Abnormality detection system, abnormality detection method, and abnormality detection program

The anomaly detection system addresses the challenge of automatically detecting and addressing abnormalities in construction data by using a control unit to calculate and compare data against limits, enhancing data management efficiency and accuracy.

JP2024134428AActive Publication Date: 2024-10-03OBIC CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023044728
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-20
Publication Date
2024-10-03
Estimated Expiration
2043-03-20

AI Technical Summary

Technical Problem

Existing systems fail to automatically detect abnormalities in construction data and implement early detection and countermeasures, making it difficult to manage large volumes of data effectively.

Method used

An anomaly detection system that includes a control unit to access project data, divide it into specific conditions, calculate approximate curves, and detect abnormalities by comparing data against upper and lower limits, with a display control unit to visualize the results on an analysis screen.

Benefits of technology

Automatically detects anomalies in construction data, allowing for early intervention and reducing the need for manual checks, thereby improving data management efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024134428000001_ABST
    Figure 2024134428000001_ABST
Patent Text Reader

Abstract

To provide an abnormality detection system, an abnormality detection method, and an abnormality detection program which enable automatically detecting an abnormality in business data to make early detection / treatment.SOLUTION: An abnormality detection system comprises: detection means to divide the population of past subject data by designated specific data, calculate an approximate curve on a lapse rate and a subject progress rate for the subject data for each of different populations, calculate a predicted value of the subject progress rate by substituting the lapse rate for an approximate curve function, calculate upper / lower limits on the basis of the approximate curve and the predicted value for the subject progress rate, and detect an abnormality in comparison between the subject data to be detected and the upper / lower limits; and display control means to display analysis data about the subject data detecting the abnormality on an analysis screen.SELECTED DRAWING: Figure 10
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an anomaly detection system, an anomaly detection method, and an anomaly detection program. [Background technology]

[0002] Conventionally, for example, the construction industry is an industry where anomalies often occur in construction-related data. Since it is necessary to check for anomalies from a huge amount of data, it is becoming beyond the range that can be checked manually. Conventionally, for example, Patent Document 1 is known as a system for detecting anomalies in business data. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2015-95122 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, Patent Document 1 does not disclose anything about automatically detecting anomalies in case (business) data and discovering and dealing with them early.

[0005] In view of the above, an object of the present invention is to provide an anomaly detection system, an anomaly detection method, and an anomaly detection program that can automatically detect anomalies in case data and perform early discovery and handling. [Means for solving the problem]

[0006] In order to solve the above-mentioned problems and achieve the object, the present invention provides an anomaly detection system having a control unit, the control unit being configured to be able to access case data including one or more specific conditions, progress rates, and case progress rates, and is characterized by comprising detection means for dividing a population of past case data according to specified specific conditions, calculating an approximate curve for the progress rate and case progress rate of the case data for each population, substituting the progress rate into a function of the approximate curve to calculate a predicted value of the case progress rate, calculating upper and lower limits based on the approximate curve and the predicted value of the case progress rate, and comparing the case data to be detected with the upper and lower limits to detect anomalies, and display control means for displaying analysis data on an analysis screen for case data in which an anomaly has been detected.

[0007] Moreover, according to one aspect of the present invention, the project data includes construction data, the specific conditions include the type of work, construction period, or public / private classification, the progress rate includes the construction period progress rate calculated by the number of months elapsed in construction / the planned construction period, and the project progress rate includes the cumulative progress rate calculated by the currently incurred costs / (landing cost budget+currently incurred costs), and the construction data may include the work, the organization, one or more specific conditions, fiscal year and month, sales amount, construction period progress rate, and cumulative progress rate.

[0008] According to one aspect of the present invention, the display control means may display a message in a specified area of ​​the analysis screen based on the construction data, the message including the construction detected as abnormal, the detection method, and the cumulative progress rate determined to be abnormal.

[0009] According to another aspect of the present invention, the display control means may display, in a specified area of ​​the analysis screen based on the construction data, actual cumulative progress rates and their approximate curves for past construction works by population or for all past construction works, broken down by construction period progress rate, as well as a graph showing the trends in actual cumulative progress rates linked to construction works in which an abnormality has been detected.

[0010] According to another aspect of the present invention, the display control means may display, in a specified area of ​​the analysis screen based on the construction data, the actual cumulative progress rate of past construction works and its approximate curve, and a graph showing the trend in the actual cumulative progress rate linked to construction works in which an abnormality has been detected, by accounting month and year.

[0011] According to another aspect of the present invention, the display control means may display a table showing actual sales and forecasted sales trends by organization for a specified accounting period in a specified area of ​​the analysis screen based on the construction data.

[0012] According to another aspect of the present invention, the display control means may display, based on the construction data, a table in a specified area of ​​the analysis screen showing the trends in actual sales and sales forecasts for each construction project of the organization in charge of the construction project in which the abnormality occurred.

[0013] In addition, in order to solve the above-mentioned problems and achieve the object, the present invention provides an anomaly detection method executed by an information processing device having a control unit, the control unit being configured to be able to access case data including one or more specific conditions, progress rates, and case progress rates, and the method includes a detection process of dividing a population of past case data according to specified specific conditions executed by the control unit, calculating an approximation curve for the progress rate of business data and the case progress rate for each population, substituting the progress rate into a function of the approximation curve to calculate a predicted value of the case progress rate, calculating upper and lower limits based on the approximation curve and the predicted value of the case progress rate, and comparing the case data to be detected with the upper and lower limits to detect an anomaly, and a display control process of displaying analysis data on an analysis screen for the case data in which an anomaly has been detected.

[0014] In addition, in order to solve the above-mentioned problems and achieve the object, the present invention provides an anomaly detection program to be executed by an information processing device having a control unit, the control unit being configured to be able to access case data including one or more specific conditions, progress rates, and case progress rates, and the control unit is characterized in executing the following detection process: a detection process in which a population of past case data is divided according to specified specific conditions, an approximation curve for the progress rate and case progress rate of the case data for each population is calculated, a predicted value of the case progress rate is calculated by substituting the progress rate into a function of the approximation curve, an upper limit value and a lower limit value based on the approximation curve and the predicted value of the case progress rate, and an anomaly is detected by comparing the case data to be detected with the upper limit value and the lower limit value; and a display control process in which analysis data for the case data in which an anomaly has been detected is displayed on an analysis screen. Effect of the Invention

[0015] The present invention has the effect of automatically detecting anomalies in case data, enabling early discovery and handling of the problem. [Brief description of the drawings]

[0016] [Figure 1] FIG. 1 is a diagram showing an example of an illegal system. [Diagram 2] FIG. 2 is a diagram showing an example of an image of a good performance. [Diagram 3] FIG. 3 is a diagram for explaining the scope of applicability (industries in which the present invention can be used). [Figure 4] FIG. 4 is a diagram for explaining the measures and effects for problem (1). [Diagram 5] FIG. 5 is a diagram for explaining the measures and effects for problem (2). [Figure 6] FIG. 6 is a diagram for explaining the measures and effects for the problem (3). [Figure 7] FIG. 7 is a diagram for explaining the measures and effects for the problem (4). [Figure 8] FIG. 8 is a diagram showing an example of a display of the initial analysis screen. [Figure 9]FIG. 9 is a diagram showing a display example of the analysis screen. [Figure 10] FIG. 10 is a block diagram illustrating a hardware configuration of the anomaly detection system according to the embodiment. [Figure 11] FIG. 11 is a flowchart for explaining an outline of the overall processing of the control unit of the anomaly detection system according to the present embodiment. [Figure 12] FIG. 12 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 13] FIG. 13 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 14] FIG. 14 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 15] FIG. 15 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 16] FIG. 16 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 17] FIG. 17 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 18A] FIG. 18A is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 18B] FIG. 18B is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 19A] FIG. 19A is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 19B] FIG. 19B is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 20A] FIG. 20A is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 20B]FIG. 20B is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 21] FIG. 21 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 22A] FIG. 22A is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 22B] FIG. 22B is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 23A] FIG. 23A is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 23B] FIG. 23B is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 24A] FIG. 24A is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 24B] FIG. 24B is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 25A] FIG. 25A is a diagram for explaining a specific example of the process of the control unit in the anomaly detection system in the present embodiment. [Figure 25B] FIG. 25B is a diagram for explaining a specific example of the process of the control unit in the anomaly detection system in the present embodiment. [Figure 26A] FIG. 26A is a diagram for explaining a specific example of the process of the control unit in the anomaly detection system in the present embodiment. [Figure 26B] FIG. 26B is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 27A] FIG. 27A is a diagram for explaining a specific example of the process of the control unit in the anomaly detection system in the present embodiment. [Figure 27B]FIG. 27B is a diagram for explaining a specific example of the process of the control unit in the anomaly detection system in this embodiment. [Figure 28A] FIG. 28A is a diagram for explaining a specific example of the process of the control unit in the anomaly detection system in the present embodiment. [Figure 28B] FIG. 28B is a diagram for explaining a specific example of the process of the control unit in the anomaly detection system in this embodiment. [Figure 29A] FIG. 29A is a diagram for explaining a specific example of the process of the control unit in the anomaly detection system in the present embodiment. [Figure 29B] FIG. 29B is a diagram for explaining a specific example of the process of the control unit in the anomaly detection system in this embodiment. [Diagram 30] FIG. 30 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Diagram 31] FIG. 31 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Diagram 32] FIG. 32 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 33A] FIG. 33A is a diagram for explaining a specific example of the process of the control unit in the anomaly detection system in the present embodiment. [Figure 33B] FIG. 33B is a diagram for explaining a specific example of the process of the control unit in the anomaly detection system in the present embodiment. [Diagram 34] FIG. 34 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Diagram 35] FIG. 35 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Diagram 36] FIG. 36 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 37]FIG. 37 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 38] FIG. 38 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 39] FIG. 39 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Diagram 40] FIG. 40 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Diagram 41] FIG. 41 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 42A] FIG. 42A is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 42B] FIG. 42B is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Diagram 43] FIG. 43 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Diagram 44] FIG. 44 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Diagram 45] FIG. 45 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 46A] FIG. 46A is a diagram for explaining a specific example of the process of the control unit in the anomaly detection system in the present embodiment. [Figure 46B] FIG. 46B is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 47A] FIG. 47A is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 47B]FIG. 47B is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 48A] FIG. 48A is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 48B] FIG. 48B is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 49A] FIG. 49A is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 49B] FIG. 49B is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 50] FIG. 50 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 51] FIG. 51 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 52] FIG. 52 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 53A] FIG. 53A is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 53B] FIG. 53B is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 54] FIG. 54 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 55] FIG. 55 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 56] FIG. 56 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 57]FIG. 57 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 58A] FIG. 58A is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 58B] FIG. 58B is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 59] FIG. 59 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 60] FIG. 60 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 61] FIG. 61 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 62] FIG. 62 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 63] FIG. 63 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 64] FIG. 64 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 65] FIG. 65 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 66] FIG. 66 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 67] FIG. 67 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 68] FIG. 68 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 69] FIG. 69 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 70] FIG. 70 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 71] FIG. 71 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in the present embodiment. [Figure 72] FIG. 72 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 73] FIG. 73 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 74] FIG. 74 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. [Figure 75] FIG. 75 is a diagram for explaining a specific example of the process of the control unit of the anomaly detection system in this embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0017] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An anomaly detection system according to an embodiment of the present invention will now be described in detail with reference to the accompanying drawings.

[0018] [1. Overview] The present invention will be outlined in the following order: (1-1. Background and premise), (1-2. Measures and effects for solving the problems), and (1-3. Analysis screen).

[0019] (1-1.Background / Premise) The background and premise will be explained with reference to Figures 1 to 3. Traditionally, the construction industry has been an industry where abnormalities have often occurred in construction-related data. Since it is necessary to check for abnormalities from within a huge amount of data, the range of checking by human hands is exceeding, and there is a demand for a mechanism that allows early detection and response by means other than human hands.

[0020] In this embodiment, a system is constructed that automatically detects abnormality periodically by creating a scenario of abnormality patterns as a measure for early detection and handling of data abnormalities and a measure that does not involve human intervention.

[0021] Specifically, in this embodiment, fraudulently registered business data is automatically detected and notified within transaction data in a business system. In this case, the approximate progress of construction managed by the company is calculated based on past construction results, and construction showing a large deviation compared to the results of uncompleted construction is detected as an abnormality. In addition, a screen is output on which the approximate construction progress curve and the progress curve of construction detected as abnormal can be confirmed. In addition, since construction abnormalities affect the figures of an organization, a screen is output on which the results by organization and construction period can be confirmed.

[0022] According to this embodiment, it is possible to periodically detect fraud from a huge amount of information related to construction work, and to confirm the predicted future progress of unfinished construction work and the degree of the workload of construction work that may occur in the future. In addition, it is possible to perform detailed analysis of the predicted progress of each organization by period and the trend of progress by month of construction work.

[0023] As an example, it is assumed that the system will be used by companies in the construction industry that implement "percentage of completion sales" to manage the progress of each project.

[0024] There are two methods for recording sales for construction work in the construction industry. (1) The percentage of completion method is a method of recording sales based on the ratio of the accumulated cost amount recorded during construction in progress to the estimated final cost amount. (2) Sales from completed construction projects is a method of recording sales when the construction work is completed.

[0025] Possible patterns of data anomalies include the following: Possible fraudulent activities include misallocation of construction costs, non-recording of costs, and delays in recording sales. For projects with good results, construction may be brought forward.

[0026] A feature that applies to both patterns is the "impact on the progress rate of construction." The approximation line of the progress rate trends of past construction works = "the progress rate trends that our company basically follows when constructing construction works" is used as a reference value, and if there is a large deviation between the approximation line of the progress rate trends of past construction works and the current construction work, it can be seen as an abnormality because the progress rate is different from the past trend.

[0027] Figure 1 is a diagram showing an example of a fraudulent system. Figure 1 shows a graph of a progress curve, with the horizontal axis showing the progress rate (%) of the construction period and the vertical axis showing the cumulative progress rate (%), and an approximation curve of the progress rate trends of past construction works and the progress of the construction works are plotted. In this figure, the progress rate is abnormally sluggish compared to the approximation curve, and there is a possibility that it corresponds to a fraudulent system.

[0028] Figure 2 is a diagram showing an example of a good performance type. Figure 2 shows a graph of the progress curve, with the horizontal axis showing the progress rate (%) of the construction period and the vertical axis showing the cumulative progress rate (%), and the approximate curve of the progress rate trends of past construction works and the construction progress are plotted. In this figure, the construction progress rate has increased abnormally compared to the approximate curve, and there is a possibility that it falls into the good performance type.

[0029] Here, we will explain the progress rate of the construction period, the completed volume, and the construction progress rate (cumulative progress rate). The progress rate of the construction period refers to the progress rate of the construction period in months as of the current accounting month. For example, if you assume that there is a construction project with a 12-month construction period, which begins in January and ends in December, and the current month is May, the progress rate of the construction period = 5 / 12 ≒ 42% (the decimals of % are rounded off). - In the case of percentage-of-completion sales, which generally refers to the amount of sales from the construction project, the amount of sales from the construction project = the amount of sales from the construction project adjusted to the cumulative progress rate. ·The construction progress rate (cumulative progress rate) refers to the actual progress rate for each construction project. The progress rate generally refers to the degree of the current cost accumulation compared to the total of the current accumulation of costs and the future forecast (the expected cost amount to be incurred until the construction is completed). For example, if the final cost budget is 1,000 yen and the current incurred cost is 500 yen, the cumulative progress rate = 500 / (500+1000) ≒ 33%.

[0030] From here on, the main focus will be on explaining the graphs, so to make the chronological explanation easier to understand, I will use the term "cumulative progress rate."

[0031] FIG. 3 is a diagram for explaining the applicable range (available industries) of the present invention. In this specification, an embodiment for the construction industry will be described as an example. The present invention is not limited to the building industry, This is applicable to other companies and industries that manage projects. Figure 3 shows the relationship between the concepts by terminology in this specification when considering expansion to industries other than the construction industry (software development, advertising and media, etc.).

[0032] "Project (work)" includes projects, which further include construction, development tasks, content production, etc. "Specific conditions" include project type / period, which include work type / construction period / public / private classification, system type / development period, content medium / production period, etc. "Project progress" includes project progress, which includes completed volume, completed man-hours, completed amount, etc.

[0033] In this way, the anomaly detection system of the present invention is not limited to the construction industry, but can also be applied to other industries that manage projects (cases), for example.

[0034] (1-2. Measures and Effects for Issues) The measures and effects for the issues (1) to (4) will be described with reference to Figs. 4 to 7.

[0035] (Challenge (1)) Fig. 4 is a diagram for explaining the measures and effects for problem (1). Measures and effects for problem (1) will be explained with reference to Fig. 4.

[0036] When the amount of work changes for a specific unit such as construction period or type, it is almost impossible to analyze the status and abnormality of the amount of work for each unit. When calculating the amount of work under specific conditions, there are the following issues. - Since it is necessary to define specific conditions and aggregate data from a huge amount of data, there is a risk of calculation errors and data reference errors, which are costly to calculate. · There are few cases where the "specific conditions that are known to have different characteristics of the output" are known in advance, so it is necessary to identify the characteristics by dividing into multiple units and checking the aggregates. Therefore, there are cases where the effect is low compared to the work costs.

[0037] As a countermeasure to this, the system calculates the volume per specific condition through automatic execution, and by simply changing the designation of the specific condition, it is possible to check whether the specified conditions are "specific conditions known to have different volume characteristics."

[0038] This makes it easier to analyze which units have different characteristics when it comes to the progress of construction work that the company handles, and it also enables the company to quickly narrow down its review to construction works with similar progress, which makes it possible to more accurately detect abnormalities in progress.

[0039] (Challenge (2)) Fig. 5 is a diagram for explaining the measures and effects for problem (2). Measures and effects for problem (2) will be explained with reference to Fig. 5.

[0040] It is not realistic, and is virtually impossible, to regularly check the progress trends of all past construction projects. If you try to refer to the progress records of all construction projects, you will encounter the following issues: It is necessary to extract information about production volume from a huge amount of data, which is costly and prone to errors. - Calculating trading volume trends requires specialized skills, so in addition to understanding data structures, it is also necessary to calculate trading volume over time.

[0041] Therefore, regular checks are necessary to grasp trends, and the above two risks arise each time.

[0042] As a countermeasure to this, the system periodically checks the progress of all past construction projects, and performs calculations on the system side so that the progress of all past construction projects can be visualized.In addition, a graph that visualizes the progress of the progress is prepared on the analysis screen.

[0043] This makes it possible to understand the progress of past construction work by checking a single graph. This reduces the risk of work costs and mistakes, and eliminates the need for specialized skills to visualize the progress of work.

[0044] (Challenge (3)) Fig. 6 is a diagram for explaining the measures and effects for the problem (3). The measures and effects for the problem (3) will be explained with reference to Fig. 6.

[0045] In order to compare the trends of the progress of construction work in progress and the progress of all past construction work, it is necessary to confirm the approximate value of the progress during the construction period of all past construction work. If you try to obtain an approximate value from the trend of the progress of all construction work, the following issues arise.

[0046] It is necessary to extract information about production volume from a huge amount of data, which is costly and prone to errors. - Calculating trading volume trends requires specialized skills, so in addition to understanding data structures, it is also necessary to calculate trading volume over time. · Calculating an approximation of trading volume requires specialized skills, so calculations are required to calculate an approximation of the data taking into account the characteristics of the data trends.

[0047] As a countermeasure to this issue, the system's algorithm is used to calculate an approximation of the progress made on all past construction projects, and the approximation is visualized on an analysis screen.

[0048] This allows you to intuitively grasp trends in the volume of work completed in past construction projects, making it possible to confirm approximate trends in the volume of work completed by your own company, taking into account the characteristics of all past construction projects. This reduces the risk of work costs and errors, and eliminates the need for specialized skills to calculate approximate values ​​for data.

[0049] (Challenge (4)) Fig. 7 is a diagram for explaining the measures and effects for problem (4). Measures and effects for problem (4) will be explained with reference to Fig. 7.

[0050] In order to notice that the progress of a construction project in progress is abnormal compared to past construction projects, it is necessary to compare and confirm each individual point of progress (each month, 10% progress interval, etc.) with the approximate value of all past construction projects, which is unrealistic and virtually impossible. When trying to compare and confirm each individual point of progress (each month, 10% progress interval, etc.) with the approximate value of all past construction projects, the following issues arise:

[0051] - Data aggregation by pattern is required, such as the amount of work done at each point in the progress of work (each month, 10% intervals of progress, etc.), and the task of pattern aggregation from a huge amount of data is required, so in addition to the risk of work costs and mistakes, knowledge about pattern aggregation is required. Furthermore, it is necessary to determine as abnormal those values ​​that are abnormally different from the approximate values ​​by comparing the results of all works in progress, so it is almost impossible to do this task manually.

[0052] As a countermeasure to this, the "progress of progress for construction work in progress" and the "approximate value of progress for all past construction work" are visualized side by side. It also makes it possible to compare progress rates and months on a single screen. The system also calculates and visualizes a threshold that can be used to determine whether something is abnormal based on the deviation from the approximate value. It also visualizes whether construction work in progress has an abnormal progress rate trend at a glance.

[0053] This makes it possible to immediately grasp the deviation from past trends at each progress rate point. It reduces the labor costs and risk of errors, eliminates the need for manual tabulation work, and makes it possible to check and understand at a glance whether the data is abnormal.

[0054] (1-3.Analysis screen) The analysis screen of the anomaly detection system of this embodiment will be described with reference to Figs. 8 and 9. The analysis screen outputs "Period progress rate and cumulative progress rate by project", "Approximate cumulative progress rate by period progress rate for the entire project", and "Forecasted sales amount (approximate value) and actual results by organization and project". Information for which an anomaly has been detected is highlighted by changing the color or font size so that the anomaly can be seen at a glance. The anomaly detection data that can be confirmed targets the cumulative progress rate by period progress rate of projects in progress, and detects projects that deviate significantly from the trend of cumulative progress rates in the past.

[0055] The analysis screen is composed of an initial analysis screen as shown in Fig. 8 and an analysis screen as shown in Fig. 9. The analysis screen switches from Fig. 8 to Fig. 9 in that order.

[0056] The initial analysis screen in Figure 8 displays a list of messages resulting from the detection of anomalies, and outputs summary messages of the detected anomalies.

[0057] Area A1 is an area that displays messages related to abnormality detection processing, and displays the difference between the cumulative progress rate of the timing, construction, and month in which the abnormality was detected and the approximate progress rate of past construction. Since the output is on an overview basis, it is necessary to select the message and switch screens to see the detailed detection method. If there are multiple pieces of information detected as abnormal, they will be displayed vertically.

[0058] The analysis screen in Figure 9 displays the graphs necessary for analyzing the result messages of detected anomalies. It switches when a message is selected on the initial analysis screen in Fig. 8. Graphs necessary for analysis are displayed, and the message outputs detailed information related to detection. The analysis screen in Fig. 9 has multiple display areas, Area A1 to Area A6.

[0059] Area A1 is an area that displays messages related to the anomaly detection process. It displays the "detection method used to detect the anomaly" and "key information of the data in which the anomaly was detected." If multiple pieces of information are detected as an anomaly, a scroll bar (not shown) is displayed in area A1, and different messages can be switched between by scrolling, even for the number of messages that are not displayed. When a displayed message is clicked, the portion of the graphs in areas A2 to A5 that is related to the clicked anomaly detection information is highlighted.

[0060] Area A2 is an area that displays graphs that output "Actual cumulative progress rates of past construction projects and their approximate curves" and "Actual cumulative progress rates linked to construction projects for which an abnormality was detected." It outputs a graph that allows you to check "Trends in cumulative progress rates by construction period progress rate." You can check the plot of cumulative progress rates by construction period progress rate for all past construction projects. You can check the approximate curve that passes through the approximate value calculated from the cumulative progress rates for each construction period progress rate for all past construction projects (which can be considered as the trend in progress rates for your company's construction projects in general). You can check how construction projects for which an abnormality was detected are trending abnormally far from the approximate curve.

[0061] Area A3 is an area that displays a graph that outputs the "approximate curve of cumulative progress rate results of past construction projects" and the "cumulative progress rate results linked to construction projects where an abnormality was detected" on a monthly basis. It outputs a graph that allows you to check the "trend in cumulative progress rate occurrence by accounting month." By checking the deviation from the approximate curve for each month, it is possible to analyze which month an abnormal trend is starting to appear.

[0062] Area A4 is an area that displays a table that outputs monthly construction results and forecast results by organization. The forecast values ​​that are output in the table that allows you to check "current construction results and forecast results by organization" are displayed using approximate values ​​calculated from past construction results. Using a prediction that "approximately, it will land at about this level," you can check the deviation from the current situation. If progress is poor, it is expected that a trend toward poor performance on an organizational level will be visualized.

[0063] Area A5 is an area that displays a table that outputs the monthly construction results and forecast results for each project. It outputs a table that allows you to check "current construction results for each project and forecast results expected to occur by the end of the period." Forecast values ​​are displayed using approximate values ​​calculated from past construction results, and a prediction that "approximately, it will land at this level" is used to check for deviations from the current situation. If progress is poor, it is expected that a trend toward poor performance on a project-by-project basis will be visualized. Note that if performance is poor on an organizational level when checked in area A4, it is possible that poor performance across multiple projects will be visualized here.

[0064] Area A6 is an extraction condition designation area for designating extraction conditions such as a base date, accounting period, business establishment, department, and data reference unit for the graphs and tables to be output in areas A2 to A5. This is the area to use when you want to check data extracted based on conditions from the data output in the graphs and tables in areas A2 to A5. When extracting and analyzing the accounting period to be checked, the graphs and tables are output only for construction projects that have been performed within the accounting year and month range of the specified accounting period. When extracting and analyzing output data at the organizational level, specify the business establishment or department and output the graphs and tables.

[0065] [2. Configuration] Fig. 10 is a block diagram showing an example of the configuration of an anomaly detection system 100 according to this embodiment. In Fig. 10, the anomaly detection system 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. The units included in the anomaly detection system 100 are connected to each other so as to be able to communicate with each other via any communication path.

[0066] The communication interface unit 104 communicatively connects the anomaly detection system 100 to a network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via the communication line. Here, the network 300 has a function of connecting the anomaly detection system 100 and the server 200 etc. so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network).

[0067] An input device 112 and an output device 114 are connected to the input / output interface unit 108. The output device 114 may be a monitor (including a home television), a speaker, or a printer. The input device 112 may be a keyboard, a mouse, a microphone, or a monitor that cooperates with a mouse to realize a pointing device function. In the following, the output device 114 may be referred to as a monitor 114.

[0068] Various databases, tables, files, etc. are stored in the storage unit 106. Computer programs for cooperating with an OS (Operating System) to give instructions to a CPU (Central Processing Unit) to perform various processes are recorded in the storage unit 106. For example, memory devices such as RAM (Random Access Memory) and ROM (Read Only Memory), fixed disk devices such as hard disks, flexible disks, optical disks, etc. can be used as the storage unit 106.

[0069] The storage unit 106 includes a business database 106a, an abnormality detection execution data table 106b, an abnormality determination result data table 106c, an abnormality determination definition master 106d, and the like.

[0070] The business database 106a is a database for storing business data (also called "project data"), accounting period master data, etc. Construction data will be described as an example of business data. Other types of business data include development task data, production content data, etc.

[0071] The construction data may include the name of the construction project, the type of work (specific conditions), the organization (business establishment, department), the month the construction project started, the month the construction project ended, the construction period (specific conditions), the construction completion category (completed or incomplete), the accounting year and month, the sales amount, the construction period progress rate, the cumulative progress rate, etc. (see Figure 12 (A) etc.).

[0072] The accounting period master can be configured as a table or the like in which accounting periods, accounting years and months, and display orders are associated with each other and registered (see FIG. 23A(D)).

[0073] The abnormality detection execution data table 106b is a table for storing automatic detection execution schedule data, acquisition range condition data for business data (for example, construction data), abnormality determination result registration target period data, and the like.

[0074] The automatic detection execution schedule data may include a detection ID, a schedule ID, an execution condition, and an execution time (see FIG. 13). The detection ID and the schedule ID become key information when referring to the data. The detection unit 102b automatically executes anomaly detection in the construction data according to the automatic detection execution schedule data.

[0075] The acquisition range condition data for business data (e.g., construction data) may include a detection ID, a schedule ID, a condition, and a condition value (see FIG. 14(C)). The detection ID and schedule ID become key information when referencing the data. The detection unit 102b divides the population of construction data for each specific condition (e.g., type of work) and automatically executes anomaly detection for each population.

[0076] The data on the period for which anomaly judgment results are to be registered may include a detection ID, a period judgment item, and an acquisition criterion (see FIG. 13). The detection ID is key information when referencing data. The detection unit 102b sets the construction data of the period judgment item (e.g., fiscal year and month) that matches the acquisition criterion as an anomaly judgment target and performs an anomaly judgment.

[0077] The abnormality determination result data table 106c is a table for storing the determination results of the abnormality detection execution such as abnormality determination result data, abnormality determination result message data, abnormality determination result message detailed data, abnormality determination result ancillary information data, etc. When the detection unit 102b detects an abnormality in the construction data, it stores the abnormality determination result data, abnormality determination result message data, abnormality determination result message data, abnormality determination result message detailed data, and abnormality determination result ancillary information data in the abnormality determination result data table 106c.

[0078] The abnormality judgment result data may include the detection ID, JOBID, judgment group CD, message ID, fiscal year and month, business establishment, department, project, type of work, abnormality judgment result (True if abnormal, False if not abnormal), construction progress rate, cumulative progress rate, predicted progress rate (predicted value of cumulative progress rate), etc. (see Figure 19A (A)). "Judgment group CD" is the key of the judgment group (population). The detection ID, JOBID, and judgment group CD become key information when referencing the data. For results that are judged to be non-abnormal as a result of the judgment, no judgment result message data record is created.

[0079] The abnormality judgment result message data may include a detection ID, a JOB ID, a judgment group CD, a message ID, an abnormality level, a definition name, an overview, and a detection target (see FIG. 19A(B)). The detection ID, the JOB ID, and the judgment group CD become key information when referencing the data.

[0080] The detailed data of the abnormality judgment result message may include a detection ID, a JOB ID, a judgment group CD, a message ID, a detection technique, a judgment method, a lower limit value, an upper limit value, etc. (See FIG. 19B(C) etc.). The detection ID, the JOB ID, and the judgment group CD become key information when referencing the data.

[0081] The anomaly judgment result ancillary information data may include a detection ID, a JOB ID, a judgment group CD, a line number, a progress rate of the work period, a predicted progress rate, a lower limit, an upper limit, etc. (see FIG. 19B(D)). The detection ID, the JOB ID, and the judgment group CD become key information when referencing the data.

[0082] The abnormality determination definition master 106d can be configured as a table in which abnormality determination definition ID, abnormality determination definition name, acquisition definition, algorithm used (e.g., approximation curve), and parameter setting {X-axis item (e.g., progress rate of construction period), Y-axis item (e.g., cumulative progress rate), X-axis scale unified item, Y-axis scale unified item, approximate function candidate name (e.g., polynomial function, logistic function, Bass model function), smoothness, significance level)} are associated and registered. The operator can set the data of the abnormality determination definition master 106d. The detection unit 102b refers to the abnormality determination definition master 106d when calculating the approximation curve, the predicted value of the cumulative progress rate, and the upper and lower limits.

[0083] The control unit 102 is a CPU or the like that performs overall control of the anomaly detection system 100. The control unit 102 has an internal memory for storing control programs such as an OS, programs that define various processing procedures, required data, and the like, and executes various types of information processing based on these stored programs.

[0084] The control unit 102 is configured to be able to access the business database 106a, the data table for abnormality detection execution 106b, the abnormality determination result data table 106c, the abnormality determination definition master 106d, and the like, which are stored in the storage unit 106. Note that the business database 106a, the data table for abnormality detection execution 106b, the abnormality determination result data table 106c, and the abnormality determination definition master 106d may be provided in another location (for example, the server 200) as long as the control unit 102 is able to access them.

[0085] The control unit 102 conceptually includes a memory control unit 102a, a detection unit 102b, and a display control unit 102c.

[0086] The memory control unit 102a may, for example, acquire daily business data from a business system (not shown) connected via the network 300 and store it in the business database 106a, or may input daily business data in response to an operator's operation on an input screen (not shown) displayed on the monitor 114, and store the data in the business database 106a.

[0087] In addition, the memory control unit 102a sets automatic detection execution schedule data, construction data acquisition range condition data, and abnormality determination result registration period data in response to, for example, an operator's operation on a data setting screen (not shown) displayed on the monitor 114, and stores them in the abnormality detection execution data table 106b.

[0088] The detection unit 102b executes anomaly detection according to the automatic detection execution schedule data, the business data acquisition range condition data, and the anomaly judgment result registration target period data stored in the data table for anomaly detection execution 106b, divides the population of past business data by the specified specific condition based on the business data stored in the business database 106a, calculates an approximation curve for the progress rate of the business data and the case progress rate for each population, calculates a predicted value of the case progress rate by substituting the progress rate into the function of the approximation curve, calculates an upper limit value (also called "upper limit threshold value") and a lower limit value (also called "lower limit threshold value") based on the approximation curve and the predicted value of the case progress rate, and detects an anomaly by comparing the business data to be detected with the upper limit value and the lower limit value. When the detection unit 102b detects an anomaly, it stores the anomaly judgment result data, the anomaly judgment result message data, the anomaly judgment result message detail data, and the anomaly judgment result attached information data in the anomaly judgment result data table 106c.

[0089] The display control unit 102c controls the display of an analysis screen (initial analysis screen, analysis screen) on the monitor 114. Based on the business data stored in the business database 106a, the display control unit 102c displays analysis data (e.g., Graphs 1 and 2, Tables 3 and 4 in FIG. 4, etc.) on the analysis screen for the business data in which an abnormality has been detected by the detection unit 102b.

[0090] The business data includes construction data, the specific conditions include the type of work, construction period, or public / private classification, the progress rate includes the construction period progress rate calculated by the number of months elapsed in construction / the planned construction period, the project progress rate includes the cumulative progress rate calculated by the currently incurred costs / (landing cost budget + currently incurred costs), and the construction data may include the construction, the organization (business establishment, department), one or more specific conditions, the fiscal year and month, the sales amount, the construction period progress rate, and the cumulative progress rate.

[0091] Based on the construction data, the display control unit 102c may display a message in a specified area of ​​the analysis screen (e.g., area A1 in FIG. 9) including the construction detected as abnormal, the detection method, and the cumulative progress rate determined to be abnormal.

[0092] Based on the construction data, the display control unit 102c may display in a specified area of ​​the analysis screen (e.g., area A2 in Figure 9) the actual cumulative progress rates of past construction works by population or all past construction works, broken down by construction period progress rate, and their approximate curves, as well as a graph showing the trends in the actual cumulative progress rates linked to construction works in which an abnormality has been detected.

[0093] Based on the construction data, the display control unit 102c may display in a specified area of ​​the analysis screen (e.g., area A3 in Figure 9) the actual cumulative progress rate of past construction projects by fiscal year and month, and an approximation curve therefor, as well as a graph showing the trend in the actual cumulative progress rate linked to construction projects in which an abnormality has been detected.

[0094] The display control unit 102c may display a table showing the trends in actual construction sales (construction actuals) and sales forecasts (construction forecasts) for each organization during a specified accounting period in a specified area of ​​the analysis screen (e.g., area A4 in FIG. 9) based on the construction data.

[0095] The display control unit 102c may display, based on the construction data, a table in a specified area of ​​the analysis screen (e.g., area A5 in FIG. 9) showing the trends in sales performance and sales forecast for each construction project of the organization in charge of the construction project in which the abnormality occurred.

[0096] [3. Specific Examples] 10 to 74, specific examples of processing by the control unit 102 of the anomaly detection system 100 in this embodiment will be described in the order of [3-1. Overall processing], [3-2. Sample data], [3-3. Methods for calculating approximate curves, predicted values, and upper and lower limits], and [3-4. Options for processing methods for past cases].

[0097] [3-1. Overall processing] FIG. 11 is a diagram illustrating an outline of a flow of the overall processing of control unit 102 in the anomaly detection system according to the present embodiment.

[0098] With reference to Fig. 11, an overview of the overall processing of the control unit 102 of the anomaly detection system 100 in this embodiment will be described. In Fig. 11, the detection unit 102b executes an anomaly detection process (step S1). Specifically, in the anomaly detection process, the detection unit 102b executes anomaly detection of construction data according to the automatic detection execution schedule data, the acquisition range condition data of the business data, and the data of the period for which anomaly judgment results are to be registered, which are stored in the data table for anomaly detection execution 106b, divides the population of past construction data by the specified specific conditions based on the construction data stored in the business database 106a, calculates an approximation curve for the construction period progress rate and the cumulative progress rate of the construction data for each population, calculates a predicted value of the cumulative progress rate by substituting the construction period progress rate into the function of the approximation curve, calculates an upper limit value and a lower limit value based on the approximation curve and the predicted value of the cumulative progress rate, and detects an anomaly by comparing the construction data to be detected with the upper limit value and the lower limit value. When detecting an abnormality, the detection unit 102b stores the abnormality determination result data, the abnormality determination result message data, the abnormality determination result message detail data, and the abnormality determination result ancillary information data in the abnormality determination result data table 106c.

[0099] The display control unit 102c executes an analysis screen display process (step S2). Specifically, in the analysis screen display process, the display control unit 102c controls the display of an analysis screen (initial analysis screen, analysis screen) on the monitor 114. Based on the construction data stored in the business database 106a, the display control unit 102c displays analysis data (e.g., messages, graphs 1-2, tables 3-4, etc. in FIG. 9) on the analysis screen for the construction work in which the detection unit 102b has detected an abnormality.

[0100] In addition, the display control unit 102c may display a message including the construction work detected as abnormal, the detection method, and the cumulative progress rate determined to be abnormal in a specified area of ​​the analysis screen (e.g., area A1 in FIG. 9) based on the construction data.

[0101] In addition, the display control unit 102c may display, in a specified area of ​​the analysis screen (for example, area A2 in FIG. 9) based on the construction data, the actual cumulative progress rate of past construction works by population or all past construction works, broken down by construction period progress rate, and an approximation curve thereof, as well as a graph showing the trend in the actual cumulative progress rate linked to construction works in which an abnormality has been detected.

[0102] In addition, the display control unit 102c may display, in a specified area of ​​the analysis screen (e.g., area A3 in FIG. 9) based on the construction data, a graph showing the actual cumulative progress rate of past construction projects and its approximate curve, as well as the trend of the actual cumulative progress rate linked to construction projects in which an abnormality has been detected, by accounting month and year.

[0103] In addition, the display control unit 102c may display a table showing the actual sales performance and forecasted sales trends for construction work by organization within a specified accounting period in a specified area of ​​the analysis screen (e.g., area A4 in FIG. 9) based on the construction work data.

[0104] In addition, the display control unit 102c may display a table in a specified area of ​​the analysis screen (e.g., area A5 in FIG. 9) based on the construction data, showing the trends in actual sales and sales forecasts for each construction project of the organization in charge of the construction project in which the abnormality occurred.

[0105] [3-2. Sample data] 12 to 51 are diagrams showing sample data for explaining a specific example of the processing by control unit 102 of anomaly detection system 100 in this embodiment. A specific example of the processing by control unit 102 of anomaly detection system 100 in this embodiment will be explained with reference to Figs. 12 to 51.

[0106] (S1: Anomaly detection process) A specific example of the anomaly detection process will be described with reference to Figures 12 to 19. The detection unit 102b executes anomaly detection of construction data according to the automatic detection execution schedule data, the business data acquisition range condition data, and the anomaly judgment result registration target period data stored in the data table for anomaly detection execution 106b, divides the population of past construction data by the specified specific condition based on the construction data stored in the business database 106a, calculates an approximation curve for the construction data progress rate and cumulative progress rate for each population, calculates a predicted value of the cumulative progress rate by substituting the construction data progress rate into the function of the approximation curve, calculates upper and lower limit values ​​based on the approximation curve and the predicted value of the cumulative progress rate, and detects an anomaly by comparing the construction data to be detected with the upper and lower limit values.

[0107] (Terminology) The progress rate of the construction period refers to the progress rate of the construction period in months as of the current accounting month. For example, if you assume that there is a construction project with a 12-month construction period, which begins in January and ends in December, and the current month is May, the progress rate of the construction period = 5 / 12 ≒ 42% (the decimals of % are rounded off). - Cumulative progress rate refers to the actual progress rate for each construction project. The progress rate generally refers to the degree of the current cost accumulation compared to the total of the current accumulation of costs and the future forecast (the expected cost amount until the completion of the construction). For example, if the final cost budget is 1000 yen and the current incurred cost is 500 yen, the cumulative progress rate = 500 / (500+1000) ≒ 33%. The predicted progress rate is a predicted value of a progress rate at an approximate position based on the past construction results, as determined by the abnormality detection process of the detection unit 102b.

[0108] The method for calculating the approximate curve, forecast value, and upper and lower limits from the construction progress rate and cumulative progress rate of the construction data will be explained in detail in (3-3. Method for calculating the approximate curve, forecast value, and upper and lower limits), and only an outline will be explained here.

[0109] 1. A process for calculating a predicted construction progress rate for all managed construction projects based on the construction data in the business database 106a, and detecting construction projects that are progressing abnormally.

[0110] Figure 12 is a diagram for explaining construction data. The construction data is used to hold information on the construction work to be carried out (organization, construction period, start time, completion time, planned man-hours, order amount, cumulative progress rate, etc.), and as shown in Figure 12(A), includes items such as construction name, business establishment, department, construction start month, construction end month, construction period, construction completion category, accounting year and month, sales amount, construction period progress rate, cumulative progress rate, etc.

[0111] In many cases, companies that use percentage of completion sales in the construction industry already manage the progress rate for the construction period and the cumulative progress rate in their business data. Therefore, this specification will be explained assuming that the progress rate for the construction period and the cumulative progress rate already exist in the business data. In some cases, companies that use sales based on completed construction in the construction industry or companies that manage projects in other industries do not manage the progress rate, so in those cases, a separate calculation is required.

[0112] The "construction progress rate" is calculated using the following formula. "Construction progress rate" = (number of months elapsed since construction began ÷ total number of months required for construction × 100 = (Number of months from "Construction start month" to "Fiscal year month" + 1 ÷ Number of months in "Construction period") x 100

[0113] The figures in the colored cells in the table in Figure 12(B) show the "construction progress rate" of the above construction works A, B, and C.

[0114] (1) Pre-settings (1-1) The storage control unit 102a stores information required for anomaly detection in the anomaly detection execution data table 106b in advance (data provided in advance). Specifically, automatic detection execution schedule data and anomaly determination result registration target period data are set in the anomaly detection execution data table 106b.

[0115] Fig. 13(A) is a diagram showing an example of automatic detection execution schedule data. The automatic detection execution schedule data has items such as detection ID, schedule ID, execution condition, and execution time. In the example shown in the figure, the detection ID is "AB001", the schedule ID is "SH001", the execution condition is "the 5th business day of every month", and the execution time is "23:00". In this example, automatic detection is executed at "23:00" on the 5th business day of every month. The 5th business day is assumed to be the timing when the monthly closing process for the previous month is finalized.

[0116] FIG. 13(B) shows an example of data for the period for which anomaly judgment results are registered. The data for the period for which anomaly judgment results are registered includes items for a detection ID, a period judgment item, and an acquisition criterion. In the example shown in the figure, the detection ID is "AB001", the period judgment item is "accounting year and month", and the acquisition criterion item is "the month before the month to which the startup date belongs". In this example, the acquisition criterion is "the month before the month to which the startup date belongs", and for example, when started on 2022 / 10 / 5, anomaly judgment is performed on the data for 2022 / 9. Detailed internal setting items are omitted as they are not directly related to this application.

[0117] (2) The detection unit 102b automatically executes anomaly detection. (2-1) First, acquire information on the timing of detecting an anomaly. Specifically, acquire the automatic detection execution schedule data and the anomaly determination result registration target period data set in the anomaly detection execution data table 106b in (1-1).

[0118] (2-2) Determine whether the timing of automatic execution is the timing to detect an abnormality. FIG. 14(A) is a diagram for explaining the automatic execution timing determination process. In the example shown in the figure, the start timing is the fifth business day of "2022 / 11 / 07", and the automatic detection execution schedule data is "the fifth business day of every month", so the execution determination result is "execute".

[0119] Depending on the execution determination result, the process branches to whether or not to perform subsequent processing. If the execution determination result is "execute," the process from (2-3) onward is executed. If the execution determination result is "not execute," the process ends.

[0120] The method of determining whether a day is a holiday or a business day is to refer to a calendar master (not shown) that exists in the business database 106a. The calendar master is based on the sales business calendar and is always updated.

[0121] (2-3) Obtain the range conditions of the data for detecting anomalies. Specifically, for example, the detection ID "AB001" and schedule ID "SH001" of the automatic detection execution schedule data shown in FIG. 14(B) are used as parameters (keys) to acquire the acquisition range condition data of the construction data set in the data table 106b for anomaly detection execution, as shown in FIG. 14(C). The acquisition range condition data of the construction data has items of detection ID, schedule ID, condition, and condition value. In the example shown in the figure, the items are detection ID "AB001", schedule ID "SH001", condition "data reference unit", and condition value "type of work".

[0122] The "condition value" can be set in a general way depending on the user company. In many cases, the shape of the progress rate change will differ depending on the characteristics of the work, such as the type of work. Examples of construction characteristics that similarly show changes in progress rate include construction period, type of work, and public / private classification (public or private construction). Here, as an example, a pattern set for the type of work will be explained. Note that all of the above characteristics are assumed to be information contained in the construction data, just like the type of work. It is also possible to set the condition value as empty. If empty, it is possible to analyze changes in progress rate for all construction works as a single unit.

[0123] (2-4) The construction data in the business database 106a is referenced to calculate the predicted progress rate for each construction project and each construction period progress rate. (2-4-1) Obtain construction data from the business database 106a. The values ​​in the acquisition range condition data of the construction data acquired in (2-3) are set as parameters to acquire data. For example, parameters (data reference unit, type of work) as shown in FIG. 15(A) are used as keys to refer to construction data in the business database 106a, and populations are divided and acquired by data reference unit. For example, construction data of population A: type of work (construction) and population B: type of work (demolition) as shown in FIG. 15(B) and (C) is acquired. Approximation values ​​are calculated for each population.

[0124] (2-4-2) From the construction data acquired in (2-4-1), calculate the cumulative progress rate (approximate value) by construction progress rate for each population. Identify abnormal construction based on the upper and lower limits considered to be the normal range obtained when calculating the approximate value. The "approximate value" is hereafter referred to as the "predicted value," as it is a reference value that is the actual actual result when compared with the actual result.

[0125] Figure 16(A) shows the acquired construction data, and Figure 16(B) plots each construction project in the construction data, with the horizontal axis showing the construction progress rate (%) and the vertical axis showing the cumulative progress rate (%).

[0126] The "construction period progress rate" and "cumulative progress rate" in the construction data are used to calculate the predicted value of the cumulative progress rate by construction period progress rate. The method for calculating the predicted value is to use an anomaly judgment algorithm: approximation curve. The data used in the approximation curve is only for construction data whose "construction completion category" is completed. In addition, the predicted progress rate by month and construction is calculated using the approximation formula of the approximation curve that was used to calculate the predicted value.

[0127] FIG. 17 is a diagram for explaining the calculation of the approximation curve F(x), the predicted progress rate, and the upper and lower limits. As shown in FIG. 17(A), the completed construction is treated as a population and the approximation curve F(x) of the cumulative progress rate by construction period progress rate of the population is calculated. In addition, the standard deviation function S(x) is calculated by focusing on the tendency of data to scatter within the population. Then, as shown in FIG. 17(B), the predicted progress rate and upper and lower limits of the uncompleted construction are calculated by substituting the construction period progress rate into the approximation curve F(x) and the standard deviation function S(x). In this way, the predicted progress rate is calculated using F(x), and the upper and lower limits are calculated using S(x).

[0128] In this invention, the key point is to use the results calculated by this process, so the specific calculation process is explained in detail in [3-3. Calculation method of approximation curve, forecast value, upper limit value and lower limit value], and only an outline will be explained here. In this explanation, the target is a company with percentage of progress sales = Since the construction data already has the construction progress rate and cumulative progress rate, there is no need to scale the approximation curve or process the data.

[0129] For example, the predicted value and upper and lower limits are calculated for each work type based on the approximate curve parameters (X-axis item: construction progress rate, Y-axis item: cumulative progress rate, approximate function candidates [polynomial function, logistic function, Bass model function], etc.) as shown in FIG. 18A(A) set in the anomaly judgment definition master 106d. Note that since the explanation will be given using values ​​that have already been scaled, an explanation of scale adjustment will be omitted. After calculating F(x), the data dispersion is calculated to calculate the standard deviation function S(x). The construction progress rate is substituted as x into F(x) and S(x), and F(x) → predicted value and S(x) → upper and lower limits are calculated. The same function is used to calculate the predicted value and upper and lower limits for each work type and work.

[0130] Figure 18A (B) shows an example of approximate data of cumulative progress rate by construction period progress rate for construction and demolition, which are calculated by population, and includes items such as work, type of work, construction period progress rate, cumulative progress rate, forecast value (forecasted progress rate, forecasted value of cumulative progress rate), lower limit, and upper limit.

[0131] FIG. 18B(C) shows the construction data after the forecast value and upper and lower limits have been calculated, and in addition to the forecast value (forecast progress rate), lower limit, and upper limit, information on the construction type, which is the data reference unit, is also stored.

[0132] According to the "acquisition criteria" of the anomaly judgment result registration target period data acquired in (1-1) shown in Figure 18B (D), a judgment is made as to whether there are any anomalies in the data for the month before the month to which the anomaly judgment execution date belongs. In this case, since the execution date is 2022 / 11 / 07, a judgment is made as to whether there are any anomalies in 2022 / 10. In this example, the record in the fourth row in Figure 18B (C) has a cumulative progress rate of "30%," a predicted progress rate of "65%," a lower limit of "60%," and an upper limit of "75%." Since the cumulative progress rate of "30%" is below the lower limit of "60%, an anomaly is detected.

[0133] (2-4-3) The construction work determined to be abnormal in (2-4-2) is saved in the abnormality judgment result data table 106c. At the same time, a message to be displayed on the analysis screen is saved. Figures 19A and 19B (A) to (D) show examples of abnormality judgment result data, abnormality judgment result message data, abnormality judgment result message detailed data, and abnormality judgment result ancillary information data. Note that the abnormality judgment result ancillary information data holds display data for each population obtained. For results that are determined not to be abnormal as a result of the judgment, no judgment result message record is created.

[0134] (S2: Analysis screen display process) The analysis screen display process will be described in detail with reference to Fig. 20 to Fig. 51. The display control unit 102c displays analysis data (e.g., messages, graphs 1 and 2, tables 3 and 4 in Fig. 9, etc.) for the construction work in which an abnormality has been detected by the detection unit 102b, on the analysis screen, based on the construction work data stored in the business database 106a.

[0135] 2. Execute the process of displaying the abnormal data detected in 1 and data related to the abnormal data on the initial analysis screen. (1) Information that is automatically detected as an anomaly from the construction data in the business database 106a is output to an initial screen for analysis. (1-1). First, obtain the result data and result message of the detected anomaly. Specifically, as shown in FIG. 20A(A), using the JOBID "output forecast alert" and the abnormality determination result "True" as parameters (keys), the abnormality determination result data as shown in FIG. 20A(B), the abnormality determination result message data as shown in FIG. 20B(C), and the abnormality determination result message detail data as shown in FIG. 20B(D) are obtained from the abnormality determination result data table 106c. Note that in order to display the detected information in a list, data is obtained without the detection ID being set. On the screen that will be displayed from now on, only data for which the abnormality determination result has been determined to be abnormal will be checked. Therefore, only data for which the value of the "Abnormal result or not" column in the abnormality determination result data is "True" is referenced.

[0136] (1-2) When an abnormality is detected, a message is displayed on the screen. Specifically, the abnormality level, definition name, summary, and detection target of the abnormality determination result message data in FIG. 20B(C) are extracted and displayed in area A1 of the initial analysis screen as shown in FIG.

[0137] (1-3) Obtain the date when the analysis initial screen is launched and set it as the base date of the extraction conditions of the analysis initial screen. Specifically, as shown in Figure 21, the base date "2022 / 11 / 1" is set as the base date of the extraction conditions of the analysis initial screen.

[0138] (2) Select the result message for which an abnormality was detected on the initial analysis screen to launch the analysis screen. The following process is performed by referring to the abnormality judgment result data, abnormality judgment result message data, and abnormality judgment result message detail data selected from the list in (1).

[0139] (2-1) Switch the message to detailed information display to secure the output area for graphs and tables. 1. Switch the message to detailed display. Specifically, for the detailed data of the anomaly determination result message shown in Fig. 22A(A), the detection method, determination method, and lower limit are referenced, and the message is displayed in detail as shown in Fig. 22A(B) (the detection method and the reason for determination are added).

[0140] 2. Secure the output area for graphs and tables on the analysis screen. In this system, for example, as shown in Fig. 22B(C), output of charts 1 to 4 (two graphs and two tables) is performed. Therefore, an output area for two graphs and two tables is secured.

[0141] (2-2). Set the extraction conditions. 1. Set extraction conditions for the accounting year and month of the anomaly judgment result data linked to the anomaly judgment result message data.

[0142] (i) From the accounting year and month of the target data, obtain the accounting period that includes that accounting year and month from the accounting period master, and set the beginning and ending accounting years and months associated with the accounting period as extraction conditions for the analysis screen.

[0143] FIG. 23A(D) shows an example of accounting period master data, which includes the fields accounting period, accounting year and month, and display order. The accounting period master manages the accounting year and month included in each accounting period. For example, using the accounting year and month of the anomaly determination result data shown in FIG. 23A(C) as a key, accounting period "50" including "2022 / 10" is obtained from the accounting period master shown in FIG. 23A(D), and further, the accounting years and months of the beginning and end of the period "2022 / 04 to 2023 / 03" linked to accounting period "50" are obtained and set as the initial value in the extraction condition as shown in FIG. 23A(A).

[0144] (ii) The accounting year and month of the beginning and end of the accounting period obtained from the accounting period master are obtained as the setting values ​​for the extraction conditions and set as the extraction conditions for the analysis data acquisition range conditions. In addition, the construction work that is the source of the selected anomaly is also obtained and set as the setting value for the extraction conditions. Figure 23A (B) shows an example of the analysis data acquisition range conditions, with the extraction condition column being "Accounting Year and Month", the FROM condition being "2022 / 04", the TO condition being "2023 / 03", and the target construction work being "Construction A".

[0145] Set the extraction conditions with the information in 2.1 set as the initial display values. Specifically, as shown in Figure 23B(A), set the extraction condition initial values ​​as the base date "2022 / 11 / 1" (timing when the analysis screen is launched), the start of the period "2022 / 04" (FROM condition of the analysis data acquisition range condition), the end of the period "2023 / 03" (TO condition of the analysis data acquisition range condition), and the target construction "Construction A" (target of analysis data acquisition).

[0146] As shown in Figures 23B(B) and (C), when switching to the graph display state, filter items for extracting data for graph output are displayed. Fixed items are output. If a judgment group CD and a judgment group key are set in the anomaly judgment result data, an additional extraction item is displayed so that data can be extracted by selecting the judgment group key. In this example, the construction type "construction" is additionally displayed.

[0147] (2-3) The cumulative progress rate transition_performance data is acquired from the construction data in the business database 106a. The cumulative progress rate transition_performance data is acquired based on the conditions initially set in the extraction conditions, and is acquired as data for displaying Charts 1 and 2.

[0148] Specifically, the construction data shown in FIG. 24B(D) is extracted based on the parameters (keys) of the start period "2022 / 04", end period "2023 / 03", construction "Construction A", and construction type "Construction" as shown in FIG. 24A(A), and the cumulative progress rate trend_actual data shown in FIG. 24B(C) is obtained. The cumulative progress rate trend_actual data includes items such as construction name, business establishment, department, construction type, construction completion category, accounting year and month, sales amount, construction period progress rate, and cumulative progress rate.

[0149] In this case, if there is even one record that contains the "fiscal year and month" in the above period from the start of the period to the end of the period, that construction will be acquired. For example, as shown in Figure 24A(B), in this example, constructions A and B will be acquired, but construction C will not be acquired.

[0150] (2-4) "Cumulative progress rate transition_approximation curve data" is obtained from the abnormality determination result data, the abnormality determination result message data, and the abnormality determination result ancillary information data in the abnormality determination result data table 106c.

[0151] Figure 25B(C) shows an example of abnormality judgment result data, Figure 25B(D) shows an example of abnormality judgment result message data, Figure 25B(E) shows an example of abnormality judgment result ancillary information data, and Figure 25B(F) shows an example of cumulative progress rate trend_approximation curve data (construction).

[0152] Using the start period "2022 / 04", end period "2023 / 03", work "Work A", and work type "Construction" as parameters (keys) as shown in Figure 25A(B), the cumulative progress rate trend_approximation curve data (construction) shown in Figure 25B(F) is obtained as data for additional display in Figures 1 and 2 from the abnormality determination result data shown in Figure 25B(C), the abnormality determination result message data shown in Figure 25B(D), and the abnormality determination result ancillary information data shown in Figure 25B(E).

[0153] The cumulative progress rate trend_approximate curve data (construction) includes items such as project name, construction progress rate, predicted progress rate, upper progress rate limit, and lower progress rate limit threshold.

[0154] (2-5) "Sales amount trend data by organization" is obtained from the cumulative progress rate trend_performance data and the abnormality determination result data in the abnormality determination result data table 106c obtained in (2-3).

[0155] FIG. 26B(D) shows an example of the cumulative progress rate transition_actual data acquired in (2-3), FIG. 26B(E) shows an example of anomaly determination result data, and FIG. 26A(C) shows an example of sales amount transition data by organization.

[0156] Using the start period "2022 / 04", end period "2023 / 03", and type of work "construction" as parameters (keys) as shown in Figure 26A(A), the cumulative progress rate trend_actual data shown in Figure 26B(D) and the anomaly determination result data shown in Figure 26B(E) are used to obtain the sales amount trend data by organization shown in Figure 26A(C) as data for display in Chart 3. Chart 3 checks only the construction results that occurred within the relevant accounting period, and obtains and displays only the data for the results within the frame shown in Figure 26A(B).

[0157] For cumulative progress rate trend_actual data, if there are results from the previous period, obtain the results excluding the previous period (obtain only results that can be counted as for the current period). For example, for the cumulative progress rate of construction A, 1% in 2022 / 03 is the previous period's results, 2% in 2022 / 04 is 2% but for the current period it is 1%, 2022 / 05 is 4% but for the current period it is 3%, etc.

[0158] As shown in Figure 26A(C), the sales amount trend data by organization has the following items: business establishment, department, accounting year and month, type of work, sales amount (actual), and sales amount (forecast). "Sales amount (actual)" and "Sales amount (forecast)" are the actual and forecast values ​​of the cumulative recorded amount of "sales amount," respectively, and are calculated using the following formula.

[0159] Sales amount (actual) = Sales amount × (cumulative progress rate ÷ 100) Sales amount (forecast) = Sales amount × (forecast progress rate ÷ 100)

[0160] Create records for all accounting months in the period range (for drawing graphs). For accounting months with no results or forecasts, create records with 0 yen. Obtain records (1) aggregated by business establishment / department and records (2) aggregated by business establishment.

[0161] In the example for the accounting month and year "2022 / 04", the results are as follows: Department A: Actual results "400", forecast "600", Department B: Actual results "12,000", forecast "12,400" (in this explanation, the records will not be retrieved due to the work type extraction condition "Construction", but to explain the image of the summary calculation, we will assume that they were retrieved), Business location A (Department A + Department B): Actual results "12,400", forecast "13,000".

[0162] (2-6) Obtain the sales amount trend data by construction project from the "cumulative progress rate trend_actual data" obtained in (2-3) and the abnormality judgment result data in the abnormality detection result data table as the display data for Figure 4.

[0163] Figure 27A (C) shows an example of data on the trend in sales amount by construction project, Figure 27B (D) shows an example of data on the trend in cumulative progress rate_actual data acquired in (2-3), and Figure 27B (E) shows an example of data on the abnormality determination result data.

[0164] Using the start period "2022 / 04", end period "2023 / 03", work "Work A", and work type "Construction" as parameters (keys) as shown in Figure 27A(A), the sales amount trend data by work shown in Figure 27A(C) is obtained as data for display in Figure 4 from the cumulative progress rate trend_actual data shown in Figure 27B(D) and the abnormality judgment result data shown in Figure 27B(E). If there is even one record that includes "accounting year / month" during the above period, that work will be subject to acquisition. For example, in the table shown in Figure 27A(A), works A and B are subject to acquisition, but work C is not.

[0165] Here, extraction is not performed by construction number. Data is extracted and obtained by the business office linked by the construction number. For example, if Construction 1 is a construction managed by the Tokyo business office, the performance data of the Tokyo business office is obtained. The determination of who is managing it is made based on whether or not there is a performance record in "Cumulative progress rate trend_performance data."

[0166] As shown in Figure 27A(C), the sales amount trend data by construction project has the following items: construction project name, business establishment, department, accounting year and month, construction type, sales amount (actual), sales amount (forecast), and forecast progress rate. "Sales amount (actual)" and "Sales amount (forecast)" are the actual and forecast values ​​of the cumulative recorded amount of "sales amount," respectively, and are calculated using the following formula.

[0167] Sales amount (actual) = Sales amount × (cumulative progress rate ÷ 100) Sales amount (forecast) = Sales amount × (forecast progress rate ÷ 100)

[0168] For the accounting year and month "end of previous period," records before the corresponding accounting period will be aggregated as the previous period and month. If the accounting year and month at the beginning of the period is April 2022, records before March 2022 will be displayed as the previous period and month. For the accounting year and month "next period and onwards," records after the corresponding accounting period will be aggregated as the next period and month. If the accounting year and month at the end of the period is March 2023, records from April 2023 onwards will be displayed as the next period and month. Records will also be created if there is no data to be aggregated as the previous period and month at the end of next period and month. In this case, records will be created with actual results and forecasts set to 0 yen.

[0169] (2-7) Bind the cumulative progress rate transition_actual data, cumulative progress rate transition_approximate curve data, sales amount transition data by organization, and sales amount transition data by construction project to the corresponding charts 1 to 4, for a total of four charts.

[0170] 1. Bind the cumulative progress rate trend_actual data and cumulative progress rate trend_approximate curve data to Figure 1. For example, according to the bind information (X-axis, Y-axis, legend, title) shown in Fig. 28A(A) and the data used for each legend shown in Fig. 28A(B), the cumulative progress rate transition_actual data shown in Fig. 28A(C) and the cumulative progress rate transition_approximation curve data shown in Fig. 28A(D) are bound to Chart 1 as shown in Fig. 28B(E). In Fig. 28A(B), it appears that the same plot is used for past performance by construction and performance of construction determined to be abnormal, but the subsequent graph coloring process colors the data so that they can be distinguished.

[0171] In Figure 1, the title is "Comparison of forecast / actual volume curves (construction schedule progress rate)," the X-axis is the construction schedule progress rate, the Y-axis is the cumulative progress rate, and the legend is "Forecast volume approximation curve," "Uncompleted construction volume line," "Normal data threshold," "Past performance by construction project," and "Construction results determined to be abnormal."

[0172] 2. Bind the cumulative progress rate trend_actual data and cumulative progress rate trend_approximate curve data to Figure 2. For example, according to the binding information (X-axis, Y-axis, legend, title) shown in FIG. 29A(A) and the data used for each legend shown in FIG. 29A(B), the cumulative progress rate trend_actual data shown in FIG. 29A(C) and the cumulative progress rate trend_approximate curve data shown in FIG. 29A(D) are bound to Chart 2 as shown in FIG. 29B(E).

[0173] In Figure 2, the title is Comparison of forecast / actual volume curves (fiscal year / month), the X-axis is the fiscal year / month, the Y-axis is the cumulative progress rate, and the legend is Forecast volume approximation curve, Uncompleted work volume line, Normal data threshold, and Work A.

[0174] 3. Bind the sales trend data by organization to Figure 3. For example, according to the bind information (header, display data, title) shown in FIG. 30(A), the sales amount trend data by organization shown in FIG. 30(B) is bound to Chart 3 as shown in FIG. 30(C).

[0175] In Figure 3, the title is Forecast and Actual Results by Organization (50th Period: April 2022 to March 2023), the row items are business establishment and department, and the column items are fiscal year and month, sales amount (forecast), and sales amount (actual).

[0176] 4. Bind the trend data on sales revenue by construction project to Figure 4. For example, according to the bind information (header, display data, title) shown in FIG. 31(A), the construction sales amount transition data shown in FIG. 31(B) is bound to Chart 4 as shown in FIG. 31(C).

[0177] In Figure 4, the title is "Forecast and results by project (Projects managed by business establishment A - 50th period: April 2022 to March 2023)," the row items are the project names, and the column items are the accounting year and month, sales amount (forecast), sales amount (actual), and forecast progress rate.

[0178] 5. Output Charts 1 to 4 to the analysis screen The bound charts 1 to 4 are output to areas A2 to A5 of the analysis screen, respectively, as shown in FIG.

[0179] 6. Highlight the data containing abnormalities based on the construction project name information contained in the "abnormality judgment result data" linked to the message. Figure 33A(A) shows an example of graph coloring parameters, Figure 33A(B) shows an example of abnormality judgment result data, Figure 33A(C) shows an example of cumulative progress rate trend_actual data (data bound to graphs 1 and 2), Figure 33A(D) shows an example of cumulative progress rate trend_approximation curve data, and Figure 33B(E) shows an example of the analysis screen display.

[0180] According to the graph coloring parameters, the plots, lines, and legends are highlighted in red in Graphs 1 and 2. As shown in Figure 33A(A), the graph coloring parameters include the legend abnormality flag (True or False), reference information flag (True or False), legend color, and line color. Reference information is information used to confirm how abnormal the object being judged to be abnormal (construction in this job) is.

[0181] If the name of the project in the legend is the same as the name of the project that was detected as abnormal, the color will be applied when the abnormality flag in the legend is True. For legends other than the project that was detected as abnormal, the color will be applied when the abnormality flag in the legend is False.

[0182] In both graphs, the normal data threshold is set as a dashed line. Regarding graph 2, the past performance data is not plotted because the fiscal years of construction start dates vary.

[0183] The points to note about the initial display of the analysis screen are as follows: (1) A message is displayed in area A1 of the analysis screen. It outputs detailed information including the object where an anomaly was detected, the detection method, and the standard value used to determine the anomaly. For the user checking the information, analysis can be performed from a state where the construction work that may have an anomaly is known. (2) Graphs 1-2 and Tables 3-4 are displayed in areas A2-A5 of the analysis screen. Graph 1 makes it possible to check the approximate cumulative progress rate transition of construction work based on past construction work. It is possible to assume that future construction work will also basically follow this approximate cumulative progress rate transition. It is also possible to check how much the cumulative progress rate of construction work for which an abnormality has been detected deviates from the predicted cumulative progress rate approximation curve. Construction work for which an abnormality has been detected is regarded as construction work in which the following issues may occur rather than "uncompleted construction work". -High-intensity work towards the end of the construction period · Delayed completion of construction Check the change in the cumulative progress rate for each construction period progress rate to confirm the increasing trend of the cumulative progress rate. In this example, we can see that the cumulative progress rate of the construction where an abnormality was detected is lower than that of other constructions.

[0184] Graph 2 shows the trend in the cumulative progress rate of construction work where an abnormality was detected, by fiscal year and month. It can be seen how there is a deviation from the cumulative progress rate approximation curve calculated from past construction work, by month. It is highly likely that work carried out in months with a large deviation is the cause of the deviation. In this example, we can see that from fiscal year to month, from May 2022 onwards, the actual results exceed the normal range from the approximation (within the lower progress rate threshold).

[0185] In Table 3, you can check the results of construction work by organization that occurred within the specified accounting period. The results of the organization that manages the construction work that was detected as abnormal may be significantly different from the predicted value. In addition, since the sales results of construction work that occurred only within the accounting period can be checked, it can be used to analyze the sales results for the current period. Since the predicted value can be used as a reference and a possible sales schedule, it can be used as a forecast of the actual sales results during the current period. Figure 34 is a diagram to explain the image of checking the deviation on Table 3. In the figure, for example, if the difference between the prediction and the actual results in August is 10,000 and the difference between the prediction and the actual results in November is 74,800, it can be seen that the deviation amount in November has increased abnormally.

[0186] In Table 4, you can check the performance of each managed construction project of the business office that manages the construction project in which an abnormality was detected. If the cause of the abnormality in the construction project in which an abnormality was detected lies within the organization, there is a possibility that an abnormality has also occurred in another construction project under management. Figure 35 is a diagram for explaining an image of checking the deviation amount on Table 4. In this figure, for example, assume that an abnormality was detected this time in construction A. It can be confirmed that construction E also has actual results that deviate significantly from the predicted value.

[0187] (Check points) An example of analyzing the progress of the completed work (cumulative progress rate by construction progress rate) by switching to each construction type will be described. Figure 36 is a diagram for explaining an analysis image using Graph 1, where (A) shows the case of construction type, and (B) shows the case of demolition type.

[0188] There are many cases where the progress rate trends differ depending on the characteristics of the work, such as the type of work. The following types of construction features show similar progress rate trends:

[0189] -Construction period condition specification image: Divide into one-month units and calculate forecast values. For example, 6-month construction period, 7-month construction period, 8-month construction period, 24-month construction period (2-year construction period), etc. Divide into several-month units and calculate forecast values. For example, 6-12-month construction period (6-month span), 12-24 months (1-year span), etc. - Image of work type condition designation: Explained in detail in this example. ·Image of specifying conditions for public / private division (public works or private works): Calculate forecast values ​​for public works, calculate forecast values ​​for private works, etc.

[0190] Few companies know in advance which characteristics to limit their analysis to in order to detect abnormalities, and whether they are appropriate for progress rate analysis, so in many cases analysis is required from the point of view of capturing these characteristics. By performing the process explained in this process flow 2(3-2)1·2 on a feature-by-feature basis to analyze how your company's characteristics appear, you can analyze.

[0191] For example, if you want to calculate a forecast value by dividing the construction period into one-month or several-month units, you can do so by adding a row to the construction data acquisition range condition data and registering, for example, the condition "judgment range" and the condition value "1" as shown in Figure 37. If this column is added, additional information is passed to the parameters used when acquiring data for anomaly detection, and data is acquired.

[0192] (3) Switch the display of the analysis graph and perform the analysis (if no specific conditions are specified) (3-1) In calculating the predicted value at the time of anomaly detection, an analysis is performed on cases that reveal the characteristics of the progress of work volume when all construction projects owned by the executing company are targeted without specifying specific conditions (construction period, type of work, etc.). The predicted value is calculated without specifying the "data reference unit" of the [Construction data acquisition range condition data] used when determining anomalies. Basically, the same processing is performed as in 1: Anomaly detection and 2: Initial screen display processing in this processing flow. Points where the processing differs are described below.

[0193] 1. Anomaly detection 1-1. Obtain the range conditions of the data for detecting anomalies. The set construction data acquisition range condition data and anomaly determination result registration target period data are acquired. Fig. 38 is a diagram showing an example of construction data acquisition range condition data. In the figure, no condition value is set. Here, a pattern in which no condition value is set is explained (the progress rate transition is analyzed for all construction projects).

[0194] 1-2. Calculate the predicted progress rate for each construction period progress rate for each construction project by referring to the construction data in the business database 106a. The data is acquired by setting the parameters to values ​​within the acquisition range condition data for the construction data acquired in 1-1. The construction data in the business database 106a is referenced using the parameters (data reference unit unspecified) as shown in Fig. 39(A) as a key, and construction data as shown in Fig. 39(B) is acquired.

[0195] From the construction data obtained in 1-3.1-2, since the data reference unit is not specified this time, the data for all construction projects is used as the population, and the cumulative progress rate (approximate value) by construction period progress rate is calculated based on this population.

[0196] Figure 40(A) shows the acquired construction data, and Figure 40(B) plots each construction project in the construction data, with the horizontal axis showing the construction progress rate (%) and the vertical axis showing the cumulative progress rate (%).

[0197] FIG. 41 is a diagram for explaining the calculation of the approximation curve F(x), the predicted progress rate, and the upper and lower limits. As shown in FIG. 41(A), the population is taken to be completed (past) construction works, and the approximation curve F(x) of the cumulative progress rate by construction period progress rate of the population is calculated. In addition, the standard deviation function S(x) is calculated by focusing on the tendency of data to scatter within the population. Then, as shown in FIG. 41(B), the predicted progress rate and upper and lower limits of the uncompleted construction works are calculated by substituting the construction period progress rate into the approximation curve F(x) and the standard deviation function S(x). In this way, the predicted progress rate is calculated using F(x), and the upper and lower limits are calculated using S(x).

[0198] For example, the predicted value and upper and lower limits are calculated using the parameters shown in Figure 42A(A) (X-axis item: construction progress rate, Y-axis item: cumulative progress rate, approximate function candidates [polynomial function, logistic function, Bass model function, etc.]) as keys. Figure 42A(B) shows an example of approximate data of cumulative progress rate by construction progress rate to be calculated, and includes items of construction progress rate, predicted value (predicted value of cumulative progress rate), lower limit, and upper limit. Note that since the explanation this time will be given using values ​​that have already been scaled, an explanation of scale adjustment will be omitted. After calculating F(x), the dispersion of the data is calculated to calculate the standard deviation function S(x). The construction progress rate is substituted as x into F(x) and S(x), and F(x) → predicted value and S(x) → upper and lower limits are calculated. The same function is used to calculate the predicted value and upper and lower limits for each work type and work.

[0199] FIG. 42B(D) shows the construction data after the prediction value and the upper and lower limits have been calculated, and in addition to the prediction value (predicted progress rate), the lower limit, and the upper limit, information on the type of work is also stored.

[0200] According to the "Acquisition Criteria" of the anomaly judgment result registration target period data acquired in 2-1 shown in Figure 42B(C), a judgment is made as to whether there are any anomalies in the data of the month before the month to which the anomaly judgment execution date belongs. In this case, since the execution date is 2022 / 11 / 07, a judgment is made as to whether there are any anomalies in 2022 / 10.

[0201] 2-4. Obtain data for graph display. In step 2 of this process flow, the work type in the parameters (2-3) to (2-5) is left blank (unspecified) to acquire data. There is no difference other than the addition of a condition for data extraction, so an explanation is omitted here.

[0202] 2-5. Bind the data for graph display to the graph, color the graph, and complete the display process. This is the same process as step 2 in this process flow, so a detailed explanation will be omitted. Figure 43 shows an image of the final drawing.

[0203] (Check points) It is assumed that it will be used in many cases when the specific conditions that can capture the trend of the volume of work cannot be known in advance. First, check the trend of the volume of work done across the entire company, and if the results are not useful, specify the characteristics that are likely to show a trend and check them again to grasp the trend of your own company. Depending on the company, there are cases where the volume of work that can be done can be grasped at the time of checking the trend of the volume of work done across the entire company.

[0204] Figure 44 is a diagram to explain an example of checking the overall company trend. There are no plot features such as inclination or concentration, and the company's trends are not visible, so the trend of construction volume cannot be grasped.

[0205] Figure 45 is a diagram to explain an example of extraction and confirmation under specific conditions. As shown in Figure 45(A), approximate cumulative progress values ​​that can occur for each construction period can be confirmed. A trend that seems to be an upward trend in the volume of work emerges. Figure 45(B) shows the state of this job when it is actually used, and there are cases where such a trend can be seen when checking the entire company without narrowing down specific conditions.

[0206] (3-2). Check and analyze the actual and forecast volumes generated in past accounting periods. As shown in Figure 46A(A), specify the accounting period item of the extraction conditions to switch the data to be output for analysis. If the current period is 50 (2022 / 04-2023 / 03), switch to 49 (2021 / 04-2022 / 03) (last period).

[0207] 46B(B) is a diagram showing an example of the analysis screen display after switching the accounting period. For graphs that are affected by the accounting period extraction item, the graph display will be switched according to the specified value as follows. Graph 1: Only the construction work that occurred during the specified period is output to the graph Graph 2: If the construction work judged as abnormal was performed during the specified period, the graph is output. If not, the graph is not output. Table 3: Information displayed during the period, previous period / construction period information can be switched to match the specified accounting period Table 4: Information displayed during the period, previous period / construction period information can be switched to match the specified accounting period

[0208] The following describes the process from data acquisition to screen display. However, since the process is basically the same as in (2), only the different parts of the process will be explained.

[0209] 1. The cumulative progress rate transition_performance data is acquired from the construction data in the business database 106a. The cumulative progress rate transition_performance data is acquired based on the conditions initially set in the extraction conditions, and is acquired as data for displaying Charts 1 and 2.

[0210] In the parameters shown in Figure 47A(A), the type of work is not set. Based on the parameters (keys) of the start period "2021 / 04", the end period "2022 / 03", and the work "Work A", the work data shown in Figure 47B(D) is extracted, and the cumulative progress rate transition_actual data shown in Figure 47B(C) is obtained.

[0211] In this case, if there is even one record that contains the "Fiscal Year and Month" in the above period from the start of the period to the end of the period, that construction will be acquired. For example, as shown in Figure 47B(B), in this example, constructions A, B, and C will all be acquired.

[0212] 2. The "sales amount trend data by organization" is obtained from the cumulative progress rate trend_actual data and the abnormality determination result data in the abnormality determination result data table 106c obtained in 1.

[0213] FIG. 48B(D) shows an example of the cumulative progress rate trend_actual data acquired in (2-3), FIG. 48B(E) shows an example of anomaly determination result data, and FIG. 48A(C) shows an example of sales amount trend data by organization.

[0214] Using the start period "2021 / 04" and end period "2022 / 03" as parameters (keys) as shown in Figure 48A(A), the cumulative progress rate trend_actual data shown in Figure 48B(D) and the anomaly determination result data shown in Figure 48B(E) are used to obtain the sales amount trend data by organization shown in Figure 48A(C) as data for display in Chart 3. Chart 3 checks only the construction results that occurred within the relevant accounting period, and obtains and displays only the data for the results within the frame shown in Figure 48A(B).

[0215] In the example for the fiscal year and month "2022 / 03", the results are: Department A: Actual results "200" and forecast "600", Department B: Actual results "9,000" and forecast "9,200", Business location A (Department A + Department B): Actual results "9,200" and forecast "9,800".

[0216] The sales amount trend data by construction project is obtained as the display data for Chart 4 from the cumulative progress rate trend_actual data obtained in 3.1 and the abnormality determination result data in the abnormality determination result data table 106c.

[0217] Figure 49A(C) shows an example of data on sales revenue trends by construction project, Figure 49B(D) shows an example of cumulative progress rate trends_actual data obtained in (2-3), and Figure 49B(E) shows an example of anomaly determination result data.

[0218] Using the start period "2021 / 04", end period "2022 / 03", and construction work "Construction A" as parameters (keys) as shown in Figure 49A(A), the cumulative progress rate trend_actual data shown in Figure 49B(D) and the anomaly determination result data shown in Figure 49B(E) are used to obtain the sales amount trend data by construction work shown in Figure 49A(C) as data for display in Figure 4. If there is even one record that includes the "accounting year / month" during the above period, that construction work will be subject to acquisition. For example, in the table of Figure 49A(B), construction works A, B, and C will be subject to acquisition.

[0219] 4. A graph of the acquired data is output to the analysis screen through the process in (2) and processes 1 to 3. Figure 50 shows an example of the analysis screen.

[0220] (Check points) FIG. 51 is a diagram for explaining points to be checked focusing on Tables 3 and 4. FIG. 51(A) is a diagram for explaining points to be checked in Table 3. In the diagram, it is possible to check the actual sales performance of construction work that occurred within a specified accounting period. When construction work for which an abnormality has been detected spans multiple periods, it is possible to check the actual situation by checking the information on the period in which a large deviation from the predicted value occurs.

[0221] FIG. 51(B) is a diagram for explaining the confirmation points in Table 4. In this diagram, it is possible to confirm the progress of construction work at the time of the specified accounting period. For construction work in which an abnormality has been detected, it is possible to analyze by period when the deviation from the predicted value began to widen.

[0222] [3-3. How to calculate trend lines, forecast values, upper and lower limits] A calculation method in which the detection unit 102b calculates the approximation curve, the forecast value, and the upper and lower limits will be described in detail with reference to Figs. 52 to 75. In the above process, the construction data is the processing target, but here, the case where the monthly actual data is the processing target will be described as an example. The processing target is different, but the calculation method is similar. The explanation of the calculation method here is also applicable to the above process. Fig. 75 is a diagram showing the correspondence relationship between the items (item names used in the explanation of the present invention) used in the explanation of [3-1. Overall processing] and [3-2. Sample data], which are the characteristic parts of the present invention, and the items (item names used in the explanation of the approximation curve algorithm) used in the explanation of [3-3. Calculation method of the approximation curve, the forecast value, the upper and lower limits]. The item names "construction period progress rate", "cumulative progress rate", and "sales amount (actual)" used in the explanation of the present invention correspond to the item names "scheduled construction period progress rate", "actual progress rate", and "actual amount" used in the explanation of the approximation curve algorithm, respectively.

[0223] 52 is a diagram showing an example of the configuration of the abnormality determination definition master 106d. The abnormality determination definition master 106d registers abnormality determination definition IDs, abnormality determination definition names, data acquisition definitions, algorithms used, and parameter settings in association with each other.

[0224] In the example shown in the figure, the anomaly judgment definition ID is "JD001", the anomaly judgment definition name is "Project progress alert", the algorithm used is "Approximation curve", and the parameter settings are {X-axis item: number of months elapsed, Y-axis item: cumulative actual amount, X-axis scale unified item: planned construction period, Y-axis scale unified item: actual amount, approximation function candidate name: [polynomial function, logistic function, Bass model function], smoothness: 12, significance level: 0.1}.

[0225] (T1: Approximation curve calculation process) The details of the approximate curve calculation process will be described with reference to Figures 53A to 55. In the approximate curve calculation process, the data is not differentiated by case code, and an approximate curve is calculated using approximate parts based on all case data of past case monthly performance data. This process has the following features.

[0226] (1) The options for approximation functions are "polynomial function, exponential function, logarithmic function, logistic function, and Bass model function," and multiple choices can be made. (2) Among the selected functions, the one with the best AIC (Akaike Information Criterion), an index for measuring the accuracy of approximation, will be the approximation curve used in the subsequent processing flow.

[0227] Hereafter, the approximation function with the best approximation accuracy will be called "Y = F(X)", the name of this approximation function will be called the "actual performance-centered approximation function", and the curve when this approximation function is displayed on a graph will be called the "actual performance-centered approximation curve". X represents the planned completion rate, Y represents the actual completion rate, and F represents the actual performance-centered approximation function. By passing X: the planned completion rate to F, the predicted value of Y: the actual completion rate can be calculated.

[0228] The above "bus model function" is used by the Ministry of Land, Infrastructure, Transport and Tourism to estimate the progress rate of construction work. In addition, polynomial functions and logistic functions are also used to compare with the bus model function (https: / / www.mlit.go.jp / sogoseisaku / jouhouka / content / 001348995.pdf).

[0229] Specifically, the following processing is performed.

[0230] (1) Among the parameter settings registered in the abnormality determination definition master 106d, information on the X-axis item, the Y-axis item, and the function for each approximate function candidate name is passed to the approximation component to find optimal coefficients. (2) Calculate the AIC based on the coefficients returned from the approximate parts. (3) The approximation function with the smallest AIC is used as the performance center approximation function.

[0231] Each process will be described in detail below. (1) Among the parameter settings registered in the abnormality determination definition master 106d, information on the X-axis item, the Y-axis item, and the function for each approximate function candidate name is passed to the approximation component to find optimal coefficients.

[0232] 53A and 53B, (A) shows an example of data in the anomaly determination definition master 106d. In this example, the anomaly determination definition ID is "JD001", the anomaly determination definition name is "project progress alert", the algorithm used is "approximate curve", and the parameter settings are {X-axis item: number of months elapsed, Y-axis item: cumulative actual amount, approximate function candidate name: [polynomial function, logistic function, Bass model function], ...}. The options for the approximating function correspond to the approximate function candidates in the parameter settings of the data registered in the anomaly determination definition master 106d, and the X and Y values ​​of the data to draw an approximate curve correspond to the processed values ​​in the X value item and the Y value item in the parameter settings of the data registered in the anomaly determination definition master 106d.

[0233] (B) shows an example of monthly performance data for a past project after processing. (C) shows the approximation function candidates, including polynomial function, logistic function, and Bass model function. If a polynomial function is selected, a polynomial function equation of degree 0 to 6 will be passed. In this example, since polynomial function, logistic function, and Bass model function are selected as approximation function candidates, the nine functions above will be passed to the approximation component. Exponential functions and logarithmic functions may also be selected as approximation function candidates.

[0234] The following processing is performed for each approximation function candidate. As an example, we will explain the case where the function to be approximated is y=a / (1+ebx+c) (logistic function). (D) shows an example of information (1) (data to be passed on an approximation curve) passed to the approximation part. (E) shows an example of information (2) (function to be approximated) passed to the approximation part. (F) shows an example of the information (coefficients) returned from the approximation part, where a=100.85, b=-0.069, and c=3.68.

[0235] (2) Calculate the AIC based on the coefficients returned from the approximate parts. For details on calculating the AIC, see http: / / www.radio3.ee.uec.ac.jp / ronbun / TR_YK_048_AIC.pdf.

[0236] In FIG. 54, (A) shows the formula for calculating AIC, which is AIC=(data size)×log(sum of squares of differences from predicted value) / (data size)+2×(number of coefficients). Here, the predicted value of Y is calculated by substituting X of the data for which an approximation curve is to be drawn into the approximation function. The square of the difference from the predicted value of Y is calculated as the square of (Y value-predicted value of Y) of the data for which an approximation curve is to be drawn. The data size is the number of pairs of data (X, Y).

[0237] AIC has the following characteristics: the smaller the sum of squares of the difference from the predicted value, the smaller the AIC, and the larger the number of coefficients, the larger the AIC. The AIC value itself has no meaning, and it is an index for judging the superiority of approximation functions by comparing the magnitude of the AIC value. The interpretation of the AIC formula is explained. The first term of the AIC formula, "(data size) x log (sum of squares of the difference from the predicted value) / (data size)," represents the accuracy of the data for which the approximate curve is to be drawn, and the second term, "2 x (number of coefficients)," represents the penalty for having a large number of coefficients. By judging the superiority of approximation functions based on AIC, a well-balanced approximation function that is resistant to data changes and does not overly fit the data for which the approximate curve is to be drawn is selected. The effect of judging the superiority of approximation functions based on AIC is explained. Even if the actual data of past cases increases over time, an approximation function that fits the past data too well is not selected, so the following two effects are obtained. (1) It is possible to prevent the type and order of approximation functions from frequently changing each time an anomaly is judged. (2) Even if the number of projects that deviate significantly from the planned progress is dramatically reduced due to thorough project progress management, the approximation curve will shift gradually before and after the thorough management.

[0238] (B) shows the data (X, Y) for which you want to draw an approximate curve. (C) shows the predicted value of Y and the sum of squares of the difference between the predicted value of Y and the average value of Y.

[0239] When the data size, the sum of squares of the difference between the predicted value of Y, the coefficient, and the number of coefficients (=3) are substituted into the AIC calculation formula, the AIC becomes 94.18, as shown in (D).

[0240] When the above process is completed for all approximate function candidates, data such as that shown in Figure 55(A) can be obtained, and the AICs for all approximate function candidates can be obtained. In this figure, "..." is replaced with actual numerical values.

[0241] (3) The approximation function with the smallest AIC is used as the performance center approximation function. As a result of calculating the AIC for all the approximate function candidates, we will proceed with the explanation of the processing flow under the assumption that the AIC of the logistic function is the smallest. If the performance center approximation function is Y=F(X), in this explanation, the performance center approximation function is y=100.85 / (1+e -0.069X+3.68 ) This is the function with the smallest AIC, and the coefficients are set to the function you want to approximate. Hereafter, this function will be referred to as F(X).

[0242] (T2: Processing to calculate the dispersion of data from the fitted curve) The process of calculating the dispersion of data from the performance center approximation curve will be described in detail with reference to Figures 56 and 57. The process of calculating the dispersion of data from the performance center approximation curve includes the following steps.

[0243] (1) Calculate a predicted value of the actual progress rate for each scheduled completion period elapsed rate of monthly actual data of past projects. (2) Calculate the difference (residual) between the forecast value and the actual data of the performance progress rate. (3) Calculate the squared residual (square of the residual).

[0244] A specific calculation will be described with reference to FIG. (1) Calculate the forecast value of the actual progress rate as forecast value = F (construction progress rate). (2) The residual, which is the difference between the actual progress rate and the forecast value, is calculated as Residual = Actual Progress Rate - Forecast Value. (3) Square the residual, Square of the residual = (residual) 2 Calculate as follows.

[0245] Figure 56(A) shows the planned construction period elapsed rate [%] and the actual progress rate [%] of the actual data of past projects. Figure 56(B) shows the newly added columns of forecast value [%], residual [%], and squared residual [% 2 ]. The forecast value [%] is calculated by passing the planned completion period progress rate to the actual performance center approximation function F(X). Because the residuals are squared, all of the squared residuals are greater than or equal to 0. By squaring the residuals, the size of the squared residuals can be expressed as how far the past performance data deviates from the approximation curve.

[0246] Figure 57(A) is a graph showing the predicted value vs. approximation curve of past project data, with the horizontal axis showing the planned progress rate [%] and the vertical axis showing the actual progress rate [%], with past actual data plotted and predicted values ​​plotted on the approximation curve. Actual progress rate - predicted value shows the residual.

[0247] FIG. 57(B) is a graph showing the residuals, with the horizontal axis showing the progress rate [%] over the scheduled construction period, and the vertical axis showing the residuals [%].

[0248] FIG. 57(C) is a graph showing the square of the residual, with the horizontal axis showing the progress rate [%] and the vertical axis showing the square of the residual [% 2 ] is shown.

[0249] (T3: A process to calculate the distribution of data) The process of calculating the tendency of data dispersion will be described in detail with reference to Figures 58A to 60. The process of calculating the tendency of data dispersion includes the following steps.

[0250] (1) Draw an approximate curve for the squared residuals, name this approximate function the residual squared approximation function, and call this residual squared approximation function σ 2 =V(X). The residual squared approximation function is (polynomial function) 2 By passing X: the expected completion time progress rate to the residual squared approximation function, the predicted value of the residual squared at that expected completion time progress rate is returned. (2) Take the square root of the residual square approximation function, name this function as the standard deviation function, and let this standard deviation function be σ = S(X). By passing X: the planned progress rate to the standard deviation function, the standard deviation (the degree of dispersion of the actual progress rate) for that planned progress rate is returned.

[0251] By taking the square root of the residual squared approximation function, it is possible to create a function that returns the standard deviation. The specific process is explained below.

[0252] (1) Draw an approximate curve using approximate parts for the squared residual (this curve is called the residual squared approximate curve). In FIG. 58A and FIG. 58B, (A) shows the planned construction period elapsed rate [%], actual progress rate [%], forecast value [%], residual [%], and square of residual [% 2 ]. (B) shows candidates for the residual squared approximation function.

[0253] (Polynomial functions) 2 The reason why the function is specified as the function to be approximated is as follows. 1. Because we are not approximating the progress rate of a project, we do not need to specify special functions such as bus model functions that are said to represent the progress of a project, and therefore we specify functions that are as simple as possible. 2. When approximating the actual progress rate, the actual progress rate increases as the planned completion rate progresses, but the squared residual may increase or decrease as the planned completion rate progresses, so in order to capture the increase or decrease in the squared residual, a polynomial function is used. 2 We have adopted the following. 3. (Polynomial functions) 2 This allows us to later use the square root of the residual squared approximation function (a polynomial function) as the standard deviation function.

[0254] The following process is performed for each candidate residual squared approximation function. For example, let the function to be approximated be y=(ax 2 +bx+c) 2In Fig. 58A and Fig. 58B, (C) shows information (1) (data for which an approximation curve is to be drawn) passed to the approximating part, (D) shows information (2) (function to be approximated) passed to the approximating part. (E) shows information returned from the approximating part, with coefficients a = -0.0028, b = 0.3209, and c = 2.1336.

[0255] Next, the AIC is calculated. Since the same process as (T1: Approximation curve calculation process) in the process flow is performed, a detailed description is omitted.

[0256] When the above process has been completed for all candidates for the function that approximates the square of the residual, data such as that shown in FIG. 59(A) is obtained.

[0257] In this example, the function with the smallest AIC and the coefficients set to the function to be approximated are used as the residual squared approximation function y=(-0.0028x 2 +0.3209x+2.1336) 2 From now on, this (quadratic function) 2 The following process flow will be explained under the assumption that the AIC of the function of the form is the smallest. Let us define the residual squared approximation function as σ 2 = V(X). In this example, V(X) = (-0.0028X 2 +0.3209X+2.1336) 2 It becomes.

[0258] Figure 59(C) shows a graph in which the residual square approximation curve V(X) is plotted against the residual square. The horizontal axis shows the expected progress rate [%], and the vertical axis shows the residual square [% 2 In this way, by drawing an approximation curve, it is possible to take into account the variation in data according to the progress rate of the construction period, such as the deviation from the approximation curve being small from the start of the project to the early and later stages, and the deviation being large in the middle stages.

[0259] (2) Calculate the standard deviation function. When the estimated completion time is passed to X of the residual square approximation function obtained in (1), the output value is in the unit [%2 ], so we take the square root and convert it to a standard deviation function with units of [%]. The standard deviation function S(X) is calculated as S(X) = √V(X). In this processing flow example, V(X) = (-0.0028X 2 +0.3209X+2.1336) 2 Therefore, S(X)=-0.0028X 2 The result is +0.3209X+2.1336.

[0260] Figure 60(A) shows the progress rate, actual progress rate, forecast value, residual, square of the residual, and the absolute value of the residual, for the actual data of past projects. Figure 60(B) shows a graph that displays the standard deviation function V(X) as a standard deviation curve, with the horizontal axis showing the progress rate [%] and the vertical axis showing the absolute value of the residual [% 2 ] The absolute value of the residual indicates the distance of deviation between the performance data of past cases and the performance center approximation curve. Note that in actual calculation processing, the absolute value of the residual is not calculated from the residual between the performance data of past cases and the predicted value using the performance center approximation function, but it is listed as a reference when displaying the standard deviation curve on a graph.

[0261] (T4: Calculation of predicted values ​​and thresholds for cases subject to abnormality detection) The calculation process of the predicted value and threshold for cases subject to abnormality judgment will be described in detail with reference to Figures 61 to 64. The result center approximation function F(X) and standard deviation function S(X) for finding the predicted value of the actual progress rate have been prepared by the processes up to now. The calculation process of the predicted value and threshold for cases subject to abnormality judgment does not use past case data, but uses the actual data of the cases subject to abnormality judgment for the calculation. The calculation process of the predicted value and threshold for cases subject to abnormality judgment performs the following processes on the processed actual data of the cases subject to abnormality judgment.

[0262] (1) The predicted value is calculated using the estimated progress rate / actual result center approximation function F(X). (2) Calculate the standard deviation (the predicted distance from the approximation curve) using the scheduled completion time progress rate-standard deviation function S(X). (3) The standard deviation is multiplied by a constant value calculated based on the significance level to provide a range above and below the predicted value, which is used as the upper and lower thresholds.

[0263] (1) Calculate the predicted value. Calculate the predicted value of the actual progress rate at the scheduled progress rate of the project that is subject to abnormality detection.

[0264] Figure 61(A) shows the result data of the case that was processed to be judged as an anomaly, with columns for predicted values ​​added to the case code, accounting year and month, progress rate, and actual progress rate. The predicted values ​​are calculated by using the result center approximation function F(X) with x = progress rate.

[0265] FIG. 61(B) is a graph of the predicted values ​​in FIG. 61(A), with the horizontal axis indicating the planned progress rate [%] and the vertical axis indicating the actual progress rate [%].

[0266] (2) Calculate the standard deviation. Calculate the standard deviation of the progress rate of the planned completion period of the projects to be judged as abnormal after processing.

[0267] Figure 62(A) shows the standard deviation column added to the processed actual data of the project subject to anomaly detection: project code, accounting year and month, planned completion period elapsed rate, actual progress rate, and forecast value. The standard deviation is calculated by using the standard deviation function S(X) where x = planned completion period elapsed rate. The calculated standard deviation means that there is a 68% chance that the actual data will fall within the range that is the standard deviation away from the actual results center approximation curve.

[0268] FIG. 62(B) is a graph of the standard deviation of FIG. 62(A), where the horizontal axis is the progress rate [%] and the vertical axis is the standard deviation [% 2 ] is shown.

[0269] (3) Determine the threshold value. FIG. 63(A) shows the case code, accounting year and month, progress rate, actual progress rate, forecast value, and standard deviation of the monthly performance data of the case to be judged as abnormal after processing, to which columns for upper threshold [%] and lower threshold [%] have been added.

[0270] The calculation method of the threshold is as shown in FIG. 63(B): Upper threshold = predicted value + Z α / 2 × (standard deviation), lower threshold = predicted value - Z α / 2 Calculate by multiplying by Z (standard deviation). α / 2 means the value of the upper α / 2% point of the standard normal distribution. For this α, the value of the parameter setting (significance level) registered in the anomaly determination definition master 106d in premise (1) is used.

[0271] FIG. 64(A) is a diagram showing an example of data in the abnormality determination definition master 106d, in which a parameter of {significance level: 0.1} is set for the abnormality determination definition ID "JD001."

[0272] For example, if the significance level α is 0.1, then α / 2 = 0.05 (5%), and Z α / 2 = 1.645. In this case, in Figure 64 (B), for the record of the project B001 that is the target of abnormality judgment and has a planned completion period elapsed rate of 40%, the upper threshold = 28.678 + 1.645 x 10.415 and the lower threshold = 28.678 - 1.645 x 10.415. This can be interpreted as meaning that there is about a 90% probability that the actual performance progress rate will be above the lower threshold and below the upper threshold. Conversely, if this range is exceeded, it will be judged to be abnormal.

[0273] Figure 64(C) is a graph of the forecast value, upper threshold, and lower threshold of Figure 63(B), with the horizontal axis showing the planned construction period progress rate [%] and the vertical axis showing the actual progress rate [%]. Note that the graphs of the actual progress center approximation curve and the upper and lower thresholds are shown, but they are only shown for reference.

[0274] Figure 64(D) is a diagram to explain the significance level and percentile (https: / / ai-trend.jp / basic-study / normal-distribution / normal-distribution / ).

[0275] (T5: Abnormality determination process) The abnormality determination process will be described in detail with reference to Figures 65 and 66. In the abnormality determination process, the following processes are performed.

[0276] (1) Anomalies are determined based on the monthly performance data of the items to be detected and the threshold value obtained in the previous process. (2) The data of the determination result is stored in a table (not shown) in the storage unit 206.

[0277] The abnormality determination process will be described in detail below. (1) For cases that are subject to abnormality detection, the actual progress rate of the case that is subject to abnormality detection is compared with the threshold value obtained in the previous process to determine whether it is abnormal or not.

[0278] FIG. 65(A) shows the case code, accounting year and month, progress rate after scheduled completion, actual progress rate, forecast value, standard deviation, upper threshold, and lower threshold of the performance data of the case that is the subject of anomaly judgment.

[0279] FIG. 65(B) shows a graph of the abnormality judgment of FIG. 65(A), with the horizontal axis showing the planned construction period elapsed rate [%] and the vertical axis showing the actual progress rate [%], and the actual result center approximation curve, upper threshold, lower threshold, B001, and B002 are plotted. In the figure, the planned construction period elapsed rate "40" and actual progress rate "60" of B001 are judged to be abnormal because they exceed the upper threshold. Also, the planned construction period elapsed rate "57.143" and actual progress rate "20" of B002 are judged to be abnormal because they fall below the lower upper threshold. For example, if the upper threshold is exceeded, the possibility of fraudulent overstating of actual results is detected. Also, if the lower threshold is exceeded, the possibility of a delay in progress is detected.

[0280] (2) The judgment result data is stored in a judgment result table. 66 is a diagram showing an example of judgment result data. The judgment result data may include the case code, accounting year and month, planned progress rate, actual progress rate, forecast value, standard deviation, upper threshold, lower threshold, and judgment result (FALSE or TRUE). For data judged to be abnormal, the judgment result is "TRUE", and for other data, it is "FALSE".

[0281] (T6: Calculation processing of data for display) The display data calculation process will be described in detail with reference to Figures 67 to 69. In the process up to this point, the performance center approximation function F(X) and the standard deviation function S(X) based on past cases have been found. In the display data calculation process, data for display (for displaying the approximation curve on the screen) is created, and the results are stored in a table for auxiliary information.

[0282] In the calculation process of the display data, the following process is carried out. (1) Calculate the progress rate of the construction period to display the data. (2) The values ​​on the approximation curve of the data to be displayed, the upper threshold value and the lower threshold value are calculated. (3) The results of the approximation curve algorithm are stored in the auxiliary information table.

[0283] The specific processing contents will be explained below. (1) Calculate the construction progress rate to be displayed as data for display. The progress rate of the data displayed is the minimum and maximum progress rate of the past project data divided by the parameter value called "smoothness." Figure 67 shows a graph of the actual data of past projects, with the horizontal axis showing the planned progress rate [%] and the vertical axis showing the actual progress rate [%], with A001, A002, and A003 plotted.

[0284] The range of the scheduled progress rate of the construction period, 0 to 120%, is divided into 12 equal parts with respect to smoothness to prepare the progress rate of the construction period as data for display. For the smoothness, the parameter setting (smoothness) value registered in the abnormality judgment definition master 106d in premise (1) is used.

[0285] 67(B) shows an example of data setting in the abnormality determination definition master 106d. In the example shown in the figure, the parameter "smoothness: 12" is set for the abnormality determination definition ID "JD001".

[0286] When the display data is displayed on the screen, the predicted value, upper threshold, and lower threshold may be displayed as a line graph, so the larger the "smoothness" value, the smoother the line graph will be, closer to a curve.

[0287] By dividing 0-120% into 12 equal parts, the construction progress rate of the display data as shown in Fig. 67(C) is prepared. In this example, the interval between each construction progress rate is 10%, which is obtained by dividing 0-120% into 12 equal parts, and the number of points in the display data is 13.

[0288] (2) The values ​​on the approximation curve of the data to be displayed, the upper threshold value and the lower threshold value are calculated. Using F(X) and S(X) obtained when processing the actual data of past cases, the values ​​on the approximation curve for the progress rate of the construction period of the data to be displayed and the upper and lower threshold values ​​are calculated. Since this is exactly the same process as that used to calculate the predicted value and threshold value for cases subject to abnormality judgment, a detailed explanation of the calculation process is omitted.

[0289] After the calculation process, the display data will be as shown in Figure 68(A), with columns for predicted value, upper threshold, and lower threshold added to the planned completion period progress rate. Figure 68(B) is a graph (line graph) of the display data in Figure 68(A), with the horizontal axis showing the planned completion period progress rate [%] and the vertical axis showing the actual progress rate [%], with the predicted value, upper threshold, and lower threshold plotted. The values ​​of the white dots on the graph are calculated.

[0290] As can be seen from the graph, the width between the upper and lower thresholds and the performance center approximation curve is calculated using a standard deviation function, so the thresholds reflect the following two characteristics:

[0291] 1. In the early and later stages of a project, there is a low possibility of deviation from the approximation curve. Therefore, even a slight deviation from the approximation curve is highly abnormal, so the threshold range is narrow. 2. There is a high possibility of deviation from the approximate curve in the middle stage of the case. As a result, even if the case is normal, there is a possibility of deviation from the approximate curve to some extent, and even if there is some deviation, the abnormality is low, so the threshold range is wide.

[0292] (3) The approximate curve result is stored in the auxiliary information table. The following display data is stored in the approximate curve algorithm result attached information table (hereinafter referred to as the "approximate curve result attached information table"). The approximate curve result attached information table stores data to be displayed as supplementary information when the anomaly judgment result is displayed as a graph on the screen. Unlike the data itself of the case to be judged for anomaly, data to be compared with the data of the case to be judged for anomaly is stored. The stored data is calculated based only on data from past cases.

[0293] Fig. 69(A) shows an example of display data, and Fig. 69(B) shows an example of approximate curve result attached information stored in approximate curve result attached information table 106c based on the display data. The approximate curve result attached information has items such as execution history ID, row number, X, Y, upper threshold, and lower threshold.

[0294] Here, the execution history ID is an ID that is automatically assigned for each execution of anomaly determination, the row number is a consecutive number assigned to each row of the display data starting from 0, X corresponds to the X-axis value of the display data, Y corresponds to the Y-axis value of the display data, the upper threshold is the upper threshold of the display data, and the lower threshold is the lower threshold of the display data.

[0295] As described above, if an abnormality is detected using the judgment result data (see Figure 66) and the approximate curve result auxiliary information (see Figure 69 (B)), a message indicating the abnormality is detected and a graph of the abnormality judgment result (e.g., a line graph) is displayed.

[0296] (Options for processing past cases) 70 to 74, options for processing the monthly performance data of past cases will be described. As described above, the anomaly determination definition master 106d is capable of setting scale unification items.

[0297] Fig. 70 is a diagram showing a setting example of the abnormality judgment definition master 106d. The assumed item set in the X-axis scale common item is the planned construction period or the implementation period, and the assumed item set in the Y-axis scale common item is the budget or the actual amount. The setting example of the abnormality judgment definition master 106d shown in Fig. 70 is an example for the construction business, but it is also assumed that it can be used in other industries.

[0298] The X-axis item, Y-axis item, X-axis scale unification item, and Y-axis scale unification item can be freely set according to the industry of the user of this anomaly detection system.

[0299] Fig. 71(A) is a diagram showing an example of monthly performance data of a past case, and Fig. 71(B) shows an example of schedule and performance data of a past case.

[0300] Four methods for processing data of past cases will be described with reference to Fig. 72. The data is classified into four patterns, ABCD, according to the parameter settings of the abnormality determination definition master 106d.

[0301] In the case of unified scale items on the AX axis: implementation period, unified scale items on the Y axis: actual amount BX-axis scale unified item: Planned construction period, Y-axis scale unified item: Actual amount In the case of CX axis scale unified item: implementation period, Y axis scale unified item: budget DX-axis scale unified item: planned construction period, Y-axis scale unified item: budget

[0302] The patterns ABCD are named as follows: Pattern A is "strict scheduled construction period and budget type", Pattern B is "flexible scheduled construction period and strict budget type", Pattern C is "strict scheduled construction period and flexible budget type", and Pattern D is "flexible scheduled construction period and budget type".

[0303] "Strict" and "Flexible" mean checking whether the project was completed on schedule and within budget in a strict and flexible manner, respectively. An example of Pattern B is explained below.

[0304] (Pattern B. Flexible construction period and strict budget (X-axis scale unified item: planned construction period, Y-axis scale unified item: actual amount)) Pattern B, flexible scheduled construction period / strict budget type, will be explained with reference to Figures 73 and 74. An example of processing A003 will be explained below. Figure 73(A) shows an example of monthly actual data for A003, and Figure 73(B) shows an example of the planned and actual data for A003. When the monthly actual data for A003 is processed and the planned construction period progress rate is calculated using the number of months elapsed / scheduled construction period, and the actual progress rate is calculated using the cumulative actual amount / actual amount, the result will be as shown in Figure 73(C).

[0305] When the monthly performance data of all past cases is processed, it will look like that shown in Figure 74(A). Figure 74(B) is a graph of the monthly performance data of past cases in Figure 39(A), and Figure 74(C) shows a graph after calculation processing of the display data.

[0306] Since the maximum value of the X-axis for past cases is 120%, the threshold value calculated in subsequent processes will converge to an X value of around 120%. This makes it possible to determine that cases subject to abnormality are within the normal range even if they are completed with some delay. Also, since the maximum value of the Y-axis for past cases is all 100%, the threshold value calculated in subsequent processes will converge to a Y value of around 100%. This makes it possible to strictly check that cases subject to abnormality are completed according to the budget before they started.

[0307] As described above, according to this embodiment, a detection unit 102b is provided which divides a population of past case data according to specified specific conditions, calculates an approximation curve for the progress rate of the case data and the case progress rate for each population, calculates a predicted value of the progress rate by substituting the progress rate into the function of the approximation curve, calculates upper and lower limits based on the approximation curve and the predicted value of the case progress rate, and detects anomalies by comparing the case data to be detected with the upper and lower limits, and a display control unit 102c is provided which displays analysis data on an analysis screen for case data in which an anomaly has been detected, thereby making it possible to automatically detect anomalies in case data and to discover and deal with them early.

[0308] [4. Contribution to the United Nations-led Sustainable Development Goals (SDGs)] This embodiment can contribute to improving business efficiency and promoting appropriate management decisions by companies, thereby contributing to goals 8 and 9 of the SDGs.

[0309] Furthermore, this embodiment can contribute to reducing waste and promoting paperless and electronic systems, thereby contributing to the achievement of goals 12, 13, and 15 of the SDGs.

[0310] Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.

[0311] 5. Other embodiments The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.

[0312] For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using known methods.

[0313] In addition, the processing procedures, control procedures, specific names, registered data for each process, information including parameters such as search conditions, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.

[0314] Furthermore, with regard to the anomaly detection system 100, each of the components shown in the figures is a functional concept, and does not necessarily have to be physically configured as shown in the figures.

[0315] For example, the processing functions of the anomaly detection system 100, particularly the processing functions performed by the control unit, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded in a non-transient computer-readable recording medium including programmed instructions for causing the information processing device to execute the processes described in this embodiment, and is mechanically read by the anomaly detection system 100 as necessary. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded in a storage unit such as a ROM or HDD (Hard Disk Drive). This computer program is executed by being loaded into a RAM, and cooperates with the CPU to form a control unit.

[0316] In addition, this computer program may be stored in an application program server connected to the anomaly detection system 100 via any network, and it is also possible to download all or part of it as needed.

[0317] In addition, the program for executing the process described in this embodiment may be stored in a non-transient computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes any "portable physical medium" such as a memory card, a Universal Serial Bus (USB) memory, a Secure Digital (SD) card, a flexible disk, a magneto-optical disk, a ROM, an Erasable Programmable Read Only Memory (EPROM), an Electrically Erasable and Programmable Read Only Memory (EEPROM (registered trademark)), a Compact Disk Read Only Memory (CD-ROM), a Magneto-Optical disk (MO), a Digital Versatile Disk (DVD), and a Blu-ray (registered trademark) Disc.

[0318] Moreover, a "program" is a data processing method written in any language or description method, and may be in any form, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a distributed configuration as multiple modules or libraries, and a program that works with a separate program, such as an OS, to achieve its function. Note that the specific configuration and reading procedure for reading a recording medium in each device shown in the embodiments, as well as the installation procedure after reading, may use well-known configurations and procedures.

[0319] The various databases etc. stored in the memory unit are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and store various programs, tables, databases, and web page files etc. used for various processes and providing websites.

[0320] The anomaly detection system 100 may be configured as an information processing device such as a known personal computer or workstation, or may be configured as the information processing device to which any peripheral device is connected. The anomaly detection system 100 may be realized by installing software (including programs, data, etc.) that causes the device to realize the processing described in this embodiment.

[0321] Furthermore, the specific form of distribution and integration of the devices is not limited to that shown in the drawings, and all or part of them can be functionally or physically distributed and integrated in any unit according to various additions or functional loads. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively. [Explanation of symbols]

[0322] 100 Anomaly Detection System 102 Control section 102a Memory control unit 102b Detection unit 102c Display control unit 104 Communication interface section 106 Storage section 106a Business Database 106b Data table for anomaly detection execution 106c Abnormality judgment result data table 106d Abnormality Judgment Definition Master 108 Input / Output Interface Section 112 Input Devices 114 Output Device 300 Network

Claims

1. An anomaly detection system including a control unit, The control unit is configured to provide access to case data including one or more specific conditions, progress rates, and case progress rates; a detection means for dividing a population of past case data according to a specified specific condition, calculating an approximate curve for the progress rate of the case data and the case progress rate for each population, calculating a predicted value of the case progress rate by substituting the progress rate into a function of the approximate curve, calculating upper and lower limits based on the approximate curve and the predicted value of the case progress rate, and detecting an anomaly by comparing the case data to be detected with the upper and lower limits; An anomaly detection system comprising a display control means for displaying analysis data on an analysis screen for case data in which an anomaly has been detected.

2. The project data includes construction data, the specific conditions include a type of work, a construction period, or a public / private classification, the progress rate includes a construction period progress rate calculated by construction elapsed months / planned construction period, and the project progress rate includes a cumulative progress rate calculated by currently incurred costs / (current cost budget+current incurred costs), The anomaly detection system according to claim 1 , wherein the construction data includes a construction, an organization, one or more specific conditions, a fiscal year and month, a sales amount, a construction progress rate, and a cumulative progress rate.

3. The anomaly detection system described in claim 2, characterized in that the display control means displays a message in a specified area of ​​the analysis screen based on the construction data, the message including the construction detected as an anomaly, the detection method, and the cumulative progress rate determined to be an anomaly.

4. The anomaly detection system described in claim 2, characterized in that the display control means displays, in a specified area of ​​the analysis screen based on the construction data, actual cumulative progress rates and their approximate curves for past construction works by population or all past construction works, by construction period progress rate, and a graph showing changes in actual cumulative progress rates linked to construction works in which an abnormality has been detected.

5. The anomaly detection system described in claim 2, characterized in that the display control means displays, in a specified area of ​​the analysis screen based on the construction data, the actual cumulative progress rate of past construction works and its approximate curve, and a graph showing the trend in the actual cumulative progress rate linked to the construction work in which an abnormality has been detected, by fiscal year and month.

6. The anomaly detection system according to claim 2, characterized in that the display control means displays a table showing trends in actual sales and sales forecasts by organization for a specified fiscal period in a specified area of ​​the analysis screen based on the construction data.

7. The display control means displays, in a predetermined area of ​​the analysis screen based on the construction data, The anomaly detection system according to claim 2, characterized in that it displays a table showing the trends in actual sales and forecast sales for each construction project of the organization in charge of the construction project in which the anomaly occurred.

8. An anomaly detection method executed by an information processing device having a control unit, The control unit is configured to provide access to case data including one or more specific conditions, progress rates, and case progress rates; Executed in the control unit, a detection process for dividing a population of past business data according to specified specific conditions, calculating an approximate curve for the progress rate and progress rate of the case data for each population, calculating a predicted value of the case progress rate by substituting the progress rate into a function of the approximate curve, calculating upper and lower limits based on the approximate curve and the predicted value of the case progress rate, and detecting anomalies by comparing the case data to be detected with the upper and lower limits; a display control step of displaying analysis data on an analysis screen for the case data in which an abnormality has been detected; An anomaly detection method comprising:

9. An abnormality detection program to be executed by an information processing device having a control unit, The control unit is configured to provide access to case data including one or more specific conditions, progress rates, and case progress rates; In the control unit, a detection process of dividing a population of past case data according to specified specific conditions, calculating an approximate curve for the progress rate of the case data and the case progress rate for each population, calculating a predicted value of the case progress rate by substituting the progress rate into a function of the approximate curve, calculating upper and lower limits based on the approximate curve and the predicted value of the case progress rate, and detecting anomalies by comparing the case data to be detected with the upper and lower limits; a display control step of displaying analysis data on an analysis screen for the case data in which an abnormality has been detected; An anomaly detection program to execute the above.

Citation Information

Patent Citations

  • BIM-based whole-process project cost management method and system and electronic equipment

    CN112837105A

  • Three-rate-in-one-based power grid infrastructure main network project multi-dimensional collaborative management and control system

    CN113837730A

  • Method and device for project management support and computer readable recording medium stored with program for execution of this method on computer

    JP2000322252A

  • Project management device, project management method and program

    JP2005208804A

  • Construction work management support system

    JP2015095122A