Warehouse system

The warehouse system automates the loading of component containers and supply units using a transport robot, enhancing labor savings and facilitating easy expansion, by integrating standardized modules for efficient component preparation in component placement machines.

JP2024133227AActive Publication Date: 2024-10-01FUJI CORP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2024112207
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-10-01
Estimated Expiration
2039-11-25

AI Technical Summary

Technical Problem

Existing technologies for loading component containers into component supply units in a warehouse system require significant manual labor, limiting labor savings.

Method used

A warehouse system equipped with a transport robot that automates the movement and loading of component storage containers and supply units, including a parts storage warehouse, component supply units, and a transport robot that moves components between storage and loading stations, reducing the need for manual operator intervention.

Benefits of technology

The system achieves further labor savings by automating the loading process, allowing components to be prepared for use in component placement machines without operator involvement, and supports easy expansion and modification with standardized modules.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024133227000001_ABST
    Figure 2024133227000001_ABST
Patent Text Reader

Abstract

To provide a warehouse system that is used for a support of a component mounting device, and achieves a further power saving as conventional one by a separation operation for separating a component housing container from a component supply unit.SOLUTION: A warehouse system comprises: a component housing container warehouse that stores a plurality of component housing containers housing a plurality of components; a component housing container unloader that separates the component housing container from a component supply unit used when supplying a component housed in each component housing container to a component mounting device; and a transfer robot that is moved between the component housing container warehouse and the component housing container unloader, and transfers each component housing container separated by the component housing container unloader to the component housing container warehouse.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present specification relates to a warehouse system used to support component placement machines. [Background technology]

[0002] A technology for mass-producing board products by performing board-related operations on boards with printed wiring has become widespread. Furthermore, it has become common to arrange a plurality of types of board-related operation machines for performing board-related operations side by side to form a board-related operation line. A component mounting machine among the board-related operation machines uses a component supply unit loaded with a component container that stores a plurality of components. In many cases, the component container and the component supply unit are stored in a warehouse. Then, the component supply unit is prepared for use by a loading operation in which the component container is loaded into the component supply unit. Examples of technologies related to the storage and preparation for use of the component container and the component supply unit are disclosed in Patent Documents 1 and 2.

[0003] Patent Document 1 discloses a manufacturing management system that controls an SMT line (a line for working with substrates) to manufacture printed circuit boards (circuit board products). This manufacturing management system includes a reel stocker, a cartridge stocker, and a control computer that manages both stockers. The control computer includes a database that stores various data files related to the manufacture of printed circuit boards, a setup support section that instructs setup work, and a mounting data creation section that creates mounting data for mounting components on the printed circuit boards. This system is said to enable efficient setup work even on SMT lines with different equipment specifications and configurations, and to create mounting data according to the setup information.

[0004] Furthermore, the component mounting system disclosed in Patent Document 2 includes a component storage facility that stores multiple feeder devices (one form of component supply unit) that accommodate a large number of components, a supply device that supplies and retrieves the feeder devices from the component mounting machines, and a transport means that transports the supply device between the component storage facility and the multiple component mounting machines. This system is said to enable necessary components to be supplied automatically and efficiently, thereby enabling labor saving and automation. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Japanese Patent Application Publication No. 10-34459 [Patent Document 2] International Publication No. 2014 / 010083 Summary of the Invention [Problem to be solved by the invention]

[0006] Incidentally, in Patent Document 1 and Patent Document 2, a function is realized in which the component containers and the component supply units stored in a warehouse (stocker, component storage) are removed from the warehouse and supplied in accordance with an instruction. However, the loading operation of loading the component containers into the component supply units is performed by an operator. Also, although a device that automates the loading operation has been put to practical use, the component containers and the component supply units are still carried into the device by an operator. For this reason, it cannot be said that sufficient labor saving has been achieved.

[0007] The problem to be solved in this specification is to provide a warehouse system that is intended to support component mounting machines and achieves even greater labor savings than before in the loading operation of loading component containers into component supply units. [Means for solving the problem]

[0008] This specification discloses a warehouse system including a component container warehouse that stores a plurality of component containers that store a plurality of components, a component supply unit warehouse that stores a plurality of component supply units that are used to supply the components stored in the component containers to a component mounting machine, a component container loader that loads the component containers into the component supply units, and a transport robot that moves between the component container warehouse, the component supply unit warehouse, and the component container loader and transports the component containers and the component supply units to the component container loader. Effect of the Invention

[0009] In the warehouse system disclosed in this specification, the transport robot transports the component containers stored in the component container warehouse to the component container loader, and transports the component supply units stored in the component supply unit warehouse to the component container loader. The component container loader also loads the component containers onto the component supply units. This automatically prepares the component supply units for use in the component mounting machine. Therefore, the operator is not involved in the loading operation, and further labor saving is achieved compared to the conventional method. [Brief description of the drawings]

[0010] [Figure 1] FIG. 1 is a front view showing a schematic diagram of a warehouse system according to a first embodiment. [Diagram 2] FIG. 2 is a control block diagram of a warehouse system and a higher-level production management system according to the first embodiment. [Diagram 3] FIG. 2 is an operational flow diagram illustrating the operation of the warehouse system according to the first embodiment. [Figure 4] FIG. 11 is a front view showing a schematic diagram of a warehouse system according to a second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] 1. Configuration of warehouse system 1 according to the first embodiment The configuration of a warehouse system 1 according to the first embodiment will be described with reference to FIG. 1. The warehouse system 1 is used to support one or more component mounting machines 91 that make up a substrate-related work line 9. Furthermore, the warehouse system 1 can support the component mounting machines 91 of multiple substrate-related work lines 9. The component mounting machine 91 uses a component supply unit loaded with a component container to perform a mounting operation of mounting components on a substrate. The warehouse system 1 is responsible for storing the component containers and the component supply units, as well as for operations related to support.

[0012] The component container stores a plurality of components. The component supply unit is used when supplying the components stored in the component container to the component mounting machine 91. The component supply unit does not need to be an integrated type, and may be configured as a separate type. In this specification, the combination of at least a portion of the component container and the component supply unit, or either one of them, is referred to as "tools."

[0013] An example of the component container is a tape reel 71, and an example of the component supply unit is a feeder device (shown by a dashed line in FIG. 1). A carrier tape containing a large number of components enclosed at a predetermined pitch is wound and held on the tape reel 71. The feeder device supplies components to a component mounting fixture of the component mounting machine 91 by pulling out the carrier tape from the tape reel 71 and sending it to a component removal position. Feeder devices are roughly divided into two types: an integrated type and a separate type.

[0014] An integrated feeder device 72 (shown by a dashed line in FIG. 1) is installed in the component mounting machine 91 in the form of a prepared feeder device 73 loaded with a tape reel 71. Then, when the components on the tape reel 71 are consumed, the prepared feeder device 73 is replaced in its entirety. There may also be cases where only the tape reel 71 is replaced. On the other hand, a separate feeder device is made up of a feeder main body incorporating a carrier tape feeding mechanism, and a reel cassette loaded with the tape reel 71. The feeder main body is permanently installed in the component mounting machine 91, and the separate reel cassette is located near the feeder main body. Then, when the components on the tape reel 71 are consumed, the reel cassette is replaced.

[0015] As described below, the prepared feeder device 73 is prepared by the warehouse system 1. Similarly, the prepared reel cassette with the tape reel 71 loaded therein is prepared by the warehouse system 1. In Fig. 3, the case where the integrated feeder device 72 is used is illustrated, and the illustration of the separate feeder device is omitted.

[0016] Also, the component container can be exemplified by a tray 75, and the component supply unit can be exemplified by a tray loading unit 76 (shown by a broken line in FIG. 1). The tray 75 has a plurality of component storage sections each storing a component. In general, the plurality of component storage sections are arranged in a two-dimensional lattice pattern. The tray loading unit 76 is provided in the component mounting machine 91 in the form of a prepared tray loading unit 77 in which the tray 75 is loaded. Then, when the components in the tray 75 are all consumed, the prepared tray loading unit 77 is entirely replaced. Note that there may be cases where only the tray 75 is replaced. As described later, the prepared tray loading unit 77 is prepared by the warehouse system 1. Also, the tray loading unit 76 may have a mechanism in which a plurality of trays 75 are loaded in a stacked manner, and which sequentially removes the trays 75 from which the components have all been consumed, starting from the top.

[0017] The warehouse system 1 of the first embodiment is composed of a plurality of warehouse modules and a transport robot 6. As shown in Fig. 1, seven warehouse modules are arranged side by side. That is, from left to right, a carrying-in and information providing section 55, a first component container warehouse 21, a second component container warehouse 22, a component supply unit warehouse 3, a reel loader 41, a tray loader 42, and a transport vehicle stopping section 51 are arranged side by side.

[0018] Each of the warehouse modules has a transfer port (not shown) on the front side for transferring tools between the transport robot 6. The arrangement and shape of the transfer ports in each of the warehouse modules are standardized. In FIG. 1, each of the warehouse modules is shown as a rectangular parallelepiped of different sizes, but the actual shape may be different from a rectangular parallelepiped. In addition, an arrangement in which multiple warehouse modules are not aligned in a row and an arrangement in which multiple warehouse modules are spaced apart from each other are permitted.

[0019] The transport robot 6 is composed of a robot body 61 and a travel path 62. The travel path 62 is laid so as to pass in front of all the warehouse modules. The robot body 61 has a movement mechanism such as a linear motor and running wheels, and moves along the travel path 62. Therefore, the robot body 61 moves between each of the warehouse modules, and its movement range extends from the loading and information provision unit 55 on the left end to the transport vehicle stop unit 51 on the right end.

[0020] Note that a plurality of robot bodies 61 may be provided. The moving path 62 may be double-tracked or circular, or may have a more complicated moving route. The plurality of robot bodies 61 are controlled by a warehouse control unit 82 (see FIG. 2) described later, and move while avoiding collisions.

[0021] Non-contact power transmitting units 63 are provided at regular intervals near the upper surface of the moving path 62. Meanwhile, non-contact power receiving units 64 are provided on the lower part of the robot main body 61. Power is supplied to the robot main body 61 by a non-contact power supply unit consisting of the non-contact power transmitting units 63 and the non-contact power receiving units 64. The non-contact power supply unit may be, for example, an electromagnetic coupling type configuration using a coil, but is not limited to this.

[0022] The robot body 61 has an arm (not shown) for gripping tools, and performs the operation of handing over tools at the delivery port of a warehouse module. In detail, the robot body 61 uses the arm to grip tools placed at the delivery port at the front side of a warehouse module. Next, the robot body 61 transports the tools by moving to another target warehouse module. Finally, the robot body 61 releases the arm at the front side of the other warehouse module and places the tools at the delivery port. Note that each warehouse module may have an arm, and the robot body 61 may only have a transport function for transporting tools.

[0023] The loading / information assignment unit 55 is one form of an operation unit that performs a predetermined operation on the part container. The loading / information assignment unit 55 also serves as an entrance unit through which the part container is loaded. The loading / information assignment unit 55 has an entrance 56 for the part container on its left side. The loading / information assignment unit 55 moves the part container loaded into the entrance 56 to an internal operation unit (not shown). The operation unit performs an information assignment operation to assign individual identification information to the part container.

[0024] The individual identification information is assigned to each of the component containers, such as the tape reel 71 and the tray 75 described above. Examples of the information assignment work include printing an individual identification number and attaching an individual identification barcode. The loading and information assignment unit 55 places the component container to which the individual identification information has been assigned at the delivery port and makes it ready for transport. This allows the information assignment work to the component container and the removal to be performed automatically, saving labor.

[0025] The first component container warehouse 21 is a warehouse equipped with a desiccator, and stores a plurality of component containers. The first component container warehouse 21 receives, stores, and removes component containers for moisture-sensitive components with priority. Moisture-sensitive components include, for example, IC components and LSI components, which are stored in the form of tape reels 71 and trays 75. If there is sufficient storage space, the first component container warehouse 21 may also store other components, feeder devices 72, and tray loading units 76 that are not given priority.

[0026] The second component storage container warehouse 22 is a general-purpose warehouse, and there are no special restrictions on the number of component storage containers that can be stored. The second component storage container warehouse 22 receives, stores, and delivers component storage containers such as tape reels 71 and trays 75. These component storage containers are transported from the carry-in and information assignment unit 55 by the transport robot 6.

[0027] The component supply unit warehouse 3 receives, stores, and delivers a plurality of component supply units, such as an integrated feeder device 72, a reel cassette, and a tray loading unit 76. These component supply units are carried into the delivery port of the component supply unit warehouse 3 by an operator. Alternatively, these component supply units are carried by a transport robot 6.

[0028] The internal configurations of the first component container warehouse 21, the second component container warehouse 22, and the component supply unit warehouse 3 are similar to each other. For example, these warehouses are composed of a storage shelf and an in-warehouse transport section. The storage shelf has a plurality of storage positions arranged two-dimensionally in the width direction and the height direction, and stores tools at each storage position. The in-warehouse transport section transports the tools between the storage positions and the delivery port. Without being limited to this, these warehouses may have a plurality of storage shelves provided in the front-rear direction, for example.

[0029] The reel loader 41 and the tray loader 42 are each a form of a component container loader that loads a component container into a component supply unit. The reel loader 41 performs a loading operation of loading a tape reel 71 into a feeder device 72 or a reel cassette. More specifically, the reel loader 41 moves the tape reel 71 placed at the transfer port by the transport robot 6 and the feeder device 72 or the reel cassette to an internal operation execution section (not shown). The operation execution section loads the tape reel 71 in a predetermined position in the feeder device 72 or the reel cassette in a predetermined attitude. This completes the loading operation of the tape reel 71, and the component mounting machine 91 is prepared for use. The prepared feeder device 73 or the prepared reel cassette is placed at the transfer port or temporarily stored inside.

[0030] The reel loader 41 may have a function of performing a separation operation to remove the tape reel 71 from the prepared feeder device 73 or the prepared reel cassette. The separated tape reel 71 is returned to the second component container warehouse 22 for storage. Also, the feeder device 72 or the reel cassette from which the tape reel 71 has been removed is returned to the component supply unit warehouse 3 for storage.

[0031] The tray loader 42 performs a loading operation of loading the trays 75 into the tray loading units 76. More specifically, the tray loader 42 moves a predetermined number of trays 75 and tray loading units 76 placed at the delivery port by the transport robot 6 to an internal operation section (not shown). The operation section loads the trays 75 in a predetermined position in the tray loading unit 76 in a predetermined attitude. This completes the loading operation of the trays 75, and prepares them for use in the component mounting machine 91. The prepared tray loading unit 77 (tray loading unit 76 with the trays 75 loaded) is placed at the delivery port or temporarily stored inside.

[0032] The tray loader 42 may have a function of performing a separation operation to remove the tray 75 from the prepared tray loading unit 77. The separated tray 75 is returned to the second component container warehouse 22 for storage. Also, the tray loading unit 76 from which the tray 75 has been removed is returned to the component supply unit warehouse 3 for storage.

[0033] Here, stand-alone type information imparting devices, reel loading devices, and tray loading devices have been used conventionally. However, in the stand-alone type, an operator is required to carry in and out the tools. In the first embodiment, the transport robot 6 is provided, which reduces the operator's load and unload work, thereby achieving further labor saving than in the past.

[0034] At the transport vehicle stopping section 51, the transport vehicle 52 that can move between the warehouse system 1 and the component mounting machine 91 stops. The transport vehicle stopping section 51 performs the work of loading the tools received from the transport robot 6 onto the transport vehicle 52. As shown by the arrow M1 in Fig. 1, the transport vehicle 52 travels on the transport path 53 that connects the warehouse system 1 and the substrate-related work line 9, and transports the loaded tools to the component mounting machine 91. Therefore, the transport vehicle stopping section 51 functions as an unloading section from which at least one of the tools of the component container and the component supply unit is unloaded.

[0035] Furthermore, the transport vehicle 52 transports idle tools that have been used by the component mounting machine 91 and are not scheduled for immediate use in the reverse direction from the component mounting machine 91 to the transport vehicle stopping section 51. The tools transported in the reverse direction are returned to one of the warehouses or one of the loaders by the transport robot 6. Therefore, the transport vehicle stopping section 51 functions as an entrance section into which at least one of the tools, the component container and the component supply unit, is carried in.

[0036] There may be a plurality of transport vehicles 52. Furthermore, in a configuration in which a plurality of substrate-related work lines 9 are to be supported, the transport path 53 may be branched or looped along the way to form a more complicated transport route. The plurality of transport vehicles 52 are controlled by a transport control unit 83 (see FIG. 2) to be described later, and travel while avoiding collisions.

[0037] 2. Common elements of the Warehouse module Here, the seven warehouse modules have common elements. This makes it easy to add, remove, or rearrange the warehouse modules. Generally, a "module" refers to a structural unit that has common elements and is easy to change. The common elements include at least one of the following six items:

[0038] 1) Standardization of at least one of the external shape and installation structure 2) Standardization of power supply specifications and / or power supply unit 3) Standardization of communication specifications and / or communication units 4) Standardization of the control unit that controls the operation of the warehouse module 5) Standardization of the host control unit that issues commands to the warehouse modules 6) Standardization of the process for loading and unloading equipment in warehouse modules Each step will be explained below in order.

[0039] 1) In the first embodiment, the external shapes of the warehouse modules excluding the transport vehicle stopping portion 51 are different, but the installation structure is common. For example, fixing seats are provided at a constant pitch on a common base or floor surface. Meanwhile, installation seats of a common shape are provided at the same constant pitch on the bottom surface of each warehouse module. The installation seats of the warehouse modules are fixed to the fixing seats using the same fasteners, for example bolts of the same thickness and length.

[0040] According to this, multiple types of warehouse modules are installed on the same common base or floor surface using the same construction method even if the total number of installation bases differs. Therefore, the installation work of the warehouse modules is simple. Furthermore, the expansion work of installing additional warehouse modules and the relocation work of changing the order or position of the warehouse modules are also simple, just like the installation work.

[0041] 2) The power supply specifications of multiple types of warehouse modules are standardized. For example, the power supply specifications are standardized by using both AC and DC as the power supply, or by making the voltage levels of the drive power supply and the control power supply different. This allows power to be supplied to multiple warehouse modules from a common power supply unit using a power cable. This eliminates the need to provide a power supply unit for each warehouse module, simplifying the structure and reducing costs.

[0042] 3) The communication specifications and communication unit configurations of multiple types of warehouse modules are standardized. This allows the same communication unit to be commonly used for multiple warehouse modules, reducing hardware costs. In addition, the communication software is also standardized, reducing software development costs.

[0043] Let us assume that communication specifications are not unified due to the different manufacturers of the multiple types of warehouse modules or due to the manufacturing dates. In this case, a separate interface device is required to realize communication between the warehouse modules and the warehouse control unit 82 (described later) and between the warehouse modules themselves. This causes problems such as increased costs and reduced communication reliability.

[0044] 4) The control units that control the operation of the warehouse modules are standardized. For example, the algorithms that determine the storage positions in the three warehouses and the logic that controls the transport units in the warehouses are standardized. This allows the three warehouses to be used efficiently. In addition, for example, the handling conditions for handling tools at the delivery ports of each warehouse module are standardized. This allows the delivery operations to be standardized regardless of differences in the individual functions of the warehouse modules. Therefore, the same operational reliability regarding the delivery of tools can be obtained in each warehouse module, and software development costs are low.

[0045] 5) The warehouse control unit 82 is provided as a common upper control unit that issues commands to the warehouse modules. This allows the transfer of tools between the warehouse modules to be centrally managed. This allows the transfer of tools and the work in the work execution unit to be carried out in a timely and efficient manner.

[0046] 6) The process of taking in and out tools in each warehouse module, i.e., the layout and shape of the delivery openings, are standardized. This simplifies and smooths the delivery of tools by the transport robot 6, improving operational reliability.

[0047] 3. Functional configuration of warehouse system 1 and production management system 8 Next, the functional configuration of the warehouse system 1 of the first embodiment and the functional configuration of the upper production management system 8 will be described with reference to Fig. 2. As shown in Fig. 2, the production management system 8 is made up of a production management section 81, a warehouse control section 82, a transport control section 83, and a line control section 84. The production management section 81 is located at the higher level of control. The warehouse control section 82, the transport control section 83, and the line control section 84 are connected to the production management section 81 by wired communication and are located below the production management section 81.

[0048] The production management department 81 promotes production plans for board products produced on the substrate-related work line 9 and manages the progress of production. More specifically, the production management department 81 issues instructions to the warehouse control department 82 to prepare tools required when starting production of a board product or when switching the type of board product being produced. In addition, the production management department 81 issues instructions to the transport control department 83 to transport the prepared tools from the warehouse system 1 to the substrate-related work line 9.

[0049] When the necessary tools are transported to and mounted on the component mounting machine 91 of the substrate-related work line 9, the production management department 81 issues an instruction to the line control department 84 to start production of substrate products. As a result, the substrate-related work line 9 performs substrate-related work and advances the production of substrate products. Information on the production results of substrate products is appropriately notified to the production management department 81 from the line control department 84. In addition, as parts are consumed and reduced as the production progresses, information on the reduced parts is notified to the production management department 81 from the line control department 84. The production management department 81 issues instructions to the warehouse control department 82 and the transport control department 83 to replenish parts.

[0050] The warehouse system 1 includes a warehouse control unit 82. The warehouse control unit 82 is communicatively connected to each of the warehouse modules via wires. Furthermore, the warehouse control unit 82 is communicatively connected to the robot body 61 wirelessly (indicated by dashed lines). The warehouse control unit 82 issues commands to each warehouse module and the robot body 61 based on instructions received from the production management unit 81. Meanwhile, the warehouse control unit 82 acquires information on the operation status from each warehouse module and the robot body 61.

[0051] However, regarding the delivery of the part container, the warehouse control unit 82 proceeds with control without receiving instructions from the production management unit 81. That is, when the part container is delivered to the delivery entrance 56, the warehouse control unit 82 issues a command to carry out an information assignment operation. Furthermore, the warehouse control unit 82 selects a warehouse for storage based on the type and quantity of the delivered part containers, and determines the storage location. Thereafter, the warehouse control unit 82 issues a command to the robot body 61 to transport the part container, and issues a command to the selected warehouse to receive and store the part container. Furthermore, the warehouse control unit 82 notifies the production management unit 81 of information regarding the stored part containers.

[0052] In controlling operations other than the delivery of part containers, the warehouse control unit 82 commands the first part container warehouse 21, the second part container warehouse 22, and the part supply unit warehouse 3 to store, store, and take out tools. The warehouse control unit 82 also commands the reel loader 41 and the tray loader 42 to perform loading operations. Furthermore, the warehouse control unit 82 commands the transport vehicle stopping unit 51 to load and unload tools onto the transport vehicle 52. Each warehouse module performs the instructed operation or work, and notifies the warehouse control unit 82 of its progress.

[0053] When the instruction from the production management unit 81 is for loading work, the warehouse control unit 82 first commands the robot body 61 to transport the part container and part supply unit stored in any of the warehouses. Next, the warehouse control unit 82 commands the reel loader 41 or the tray loader 42 to perform the loading work. Next, the warehouse control unit 82 commands the robot body 61 to transport the prepared tools to the transport vehicle stop unit 51.

[0054] Furthermore, when the instruction is for the transport operation of tools to the component mounting machine 91, the warehouse control unit 82 commands the robot body 61 to transport the tools stored in any of the warehouses to the transport vehicle stopping unit 51. In both cases of the loading operation and the transport operation, the warehouse control unit 82 commands the transport vehicle stopping unit 51 to load the tools onto the transport vehicle 52.

[0055] The transport control unit 83 is wirelessly connected to the transport vehicle 52 for communication (shown by a dashed line). The transport control unit 83 controls the transport of tools by the transport vehicle 52. The transport control unit 83 receives instructions from the production management unit 81 and causes the transport vehicle stopping unit 51 to stop the transport vehicle 52. Once the tools are loaded onto the transport vehicle 52, the transport control unit 83 causes the transport vehicle 52 to travel from the warehouse system 1 to the component mounting machine 91. The tools transported by the transport vehicle 52 are mounted on the component mounting machine 91 for use. The loading and unloading of tools onto the component mounting machine 91 is performed automatically or manually.

[0056] The line control unit 84 is connected by wire for communication with each of the substrate-related performing machines that make up the substrate-related performing line 9. The line control unit 84 controls the operation of each of the substrate-related performing machines. The line control unit 84 receives instructions from the production management unit 81 and causes the substrate-related performing machines to perform substrate-related work. The line control unit 84 notifies the production management unit 81 of information on the production results of the board products and information on the number of parts that have been reduced.

[0057] When the production of a certain type of board product is completed, it becomes clear that there are idle tools that will not be used in the next production plan. The production management unit 81 issues an instruction to the transport control unit 83 and the warehouse control unit 82 to return the idle tools to the warehouse system 1. At this time, the transport control unit 83 controls the transport in the reverse direction from the component mounting machine 91 to the warehouse system 1. In addition, the warehouse control unit 82 controls the warehousing operation in the reverse direction from the transport vehicle stopping unit 51 to the warehouse or loader.

[0058] 4. Operation of the Warehouse System 1 of the First Embodiment Next, the operation of the warehouse system 1 of the first embodiment will be described with reference to the operation flow shown in Fig. 3. This operation flow is mainly controlled by the warehouse control unit 82. In step S1 of Fig. 3, the warehouse control unit 82 checks whether or not a part container has been carried into the carry-in entrance 56. In step S2 when the part container has been carried in, the carry-in and information providing unit 55 performs information providing work.

[0059] In the next step S3, the warehouse control unit 82 selects a warehouse in which to store the part container to which the individual identification information has been assigned, and further determines a storage location. In the next step S4, the transport robot 6 transports the part container to the selected warehouse. The selected warehouse receives the part container and stores it in the determined storage location. After step S4, or if no part container has been carried in at step S1, execution of the operation flow proceeds to step S5.

[0060] In step S5, the warehouse control unit 82 checks whether or not an instruction has been received from the production management unit 81. If an instruction has been received, in step S6, the warehouse control unit 82 checks the contents of the instruction and determines the branch destination of the operation flow. That is, the warehouse control unit 82 branches to step S11 if the instruction is for transport work, step S21 if the instruction is for loading work, and step S31 if the instruction is for separation work.

[0061] In step S11 for transport work, the warehouse control unit 82 issues a command to the warehouse module in which the tools to be transported are stored to send them out. The warehouse module that receives the command sends the tools out to the delivery port. Next, the warehouse control unit 82 issues a command to the robot body 61 to transport them. The transport robot 6 receives the tools from the delivery port of the warehouse module and transports them to the transport vehicle stop unit 51.

[0062] Step S11 is executed in the component mounting machine 91 when the remaining number of components decreases and replacement work of the tape reel 71 or the tray 75 is performed. Step S11 is also executed for the prepared feeder device 73 or the prepared reel cassette temporarily stored in the reel loader 41. Furthermore, step S11 is executed for the prepared tray loading unit 77 temporarily stored in the tray loader 42. After step S11, the execution of the operation flow is merged with step S24 (described later).

[0063] In step S21, if a loading operation is performed in step S6, the warehouse control unit 82 issues a command to transport the component container and the component supply unit that are the subject of the instructed loading operation. In the following, a case will be described in which the tape reel 71 and the tray 75 are stored in the second component container warehouse 22. In the case in which the tape reel 71 and the tray 75 are stored in the first component container warehouse 21, the second component container warehouse 22 in the following description will be replaced with the first component container warehouse 21.

[0064] When loading the tape reel 71 into the feeder device 72 or the reel cassette, the warehouse control unit 82 first commands the second component container warehouse 22 to remove the tape reel 71, and then commands the robot body 61 to transport it. In accordance with the command, the second component container warehouse 22 removes the tape reel 71 to the delivery port. The robot body 61 receives the tape reel 71 from the second component container warehouse 22 and transports it to the reel loader 41.

[0065] Next, the warehouse control unit 82 commands the component supply unit warehouse 3 to remove the feeder device 72 or the reel cassette, and then commands the robot body 61 to transport it. The component supply unit warehouse 3 removes the feeder device 72 or the reel cassette to the delivery port in accordance with the command. The robot body 61 receives the feeder device 72 or the reel cassette from the component supply unit warehouse 3 and transports it to the reel loader 41. The robot body 61 may transport the tape reel 71 and the feeder device 72 or the reel cassette together.

[0066] In the next step S22, the reel loader 41 performs an operation of loading the tape reel 71 into the feeder device 72 or the reel cassette. Then, the reel loader 41 places the prepared feeder device 73 or the prepared reel cassette at the delivery port. Furthermore, the reel loader 41 notifies the warehouse control unit 82 that the loading operation is completed. In the next step S23, the warehouse control unit 82, which has received the notification, commands the robot body 61 to transport. The robot body 61 receives the prepared feeder device 73 or the prepared reel cassette from the reel loader 41, and transports it to the transport vehicle stop unit 51.

[0067] In the next step S24, the warehouse control unit 82 commands the transport vehicle stopping unit 51 to load the prepared feeder device 73 or the prepared reel cassette onto the transport vehicle 52. The subsequent transport to the component mounting machine 91 is performed under the control of the transport control unit 83. After step S24, the execution of the operation flow is returned to step S1. Also, when loading the tray 75 into the tray loading unit 76, the same operations as those from step S21 to step S24 described above are executed, except that the tray loader 42 performs the loading operation.

[0068] In step S31 in the case of separation work in step S6, the warehouse control unit 82 commands the reel loader 41 or the tray loader 42 to return the tools returned from the component mounting machine 91. For example, in the case of separation work to remove the tape reel 71 from the prepared feeder device 73 or the prepared reel cassette, the warehouse control unit 82 first commands the transport vehicle stop unit 51 to unload the prepared feeder device 73 or the prepared reel cassette from the transport vehicle 52, and then commands the robot body 61 to transport it. In accordance with the command, the transport vehicle stop unit 51 unloads the prepared feeder device 73 or the prepared reel cassette and places it at the delivery port. The robot body 61 receives the prepared feeder device 73 or the prepared reel cassette from the transport vehicle stop unit 51 and transports it to the reel loader 41.

[0069] In the next step S32, the reel loader 41 performs a separation operation to remove the tape reel 71 from the prepared feeder device 73 or the prepared reel cassette. Then, the reel loader 41 places the separated tape reel 71 and the feeder device 72 or the reel cassette at the delivery port. Furthermore, the reel loader 41 notifies the warehouse control unit 82 that the separation operation has been completed.

[0070] In the next step S33, the warehouse control unit 82 that has received the notification commands the robot body 61 to transport. The robot body 61 receives the tape reel 71 and the feeder device 72 or the reel cassette from the reel loader 41. Next, the robot body 61 returns the tape reel 71 to the second component container warehouse 22, and returns the feeder device 72 or the reel cassette to the component supply unit warehouse 3. After step S33, the execution of the operation flow is returned to step S1. Also, in the case of a separation operation for removing the tray 75 from the prepared tray loading unit 77, the same operations as those from step S31 to step S33 are executed, except that the tray loader 42 performs the separation operation.

[0071] The above-mentioned separation work is not essential. In other words, the prepared feeder device 73 or prepared reel cassette returned from the component mounting machine 91 may be stored in the reel loader 41 or the component supply unit warehouse 3 while still in a usable state. According to this storage method, in a combination of the tape reel 71 and the feeder device 72 or the reel cassette that are used intermittently with a downtime in between, it is possible to reduce the work of removing and reloading the tape reel 71. Similarly, the prepared tray loading unit 77 returned from the component mounting machine 91 may be stored in the tray loader 42 or the component supply unit warehouse 3 while still in a usable state.

[0072] There may also be a case where the production management unit 81 issues multiple instructions. For example, when an instruction is given to load three feeder devices 72 or reel cassettes, the warehouse control unit 82 repeats steps S21 to S24 three times. This allows the transport vehicle 52 to transport three prepared feeder devices 73 or three prepared reel cassettes together.

[0073] Furthermore, there is a case where the transport vehicle 52 returns the idle tools from the component mounting machine 91 to the transport vehicle stopping section 51, and then transports the prepared tools to the component mounting machine 91. In this case, the warehouse control section 82 executes in advance steps S21 to S24 corresponding to the tools to be prepared, and executes steps S31 to S33 corresponding to the returned tools later. This is efficient because the unloading of the returned tools and the loading of the prepared tools are carried out consecutively without delay after the transport vehicle 52 stops at the transport vehicle stopping section 51.

[0074] In the warehouse system 1 of the first embodiment, the transport robot 6 transports the component containers (tape reels 71, trays 75) stored in the second component container warehouse 22 to the component container loader (reel loader 41, tray loader 42), and transports the component supply units (feeder devices 72, reel cassettes, tray loading units 76) stored in the component supply unit warehouse 3 to the component container loader. The component container loader also loads the component containers into the component supply units. This automatically prepares the component supply units for use in the component mounting machine 91. Therefore, the operator is not involved in the loading operation, and further labor saving is achieved compared to the conventional method.

[0075] In addition, since the seven warehouse modules share common elements, it is easy to add more warehouse modules. This makes it easy to accommodate an increase in the amount of equipment stored, and the cost required for this is low. Furthermore, since the warehouse system 1 can be configured by freely combining multiple types of warehouse modules, it is possible to add work execution functions such as information assignment work in addition to the storage function, achieving even greater labor savings than before.

[0076] 5. Warehouse system 1A according to the second embodiment A warehouse system 1A according to the second embodiment will be described with reference to Fig. 4. As shown in Fig. 4, in the warehouse system 1A according to the second embodiment, a plurality of warehouse modules are divided and arranged in a lower and upper tier in the height direction. The types and arrangement of the warehouse modules in the lower tier are the same as those in the first embodiment. The types and arrangement of the warehouse modules in the upper tier are the same as those in the lower tier except that the transport vehicle stopping unit 51 is omitted.

[0077] The transport robot 6A is composed of two sets of robot bodies 61 and moving paths 62 for the lower and upper levels, respectively, and an elevator 65. The robot body 61 for the upper level moves to the moving path 62 for the lower level using the elevator 65, so that it can move to the transport vehicle stopping section 51 provided only for the lower level. The two robot bodies 61 are controlled by the warehouse control section 82 and move while avoiding collisions.

[0078] In the second embodiment, the structure and function of each warehouse module and the operation of the transport robot 6A are the same as those in the first embodiment. In the warehouse system 1A of the second embodiment, the warehouse modules are arranged in two tiers, one above the other, so that the storage capacity of tools can be increased by about twice as much as in the first embodiment without increasing the installation space. Furthermore, the warehouse modules can be arranged in three or more tiers, so that a large number of tools can be stored with higher space efficiency.

[0079] 6. Applications and Modifications of the Embodiments It is also possible to omit the transport vehicle stopping section 51, the transport vehicle 52, and the transport path 53, and have an operator carry the prepared tools to the component mounting machine 91. Also, the separation work performed by the reel loader 41 may be performed by a separate reel unloader. Similarly, the separation work performed by the tray loader 42 may be performed by a separate tray unloader.

[0080] The first component container warehouse 21, the second component container warehouse 22, and the component supply unit warehouse 3 may store raw materials for circuit boards, incomplete circuit board products with some components not yet mounted, circuit board products that have been determined to be unsatisfactory by a circuit board inspection machine and require repair, etc. The warehouse system (1, 1A) may also store solder used in a solder printing device, and tools such as a screen and a squeegee, and may be capable of transporting these from the transport vehicle stopping section 51 to the solder printing device. In addition, the first and second embodiments can be applied and modified in various ways. [Explanation of symbols]

[0081] 1, 1A: Warehouse system 21: First component storage container warehouse 22: Second component storage container warehouse 3: Component supply unit warehouse 41: Reel loader 42: Tray loader 51: Transport vehicle stop section 52: Transport vehicle 53: Transport path 55: Loading and information provision section 56: Loading entrance 6: Transport robot 61: Robot body 62: Movement path 63: Non-contact power transmission section 64: Non-contact power receiving section 65: Elevator 71: Tape reel 72: Feeder device 73: Prepared feeder device 75: Tray 76: Tray loading unit 77: Prepared tray loading unit 8: Production management system 81: Production management section 82: Warehouse control section 83: Transport control section 84: Line control section 9: Substrate work line 91: Component placement machine

Claims

1. a part container warehouse for storing a plurality of part containers each containing a plurality of parts; a component container unloader for separating the component container from a component supply unit used when supplying the components contained in the component container to a component mounting machine; a transport robot that moves between the part container warehouse and the part container unloader and transports the part container separated by the part container unloader to the part container warehouse; A warehouse system comprising:

2. a component supply unit warehouse for storing a plurality of component supply units used when supplying the components accommodated in the component container to the component mounting machine; a component container unloader for separating the component container, which contains a plurality of components, from the component supply unit; a transport robot that moves between the component supply unit warehouse and the component container unloader and transports the component supply unit separated by the component container unloader to the component supply unit warehouse; A warehouse system comprising:

Citation Information

Patent Citations

  • Electronic component mounting system and electronic component mounting method

    JP2013235906A

  • System for producing printed-wiring board unit and its producing method

    WO1992017047A1

  • Component mounting system

    WO2014010083A1

  • Production control system provided with SMT line

    JP1998034459A