Water blocking method for structure

A combined water-blocking method using a polyethylene sheet and polyurethane layer with a mounting bar addresses adhesion issues, ensuring structural integrity and ease of maintenance in waste disposal sites.

JP2024138955APending Publication Date: 2024-10-09TOBISHIMA CONSTRUCT
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023049692
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-27
Publication Date
2024-10-09

AI Technical Summary

Technical Problem

Conventional water-blocking methods using polyethylene-based sheets and polyurethane-based agents face issues with weak adhesion, peeling, and damage due to tensile forces, especially in structures with rising parts, and cracks in mortar-based foundations lead to impermeable layer failures.

Method used

A method combining a polyethylene water-blocking sheet with a mounting bar and a polyurethane sprayed water-blocking layer, where the sheet is fixed with a mounting bar and the layer is applied over the sheet and structure surface, using a mounting bar to enhance adhesion and prevent peeling.

Benefits of technology

The method minimizes sheet damage, maintains impermeability, and facilitates easy maintenance by ensuring the layers remain tightly bonded, reducing labor and preventing leaks even under tensile forces and structural stress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024138955000001_ABST
    Figure 2024138955000001_ABST
Patent Text Reader

Abstract

To provide a water blocking method for a structure, in which a formed spray water-blocking layer is less likely to be detached, and a laying place of a water blocking sheet and a formation place of the spray water-blocking layer can be determined according to a construction site, and in which breakage of the water blocking sheet is minimized and breakage of a fixation part is prevented, and further, leakage and inundation do not occur even when a hole is formed in a spray water-blocking layer portion, since it is tightly attached to a structure member, and further, in which maintenance such as repairs can be easily carried out, and labor can be saved for work efficiency.SOLUTION: A water blocking sheet 4 is laid on a part of a surface where water should be blocked of a structure 1, and a boundary between an end surface of the laid water blocking sheet 4 and the surface of the structure 1 is sealed using an attachment bar 6. Then, a spray water-blocking agent is sprayed onto a residual part of the surface where water should be blocked of the structure 1, the attachment bar 6, and on a water blocking sheet 4 portion in the vicinity of the attachment bar 6, in order to form a spray water-blocking layer 5.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a waterproofing method for structures, for example, in structures such as final disposal sites, for preventing leakage of leachate originating from waste. [Background technology]

[0002] For example, when constructing a structure such as a final disposal site for disposing of waste, it is necessary to install waterproofing work on the base and surrounding walls to prevent leakage of leachate originating from the waste. A typical waterproofing method is to place a polyethylene waterproof sheet so that it is in close contact with the target surface. In conventional waterproofing using waterproof sheets, the ends of the waterproof sheet are physically fixed to the upper ends of rising parts such as steel frame surfaces, retaining walls, and center columns using anchor bolts or the like.

[0003] However, if the end of the waterproof sheet is physically fixed to the upper end of the rising portion using anchor bolts or the like as described above, there is a possibility that the physically fixed portion using the anchor bolts or the like may be damaged due to the weight of the waste or the downward tensile force during landfill work.

[0004] There is also a waterproofing method (for example, JP 2008-142703 A) in which a waterproof layer is formed using a polyurethane-based spray waterproofing agent, but because the bottom of the final disposal site is made up of ground and mortar, if cracks appear in the ground or mortar, the waterproof layer will also crack, which is an issue. For this reason, there are very few cases of waterproofing using spray waterproofing agents in Japan.

[0005] Furthermore, the combination of a waterproof sheet and a spray-on waterproofing agent, i.e., the method of spraying the waterproofing agent onto the waterproof sheet, has been pointed out as having a problem in that the waterproof sheet is polyethylene-based and the spray-on waterproofing agent is polyurethane-based, resulting in weak adhesion and easy peeling, and a solution to this problem has been demanded. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2008-142703 A Summary of the Invention [Problem to be solved by the invention]

[0007] Thus, the present invention has been devised to address the above-mentioned conventional problems, and has the object of providing a waterproofing method for structures which reduces work efficiency compared to conventional waterproofing sheet installation work, by determining the location of the waterproofing sheet and the location of the sprayed waterproofing layer according to the construction site, such as by laying a waterproofing sheet on slopes and bottom surfaces while forming a sprayed waterproofing layer on rising portions, thereby making it difficult for the waterproofing sheet to be subjected to, for example, the load of waste or downward tensile force during landfill work, thereby minimizing damage to the waterproofing sheet and preventing damage to the fixing parts, and further, even if a hole such as a pinhole occurs in the sprayed waterproofing layer, it is in close contact with the structural components and therefore does not leak or become waterlogged, and furthermore, maintenance such as repairs can be easily performed. [Means for solving the problem]

[0008] The present invention relates to A waterproof sheet was laid on a part of the surface of the structure to be waterproofed, and the boundary between the end face of the laid waterproof sheet and the surface of the structure was sealed with an attachment bar. Next, a sprayed waterproofing agent was sprayed onto the remaining part of the surface of the structure to be waterproofed, the attachment bar, and the waterproof sheet part in the vicinity of the attachment bar to form a sprayed waterproof layer. It is characterized by: or This is a waterproofing method for a structure having a generally concave shape, in which a waterproof sheet is laid from the bottom surface of the structure to a midpoint of the rising portion or to at least a part of the foundation portion around the base end of the rising portion, the boundary between the end surface of the laid waterproof sheet and the surface of the structure is sealed with an attachment bar, and then a sprayed waterproofing agent is sprayed onto the remaining portion of the surface of the structure to be waterproofed, as well as onto the attachment bar and the waterproof sheet portion in the vicinity of the attachment bar, to form a sprayed waterproof layer. It is characterized by: or The waterproof sheet and the sprayed waterproof layer are joined on the structure via a mounting bar. It is characterized by: or The sprayed water-proof layer is applied to the structure to make it waterproof, and the water-proof sheet is applied to make it waterproof other than the structure. It is characterized by the above. Effect of the Invention

[0009] According to the present invention, the sprayed water-proof layer is not easily peeled off, and the location of laying the water-proof sheet and the location of forming the sprayed water-proof layer can be determined according to the construction site, for example, by laying the water-proof sheet on slopes and bottom surfaces, while forming the sprayed water-proof layer on rising portions. This makes it difficult for the water-proof sheet to be subjected to, for example, the load of waste or downward tensile force during landfill work, thereby minimizing damage to the water-proof sheet and preventing damage to the fixing parts. Furthermore, even if a hole such as a pinhole occurs in the sprayed water-proof layer, it is in close contact with the structural components and will not leak or become water-logged. Furthermore, maintenance such as repairs can be easily performed, resulting in reduced labor efficiency compared to conventional water-proof sheet installation work. [Brief description of the drawings]

[0010] [Figure 1] FIG. 2 is an explanatory diagram illustrating the general configuration of the present invention in a retaining wall portion. [Diagram 2] FIG. 2 is an explanatory diagram illustrating a schematic configuration of the present invention in a center pillar portion. [Diagram 3]FIG. 2 is an explanatory diagram illustrating the general configuration of the present invention around the leachate collection drainage pipe. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] The waterproofing method for a structure of the present invention will be described with reference to the drawings. The bottom and rising parts of a structure 1, such as a final disposal site where waste is disposed of, are designed to prevent seepage water originating from the waste. The rising parts refer to locations such as the steel frame surface, retaining wall section 2, and center column section 3. Figure 1 is a diagram illustrating the schematic configuration of the retaining wall section 2 of the structure 1 according to the present invention.

[0012] Reference numeral 4 in Fig. 1 denotes a waterproof sheet. A polyethylene-based waterproof sheet 4 is used as the waterproof sheet 4. Reference numeral 5 denotes a sprayed waterproof layer formed by spraying a sprayed waterproof agent. A polyurethane-based sprayed waterproof agent is used as the sprayed waterproof agent.

[0013] Here, when combining a waterproof sheet 4 such as a polyethylene-based one with a polyurethane-based spray-on waterproofing agent, there is generally a problem that the adhesion of polyurethane to polyethylene is weak and it peels off due to tensile force, making it impossible to provide adequate waterproofing.

[0014] Therefore, in the present invention, a waterproof sheet 4 is first laid on a part of the surface to be waterproofed in a structure 1 such as a final disposal site. Then, a mounting bar 6 is attached to the boundary between the end face of the laid waterproof sheet 4 and the surface of the structure 1, and the mounting bar 6 is attached and fixed with a fixing member so as to close the boundary. In other words, the end of the waterproof sheet 4 is fixed airtightly to the surface of the structure 1 by sealing it with the mounting bar 6 and the fixing member. The mounting bar 6 is made of a material that has a stronger adhesive force to the sprayed waterproofing agent than the waterproof sheet 4, such as a metal plate, or preferably a stainless steel bar. The method of fixing the mounting bar 6 is not limited in any way, but an anchor bolt is used in this embodiment.

[0015] After sealing the boundary with the mounting bar 6, the remaining portion of the surface of the structure 1, i.e., the portion where the waterproof sheet 4 is not laid, is sprayed with a sprayed waterproof layer 5. When spraying the sprayed waterproof agent, it is preferable to spray it from above the mounting bar 6 and the portion of the waterproof sheet 4 in the vicinity of the mounting bar 6. The spraying work of the sprayed waterproof agent is performed by spraying the remaining portion from top to bottom, and by repeating this work of spraying from top to bottom, the sprayed waterproof agent can be efficiently coated.

[0016] Here, in order to improve the adhesion of the spray-on waterproofing agent, the surface of the mounting bar 6 can be roughened by polishing, or adhesion-inhibiting components such as dust and oil can be removed with a solvent, or both, thereby improving the adhesion of the polyurethane-based spray-on waterproofing agent. However, this processing is not necessarily required, and can be determined appropriately depending on the structure 1 and the construction site.

[0017] An embodiment of the retaining wall portion 2 will be described with reference to FIG. As shown in Fig. 1, the retaining wall portion 2 in this embodiment is provided with a step portion 7 and a slope portion 8, and a waterproof sheet 4 is laid on the step portion 7 and the slope portion 8. When laying this waterproof sheet 4, a waterproof sheet layer 9 is formed by stacking each member as can be seen from Fig. 1.

[0018] The waterproof sheet layer 9 is formed by first laying a protective mat made of a felt material such as recycled felt on the step portion 7 and the slope portion 8 of the structure 1. Next, a polyethylene-based waterproof sheet 4 (lower waterproof sheet 4) such as a low-density polyethylene sheet is laid on the protective mat, and a conductive mat for detecting water leakage is laid on the lower waterproof sheet 4. Then, a bentonite-based self-repairing mat such as a bentonite sheet is laid on the conductive mat, and a polyethylene-based waterproof sheet 4 (upper waterproof sheet 4) is laid on top of the self-repairing mat. After that, a power supply electrode is placed on the upper waterproof sheet 4, and then a light-shielding protective mat made of a felt material such as recycled felt is laid to form the waterproof sheet layer 9. Note that the conductive mat and the power supply electrode are omitted in FIG. 1.

[0019] Then, after the waterproof sheet layer 9 is formed, mounting bars 6 are attached to the boundaries between each end face of the bottom waterproof sheet 4 and the top waterproof sheet 4 constituting the waterproof sheet layer 9 and the surface of the retaining wall portion 2 of the structure 1, and the mounting bars 6 are fixed with fixing members so as to close the boundaries. As can be seen from Fig. 1, the vicinity of the ends of the members other than the bottom waterproof sheet 4 and the top waterproof sheet 4 constituting the waterproof sheet layer 9 will be buried in the concrete that will be poured later.

[0020] Here, to attach the mounting bar 6, first, a double-sided adhesive tape (e.g., butyl tape) that has airtight waterproof properties and adhesive power on both sides is attached to the surface of the structure 1. It is preferable to attach it to the part where the end face of the waterproof sheet 4 and the surface of the structure 1 are located. Then, the end face of the lower waterproof sheet 4 is attached to the double-sided adhesive tape and fixed. Next, the double-sided adhesive tape is similarly attached to the end face of the lower waterproof sheet 4, and the end face of the upper waterproof sheet 4 is attached to the attached double-sided adhesive tape and fixed. After that, the mounting bar 6 is attached on top of that, and a rubber plate is sandwiched between the upper waterproof sheet 4 and the mounting bar 6. In other words, the mounting bar 6 is attached on the rubber plate, and these are fixed by a fixing member such as an anchor (see FIG. 1).

[0021] This rubber plate is elastic, so it can tightly seal the gap between the structure 1 and the waterproof sheet layer 9 to prevent leachate from penetrating therebetween, and because it is non-slip and has high frictional force, it prevents the waterproof sheet 4 from peeling off due to the load of the waste or the downward pulling force during landfill work, and prevents the mounting bar 6 from being damaged.

[0022] The waterproof sheet layer 9 may be configured such that the ends of the lower waterproof sheet 4 and the upper waterproof sheet 4 are fused together (sewn together) and another upper waterproof sheet 4 is extended from the end of the upper waterproof sheet 4. In this case, the extending upper waterproof sheet 4 is fixed to the surface of the structure by the above-mentioned method.

[0023] Next, the mounting bar 6 is attached to fix the waterproof sheet 4 and seal the seam, and then a sprayed waterproof agent is sprayed onto the remaining part of the retaining wall 2 of the structure 1, i.e., the surface on which the waterproof sheet 4 is not laid, to form a sprayed waterproof layer 5.

[0024] In forming the sprayed water-proof layer 5, first, a base material (primer) such as an epoxy primer (e.g., a resin primer) is applied to the remaining portion to which the sprayed water-proofing agent is to be sprayed, using a coating roller, brush, or airless paint sprayer. The base material has the role of improving the compatibility of the sprayed water-proofing agent, increasing the adhesion of the surface, and making the sprayed water-proofing agent less likely to peel off.

[0025] Thereafter, a sprayed waterproofing agent is sprayed onto the applied base material. As a spraying method, it is preferable to spray the sprayed waterproofing agent from the top to the bottom of the remaining part of the retaining wall portion 2. In addition, it is preferable that the thickness of the sprayed sprayed waterproofing agent is 2 mm or more.

[0026] In this embodiment, the ultra-fast-curing polyurethane resin is sprayed as the spray waterproofing agent using a spray machine, and the sprayed waterproofing agent gels and hardens in about 10 to 20 seconds, forming a uniform, strong, seamless waterproof film without dripping.

[0027] Next, a light-shielding water-blocking agent (top coat) is applied over the sprayed water-blocking agent using a coating roller, brush, or airless paint sprayer to form the sprayed water-blocking layer 5 (see Figure 1). As the water-blocking agent, an acrylic HALS hybrid paint (Resitop) or the like is used. In other words, the sprayed water-proof layer 5 is formed from three layers: a primer is applied, a sprayed water-proofing agent is sprayed on top of the primer, and a light-proofing top coat is applied on top of the sprayed water-proofing agent.

[0028] Here, the sprayed water-proof layer 5 is also formed on the mounting bar 6 and the portion of the water-proof sheet 4 in the vicinity of the mounting bar 6. This allows the sprayed water-proofing agent to bond to the mounting bar 6, making the sprayed water-proof layer 5 less likely to peel off.

[0029] By forming the sprayed water impermeable layer 5 in this manner, the sprayed water impermeable layer 5 is bonded to the retaining wall 2 of the structure 1, making it less likely to be damaged by the weight of the waste, and since it covers in a tightly adhered state, it can be constructed without any gaps. Even if a hole (pinhole) occurs in the sprayed water impermeable layer 5, it is less likely to leak or become flooded because it is in close contact with the retaining wall 2 of the structure 1, and if repair is required, it can be done simply by forming an appropriate sprayed water impermeable layer 5 over the location where the hole occurred, making maintenance easy.

[0030] Furthermore, the formation of the waterproof sheet layer 9 requires tasks such as lifting the waterproof sheets 4 etc. with a crane, pulling the sheets out using a spreader, fusing the overlaps between adjacent sheets, and laying each sheet in layers one by one, which is so-called heavy labor, whereas the formation of the sprayed waterproof layer 5 requires only the application of a primer, a sprayed waterproof agent, and a top coat, which reduces the physical burden. Therefore, by combining the waterproof sheet layer 9 and the sprayed waterproof layer 5 as in the present invention, the labor required for the sprayed waterproof layer 5 can be saved.

[0031] Next, an embodiment of the center pillar portion 3 will be described with reference to FIG. As can be seen from Fig. 2, a sprayed waterproof layer 5 is formed up to a part of the foundation (structural body) around the base end of the center column 3. First, a waterproof sheet 4 is laid on the bottom surface of the structure 1, and at the base end of the center column 3, the waterproof sheet 4 is laid up to the foundation, which is the structural body constructed at the base end, and a mounting bar 6 is attached to the boundary between the end face of the waterproof sheet 4 and the foundation, and fixed with a fixing member such as an anchor (see Fig. 2).

[0032] The waterproof sheet 4 is laid by laying each component in order as described above to form the waterproof sheet layer 9. The mounting bar 6 is also attached as described above by sticking double-sided adhesive tape to the prescribed locations, and then sticking and fixing the end face of the bottom waterproof sheet 4 on top of the stuck double-sided adhesive tape. Double-sided adhesive tape is stuck onto the end face of the bottom waterproof sheet 4, and the top waterproof sheet 4 is stuck on top of that, and the mounting bar 6 is attached and fixed with a rubber plate in between. This eliminates gaps in the mounting bar 6 and completely prevents seepage of seepage water.

[0033] In this embodiment, the sprayed water-proof layer 5 is formed over the entire center column section 3, and as described above, the sprayed water-proof layer 5 is also formed up to a part of the foundation part around the base end of the center column section 3. As described above, the sprayed water-proof layer 5 is also formed of three layers, which are a base material, a sprayed water-proofing agent sprayed on the base material, and a water-proofing agent with light-shielding properties applied on top of the sprayed water-proofing agent.

[0034] In this way, the sprayed waterproof layer 5 is applied to waterproof structures that are smooth and unlikely to crack, such as the retaining wall 2 and central column 3 in structures such as final disposal sites, concrete pouring areas such as foundations, and steel frame areas, while the waterproof sheet layer 9 formed by laying the waterproof sheet 4 is applied to waterproof areas other than the structures that are prone to cracking and deformation, such as the ground and mortar, such as the bottom of the final disposal site. The waterproof sheet 4 and the sprayed waterproof layer 5 are joined on the structure via the mounting bar 6. In this way, the application locations of the waterproof sheet layer 9 and the sprayed waterproof layer 5 are appropriately determined depending on the location of construction. Furthermore, by fixing the waterproof sheet 4 on a strong structure with the mounting bar 6, it can be firmly fixed and properly sealed.

[0035] Next, an embodiment of the leachate collection pipe 10 and its surroundings will be described with reference to FIG. Here, the leachate collection and drainage pipe 10 is installed along the slope portion 8 of the structure 1 and has a collection and drainage function of collecting leachate generated from the waste and discharging it outside the structure 1, and also has an air supply function as a gas venting facility.

[0036] A waterproof sheet 4 is laid on the slope portion 8 of the structure 1, and the waterproof sheet 4 is laid up to a part of the concrete pouring portion (structural body) around the leachate collection drainage pipe 10. Then, a mounting bar 6 is attached to the boundary between the end face of the waterproof sheet 4 laid up to the vicinity of the leachate collection drainage pipe 10 and the concrete pouring portion, and fixed with a fixing member such as an anchor. In laying the waterproof sheet 4, each component is laid in order as described above to form the waterproof sheet layer 9. The mounting bar 6 is also attached in the same manner as described above.

[0037] Then, a sprayed water-proof layer 5 is formed in the remaining portion of the concrete poured area around the leachate collection drainage pipe 10 where the water-proof sheet layer 9 is not formed. At this time, the sprayed water-proof agent is also sprayed onto the mounting bar 6 and the portion of the water-proof sheet 4 in the vicinity of the mounting bar 6 to form the sprayed water-proof layer 5, and at this time, the sprayed water-proof agent is also sprayed onto the base end (root portion) of the leachate collection drainage pipe 10 protruding from the slope portion 8 to form the sprayed water-proof layer 5 (see FIG. 3). In other words, the sprayed water-proof layer 5 is formed from a part of the leachate collection drainage pipe 10 to a part of the water-proof sheet 4.

[0038] This effectively seals the area around the base end of the leachate collection drainage pipe 10. Also, rather than laying the waterproof sheet 4 so as to completely cover the area around the leachate collection drainage pipe 10, fixing the end of the waterproof sheet 4 with the mounting bar 6 and spraying the spray waterproofing agent is easier and more efficient. Also, as explained earlier, maintenance is easier.

[0039] As described above, by configuring in the order of (1) forming the waterproof sheet layer 9, (2) attaching the mounting bar 6, and (3) forming the sprayed waterproof layer 5 as in the embodiment of the present invention based on Figures 1 to 3, it is possible to solve the problems of the conventional method in which the fixing parts are damaged due to the load of the waste or the downward tensile force during landfill work, in which the waterproof layer is also cracked when cracks are formed in the ground or mortar, and in which the polyethylene-based waterproof sheet and the polyurethane-based sprayed waterproof agent have weak adhesion and are prone to peeling off. [Explanation of symbols]

[0040] 1 structure 2 Retaining wall 3 Middle pillar part 4. Waterproof sheet 5. Sprayed water impermeable layer 6 Mounting bar 7 Small step 8 Slope section 9. Water-impermeable sheet layer 10 Leachate collection and drainage pipe

Claims

1. A waterproof sheet was laid on a part of the surface of the structure to be waterproofed, and the boundary between the end face of the laid waterproof sheet and the surface of the structure was sealed with an attachment bar. Next, a sprayed waterproofing agent was sprayed onto the remaining part of the surface of the structure to be waterproofed, the attachment bar, and the waterproof sheet part in the vicinity of the attachment bar to form a sprayed waterproof layer. A waterproofing method for a structure.

2. This is a waterproofing method for a structure having a generally concave shape, in which a waterproof sheet is laid from the bottom surface of the structure to a midpoint of the rising portion or to at least a part of the foundation portion around the base end of the rising portion, the boundary between the end surface of the laid waterproof sheet and the surface of the structure is sealed with an attachment bar, and then a sprayed waterproofing agent is sprayed onto the remaining portion of the surface of the structure to be waterproofed, as well as onto the attachment bar and the waterproof sheet portion in the vicinity of the attachment bar, to form a sprayed waterproof layer. A waterproofing method for a structure.

3. The waterproof sheet and the sprayed waterproof layer are joined on the structure via a mounting bar.

3. The waterproofing method for a structure according to claim 1 or 2.

4. The sprayed water-proof layer is applied to the structure to make it waterproof, and the water-proof sheet is applied to make it waterproof other than the structure.

4. The waterproofing method for a structure according to claim 3.

Citation Information

Patent Citations

  • Water sealing method and water sealing structure

    JP2008142703A