Secondary battery management device, secondary battery management method, and program
The secondary battery management device addresses the inefficiencies in peak cutting by using error distribution information to correct discharge plans, ensuring accurate power distribution and efficient peak suppression.
Patent Information
- Application Number
- JP2023055437
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-30
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2043-03-30
AI Technical Summary
Conventional peak cutting methods fail to accurately suppress peak power due to discrepancies between predicted and actual peak times in power consumption, leading to inefficiencies in power management.
A secondary battery management device that calculates predicted power reception values, creates power reception prediction information, and corrects discharge plans using error distribution information to account for potential deviations in peak times, ensuring accurate power distribution.
The device effectively suppresses peak power by adjusting discharge plans based on actual peak time deviations, enhancing power utilization and cost efficiency.
Smart Images

Figure 2024142996000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a secondary battery management device, a secondary battery management method, and a program used in power supply equipment. [Background technology]
[0002] A control method for power supply equipment called peak cut is commonly used to suppress the peak power, which is the peak of the power received by a consumer from a commercial power source. In this control method, control is performed to supply power from a secondary battery of the power supply equipment to the load equipment, etc. of the consumer at the time when the power consumed by the load equipment, etc. of the consumer is at its maximum, thereby suppressing the peak of the received power.
[0003] Specifically, a power supply equipment management device controls the secondary battery and a power conversion device connected to the secondary battery so that the power stored in the secondary battery is supplied to load equipment during a specified time period. As a secondary battery management device that manages this secondary battery, there is also known a device that has a function of performing control aimed at reducing power supply costs in addition to a function of performing peak cutting (for example, see Patent Document 1). [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2019-161843 A Summary of the Invention [Problem to be solved by the invention]
[0005] In conventional peak shaving, the predicted time when the consumer's received power would peak was calculated based on various information such as the actual value of the received power, and the power supply equipment was controlled so that power was supplied from the secondary battery during the time period of the predicted time. However, since the power consumed by the consumer's load equipment, etc., fluctuates due to various factors, the time when the received power actually peaks may deviate from the predicted time calculated in advance. In other words, power may be supplied from the secondary battery during a time period different from the time when the received power actually peaks, making it impossible to suppress the peak of the received power.
[0006] The present disclosure discloses a secondary battery management device, a secondary battery management method, and a program that can suppress peak power even if the time when received power actually peaks differs from a previously calculated predicted time. [Means for solving the problem]
[0007] A secondary battery management device in a first aspect of the present disclosure includes a receiving power prediction unit that performs a process of calculating a receiving power prediction value, which is a predicted value at any time of a receiving power value, which is the power value of power received by a consumer from a commercial power source, and creating receiving power prediction information that indicates a time change of the receiving power prediction value; a peak prediction unit that performs a process of calculating predicted time information based on the receiving power prediction information, the predicted time information including a predicted peak time at which the receiving power value is predicted to reach a receiving power peak that satisfies a predetermined condition; a plan creation unit that performs a process of creating a discharge plan for a secondary battery that supplies power to the consumer, based on the receiving power prediction information and the predicted time information; and a correction unit that performs a correction process to correct the discharge plan, wherein the correction unit performs the correction process based on error distribution information including an error value that is the difference between the peak time, which is the time when the receiving power value actually reaches the receiving power peak, and the predicted peak time, and an error occurrence probability that is the probability that the error value will occur.
[0008] According to the secondary battery management device configured in this manner, the correction unit performs the following on the basis of the error distribution information: , corrects the discharge plan created by the plan creation unit. This error distribution information includes an error value, which is the difference between the predicted peak time and the actual peak time, and an error occurrence probability, which is the probability that the error value will occur. In other words, the discharge plan is corrected based on the error distribution information, which includes an error value related to the predicted peak time and an error occurrence probability at which the error value will occur. Therefore, even if the time at which the actual peak of the received power occurs differs from the predicted time calculated in advance, it is possible to suppress the peak power.
[0009] In the above, it is preferable that the power receiving device further includes an error calculation unit that performs a process of calculating the error distribution information based on actual information indicating an actual change over time of the received power value and the received power prediction information corresponding to the actual information.
[0010] In the secondary battery management device configured in this manner, error distribution information is calculated based on performance information regarding time changes in actual received power values at the consumer and power reception prediction information corresponding to the performance information. That is, the error distribution information used in the correction process of the discharge plan is calculated based on information regarding past performance at the consumer.
[0011] As a result, the discharge plan can be appropriately and accurately corrected based on information reflecting actual results, and peak power can be suppressed even if the time when the actual peak of received power occurs differs from the predicted time.
[0012] In the above, the error distribution information is information in which a plurality of the error values are linked to the respective error occurrence probabilities, the discharge plan is information in which a discharge time set as the time at which a predetermined power is discharged and a planned discharge value set as the power value of the power discharged from the secondary battery at the discharge time are associated with each other, and the correction unit performs the correction process by distributing at least a portion of the planned discharge value set at a predetermined time in the discharge plan to a time that is away from the predetermined time by a time corresponding to the error value in accordance with distribution information calculated based on the error distribution information, and it is preferable that the distribution information is information in which the error value is linked to an distribution ratio set corresponding to each of the error occurrence probabilities.
[0013] In the secondary battery management device configured in this way, a discharge plan correction process is performed based on the distribution information calculated based on the error distribution information. That is, the correction unit performs processing so that at least a part of the scheduled discharge value set at the predetermined time is distributed to a time away from the predetermined time by a time corresponding to the error value at a distribution ratio set corresponding to the error occurrence probability for each error value.
[0014] In other words, the power scheduled to be discharged at a specified time in the discharge plan is distributed to the times corresponding to the error values in a ratio according to the probability of occurrence of the error values, so that peak power can be suppressed even if the actual peak time differs from the predicted time.
[0015] In the above, it is preferable that the distribution information is calculated based on information extracted from the error distribution information on the basis of a time width determined in accordance with a preset condition.
[0016] In the secondary battery management device configured in this manner, allocation information is calculated based on error distribution information included in a time width, which is a time interval determined according to a preset condition. This preset condition can be, for example, information such as the percentage of the total error distribution information that is accounted for by information actually used when calculating the allocation information. In this case, a time width is determined that includes information that at least satisfies a percentage set in advance, for example, by a consumer's administrator. Then, information is extracted from the error distribution information based on that time width, and allocation information is calculated. For this reason, for example, a large error distribution information with a low probability of error occurrence can be calculated. It is possible to calculate the allocation information according to preset conditions, such as calculating the allocation information based on information excluding error values.
[0017] In the above, when there is a time in the discharge plan after correction by the correction process where the corrected discharge planned value, which is the corrected discharge planned value, is equal to or greater than a predetermined threshold, it is preferable that the correction unit performs a reallocation process to allocate the power difference between the corrected discharge planned value at that time and the predetermined threshold to other times at which the corrected discharge planned value that does not exceed the predetermined threshold is set, in accordance with an order determined based on the difference between the predetermined threshold and the corrected discharge planned value at the other times.
[0018] In the secondary battery management device configured in this manner, if there is a time when the corrected corrected discharge schedule value is equal to or greater than a predetermined threshold, a re-allocation process is performed to allocate the difference in power to other times when the corrected discharge schedule value has not reached the predetermined threshold. The allocation of this difference in power is performed in an order based on the difference between the predetermined threshold and the corrected discharge schedule value at the other times. Examples of this predetermined threshold include the upper limit of power that the secondary battery can supply to consumers, such as the rating of a power conversion device connected to the secondary battery. This makes it possible to efficiently use the power stored in the secondary battery and suppress peak power.
[0019] A secondary battery management method in a second aspect of the present disclosure is a secondary battery management method that uses an electronic computing device to manage a secondary battery that supplies power to a consumer, and includes a power reception prediction step of calculating a power reception prediction value, which is a predicted value at an arbitrary time of a power reception power value, which is the power value of power received by the consumer from a commercial power source, and creating power reception prediction information that indicates a time change of the power reception prediction value; a peak prediction step of calculating predicted time information including a predicted peak time at which the power reception prediction value is predicted to reach a power reception peak that satisfies a predetermined condition, based on the power reception prediction information; a plan creation step of creating a discharge plan for the secondary battery based on the power reception prediction information and the predicted time information; and a plan correction step of performing a correction process to correct the discharge plan, wherein the plan correction step performs the correction process based on error distribution information including an error value that is the difference between the peak time at which the power reception power value actually reaches the power reception peak and the predicted peak time, and an error occurrence probability that is the probability that the error value will occur.
[0020] A program in a third aspect of the present disclosure is a program that causes an electronic computing device to realize a power reception prediction function that performs a process of calculating a power reception prediction value, which is a predicted value at any time of a received power value, which is the power value of power received by a consumer from a commercial power source, and creating power reception prediction information that indicates a time change of the power reception prediction value; a peak prediction function that performs a process of calculating predicted time information including a predicted peak time at which the power reception prediction value is predicted to reach a power reception peak that satisfies a predetermined condition, based on the power reception prediction information; a plan creation function that performs a process of creating a discharge plan for a secondary battery that supplies power to the consumer, based on the power reception prediction information and the predicted time information; and a plan correction function that performs a correction process to correct the discharge plan, where the plan correction function performs the correction process based on error distribution information including an error value that is the difference between the peak time at which the received power value actually reaches the received power peak and the predicted peak time, and an error occurrence probability that is the probability of the error value occurring. Effect of the Invention
[0021] According to the secondary battery management device, secondary battery management method, and program disclosed herein, peak power can be suppressed even if the actual time at which received power peaks differs from a previously calculated predicted time. [Brief description of the drawings]
[0022] [Figure 1] 1 is a block diagram illustrating a power supply facility in which a secondary battery management device according to the present disclosure is used. [Diagram 2] 1 is a block diagram illustrating a configuration of a secondary battery management device according to the present disclosure. [Diagram 3] FIG. 1 is a diagram for explaining an overview of peak shaving. [Figure 4] 10A and 10B are diagrams illustrating an example of a change in a predicted received power value calculated in advance and an example of a change in an actual received power value. [Diagram 5] FIG. 11 is a diagram illustrating error distribution information. [Figure 6] Fig. 6(a) is a diagram showing an example of an initial discharge plan, Fig. 6(b) is a diagram showing an example of allocation information, and Fig. 6(c) is a diagram showing an example of a corrected discharge plan. [Figure 7] Fig. 7(a) is a diagram showing an example of an original discharge plan, and Fig. 7(b) is a diagram showing an example of a corrected discharge plan. [Figure 8] 11A and 11B are diagrams illustrating an example of power reception prediction information and a discharge plan. [Figure 9] FIG. 11 is a diagram illustrating an example of error distribution information. [Figure 10] 11 is a diagram illustrating an example of a process for extracting information required for calculating allocation information from error distribution information. FIG. [Figure 11] Fig. 11(a) is a diagram showing an example of information extracted from error distribution information, and Fig. 11(b) is a diagram showing an example of information (distribution information) extracted after correction processing. [Figure 12] Fig. 12(a) is a table showing an example of an initial discharge plan, Fig. 12(b) is a table showing an example of allocation information, and Fig. 12(c) is a table showing an example of a corrected discharge plan. [Figure 13] Fig. 13(a) is a diagram illustrating an example of an original discharge plan, and Fig. 13(b) is a diagram illustrating an example of a corrected discharge plan. [Figure 14] FIG. 4 is a flow chart illustrating a process performed by the secondary battery management device. [Figure 15] Fig. 15(a) is a diagram for explaining an example of a discharge plan after correction, and Fig. 15(b) is a diagram for explaining an example of a discharge plan after reallocation processing. [Figure 16] FIG. 11 is a flow diagram illustrating a process performed by a secondary battery management device according to another embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0023] [First embodiment] Hereinafter, an apparatus according to a first embodiment of the present disclosure will be described with reference to FIGS.
[0024] 1-1 Configuration Description In this embodiment, the power management system 1 supplies and manages power to a consumer's load equipment 30. As shown in Fig. 1, the power management system 1 is mainly composed of a power supply equipment 10, a secondary battery management device 20, and a data server 40.
[0025] The power supply facility 10 receives power from a commercial power source 50 and supplies the power to a load facility 30. The load facility 30 is a device or apparatus that consumes power and is located in a customer's facility or the like. Examples of the load facility 30 include, but are not limited to, air conditioners and lighting equipment.
[0026] The power supply equipment 10 has at least a secondary battery 11, a power conversion device 12, and a control device 13. The secondary battery 11 has a storage battery that can be repeatedly charged and discharged. The secondary battery 11 is charged with power from a commercial power source 50 supplied via the power conversion device 12. The secondary battery 11 also discharges the stored power and supplies the power to the load equipment 30 via the power conversion device 12.
[0027] The power converter 12 is a bidirectional converter having a function of converting AC power supplied from the commercial power source 50 into DC power and a function of converting DC power supplied from the secondary battery 11 into AC power. The power conversion device 12 converts AC power supplied from a commercial power source 50 into DC power of a magnitude suitable for charging the secondary battery 11. The power conversion device 12 also converts DC power supplied from the secondary battery 11 into AC power of a magnitude suitable for the load equipment 30.
[0028] The control device 13 is a part that mainly controls the power supply equipment 10. The control device 13 controls at least the secondary battery 11 and the power conversion device 12. The control device 13 also has a function of sequentially acquiring information about the secondary battery 11, such as the amount of stored power and the state of charge (SOC) of the secondary battery 11, and outputting the information as information that the secondary battery management device 20 can process.
[0029] The control device 13 controls the secondary battery 11, the power conversion device 12, and the like so that power is supplied from the secondary battery 11 to the load equipment 30 during a time period when the load equipment 30 consumes a lot of power. The control device 13 also controls the secondary battery 11, the power conversion device 12, and the like so that the secondary battery 11 is charged using power from the commercial power source 50 during a time period when the load equipment 30 does not consume a lot of power. For example, the control device 13 controls the secondary battery 11, the power conversion device 12, and the like so that power stored in the secondary battery 11 is supplied to the load equipment 30 during daytime hours. The control device 13 also controls the secondary battery 11, the power conversion device 12, and the like so that the secondary battery 11 is charged using power from the commercial power source 50 during, for example, nighttime hours.
[0030] The power management system 1 repeats a period of supplying power to the load equipment 30 and a period of charging the secondary battery 11 at a predetermined interval. The period of one repetition of the operation of the power management system 1 is also referred to as an "operation cycle." In the following description, the operation cycle of the power supply equipment 10 is assumed to be one day (24 hours).
[0031] The data server 40 collects information used in processing performed by the secondary-battery management device 20, the details of which will be described later, and stores the collected information. The data server 40 is connected to an external communication line such as the Internet. The data server 40 has a function of outputting the collected information and stored information to the secondary-battery management device 20.
[0032] The data server 40 collects information required when the secondary battery management device 20 performs a process of creating power reception prediction information and a process of creating a discharge plan. Examples of information required when performing a process of creating power reception prediction information include information on time changes in power received by the power supply equipment 10 from the commercial power source 50 in the past (hereinafter also referred to as "performance information"). Other examples include information on the actual power consumption of the load equipment 30. Alternatively, examples include information on weather forecasts for the period for which the power reception prediction information is created, and other information related to the power consumption of the load equipment 30. The data server 40 may perform a process of collecting requested information in response to a request from the secondary battery management device 20.
[0033] The secondary battery management device 20 is a device for controlling the power supply equipment 10 in order to suppress peak power of the received power supplied from the commercial power source 50 to the load equipment 30.
[0034] The control performed by the secondary battery management device 20 is a control method generally known as peak cutting. In peak cutting, as shown in Fig. 3 for example, in a time period when the received power value exceeds a threshold, control is performed to discharge the power stored in the secondary battery 11 and supply it to the load equipment 30. In the bar graph for the time period from 12:00 to 16:00 in Fig. 3, the unshaded white area indicates the received power when peak cutting is not performed, and the shaded area indicates the received power after peak cutting is performed.
[0035] By doing this, it is possible to prevent the occurrence of time periods in which the received power value is extremely high. In addition, control is performed to appropriately discharge the power stored in the secondary battery 11. This type of control is expected to enable efficient use of power and to reduce electricity charges.
[0036] In this embodiment, in order to perform this peak shaving, the secondary battery management device 20 controls the secondary battery 11. More specifically, the secondary battery management device 20 controls the secondary battery 11, the power conversion device 12, etc. via the control device 13 to control the supply of power from the secondary battery 11 to the load equipment 30.
[0037] As shown in Fig. 2, the secondary battery management device 20 mainly includes a power reception prediction unit 21, a peak prediction unit 22, a plan creation unit 23, a correction unit 24, an error calculation unit 25, a storage unit 26, and a control unit 27. The secondary battery management device 20 is a known electronic computing device such as a server device or a PC, on which dedicated software is installed. That is, the functions of each unit are realized by the cooperation of the dedicated software and hardware. The secondary battery management device 20 may be configured such that each unit is composed of dedicated hardware and each function is realized.
[0038] The secondary battery management device 20 controls the secondary battery 11, the power conversion device 12, etc. at a preset time interval. In other words, the secondary battery management device 20 controls the secondary battery 11, the power conversion device 12, etc., using the preset time interval as a unit of time. For example, the secondary battery management device 20 controls the secondary battery 11, the power conversion device 12, etc., using 30 minutes as the minimum unit of time for control. In the following description, the length of time of this preset time interval is referred to as "L". The minimum unit of time for control by the secondary battery management device 20, which has the length of time L, is also referred to as a "frame of time" or "frame".
[0039] The length L of this time frame is preferably a length obtained by equally dividing the period of the operation cycle of the power management system 1. For example, the length L of the time frame is preferably the length of one period (30 minutes) obtained by dividing one day (24 hours) into 48 equal parts, or the length of 24 hours divided into 24 equal parts (1 hour). In the following description, the length L of the time frame is assumed to be 30 minutes. The length L of the time frame may be longer or shorter than 30 minutes. For example, the length L of the time frame may be a length such as 1 minute, as long as it does not interfere with the processing performed by the secondary-battery management device 20.
[0040] In the following description, a frame of a specific time is specified by the time at which the frame starts. For example, if a frame of a specific time starts at 12:00 and ends at 12:30, the frame is described as a "frame at 12:00" (frame at 12:00) or a "frame starting at 12:00" (frame of the time starting at 12:00). Alternatively, it is described as a "12:00 time slot" or a "time slot starting at 12:00". Alternatively, a frame of a time is specified by the number of frames counted from a frame of a reference time. For example, if a frame starting at a specific time is the 23rd frame counted from a frame of a reference time, it is described as the 23rd frame (frame of the 23rd time) or the 23rd time slot. In the following description, it is assumed that a frame of midnight (0:00) is set as a frame of a reference time.
[0041] The power reception prediction unit 21 is a part that calculates the time change of the predicted value of the power value indicating the amount of power that the power supply equipment 10 will receive from the commercial power source 50 at any point in time. Hereinafter, the power value of the power that the power supply equipment 10 will receive from the commercial power source 50 will be referred to as the "received power value," and the predicted value of the received power value will be referred to as the "predicted power reception value." The power reception prediction unit 21 predicts the time change of the power value that the power supply equipment 10 will receive from the commercial power source 50 in the future based on information acquired from the data server 40. This is the part that performs the process.
[0042] The power reception prediction unit 21 calculates a power reception prediction value at regular time intervals based on information acquired from the data server 40, and calculates the change over time. For example, the power reception prediction unit 21 calculates the change over time of the power reception prediction value based on actual information on the power received by the power supply equipment 10 from the commercial power source 50 in the past, information on the actual power consumption by the load equipment 30, etc. The power reception prediction unit 21 may perform a process of calculating the change over time of the power reception prediction value by further using information on weather forecasts and other information related to the amount of power consumed by the load equipment 30.
[0043] Hereinafter, information including at least the predicted time change of the received power value calculated by the power reception prediction unit 21 will also be referred to as “power reception prediction information.” The power reception prediction information calculated by the power reception prediction unit 21 is stored in the storage unit 26.
[0044] The peak prediction unit 22 is a part that calculates the time when the predicted power receiving value is predicted to reach the power receiving peak based on the power receiving prediction information calculated by the power receiving prediction unit 21. Hereinafter, the time when the predicted power receiving value is predicted to reach the power receiving peak is also referred to as the "predicted peak time."
[0045] A power receiving peak refers to a state in which the power receiving value satisfies a predetermined condition. Various conditions are exemplified as conditions related to this power receiving peak. For example, a state in which the power receiving value is the largest value within a predetermined period (e.g., within an operation cycle period). Alternatively, a state in which the power receiving value is equal to or greater than a preset threshold value within a predetermined period, or a state in which the power receiving value is equal to or greater than a preset threshold value within a period in which the power receiving value is equal to or greater than a preset threshold value, or a state in which the power receiving value is the largest ...
[0046] In the following description, the power receiving peak is defined as the state in which the power receiving value is the largest value within the operation cycle. In addition, the peak prediction unit 22 calculates the time when the power receiving prediction value becomes the power receiving peak in the operation cycle (24 hours) as the predicted peak time, and also calculates the time when the power receiving prediction value becomes the next largest value.
[0047] The peak prediction unit 22 also performs a process of selecting a time slot including a predicted peak time. For example, when the calculated predicted peak time is 12:03, the peak prediction unit 22 performs a process of selecting a time slot of 12:00 as a time slot including the predicted peak time. In addition, when a plurality of power receiving peaks are calculated, the peak prediction unit 22 also performs a process of ranking according to the magnitude of the predicted power receiving value of the power receiving peak. Note that the process of selecting a time slot including a predicted peak time and the process of ranking may be performed by a part other than the peak prediction unit 22. In the following description, information including at least the predicted peak time calculated by the peak prediction unit 22 is also referred to as "predicted time information". The predicted time information calculated by the peak prediction unit 22 is stored in the storage unit 26. The predicted time information may include information such as the ranking of the magnitude of the predicted power receiving value at the power receiving peak.
[0048] The plan creation unit 23 is a part that performs processing to create a discharge plan (see the bar graph in FIG. 4) for the secondary battery 11 based on the power reception prediction information and the predicted time information. The discharge plan includes at least information on the time period (time frame) when the supply of power from the secondary battery 11 will start, and information on the amount of power supplied from the secondary battery 11 during that time. Hereinafter, the amount of power supplied from the secondary battery 11, set in the discharge plan, will also be referred to as the "scheduled discharge value." The time period (time frame) when the supply of power from the secondary battery 11 will start in this discharge plan is an example of a discharge time.
[0049] The plan creation unit 23 calculates the state of the secondary battery 11 for a predetermined period according to a preset condition. The plan creation unit 23 performs a process of creating a discharge plan. The plan creation unit 23 performs a process of creating a discharge plan for, for example, one operation cycle. Alternatively, the plan creation unit 23 may perform a process of creating a plan for a time period during which the load equipment 30 actually operates in a day.
[0050] In principle, the plan creation unit 23 performs processing to create a discharge plan so that all of the power stored in the secondary battery 11 is supplied to the load equipment 30 by the time charging of the secondary battery 11 begins in the next operating cycle, and the amount of stored power becomes zero.
[0051] The plan creation unit 23 performs processing to create a discharge plan based on the power reception prediction information calculated by the power reception prediction unit 21, the predicted time information calculated by the peak prediction unit 22, and information regarding the amount of power stored in the secondary battery 11.
[0052] For example, the plan creation unit 23 creates a discharge plan so that power is supplied from the secondary battery 11 to the load equipment 30 in a time period (time frame) that includes the predicted peak time, and the received power value becomes a value that satisfies a predetermined condition. Hereinafter, the time period that includes the predicted peak time will also be referred to as the "time period of the predicted peak time", or the "time frame of the predicted peak time", or the "frame of the predicted peak time".
[0053] The preset condition is, for example, that the received power value during the time period of the predicted peak time is equal to or less than a predetermined threshold value. Alternatively, the power value during the time period of the predicted peak time is equal to or less than the maximum received power value during a certain period of time in the past. Alternatively, the power value is equal to or less than the predicted received power value at another selected time. In the present embodiment, the following description will be given assuming that the plan creation unit 23 creates a discharge plan so that the received power value during the time period of the predicted peak time is equal to or less than a preset threshold value.
[0054] When it is determined that sufficient power is stored in the secondary battery 11 after power is supplied to the load equipment 30 during the time period of the predicted peak time, the plan creation unit 23 may perform a process of creating a plan for power supply from the secondary battery 11 during a different time period. For example, the plan creation unit 23 may perform a process of creating a plan for power supply from the secondary battery 11 during a time frame in which the power reception prediction value is the next largest value after the prediction value during the predicted peak time. Furthermore, when it is determined that sufficient power continues to be stored in the secondary battery 11 after the power supply, a plan for power supply from the secondary battery 11 during a further different time frame may be created. The discharge plan created by the plan creation unit 23 is stored in the storage unit 26. The discharge plan created by the plan creation unit 23 may be stored in another storage unit.
[0055] The error calculation unit 25 is a part that calculates information regarding the error of the predicted peak time and the probability of occurrence of the error. Since the amount of power consumed by the load equipment 30 and its change over time vary due to various factors, the change over time of the actual received power value may differ from the power reception prediction information. That is, as shown as an example in FIG. 4, the time when the actual received power value reaches the receiving peak (hereinafter also referred to as the "peak time" or "actual peak time") may differ from the predicted peak time. In FIG. 4, the part surrounded by the solid line circle is the predicted receiving peak, and the part surrounded by the dashed line circle is the actual receiving peak.
[0056] The error calculation unit 25 acquires information on a plurality of past operation cycles from the storage unit 26 or the like, and calculates information on the error of the predicted peak time and the probability of occurrence of the error value. Specifically, the error calculation unit 25 calculates information on the difference between each of the plurality of predicted peak times calculated in the past and the corresponding peak time (actual peak time) in the corresponding period. Hereinafter, the time difference between the predicted peak time and the corresponding actual peak time will be referred to as the "prediction error of the predicted peak time" or simply as the "prediction error."
[0057] Furthermore, the error calculation unit 25 calculates the probability of occurrence of a prediction error for each magnitude of the prediction error based on the acquired information. Then, the error calculation unit 25 creates information linking possible prediction errors with the probability of occurrence of each prediction error in one operation cycle. That is, the error calculation unit 25 creates information related to the error distribution of prediction errors in one operation cycle. The error calculation unit 25 stores the created information related to the error distribution of prediction errors in the storage unit 26.
[0058] Hereinafter, the probability of a given prediction error occurring is also referred to as "error probability" or "error probability density." Information linking a prediction error with the error probability of each prediction error is also referred to as "error distribution information." The error calculation unit 25 creates error distribution information using the "time frame" used as a unit of time by the peak prediction unit 22 and the plan creation unit 23 as a similar unit of time. The error calculation unit 25 calculates the error probability for each time frame corresponding to a given prediction error to create error distribution information. The prediction error is an example of an error value. The error probability or error probability density is an example of an error occurrence probability.
[0059] The error calculation unit 25 may perform a process of calculating an error function indicating the relationship between the predicted error and the error probability, using a known method known in the technical field in which the error distribution is used, based on the information on the past predicted peak time and the corresponding performance information. For example, the error calculation unit 25 may perform a process of calculating an error function as shown in the curved graph in Fig. 5. The error calculation unit 25 stores the calculated error function in the storage unit 26 as error distribution information.
[0060] In Fig. 5, the horizontal axis indicates the magnitude of the prediction error. "0" near the center of the horizontal axis in Fig. 5 indicates that the actual peak time is the same as the predicted peak time. Also, in Fig. 5, the absolute value of the prediction error (magnitude of difference) increases as one moves away from "0" on the horizontal axis to the left or right. In Fig. 5, the vertical axis is the error density, indicating the likelihood of a prediction error of a given magnitude occurring.
[0061] In the error distribution information, the likelihood of a prediction error occurring is indicated using a probability density. Therefore, the sum of the error probabilities of each prediction error is "1". To explain using FIG. 5 as an example, the sum of the areas of the bar graphs in FIG. 5 is "1". Also, the integral value of the error distribution function shown by the curved graph in FIG. 5 is "1".
[0062] The correction unit 24 is a part that performs a process of correcting the discharge plan created by the plan creation unit 23 based on the error distribution information. As described above, the predicted peak time calculated by the peak prediction unit 22 may contain a prediction error. The correction unit 24 performs a process of distributing the amount of power that is scheduled to be supplied from the secondary battery 11 to the load equipment 30 in the discharge plan to a time period (transition time period) that is away from the time period (time frame) of the predicted peak time by the time of the prediction error.
[0063] Hereinafter, the discharge plan created by the plan creation unit 23 before the correction process by the correction unit 24 is also referred to as the "initial discharge plan" or the "original plan." In addition, in the original plan, the power that is scheduled to be supplied from the secondary battery 11 to the load equipment 30 during the time period of the predicted peak time is also referred to as the "planned discharge amount."
[0064] The correction unit 24 performs a process of allocating the originally planned discharge amount to a time period shifted from the time period of the predicted peak time by the prediction error at a rate corresponding to the probability of the prediction error occurring, without changing the total amount.
[0065] More specifically, the correction unit 24 creates allocation information used in the process of allocating power based on the error distribution information. The correction unit 24 creates the allocation information based on information extracted from the error distribution information according to a time width determined by conditions previously set by the user. The correction unit 24 creates the allocation information so that the sum of the discharge amounts allocated to each time period according to the allocation information is the same as the initial planned discharge amount.
[0066] The allocation information is information that links information about the prediction error with the allocation ratio for the prediction error (see Fig. 6(b)). In other words, it is information that links the time frames corresponding to the prediction error with the ratio at which the planned discharge amount is allocated for each time frame.
[0067] The horizontal axis in Fig. 6(b) shows the time frames corresponding to the prediction error, and the "0 frame" on the horizontal axis shows the time slot of the predicted peak time. Also, "-1 frame" shows the time slot (time frame) that is one frame earlier than the time slot of the predicted peak time, and "1 frame" shows the time slot (time frame) that is one frame later than the time slot of the predicted peak time.
[0068] Based on the created allocation information, the correction unit 24 performs a process of correcting the discharge plan so that the planned discharge amount in the initial plan (see FIG. 6(a)) is allocated to a time period that is away (shifted) from the predicted peak time by an error (see FIG. 6(c)). Details of the process of creating the allocation information by the correction unit 24 and details of the correction process using the allocation information will be described later.
[0069] When the supply of power from the secondary battery 11 is scheduled for a plurality of different time periods (time frames) in the initial discharge plan, the correction unit 24 performs a process of correcting each time period (time frame) in which the supply of the power is scheduled. Furthermore, when the correction process results in power being allocated to the same time period from the planned discharge amounts set for different time periods, the correction unit 24 performs a process of adding up the allocated powers to obtain the planned discharge amount for the time period. For example, the initial discharge plan may have planned discharge amounts set for different adjacent time periods (see FIG. 7(a)), and the correction process may allocate power from the planned discharge amounts on both sides to a time period between two time periods in which planned discharge amounts are set. In such a case, the correction unit 24 performs a process of adding up the power amounts allocated from each time period to obtain the planned discharge amount for the time period (see FIG. 7(b)).
[0070] The storage unit 26 is a part that stores power reception prediction information calculated in the past by the power reception prediction unit 21, predicted peak times calculated in the past by the peak prediction unit 22, and performance information. The storage unit 26 may store information such as thresholds and parameters used in processing by the secondary battery management device 20. The storage unit 26 is a storage medium such as a hard disk or SSD. The storage unit 26 may be external to the secondary battery management device 20, or may be communicably connected to the secondary battery management device 20 via a communication means such as a network.
[0071] The control unit 27 is a part that outputs a signal for controlling the secondary battery 11 according to the corrected plan. That is, the control unit 27 is a part that receives the corrected discharge plan from the correction unit 24 or the storage unit 26, and outputs a signal for controlling the secondary battery 11 to the control device 13.
[0072] 1-2 Operation Description Next, the operation mainly performed by the secondary-battery management device 20 will be described according to actual use, mainly with reference to FIG.
[0073] The secondary battery management device 20 starts the process by the user's operation. The secondary battery management device 20 may start the process automatically when a specific time arrives. Note that, when the secondary battery management device 20 starts the process, the secondary battery 11 is charged to 100%. It is in a degraded state.
[0074] First, the power reception prediction unit 21 acquires information such as actual information, calculates the predicted time change of the power reception value calculated by the power reception prediction unit 21, and performs a process of creating power reception prediction information (see Figure 8) (S100) (power reception prediction step).
[0075] Next, the peak prediction unit 22 performs a process of calculating predicted time information (S110) (peak prediction step). Specifically, the peak prediction unit 22 calculates the predicted peak time at which the predicted power reception value will be the largest during the operation cycle (24 hours) based on the power reception prediction information created by the power reception prediction unit 21. Furthermore, the peak prediction unit 22 performs a process of obtaining a time frame that includes the predicted peak time. If there is a time at which the predicted power reception value will be the next largest, the peak prediction unit 22 performs the same process for that time.
[0076] 8, the peak prediction unit 22 calculates time AA as the predicted peak time when the predicted power receiving value is the largest, and selects a time slot (a block of time) that includes the predicted peak time. Similarly, the peak prediction unit 22 calculates time BB when the predicted power receiving value is the second largest value after the value at time AA, and selects a time slot (a block of time) that includes time BB.
[0077] Next, the plan creation unit 23 performs a process of creating a discharge plan for the secondary battery 11 based on the power reception prediction information and the predicted time information (S120) (plan creation step). The plan creation unit 23 creates a discharge plan so that the power required for the power reception value at the predicted peak time to be equal to or lower than a preset threshold is supplied from the secondary battery 11 to the load equipment 30 in a time period including time AA (hereinafter also referred to as the "time period of time AA"). Furthermore, the plan creation unit 23 creates a discharge plan so that the power of the secondary battery 11 minus the amount of power supplied in the time period of time AA is supplied to the load equipment 30 in a time period including time BB (hereinafter also referred to as the "time period of time BB") (see the bar graph in FIG. 8).
[0078] Next, the error calculation unit 25 performs a process of calculating error distribution information (S130). The error calculation unit 25 calculates error distribution information as shown in Fig. 9 based on information acquired from the storage unit 26 and the data server 40. In Fig. 9, the horizontal axis represents the prediction error using time frames. Also, in Fig. 9, the vertical axis represents the error probability.
[0079] Next, the correction unit 24 performs a process of calculating the allocation information based on the error distribution information (S140). First, the correction unit 24 performs a process of extracting information used for calculating the allocation information from the error distribution information. The correction unit 24 performs a process of extracting information included in a time width determined by a condition set in advance by a user from the error distribution information.
[0080] An example of the condition set by the user in advance is the coverage rate C shown in the following formula. In the formula, "Dp" is the error probability (error probability density) in the frame corresponding to the prediction error, "p" is a number for identifying a specific frame, and "a" is the number of consecutive frames (number of frames in a time) before and after the frame at a specific time (frame p).
number
[0081] Hereinafter, the frame "a" in the direction from the frame with a prediction error of "0" to the negative side of the time will be referred to as "-a frame." Also, the frame "a" in the direction from the frame with a prediction error of "0" to the positive side of the time will be referred to as "+a frame."
[0082] When the above conditions are set, the correction unit 24 selects the number of frames in time "a" so that the coverage ratio C is at least equal to or greater than the value preset by the user. In this embodiment, the correction unit 24 selects the number of frames in time "a" so that the coverage ratio C is at least equal to or greater than the value preset by the user and is close to the value preset by the user.
[0083] Then, the correction unit 24 performs a process of extracting information contained between "-a frame" and "+a frame", centered on the frame at the time when the prediction error is "0", as information to be used for calculating the allocation information.
[0084] In the following, a specific description will be given with reference to Figs. 9 and 10, assuming that the user has set 60% as the preset value. The denominator in the above formula is the sum of the probabilities of occurrence of prediction errors in each frame. That is, the denominator in the above formula is the sum of the values of the bar graph shown in Fig. 9. As described above, the error distribution information is a probability density, and the sum of its values is "1", so the above denominator is "1". For this reason, the correction unit 24 selects the number of "a" so that the sum of the occurrence probabilities of each measurement error in the frames between "-a frame" and "+a frame" is equal to or greater than 60% and close to 60%. With reference to Fig. 10, when "a" is set to "6", the coverage rate C is 62%, so the correction unit 24 extracts information between "-6 frames" and "+6 frames" with the frame at the time when the prediction error is "0" as the center.
[0085] Furthermore, the correction unit 24 performs a process of correcting the extracted information to values suitable for correction processing. Specifically, the correction unit 24 performs a process so that the sum of the error probabilities between the frames in the extracted information becomes 100% while maintaining the ratio of the error probabilities between the frames.
[0086] The correction process performed by the correction unit 24 will be specifically described with reference to Figs. 11(a) and 11(b). Fig. 11(a) is an example of information extracted by the correction unit 24 from the error distribution information, where the sum of the error probabilities of each frame is 62%. The correction unit 24 performs a process of multiplying the error probability value of each frame by a fixed numerical value so that the sum of the error probabilities becomes 100% (see Fig. 11(b)). By performing such a process, the discharge plan is corrected using the distribution information. When performing the discharge plan, the power can be allocated without changing the total amount of the planned discharge amount. That is, the discharge plan can be corrected without changing the total amount of power planned to be supplied from the secondary battery 11 in the original discharge plan. This prevents the occurrence of a situation in which, for example, even though discharging is planned for a late time period in the corrected discharge plan, the power stored in the secondary battery 11 is insufficient to supply power, or power remains in the secondary battery 11 at the end of the discharge plan.
[0087] The correction unit 24 performs a process of correcting the discharge plan based on the calculated distribution information (S150) (plan correction step). The correction unit 24 performs a process of distributing the initial planned discharge value of the time period in which the secondary battery 11 is scheduled to supply power to the load equipment 30 in the discharge plan to adjacent time periods based on the distribution information. Furthermore, when power from other time periods is distributed to the same time period, the correction unit 24 performs a process of adding up the distributed power to correct the initial plan.
[0088] After the correction unit 24 corrects the original plan, the planned discharge amount for each time period (time frame) is expressed by the following formula.
number
[0089] In the above formula, P indicates the number of frames counted from the frame of the reference time (frame at 0:00). Xp indicates the amount of power to be supplied from the secondary battery 11 to the load equipment 30 in the Pth frame (Pth time slot) in the original plan. Y i (i=-a,-a+1,...,-1,0,+1...,+a-1,+a) indicates the distribution information. Xp' indicates the corrected amount of power to be supplied from the secondary battery 11 to the load equipment 30 in the Pth frame (Pth time period) after the correction process by the correction unit 24 is performed.
[0090] A specific description will be given with reference to the examples shown in Fig. 12 and Fig. 13. In the initial plan, as shown in Fig. 12(a), a discharge plan is created in which the planned discharge amount is allocated to the P-1th frame, 100 [kW] to the Pth frame, and 80 [kW] to the P+1th frame (see Fig. 13(a)). In addition, based on the error distribution information, the allocation information is calculated as shown in Fig. 12(b). In this allocation information, 50% is set to the predicted peak time (frame 0), 25% to the frame that has transitioned one frame before the predicted peak time (frame -1), and 25% to the frame that has transitioned one frame after the predicted peak time (frame +1).
[0091] When the correction unit 24 performs the correction process according to the above formula, a calculation based on the distribution information is performed for each frame in the discharge plan, and the results of the calculation are added to correct the original plan. The discharge plan after the correction is shown in Figure 12(c) and Figure 13(b).
[0092] When the correction process is completed, the correction unit 24 stores the corrected discharge plan in the storage unit 26. The correction unit 24 may perform a process of outputting the corrected discharge plan directly to the control unit 27. The control unit 27 outputs a signal to control the secondary battery 11 to the control device 13 according to the corrected discharge plan. The control device 13 performs control so that a predetermined amount of power is supplied from the secondary battery 11 to the load equipment 30 via the power conversion device 12 in a predetermined time period (time frame) according to the received corrected discharge plan.
[0093] 1-3 Explanation of effects According to the secondary-battery management device 20 configured as above, the correction unit 24 corrects the discharge plan created by the plan creation unit 23 based on the error distribution information. Therefore, even if the actual peak time differs from the predicted peak time, it is possible to suppress the peak power.
[0094] Furthermore, the error calculation unit 25 performs a process of calculating error distribution information based on performance information based on a plurality of past operation cycles and power reception prediction information corresponding to the performance information. That is, the error calculation unit 25 calculates based on information on the actual peak time obtained from the past performance information and information on the predicted peak time in the past corresponding to the performance information. That is, the initial discharge plan is corrected based on the error distribution information calculated based on the past performance.
[0095] As a result, the discharge plan can be appropriately and accurately corrected based on information reflecting actual results, and peak power can be more reliably suppressed even if the time when the actual received power peaks differs from the predicted time.
[0096] In addition, in the correction process, the correction unit 24 calculates allocation information based on the error distribution information. This allocation information is information in which the prediction error is linked to an allocation ratio corresponding to the error probability of the prediction error. Then, the correction unit 24 performs a process of allocating the planned discharge amount set in a predetermined time slot of the original plan according to this allocation information. That is, the correction unit 24 performs a process of allocating the planned discharge amount allocated to a predetermined time slot of the original plan to a time slot shifted by a time frame corresponding to the magnitude of the prediction error, at an allocation ratio corresponding to the error probability of the prediction error.
[0097] In other words, the planned discharge amount set for a given time period in the discharge plan is allocated to a time period separated by the predicted error at a ratio that takes into account the error contained in the predicted time information and the possibility of the error occurring. Therefore, even if the actual peak time differs from the predicted peak time, it is possible to more reliably and effectively suppress peak power.
[0098] Furthermore, the correction unit 24 extracts information included in a time width determined according to a preset condition from the error distribution information to create the allocation information. Therefore, for example, it is possible to create the allocation information by excluding a prediction error having a small error probability and a large value. That is, it is possible to create the allocation information by excluding a prediction error of a large value that is considered to have occurred exceptionally, and a prediction error that is not expected to have a large effect on the correction process. Therefore, it is possible to perform the correction process of the discharge plan more appropriately. In addition, since the allocation information is created based on information within a certain range, the process can be simplified compared to the case where the allocation information is calculated using all of the error distribution information. That is, it is possible to reduce the processing load on the correction unit 24.
[0099] Second Embodiment Next, a secondary battery management device 20A according to a second embodiment of the present disclosure will be described. The basic configuration of the secondary battery management device 20A of this embodiment is similar to that of the first embodiment, but the processing performed after the correction processing of the discharge plan is different from that of the first embodiment. Therefore, in the following description, the same components as those of the first embodiment are given the same reference numerals and their description is omitted, and the description will be centered on the processing different from that of the first embodiment.
[0100] 2-1 Configuration Description The correction unit 24A of the secondary battery management device 20A in this embodiment has a function of reallocating the power exceeding the upper limit of the time period to another time period when the corrected discharge plan has a planned discharge amount exceeding the upper limit (predetermined threshold). Here, the upper limit is a value determined by the rated value of the power conversion device 12, etc., and is the maximum power from the secondary battery 11 that the power conversion device 12, etc., can accept when supplying power to the load equipment 30. This upper limit is an example of the predetermined threshold.
[0101] Even if power exceeding this upper limit is supplied from the secondary battery 11, for example, power exceeding the input rating of the power conversion device 12 is wasted without being converted to AC power. Therefore, in the corrected discharge plan, the correction unit 24A performs a process of reallocating the amount of power exceeding this upper limit to a time period in which the planned discharge amount has not reached the upper limit.
[0102] When performing this reallocation process, correction unit 24A performs a process of allocating power in order of smallest difference between the planned discharge amount and the upper limit (hereinafter also referred to as "reallocation process"). That is, correction unit 24A extracts time periods in the corrected discharge plan where a planned discharge amount that is less than the upper limit is set, and further compares the difference between the planned discharge amount and the upper limit for each time period, and ranks them in order of smallest difference. Then, according to this ranking, correction unit 24A performs a process of sequentially allocating the amount of power that exceeds the upper limit for the other time periods.
[0103] 2-2 Explanation of the action Next, the reallocation process performed by the corrector 24A will be described using the corrected discharge plan illustrated in FIG. 15(a) as an example.
[0104] The correction unit 24A performs a correction process (S150) and creates a corrected discharge plan, and then detects a time period in which the corrected planned discharge value (hereinafter also referred to as the "corrected planned discharge value") is set and a value exceeding the upper limit value is set (S160) (detection step).
[0105] In the example shown in Fig. 15(a), a corrected scheduled discharge value exceeding the upper limit of 20 [kW] is set for each time period between 9:30 and 11:30. Correction unit 24A detects the time period between 9:30 and 11:30 as a time period for which a corrected scheduled discharge value exceeding the upper limit is set, and performs a process of calculating the total amount of power that exceeds the upper limit of the corrected scheduled discharge value. Hereinafter, the total amount of power that exceeds the upper limit is also referred to as "surplus power."
[0106] Next, the correction unit 24A detects time periods for which a corrected scheduled discharge value that is less than the upper limit value is set, and performs a process of ranking the time periods based on the difference between the upper limit value and the corrected scheduled discharge value (S170) (ranking step). The correction unit 24A ranks the relevant time periods in ascending order of the difference between the upper limit value and the corrected scheduled discharge value.
[0107] In the example shown in Fig. 15(a), corrected scheduled discharge values that are less than the upper limit are set for the time slots from 8:00 to 9:00 and from 12:00 to 13:30. For this reason, correction unit 24A extracts each time slot and performs a ranking process based on the difference between the corrected scheduled discharge value and the upper limit for each time slot. Correction unit 24A ranks the time slots in ascending order of difference as follows: 1st: "8:30 time slot", 2nd: "13:30 time slot", 3rd: "12:00 time slot", 4th: "8:00 time slot", 5th: "9:00 time slot", and 6th: "12:30 time slot".
[0108] Next, the correction unit 24A performs a process of allocating the surplus power according to the above-mentioned ranking. First, the correction unit 24A allocates the surplus power to the first time slot, "8:30 time slot," and performs a process of setting the planned discharge amount for that time slot to the same value as the upper limit value (S180). After allocating the surplus power to the "8:30 time slot," if there is any surplus power left (No in S190), the correction unit 24A performs a process of allocating the remaining power to the second time slot, "13:30 time slot." The correction unit 24A repeats the above process until the value of the surplus power becomes 0.
[0109] The correction unit 24A terminates the reallocation process when the value of the surplus power becomes 0, that is, when there are no more time periods in which the set planned discharge amount value exceeds the upper limit value (Yes in S190) (see Figure 15 (b)).
[0110] 2-3 Explanation of effects According to the secondary battery management device 20 configured as described above, if there is a time period in the corrected discharge plan in which a corrected scheduled discharge value that is equal to or greater than the upper limit is set, the correction unit 24 performs a process of reallocating the surplus power that exceeds the upper limit. Specifically, the correction unit 24 performs a reallocation process in which the surplus power is reallocated to a time period in which a corrected scheduled discharge value that does not reach the upper limit is set. This makes it possible to suppress peak power without wasting the power stored in the secondary battery 11.
[0111] This reallocation process is performed in the order of the smallest difference between the upper limit and the corrected discharge schedule value of the time period that has not yet reached the upper limit. That is, the surplus power is allocated in the order of the time period in which the corrected discharge schedule value closest to the upper limit is set. In the corrected discharge plan, the time period in which the corrected discharge schedule value closest to the upper limit is set can be determined as the time period in which the received power value is likely to be the peak power reception value. Therefore, by preferentially allocating the surplus power from the time period in which it is determined that the received power value is likely to be the peak power reception value, the power stored in the secondary battery 11 can be efficiently used to suppress the peak power. In addition, since the reallocation process increases the time period in which power is supplied from the secondary battery 11 at the upper limit, it is expected that the power conversion efficiency of the power conversion device 12 will be improved and the power stored in the secondary battery 11 will be efficiently used.
[0112] The technical scope of the present disclosure is not limited to the above-described embodiments, and various modifications can be made without departing from the spirit and scope of the present disclosure.
[0113] For example, in the above embodiment, when the correction unit 24 performs a process of extracting information used for calculating the allocation information from the error distribution information, an example is described in which the number of frames a that satisfies the coverage rate C is selected, but the present invention is not limited to this. For example, the correction unit 24 may perform a process of extracting information included in a time width previously set by the user from the error distribution information. Alternatively, the correction unit 24 may perform a process of extracting information included in a number of frames previously set by the user from the error distribution information. Alternatively, the correction unit 24 may perform a process of extracting information included in a time width determined by other conditions related to the error distribution information previously set by the user.
[0114] Furthermore, the present disclosure is not limited to the above-mentioned embodiments as long as it is consistent with the gist of the disclosure described in the above-mentioned embodiments. Therefore, the present disclosure may be a configuration in which at least two of the above-mentioned embodiments are combined, or a configuration in which any of the components illustrated or the components described with reference numerals in the above-mentioned embodiments are eliminated. [Explanation of symbols]
[0115] 1... Power management system 10... Power supply equipment 11... Secondary battery 12...Power conversion device 13...Control device 20, 20A... Secondary battery management device 21... Power reception prediction unit 22... Peak prediction unit 23: Plan creation section 24, 24A: Correction section 25: Error calculation section 26: Memory unit 27: Control unit 30: Load equipment 40: Data server 50…Commercial power supply
Claims
1. a power reception prediction unit that calculates a power reception prediction value, which is a prediction value at any time of a power reception power value, which is a power value of power received by a consumer from a commercial power source, and creates power reception prediction information that indicates a time change of the power reception prediction value; a peak prediction unit that performs processing to calculate, based on the power reception prediction information, predicted time information including a predicted peak time at which the power reception value is predicted to reach a power reception peak that satisfies a predetermined condition; a plan creation unit that creates a discharge plan for a secondary battery that supplies power to the consumer based on the power reception prediction information and the predicted time information; A correction unit that performs a correction process to correct the discharge plan; Equipped with The correction unit performs the correction process based on error distribution information including an error value that is a difference between a peak time that is a time when the received power value actually reaches the received power peak and the predicted peak time, and an error occurrence probability that is a probability that the error value occurs. Secondary battery management device.
2. An error calculation unit that calculates the error distribution information based on actual data indicating an actual change over time of the received power value and the power reception prediction data corresponding to the actual data. The secondary battery management device according to claim 1 .
3. the error distribution information is information in which a plurality of the error values are associated with the respective error occurrence probabilities, the discharge plan is information in which a discharge time set as a time at which a predetermined power is discharged is associated with a planned discharge value set as a power value of power discharged from the secondary battery at the discharge time, The correction unit performs the correction process by distributing at least a part of the scheduled discharge value set at a predetermined time in the discharge plan to a time away from the predetermined time by a time corresponding to the error value in accordance with distribution information calculated based on the error distribution information, The distribution information is information in which the error value is associated with a distribution ratio set corresponding to each of the error occurrence probabilities. The secondary battery management device according to claim 2 .
4. the distribution information is calculated based on information extracted from the error distribution information based on a time width determined in accordance with a preset condition; The secondary battery management device according to claim 3 .
5. The correction unit is In the discharge plan corrected by the correction process, when there is a time when the corrected scheduled discharge value, which is the corrected scheduled discharge value, is equal to or greater than a predetermined threshold value, a reallocation process is performed in which the power of the difference between the corrected scheduled discharge value at that time and the predetermined threshold value is allocated to another time when the corrected scheduled discharge value that does not exceed the predetermined threshold value is set, according to an order determined based on the difference between the predetermined threshold value and the corrected scheduled discharge value at the other time. The secondary battery management device according to claim 3 or 4.
6. A secondary battery management method for managing a secondary battery that supplies power to a consumer using an electronic computing device, comprising: a power reception prediction step of calculating a power reception prediction value, which is a prediction value at an arbitrary time of a power reception power value, which is a power value of power received by the consumer from a commercial power source, and generating power reception prediction information indicating a time change of the power reception prediction value; a peak prediction step of calculating, based on the power reception prediction information, predicted time information including a predicted peak time at which the power reception prediction value is predicted to reach a power reception peak that satisfies a predetermined condition; a plan creation step of performing a process of creating a discharge plan for the secondary battery based on the power reception prediction information and the predicted time information; A plan correction step of performing a correction process to correct the discharge plan; Including, The plan correction step performs the correction process based on error distribution information including an error value, which is a difference between a peak time at which the received power value actually reaches the received power peak and the predicted peak time, and an error occurrence probability, which is a probability that the error value occurs. Secondary battery management method.
7. For electronic computing devices, a power reception prediction function that calculates a power reception prediction value, which is a prediction value at any time of a power reception power value, which is a power value of power received by a consumer from a commercial power source, and performs processing to create power reception prediction information that indicates a time change of the power reception prediction value; a peak prediction function for performing a process of calculating, based on the power reception prediction information, predicted time information including a predicted peak time at which the power reception prediction value is predicted to reach a power reception peak that satisfies a predetermined condition; a plan creation function that creates a discharge plan for a secondary battery that supplies power to the consumer based on the power reception prediction information and the predicted time information; A plan correction function that performs a correction process to correct the discharge plan; A program for achieving the above, The plan correction function performs the correction process based on error distribution information including an error value, which is a difference between a peak time at which the received power value actually reaches the received power peak and the predicted peak time, and an error occurrence probability, which is a probability that the error value occurs. program.
Citation Information
Patent Citations
Device, method and program for prediction of power demand peak
JP2015139283A
Power load leveling device
JP2016116401A
Power demand management device and power demand management method
JP2017103846A
Power control value calculation apparatus, power control value calculation method, and program
JP2017153234A
Power storage control device
JP2019161843A