amount of water transferred is small, the water flow in the storage tank 120d generated by the transferred water becomes weaker compared to when the total amount of water transferred is large. Consequently, the amount of solids flowing out of the storage tank 120d is reduced.

[0172] Furthermore, the control device 600 is configured to perform the specific treatment S900 once a day. Therefore, the amount of solid matter remaining in the sedimentation tank 110d can be reduced compared to when the specific treatment S900 is performed less frequently.

[0173] The control program 631d of the control device 600 may be configured to perform a schedule determination process (Figure 7) and a schedule execution process (Figure 8). In this case, the control device 600 performs the specific treatment S900 N times per day (where N is an integer of 1 or more). Therefore, the amount of solid matter remaining in the sedimentation tank 110d can be appropriately reduced. The control device 600 also allows the user to change the number of times N per day that the specific treatment S900 is performed. The user can adjust the number of times N per day that the specific treatment S900 is performed in accordance with the inflow load of the wastewater treatment device 100d.

[0174] The specific treatment S900 (Figure 3) includes a first transfer treatment S120 which is performed before the stirring treatment S140. The first transfer treatment S120 includes a process of transferring water from the sedimentation tank 110d to the storage tank 120d using a transfer device 940d (Figure 12). With this configuration, the water level in the sedimentation tank 110d may decrease due to the water transfer. Then, the stirring treatment of the sedimentation tank 110d (stirring treatment S140) can be performed with the water level lowered. Therefore, the possibility of solid matter overflowing from the sedimentation tank 110d during the stirring treatment is reduced.

[0175] As shown in Figure 11, the water treatment tanks 110d-160d of the wastewater treatment device 100d include a sedimentation tank 110d. The wastewater treatment device 100d has a partition wall 201d that forms an opening 123d. The opening 123d is an example of a flow path connecting the storage tank 120d and the sedimentation tank 110d. Water transferred to the storage tank 120d flows into the sedimentation tank 110d through the opening 123d after the separation of solid matter. Therefore, the possibility of water overflowing from the storage tank 120d to the wastewater treatment device 100d is reduced. The sedimentation tank 110d into which water from the storage tank 120d flows is an example of a "target tank which is either a sedimentation tank or a water treatment tank located upstream of the sedimentation tank".

[0176] As shown in Figure 11, the wastewater treatment device 100d includes an aerobic treatment tank 140d located downstream of the sedimentation tank 110d, and the water treatment tanks 110d-160d of the wastewater treatment device 100d are configured to receive aerobic treatment. The water from which solid matter has been separated by the sedimentation tank 110d flows into the aerobic treatment tank 140d. This reduces the load on the aerobic treatment tank 140d, allowing it to perform aerobic treatment properly. In this way, the wastewater treatment device 100d can treat wastewater properly.

[0177] E. Variations: (1) The control device 600 executes various processes in relation to the specific process S900 (Figure 3). For example, the number of times N the specific process S900 (Figure 3) is executed per day may be any integer greater than or equal to 1. The start time of each of the N specific processes S900 may be predetermined and not determined by the user. The processes in Figures 7 and 8 may be applied to the embodiments in Figures 9 and 10. In this case, in the process in Figure 7, the control device 600 may allow the user to determine N first start times T11 (Figure 10) for the N specific processes. The control device 600 may allow the user to adjust the durations DT1, DT2, DT3, and DT4 in Figure 4. The control device 600 may allow the user to adjust the waiting times DT11 and DT12 in Figure 10. In the embodiment in Figure 10, the order of the specific processes in the water treatment tanks 130, 140, and 160 may be any other order. For example, the control device 600 may perform specific processing in the order of the second filtration tank 160, the first filtration tank 140, and the sedimentation tank 130. The control device 600 may stop the blowers 700 and 700d during the sedimentation process S160.

[0178] (2) The process of transferring water containing solids from a water treatment tank that separates solids, such as a filtration tank or a sedimentation tank, to another water treatment tank may be replaced by any other process instead of the specific process S900 (Figure 3). For example, one or more processes arbitrarily selected from S120, S140, and S160 may be omitted.

[0179] (3) The configuration of the plurality of first carriers 148 in the first filtration tank 140 (Figure 1) may be any configuration capable of capturing solid matter. For example, the first carrier 148 may be a resin sponge. In order to separate the solid matter from the first carrier 148 in the stirring process S140 (Figure 3), it is preferable that the plurality of first carriers 148 flow together with the water when the water flows. For example, when the specific gravity of the first carrier 148 is greater than 1, the smaller the specific gravity, the easier the first carrier 148 flows. The specific gravity of the first carrier 148 may be so large that the first carrier 148 does not flow when the water flows. The specific gravity of the first carrier 148 may also be less than 1. In this case, it is preferable that the first filtration tank 140 has a member (for example, a mesh lid member) to prevent the plurality of first carriers 148 from moving upward. The above description of the first filtration tank 140 and the anaerobic filter bed 138d may also apply to the second filtration tank 160 and the second filter carrier 168.

[0180] (4) The second carrier 168 in the second filtration tank 160 (Figure 1) may be a different carrier from the first carrier 148 in the first filtration tank 140. For example, one or more parameters such as size, shape, specific gravity, and material may differ between the first carrier 148 and the second carrier 168. For example, the size of the second carrier 168 may be smaller than the size of the first carrier 148. In this case, the second filtration carrier 168 can easily capture small solid particles. Also in this case, the volume V2 of the multiple second carriers 168 may be smaller than the volume V1 of the multiple first carriers 148.

[0181] (5) The configurations of the filtration tanks 140 and 160 may be various other configurations in place of the above configuration. For example, the first filtration section 147 of the first filtration tank 140 may have a filter fixed to the filtration tank, such as a mesh section, instead of the multiple carriers 148. Similarly, the second filtration section 167 of the second filtration tank 160 may also have a filter. The filter of the second filtration tank 160 is preferably finer than the filter of the first filtration tank 140. In any case, the filtration tanks 140 and 160 may be configured such that water moves downward through the filtration sections 147 and 167 during normal operation.

[0182] (6) The configuration of the wastewater treatment device is not limited to the configurations of wastewater treatment devices 100, 100b, and 100d in Figures 1, 2, 9, and 11, but may be any other configuration. For example, the configuration of the wastewater treatment device may be any configuration comprising a plurality of water treatment tanks, including a first filtration tank (for example, a first filtration tank 140 (Figure 1)), an aerobic treatment tank (for example, an aerobic filter bed tank 150) located downstream of the first filtration tank, and a second filtration tank (for example, a second filtration tank 160) located downstream of the aerobic treatment tank. Here, it is preferable that the aerobic treatment tank has a fixed bed.

[0183] The upstream configuration of the aerobic filter bed tank 150 (Figure 1) may be any configuration including the first filtration tank 140. For example, one or more water treatment tanks, arbitrarily selected from water treatment tanks 110, 120, 130, and 190, may be omitted. In addition, an anaerobic treatment tank 130d (Figure 11) may be provided between the impurity removal tank 130 and the first filtration tank 140, or between the first filtration tank 140 and the aerobic filter bed tank 150.

[0184] The circulating airlift pump 340 may transfer water to any water treatment tank upstream of the aerobic filter bed tank 150, or to the sludge storage tank 190. For example, the circulating airlift pump 340 may transfer water to any of the flow rate adjustment tank 120, the sludge storage tank 190, the impurity removal tank 130, or the anaerobic treatment tank mentioned above. Similarly, the first airlift pump 310 may transfer water to any water treatment tank upstream of the first filtration tank 140, or to the sludge storage tank 190. The second airlift pump 320 may transfer water to any water treatment tank upstream of the second filtration tank 160, or to the sludge storage tank 190. The sedimentation tank airlift pump 330 may transfer water to any water treatment tank upstream of the sedimentation tank 130, or to the sludge storage tank 190.

[0185] The downstream configuration of the aerobic filter bed tank 150 (Figure 1) may be any configuration including a second filtration tank 160. For example, a treated water tank for temporarily storing water may be provided between the aerobic filter bed tank 150 and the second filtration tank 160, or between the second filtration tank 160 and the disinfection tank 170. The circulating airlift pump 340 may transfer water from this treated water tank.

[0186] The wastewater treatment device is not limited to the second airlift pump 320 (Figure 1) and the circulating airlift pump 340, but may have various target transfer devices configured to transfer water from the first target tank to the second target tank. Here, the first target tank is either an aerobic treatment tank (e.g., an aerobic filter bed tank 150) or a water treatment tank located downstream of the aerobic treatment tank (e.g., a second filtration tank 160, or one of the above-mentioned treated water tanks). The second target tank is either a first filtration tank (e.g., a first filtration tank 140), a water treatment tank located upstream of the first filtration tank (e.g., water treatment tanks 110, 120, 130, or one of the above-mentioned anaerobic treatment tanks), a storage tank for storing solids (e.g., a sludge storage tank 190), or an anaerobic treatment tank. Note that such target transfer devices may be omitted. For example, the circulating airlift pump 340 may be omitted.

[0187] (7) The wastewater treatment apparatus may have various configurations comprising a plurality of water treatment tanks including a sedimentation tank and a storage tank, a stirring device configured to agitate the water in the sedimentation tank, and a transfer device configured to transfer water from the sedimentation tank to the storage tank. Here, the sedimentation tank is a water treatment tank configured to settle solids without filtering them (for example, sedimentation tank 130 (Figure 1), sedimentation tank 110d (Figure 11)). The storage tank is a water treatment tank configured to store solids (for example, sludge storage tank 190 (Figure 1), storage tank 120d (Figure 11)). For example, in the wastewater treatment apparatus 100 of Figure 1, one or more water treatment tanks arbitrarily selected from water treatment tanks 110, 120, 140, 150, 160, 170, and 180 may be omitted. Also, in the wastewater treatment apparatus 100d of Figure 11, one or more water treatment tanks arbitrarily selected from water treatment tanks 130d-160d may be omitted.

[0188] The configuration of the sedimentation tank is not limited to a configuration having inlet baffles (for example, inlet baffles 131, 111d (Figures 1 and 11)) and advection baffles (for example, advection baffles 132, 112d (Figures 1 and 11)), but may be various configurations capable of settling solids. For example, one or both of the inlet baffles and advection baffles may be omitted. The sedimentation tank may be configured such that water flows in from the top and flows out from an opening provided at the bottom. The tank may be configured such that water flows in through an opening at the bottom and flows out through an opening at the water surface. The sedimentation tank may have a weir that transfers water without transferring solids. The storage tank may have various configurations capable of storing solids instead of a configuration having an inlet baffle 191 (Figure 1) and a transfer baffle 192, and a configuration having a filter material 121d (Figure 11). For example, the inlet baffle 191 and transfer baffle of the sludge storage tank 190 (Figure 1) Full 192 and either or both may be omitted. The filter media 121d of the storage tank 120d (Figure 11) may be omitted. The storage tank 120d may be provided with either or both an inlet baffle and an advection baffle. The storage tank may be configured such that water flows in from the top and flows out from an opening at the bottom. The storage tank may be configured such that water flows in from an opening at the bottom and flows out from an opening at the water level. The storage tank is, The structure may have a weir that allows water to be transferred without transferring solid matter. The storage tank is preferably a water treatment tank into which water does not flow when no treatment is being performed to transfer water from the sedimentation tank to the storage tank (for example, specific treatment S900 in Figure 3), as described above in the sludge storage tank 190 (Figure 1) and storage tank 120d (Figure 11). However, the storage tank may be a water treatment tank into which water flows for wastewater treatment when no treatment is being performed to transfer water from the sedimentation tank to the storage tank.

[0189] Furthermore, the water level in the sedimentation tank during normal operation may fluctuate in accordance with the fluctuations in the amount of wastewater flowing into the wastewater treatment device per unit time. In this case, the lower part of the sedimentation tank (for example, the 130L (Figure 1) and 110dL (Figure 11) sections) may be at or below half the maximum design water level of the sedimentation tank.

[0190] In either case, it is preferable that the control device 600 is configured to perform specific processes including stirring and transfer. Here, the stirring process is the process of stirring the water in the sedimentation tank with an stirring device. The transfer process is the process of transferring the water containing solids from the sedimentation tank to the storage tank with a transfer device after the stirring process. As a result, the sedimentation tank can continue to separate solids without the need for cleaning of the sedimentation tank by an operator (for example, drawing out solids from outside the wastewater treatment device).

[0191] (8) The fixed bed provided in the aerobic treatment tank may be various components fixed to the wall forming the aerobic treatment tank. The aerobic treatment tank may have multiple carriers that flow together with water.

[0192] (9) The wastewater treatment device has various flow paths connecting the two water treatment tanks. For example, the opening 193 formed in the second partition wall 202 (Figure 1) is an example of a flow path connecting the sludge storage tank 190 and the flow rate adjustment tank 120. The flow path forming part is not limited to a wall such as the second partition wall 202, but may be any member such as a pipe or a trough.

[0193] (10) The device for transferring water may include other types of pumps instead of the airlift pump (for example, an electric pump). Also, the device for agitating the water in the water treatment tank may include other types of devices instead of the aeration device. For example, an agitator having a screw and a motor to rotate the screw may be used. Also, a pump for transferring water from a first position to a second position in the water treatment tank may be used.

[0194] (11) The arrangement of the multiple water treatment tanks within the body may be any arrangement. For example, two or more water treatment tanks may be arranged side by side in the width direction of the body. Alternatively, the multiple water treatment tanks may be distributed across multiple bodies. Thus, the wastewater treatment device may have multiple bodies.

[0195] (12) The control device 600 (Figures 2 and 12) may be any type of computer instead of a PLC (for example, a personal computer).

[0196] In each of the above embodiments, some of the configurations implemented by hardware may be replaced with software, and conversely, some or all of the configurations implemented by software may be replaced with hardware. For example, the control device 600 may include a dedicated hardware circuit that performs the function of the specific process S900 in Figure 3.

[0197] Furthermore, if some or all of the functions of the present invention are implemented by a computer program, the program may be provided in the form of a computer-readable recording medium (for example, a non-temporary recording medium). The program may be used while stored on the same or a different recording medium (computer-readable recording medium) as it was provided. "Computer-readable recording medium" is not limited to portable recording media such as memory cards and CD-ROMs, but may also include internal storage devices within a computer such as various ROMs, and external storage devices connected to a computer such as hard disk drives.

[0198] The present invention has been described above based on examples and modifications. However, the embodiments of the invention described above are for the purpose of facilitating understanding of the present invention and do not limit it. The present invention can be modified and improved without departing from its spirit, and equivalents thereof are included. [Explanation of symbols]

[0199] 100, 100b, 100d...Wastewater treatment equipment, 110...Aeration type screen, 110d...Sedimentation tank, 111...Screen, 111d...Inlet baffle, 112d...Advection baffle, 113, 113d...Opening, 115d...Transfer pipe, 119d...Aeration device (Sedimentation tank aeration device), 120...Flow rate adjustment tank, 120d...Storage tank, 121...Pump, 121d...Filter media, 122...Metering adjustment device, 123...Transfer pipe, 123d...Opening, 130...Sedimentation tank (Contamination removal tank), 130d...Anaerobic treatment tank, 131, 131d...Inlet baffle, 132...Advection baffle, 133, 133d...Opening, 1 38d...Anaerobic filter bed, 139...Sedimentation tank aeration device, 140...First filtration tank, 140d...Aerobic treatment tank, 141...Inlet baffle, 143, 143d...Opening, 146...First support section, 147...First filtration section, 148...First carrier (first filtration carrier), 148d...Aerobic filter bed, 149...First aeration device, 149d...Aerobic aeration device, 150...Aerobic filter bed tank, 150d...Treatment water tank, 153, 153d...Opening, 158...Filter bed, 159...Aerobic aeration device, 160...Second filtration tank, 160d...Disinfection tank, 161...Inlet baffle, 161d...Disinfectant, 163, 163d...Opening, 166...Second support section, 1 67...Second filtration section, 168...Second carrier (second filtration carrier), 169...Second aeration device, 170...Disinfection tank, 171...Disinfectant, 173...Opening, 180...Discharge pump tank, 181...Discharge pump, 190...Sludge storage tank, 191...Inflow baffle, 192...Advection baffle, 193...Opening, 200, 200d...Body, 201, 201d...First partition wall, 202, 202d...Second partition wall, 203, 203d...Third partition wall, 204, 204d...Fourth partition wall, 205, 205d...Fifth partition wall, 206...Sixth partition wall, 207...Seventh partition wall, 208...Eighth partition wall, 310...First air vent Airlift pump, 310d...transfer airlift pump, 311...first suction port, 311d...suction port, 320...second airlift pump (target transfer device), 320d...circulation airlift pump, 321...second suction port, 321d...suction port, 330...sedimentation tank airlift pump, 331...third suction port, 340...circulation airlift pump, 341...suction port, 390...transfer pipe, 431, 432, 433, 441, 461...solids, 510...first valve (transfer valve), 510a...first transfer valve, 510b...second transfer valve, 510c...third transfer valve, 510d...transfer valve,511...First auxiliary pump air supply pipe, 512...Second auxiliary pump air supply pipe, 513...Third auxiliary pump air supply pipe, 513d...Pump air supply pipe, 517...Pump connecting pipe, 518...Main pump air supply pipe, 519...First connecting pipe, 520...Second valve (agitation valve), 520a...First agitation valve, 520b...Second agitation valve, 520c...Third agitation valve, 520d...Agitation valve, 521...First auxiliary diffuser air supply pipe, 522...Second auxiliary diffuser air supply pipe, 523...Third auxiliary diffuser air supply pipe, 523d...Diffusion air supply pipe, 527...Diffusion connecting pipe, 528...Main diffuser air supply pipe, 529...Second connecting pipe, 530, 530d...Aerobic valve, 535, 535d...Aerobic pump supply Trachea, 536, 536d... Aerobic air supply pipe, 540, 540d... Circulation valve, 590, 590d... Blower pipe, 600... Control device, 610... Processor, 620... Volatile memory device, 630... Non-volatile memory device, 631, 631b, 631d... Control program, 640... Output device, 650... Input device, 690... Interface, 700, 700d... Blower, 710, 710d... Outer pipe, 910... First transfer device, 920... Agitator, 930, 930b... Sedimentation tank agitator, 930d... Agitator, 940, 940b... Second transfer device, 940d... Transfer device, 1000, 1000b, 1000d... Wastewater treatment system

Claims

1. A wastewater treatment device, comprising: The system includes a plurality of water treatment tanks including a first filtration tank, an aerobic treatment tank disposed downstream of the first filtration tank, and a second filtration tank disposed downstream of the aerobic treatment tank, The aerobic treatment tank has a fixed bed. Wastewater treatment equipment.

2. The wastewater treatment device according to claim 1, The plurality of water treatment tanks include A first target tank which is either the aerobic treatment tank or a water treatment tank arranged downstream of the aerobic treatment tank; a second target tank which is any one of the first filtration tank, a water treatment tank arranged upstream of the first filtration tank, a storage tank for storing solids, and an anaerobic treatment tank; Including, The wastewater treatment device includes a target transfer device configured to transfer water from the first target tank to the second target tank. Wastewater treatment equipment.

3. The wastewater treatment device according to claim 1 or 2, The plurality of water treatment tanks includes a disinfection tank following the second filtration tank, Wastewater treatment equipment.

4. The wastewater treatment device according to any one of claims 1 to 3, The first filtration tank has a first filtration section including a plurality of carriers, The second filtration tank has a second filtration section including a plurality of carriers, The carrier of the second filtration section is the same as the carrier of the first filtration section. Wastewater treatment equipment.

5. The wastewater treatment device according to any one of claims 1 to 4, The first filtration tank has a first filtration section including a plurality of carriers, The second filtration tank has a second filtration section including a plurality of carriers, The volume of the plurality of carriers in the second filtration section is larger than the volume of the plurality of carriers in the first filtration section. Wastewater treatment equipment.

6. The wastewater treatment device according to claim 4 or 5, The top of the first filtration tank is open, The specific gravity of the carrier of the first filtration section is greater than 1, The upper part of the second filtration tank is open, The specific gravity of the carrier of the second filtration section is greater than 1. Wastewater treatment equipment.

7. The wastewater treatment device according to any one of claims 1 to 6, A first transfer device configured to simultaneously transfer water from the first filtration tank to a water treatment tank other than the first filtration tank and transfer water from the second filtration tank to a water treatment tank other than the second filtration tank; a stirring device configured to stir the water in the first filtration tank and the water in the second filtration tank at the same time; A wastewater treatment device comprising:

8. The wastewater treatment device according to claim 7, The wastewater treatment device has a blower pipe which is a pipe to be connected to a blower, The first transfer device is a first air lift pump having a first suction port disposed within the first filtration tank; a second air lift pump having a second suction port disposed within the second filtration tank; a pump connection pipe that connects the first air lift pump and the second air lift pump; a first connecting pipe that connects the blower pipe and the pump connecting pipe; a first valve provided on a flow path of the first connecting pipe; having The stirring device is A first air diffuser disposed in the first filtration tank; A second air diffuser disposed in the second filtration tank; An aeration connection pipe that connects the first aeration device and the second aeration device; A second connection pipe that connects the blower pipe and the aeration connection pipe; a second valve provided on a flow path of the second connecting pipe; The wastewater treatment device has

9. The wastewater treatment device according to any one of claims 1 to 6, A first air lift pump configured to transfer water from the first filtration tank to a water treatment tank other than the first filtration tank; A second air lift pump configured to transfer water from the second filtration tank to a water treatment tank other than the second filtration tank; A first air diffuser configured to agitate the water in the first filtration tank; A second air diffuser configured to agitate the water in the second filtration tank; a blower pipe which is a pipe to be connected to a blower; a first connecting pipe connecting the blower pipe and the first air lift pump; a first valve provided on a flow path of the first connecting pipe; a second connecting pipe connecting the blower pipe and the second air lift pump; a second valve provided on a flow path of the second connecting pipe; A third connection pipe that connects the blower pipe and the first air diffuser; a third valve provided on a flow path of the third connecting pipe; A fourth connecting pipe connecting the blower pipe and the second air diffuser; a fourth valve provided on a flow path of the fourth connecting pipe; A wastewater treatment device comprising:

10. A wastewater treatment system comprising: A wastewater treatment device according to any one of claims 1 to 9, A control unit; Equipped with The plurality of water treatment tanks include a settling tank disposed upstream of the first filtration tank and configured to settle solid matter without filtering the solid matter; a reservoir configured to store solids; Including, The wastewater treatment device comprises: a settling tank agitator configured to agitate the water in the settling tank; a second transfer device configured to transfer water from the settling tank to the reservoir; Equipped with The control unit is a stirring process in which the settling tank agitator stirs the water in the settling tank; a transfer process for transferring water containing solids from the settling tank to the storage tank using the second transfer device after the stirring process; A wastewater treatment system configured to perform a specific process including: