Method and system for controlling tower crane

A system with identification members automates the input of temporary storage locations for construction materials, reducing time and errors in tower crane operations by using building information model data.

JP2024136786APending Publication Date: 2024-10-04TODA CORP

Patent Information

Application Number
JP2023048030
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-24
Publication Date
2024-10-04

AI Technical Summary

Technical Problem

The manual input of temporary storage locations for construction materials using a keyboard is time-consuming and prone to errors in existing tower crane control systems.

Method used

Implementing a system with temporary storage site identification members and member identification members, readable by devices, to automate the identification and transportation of construction materials using a tower crane, based on building information model data.

Benefits of technology

This system reduces input time and prevents errors by automating the identification and transportation process, ensuring accurate placement of materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024136786000001_ABST
    Figure 2024136786000001_ABST
Patent Text Reader

Abstract

To reduce labor required for input and to prevent input errors.SOLUTION: In an identification information reading step 94, a reading device is used for reading identification information of a component from a component identification member mounted in a component identification member mounting step 92 to the component temporarily placed in a temporary storage area in a component temporary storage step 93, and before or after that, reading identification information of the temporary storage area from a temporary storage area identification member installed in a temporary storage area identification member installation step 91 near the temporary storage area where the component is temporarily placed in the component temporary storage step 93. In a transportation step 97, a tower crane is automatically operated based on a loading position identified in a loading position identification step 95 and a target position identified in a target position identification step 96, to transport the component from the loading position to the target position.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method and system for automatically controlling a tower crane. [Background technology]

[0002] Patent Document 1 discloses a method of constructing a building in which an overhead traveling crane is used to hoist materials that make up the building, transport them to a designated location, and install them, either between the permanent columns of the building to be constructed or between temporary columns erected around the building. Patent Document 2 discloses an automatic operation system for a tower crane that has a simple configuration and operation and is capable of efficiently performing operations and tasks including rotating the rotating body, raising and rotating the jib, and hoisting and lowering the load without straying from the set transport trajectory. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 5-287903 [Patent Document 2] JP 2019-112178 A Summary of the Invention [Problem to be solved by the invention]

[0004] In the construction method of Patent Document 1, the temporary storage positions of materials temporarily stored in a stockyard are input by keyboard, which is time-consuming and has the potential for input errors. The present invention aims to solve such problems, for example. [Means for solving the problem]

[0005] The tower crane control method includes a temporary storage site identification member installation step of installing, near each of a plurality of temporary storage sites for temporarily storing components, a temporary storage site identification member capable of reading identification information of the temporary storage site by a reading device, a component identification member attachment step of attaching, to a component, a component identification member capable of reading identification information of the component by a reading device, and a component temporary storage step of temporarily storing the component, to which the component identification member has been attached in the component identification member attachment step, in any of the plurality of temporary storage sites, using a reading device to read identification information of the component from the component identification member attached in the component identification member attachment step to the component temporarily stored in the temporary storage site in the component temporary storage step, and before or after that, the temporary storage site identification member installed in the temporary storage site identification member installation step in the vicinity of the temporary storage site where the material is temporarily stored in the step; a loading position specifying step of specifying a loading position to which the material is to be loaded based on the identification information of the temporary storage site read in the identification information reading step; a target position specifying step of specifying a target position to which the material is to be transported based on the identification information of the material read in the identification information reading step; and a transporting step of transporting the material from the loading position to the target position by automatically operating a tower crane based on the loading position specified in the loading position specifying step and the target position specified in the target position specifying step. Effect of the Invention

[0006] According to this tower crane control method, it is possible to reduce the time and effort required for input and prevent input errors. [Brief description of the drawings]

[0007] [Figure 1] FIG. 1 is a plan view showing an example of a construction site. [Diagram 2] FIG. 1 is a block diagram showing an example of a tower crane control system. [Diagram 3] FIG. 4 is a flow diagram showing an example of a tower crane control process. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0008] With reference to FIG. 1, a construction site 80 to which a tower crane control method and system is applied will be described. A construction site 80 includes a building 81 under construction, a plurality of temporary storage areas 84a-84c for temporarily storing components 86a-86c such as steel frames to be used in the building 81, and a tower crane 82 for transporting the components 86a-86c temporarily stored in the temporary storage areas 84a-84c. Display members 85a-85c are installed near each of the temporary storage areas 84a-84c.

[0009] The tower crane control system 10 will be described with reference to FIG. The tower crane control system 10 includes, for example, a building information model database 11, an identification member creation device 12, a reading device 13, and an automatic driving device 14.

[0010] The building information model database 11 is, for example, a computer, and stores a building information model (BIM). The building information model stored in the building information model database 11 includes information that represents a design drawing of a building 81, which components are to be used where in the building 81, how far the construction of the building 81 has progressed, where temporary storage areas 84a to 84c are located in the construction site 80, which areas of the construction site 80 are off-limits, the schedule and procedures of construction work, and the like.

[0011] The identification member creating device 12 is, for example, a computer, and creates the temporary storage site identification member 87 and the member identification member 88. The temporary storage site identification member 87 can read identification information for identifying each of the temporary storage sites 84a-84c by using the reading device 13. The identification member creation device 12 acquires the identification information of the temporary storage sites 84a-84c to be provided at the construction site 80 from the building information model stored in the building information model database 11, and creates the temporary storage site identification member 87 using the acquired identification information. The temporary storage site identification member 87 created by the identification member creation device 12 is attached to display members 85a-85c installed in the vicinity of the temporary storage sites 84a-84c identified by the identification information. The member identification member 88 can read identification information identifying each of the members 86a-86c by using the reading device 13. The identification member creation device 12 acquires the identification information of the members 86a-86c used in the building 81 from the building information model stored in the building information model database 11, and creates the member identification member 88 using the acquired identification information. The member identification member 88 created by the identification member creation device 12 is attached to the members 86a-86c identified by the identification information.

[0012] The temporary storage site identification member 87 and the member identification member 88 are, for example, stickers. The identification member creation device 12 creates the temporary storage site identification member 87 and the member identification member 88 by using, for example, a printer to print a barcode such as a two-dimensional barcode representing identification information of the temporary storage sites 84a-84c and the members 86a-86c on the stickers. Alternatively, the temporary site identification member 87 and the member identification member 88 may be RFID tags. The identification member creation device 12 creates the temporary site identification member 87 and the member identification member 88 by using, for example, an RFID reader to write identification information of the temporary sites 84a-84c and the members 86a-86c to the RFID tags. The created temporary storage site identification members 87 and member identification members 88 are attached to the display members 85a to 85c and members 86a to 86c, for example, by being attached to the display members 85a to 85c and members 86a to 86c.

[0013] The reading device 13 is, for example, a barcode reader, an RFID reader, or a smartphone, and reads the identification information from the temporary storage site identification member 87 and the member identification member 88. The reading device 13 transmits the read identification information to the automatic driving device 14. The identification information may be transmitted by direct communication between the reading device 13 and the automatic driving device 14, or may be transmitted via the Internet or a public communication line. Alternatively, the identification information may be transmitted indirectly, for example, by the automatic driving device 14 downloading and acquiring the identification information uploaded by the reading device 13 to cloud storage.

[0014] The automatic driving device 14 is, for example, a computer, and automatically drives the tower crane 82. The automatic driving device 14 determines which members 86a-86c are temporarily stored in which temporary storage sites 84a-84c based on the identification information read by the reading device 13. The automatic driving device 14 also determines the order and route for transporting the members 86a-86c temporarily stored in the temporary storage sites 84a-84c based on the building information model stored in the building information model database 11. Then, the automatic driving device 14 automatically drives the tower crane 82 according to the determined order and route, thereby transporting the members 86a-86c. Note that a specific method for automatically driving the tower crane 82 may be, for example, the method described in Patent Document 2, or may be another method.

[0015] For example, the automatic driving device 14 may have an automatic driving information generating unit and an automatic driving unit. The automatic driving information generating unit and the automatic driving unit may be physically different computers. The automatic operation information generation unit generates automatic operation information for automatically operating the tower crane 82 based on the identification information received from the reading device 13. The automatic driving unit automatically drives the tower crane 82 based on the automatic driving information generated by the automatic driving information generation unit. For example, when the identification information read by the reading device 13 is uploaded to the cloud storage, the automatic driving information generating unit of the automatic driving device 14 is notified of the fact and acquires the identification information from the cloud storage. The automatic driving information generating unit acquires the loading position coordinate information based on the building center coordinate information and the storage location information uploaded to the cloud storage in advance, and acquires the loading position coordinate of the corresponding suspended load based on the acquired loading position coordinate information and the identification information of the temporary storage location. In addition, the automatic driving information generating unit acquires the crane suspended load passing point coordinate information uploaded to the cloud storage in advance, and acquires the passing point information of the corresponding suspended load based on the acquired passing point coordinate information and the identification information of the member. Then, the automatic driving information generating unit generates automatic driving information based on the acquired loading position coordinate and the passing point information, and uploads the generated automatic driving information to the cloud storage. The automatic driving unit of the automatic driving device 14 is notified of the fact and acquires the automatic driving information from the cloud storage, and automatically operates the tower crane 82 based on the acquired automatic driving information.

[0016] The tower crane control process 90 will now be described with reference to FIG. The tower crane control processing 90 includes, for example, a temporary storage site identification member installation process 91, a member identification member mounting process 92, a member temporary placement process 93, an identification information reading process 94, a loading position identification process 95, a target position identification process 96, and a transportation process 97.

[0017] First, in a temporary storage site identification member installation step 91, a temporary storage site identification member 87 including identification information for identifying each temporary storage site is installed near each temporary storage site 84a to 84c. For example, first, a plurality of temporary storage sites 84a to 84c are set within the construction site 80, and information indicating the position and identification information of each of the set temporary storage sites 84a to 84c are written to the building information model stored in the building information model database 11. Thereafter, the identification member creation device 12 acquires identification information of the temporary storage sites 84a to 84c from the building information model stored in the building information model database 11, and creates a temporary storage site identification member 87 including the acquired identification information for each of the temporary storage sites 84a to 84c. Next, the created temporary storage site identification members 87 are attached to the display members 85a to 85c. Finally, the display members 85a to 85c to which the temporary storage site identification members 87 are attached are placed near the temporary storage sites 84a to 84c, thereby placing the temporary storage site identification members 87 near the temporary storage sites 84a to 84c. It is preferable that the temporary storage site identification member 87 includes a mark that allows a worker to visually recognize where the temporary storage site is identified by the identification information included therein, thereby preventing the display members 85a to 85c from being installed in the wrong locations.

[0018] Next, in a component identification member attachment step 92, a component identification member 88 containing identification information for identifying a component used in the building 81 is attached to a component that is identified by that identification information. For example, first, in a factory where components are manufactured, the components are manufactured based on the building information model stored in the building information model database 11. Alternatively, in a warehouse where the components are stored, the components to be shipped to the construction site 80 are identified based on the building information model stored in the building information model database 11. Thereafter, the identification member creation device 12 acquires identification information for identifying the manufactured or identified member from the building information model stored in the building information model database 11, and creates a member identification member 88 including the acquired identification information. Finally, the component identification member 88 created by the identification member creation device 12 is attached to the manufactured or identified component. In addition, since it is desirable to perform the attachment work of the component identification member 88 at the site where the component is manufactured or identified, it is desirable to install an identification member creation device 12 in each of the factories where the components are manufactured and the warehouses where the components are stored.

[0019] Next, in a component temporary placement step 93, the component to which the component identification member 88 is attached is temporarily placed in one of the temporary placement locations 84a to 84c. For example, first, materials manufactured in a factory or shipped from a warehouse are transported by truck or the like and delivered to the construction site 80. Thereafter, the members carried to the construction site 80 are temporarily stored in a temporary storage area. Note that a tower crane 82 may be used to temporarily store the components. It is also preferable to temporarily store one component at one temporary storage site. If multiple components are temporarily stored at one temporary storage site, there is a possibility that the wrong component will be transported in the transportation process 97. However, if measures are taken to prevent such mistakes, multiple components may be temporarily stored at one temporary storage site.

[0020] Next, in an identification information reading step 94, a reading device 13 is used to read the identification information of the component temporarily placed in the temporary storage area in the component temporary storage step 93 from the component identification member 88 attached to the component, and also to read the identification information of the temporary storage area from a temporary storage area identification member 87 installed in the vicinity of the temporary storage area where the component is temporarily placed. For example, first, the identification information is read from the component identification member 88, and then the identification information is read from the temporary storage site identification member 87. Alternatively, conversely, first, the identification information is read from the temporary storage site identification member 87, and then the component identification member 88 is read. In this way, the reader 13 successively reads the identification information of the component and the identification information of the temporary storage location, and recognizes the two pieces of identification information as a pair. This makes it possible to know in which temporary storage location the component is temporarily stored.

[0021] When a plurality of components are temporarily stored in different temporary storage locations, the above-described operation of reading the identification information of the component and the identification information of the temporary storage location as a pair is repeated for each of the components. Furthermore, when a plurality of components are temporarily stored in the same temporary storage area, only the identification information of the component to be transported first is read, and the identification information of the other components is not read.

[0022] The format of the identification information may be any format, but it is preferable that the format be one that allows distinction between identification information for a component and identification information for a temporary storage site. In this way, even if the identification information is read first as described above, it is possible to distinguish which is the identification information for a component and which is the identification information for a temporary storage site. Furthermore, if the identification information for components is read consecutively by mistake or the identification information for temporary storage sites is read consecutively by mistake, a warning can be issued that the reading order is incorrect.

[0023] The reading device 13 may have, for example, a display device that displays characters or an audio output device that outputs audio, and may notify the user of the type of identification information to be read next by the characters displayed on the display device or the audio output from the audio output device. For example, if the identification information has not yet been read, the reader 13 notifies the user that the identification information of the component or the temporary storage site should be read. When the user reads the identification information in accordance with this notification, the reader 13 determines whether the identification information is identification information for a member or identification information for a temporary storage site.

[0024] If the read identification information is that of a component, the reader 13 notifies the user that the identification information of the temporary storage site should be read next. If the user reads the identification information in accordance with this notification, the reader 13 determines whether it is the identification information of a component or the identification information of the temporary storage site, and if it is the identification information of a component, notifies the user that the reading order is incorrect. In this case, the user may be prompted to read the identification information of the temporary storage site again, or to start reading the identification information again from the beginning.

[0025] Conversely, if the identification information read first is that of the temporary storage site, the reading device 13 notifies the user that the identification information of the component should be read next. When the user reads the identification information in accordance with this notification, the reading device 13 determines whether it is the identification information of the component or the identification information of the temporary storage site, and if it is the identification information of the temporary storage site, the reading device 13 notifies the user that the reading order is incorrect. In this case as well, the user may be prompted to read the identification information of the component again, or to start reading the identification information again from the beginning.

[0026] When the identification information of the component and the identification information of the temporary storage site are correctly read as a pair, the reading device 13 notifies the user of that fact and asks the user whether or not to continue reading. The reading device 13 may have a button for inputting the user's response. When reading is to be continued, the process returns to the beginning, and the reading device 13 notifies the user that the identification information of the component or the temporary storage site should be read.

[0027] In this manner, the reader 13 reads pairs of identification information of components and identification information of the temporary placement sites for any number of components temporarily placed in the temporary placement sites 84a to 84c.

[0028] Next, in a loading position specifying step 95, the automatic driving device 14 specifies the loading position where the part is to be loaded, based on the identification information of the temporary storage site read in the identification information reading step 94. For example, the automatic driving device 14 acquires information about a temporary storage area identified by the identification information from the building information model stored in the building information model database 11, and identifies the location of the temporary storage area from the acquired information, thereby identifying the loading location. When there are multiple pairs of identification information read in the identification information reading step 94, the pickup location is identified based on the identification information of the temporary storage site included in each pair.

[0029] Next, in a target position specifying step 96, the automatic driving device 14 specifies a target position to which the part is to be transported based on the identification information of the part read in the identification information reading step 94. For example, the automatic driving device 14 acquires information about the component identified by the identification information from the building information model stored in the building information model database 11, and identifies the target position by determining from the acquired information where in the building 81 the component is to be used. When there are a plurality of pairs of identification information read in the identification information reading step 94, the target position is specified based on the identification information of the members included in each pair.

[0030] Next, in a transportation process 97, the automatic driving device 14 automatically operates the tower crane 82 based on the loading position identified in the loading position identification process 95 and the target position identified in the target position identification process 96, thereby transporting the members 86a to 86c temporarily placed in the temporary storage areas 84a to 84c from the loading position to the target position. For example, the automatic driving device 14 acquires information indicating how far the construction of the building 81 has progressed and information indicating no-entry areas from the building information model stored in the building information model database 11, and based on the acquired information, determines a route for moving the hook of the tower crane 82 to the loading position while avoiding the existing building 81 and the no-entry areas, and automatically drives the tower crane 82 according to the determined route to move the hook to the loading position. Next, the automatic driving device 14 determines a route for transporting the component temporarily placed at the temporary storage area from the loading position to the target position while avoiding existing buildings 81 and restricted entry areas, with the component temporarily placed at the temporary storage area hung from a hook, and after the worker hangs the component temporarily placed at the loading position from the hook of the tower crane 82, the automatic driving device 14 automatically drives the tower crane 82 according to the determined route, thereby transporting the component hung from the hook from the loading position to the target position.

[0031] When there are multiple pairs of identification information read in the identification information reading step 94, the automatic driving device 14 determines the order in which to transport the parts, and transports the parts one by one in accordance with the determined order. For example, the automatic driving device 14 acquires information representing the construction work schedule and work procedures from the building information model stored in the building information model database 11, and determines the order in which to transport components based on the acquired information. Alternatively, the automatic driving device 14 may simulate a state in which one of a plurality of components is transported to the target position first, and calculate a route for transporting the other components, thereby determining whether the component will interfere with the transport of the other components, such as by preventing the other components from being transported to the target position or by forcing a detour even if the component can be transported, and may determine the order in which the components will be transported so that the component is transported after the other components if it is determined that the component will interfere with the transport of the other components.

[0032] The order in which the components are transported may be determined based not only on the components identified by the identification information of the components included in the pair of identification information read in the identification information reading process 94, i.e., the components temporarily stored in any of the temporary storage sites 84a to 84c at that time, but also on all the components to be transported by the tower crane 82. In this case, the components determined to be transported after the components that have not yet been brought into the construction site 80 may not be transported in the transporting process 97, but may remain temporarily stored in the temporary storage site.

[0033] Depending on the schedule and work procedures of the construction work, there is a possibility that components that cannot be or should not be transported to the target position at that time may be temporarily stored in the temporary storage area. The automatic driving device 14 determines whether or not the components temporarily stored in the temporary storage area are in a state in which they can be transported to the target position based on the building information model stored in the building information model database 11, and may leave the components temporarily stored in the temporary storage area without transporting them in the transportation step 97.

[0034] As described above, by successively reading the identification information of the parts temporarily placed in the temporary storage areas and the identification information of the temporary storage areas where the parts are temporarily placed, it is possible to know which parts are temporarily placed in which temporary storage areas, thereby reducing the effort of inputting data and preventing input errors. The reading device can facilitate the work of reading the identification information by notifying the user of the reading order of the identification information and by warning the user when the reading order is incorrect. By managing component identification information, temporary storage site identification information, and other information in a unified manner using the construction information model, this information can be easily managed. By determining routes that avoid no-entry areas and existing buildings based on the construction information model, it is possible to prevent entry into no-entry areas and collisions with buildings.

[0035] The above-described embodiment is an example for facilitating understanding of the present invention. The present invention is not limited thereto, and includes various modifications, changes, additions, or deletions without departing from the scope defined by the appended claims. This can be easily understood by those skilled in the art from the above description.

[0036] In steel construction work, to identify the steel components brought to the construction site, on-site scaffolders and steel workers do not need to visually check and identify them based on numbers written on the components themselves in advance at the steel fabrication factory. Identification numbers are assigned in advance to steel components and on-site steel component storage areas, which are then converted into two-dimensional barcodes and affixed to the steel components and steel component storage areas. At the site, the two-dimensional barcodes can be read with a dedicated application to identify the components and material storage areas. The information read from the two-dimensional barcode can be input into the tower crane's three-dimensional automatic guidance system, making it possible to automatically set the component installation position and the component installation route when the tower crane is operating automatically. Identification numbers are assigned to steel components in advance, which are then converted into two-dimensional barcodes and affixed to the steel components at the factory. At the construction site, the two-dimensional barcodes of the steel components can be read with a dedicated application to identify the components. Additionally, identification numbers are assigned in advance to the steel structure material storage areas on-site, which are then converted into two-dimensional barcodes and installed for each storage area. By reading the two-dimensional barcode of the material storage area after identifying the material, information on the steel structure material and its storage area can be obtained. Identification numbers for steel components and steel component storage areas are assigned in advance using BIM or similar tools. The information read by a dedicated application is uploaded wirelessly to a dedicated cloud storage. The uploaded information can be imported from cloud storage into the tower crane's 3D automatic guidance system, which can automatically set the component installation positions and the component installation path when the tower crane is operating automatically. Regarding the component installation path, a path can be automatically generated that avoids "no entry areas" specified in the BIM data and parts of the building that have already been constructed. By automating the identification work that was previously done visually by humans, work efficiency can be improved and identification errors can be prevented. By linking with the tower crane three-dimensional automatic guidance system, it is possible to automatically set the component installation position and the component installation path when the tower crane is operating automatically. [Explanation of symbols]

[0037] 10 tower crane control system, 11 building information model database, 12 identification component creation device, 13 reading device, 14 automatic driving device, 80 construction site, 81 building, 82 tower crane, 84a-84c temporary storage area, 85a-85c display components, 86a-86c components, 87 temporary storage area identification components, 88 component identification components, 90 tower crane control processing, 91 temporary storage area identification component installation process, 92 component identification component attachment process, 93 component temporary storage process, 94 identification information reading process, 95 loading position identification process, 96 target position identification process, 97 transportation process.

Claims

1. a temporary storage site identification member installation step of installing a temporary storage site identification member capable of reading identification information of the temporary storage site by a reading device in the vicinity of each of a plurality of temporary storage sites for temporarily storing materials; a member identification member attachment step of attaching a member identification member, the member identification information of which can be read by a reading device, to the member; a member temporary storage step of temporarily storing the member to which the member identification member has been attached in the member identification member attachment step in any one of the plurality of temporary storage areas; an identification information reading step of reading, using a reading device, identification information of the component from the component identification member attached in the component identification member attachment step to the component temporarily placed in the temporary storage site in the component temporary storage step, and, before or after this, reading identification information of the temporary storage site from the temporary storage site identification member installed in the temporary storage site identification member installation step in the vicinity of the temporary storage site where the component is temporarily placed in the component temporary storage step; a loading position specifying step of specifying a loading position where the member should be loaded based on the identification information of the temporary storage site read in the identification information reading step; a target position specifying step of specifying a target position to which the member is to be transported based on the identification information of the member read in the identification information reading step; a transporting step of transporting the member from the loading position to the target position by automatically operating a tower crane based on the loading position identified in the loading position identifying step and the target position identified in the target position identifying step; A tower crane control method comprising:

2. In the identification information reading step, when the identification information first read is identification information of a component, the reading device prompts the user to next read identification information of a temporary storage site, and conversely, when the identification information first read is identification information of a temporary storage site, the reading device prompts the user to next read identification information of a component.

2. The tower crane control method of claim 1.

3. In the identification information reading step, the reading device warns a user that the reading order is incorrect when at least one of the following cases is true: when the first and second read identification information are both identification information of a member; and when the first and second read identification information are both identification information of a temporary storage site.

3. A tower crane control method according to claim 1 or 2.

4. In the temporary storage site identification member installation step, identification information of the temporary storage site is acquired from a building information model stored in a building information model database, the temporary storage site identification member is created based on the acquired identification information of the temporary storage site, and the created temporary storage site identification member is installed in the vicinity of the temporary storage site, In the member identification member attachment step, identification information of the member is acquired from the building information model stored in the building information model database, the member identification member is created based on the acquired identification information of the member, and the created member identification member is attached to the member; In the loading position specifying step, the loading position is specified from the identification information of the temporary storage site based on the building information model stored in the building information model database; In the target position specifying step, the target position is specified from the identification information of the member based on the building information model stored in the building information model database; In the transporting step, a route for transporting the component is determined based on the building information model stored in the building information model database, and the tower crane is automatically operated according to the determined route.

3. A tower crane control method according to claim 1 or 2.

5. In the transportation step, a route is determined based on the building information model stored in the building information model database, the route being designed to avoid entry into a no-entry area and collision with a completed building.

5. The tower crane control method according to claim 4.

6. a reading device that reads identification information of a component from a component identification member attached to a component temporarily placed in any one of a plurality of temporary storage sites, and reads identification information of the temporary storage site from a temporary storage site identification member installed in the vicinity of the temporary storage site where the component is temporarily placed; an automatic driving device that specifies a loading position where the component should be loaded based on the identification information of the temporary storage site read by the reading device, specifies a target position where the component should be transported based on the identification information of the component read by the reading device, determines a route for transporting the component based on the specified loading position and target position, and transports the component by automatically driving a tower crane according to the determined route; A tower crane control system comprising:

Citation Information

Patent Citations

  • Automatic mounting equipment for steel structure

    CN116816104A

  • Construction of building

    JP1993287903A

  • Storage site management system

    JP2012111573A

  • Carrying passage calculation system

    JP2015068019A

  • Method for crane control and stock management

    US20130041500A1

Cited By

  • Assembly support system and assembly support method

    JP7938769B1