Production planning device, production planning method, and program
The production planning device optimizes article distribution across multiple lines using entropy and enthalpy, addressing computational inefficiencies and reducing production throughput, thereby enhancing planning efficiency.
Patent Information
- Application Number
- JP2024027751
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-23
- Filing Date
- 2024-02-27
- Publication Date
- 2024-10-07
AI Technical Summary
Existing production planning systems face significant computational challenges and inefficiencies when creating production planning data for multiple types of articles across multiple production lines, leading to impractically long processing times.
A production planning device and method that utilizes entropy and enthalpy to distribute articles across production lines, reducing production throughput by associating loss information with entropy, and calculating predicted processing times to optimize distribution patterns.
The system efficiently reduces production throughput and simplifies production planning by minimizing computational load while ensuring accurate distribution of articles across multiple production lines.
Smart Images

Figure 2024137754000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a production planning device, a production planning method, and a program. [Background technology]
[0002] There are known production planning devices that create production plan data for items. For example, a production planning device disclosed in Patent Document 1 creates production plan data that indicates the procedure for producing a plurality of types of items. This production planning device acquires information on a plurality of types of items, and creates the production plan data based on the acquired information. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2016-18434 A Summary of the Invention [Problem to be solved by the invention]
[0004] In Patent Document 1, the production plan data is created using a genetic algorithm. When a genetic algorithm is used, for example, child data is created from parent data of the production plan data, and the created child data is made into parent data, and this process is repeated. For example, by applying a genetic algorithm to the production sequence of multiple types of items, production plan data that reduces production throughput can be created.
[0005] When multiple types of items are produced on multiple production lines, the pattern of item distribution to each production line also affects production throughput. For this reason, it is possible to apply a genetic algorithm by taking into account the pattern of item distribution to each production line in addition to the production sequence of the items. However, in this case, the amount of calculations increases significantly compared to creating production plan data for a single production line. As a result, creating the production plan data may take an unrealistic amount of time, which may impair practicality.
[0006] One aspect of the present invention aims to provide a production planning device that can easily execute a production plan, which can reduce production throughput even when multiple types of articles are produced on multiple production lines. Another aspect of the present invention aims to provide a production planning method that can easily execute a production plan, which can reduce production throughput even when multiple types of articles are produced on multiple production lines. Yet another aspect of the present invention aims to provide a program that can easily execute a production plan, which can reduce production throughput even when multiple types of articles are produced on multiple production lines. [Means for solving the problem]
[0007] A production planning device in one aspect of the present invention includes an acquisition unit and a distribution planning unit. The acquisition unit acquires item list information. The item list information includes information on a plurality of types of items. The distribution planning unit creates distribution planning data. The distribution planning data is data for distributing the plurality of types of items included in the item list information to a plurality of production lines. The distribution planning unit creates the distribution planning data based on entropy associated with loss information regarding losses in production processing speed in each production line.
[0008] In this production planning device, the distribution planning unit creates distribution plan data based on entropy. The entropy is associated with loss information regarding losses in the production processing speed in each production line. In this way, the entropy is associated with loss information regarding losses in the production processing speed, and the distribution plan data is created based on the entropy. As a result, distribution plan data is created that reduces production throughput while suppressing the amount of calculations. Therefore, even when multiple types of goods are produced on multiple production lines, a production plan that can reduce production throughput can be easily executed.
[0009] In the above-mentioned one aspect, the loss information may include the number of each type of article distributed to each production line. The entropy may be related to the number of each type of article distributed to each production line. In this case, the distribution plan data that easily and reliably reduces the production throughput is created.
[0010] In the above-mentioned one aspect, the distribution plan unit may create the distribution plan data based on the enthalpy and entropy associated with the total number of the multiple types of articles to be distributed to each production line. In this case, the distribution plan data that can reduce the production throughput more easily and reliably is created.
[0011] In one aspect, the distribution plan unit may include a time calculation unit and a distribution calculation unit. The time calculation unit may calculate a predicted processing time for the multiple types of items distributed to each production line. The distribution calculation unit may calculate a distribution pattern for distributing the multiple types of items included in the item list information to each of the multiple production lines based on the predicted processing time calculated by the time calculation unit. The time calculation unit may calculate the predicted processing time based on entropy and enthalpy. In this case, distribution plan data that can reduce production throughput more easily and reliably is created.
[0012] In the above-mentioned one aspect, the distribution calculation unit may calculate the sum and variance of the predicted processing time of each production line, and calculate a distribution pattern for distributing the multiple types of items included in the item list information to each production line based on the calculation result. In this case, the distribution plan data that can reduce the production throughput more easily and reliably is created.
[0013] In one of the above aspects, the time calculation unit is Time pred =H / v pred , v pred =v max The predicted processing time may be calculated so that the ratio (G / H) is satisfied. In this case, the predicted processing time for each of the multiple production lines is expressed as "Time pred The predicted processing speed of the multiple types of items distributed to each production line may be expressed as "v pred The maximum processing speed of each production line may be max " The enthalpy in each production line may be "H". The Gibbs energy calculated from the entropy and enthalpy in each production line may be "G". In this case, the predicted processing time is more easily calculated.
[0014] In one of the above aspects, the time calculation unit is Time pred =Time ideal +Time loss , Time ideal =Σ(N i / v i ), and Time loss =ΣX i S i In this case, the predicted processing time for each of the multiple production lines may be calculated so that the following is satisfied: pred The ideal processing time for each production line may be “Time ideal The loss time in each production line may be expressed as "Time loss " The total number of the i-th type of goods among the multiple types of goods distributed to each production line may be "N iThe expected processing speed of the i-th type of item among the multiple types of items distributed to each production line may be expressed as "v i The coefficient of the j-th parameter among the multiple parameters distributed to each production line may be expressed as "X j The entropy for the j-th parameter among the multiple parameters distributed to each production line may be expressed as "S j " In this case, the predicted processing time can be calculated more easily.
[0015] In one aspect, the item list information may include parameter information indicating the value of each parameter for a plurality of types of parameters that specify each of the plurality of types of items. The loss information may include the number of each type of value of each parameter. The distribution plan unit may create the distribution plan data based on the entropy associated with the number of each type of value of each of the plurality of parameters included in the plurality of types of parameters. In this case, the distribution plan data that can reduce the production throughput is created more easily and reliably.
[0016] In one of the above aspects, the production planning device may further include a parameter extraction unit. The parameter extraction unit may extract a plurality of parameters from the plurality of types of parameters based on correlation information between the plurality of types of parameters. The distribution plan unit may create distribution plan data based on entropy associated with the number of each type of parameter value for each of the parameters extracted by the parameter extraction unit. In this case, distribution plan data that can reduce production throughput more easily and reliably is created.
[0017] In the above-mentioned one aspect, the parameter extraction unit may extract parameters included in a second combination having a correlation coefficient lower than the correlation coefficient of the first combination from among the plurality of types of parameters. In this case, the distribution plan data that can reduce the production throughput is created more easily and reliably.
[0018] A production planning method according to another aspect of the present invention includes acquiring item list information including information on a plurality of types of items, and creating distribution plan data. The distribution plan data is data for distributing the plurality of types of items included in the item list information to a plurality of production lines. The distribution plan data is created based on entropy associated with loss information regarding losses in the production processing speed in each production line.
[0019] According to yet another aspect of the present invention, a program causes a computer to acquire item list information including information on a plurality of types of items, and to create distribution plan data. The distribution plan data is data for distributing the plurality of types of items included in the item list information to a plurality of production lines. The distribution plan data is created based on entropy associated with loss information regarding losses in the production processing speed in each production line. Effect of the Invention
[0020] One aspect of the present invention provides a production planning device that can easily execute a production plan, which can reduce production throughput even when multiple types of articles are produced on multiple production lines. Another aspect of the present invention provides a production planning method that can easily execute a production plan, which can reduce production throughput even when multiple types of articles are produced on multiple production lines. Yet another aspect of the present invention provides a program that can easily execute a production plan, which can reduce production throughput even when multiple types of articles are produced on multiple production lines. [Brief description of the drawings]
[0021] [Figure 1] FIG. 1 is a block diagram of a production planning device according to an embodiment of the present invention. [Diagram 2] FIG. 1 is a conceptual diagram illustrating distribution of items to multiple production lines. [Diagram 3] 1 is a table showing production process parameters of an article. [Figure 4] FIG. 1 is a conceptual diagram showing the processing time of an article to be processed on a production line. [Diagram 5] FIG. 1 is a correlation diagram between average production rate and entropy. [Figure 6] FIG. 1 is a correlation diagram between average production rate, entropy, and enthalpy. [Figure 7] FIG. 11 is a correlation diagram between an average production speed and a predicted processing speed in the present embodiment. [Figure 8] 1 is a flowchart illustrating an example of a production planning method. [Figure 9] 13 is a flowchart illustrating an example of a distribution plan process. [Figure 10] 13 is a flowchart showing an example of a distribution plan process in a modified example of the embodiment. [Figure 11] FIG. 13 is a correlation diagram between the sum of switching times calculated by a genetic algorithm and the sum of switching times calculated thermodynamically. [Figure 12] FIG. 11 is a block diagram of a production planning device according to a modified example of the present embodiment. [Figure 13] 1 is a table showing parameters of an article. [Figure 14] FIG. 13 is a diagram showing correlations of parameters of an article. [Figure 15] 13 is a flowchart showing an example of a production planning method according to a modified example of the present embodiment. [Figure 16] FIG. 2 illustrates an example of a hardware configuration of a production planning device. [Figure 17] 13 is a Gantt chart of a plurality of production lines of production plan data in a comparative example. [Figure 18] 1 is a Gantt chart of a plurality of production lines of production plan data in the example shown in this embodiment. [Figure 19] 11 is a graph comparing the total predicted processing time for the example shown in this embodiment and a comparative example. [Figure 20] 11 is a graph comparing the variance of predicted processing times for the example shown in this embodiment and a comparative example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0022] Hereinafter, an embodiment of the present invention will be described in detail with reference to the accompanying drawings. In the description of the drawings, the same or equivalent elements are designated by the same reference numerals, and duplicated explanations will be omitted.
[0023] First, the functions and configuration of a production planning device in this embodiment will be described with reference to Fig. 1. Fig. 1 is a block diagram of the production planning device. The production planning device 1 creates production plan data for a plurality of types of items and formulates a production plan. The "items" are, for example, products whose production is planned by the production planning device 1. The production planning device 1 creates production plan data for, for example, electronic components. The electronic components may be, for example, DIP capacitors.
[0024] The production planning device 1 creates a distribution plan for distributing multiple types of items to multiple production lines. The production planning data created by the production planning device 1 includes a distribution pattern for distributing multiple types of items to multiple production lines. FIG. 2 is a conceptual diagram showing the distribution of items to multiple production lines. For example, as shown in FIG. 2, multiple types of items included in item list information L are distributed to multiple production lines α1 to α N For example, the production lines α1 to α N are machines M1 to M N The above-mentioned distribution pattern created by the production planning device 1 is a pattern in which each of the multiple types of items included in the item list information L is distributed to the production lines α1 to α N The table indicates whether the funds will be distributed to one of the following:
[0025] In the example shown in this embodiment, the production planning device 1 further creates a sequence plan for the production sequence of the items on the production line. In this case, the production plan data created by the production planning device 1 further includes a sequence pattern for producing the items on the production line.
[0026] 3 is a table showing production process parameters of an article. For example, in a production line, multiple lots A1 to A 10 A process is executed to produce multiple lots A1 to A10 Each lot A1 to A2 contains different types of items, and the same lot contains the same type of items. 10 Each lot includes multiple types of items. 10 3 shows the number of items PCS, the production processing time time required for the production processing of one item, and the presence or absence of parameters P1 and P2 in the production processing of each lot. The parameters P1 and P2 are, for example, characteristics of the items included in the lot, parts used in the production processing, or tools used in the production processing. In the table shown in Fig. 3, "1" for parameters P1 and P2 indicates that parameters P1 and P2 are present, and "0" for parameters P1 and P2 indicates that parameters P1 and P2 are not present.
[0027] 4 is a conceptual diagram showing the processing time of items processed on a production line. In FIG. 4, lot processing times 31, 32, 33, and 34 respectively indicate the production processing times required for the production processing of lots. 10 The preparation time 41 is the production preparation time required to start the production process in the production line. The switching times 51 to 53 are the lot switching times required to switch the lots. Therefore, in the production line, the lots A1 to A 10 The total processing time t required for all production processes total is expressed by the following equation (1).
number
[0028] "t Ai " is the processing time to produce each lot. "f(A i ,A i+1 )” is “A i " to "A i+1 “g(A0)” is the production preparation time.
[0029] The production planning device 1 includes an acquisition unit 11, a distribution planning unit 13, a sequence planning unit 17, a storage unit 18, and an output unit 19. The acquisition unit 11 acquires item list information L. The item list information L includes, for example, information on multiple types of items. The information on the multiple types of items includes, for example, item names that identify the items. The item names correspond, for example, to different types of items. The production planning device 1 creates production plan data based on the item list information L acquired by the acquisition unit 11.
[0030] The acquisition unit 11 acquires information input from inside or outside the production planning device 1. For example, the acquisition unit 11 acquires the item list information L from a storage area outside the production planning device 1 via an external network such as the Internet or an internal network. The acquisition unit 11 may acquire the item list information L from the storage unit 18. The acquisition unit 11 may acquire information directly input by a user as the item list information L.
[0031] The distribution planning unit 13 creates distribution plan data. The distribution plan data indicates a distribution pattern for distributing multiple types of items included in the item list information L to multiple production lines. The distribution planning unit 13 creates the distribution plan data based on the entropy S. The entropy S is associated with loss information regarding losses in the production processing speed in each production line. The loss information includes, for example, the number of each type of item distributed to each production line. In other words, the distribution planning unit 13 creates the distribution plan data based on the entropy S associated with the number of each type of item distributed to each production line.
[0032] For example, it is considered that the more types of items distributed to a production line, the longer the lot changeover time and the greater the loss in production processing speed. Therefore, in terms of thermodynamics, it is considered that the more types of items distributed to a production line, the higher the disorder and the greater the entropy. For this reason, for example, the number of each type of item distributed to each production line is made to correspond to the number of each type of particle in thermodynamics.
[0033] In thermodynamics, entropy S is expressed by the equation (2): S = k B It is represented by InW. B " is the Boltzmann constant. "W" is the number of configurations. "W" is expressed by the following formula (3). "n i " is the number of the i-th particle. "N" is n i is the sum of.
number
[0034] The distribution planning unit 13, for example, substitutes the number of items to be distributed to the production line into "N" in formula (3) and calculates "n i The entropy S is calculated by substituting the number of each type of item distributed to the production line into "k B " can be set to 1.
[0035] The entropy S has a correlation with the average production speed of the items distributed to the production line, as shown in FIG. 5. FIG. 5 is a correlation diagram between the average production speed calculated without using the entropy S and the entropy S. In this case, R 2 The value is 0.8. In this specification, the "average production speed calculated without using entropy" is a production processing speed calculated by simultaneously applying a genetic algorithm to the production sequence of the items in the production line and the distribution pattern for distributing multiple types of items to multiple production lines.
[0036] In the example shown in this embodiment, the distribution plan unit 13 creates distribution plan data based on enthalpy H and entropy S. The enthalpy H is associated with the total number of multiple types of items distributed to each production line. In thermodynamics, enthalpy H is the sum of the energy possessed by a particle. The relationship between enthalpy H and entropy S is expressed by formula (4): G=H-TS. "G" is Gibbs energy. "T" is a coefficient. Formula (4) can be transformed into formula (5): G / H=1-(TS / H).
[0037] Equation (5), which is composed of enthalpy H and entropy S, corresponds to thermal efficiency in thermodynamics. Equation (6): 1-(S / H), in which "T" in equation (5) is set to 1, has a correlation with the average production rate calculated without using entropy S, as shown in FIG. 6. FIG. 6 is a correlation diagram between the average production rate calculated without using entropy S, entropy S, and enthalpy H. FIG. 6 is a correlation diagram between the average production rate calculated without using entropy S, and 1-(S / H). In this case, R 2 The value is 0.93.
[0038] On both sides of equation (5), we use the maximum processing speed v max By integrating, we get equation (7):v max (G / H)=v max -v max (TS / H) is derived. The maximum processing speed corresponds to the maximum production speed (pcs / min) of items on each production line. Equation (7) corresponds to the following equation (8).
number
[0039] The left side of equation (8) is the predicted processing speed. The predicted processing speed is the production processing speed of the items distributed to the production line, and is the average production speed predicted by calculation using the entropy S and enthalpy H. Hereinafter, the predicted processing speed will be partially omitted and simply written as "v pred " is shown. loss_pred " is the predicted loss rate. The predicted loss rate is the loss of the production processing rate in the production line, and is a value predicted by calculation using the entropy S and enthalpy H.
[0040] The estimated processing time is “Time pred " If equation (7) and equation (8) are taken into consideration, equation (9) holds. The predicted processing time is the production processing time of the items distributed to the production line.
number
[0041] The distribution planning unit 13 includes a time calculation unit 21 and a distribution calculation unit 22. The time calculation unit 21 calculates the predicted processing time of multiple types of items distributed to each production line. The time calculation unit 21 calculates the predicted processing time based on the entropy S and the enthalpy H.
[0042] The time calculation unit 21 calculates the predicted processing time so that, for example, the formula (9) is satisfied. For example, the time calculation unit 21 calculates the predicted processing time so that the formula (10): Time pred =H / v pred , and formula (11): v pred =v max The predicted processing time is calculated so that the ratio (G / H) is satisfied. In this case, the predicted processing time for each of the multiple production lines is calculated as "Time pred " and the predicted processing speed of multiple types of items distributed to each production line is "v pred " and the maximum processing speed of each production line is "v max ", the enthalpy in each production line is "H", and the Gibbs energy calculated from the entropy and enthalpy in each production line is "G".
[0043] The predicted processing speed is correlated with the average production speed of the items distributed to the production line, as shown in FIG. 7. FIG. 7 is a correlation diagram between the average production speed calculated without using the entropy S and the predicted processing speed. In this case, R 2 The value is 0.93.
[0044] The distribution calculation unit 22 creates distribution plan data based on the predicted processing time calculated by the time calculation unit 21. The distribution calculation unit 22 calculates a distribution pattern for distributing multiple types of items included in the item list information L to each of the multiple production lines based on the predicted processing time calculated by the time calculation unit 21. For example, the distribution calculation unit 22 calculates the sum and variance of the predicted processing times of the multiple production lines, and calculates a distribution pattern for distributing multiple types of items included in the item list information L to each of the multiple production lines based on the calculation results.
[0045] The distribution calculation unit 22 calculates the total predicted processing time of the multiple production lines, Time total "M" is the number of production lines. For example, "M" is the number of machines that distribute goods. "Time i pred ” is the predicted processing time of the i-th production line.
number
[0046] The distribution calculation unit 22 calculates the variance var of the predicted processing times of the multiple production lines by the following formula (13). pred_AVG " is the average predicted processing time.
number
[0047] The sequence planning unit 17 creates sequence planning data. The sequence planning data indicates the production sequence of items on the production line. The sequence planning unit 17 creates the sequence planning data based on the distribution planning data calculated by the distribution planning unit 13. The sequence planning unit 17 calculates the production sequence of the items distributed to the production line by a known method. For example, the sequence planning unit 17 uses a genetic algorithm to calculate the production sequence of the items so as to shorten the production processing time.
[0048] The storage unit 18 stores various information in advance and stores information from various functional units. For example, the storage unit 18 stores the information acquired by the acquisition unit 11, the distribution plan data created by the distribution plan unit 13, and the sequence plan data created by the sequence plan unit 17.
[0049] The output unit 19 outputs the production plan data. For example, the output unit 19 outputs the distribution plan data created in the distribution plan unit 13 and the sequence plan data created in the sequence plan unit 17. For example, the output unit 19 includes a display unit and displays the production plan data. The output unit 19 may transmit the production plan data to the outside of the production planning device 1.
[0050] Next, an example of a production planning method in this embodiment will be described with reference to Fig. 8. Fig. 7 is a flowchart showing a part of the production planning method.
[0051] First, the acquisition unit 11 acquires item list information L (process S1). Next, the distribution planning unit 13 executes a distribution planning process (process S2). In process S2, the distribution planning unit 13 creates distribution planning data based on the item list information L acquired in process S1. In process S2, the distribution planning unit 13 creates distribution planning data for distributing multiple types of items included in the item list information L to multiple production lines, based on entropy associated with loss information regarding losses in the production processing speed in each production line.
[0052] Next, the sequence planning unit 17 executes a sequence planning process (process S3). In process S3, the sequence planning unit 17 creates sequence planning data based on the distribution plan data calculated in process S2. In other words, in process S3, the sequence planning unit 17 calculates a production sequence for the items to be distributed to the production line based on the distribution plan data.
[0053] Next, the output unit 19 outputs the production plan data (process S4). The output unit 19 outputs, for example, the distribution plan data created in the distribution plan unit 13 and the sequence plan data created in the sequence plan unit 17.
[0054] Next, an example of the distribution planning process in this embodiment will be described with reference to Fig. 9. Fig. 9 is a flowchart showing a part of the distribution planning process.
[0055] First, the distribution calculation unit 22 derives a random number and creates multiple distribution patterns based on the random number (process S11). For example, in process S11, the distribution calculation unit 22 creates multiple distribution patterns in which the items included in the item list information L acquired in process S1 are randomly distributed to the machines in the production line. In process S11, the multiple distribution patterns created are set as parent data. For example, each distribution pattern has information on the machine to which each item is distributed as a gene.
[0056] Next, the time calculation unit 21 calculates the predicted processing time of each machine (process S12). For example, in process S12, the time calculation unit 21 calculates the entropy S and enthalpy H for each machine in the production line. The time calculation unit 21 calculates the predicted processing time based on the calculated entropy S and enthalpy H and equations (4), (10), and (11). In process S12, the time calculation unit 21 calculates the predicted processing time for each of all production lines of the multiple distribution patterns set as parent data.
[0057] Next, the distribution calculation unit 22 calculates the total processing time and the variance (process S13). In process S13, the distribution calculation unit 22 calculates the total predicted processing time based on formula (12) for each of the multiple distribution patterns set as parent data. For example, the distribution calculation unit 22 calculates the total predicted processing time for all of the multiple distribution patterns set as parent data. In process S13, the distribution calculation unit 22 calculates the variance of the predicted processing time based on formula (13) for each of the multiple distribution patterns set as parent data. For example, the distribution calculation unit 22 calculates the variance of the predicted processing time for all of the multiple distribution patterns set as parent data.
[0058] Next, the distribution calculation unit 22 judges whether or not the number of loops from process S13 to process S19 is a predetermined value (process S13). The predetermined value is, for example, a number equal to or greater than 2. For example, in process S13, the distribution calculation unit 22 acquires the number of loops from process S13 to process S19, and judges whether or not the acquired number of loops is a multiple of 3. If it is judged that the number of loops is the predetermined value, the process proceeds to process S14 (YES in process S13). If it is not judged that the number of loops is the predetermined value, the process proceeds to process S15 (NO in process S13).
[0059] If it is determined that the number of loops is a predetermined value, the distribution calculation unit 22 calculates the sum of the predicted processing times (process S14). When process S14 ends, the process proceeds to process S16. For example, in process S14, the distribution calculation unit 22 calculates the sum of the predicted processing times based on equation (12) for each of the multiple distribution patterns set as parent data. For example, the distribution calculation unit 22 calculates the sum of the predicted processing times for all of the multiple distribution patterns set as parent data.
[0060] If it is determined that the loop count is not a predetermined value, the distribution calculation unit 22 calculates the variance of the predicted processing time (process S15). When process S15 ends, the process proceeds to process S16. For example, in process S15, the distribution calculation unit 22 calculates the variance of the predicted processing time based on formula (12) for each of a plurality of distribution patterns set as parent data. For example, the distribution calculation unit 22 calculates the variance of the predicted processing time for all of the plurality of distribution patterns set as parent data.
[0061] The distribution calculation unit 22 selects a plurality of distribution patterns based on the total predicted processing time or the variance of the predicted processing time (process S16). For example, in process S16, the distribution calculation unit 22 selects the top X% distribution patterns having the shortest total predicted processing time in process S14 from the plurality of distribution patterns set as parent data. For example, the distribution calculation unit 22 selects the top X% distribution patterns having the smallest variance of the predicted processing time in process S15 from the plurality of distribution patterns set as parent data. The top X% is, for example, the top 50%. The distribution calculation unit 22 updates the plurality of distribution patterns selected in process S16 as parent data.
[0062] Next, the distribution calculation unit 22 executes a genetic algorithm process (process S17). For example, in process S17, the distribution calculation unit 22 selects two distribution patterns from a plurality of distribution patterns set as parent data, and creates a distribution pattern that inherits information on the common part of genes of the two selected distribution patterns as child data. In process S17, the distribution calculation unit 22 selects two distribution patterns from a plurality of distribution patterns set as parent data, for example, by a random number. In process S17, the distribution calculation unit 22 replaces genes that are not inherited from the parent data with information determined by a random number while observing the constraints of the machine. In process S17, the distribution calculation unit 22 creates distribution patterns as child data for the number of distribution patterns created in process S11.
[0063] In process S17, the distribution calculation unit 22 creates child data to which mutated data is added with a specified probability. The distribution calculation unit 22 replaces part of the information of the common part of the distribution pattern selected from the parent data as the mutated data. For example, the distribution calculation unit 22 replaces, with a probability of 1%, the mutated data with information determined by random numbers while observing the constraints.
[0064] Next, the distribution plan unit 13 performs an evaluation (process S18). For example, in process S18, the time calculation unit 21 uses the child data created in process S17 to calculate the predicted processing time of each machine in the same manner as in process S12. In process S18, the time calculation unit 21 calculates the predicted processing time for each production line of the multiple distribution patterns set as child data. In process S18, the distribution calculation unit 22 calculates the sum of the predicted processing times for all of the multiple distribution patterns set as child data. For example, the distribution calculation unit 22 sets the sum of the predicted processing times calculated in process S18 as an evaluation value.
[0065] Next, the distribution calculation unit 22 judges whether or not the evaluation value has not improved for a predetermined number of consecutive times (process S19). For example, if it is judged that the evaluation value has not improved for a predetermined number of consecutive times, the process proceeds to process S20 (YES in process S19). For example, if it is not judged that the evaluation value has not improved for a predetermined number of consecutive times, the child data is set as the parent data, and the process proceeds to process S13 (NO in process S19). For example, the predetermined number of times is 10 times.
[0066] If it is not determined that the evaluation value has not improved for a predetermined number of consecutive times, the distribution calculation unit 22 calculates a distribution pattern to be output (process S20). The total predicted processing time converges to a relatively stable value by repeating the loop. In contrast, the variance of the predicted processing time oscillates. For this reason, for example, the distribution calculation unit 22 calculates, as the distribution pattern to be output, the distribution pattern with the smallest variance of the predicted processing time in ±5 generations of the generation with the smallest total predicted processing time. As a result, a distribution pattern in which both the total predicted processing time and the variance of the predicted processing time are reduced can be output.
[0067] Although an example of the production planning method has been described above, the order of each process and the number of loops are not limited to this. For example, the calculation of the total predicted processing time and the calculation of the variance of the predicted processing time may be performed after the process S13.
[0068] Next, an example of a production planning method in a modified example of this embodiment will be described with reference to Fig. 10. This modified example differs from the above-described embodiment in that NSGA2 is used. Below, differences between the above-described embodiment and the modified example will be mainly described. Fig. 10 is a flowchart showing a part of the production planning method.
[0069] First, the distribution calculation unit 22 derives a random number and creates a plurality of distribution patterns based on the random number (process S21). For example, in process S21, the distribution calculation unit 22 creates a plurality of distribution patterns in which the items included in the item list information L acquired in process S1 are randomly distributed to the machines in the production line. In process S21, the created plurality of distribution patterns are set as parent data. For example, each distribution pattern has information of the machine to which each item is distributed as a gene.
[0070] Next, the time calculation unit 21 calculates the predicted processing time of each machine (process S22). For example, in process S22, the time calculation unit 21 calculates the entropy S and enthalpy H for each machine in the production line. The time calculation unit 21 calculates the predicted processing time based on the calculated entropy S and enthalpy H and equations (4), (10), and (11). In process S22, the time calculation unit 21 calculates the predicted processing time for each of all production lines of the multiple distribution patterns set as parent data.
[0071] Next, the distribution calculation unit 22 calculates the sum and variance of the predicted processing time (process S23). In process S23, the distribution calculation unit 22 calculates the sum of the predicted processing time based on formula (12) for each of the multiple distribution patterns set as parent data. For example, the distribution calculation unit 22 calculates the sum of the predicted processing time for all of the multiple distribution patterns set as parent data. In process S23, the distribution calculation unit 22 calculates the variance of the predicted processing time based on formula (13) for each of the multiple distribution patterns set as parent data. For example, the distribution calculation unit 22 calculates the variance of the predicted processing time for all of the multiple distribution patterns set as parent data.
[0072] Next, the distribution calculation unit 22 executes non-priority sorting and congestion degree sorting (process S24). For example, the distribution calculation unit 22 executes non-priority sorting using the total predicted processing time and the variance of the predicted processing time as objective variables. By non-priority sorting, the distribution calculation unit 22 selects the top 50% of distribution patterns in which two objective variables are mutually exclusive from the multiple distribution patterns set as parent data. The distribution calculation unit 22 updates the multiple distribution patterns selected in process S24 as parent data. For example, the distribution calculation unit 22 executes congestion degree sorting in the objective variable space of the total predicted processing time and the variance of the predicted processing time.
[0073] Next, the distribution calculation unit 22 executes a genetic algorithm process (process S25). For example, the distribution calculation unit 22 selects two distribution patterns with low congestion using random numbers, and creates a distribution pattern that inherits information on the common part of the genes of the two selected distribution patterns as child data. In process S25, the distribution calculation unit 22 replaces, for example, genes that are not inherited from the parent data with information determined by random numbers while observing the machine constraints. In process S25, the distribution calculation unit 22 creates distribution patterns as child data for the number of distribution patterns created in process S21.
[0074] In process S25, the distribution calculation unit 22 creates child data to which mutated data is added with a specified probability. The distribution calculation unit 22 replaces part of the information of the common part of the distribution pattern selected from the parent data as the mutated data. For example, the distribution calculation unit 22 replaces, with a probability of 1%, the mutated data with information determined by random numbers while observing the constraints.
[0075] Next, the distribution calculation unit 22 judges whether or not the loop has been executed a predetermined number of times (process S26). For example, if it is judged that the loop has been executed a predetermined number of times, the process proceeds to process S27 (YES in process S26). For example, if it is not judged that the loop has been executed a predetermined number of times, the process proceeds to process S22 (NO in process S26). The predetermined number of times is, for example, a predetermined value.
[0076] Next, the distribution calculation unit 22 calculates a distribution pattern (process S27). For example, the distribution calculation unit 22 calculates, as the distribution pattern to be output, a distribution pattern corresponding to the point closest to the origin in terms of Euclidean distance, or a distribution pattern with the smallest total predicted processing time among distribution patterns with a prescribed variance or less. As a result, a distribution pattern in which both the total predicted processing time and the variance of the predicted processing time are reduced can be output. Although an example of a production planning method has been described above, the order of each process and the number of loops are not limited to this.
[0077] Next, a production planning device in a modified example of this embodiment will be described with reference to Figs. 11 to 14. Fig. 11 is a block diagram of the production planning device. Fig. 12 is a table showing parameters of items. This modified example is generally similar to or the same as the above-described embodiment. This modified example differs from the above-described embodiment in that it includes a distribution planning unit 13A instead of the distribution planning unit 13 and also includes a parameter extraction unit 70. Below, the differences between the above-described embodiment and the modified example will be mainly described.
[0078] The item list information L acquired by the acquisition unit 11 of the production planning device 1A includes, for example, information on a plurality of types of items. As shown in Fig. 12, the item list information L acquired by the acquisition unit 11 of the production planning device 1A includes parameter information indicating the values of a plurality of types of parameters that identify each of the plurality of types of items. The parameter information includes, for example, an item name that identifies the item, a parameter X, a parameter Y, a parameter Z, and a parameter W. The production planning device 1A creates production plan data based on the item list information L acquired by the acquisition unit 11.
[0079] The distribution planning unit 13A of the production planning device 1A creates distribution plan data based on the entropy S. The entropy S is associated with loss information regarding losses in the production processing speed in each production line. The loss information includes, for example, the number of each type of value of each parameter. In other words, the distribution planning unit 13A creates the distribution plan data based on the entropy S associated with the number of each type of value of each of a plurality of parameters included in the plurality of types of parameters.
[0080] The distribution planning unit 13A of the production planning device 1A, for example, substitutes the number of items to be distributed to the production line into "N" in formula (3) and obtains "n iThe entropy S is calculated by substituting the number of different types of values of each parameter of items distributed to the production line into "." For example, in the table shown in Figure 12, the entropy S associated with the number of different types of values of the item name is In(5! / 1!1!2!1!). The entropy S associated with the number of different types of values of parameter X is In(5! / 1!1!2!1!). The entropy S associated with the number of different types of values of parameter Y is In(5! / 2!3!). The entropy S associated with the number of different types of values of parameter Z is In(5! / 5!). The entropy S associated with the number of different types of values of parameter W is In(5! / 4!1!).
[0081] In this modified example, the distribution plan unit 13A creates distribution plan data based on enthalpy H and entropy S. The enthalpy H is associated with the total number of multiple types of items distributed to each production line. In thermodynamics, enthalpy H is the sum of the energies possessed by particles. If the entropy of each parameter for multiple types of parameters is Si, the relationship between enthalpy H and entropy S is expressed by the formula (21)G / H=1-(1 / H)ΣT i S i The "i" indicates the different types of parameters.
[0082] The production planning device 1A further includes a parameter extraction unit 70 in addition to the configuration of the production planning device 1. The parameter extraction unit 70 extracts a plurality of parameters from the plurality of types of parameters based on correlation information between the plurality of types of parameters.
[0083] For example, the parameter extraction unit 70 extracts parameters included in a second combination having a correlation coefficient lower than the correlation coefficient of the first combination from among a plurality of types of parameters. FIG. 13 is a diagram showing the correlation of parameters of an article. FIG. 13 shows correlation coefficients between parameters. In the example shown in FIG. 13, the correlation coefficients between the article name, parameter X, parameter Y, and parameter Z are 0.87 to 1. The parameter W has a correlation coefficient of 0.66 or less with respect to the other parameters. In this case, for example, a combination of the article name, parameter X, parameter Y, and parameter Z corresponds to the first combination, and a combination of the parameter W and the other parameters corresponds to the second combination. The parameter extraction unit 70 extracts, for example, the parameter X and parameter Z included in the second combination.
[0084] In this case, by substituting equation (21) into equation (9), the following equation (22) is derived.
number
[0085] The distribution planning unit 13A calculates the entropy S associated with the number of types of parameter values for each parameter extracted by the parameter extraction unit 70. i The time calculation unit 21A calculates the predicted processing time so that, for example, the formula (22) is satisfied. The distribution calculation unit 22A calculates the total predicted processing time of the multiple production lines, Time total The distribution calculation unit 22A calculates the variance var of the predicted processing times of the multiple production lines by the following formula (13).
[0086] Next, the production planning method in this modified example will be described with reference to Fig. 14. Fig. 14 is a flowchart showing a part of the production planning method. The production planning method shown in Fig. 14 differs from the production planning method shown in Fig. 8 in that a distribution planning unit 13A is used instead of the distribution planning unit 13, and in that a parameter extraction process by a parameter extraction unit 70 is included. The differences from the production planning method shown in Fig. 8 will be mainly described below.
[0087] First, the acquisition unit 11 acquires the item list information L (process S1). Next, the parameter extraction unit 70 extracts a plurality of parameters from the plurality of types of parameters based on correlation information between the plurality of types of parameters included in the item list information L (process S31). The parameter extraction unit 70 extracts parameters included in a second combination having a correlation coefficient lower than the correlation coefficient of a first combination among the plurality of types of parameters.
[0088] Next, the distribution planning unit 13A executes a distribution planning process (process S2). In process S2, the distribution planning unit 13A calculates the entropy S associated with the number of types of parameter values for each parameter extracted by the parameter extraction unit 70. i Based on this, distribution plan data is created.
[0089] Next, the sequence planning unit 17 executes a sequence planning process (process S3). Next, the output unit 19 outputs the production plan data (process S4). The output unit 19 outputs, for example, the distribution plan data created in the distribution plan unit 13A and the sequence plan data created in the sequence planning unit 17.
[0090] Next, a production planning device in a modified example of this embodiment will be described with reference to Fig. 15. This modified example is generally similar to or the same as the above-mentioned embodiment and modified example. This modified example differs from the above-mentioned embodiment in that the time calculation unit 21A performs a different process from the above-mentioned time calculation unit 21A. Below, the differences between the above-mentioned embodiment and the modified example will be mainly described.
[0091] In this modified example, the distribution planning unit 13A also creates distribution plan data based on the entropy S. The entropy S is associated with loss information related to losses in the production processing speed in each production line. In this modified example, the loss information includes, for example, the changeover time of the items distributed in each production line, i.e., the lot changeover time in each production line. In other words, the loss information includes, for example, the changeover time according to the number of each type of parameter value. In other words, the distribution planning unit 13 creates the distribution plan data based on the entropy S associated with the lot changeover time in each production line.
[0092] In the predicted processing time for each of the multiple production lines, the formula (23): Time pred =Time ideal +Time loss is true. pred " is the predicted processing time for each production line. The predicted processing time is the production processing time for the items distributed to the production line. ideal " is the ideal processing time for each production line. loss " is the lost time in each production line. The lost time corresponds to, for example, the changeover time of the articles distributed in each production line, that is, the lot changeover time in each production line.
[0093] In this case, “Time ideal " is expressed by the formula (24): Time ideal =Σ(N i / v i ) is represented by “N j " is the total number of items of the i-th type among the multiple types of items distributed to each production line. "v j " is the expected processing speed of the i-th type of item among the multiple types of items distributed to each production line.
[0094] “Time loss " is expressed by the entropy S in the formula (25): Time loss =ΣX j S jIt is expressed as “X j " is the coefficient of the j-th parameter among the multiple parameters distributed to each production line. "S j ” is the entropy for the j-th parameter among the multiple types of parameters distributed to each production line.
[0095] In this modification, the time calculation unit 21A thermodynamically calculates the predicted processing time so that the formulas (23), (24), and (25) are satisfied. The predicted processing time thus calculated thermodynamically has a correlation with the predicted processing time calculated by the genetic algorithm. FIG. 15 is a correlation diagram between the sum of the switching times calculated by the genetic algorithm and the sum of the switching times calculated thermodynamically. R 2 The value is 0.9526. In this way, there is a strong correlation between the sum of the switching times calculated by the genetic algorithm and the sum of the switching times calculated thermodynamically.
[0096] Next, the hardware configuration of the production planning devices 1, 1A will be described with reference to Fig. 16. Fig. 16 is a diagram showing an example of the hardware configuration of the production planning device 1. The production planning device 1A also has a similar hardware configuration to the production planning device 1.
[0097] The production planning device 1, 1A includes a processor 101, a main memory device 102, an auxiliary memory device 103, a communication device 104, an input device 105, and an output device 106. The production planning device 1, 1A includes one or more computers configured with these hardware devices and software such as programs. Each of the acquisition unit 11, the distribution planning unit 13, 13A, the sequence planning unit 17, the storage unit 18, the output unit 19, and the parameter extraction unit 70 may be configured with one computer or multiple computers. The production planning device 1, 1A is realized in cooperation with the hardware.
[0098] When the production planning device 1, 1A is configured by a plurality of computers, these computers may be connected locally or via a communication network such as the Internet or an intranet. This connection logically constructs one production planning device 1, 1A.
[0099] The processor 101 executes an operating system and application programs. The main memory 102 is composed of a ROM (Read Only Memory) and a RAM (Random Access Memory). For example, at least a part of the various functional units of the production planning device 1 can be realized by the processor 101 and the main memory 102. For example, at least a part of the acquisition unit 11, the distribution planning units 13, 13A, the sequence planning unit 17, the storage unit 18, the output unit 19, and the parameter extraction unit 70 are realized by the processor 101 and the main memory 102.
[0100] The auxiliary storage device 103 is a storage medium including a hard disk, a flash memory, etc. The auxiliary storage device 103 generally stores a larger amount of data than the main storage device 102. For example, at least a part of the storage unit 18 is realized by the auxiliary storage device 103.
[0101] The communication device 104 is configured with a network card or a wireless communication module. For example, at least a part of the acquisition unit 11 and the output unit 19 is realized by the communication device 104. The input device 105 is configured with a keyboard, a mouse, a touch panel, etc. For example, at least a part of the acquisition unit 11 is realized by the input device 105. The output device 106 is configured with a display, a printer, etc. For example, at least a part of the output unit 19 is realized by the output device 106. For example, the output device 106 includes a display device.
[0102] The auxiliary storage device 103 stores in advance a program and data necessary for processing. The program causes a computer to execute each functional element of the production planning devices 1, 1A. This program causes, for example, the above-mentioned processes S1 to S31 to be executed in the computer. This program may be provided in a state recorded on a tangible recording medium such as a CD-ROM, a DVD-ROM, or a semiconductor memory. This program may be provided as a data signal via a communication network.
[0103] Next, the effects of the production planning device 1, 1A, the production planning method, and the program in this embodiment or the modified example will be described.
[0104] In this production planning device 1, the distribution planning unit 13 creates distribution plan data based on the entropy S. The entropy S is associated with loss information on losses in the production processing speed in each production line. In this way, the entropy S is associated with the loss information on losses in the production processing speed, and the distribution plan data is created based on the entropy S. As shown in FIG. 5, the entropy S has a correlation with the average production speed of the items distributed to the production line. Therefore, if the distribution plan data is created based on the entropy S, the distribution plan data is created in which the amount of calculation is suppressed and the production throughput is reduced. Therefore, even when multiple types of items are produced in multiple production lines, a production plan that can reduce the production throughput can be easily executed. The same is true for the production planning device 1A.
[0105] The loss information may include the number of each type of article distributed to each production line. The entropy may be associated with the number of each type of article distributed to each of the multiple production lines. In this case, the correlation between the entropy S and the average production speed of the articles distributed to the production lines is more reliably ensured. Therefore, distribution plan data that easily and reliably reduces the production throughput is created.
[0106] The distribution plan unit 13 may create distribution plan data based on enthalpy H and entropy S, which are associated with the total number of multiple types of articles to be distributed to each production line. As shown in Fig. 6, "1-(S / H)" consisting of enthalpy H and entropy S has a correlation with the average production speed calculated without using entropy. This correlation is higher than when enthalpy H is not used. Therefore, distribution plan data that can reduce the production throughput more easily and reliably is created.
[0107] The distribution plan unit 13 may include a time calculation unit 21 and a distribution calculation unit 22. The time calculation unit 21 calculates a predicted processing time for multiple types of items distributed to each production line. The distribution calculation unit 22 calculates a distribution pattern for distributing multiple types of items included in the item list information L to each of the multiple production lines based on the predicted processing time calculated by the time calculation unit 21. The time calculation unit 21 may calculate the predicted processing time based on the entropy S and the enthalpy H. In this case, distribution plan data that can reduce production throughput more easily and reliably is created.
[0108] The distribution calculation unit 22 may calculate the sum and variance of the predicted processing time of each production line, and based on the calculation result, calculate a distribution pattern for distributing multiple types of items included in the item list information L to each production line. In this case, distribution plan data that can reduce the production throughput more easily and reliably is created.
[0109] The time calculation unit 21 is a Time pred =H / v pred , v pred =v max The predicted processing time may be calculated so that the ratio (G / H) is satisfied. In this case, the predicted processing time for each of the multiple production lines is expressed as "Time pred The predicted processing speed of the multiple types of items distributed to each production line may be expressed as "v pred The maximum processing speed of each production line may be max" The enthalpy in each production line may be "H". The Gibbs energy calculated from the entropy and enthalpy in each production line may be "G". In this case, the predicted processing time is more easily calculated.
[0110] The time calculation unit 21 is a Time pred =Time ideal +Time loss , Time ideal =Σ(N i / v i ), and Time loss =ΣX j S j In this case, the predicted processing time for each of the multiple production lines may be calculated so that the following is satisfied: pred The ideal processing time for each production line may be “Time ideal The loss time in each production line may be expressed as "Time loss " The total number of the i-th type of goods among the multiple types of goods distributed to each production line may be "N i The expected processing speed of the i-th type of item among the multiple types of items distributed to each production line may be expressed as "v i The coefficient of the i-th parameter among the multiple parameters distributed to each production line may be expressed as "X j The entropy for the j-th parameter among the multiple parameters distributed to each production line may be expressed as "S i " In this case, the predicted processing time can be calculated more easily.
[0111] The item list information L may include parameter information indicating the value of each parameter for multiple types of parameters that specify each of the multiple types of items. The loss information may include the number of each type of parameter value. The distribution plan unit 13A creates the distribution plan data based on the entropy associated with the number of each type of value of each of the multiple parameters included in the multiple types of parameters. In this case, the distribution plan data that can reduce the production throughput is created more easily and reliably.
[0112] The production planning device 1A further includes a parameter extraction unit 70. The parameter extraction unit 70 extracts a plurality of parameters from a plurality of types of parameters based on correlation information between the plurality of types of parameters. The distribution plan unit 13A may create distribution plan data based on the entropy associated with the number of each type of parameter value for each of the parameters extracted by the parameter extraction unit. In this case, parameters with low necessity are removed, and robustness can be improved. Therefore, distribution plan data that can reduce production throughput with higher accuracy is created.
[0113] The parameter extraction unit 70 may extract parameters included in a second combination having a correlation coefficient lower than the correlation coefficient of the first combination of the multiple types of parameters. In this case, parameters with low necessity may be excluded based on the correlation coefficient. If the number of parameters is reduced, robustness may be improved. Therefore, distribution plan data that can reduce production throughput with higher accuracy is created.
[0114] Next, an example of verification of the production planning device in this embodiment will be described with reference to Fig. 17 to Fig. 20. Fig. 17 is a Gantt chart of multiple production lines of production planning data in a comparative example. Fig. 18 is a Gantt chart of multiple production lines of production planning data in the example shown in this embodiment. In the comparative example, multiple types of items are distributed to production lines according to human empirical rules, and the production planning data is created for each production line using a genetic algorithm. Figs. 17 and 18 show production processing times for items N1 to N12 of different types. The same symbols represent the same type of items.
[0115] In production lines that produce the same type of item, the lot changeover time in formula (1) is expected to be reduced. On the other hand, it is expected that the more types of items distributed to a production line, the longer the lot changeover time. In the comparative example, the number of types of items distributed differs greatly between production lines. In the comparative example, the production end time also differs significantly. In contrast, in the production plan data in the example shown in this embodiment, it was confirmed that the production processing time is shorter than that of the comparative example, and the difference in production end time is also reduced.
[0116] FIG. 19 is a graph comparing the total predicted processing time for the example shown in this embodiment and the comparative example. In FIG. 19, data D1 shows the comparative example, and data D2 shows the example in this embodiment. In FIG. 19, entropy S is not used in data D1, and a genetic algorithm is simultaneously applied to the production order of items in the production line and the distribution pattern for distributing multiple types of items to multiple production lines. In data D2, distribution plan data is created in the production planning device 1A, and the items are distributed based on the created distribution plan data, and then the production order is created by the genetic algorithm. In this case, it was confirmed that the total predicted processing time of data D2 was shorter than the total predicted processing time of data D1.
[0117] FIG. 20 is a graph comparing the variance of the predicted processing time for the example shown in this embodiment and the comparative example. In FIG. 20, data D11 shows the comparative example, and data D12 shows the example in this embodiment. In FIG. 20, entropy S is not used in data D11, and a genetic algorithm is simultaneously applied to the production order of the items in the production line and the distribution pattern for distributing multiple types of items to multiple production lines. In data D12, distribution plan data is created in the production planning device 1A, and the items are distributed based on the created distribution plan data, and then the production order is created by the genetic algorithm. In this case, it was confirmed that the variance of the predicted processing time of data D12 is reduced more than the variance of the predicted processing time of data D11.
[0118] The above describes the embodiments and modifications of the present invention, but the present invention is not necessarily limited to the above-described embodiments and modifications, and various modifications are possible without departing from the spirit of the present invention.
[0119] For example, in the example shown in this embodiment, both the distribution planning unit 13, 13A and the sequence planning unit 17 are provided, and a configuration is shown in which both the distribution planning process and the sequence planning process are executed. However, it is also possible to provide only the distribution planning unit 13, 13A without providing the sequence planning unit 17. In this case, only the distribution planning data may be output as the production plan data.
[0120] In the example shown in the present embodiment, a configuration has been described in which the predicted processing time is calculated based on both the entropy and the enthalpy. However, the production plan data may be created without calculating the predicted processing time. The production plan data may be created using only the entropy without using the enthalpy.
[0121] As will be understood from the description of the above embodiments, the present specification includes disclosure of the following aspects. (Appendix 1) An acquisition unit that acquires item list information including information on a plurality of types of items; a distribution plan unit that creates distribution plan data for distributing the plurality of types of items included in the item list information to a plurality of production lines; A production planning device, wherein the distribution planning unit creates the distribution plan data based on entropy associated with loss information regarding losses in production processing speed in each of the production lines. (Appendix 2) the loss information includes the number of each type of item distributed to each of the production lines; 2. The production planning device of claim 1, wherein the entropy is associated with the number of each type of item distributed to each of the multiple production lines. (Appendix 3) The production planning device according to claim 1 or 2, wherein the distribution planning unit creates the distribution plan data based on enthalpy and the entropy associated with a total number of the multiple types of items to be distributed to each of the production lines. (Appendix 4) the distribution plan unit includes a time calculation unit that calculates a predicted processing time of the plurality of types of items distributed to each of the production lines, and a distribution calculation unit that calculates a distribution pattern for distributing the plurality of types of items included in the item list information to each of the plurality of production lines based on the predicted processing time calculated by the time calculation unit, 4. The production planning device according to claim 3, wherein the time calculation unit calculates the predicted processing time based on the entropy and the enthalpy. (Appendix 5) The production planning device according to claim 4, wherein the distribution calculation unit calculates a sum and variance of the predicted processing time for each of the production lines, and calculates a distribution pattern for distributing the multiple types of items included in the item list information to each of the production lines based on the calculation results. (Appendix 6) In each of the plurality of production lines, the predicted processing time in each of the production lines is “Time pred " and the predicted processing speed of the multiple types of items distributed to each of the production lines is "v pred" and the maximum processing speed of each of the production lines is "v max ", the enthalpy in each of the production lines is "H", and the Gibbs energy calculated from the entropy and the enthalpy in each of the production lines is "G", the time calculation unit Time pred =H / v pred v pred =v max (G / H) The production planning device according to claim 4 or 5, wherein the predicted processing time is calculated so that the following is satisfied. (Appendix 7) In each of the plurality of production lines, the predicted processing time in each of the production lines is “Time pred " and the ideal processing time in each of the production lines is "Time ideal " and the loss time in each of the production lines is "Time loss ", and the total number of the i-th type of items among the multiple types of items distributed to each of the production lines is "N i " and the expected processing speed of the i-th type of item among the multiple types of items distributed to each of the production lines is "v i ", and the coefficient of the j-th parameter among the multiple types of parameters distributed to each of the production lines is "X j ", and the entropy for the j-th parameter among the multiple types of parameters distributed to each of the production lines is "S j ", then The time calculation unit is Time pred =Time ideal +Time loss Time ideal =Σ(N i / v i ) Time loss =ΣX j S j The production planning device according to claim 4 or 5, wherein the predicted processing time is calculated so that the following is satisfied. (Appendix 8) the item list information includes parameter information indicating values of a plurality of types of parameters that identify each of the plurality of types of items; The loss information includes the number of each type of value of each of the parameters, 8. The production planning device according to claim 1, wherein the distribution planning unit creates the distribution plan data based on an entropy associated with a number of types of values of each of a plurality of the parameters included in the plurality of types of parameters. (Appendix 9) A parameter extraction unit extracts a plurality of the parameters from the plurality of types of parameters based on correlation information between the plurality of types of parameters, The production planning device according to claim 8, wherein the distribution planning unit creates the distribution plan data based on an entropy associated with the number of each type of parameter value for each of the parameters extracted by the parameter extraction unit. (Appendix 10) 10. The production planning device according to claim 9, wherein the parameter extraction unit extracts the parameters included in a second combination having a correlation coefficient lower than a correlation coefficient of a first combination of the multiple types of parameters. (Appendix 11) Obtaining item list information including information on a plurality of types of items; creating distribution plan data for distributing the multiple types of items included in the item list information to multiple production lines based on entropy associated with loss information regarding losses in production processing speed in each of the production lines. (Appendix 12) Obtaining item list information including information on a plurality of types of items; and creating distribution plan data for distributing the multiple types of items included in the item list information to multiple production lines based on entropy associated with loss information regarding losses in production processing speed in each of the production lines. [Explanation of symbols]
[0122] 1, 1A... production planning device, 11... acquisition unit, 13, 13A... distribution planning unit, 21, 21A... time calculation unit, 22, 22A... distribution calculation unit, 70... parameter extraction unit, H... enthalpy, L... item list information, S, S i …entropy, v max …max processing speed, var…variance.
Claims
1. An acquisition unit that acquires item list information including information on a plurality of types of items; a distribution plan unit that creates distribution plan data for distributing the plurality of types of items included in the item list information to a plurality of production lines; A production planning device, wherein the distribution planning unit creates the distribution plan data based on entropy associated with loss information regarding losses in production processing speed in each of the production lines.
2. the loss information includes the number of each type of item distributed to each of the production lines; The production planning device according to claim 1 , wherein the entropy is associated with the number of each type of the articles distributed to each of the production lines.
3. The production planning device according to claim 1 , wherein the distribution planning unit creates the distribution plan data based on enthalpy and the entropy associated with a total number of the plurality of types of articles to be distributed to each of the production lines.
4. the distribution plan unit includes a time calculation unit that calculates a predicted processing time of the plurality of types of items distributed to each of the production lines, and a distribution calculation unit that calculates a distribution pattern for distributing the plurality of types of items included in the item list information to each of the plurality of production lines based on the predicted processing time calculated by the time calculation unit, The production planning device according to claim 3 , wherein the time calculation unit calculates the predicted processing time based on the entropy and the enthalpy.
5. 5. The production planning device according to claim 4, wherein the distribution calculation unit calculates a sum and a variance of the predicted processing time for each of the production lines, and calculates a distribution pattern for distributing the multiple types of items included in the item list information to each of the production lines based on a calculation result.
6. In each of the plurality of production lines, the predicted processing time in each of the production lines is "Time pred ", and the predicted processing speed of the plurality of types of articles distributed to each of the production lines is "v pred " and the maximum processing speed in each of the production lines is "v max ", the enthalpy in each of the production lines is "H", and the Gibbs energy calculated from the entropy and the enthalpy in each of the production lines is "G", the time calculation unit Time pred =H / v pred v pred =v max (G / H) 6. The production planning device according to claim 4, wherein the predicted processing time is calculated so that the following is satisfied:
7. In each of the plurality of production lines, the predicted processing time in each of the production lines is "Time pred ", and the ideal processing time in each of the production lines is "Time ideal " and the loss time in each of the production lines is "Time loss ", and the total number of the i-th type of articles among the multiple types of articles distributed to each of the production lines is "N i ", and the expected processing speed of the i-th type of article among the multiple types of articles distributed to each of the production lines is "v i ", and the coefficient of the j-th parameter among the multiple parameters for identifying each of the multiple types of articles distributed to each of the production lines is "X j ", and the entropy for the j-th parameter among the plurality of types of parameters is "S j ", then The time calculation unit is Time pred =Time ideal +Time loss Time ideal =S(N) i / v i ) Time loss =ΣX j S j 6. The production planning device according to claim 4, wherein the predicted processing time is calculated so that the following is satisfied:
8. the item list information includes parameter information indicating values of a plurality of types of parameters that identify each of the plurality of types of items; The loss information includes the number of each type of value of each of the parameters, The production planning device according to claim 1 , wherein the distribution planning unit creates the distribution plan data based on an entropy associated with a number of values of each type of a plurality of the parameters included in the plurality of types of parameters.
9. A parameter extraction unit extracts a plurality of the parameters from the plurality of types of parameters based on correlation information between the plurality of types of parameters, 9. The production planning device according to claim 8, wherein the distribution plan unit creates the distribution plan data based on an entropy associated with a number of types of values of the parameters for each of the parameters extracted by the parameter extraction unit.
10. 10. The production planning device according to claim 9, wherein the parameter extraction unit extracts the parameters included in a second combination having a correlation coefficient lower than a correlation coefficient of a first combination of the plurality of types of parameters.
11. Obtaining item list information including information on a plurality of types of items; creating distribution plan data for distributing the multiple types of items included in the item list information to multiple production lines based on entropy associated with loss information regarding losses in production processing speed in each of the production lines.
12. Obtaining item list information including information on a plurality of types of items; and creating distribution plan data for distributing the multiple types of items included in the item list information to multiple production lines based on entropy associated with loss information regarding losses in production processing speed in each of the production lines.
Citation Information
Patent Citations
Production planning device
JP2016018434A
