System, method, and program
By setting an offset wall based on a virtual sphere centered on the work tool, the system efficiently prevents interference with virtual walls while minimizing computational requirements.
Patent Information
- Application Number
- JP2023052103
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-28
- Publication Date
- 2024-10-10
AI Technical Summary
Existing systems require significant computational effort to accurately determine the distance between a work tool and a virtual wall, as the point of closest contact changes with the work tool's attitude, necessitating complex calculations for interference prevention.
A system that identifies a virtual wall and sets an offset wall closer to a control point by the radius of a virtual sphere centered on the work tool, controlling the work machine to prevent contact with this offset wall, thereby simplifying the calculation process.
This approach allows for efficient restriction of the work tool's operation to avoid the virtual wall with minimal computational effort, maintaining operability and reducing calculation complexity.
Smart Images

Figure 2024140777000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a system, a method, and a program. [Background technology]
[0002] A technique is known in which a virtual wall is set in space to limit the operating range of a work machine. A control device for the work machine can control the work machine so that it does not exceed the virtual wall by limiting the amount of operation of the actuator of the work machine according to the distance between the virtual wall and the work machine. Furthermore, Patent Document 1 discloses a technology for preventing the work tool from entering the interference prevention area by defining a virtual circle having a center on the rotation axis of the work tool and a radius to the tip of the work tool, and determining the relationship between the virtual circle and the interference prevention area. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Application Publication No. 9-256403 Summary of the Invention [Problem to be solved by the invention]
[0004] Incidentally, the closest point between the virtual wall and the working implement provided on the work machine changes depending on the posture of the working implement. Therefore, when trying to obtain the exact distance between the virtual wall and the working implement, it is necessary to obtain the distance between each of the multiple contour points of the working implement and the virtual wall, which requires a large amount of calculation. As described in Patent Document 1, even when obtaining the relationship between a virtual circle and the virtual wall, it is necessary to solve a quadratic equation that shows the relationship between a circle and a straight line, which requires a large amount of calculation.
[0005] An object of the present disclosure is to provide a system, method, and program that can restrict the operation of a work machine so that the work implement does not enter a virtual wall with a small amount of calculation. [Means for solving the problem]
[0006] A system according to a first aspect of the present disclosure controls a work machine equipped with a work implement having a working tool at its tip. The system includes a processor. The processor identifies a virtual wall that is a surface that prohibits the entry of the work implement. The processor identifies a position of a control point of the work implement on the work machine. The processor identifies an offset wall that moves the virtual wall closer to the control point in a normal direction to the virtual wall by the length of the radius of a virtual sphere defined so as to include the work implement with the control point as its center. The processor controls the work machine so that the offset wall does not come into contact with the control point.
[0007] A method according to a second aspect of the present disclosure is a method for controlling a work machine equipped with a work implement having a work tool at its tip, and includes a virtual wall identifying step, a control point identifying step, an offsetting step, and a controlling step. The virtual wall identifying step identifies a virtual wall that is a surface that prohibits the entry of the work implement. The control point identifying step identifies the position of a control point of the work implement on the work machine. The offsetting step identifies an offset wall that moves the virtual wall closer to the control point in the normal direction of the virtual wall by the length of the radius of a virtual sphere defined so as to include the work implement with the control point as its center. The controlling step controls the work machine so that the offset wall does not come into contact with the control point.
[0008] A program according to a third aspect of the present disclosure causes a computer that controls a work machine equipped with a work implement having a work tool at its tip to execute a virtual wall identifying step, a control point identifying step, an offsetting step, and a control step. The virtual wall identifying step identifies a virtual wall that is a surface that prohibits the entry of the work implement. The control point identifying step identifies the position of a control point of the work implement on the work machine. The offsetting step identifies an offset wall that moves the virtual wall closer to the control point in the normal direction of the virtual wall by the length of the radius of a virtual sphere defined so as to include the work implement with the control point as its center. The control step controls the work machine so that the offset wall and the control point do not come into contact with each other. Effect of the Invention
[0009] According to at least one of the above aspects, the operation of the work machine can be restricted with a small amount of calculation so that the work implement does not enter the virtual wall. [Brief description of the drawings]
[0010] [Figure 1] 1 is a schematic diagram showing the configuration of a work machine according to a first embodiment. [Diagram 2] 1 is a diagram showing a drive system of a work machine according to a first embodiment. [Diagram 3] 1 is a schematic block diagram showing a configuration of a control device according to a first embodiment. [Figure 4] 4 is a diagram illustrating a relationship between a virtual sphere and a virtual wall in the first embodiment. FIG. [Diagram 5] 4 is a diagram showing a relationship between a phantom sphere and an outer shell of a bucket in the first embodiment. FIG. [Figure 6] 4A to 4C are diagrams illustrating an example of resetting a virtual wall accompanying rotation of a rotating body in the first embodiment. [Figure 7] 11 is a flowchart (part 1) showing update and intervention control of a virtual wall set in the first embodiment. [Figure 8] 13 is a flowchart (part 2) showing update and intervention control of a virtual wall set in the first embodiment. [Figure 9] 10 is a diagram illustrating a relationship between a control point and a virtual sphere according to a modified example of the first embodiment. FIG. [Figure 10] FIG. 11 is a diagram showing the configuration of an attachment according to a second embodiment. [Figure 11] 13A and 13B are diagrams illustrating examples of control points and a virtual sphere according to the second embodiment. [Figure 12] 13A and 13B are diagrams showing the configuration of an attachment according to a third embodiment. [Figure 13] 13A to 13C are diagrams illustrating examples of control points and a virtual sphere according to the third embodiment. [Figure 14] FIG. 13 is a diagram illustrating a configuration of a work system according to another embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] First embodiment <<Configuration of the Work Machine>> Hereinafter, the embodiments will be described in detail with reference to the drawings. FIG. 1 is a schematic diagram showing the configuration of a work machine 100 according to the first embodiment. The work machine 100 according to the first embodiment is, for example, a hydraulic excavator. The work machine 100 includes a traveling body 120, a rotating body 140, a work implement 160, a cab 180, and a control device 200. The work machine 100 according to the first embodiment generates a virtual wall VW by operation by an operator, and is controlled so that the work machine 100 does not come into contact with the virtual wall VW. This allows the operator to operate the work machine 100 so as not to enter a no-entry zone.
[0012] The running body 120 supports the working machine 100 so that the working machine 100 can run. The running body 120 is, for example, a pair of left and right caterpillar tracks. The rotating body 140 is supported by the running body 120 so as to be capable of rotating about a rotation center. The working machine 160 is supported movably on the rotating body 140. The working machine 160 is hydraulically driven. The working machine 160 includes a boom 161, an arm 162, and an attachment 163 which is a working implement. The attachment 163 is an example of a working tool. In the example shown in FIG. 1, the attachment 163 is a bucket. A base end of the boom 161 is rotatably attached to the rotating body 140. A base end of the arm 162 is rotatably attached to a tip end of the boom 161. The attachment 163 is rotatably attached to a tip end of the arm 162. Here, the part of the rotating body 140 to which the working machine 160 is attached is referred to as a front part. In addition, with respect to the rotating body 140, the opposite part is referred to as a rear part, the left part is referred to as a left part, and the right part is referred to as a right part, based on the front part.
[0013] The operator's cab 180 is provided at the front of the rotating body 140. In the operator's cab 180, there are provided an operation device 141 for an operator to operate the work machine 100, and a monitor device 142 which is a man-machine interface for the control device 200. The monitor device 142 is realized by, for example, a computer equipped with a touch panel.
[0014] The control device 200 controls the traveling body 120, the rotating body 140, and the work machine 160 based on the operation of the operation device by an operator. The control device 200 is provided inside the operator's cab 180, for example.
[0015] Drive system of the work machine 100 FIG. 2 is a diagram showing the drive system of the work machine 100 according to the first embodiment. The work machine 100 is equipped with a number of actuators for driving the work machine 100. Specifically, the work machine 100 is equipped with a power source 111, a hydraulic pump 112, a control valve 113, a pair of travel motors 114, a swing motor 115, a boom cylinder 116, an arm cylinder 117, and an attachment cylinder 118.
[0016] The power source 111 drives the hydraulic pump 112. The power source 111 is, for example, an engine. The hydraulic pump 112 is driven by the power source 111 and supplies hydraulic oil to the travel motor 114 , the swing motor 115 , the boom cylinder 116 , the arm cylinder 117 and the attachment cylinder 118 via a control valve 113 . The control valve 113 controls the flow rate of hydraulic oil supplied from the hydraulic pump 112 to the travel motor 114 , the swing motor 115 , the boom cylinder 116 , the arm cylinder 117 and the attachment cylinder 118 . The traveling motor 114 is driven by hydraulic oil supplied from the hydraulic pump 112 to drive the traveling body 120 . The swing motor 115 is driven by hydraulic oil supplied from the hydraulic pump 112 to swing the swing body 140 relative to the traveling body 120 .
[0017] The boom cylinder 116 is a hydraulic cylinder for driving the boom 161. A base end of the boom cylinder 116 is attached to the rotating body 140. A tip end of the boom cylinder 116 is attached to the boom 161. The arm cylinder 117 is a hydraulic cylinder for driving the arm 162. A base end of the arm cylinder 117 is attached to the boom 161. A tip end of the arm cylinder 117 is attached to the arm 162. The attachment cylinder 118 is a hydraulic cylinder for driving the attachment 163. A base end of the attachment cylinder 118 is attached to the arm 162. A tip end of the attachment cylinder 118 is attached to the attachment 163.
[0018] Measurement system of the work machine 100 The work machine 100 is equipped with a number of sensors for measuring the attitude and position of the work machine 100. Specifically, the work machine 100 is equipped with an incline measuring instrument 101, a swing angle sensor 102, a boom angle sensor 103, an arm angle sensor 104, an attachment angle sensor 105, and a payload meter 106.
[0019] The inclination measuring device 101 measures the attitude of the rotating body 140. The inclination measuring device 101 measures the inclination (e.g., roll angle, pitch angle, and yaw angle) of the rotating body 140 with respect to a horizontal plane. An example of the inclination measuring device 101 is an IMU (Inertial Measurement Unit). In this case, the inclination measuring device 101 measures the acceleration and angular velocity of the rotating body 140, and calculates the inclination of the rotating body 140 with respect to the horizontal plane based on the measurement results. The inclination measuring device 101 is installed, for example, below the cab 180. The inclination measuring device 101 outputs attitude data of the rotating body 140, which is a measurement value, to the control device 200.
[0020] The turning angle sensor 102 measures the turning angle of the rotating body 140 relative to the running body 120. The measurement value of the turning angle sensor 102 indicates zero, for example, when the directions of the running body 120 and the rotating body 140 are the same. The turning angle sensor 102 is installed, for example, at the center of rotation of the rotating body 140. The turning angle sensor 102 outputs turning angle data, which is the measurement value, to the control device 200.
[0021] The boom angle sensor 103 measures a boom angle, which is a rotation angle of the boom 161 relative to the revolving structure 140. The boom angle sensor 103 may be an IMU attached to the boom 161. In this case, the boom angle sensor 103 measures the boom angle based on the inclination of the boom 161 relative to a horizontal plane and the inclination of the revolving structure measured by the inclination measuring device 101. The measurement value of the boom angle sensor 103 indicates zero, for example, when the direction of a straight line passing through the base end and the tip end of the boom 161 coincides with the front-rear direction of the revolving structure 140. Note that the boom angle sensor 103 according to another embodiment may be a stroke sensor attached to the boom cylinder 116. Also, the boom angle sensor 103 according to another embodiment may be a rotation sensor provided on a pin connecting the revolving structure 140 and the boom 161. The boom angle sensor 103 outputs boom angle data, which is a measurement value, to the control device 200.
[0022] The arm angle sensor 104 measures an arm angle, which is a rotation angle of the arm 162 relative to the boom 161. The arm angle sensor 104 may be an IMU attached to the arm 162. In this case, the arm angle sensor 104 measures the arm angle based on the inclination of the arm 162 relative to the horizontal plane and the boom angle measured by the boom angle sensor 103. The measurement value of the arm angle sensor 104 indicates zero when, for example, the direction of a straight line passing through the base end and the tip of the arm 162 coincides with the direction of a straight line passing through the base end and the tip of the boom 161. Note that the arm angle sensor 104 according to another embodiment may perform angle calculation by attaching a stroke sensor to the arm cylinder 117. Also, the arm angle sensor 104 according to another embodiment may be a rotation sensor provided on a pin connecting the boom 161 and the arm 162. The arm angle sensor 104 outputs arm angle data, which is a measurement value, to the control device 200.
[0023] The attachment angle sensor 105 measures an attachment angle, which is a rotation angle of the attachment 163 relative to the arm 162. The attachment angle sensor 105 may be a stroke sensor provided on the attachment cylinder 118 for driving the attachment 163. In this case, the attachment angle sensor 105 measures the attachment angle based on the stroke amount of the attachment cylinder 118. The measurement value of the attachment angle sensor 105 indicates zero, for example, when the direction of a straight line passing through the base end and the tip end of the attachment 163 coincides with the direction of a straight line passing through the base end and the tip end of the arm 162. Note that the attachment angle sensor 105 according to another embodiment may be a rotation sensor provided on a pin connecting the arm 162 and the attachment 163. Also, the attachment angle sensor 105 according to another embodiment may be an IMU attached to the attachment 163. The attachment angle sensor 105 outputs attachment angle data, which is a measurement value, to the control device 200.
[0024] The payload meter 106 measures the weight of the load held by the attachment 163. The payload meter 106 measures, for example, the bottom pressure of the cylinder of the boom 161 and converts it into the weight of the load. Alternatively, for example, the payload meter 106 may be a load cell. The payload meter 106 outputs load weight data, which is a measurement value, to the control device 200.
[0025] Configuration of the control device 200 FIG. 3 is a schematic block diagram showing the configuration of the control device 200 according to the first embodiment. The control device 200 is a computer including a processor 210, a main memory 230, a storage 250, and an interface 270. The control device 200 is an example of a control system. The control device 200 receives measurement values from an inclination measuring device 101, a rotation angle sensor 102, a boom angle sensor 103, an arm angle sensor 104, an attachment angle sensor 105, and a payload meter 106.
[0026] The storage 250 is a non-transitory tangible storage medium. Examples of the storage 250 include a magnetic disk, an optical disk, a magneto-optical disk, and a semiconductor memory. The storage 250 may be an internal medium directly connected to the bus of the control device 200, or may be an external medium connected to the control device 200 via the interface 270 or a communication line. The storage 250 stores a control program for controlling the work machine 100.
[0027] The control program may be for realizing a part of the functions to be performed by the control device 200. For example, the control program may be for realizing the functions by combining with other programs already stored in the storage 250 or by combining with other programs implemented in other devices. In another embodiment, the control device 200 may include a custom LSI (Large Scale Integrated Circuit) such as a PLD (Programmable Logic Device) in addition to or instead of the above configuration. Examples of PLDs include PAL (Programmable Array Logic), GAL (Generic Array Logic), CPLD (Complex Programmable Logic Device), and FPGA (Field Programmable Gate Array). In this case, some or all of the functions realized by the processor may be realized by the integrated circuit.
[0028] Geometry data representing the dimensions and center of gravity positions of the rotating body 140, the boom 161, the arm 162, and the attachment 163 is recorded in the storage 250. The geometry data is data representing the position of an object in a predetermined coordinate system. In addition, the storage 250 stores, for each model number of the attachment 163, the geometry data relating to the attachment 163 of that model number.
[0029] <Software Configuration> By executing the control program, the processor 210 is equipped with an operation amount acquisition unit 211, an input unit 212, a display control unit 213, a measurement value acquisition unit 214, a position identification unit 215, a generation unit 216, a rotation conversion unit 217, an intervention judgment unit 218, an intervention control unit 219, and a control signal output unit 220.
[0030] The operation amount acquisition unit 211 acquires an operation signal indicating the operation amount of each actuator from the operation device 141. The input unit 212 receives an operation input by an operator from the monitor device 142. In particular, when the attachment 163 is replaced, the input unit 212 receives an input of the model number of the attachment 163. In response to this, the processor 210 reads out the geometry data associated with the model number from the storage 250. The display control unit 213 outputs screen data to be displayed on the monitor device 142 to the monitor device 142 . The measurement value acquisition unit 214 acquires measurement values from the inclination measuring instrument 101, the rotation angle sensor 102, the boom angle sensor 103, the arm angle sensor 104, the attachment angle sensor 105, and the payload meter 106.
[0031] The position identifying unit 215 identifies the position of the outer shell of the work machine 100 in the vehicle body coordinate system. The outer shell of the work machine 100 is the external shape of the work machine 100. The outer shell of the work machine 100 is defined, for example, by the shapes that form the external shapes of the revolving body 140 and the work implement 160. Specifically, the position identifying unit 215 identifies a plurality of points of the outer shell of the work machine 100 in the vehicle body coordinate system and the position of the control point P of the attachment 163 based on various measurement values acquired by the measurement value acquiring unit 214 and the geometry data recorded in the storage 250. The plurality of points of the outer shell identified by the position identifying unit 215 include the end of the arm 162 on the attachment 163 side (arm top), the end of the arm 162 on the boom 161 side (arm bottom), and a point behind the counterweight of the revolving body 140. The vehicle body coordinate system is an orthogonal coordinate system with the representative point of the revolving body 140 (for example, a point passing through the center of rotation) as the origin. The calculation by the position specifying unit 215 will be described later. Note that the points specified by the position specifying unit 215 are not limited to these.
[0032] The control point P of the attachment 163 is the center of the virtual sphere VS when the attachment 163 is regarded as a sphere (virtual sphere VS). In order to simply express the attachment 163, the virtual sphere VS is defined so as to include the attachment 163 with the control point P as the center. FIG. 4 is a diagram showing the relationship between the virtual sphere VS and the virtual wall VW in the first embodiment. FIG. 5 is a diagram showing the relationship between the virtual sphere VS and the outer shell of the bucket in the first embodiment. The attachment 163 in the first embodiment is a bucket, and as shown in FIG. 4 and FIG. 5, the control point P is the midpoint of the line segment connecting the midpoint of the pin (rotation axis) connecting the arm 162 and the bucket to the midpoint of the blade tip (tip) of the bucket. The radius r of the virtual sphere VS in the first embodiment is equal to the distance from the control point P to the farthest point of the outer shell of the bucket. Therefore, the virtual sphere VS includes the bucket. In the example of Fig. 5, AP0, AP1, AP2, AP3, AP4, and AP5 are identified as points for simply expressing the outer shell of the bucket, and among these, AP2 is the point farthest from control point P. Therefore, in the example of Fig. 5, the radius r is equal to the distance from control point P to point AP2. By setting the control point P of the bucket to the midpoint of the line segment connecting the midpoint of the bucket's rotation axis and the midpoint of the bucket's tip, the gap between the bottom of the bucket and the virtual sphere VS can be reduced. On the other hand, the distance between the opening surface of the bucket and the virtual sphere VS is greater than that between the bottom surface and the opening surface of the bucket, but since the opening surface of the bucket in a backhoe shovel does not normally face the front of the work machine 100, there are almost no situations in which this affects operability. In addition, since the shape of the bucket is close to a hemisphere, there is also the advantage that by setting the control point P to the midpoint of the line segment connecting the midpoint of the bucket's rotation axis and the midpoint of the bucket's tip, the operator can easily imagine the virtual sphere VS when operating the bucket.
[0033] When the input unit 212 receives an instruction to generate a virtual wall VW from an operator, the generation unit 216 calculates parameters of the virtual wall VW based on the position of the tip of the attachment 163 identified by the position identification unit 215. The generation unit 216 records the parameters of the generated virtual wall VW in the vehicle body coordinate system in the main memory 230.
[0034] The rotation conversion unit 217 updates the parameters of the virtual wall VW stored in the main memory 230 as the revolving body 140 revolves. Specifically, the rotation conversion unit 217 performs rotation conversion on the parameters of the virtual wall VW around the origin of the vehicle body coordinate system by the amount of change in the pitch angle, roll angle, and yaw angle measured by the inclination measuring device 101. FIG. 6 is a diagram showing an example of resetting the virtual wall VW with the revolving body revolving in the first embodiment. For example, as shown in FIG. 6, when the revolving body 140 revolves after the virtual wall VW is set, the rotation conversion unit 217 calculates the amount of change in the roll angle, pitch angle, and yaw angle caused by the revolving body 140 by referring to the measurement value of the inclination measuring device 101 acquired by the measurement value acquisition unit 214, and performs rotation conversion on the parameters of the virtual wall VW around the origin of the vehicle body coordinate system. This allows the rotation conversion unit 217 to cancel the rotation of the virtual wall VW caused by the revolving body 140 revolving.
[0035] The intervention determination unit 218 determines whether or not to limit the rotation speed of the revolving body 140 or the speed of the working machine 160 based on the positional relationship between the virtual wall VW and the multiple points of the outer shell identified by the position identification unit 215, and the positional relationship between the virtual sphere VS of the attachment 163 and the virtual wall VW. Hereinafter, the control device 200 limiting the speed of the revolving body 140 or the working machine 160 is also referred to as intervention control. Specifically, the intervention determination unit 218 obtains the minimum rotation angle until at least one of the multiple points of the outer shell comes into contact with the virtual wall VW, and determines that intervention control is to be performed for the revolving body 140 when the minimum rotation angle is equal to or smaller than a predetermined angle. In addition, the intervention determination unit 218 obtains the minimum distance between the virtual wall VW and the working machine 160, and determines that intervention control is to be performed for the working machine 160 when the minimum distance is equal to or smaller than a predetermined distance. At this time, the intervention determination unit 218 obtains the distance for the attachment 163 based on the virtual sphere VS. In order to reduce the amount of calculations, the intervention determination unit 218 specifies an offset wall OW obtained by offsetting the virtual wall VW by the radius r of the virtual sphere VS as shown in Fig. 4. The distance d1 between the virtual sphere VS and the virtual wall VW is equal to the distance d2 between the control point P and the offset wall OW. Therefore, the intervention determination unit 218 finds the distance d1 between the virtual sphere VS and the virtual wall VW by calculating the distance d2 between the control point P and the offset wall OW.
[0036] When the intervention determination unit 218 determines that intervention control is to be performed, the intervention control unit 219 controls an intervention target operation amount among the operation amounts acquired by the operation amount acquisition unit 211. The control signal output unit 220 outputs the operation amount acquired by the operation amount acquisition unit 211 or the operation amount controlled by the intervention determination unit 218 to the control valve 113 .
[0037] Calculation of the Position Identification Unit 215 Here, a method for identifying the positions of points on the hull of the work machine 100 by the position identifying unit 215 will be described. The position identifying unit 215 identifies the positions of points on the hull based on various measurement values acquired by the measurement value acquiring unit 214 and geometry data recorded in the storage 250. Geometry data representing the dimensions and center of gravity positions of the rotating body 140, the boom 161, the arm 162, and the attachment 163 is recorded in the storage 250.
[0038] The geometry data of the rotating body 140 is the position (x bm , y bm , z bm ), and the position of the point on the hull of the rotating body 140 (x sp , y sp , z sp ) is shown. The points on the outer hull of the rotating body 140 are points that are likely to come into contact with a wall surface when the body turns, such as the protruding points of the counterweight. The vehicle body coordinate system is defined by an X sb Axis, Y extending left and right sb Axis, extending vertically Z sb The up-down direction of the rotating body 140 does not necessarily coincide with the vertical direction.
[0039] The geometry data of the boom 161 is the position of the boom top in the boom coordinate system, which is a local coordinate system (x am , y am , z amThe boom coordinate system is based on the position of the pin connecting the boom 161 and the rotating body 140, and is expressed by the X axis extending in the longitudinal direction. bm The shaft extends in the direction that the pin extends. bm axis, x bm Axis and Y bm Z perpendicular to the axis bm It is a coordinate system composed of axes. The position of the boom top is the position of the pin that connects the boom 161 and the arm 162. The boom top is one of the points on the hull of the work machine 100.
[0040] The geometry data of the arm 162 is the position of the arm top in the arm coordinate system, which is a local coordinate system (x at , y at , z at The arm coordinate system is based on the position of the pin connecting the arm 162 and the boom 161, and is expressed as an X axis extending in the longitudinal direction. am The shaft extends in the direction that the pin extends. am axis, x am Axis and Y am Z perpendicular to the axis am It is a coordinate system composed of axes. The position of the arm top is the position of the pin that connects the arm 162 and the attachment 163. The arm top is one of the points on the outer hull of the work machine 100.
[0041] The geometry data of the attachment 163 is the position (x cp , y cp , z cp The attachment coordinate system is based on the position of the pin connecting the attachment 163 and the arm 162, and is expressed as X at The shaft extends in the direction that the pin extends. at axis, x at Axis and Y at Z perpendicular to the axis at In other words, the control point P is a point that is uniquely specified in the coordinate system based on the attachment 163.
[0042] The position identification unit 215 detects the boom angle θ bm Based on the measured values and the geometry data of the rotating body 140, a boom-body transformation matrix T for transforming from the boom coordinate system to the body coordinate system is calculated by the following formula (1). bm sb Generate the boom-body transformation matrix T bm sb is Y bm Boom angle θ around the axis bm and the deviation between the origin of the vehicle coordinate system and the origin of the boom coordinate system (x bm , y bm , z bm ) is the matrix that translates the In addition, the position identification unit 215 identifies the position of the boom top in the boom coordinate system indicated by the geometry data of the boom 161 and the boom-vehicle body transformation matrix T bm sb The position of the boom top in the vehicle body coordinate system is calculated by multiplying this by
[0043]
number
[0044] The position specifying unit 215 detects the arm angle θ am Based on the measured values and the geometry data of the boom 161, an arm-boom transformation matrix T for transforming from the arm coordinate system to the boom coordinate system is calculated by the following formula (2). am bm The arm-boom transformation matrix T am bm is Y am Arm angle θ around the axis am and the deviation between the origin of the boom coordinate system and the origin of the arm coordinate system (x am , y am , z am ) is a matrix that translates the boom-vehicle body transformation matrix T bm sb and the arm-boom transformation matrix T am bmThe arm-body transformation matrix T am sb In addition, the position specifying unit 215 generates the position of the arm top in the arm coordinate system indicated by the geometry data of the arm 162 and the arm-vehicle body transformation matrix T am sb The position of the arm top in the vehicle body coordinate system is calculated by multiplying this by
[0045]
number
[0046] The position specifying unit 215 determines the attachment angle θ at Based on the measured values and the geometry data of the arm 162, an attachment-arm transformation matrix T for transforming from the attachment coordinate system to the arm coordinate system is calculated by the following formula (3). at am Generate the attachment-arm transformation matrix T at am is Y at Attachment angle θ around the axis at and the deviation between the origin of the arm coordinate system and the origin of the attachment coordinate system (x at , y at , z at ) is a matrix that translates the arm-vehicle body transformation matrix T am sb and the attachment-arm transformation matrix T at am The attachment-body transformation matrix T is used to transform from the attachment coordinate system to the vehicle coordinate system. at sb Generate.
[0047]
number
[0048] The position identification unit 215 identifies the position of the control point P in the attachment coordinate system indicated by the geometry data of the attachment 163 and the attachment-vehicle body transformation matrix T at sb By calculating the product of these, the position of the control point P of the attachment 163 in the vehicle body coordinate system is calculated.
[0049] <<Control method for the work machine 100>> The control method for the work machine 100 according to the first embodiment will be described below. First, the operator of the work machine 100 operates the monitor device 142 to set the virtual wall VW. When the input unit 212 receives an instruction to set the virtual wall VW from the monitor device 142, the display control unit 213 causes the monitor device 142 to display a selection screen for the type of virtual wall VW to be set. The control device 200 can set five types of virtual walls VW: a front wall, a left wall, a right wall, an upper wall, and a lower wall. The front wall, the left wall, and the right wall are wall surfaces that extend in the vertical direction. The upper wall and the lower wall are wall surfaces that extend in the horizontal direction. The virtual wall VW is represented by a normal vector that indicates the normal direction of the virtual wall VW and a position vector that indicates the position of the point through which the virtual wall VW passes, both of which are defined in the vehicle body coordinate system.
[0050] The work machine 100 can perform work within the reach of the work implement 160 by rotating the rotating body 140. Therefore, an operator usually rotates the work machine 100 when performing work such as excavation. The vehicle body coordinate system is based on the rotating body 140, and therefore rotates following the rotation of the work machine 100 when viewed from the viewpoint of the global coordinate system. If the virtual wall VW set in the vehicle body coordinate system rotates following the rotation of the work machine 100, the right wall and the left wall will not interfere with the work machine 100 and will be meaningless. For example, if a right wall is set on the right side of the rotating body 140, the right wall will always be maintained on the right side of the rotating body 140 and will not interfere with the work machine 100 no matter how the rotating body 140 is rotated. In addition, if the front wall rotates following the rotation of the work machine 100, it will behave as a ring-shaped wall rather than a flat wall, and will not function as a virtual wall VW along the wall surface of a building. Therefore, the control device 200 according to the first embodiment performs a rotational transformation process of the virtual wall VW in order to maintain the position of the virtual wall VW in the global coordinate system before and after the work machine 100 turns.
[0051] Fig. 7 is a flowchart (part 1) showing update and intervention control of the virtual wall VW set in the first embodiment. Fig. 8 is a flowchart (part 2) showing update and intervention control of the virtual wall VW set in the first embodiment. When the operator of the work machine 100 sets at least one virtual wall VW by operating the monitor device 142, the control device 200 starts the control described below.
[0052] The operation amount acquisition unit 211 acquires operation signals of the boom 161, the arm 162, the attachment 163, and the revolving body 140 from the operation device 141 (step S201). The measurement value acquisition unit 214 acquires measurement values of the inclination measuring instrument 101, the revolving angle sensor 102, the boom angle sensor 103, the arm angle sensor 104, the attachment angle sensor 105, and the payload meter 106 (step S202).
[0053] The rotational transformation unit 217 performs rotational transformation on each of the one or more virtual walls VW stored in the main memory 230 based on the roll angle, pitch angle, and yaw angle of the rotating body 140 acquired from the inclinometer 101 in step S202, and updates them (step S203).
[0054] The position identifying unit 215 calculates the positions of multiple points on the hull of the work machine 100 and the control point P of the attachment 163 in the vehicle body coordinate system based on the measurement values acquired in step S202 (step S204). The intervention determination unit 218 selects the hull points identified by the position identifying unit 215 one by one (step S205), and executes the processes of steps S206 to S212 below.
[0055] The intervention determination unit 218 determines whether the point passing through the point selected in step S205 and the X sb -Y sbThe intervention determination unit 218 also determines a cross section that passes through the point selected in step S205 and is parallel to the X coordinate system of the vehicle body. sb -Z sb A cross section parallel to the plane is identified (step S207).
[0056] The intervention determination unit 218 selects one by one from one or more virtual walls VW set in the main memory 230 (step S208), and executes the processes of steps S209 to S212 below. The intervention determination unit 218 calculates the intersection line between the cross section generated in step S206 and the virtual wall VW selected in step S208 as a horizontal virtual wall line (step S209). Note that the horizontal virtual wall line may not exist depending on the positional relationship between the cross section generated in step S206 and the virtual wall VW. If the horizontal virtual wall line exists, the intervention determination unit 218 calculates the turning angle at which the point selected in step S205 contacts the horizontal virtual wall line calculated in step S209 for each of the right turn and the left turn (step S210). For example, the intervention determination unit 218 calculates the intersection point between the horizontal virtual wall line and a circle centered on the turning center and passing through the point selected in step S205, and calculates the angle between the line segment extending from the turning center to the point selected in step S205 and the line segment extending from the turning center to the intersection point. Note that the intersection point may not exist depending on the positional relationship between the point selected in step S205 and the horizontal virtual wall line.
[0057] The intervention determination unit 218 also calculates the intersection line between the cross section generated in step S207 and the virtual wall VW selected in step S208 as a vertical virtual wall line (step S211). Note that depending on the positional relationship between the cross section generated in step S207 and the virtual wall VW, a vertical virtual wall line may not exist. If a vertical virtual wall line exists, the intervention determination unit 218 determines the distance between the point selected in step S205 and the vertical virtual wall line calculated in step S211 (step S212).
[0058] Next, the intervention determination unit 218 executes the following processes of steps S213 to S221 for the control point P of the attachment 163 identified in step S204. The intervention determination unit 218 identifies a radius r of a virtual sphere VS based on the geometry data of the attachment 163 (step S213). The radius r of the virtual sphere VS may be included in the geometry data of the attachment 163, or may be found by calculating the distance between a point on the outer shell of the attachment 163 indicated in the geometry data and a reference point.
[0059] The intervention determination unit 218 selects one by one from one or more virtual walls VW set in the main memory 230 (step S214), and executes the processes of steps S215 to S221 below. The intervention determination unit 218 calculates the position of an offset wall OW obtained by offsetting the virtual wall VW selected in step S214 in the normal direction by the length of the radius r identified in step S213 (step S215). That is, the intervention determination unit 218 moves the virtual wall VW selected in step S214 closer to the control point P of the attachment 163 by the length of the radius r. The intervention determination unit 218 calculates the position of an offset wall OW that passes through the control point P of the attachment 163 and is located within the X coordinate system of the vehicle body coordinate system. sb -Y sb The intervention determination unit 218 also determines a cross section that passes through the control point P of the attachment 163 and is parallel to the X coordinate system of the vehicle body. sb -Z sb A cross section parallel to the plane is identified (step S217).
[0060] The intervention determination unit 218 calculates the intersection line between the cross section generated in step S216 and the offset wall OW calculated in step S215 as a horizontal virtual wall line (step S218). Note that the horizontal virtual wall line may not exist depending on the positional relationship between the cross section generated in step S206 and the offset wall OW. If the horizontal virtual wall line exists, the intervention determination unit 218 calculates the turning angle at which the control point P of the attachment 163 contacts the horizontal virtual wall line calculated in step S209 for each of the right turn and the left turn (step S219). This turning angle is equivalent to the turning angle at which the virtual sphere VS contacts the virtual wall VW. For example, the intervention determination unit 218 calculates the intersection point between the horizontal virtual wall line and a circle that is centered on the turning center and passes through the control point P of the attachment 163, and calculates the angle between the line segment extending from the turning center to the control point P of the attachment 163 and the line segment extending from the turning center to the intersection point. Depending on the positional relationship between the control point P of the attachment 163 and the horizontal imaginary wall line, there may be cases where no intersection exists.
[0061] The intervention determination unit 218 also calculates the intersection line between the cross section generated in step S217 and the offset wall OW calculated in step S215 as a vertical virtual wall line (step S220). Note that the vertical virtual wall line may not exist depending on the positional relationship between the cross section generated in step S217 and the offset wall OW. If a vertical virtual wall line exists, the intervention determination unit 218 calculates the distance between the control point P of the attachment 163 and the vertical virtual wall line calculated in step S220 (step S221). This distance is equivalent to the distance at which the virtual sphere VS and the virtual wall VW come into contact.
[0062] The intervention judgment unit 218 calculates the minimum turning angle at which at least one of the multiple points and the virtual sphere VS contacts at least one virtual wall VW for each right turn and left turn, based on the turning angles of each point on the work machine 100 and each virtual wall VW on the virtual sphere VS obtained in step S210 and step S219 (step S222). The intervention determination unit 218 calculates the shortest distance between the work machine 160 and the virtual wall VW based on the distances to each point on the work machine 100 and each virtual wall VW on the virtual sphere VS determined in step S212 and step S221 (step S223).
[0063] The intervention determination unit 218 calculates the turning direction and the target turning speed based on the operation signal of the rotating body 140 acquired in step S201 (step S224). The intervention determination unit 218 determines whether the minimum turning angle for the turning direction indicated by the operation signal is greater than the intervention start angle (step S225). If the minimum turning angle is greater than the intervention start angle (step S225: YES), the intervention control unit 219 does not perform intervention control for the turning. On the other hand, if the minimum turning angle is equal to or less than the intervention start angle (step S225: NO), the intervention control unit 219 specifies the limit angular velocity from the minimum turning angle based on a predetermined limit angular velocity table, and limits the target turning speed of the rotating body 140 to a value equal to or less than the limit angular velocity (step S226). The limit angular velocity table is a function indicating the relationship between the minimum turning angle and the limit angular velocity, and is a function in which the limit angular velocity decreases as the minimum turning angle decreases. The limit angular velocity table may be set to a deceleration rate that does not impair the feeling of operation of the revolving body 140 by the operator, for example.
[0064] The intervention determination unit 218 calculates the target speed of the work implement 160 based on the operation signals of the boom 161, the arm 162, and the attachment 163 acquired in step S201 (step S227). Specifically, the intervention determination unit 218 calculates the target speeds of the boom 161, the arm 162, and the attachment 163 based on the operation signals of the boom 161, the arm 162, and the attachment 163 acquired in step S201. Next, the intervention determination unit 218 determines whether the shortest distance calculated in step S223 is longer than the intervention start distance (step S228). If the shortest distance is longer than the intervention start distance (step S228: YES), the intervention control unit 219 does not perform intervention control for the work implement 160. On the other hand, if the shortest distance is equal to or less than the intervention start distance (step S228: NO), the intervention control unit 219 selects each axis of the work machine 160 one by one, and performs the following processing of steps S230 to S231 for the selected axis (step S229). The intervention control unit 219 determines whether the operation direction of the selected axis is an operation in a direction approaching the virtual wall VW (step S230). If the operation direction of the selected axis is not an operation in a direction approaching the virtual wall VW (step S230: NO), the intervention control unit 219 does not perform intervention control for the selected axis. On the other hand, if the operation direction of the selected axis is an operation in a direction approaching the virtual wall VW (step S230: YES), the intervention control unit 219 specifies the speed limit for the selected axis based on a predetermined speed limit table, and limits the target speed to a value equal to or less than the speed limit (step S231).
[0065] The control signal output unit 220 generates a control signal based on the target speeds of the boom 161, the arm 162, and the attachment 163 and the target angular velocity of the revolving body 140, and outputs the control signal to the control valve 113 (step S232).
[0066] Actions and Effects In this way, the control device 200 controls the work machine 100 in the following procedure. The control device 200 specifies a virtual wall VW, which is a surface that prohibits the intrusion of the work machine 160. The control device 200 specifies the position of the control point P of the attachment 163 on the work machine 100. The control device 200 specifies an offset wall OW, which is obtained by moving the virtual wall VW closer to the control point P in the normal direction of the virtual wall VW by the length of the radius r of a virtual sphere VS centered at the control point P that contains the attachment 163. The control device 200 controls the work machine 100 so that the offset wall OW does not come into contact with the control point P. This allows the control device 200 to calculate the positional relationship between the virtual sphere VS and the virtual wall VW by simple calculations using surfaces and points. Therefore, the control device 200 can restrict the operation of the work machine 100 so that the attachment 163 does not intrude into the virtual wall VW with a small amount of calculation.
[0067] Further, according to the control device 200 according to the first embodiment, the control point P of the attachment 163 is set to the midpoint of the line segment connecting the midpoint of the rotation axis of the attachment 163 and the midpoint of the tip of the attachment 163. This makes it possible to reduce the gap between the attachment 163 and the virtual sphere VS, and does not impede the operability of the work machine 160 by the operator. Note that the control point P according to other embodiments is not limited to this. For example, as shown in FIG. 9, the control point P according to other embodiments may be the geometric center of the attachment 163, or may be a point such that the virtual sphere VS that includes the attachment 163 becomes the smallest including sphere. FIG. 9 is a diagram showing the relationship between the control point P and the virtual sphere VS according to a modification of the first embodiment. Note that the distance to the tip of the attachment 163 is shorter than the distance from the rotation axis to the tip of the attachment 163 for all of the control point P, which is the midpoint of the line segment connecting the midpoint of the rotation axis of the attachment 163 and the midpoint of the tip of the attachment 163, the control point P, which is the geometric center of the attachment 163, and the control point P when the virtual sphere VS is the minimum containing sphere. In this case, controllability can be improved compared to control using the virtual sphere VS in which the control point P is the center of the rotation axis (arm top). In another embodiment, the control point P may be the center of the rotation axis of the attachment 163. When the control point P is the center of the rotation axis of the attachment 163, the control point P is determined regardless of the rotation angle of the attachment 163, so that the attachment-vehicle body transformation matrix T at sb This allows the coordinate transformation calculation to be omitted.
[0068] Further, the storage 250 of the control device 200 according to the first embodiment stores geometry data capable of identifying the position of the control point P and the radius r of the virtual sphere VS in association with the model number (type) of the attachment 163. The control device 200 reads out the geometry data associated with the model number of the attachment 163 attached to the work machine 160 from the storage 250 to identify the position of the control point P and the radius r of the virtual sphere VS. This eliminates the need to manually set the position of the control point P and the radius r of the virtual sphere VS every time the attachment 163 is replaced. Note that the data capable of identifying the position of the control point P and the radius r of the virtual sphere VS may include the position of the control point P and the radius r of the virtual sphere VS, or may include data such as the position of the rotation axis, the position of the tip, and the shape of the outer shell required to obtain the control point P and the radius r.
[0069] Second embodiment The work machine 100 according to the first embodiment is equipped with a bucket as the attachment 163. In contrast, the work machine 100 according to the second embodiment is equipped with a tiltrotating bucket as the attachment 163, which has a tiltrotator 164 and a bucket 165. The tiltrotator 164 is an example of a movable part of the attachment 163.
[0070] FIG. 10 is a diagram showing the configuration of an attachment 163 according to the second embodiment. The tilt rotator 164 is attached to the tip of the arm 162 so as to support the bucket 165. The tilt rotator 164 includes a mounting portion 1641, a tilt portion 1642, and a rotating portion 1643. The mounting portion 1641 is attached to the tip of the arm 162 so as to be rotatable around an axis extending in the left-right direction in the figure. The tilt portion 1642 is attached to the mounting portion 1641 so as to be rotatable around an axis extending in the front-rear direction in the figure. The rotating portion 1643 is attached to the tilt portion 1642 so as to be rotatable around an axis extending in the up-down direction in the figure. Ideally, the rotation axes of the mounting portion 1641, the tilt portion 1642, and the rotating portion 1643 are mutually orthogonal. The base end portion of the bucket 165 is fixed to the rotating portion 1643. This allows the bucket 165 to rotate around three axes mutually orthogonal to the arm 162. However, in reality, the rotation axes of mounting portion 1641, tilt portion 1642, and rotation portion 1643 may include design errors and may not necessarily be perpendicular to each other.
[0071] FIG. 11 is a diagram showing an example of a control point P and a virtual sphere VS according to the second embodiment. A control point P of the attachment 163 according to the second embodiment is the midpoint of a line segment connecting the midpoint of the rotation axis of the attachment 163 (arm top) and the midpoint of the blade tip (tip) of the bucket 165 when the inclination of the tilt part 1642 is zero (reference posture). The control point P is defined in the attachment 163 coordinate system.
[0072] The radius r of the virtual sphere VS according to the second embodiment is equal to the distance from the control point P to the farthest point of the outer shell of the bucket 165. The farthest point at this time is the farthest point from the control point P in all postures that can be taken by the tilt rotator 164. This makes it possible to specify the control point P and the virtual sphere VS regardless of the inclination of the tilt unit 1642 and the rotation angle of the rotation unit 1643. In addition, even if the tilt rotator 164 does not include a sensor for measuring the inclination of the tilt unit 1642 or a sensor for measuring the rotation angle of the rotation unit 1643, it is possible to prevent the attachment 163 having the tilt rotator 164 from entering the virtual wall VW. The control device 200 according to the second embodiment can obtain the control point P and the virtual wall VW of the attachment 163 having the tilt rotator 164 by the same calculation as in the first embodiment.
[0073] In this way, the control device 200 sets the radius r of the virtual sphere VS to a length that allows the virtual sphere VS to contain the attachment 163 regardless of the posture of the movable part, thereby enabling the control device 200 to realize intrusion prevention control of the virtual wall VW using the virtual sphere VS by the same calculation regardless of whether the attachment 163 has a movable part or not.
[0074] Third embodiment The work machine 100 according to the third embodiment is equipped with a tiltrotating bucket having a tiltrotator 164 and a bucket 165 as an attachment 163, similar to the second embodiment. On the other hand, the control device 200 according to the third embodiment differs from the second embodiment in the method of calculating the control point P and the virtual sphere VS. Similar to the second embodiment, the control point P according to the third embodiment is the midpoint of a line segment connecting the midpoint of the rotation shaft of the attachment 163 (arm top) and the midpoint of the blade tip (tip) of the bucket 165 when the inclination of the tilt section 1642 is zero (reference posture). On the other hand, the control point P according to the third embodiment is defined not by the attachment coordinate system but by a bucket coordinate system that uses the midpoint of the rotation shaft of the bucket 165 as a reference. Therefore, the position of the control point P in the attachment coordinate system changes depending on the posture of the tilt rotator 164.
[0075] FIG. 12 is a diagram showing the configuration of an attachment 163 according to the third embodiment. The tilt rotator 164 according to the second embodiment includes a tilt angle sensor 406 and a rotation angle sensor 407 around the rotation axis of the tilt section 1642 .
[0076] The tilt angle sensor 406 measures the tilt angle, which is the angle of the tilt section 1642 relative to the mounting section 1641 of the tilt rotator 164. The tilt angle sensor 406 may be a rotation sensor provided on a joint shaft that rotatably connects the mounting section 1641 and the tilt section 1642. The measurement value of the tilt angle sensor 406 indicates zero when, for example, the rotation axis of the arm 162 and the rotation axis of the rotating section 1643 are perpendicular to each other. Note that the tilt angle sensor 406 according to another embodiment may be a stroke sensor attached to a tilt cylinder and convert the stroke amount into an angle. The tilt angle sensor 406 outputs tilt angle data, which is the measurement value, to the control device 200.
[0077] The rotation angle sensor 407 measures the rotation angle, which is the angle of the rotating part 1643 relative to the tilt part 1642 of the tilt rotator 164. The rotation angle sensor 407 may be a rotation sensor provided in a rotation motor of the rotating part 1643. The measurement value of the tilt angle sensor 406 indicates zero when, for example, the direction in which the blade tip of the bucket 165 is facing is parallel to the motion plane of the work machine 160. The rotation angle sensor 407 outputs rotation angle data, which is the measurement value, to the control device 200.
[0078] Calculation of the Position Identification Unit 215 The position specifying unit 215 determines the attachment angle θ at Based on the measurement value and the geometry data of the arm 162, a first tilt-arm transformation matrix T for transforming from the first tilt rotated coordinate system to the arm coordinate system is calculated by the following formula (4). t1 am The first tilt-arm transformation matrix T t1 am is Y t1 Attachment angle θ around the axis at and the deviation between the origin of the arm coordinate system and the origin of the first tilt rotate coordinate system (x t1 , y t1 , z t1 ), and then the tilt angle φ of the joint axis of the tilt part 1642 is t In addition, the position specifying unit 215 uses the arm-vehicle body transformation matrix T am sb and the first tilt-arm transformation matrix T t1 am The first tilt-body transformation matrix T t1 sb Generate the arm-body transformation matrix T am sb The calculation method is the same as that explained in the first embodiment.
[0079]
number
[0080] The position specifying unit 215 detects the tilt angle θ t Based on the measurement values and the geometry data of the attachment 163, a second tilt-first tilt transformation matrix T for transforming from the first tilt rotated coordinate system to the second tilt rotated coordinate system is calculated by the following formula (5). t2 t1 The second tilt-first tilt transformation matrix T t2 t1 X t2Tilt angle θ around the axis t and the deviation between the origin of the first tilt-rotate coordinate system and the origin of the second tilt-rotate coordinate system (x t2 , y t2 , z t2 ), and then the inclination of the rotation axis of the rotating part 1643 is changed by φ r In addition, the position identification unit 215 uses the first tilt-vehicle body transformation matrix T t1 sb and the second tilt-first tilt transformation matrix T t2 t1 The second tilt-body transformation matrix T t2 sb Generate.
[0081]
number
[0082] The position specifying unit 215 detects the rotation angle θ r Based on the measurement value and the geometry data of the attachment 163, a bucket-second tilt transformation matrix T for transforming from the second tilt rotate coordinate system to the bucket coordinate system is calculated by the following formula (6). bk t2 The bucket-second tilt transformation matrix T bk t2 is Z bk Rotation angle θ around the axis r and the deviation between the origin of the second tilt-rotate coordinate system and the origin of the bucket coordinate system (x bk , y bk , z bk ) is a matrix that translates the vehicle body by the second tilt-vehicle body transformation matrix T t2 sb and the bucket-second tilt transformation matrix T bk t2 The bucket-body transformation matrix T bk sb Generate.
[0083]
number
[0084] The position identification unit 215 identifies the position of the control point P indicated by the geometry data of the attachment 163 and the bucket-vehicle body transformation matrix T bk sb By calculating the product of these, the position of the control point P of the attachment 163 in the vehicle body coordinate system can be calculated.
[0085] In addition, when the attachment 163 does not include the tilt rotator 164, the control device 200 does not include the tilt angle θ t and rotation angle θ r In this case, the measurement value of the tilt angle θ t and rotation angle θ r is treated as zero (as the reference attitude). This allows the position specifying unit 215 to specify the position of the control point P of the attachment 163 using the same calculation method regardless of whether the tilt rotator 164 is present or not.
[0086] FIG. 13 is a diagram showing an example of a control point P and a virtual sphere VS according to the third embodiment. The control point P according to the third embodiment is defined in a bucket coordinate system. Therefore, the length from the control point P to the outer shell of the bucket 165 is determined regardless of the attitude of the tiltrotator 164. Therefore, the control device 200 according to the third embodiment can make the radius r of the virtual sphere VS shorter than the radius r of the virtual sphere VS according to the second embodiment. As a result, the control device 200 according to the third embodiment can improve controllability compared to the second embodiment.
[0087] Other Embodiments Although one embodiment has been described in detail above with reference to the drawings, the specific configuration is not limited to the above, and various design changes are possible. That is, in other embodiments, the order of the above-mentioned processes may be changed as appropriate. Also, some of the processes may be executed in parallel. The control device 200 according to the embodiment described above may be configured by a single computer, or the configuration of the control device 200 may be divided and arranged among multiple computers, and the multiple computers may cooperate with each other to function as the control device 200. In this case, some of the computers that configure the control device 200 may be mounted inside the work machine 100, and other computers may be provided outside the work machine 100.
[0088] The work machine 100 according to the embodiment described above is operated by an operator who sits in the cab 180, but the work machine 100 according to other embodiments is not limited to this. FIG. 14 is a diagram showing the configuration of a work system according to another embodiment. The work machine 100 according to other embodiments may be operated by a remote control device 500 as shown in FIG. 14. The remotely controlled work machine 100 further includes an imaging device 119 in addition to the configuration of the embodiment described above, and the control device 200 transmits images captured by the imaging device 119 to the remote control device 500 in real time. The remote control device 500 includes a driver's seat 510, a display 520, an operation device 530, and a remote control server 540. The remote control server 540 displays images received from the work machine 100 on the display 520. This allows the operator to recognize the situation around the remote work machine 100. In addition, the remote control server 540 transmits an operation signal of the operation device 530 by the operator to the work machine 100 via a network. The remote control server 540 executes at least a part of the functions of the control device 200 according to the embodiment described above. That is, in a work system including a remote control server 540, the control device 200 and the remote control server 540 configure the work system.
[0089] Furthermore, the control device 200 according to the embodiment described above performs a rotational transformation process on the virtual wall VW to treat the virtual wall VW as a flat surface, but this is not limited to the above. For example, in another embodiment, if it is desired to have the virtual wall VW function as an annular wall surrounding the work machine 100, it is not necessary to perform the rotational transformation process on the virtual wall VW. In this case, the virtual wall VW becomes a curved surface. Note that the control device 200 according to another embodiment may perform a rotational transformation process on the virtual wall VW defined as a curved surface. [Explanation of symbols]
[0090] LIST OF SYMBOLS 100...Working machine 101...Inclination measuring device 102...Slewing angle sensor 103...Boom angle sensor 104...Arm angle sensor 105...Attachment angle sensor 106...Payload meter 111...Power source 112...Hydraulic pump 113...Control valve 114...Traveling motor 115...Slewing motor 116...Boom cylinder 117...Arm cylinder 118...Attachment cylinder 120...Traveling body 140...Slewing body 141...Operation device 142...Monitor device 160...Working machine 161...Boom 162...Arm 163...Attachment 164...Tilt rotator 1641...Mounting section 1642...Tilt section 1643...Rotating section 165...Bucket 180...Operator's cab 200...Control device 210...Processor 211...Operation amount acquisition section 212...input unit 213...display control unit 214...measurement value acquisition unit 215...position identification unit 216...generation unit 217...rotation conversion unit 218...intervention determination unit 219...intervention control unit 220...control signal output unit 230...main memory 250...storage 270...interface 406...tilt angle sensor 407...rotation angle sensor OW...offset wall P...control point VS...virtual sphere VW...virtual wall
Claims
1. A system for controlling a work machine having a work implement with a work tool at its tip, A processor is provided. The processor, Identifying a virtual wall that is a surface that prohibits entry of the work machine; determining a position of a control point of the implement on the work machine; Identifying an offset wall that moves the virtual wall closer to the control point in a normal direction of the virtual wall by a length of a radius of a virtual sphere defined so as to include the work tool with the control point as a center; The work machine is controlled so that the offset wall and the control point do not come into contact with each other. system.
2. The distance from the control point to the tip of the tool is shorter than the distance from the rotation axis of the tool to the tip. The system of claim 1 .
3. The control point is the midpoint of a line segment connecting the midpoint of the rotation axis of the work tool and the midpoint of the tip of the work tool. The system of claim 2.
4. The radius of the phantom sphere is equal to the distance from the control point to the farthest point on the hull of the implement. A system according to claim 1 or claim 2.
5. The work tool has a movable part, The control point is a point determined by the outer shell of the working tool when the attitude of the movable part is in a reference attitude. A system according to claim 1 or claim 2.
6. The virtual sphere includes the working tool no matter what position the movable part takes. The system of claim 5.
7. the control point is defined in a coordinate system relative to a driven part that is moved by the movable part; The processor determines the position of the control point based on the pose of the moving part. The system of claim 5.
8. The processor, The position of the control point and the radius of the virtual sphere are identified by reading out the data associated with the type of the work tool attached to the work machine from a storage unit that stores data capable of identifying the position of the control point and the radius of the virtual sphere in association with the type of the work tool. A system according to claim 1 or claim 2.
9. 1. A method for controlling a work machine having a work implement with a tip implement, comprising: A step of identifying a virtual wall that is a surface into which the work machine is prohibited from entering; determining a position of a control point of the work implement on the work machine; A step of specifying an offset wall by moving the virtual wall closer to the control point in a normal direction of the virtual wall by a length of a radius of a virtual sphere defined so as to include the work tool with the control point as a center; controlling the work machine so that the offset wall and the control point do not come into contact; A method for providing the above.
10. A computer that controls a work machine having a work implement with a work tool at its tip A step of identifying a virtual wall that is a surface into which the work machine is prohibited from entering; determining a position of a control point of the work implement on the work machine; A step of specifying an offset wall by moving the virtual wall closer to the control point in a normal direction of the virtual wall by a length of a radius of a virtual sphere defined so as to include the work tool with the control point as a center; controlling the work machine so that the offset wall and the control point do not come into contact; A program for executing the above.
Citation Information
Patent Citations
Interference preventing device for construction machine
JP1997256403A
Cited By
A working machine, a system for controlling a working machine, and a method
JP2026142808A
Area setting system
WO2026168265A1
