The liquid ejection apparatus addresses nozzle damage from leakage currents by employing a controlled voltage approach, applying a lower voltage for leakage detection to minimize damage and ensure accurate inspection without nozzle degradation.

JP2024143005APending Publication Date: 2024-10-11BROTHER KOGYO KK
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023055455
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

Existing liquid ejection devices face the risk of significant damage to nozzles due to leakage currents when high voltages are applied during leakage current determination processes, as the voltage levels are not differentiated from those used in abnormal nozzle inspections.

Method used

A liquid ejection apparatus with a control unit that applies a first voltage for nozzle inspection and a second, lower voltage for leakage current detection, reducing the risk of nozzle damage by minimizing leakage current magnitude during the detection process.

Benefits of technology

The solution effectively determines leakage currents without causing substantial damage to the nozzles by using a lower voltage during leakage current detection, thereby reducing the risk of nozzle failure and maintaining device integrity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024143005000001_ABST
    Figure 2024143005000001_ABST
Patent Text Reader

Abstract

To suppress leak currents from damaging a nozzle.SOLUTION: A liquid discharge device is provided with: a liquid discharge head having a nozzle, which makes the nozzle discharge liquid; an electrode; a voltage applying part that applies a voltage to the liquid discharge head or the electrode as an application target, so as to generate a potential difference between the liquid discharge head and the electrode; a signal output part that outputs a signal according to an electrical change in the electrode; and a control part. The control part executes: an abnormal nozzle inspecting process for making the liquid discharge head perform driving for making the nozzle discharge liquid toward the electrode, while controlling the voltage applying part so that a first voltage is applied to the application target, so as to inspect whether the nozzle is an abnormal nozzle or not on the basis of a signal obtained from the signal output part; and a voltage inspecting process for determining whether a predetermined voltage is maintained or not, on the basis of the signal obtained from the signal output part without making the liquid discharge head perform the driving, while controlling the voltage applying part so that a second voltage lower than the first voltage is applied to the application target.SELECTED DRAWING: Figure 5
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a liquid ejection device. [Background technology]

[0002] As a liquid ejection device that ejects liquid from a nozzle, Patent Document 1 discloses a printer that ejects ink from the nozzles of an inkjet head to record an image. In the printer of Patent Document 1, a high voltage (e.g., 600 V) is applied to the electrode to generate a potential difference between the inkjet head and the electrode, and the inkjet head is driven so that ink is ejected from the nozzle toward the electrode in the applied state. Then, a signal corresponding to the electrical change in the electrode is obtained, and based on the signal, an inspection is performed to determine whether or not the nozzle is abnormal, that is, the nozzle does not eject ink.

[0003] Furthermore, the printer of Patent Document 1 executes a leak determination process to determine whether or not a leak current flows between the inkjet head and the electrodes when the above-mentioned voltage application state is established. In the leak determination process, similar to the above-mentioned inspection for abnormal nozzles, a signal corresponding to an electrical change in the electrodes is acquired without driving the inkjet head in a voltage application state in which a high voltage is applied to the electrodes, and whether or not a leak current flows is determined based on the signal. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent Publication No. 2022-158052 Summary of the Invention [Problem to be solved by the invention]

[0005] Here, in the printer of Patent Document 1, the voltage applied to the electrodes in the leak current determination process is the same voltage as the voltage applied when inspecting for abnormal nozzles, so when a leak current flows in the leak current determination process, there is a risk that a large leak current will flow and cause severe damage to the nozzle.

[0006] SUMMARY OF THE PRESENT EMBODIMENT An object of the present invention is to provide a liquid ejection device capable of suppressing damage to nozzles caused by leakage current. [Means for solving the problem]

[0007] In order to solve the above problems, the liquid ejection device of the present invention comprises a liquid ejection head having a nozzle and ejecting liquid from the nozzle, an electrode, a voltage application unit which applies a voltage to the application destination, with the liquid ejection head or the electrode as the application destination, thereby generating a potential difference between the liquid ejection head and the electrode, a signal output unit which outputs a signal corresponding to an electrical change in the electrode, and a control unit, wherein the control unit controls the voltage application unit to apply a first voltage to the application destination, and performs an abnormal nozzle inspection process which drives the liquid ejection head to eject liquid from the nozzle toward the electrode based on the signal obtained from the signal output unit and inspects whether the nozzle is an abnormal nozzle based on the signal obtained from the signal output unit, and a voltage inspection process which controls the voltage application unit to apply a second voltage lower than the first voltage to the application destination, and determines whether a predetermined voltage is maintained based on the signal obtained from the signal output unit without driving the liquid ejection head. Effect of the Invention

[0008] According to the present invention, by determining whether a predetermined voltage is maintained in the voltage inspection process, it is possible to grasp whether a leakage current of a predetermined level or more is flowing. Also, in the voltage inspection process, a voltage lower than that in the abnormal nozzle inspection process is applied to the application destination. Therefore, even if a leakage current flows during the execution of the voltage inspection process, the magnitude of the leakage current can be reduced, thereby suppressing damage to the nozzle caused by the leakage current. [Brief description of the drawings]

[0009] [Figure 1] 1 is a schematic configuration diagram of an inkjet printer according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a block diagram illustrating an electrical configuration of the inkjet printer. [Diagram 3] FIG. 2 is a diagram illustrating a configuration of a testing circuit. [Figure 4] 1A is a diagram for explaining the signal output from the high-pass filter to the amplifier circuit when ink is not ejected from the nozzle by the ejection drive, FIG. 1B is a diagram for explaining the signal output from the high-pass filter to the amplifier circuit when ink is ejected from the nozzle by the ejection drive, and FIG. 1C is a diagram for explaining the ejection detection signal output from the amplifier circuit. [Diagram 5] 10 is a flowchart illustrating a process performed when an inspection instruction signal is received. [Figure 6] FIG. 13 is a diagram illustrating a leakage current detection processing related table. [Figure 7] 13 is a flowchart illustrating a process performed when an inspection instruction signal is received according to a modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] A schematic configuration of an inkjet printer 1 (corresponding to a "liquid ejection device") according to a preferred embodiment of the present invention will be described. As shown in FIG. 1, the printer 1 includes a platen 2, a carriage 3, a holder 4, a head unit 5, transport rollers 6 and 7, a maintenance unit 8, an inspection circuit 40 (see FIG. 2), and a control device 100 (see FIG. 2). In the following, the front side of the paper in FIG. 1 is defined as the "upper side" of the printer 1, and the rear side of the paper is defined as the "lower side" of the printer 1. The front-rear and left-right directions shown in FIG. 1 are defined as the "front-rear direction" and the "left-right direction" of the printer 1. In the following, the directional terms front-rear, left-right, and up-down will be used appropriately.

[0011] A sheet of paper P, which is a recording medium, is placed on the upper surface of the platen 2. In addition, above the platen 2, two guide rails 18 and 19 are provided which extend parallel to each other in the left-right direction (scanning direction).

[0012] The carriage 3 is attached to two guide rails 18, 19, and is movable in the scanning direction along the two guide rails 18, 19 in an area facing the platen 2. A drive belt 11 is also attached to the carriage 3. The drive belt 11 is an endless belt wound around two pulleys 12, 13. One of the pulleys, the pulley 12, is connected to a carriage drive motor 14 (see FIG. 2). The pulley 12 is driven to rotate by the carriage drive motor 14, causing the drive belt 11 to run, thereby causing the carriage 3 to reciprocate in the scanning direction. At this time, the head unit 5 mounted on the carriage 3 also reciprocates in the scanning direction together with the carriage 3.

[0013] The holder 4 is disposed in front of the carriage 3 and to the right of the platen 2. Four ink cartridges 15 are removably attached to the holder 4. The four ink cartridges 15 store black, yellow, cyan, and magenta ink (corresponding to "liquid"), respectively.

[0014] The head unit 5 is mounted on the carriage 3 with a gap between it and the platen 2, and moves back and forth in the scanning direction together with the carriage 3. The head unit 5 has an inkjet head 20 (corresponding to a "liquid ejection head"; hereinafter, simply referred to as the "head 20") and a buffer tank 25 that is provided on the upper surface of the head 20 and temporarily stores ink to be supplied to the head 20. One end of each of four flexible ink supply tubes 26 is detachably connected to the buffer tank 25. The other end of each of the four ink supply tubes 26 is connected to the holder 4. The ink in the four ink cartridges 15 attached to the holder 4 is supplied to the buffer tank 25 via the four ink supply tubes 26.

[0015] The head 20 has a flow path unit 21 and an actuator 22 (see FIG. 2). The flow path unit 21 is made of a metal material and is connected to the ground. The lower surface of the flow path unit 21 is a nozzle surface 20a (see FIG. 3) on which a plurality of nozzles 10 are formed. This nozzle surface 20a is parallel to the horizontal plane. The flow path unit 21 also has an internal flow path formed therein that communicates with the plurality of nozzles 10. This internal flow path is connected to a buffer tank 25, and the plurality of nozzles 10 eject ink supplied from the buffer tank 25 via the internal flow path downward.

[0016] The nozzle surface 20a has four nozzle rows 9 aligned in the scanning direction formed thereon. The four nozzle rows 9 eject black, yellow, cyan, and magenta inks in that order from the nozzle row 9 located on the right side.

[0017] The actuator 22 generates ejection energy for ejecting ink individually from each nozzle 10. For example, the actuator 22 applies pressure to the ink by changing the capacity of a pressure chamber (not shown) that communicates with the nozzle 10, or applies pressure to the ink by generating air bubbles in the pressure chamber by heating. However, since the configuration of the actuator 22 itself is known, further detailed description will be omitted here.

[0018] The transport rollers 6, 7 are synchronously driven to rotate by a transport motor 16 (see FIG. 2). The transport rollers 6, 7 work together to transport the paper P placed on the platen 2 in the transport direction shown in FIG.

[0019] The maintenance unit 8 is used to perform maintenance operations to maintain and recover the ejection function of the nozzles 10 of the head 20, and includes a cap 30, a suction pump 31, a waste liquid tank 32, a wiper mechanism 33 (corresponding to a "cleaning means"), etc.

[0020] The cap 30 is disposed at a position on one side of the platen 2 in the scanning direction (the right side in FIG. 1). When the carriage 3 moves to the right of the platen 2 and is positioned at the standby position, the multiple nozzles 10 of the head 20 and the cap 30 face each other vertically. The cap 30 is driven by a cap drive motor 34 (see FIG. 2) and can be raised and lowered in the vertical direction. When the carriage 3 is positioned at the standby position so that the multiple nozzles 10 and the cap 30 face each other, the cap drive motor 34 raises the cap 30, so that the upper end of the cap 30 comes into close contact with the nozzle surface 20a, and the multiple nozzles 10 are covered by the cap 30 in a capped state. When the cap drive motor 34 lowers the cap 30, the multiple nozzles 10 are not covered by the cap 30 in an uncapped state. The cap 30 is not limited to a cap that covers the multiple nozzles 10 by coming into close contact with the nozzle surface 20a. The cap 30 may cover the multiple nozzles 10, for example, by being attached closely to a frame (not shown) or the like that is arranged around the nozzle surface 20a of the head 20. The cap drive motor 34 corresponds to the "switching means."

[0021] The suction pump 31 is a tube pump or the like, and is connected to the cap 30 and the waste liquid tank 32. In the maintenance unit 8, when the suction pump 31 is driven in the above-mentioned capped state, it is possible to perform a so-called suction purge, in which ink is discharged from inside the head 20 through the multiple nozzles 10. The ink discharged by the suction purge is stored in the waste liquid tank 32.

[0022] For convenience, the cap 30 covers all the nozzles 10 together, and ink in the head 20 is discharged from all the nozzles 10 during suction purge. However, the present invention is not limited to this. For example, the cap 30 may have a portion covering the nozzles 10 constituting the rightmost nozzle row 9 that ejects black ink and a portion covering the nozzles 10 constituting the three leftmost nozzle rows 9 that eject color inks, i.e., yellow, cyan, and magenta inks, separately, so that either the black ink or the color ink in the head 20 can be selectively discharged during suction purge. Alternatively, for example, the cap 30 may be provided for each nozzle row 9, and ink can be discharged from the nozzles 10 for each nozzle row 9 individually during suction purge.

[0023] An electrode 41 having a rectangular planar shape is housed within the cap 30. The electrode 41 constitutes an inspection circuit 40 (FIG. 2). Although details will be described later, the control device 100 (see FIG. 2) controls the inspection circuit 40 to determine whether or not the nozzle 10 is an abnormal nozzle, detect leakage current flowing between the head 20 and the electrode 41, and so on.

[0024] The wiper mechanism 33 is disposed at a position sandwiched between the platen 2 and the cap 30 in the left-right direction. The wiper mechanism 33 includes a wiper 35, a wiper lift mechanism 36, and a wiper lift motor 37 (see FIG. 2). The wiper 35 is a flexible plate-like member made of an elastic material such as rubber. The wiper 35 is formed to be longer than the nozzle surface 20a in the front-rear direction.

[0025] The wiper lift mechanism 36 is a cam mechanism for raising and lowering the wiper 35. The wiper lift motor 37 is a motor for driving the wiper lift mechanism 36. Under the control of the control device 100, the wiper lift motor 37 rotates to drive the wiper lift mechanism 36, and the wiper 35 rises and falls. As a result, the wiper 35 selectively takes an elevated position where its tip is positioned above the nozzle surface 20a, and a lowered position where its tip is positioned below the nozzle surface 20a.

[0026] The printer 1 can execute a wiping process to wipe the nozzle surface 20a. Specifically, with the cap 30 in the uncapped state and the wiper 35 in the raised position, the carriage 3 is moved leftward from the standby position. At this time, the wiper 35 moves relative to the head 20 and comes into sliding contact with the nozzle surface 20a. This wipes off the ink adhering to the nozzle surface 20a.

[0027] As shown in FIG. 2, the control device 100 (corresponding to a "control unit") includes a CPU (Central Processing Unit) 101, a ROM (Read Only Memory) 102, a RAM (Random Access Memory) 103, a flash memory 104, an ASIC (Application Specific Integrated Circuit) 105, and the like. The ROM 102 stores programs executed by the CPU 101, various fixed data, and the like. The RAM 103 temporarily stores data and image data required when executing the programs. The flash memory 104 stores data such as various tables. The ASIC 105 is connected to various devices or drive units of the printer 1, such as the head 20, the carriage drive motor 14, the conveyor motor 16, the suction pump 31, the cap drive motor 34, the wiper lift motor 37, the inspection circuit 40, and the communication interface 110.

[0028] In addition, the control device 100 may be one in which only the CPU 101 performs various processes, or one in which only the ASIC 105 performs various processes, or one in which the CPU 101 and the ASIC 105 work together to perform various processes. In addition, the control device 100 may be one in which one CPU 101 performs processes independently, or one in which multiple CPUs 101 share the processes. In addition, the control device 100 may be one in which one ASIC 105 performs processes independently, or one in which multiple ASICs 105 share the processes.

[0029] The control device 100 executes various processes using the CPU 101 and ASIC 105 in accordance with the programs stored in the ROM 102. For example, when the control device 100 receives a recording command from the external device 200 via the communication interface 110, it executes a recording process that alternates between a discharge process and a conveying process. The discharge process is a process of discharging ink from the nozzles 10 based on image data stored in the RAM 103 during one movement (pass) of the carriage 3 in the scanning direction. The conveying process is a process of conveying the paper P forward a predetermined amount by the conveying rollers 6, 7. Thus, the printer 1 of this embodiment is a serial type inkjet printer.

[0030] The control device 100 also controls the head 20 and the inspection circuit 40 to perform a nozzle inspection process (corresponding to an "abnormal nozzle inspection process") for inspecting each of the nozzles 10 of the head 20 to determine whether the nozzle 10 is an abnormal nozzle that cannot normally eject ink. Specifically, in the nozzle inspection process, the control device 100 sets the head 20 in the capped state and applies a voltage to the electrode 41 to create a potential difference between the head 20 and the electrode 41. Then, the control device 100 causes the actuator 22 of the head 20 to perform an ejection drive to eject ink from the nozzle 10 toward the electrode 41, and inspects whether the nozzle 10 is an abnormal nozzle based on an ejection signal output from the inspection circuit 40 in response to a change in the voltage of the electrode 41 at this time. In addition, in the above-mentioned applied state, the control device 100 performs a leak current detection process (corresponding to a "voltage inspection process") for detecting a leak current flowing between the head 20 and the electrode 41 based on a signal output from the inspection circuit 40 without causing the actuator 22 of the head 20 to perform an ejection drive.

[0031] (Test circuit 40) Next, the inspection circuit 40 will be described with reference to Fig. 3. The inspection circuit 40 has the above-mentioned electrode 41, a voltage application circuit 42 (corresponding to the "voltage application section"), a low-pass filter 43, a DC leak signal output section 44, a high-pass filter 45, an amplifier circuit 46, and an AC leak signal output section 47. The combination of the low-pass filter 43, the DC leak signal output section 44, the high-pass filter 45, the amplifier circuit 46, and the AC leak signal output section 47 corresponds to the "signal output section."

[0032] The voltage application circuit 42 is a circuit for applying a voltage to the electrode 41. The voltage application circuit 42 boosts an input voltage and outputs the boosted voltage, thereby applying the voltage to the electrode 41. The configuration and operation of the voltage application circuit 42 will be described in detail later.

[0033] The voltage application circuit 42 and the electrode 41 are connected via a low-pass filter 43. The low-pass filter 43 is a filter that attenuates frequency components higher than the cutoff frequency in the voltage fluctuation at the electrode 41 and outputs the components to the voltage application circuit 42. In other words, mainly the DC component of the voltage at the electrode 41 is output to the voltage application circuit 42 via the low-pass filter 43.

[0034] The DC leak signal output unit 44 is connected to a wiring branched from a wiring connecting the voltage application circuit 42 and the low-pass filter 43. Here, in the printer 1, for example, the electrode 41 and the head 20 may be electrically connected through the ink attached to the cap 30 and the ink in the nozzle 10 during suction purging, causing a DC leak current to flow between the electrode 41 and the head 20. When a DC leak current flows between the electrode 41 and the head 20, the voltage of the electrode 41 drops. Also, the larger the DC leak current, the larger the drop in the voltage of the electrode 41. Therefore, when the magnitude of the DC leak current flowing between the electrode 41 and the head 20 is less than a predetermined threshold Td, the electrode 41 is kept at a predetermined voltage (the voltage of the electrode 41 is within a predetermined range). On the other hand, when the magnitude of the DC leak current is equal to or greater than the threshold Td, the electrode 41 is not kept at a predetermined voltage.

[0035] The DC leak signal output unit 44 outputs to the control device 100 a DC leak signal according to the amount of voltage drop of the electrode 41 input through the low-pass filter 43 described above. The value of this DC leak signal increases as the DC leak current flowing between the electrode 41 and the head 20 increases. Therefore, the control device 100 can derive the magnitude of the DC leak current flowing between the electrode 41 and the head 20 from the DC leak signal.

[0036] The high-pass filter 45 is connected to a wiring branched off from the wiring connecting the electrode 41 and the low-pass filter 43. The amplifier circuit 46 is connected to the high-pass filter 45.

[0037] The high-pass filter 45 is a filter that attenuates the DC component of the voltage of the electrode 41, i.e., the high-voltage component of the voltage of the electrode 41. As a result, when a voltage fluctuation occurs in the electrode 41, the change in the voltage of the electrode 41 is output to the amplifier circuit 46 after the high-voltage component is removed by the high-pass filter 45. The voltage input from the high-pass filter 45 to the amplifier circuit 46 is amplified by the amplifier circuit 46 and output to the control device 100 as a discharge detection signal.

[0038] Here, a change in the voltage of the electrode 41 when the head 20 is driven to eject in the above-mentioned capped state in which a potential difference is generated between the head 20 and the electrode 41 by applying a voltage to the electrode 41 by the voltage application circuit 42 will be described. When ink is not ejected from the nozzle 10 by the ejection drive, the voltage of the electrode 41 hardly changes. When ink is ejected from the nozzle 10 by the ejection drive, the voltage of the electrode 41 changes. Furthermore, the change in the voltage of the electrode 41 at this time is rapid. Therefore, the high-frequency component of the voltage of the electrode 41 differs depending on whether or not ink is ejected from the nozzle 10 by the ejection drive.

[0039] As a result, when ink is not ejected from the nozzle 10 by the ejection drive, the signal output from the high-pass filter 45 to the amplifier circuit 46 and the ejection detection signal amplified and output by the amplifier circuit 46 become signals whose voltages barely change from V0, as shown in Fig. 4(a), where V0 is, for example, a voltage close to the ground potential.

[0040] On one hand, when ink is ejected from nozzle 10 by ejection driving and the voltage of electrode 41 changes, the signal output from high-pass filter 45 to amplifier circuit 46 becomes a signal whose voltage changes with respect to V0 as shown in Fig. 4(b). However, the amount of change in the voltage of electrode 41 when ink is ejected from nozzle 10 by ejection driving is smaller than the amount of change in the voltage of electrode 41 when an alternating leakage current flows between head 20 and electrode 41, as will be described later. Therefore, the signal output from high-pass filter 45 to amplifier circuit 46 when ink is ejected from nozzle 10 by ejection driving also becomes a signal with a small amount of voltage change as shown in Fig. 4(b).

[0041] Also, the ejection detection signal output from amplifier circuit 46 becomes a signal obtained by amplifying the signal in Fig. 4(b) as shown in Fig. 4(c). Therefore, the ejection detection signal from amplifier circuit 46 has a larger voltage change than the signal output from high-pass filter 45 to amplifier circuit 46. For example, the ejection detection signal when ink is ejected from nozzle 10 by ejection driving becomes a signal whose maximum value is larger than Vh1 (>V0) and whose minimum value is smaller than Vm1 (<V0).

[0042] Thus, the ejection detection signal becomes a signal indicating whether ink is ejected from nozzle 10 by ejection driving. Also, since the ejection detection signal is a signal amplified by amplifier circuit 46, it becomes a signal with a certain amount of voltage change when ink is ejected from nozzle 10 by ejection driving.

[0043] The AC leak signal output unit 47 is connected to a wiring branched from the wiring connecting the high pass filter 45 and the amplifier circuit 46. Here, in the printer 1, for example, the electrode 41 and the head 20 may be temporarily connected to each other through the ink attached to the cap 30 and the ink in the nozzle 10 during suction purging, causing an AC leak current to flow between the electrode 41 and the head 20. When an AC leak current flows between the head 20 and the electrode 41, the voltage of the electrode 41 changes, and the voltage output from the high pass filter 45 to the amplifier circuit 46 also changes. This voltage change is larger than the change in the voltage output from the high pass filter 45 to the amplifier circuit 46 when ink is ejected from the nozzle 10 by the above-mentioned ejection drive. When the magnitude of the AC leak current flowing between the electrode 41 and the head 20 is less than a predetermined threshold value Ta, the electrode 41 is maintained at a predetermined voltage. On the other hand, when the magnitude of the AC leak current is equal to or greater than the threshold value Ta, the electrode 41 is not maintained at a predetermined voltage.

[0044] The AC leak signal output unit 47 outputs to the control device 100 an AC leak signal that corresponds to the amount of change in the voltage output from the high-pass filter 45 to the amplifier circuit 46. The value of this AC leak signal increases as the AC leak current flowing between the electrode 41 and the head 20 increases. Therefore, the control device 100 can derive the magnitude of the AC leak current flowing between the electrode 41 and the head 20 from this AC leak signal.

[0045] As described above, the control device 100 can derive the DC and AC leakage currents flowing between the electrode 41 and the head 20 based on the DC leakage signal and the AC leakage signal output from the inspection circuit 40, and determine whether these leakage currents are equal to or greater than the predetermined thresholds Td, Ta. For convenience, the description will be given assuming that the DC and AC leakage currents are derived based on the DC leakage signal and the AC leakage signal output from the inspection circuit 40, but this is not limiting. Since the magnitudes of the DC leakage signal and the AC leakage signal are correlated with the magnitude of the leakage current, the control device 100 may be configured to obtain only the values ​​of the DC leakage signal and the AC leakage signal without deriving the DC and AC leakage currents, and compare the values ​​of these signals with a predetermined threshold. In other words, determining whether the DC and AC leakage currents derived based on the DC leakage signal and the AC leakage signal are equal to or greater than the thresholds Td, Ta is the same as determining whether the values ​​of the DC leakage signal and the AC leakage signal are equal to or greater than the predetermined thresholds (whether the electrode 41 is maintained at a predetermined voltage).

[0046] Here, the difference between the roles of the DC leak signal and the AC leak signal will be explained. When a voltage is applied to the electrode 41, two types of current leak from the electrode 41 to the metal part of the head 20 connected to the ground via the ink in the nozzle 10 are considered: short circuit and discharge. A short circuit is a leak that occurs mainly when the electrode 41 and the ink in the nozzle 10 are connected by an unintended ink path such as a liquid column formed between the electrode 41 and the nozzle 10, and is a leak in which a current continues to flow. A short circuit is detected by a DC leak signal. A discharge is a leak that occurs mainly when the ink path connected to the electrode 41 and the ink path connected to the nozzle 10 come close to each other, and is a leak in which a current flows only temporarily, which is shorter than a short circuit. A discharge is detected by an AC leak signal. In order to detect these two different types of leaks more accurately, a DC leak signal that has passed through a low-pass filter 43 and an AC leak signal that has passed through a high-pass filter 45 are output to the control device 100.

[0047] <Voltage application circuit> Next, a description will be given of the configuration of the voltage application circuit 42. As shown in Fig. 3, the voltage application circuit 42 has a first voltage input unit 51, a second voltage input unit 52, a voltage output unit 53, a plurality of charge pumps 54 connected in series, a switch element 55, and a PWM signal input unit 56.

[0048] The first voltage input unit 51 is connected to the power supply circuit 60 of the printer 1 and receives the power supply voltage. The power supply voltage is 50V or less. The second voltage input unit 52 is held at ground potential. The voltage output unit 53 is a section that outputs a voltage to be applied to the electrode 41, and is connected to the electrode 41 via the low-pass filter 43.

[0049] Each charge pump 54 has inputs 61a and 61b, outputs 62a and 62b, capacitors 63a and 63b, and diodes 64a and 64b.

[0050] In the charge pump 54 located closest to the input side (left side in FIG. 3) among the multiple charge pumps 54, the input section 61a is connected to the first voltage input section 51 via a resistor 80, and the input section 61b is connected to the second voltage input section 52. In the charge pumps 54 other than the charge pump 54 located closest to the input side among the multiple charge pumps 54, the input section 61a is connected to the output section 62a of the adjacent charge pump 54 on the input side (left side in FIG. 3), and the input section 61b is connected to the output section 62b of the adjacent charge pump 54 on the input side. The output section 62b of the charge pump 54 located closest to the output side (right side in FIG. 3) among the multiple charge pumps 54 is connected to the voltage output section 53. The output section 62a of the charge pump 54 located closest to the output side is not connected to other circuits, etc.

[0051] The capacitors 63a and 63b are ceramic capacitors. The capacitor 63a is connected between the input section 61a and the output section 62a. The capacitor 63b is connected between the input section 61b and the output section 62b. The cathode of the diode 64a is connected between the capacitor 63a and the output section 62a. The anode of the diode 64a is connected between the input section 61b and the capacitor 63b. The cathode of the diode 64b is connected between the capacitor 63b and the output section 62b. The anode of the diode 64b is connected between the capacitor 63a and the output section 62a.

[0052] The switch element 55 has a transistor 81 and resistors 82 and 83. In this embodiment, the transistor 81 is an NPN type transistor, but is not limited to this, and may be another transistor that can be switched on and off by a PWM signal, such as a PNP type transistor or a MOS-FET.

[0053] The collector of the transistor 81 is connected to the first voltage input unit 51 via a resistor 80. The base of the transistor 81 is connected to the PWM signal input unit 56 via a resistor 82. The emitter of the transistor 81 is held at the ground potential. In addition, the base and emitter of the transistor 81 are connected to each other via a resistor 83.

[0054] A PWM signal, which is a pulse signal, is input to the PWM signal input unit 56 from the control device 100. When the PWM signal is at a HIGH level, the transistor 81 is turned on, and the collector and emitter of the transistor 81 are conductive. When the PWM signal is at a LOW level, the transistor 81 is turned off, and the collector and emitter of the transistor 81 are insulated from each other. Here, the control device 100 can change the duty ratio, which is the ratio of the HIGH level period to the cycle of the PWM signal, and the frequency of the PWM signal.

[0055] Next, a description will be given of the operation of the voltage application circuit 42. In the voltage application circuit 42, when a PWM signal is input to the PWM signal input unit 56, the voltages input to the voltage input units 61 and 62 are boosted by the multiple charge pumps 54. Then, the boosted voltages are output from the voltage output unit 63.

[0056] The boosting in each charge pump 54 at this time will be described below. Here, as shown in Fig. 3, in the voltage application circuit 42, the voltage input to the first voltage input section 61 is Va, the voltage input to the input section 61b of a certain charge pump 54 is Vb, the voltage input to the input section 61a of this charge pump 54 is Vc, the voltage output from the output section 62a of this charge pump 54 is Vd, and the voltage output from the output section 62b of this charge pump 54 is Ve.

[0057] In this case, when the PWM signal input to the PWM signal input unit 56 repeatedly switches between HIGH and LOW, the charging state of the capacitors 63a, 63b and the discharging state of the capacitors 63a, 63b are switched. When the PWM signal switches from HIGH to LOW, the voltages Vc, Vd, and Ve increase. When the PWM signal switches from LOW to HIGH, the voltages Vc and Vd decrease. On the other hand, since the diode 64b is connected, when the PWM signal switches from LOW to HIGH and the voltage Vd decreases, the voltage Ve does not decrease but remains almost constant.

[0058] As a result, when the PWM signal repeatedly switches between HIGH and LOW, the voltages Vc and Vd alternate between decreasing and increasing, and the voltage when it increases gradually becomes larger. On the other hand, the voltage Ve increases gradually by alternately increasing and maintaining. The final voltage Ve varies depending on the duty ratio of the PWM signal, but its maximum value is about (Vb+Va). That is, one charge pump 54 can boost the voltage Vb input to the input section 61b to a maximum of about (Vb+Va) and output it from the output section 62b. Therefore, for example, if the voltage application circuit 42 has M charge pumps 54 and the voltage Vb input to the input section 61b of the charge pump 54 on the most input side is voltage Vb1, each of the M charge pumps 54 boosts the voltage Vb by about voltage Va, so that the voltage output section 63 outputs a maximum of about (Vb1+M×Va). In this embodiment, since the voltage Vb1 is 0V, the voltage output from the voltage output unit 63 is approximately (M×Va) at most. Furthermore, in this embodiment, since the voltage application circuit 42 has ten or more charge pumps 54, the power supply voltage Va input to the first voltage input unit 61 in the voltage application circuit 42 is boosted to ten times or more by these charge pumps 54. The control device 100 can adjust the voltage applied to the electrode 41 by changing at least one of the duty ratio and the frequency of the PWM signal.

[0059] As described above, by using a plurality of charge pumps 54 to boost the voltage, the voltage application circuit 42 can be made smaller than when a transformer is used to boost the voltage. Specifically, the area of ​​the circuit board can be made smaller when the voltage application circuit 42 is formed using a plurality of charge pumps 54 than when a transformer is used to form the voltage application circuit. Also, the charge pump 54 formed by the capacitors 63a, 63b and the diodes 64a, 64b can reduce the volume of the components arranged on the circuit board compared to a transformer, so that the amount of protrusion from the circuit board can be reduced.

[0060] Incidentally, in order to improve the inspection accuracy in the nozzle inspection process, it is preferable that the amount of change in voltage at the electrode 41 is large when ink is ejected from the nozzle 10 by the ejection drive. The magnitude of the amount of change in voltage at the electrode 41 increases as the voltage applied to the electrode 41 by the voltage application circuit 42 increases. Therefore, in this embodiment, when performing the nozzle inspection process, the voltage application circuit 42 applies a relatively high first voltage (500 V in this embodiment) to the electrode 41.

[0061] Before the nozzle inspection process, a leakage current detection process is performed to check whether or not a voltage drop occurs due to current leaking from the electrode 41 to the outside. By performing the leakage current detection process, it is possible to confirm that the voltage value of the electrode 41 is normal when the voltage application circuit 42 applies a voltage to the electrode 41 while the ejection drive is not being performed. At this time, in most cases where the voltage value is not normal, that is, when current is leaking, the leakage occurs via the ink in the nozzle 10. If a leakage current flows through the ink in the nozzle 10, the nozzle 10 may be damaged. More specifically, it is considered that a large current flows through the ink in the nozzle 10, causing ink components to precipitate and block the nozzle flow path. It is also considered that damage such as cracks and peeling may occur in the insulating film such as polyimide formed on the nozzle surface 20a. Due to these conditions, the nozzle 10 will not be able to eject normally. Therefore, when performing the leakage current detection process, the voltage application circuit 42 applies a second voltage lower than the first voltage to the electrode 41. The second voltage is set to, for example, a value equal to or less than half the value of the first voltage, and is 200V in this embodiment.

[0062] (Processing upon receipt of inspection instruction signal) Next, the process performed by the control device 100 when an inspection instruction signal is received to instruct whether or not the nozzle 10 is an abnormal nozzle will be described. When an inspection instruction signal is received, the control device 100 performs the process according to the flow of FIG. 5. For example, when a user operates an operation unit (not shown) of the printer 1 or an external device 200 connected to the printer 1 to instruct whether or not the nozzle 10 is an abnormal nozzle, an inspection instruction signal is transmitted from the operation unit, the external device 200, etc., and the control device 100 receives this inspection instruction signal. Alternatively, when a condition set for inspecting an abnormal nozzle is satisfied, such as when the power is turned on or a recording command is received, when a predetermined cycle has elapsed, when a predetermined time has arrived, or after an error has occurred, the control device 100 receives a signal according to the above-described condition as an inspection instruction signal.

[0063] 5 in more detail, when an inspection command signal is received, the control device 100 sets a variable N to 1 (S1). The variable N indicates the number of leakage current detection processes to be executed next (processing in S4 described later) after receiving the inspection command signal.

[0064] Next, the control device 100 executes the capping process (S2). In the capping process, the control device 100 controls the cap driving motor 34 to raise the cap 30, thereby bringing the cap into the above-mentioned capped state. However, if the capped state is established immediately before the capping process, the capping state is maintained in the capping process of S2. The same applies to the following capping processes.

[0065] Next, the control device 100 adjusts the duty ratio and frequency of the PWM signal output to the voltage application circuit 42 to apply a second voltage (200V in this embodiment) to the electrode 41 (S3). Next, the control device 100 detects a leak current based on the AC leak signal and the DC leak signal output from the inspection circuit 40 while the second voltage is applied to the electrode 41, without driving the actuator 22 of the head 20 to eject ink (S4). Specifically, the control device 100 determines the amount of voltage drop of the electrode 41 based on the DC leak signal output from the DC leak signal output unit 44, and derives the magnitude of the DC leak current based on the amount of drop. The control device 100 also determines the amount of change in the voltage of the electrode 41 based on the AC leak signal output from the AC leak signal output unit 47, and derives the magnitude of the AC leak current based on the amount of change.

[0066] Next, the control device 100 judges whether the DC leakage current derived in the process of S4 is equal to or greater than the threshold value Td (S5). If it is judged that the DC leakage current is equal to or greater than the threshold value Td (S5: YES), it is judged that a short circuit has occurred, and the process proceeds to S7. On the other hand, if it is judged that the DC leakage current is less than the threshold value Td (S5: NO), it is judged that a short circuit has not occurred, and the control device 100 judges whether the AC leakage current derived in the process of S4 is equal to or greater than the threshold value Ta (S6). If it is judged that the AC leakage current is less than the threshold value Ta (S6: NO), it is judged that a discharge has not occurred, and the process proceeds to S15 to perform a nozzle inspection process. On the other hand, if it is judged that the AC leakage current is equal to or greater than the threshold value Ta (S6: NO), it is judged that a discharge has occurred, and the process proceeds to S7.

[0067] In the process of S7, the control device 100 sets the duty ratio of the PWM signal output to the voltage application circuit 42 to 0, and cancels the application of voltage to the electrode 41. Next, the control device 100 judges whether the variable N is 2 or not (S8). If it is judged that the variable N is not 2 (is 1) (S8: NO), the control device 100 updates the variable N to [N+1] (S9). Thereafter, the control device 100 waits for a predetermined time (10 minutes in this embodiment) (S10). Thereafter, the control device 100 returns to the process of S3 to detect the leakage current again.

[0068] In the process of S8, when it is determined that the variable N is 2 (S8: YES), the control device 100 executes a cleaning process to remove ink that may be a cause of leak current without executing a nozzle inspection process. That is, the control device 100 first controls the cap drive motor 34 to lower the cap 30 to the above-mentioned uncapped state (S11). After this, the control device 100 executes an empty suction process to drive the suction pump 31 in the uncapped state (S12). This allows ink adhering to the inside of the cap 30 that may be a cause of leak current to be discharged to the waste liquid tank 32. Next, the control device 100 executes a wiping process to move the carriage 3 from the standby position to the left in a state where the wiper 35 is positioned at the raised position by controlling the wiper lift motor 37 (S13). This allows ink adhering to the nozzle surface 20a that may be a cause of leak current to be wiped off. Next, the control device 100 executes a capping process similar to the process of S2 (S14), and proceeds to the process of S15 to execute a nozzle inspection process.

[0069] In the process of S15, the duty ratio and frequency of the PWM signal output to the voltage application circuit 42 are adjusted to apply a first voltage (500 V in this embodiment) to the electrode 41. Next, the control device 100 executes a nozzle inspection process (S16). In the nozzle inspection process, the control device 100 controls the actuator 22 to drive each of the multiple nozzles 10 of the head 20 so as to eject ink, and acquires an ejection detection signal output from the inspection circuit 40. Then, the control device 100 determines whether or not each of the multiple nozzles 10 is an abnormal nozzle based on the acquired ejection detection signal.

[0070] Next, after removing the voltage from the electrode 41, the control device 100 judges whether or not there is an abnormal nozzle based on the results of the nozzle inspection process in S16 (S17). If there is no abnormal nozzle (S17: NO), the process ends. If there is an abnormal nozzle (S17: YES), the control device 100 controls the suction pump 31, etc. to execute a purge process that performs suction purging (S18), and ends the process.

[0071] As described above, according to this embodiment, in the leakage current detection process, a voltage lower than that in the nozzle inspection process is applied to the electrode 41. Therefore, even if a leakage current flows during the execution of the leakage current detection process, the magnitude of the leakage current can be reduced, thereby suppressing damage to the nozzle 10 caused by the leakage current.

[0072] In addition, in this embodiment, after receiving the inspection instruction signal, if the DC or AC leakage current detected in the leakage current detection process executed for the first time is equal to or greater than the threshold value Td, Ta, the leakage current detection process is executed again after a predetermined time has elapsed. Here, as time passes, the ink or the like in the cap 30 that caused the leakage current may move due to its own weight. That is, even if the DC or AC leakage current detected in the first leakage current detection process is equal to or greater than the threshold value Td, Ta, the DC and AC leakage currents may become less than the threshold value Td, Ta after a predetermined time has elapsed, so the second leakage current detection process is executed again after a predetermined time has elapsed. As a result, if the DC and AC leakage currents detected in the second leakage current detection process are less than the threshold value Td, Ta, it is possible to omit the cleaning process for removing the ink that causes the leakage current, such as the empty suction process or the wiping process.

[0073] Furthermore, in this embodiment, when an inspection command signal is received, a leak current detection process is executed before executing the nozzle inspection process. Then, if the DC and AC leak currents detected by the leak current detection process are less than the thresholds Td, Ta, the nozzle inspection process is executed, but if the DC or AC leak currents detected by the leak current detection process are equal to or greater than the thresholds Td, Ta, the nozzle inspection process is not executed, and a cleaning process is executed to remove ink that may be a cause of the leak current. Then, after this cleaning process is executed, the nozzle inspection process is executed. This makes it possible to reduce the possibility of a large leak current flowing when executing the nozzle inspection process.

[0074] <Modification> Although the preferred embodiments of the present invention have been described above, the present invention is not limited to the above-mentioned embodiments, and various modifications are possible within the scope of the claims.

[0075] Here, as described above, when the head 20 and the electrode 41 are connected by the ink in the cap 30, a leakage current flows even if the voltage applied to the electrode 41 is low, so it is possible to detect the leakage current. However, when the head 20 and the electrode 41 are not completely connected by the ink in the cap 30 and are partially interrupted, no leakage current flows when the voltage applied to the electrode 41 is low, but if the applied voltage is increased, a discharge may occur at the interrupted portion and a leakage current may flow. In other words, even if the DC and AC leakage currents flow less than the thresholds Td and Ta in the leakage current detection process, a large leakage current may flow in the nozzle inspection process in which a voltage higher than that in the leakage current detection process is applied to the electrode 41.

[0076] Therefore, in a modification described with reference to Fig. 6 and Fig. 7, the control device 100 performs a process to solve the above problem. That is, in this modification, when the control device 100 receives an inspection command signal, before performing a nozzle inspection process, the control device 100 executes a leakage current detection process multiple times (four times in this modification) by changing the value of the voltage applied to the electrode 41. As shown in Fig. 6, a leakage current detection association table is stored in the flash memory 104. In the leakage current detection association table, the value of the voltage applied to the electrode 41, the threshold value Td of the DC leakage current, and the threshold value Ta of the AC leakage current are associated with the value of the variable N. That is, in the leakage current detection association table, the value of the voltage applied to the electrode 41, the threshold value Td of the DC leakage current, and the threshold value Ta of the AC leakage current are associated with each leakage current detection process. For example, the first leakage current detection process in which the variable N is 1 is associated with a value of 200 V applied to the electrode 41, a DC leakage current threshold Td1, and an AC leakage current threshold Ta1. The second leakage current detection process in which the variable N is 2 is associated with a value of 400 V applied to the electrode 41, a DC leakage current threshold Td2, and an AC leakage current threshold Ta2.

[0077] As can be seen from FIG. 6, the later the leakage current detection process is performed, the higher the voltage value applied to the electrode 41. That is, the voltage value applied to the electrode 41 is 200V in the first leakage current detection process, 400V in the second, 500V in the third, and 600V in the fourth. In addition, in the fourth leakage current detection process, which is the last one, the voltage value applied to the electrode 41 is set higher than the first voltage (500V) applied to the electrode 41 in the nozzle inspection process. In addition, the later the leakage current detection process is performed, the higher the threshold value Td of the DC leakage current and the threshold value Ta of the AC leakage current are set. The second to fourth leakage current detection processes correspond to the "voltage re-inspection process". In addition, the threshold values ​​Td1 and Ta1 correspond to the "first threshold value", and the threshold values ​​Td2 to 4 and Ta2 to 4 correspond to the "second threshold value".

[0078] Next, a process according to a modified example, which is performed by the control device 100 when an inspection instruction signal is received, will be described. When an inspection instruction signal is received, the control device 100 performs a process according to the flow of FIG.

[0079] 7 in more detail, when receiving an inspection command signal, the control device 100 sets the variable N to 1 (A1), and then executes a capping process (A2). Next, the control device 100 refers to a leakage current detection related table stored in the flash memory 104, and extracts a voltage value, a threshold value Td, and a threshold value Ta corresponding to the variable N (A3). Next, the control device 100 adjusts the duty ratio and frequency of the PWM signal output to the voltage application circuit 42, and applies the voltage of the voltage value extracted in the process of A3 to the electrode 41 (A4). Next, the control device 100 performs a leakage current detection process similar to the process of S4 described above (A5).

[0080] Next, the control device 100 determines whether the DC leakage current derived in the process of A5 is equal to or greater than the threshold value Td extracted in the process of A3 (A6). If it is determined that the DC leakage current is equal to or greater than the threshold value Td (A6: YES), the process proceeds to A10. The processes of A10 to A18 are the same as the processes of S10 to S18 described above.

[0081] When it is determined in the process of A6 that the DC leakage current is less than the threshold value Td (A6: NO), the control device 100 determines whether or not the AC leakage current derived in the process of A5 is equal to or greater than the threshold value Ta extracted in the process of A3 (A7). When it is determined that the AC leakage current is equal to or greater than the threshold value Ta (A7: YES), the process proceeds to the process of A10. On the other hand, when it is determined that the AC leakage current is less than the threshold value Ta (A7: NO), the control device 100 determines whether or not the variable N is 4 (A8). When it is determined that the variable N is not 4 (3 or less) (A8: NO), the control device 100 updates the variable N to [N+1] (A9), and returns to the process of A3 to detect the leakage current again. On the other hand, when it is determined that the variable N is 4 in the process of A8 (A8: YES), the process proceeds to the process of A15 to execute the nozzle inspection process.

[0082] As described above, according to this modification, in the four leak current detection processes, the voltage applied to the electrode 41 becomes higher as the leak current detection process is performed later. That is, the voltage applied to the electrode 41 is gradually increased from a low voltage so that the leak current is more likely to occur. In addition, the second to fourth leak current detection processes are performed on the condition that the DC and AC leak currents detected in the previous leak current detection processes are less than the thresholds Td and Ta. For example, the third leak current detection process is performed on the condition that the DC and AC leak currents detected in the first and second leak current detection processes are less than the thresholds Td and Ta. Therefore, when the current is in a state where it is easy to flow, the leak current can be detected at a low voltage, and by gradually approaching the inspection voltage, the leak current can be detected at a lower voltage in between, so that damage to the nozzle 10 caused by the leak current can be suppressed.

[0083] Furthermore, according to this modification, when an inspection command signal is received, four leak current detection processes are executed before executing the nozzle inspection process. Then, the nozzle inspection process is executed only when all of the DC and AC leak currents detected by the four leak current detection processes are less than the thresholds Td, Ta set for the respective leak current detection processes. On the other hand, when the DC or AC leak current detected by any of the leak current detection processes is equal to or greater than the thresholds Td, Ta set for the leak current detection process, the nozzle inspection process is not executed, and a cleaning process is executed to remove ink that may be a cause of the leak current. Then, after the cleaning process, the nozzle inspection process is executed. This makes it possible to reduce the possibility of a large leak current flowing when executing the nozzle inspection process.

[0084] Furthermore, in the fourth leakage current detection process, a voltage (600V) higher than the voltage (500V) applied to electrode 41 in the nozzle inspection process is applied to electrode 41. This reduces the possibility that a leakage current larger than the leakage current detected in the fourth leakage current detection process will flow in the nozzle inspection process. Here, it is not necessarily necessary to apply a voltage (600V) higher than the voltage (500V) applied to electrode 41 in the nozzle inspection process, and it may be omitted.

[0085] As described above, in this modified example, it is possible to reduce the possibility of a large leakage current flowing in each of the four leakage current detection processes and in the nozzle inspection process.

[0086] In this modified example, when an inspection command signal is received, the leakage current detection process is executed up to four times, but this is not limited to the above. For example, the leakage current detection process may be executed up to two times. Furthermore, the voltage (third voltage) applied to the electrode 41 in the last leakage current detection process may be higher than the voltage (second voltage) applied to the electrode 41 in the first leakage current detection process, and may be equal to or lower than the voltage (first voltage) applied to the electrode 41 in the nozzle inspection process.

[0087] In addition, the value of the voltage applied to the electrode 41 is changed stepwise, but this is not limiting. It may be changed linearly or exponentially. In these cases, the thresholds Td and Ta may also be changed linearly or exponentially.

[0088] Moreover, the threshold values ​​Td1 to Td4 may be the same value, and the threshold values ​​Ta1 to Ta4 may be the same value.

[0089] Other modifications will be described below.

[0090] In the above-described embodiment, the voltage output from the voltage application circuit 42 is adjusted by changing at least one of the duty ratio and the frequency of the PWM signal, but this is not limiting. For example, a transformer may be provided between the first voltage input unit 51 of the voltage application circuit 42 and the power supply circuit 60, and this transformer may step up the voltage input from the power supply circuit 60 and output it to the first voltage input unit 51. In this configuration, the voltage output from the voltage application circuit 42 can be adjusted by changing the step-up rate in the transformer.

[0091] The voltage application circuit 42 is not limited to having a plurality of charge pumps 54, and may have one charge pump 54. In addition, the voltage application circuit 42 is configured to boost and output an input voltage using the charge pump 54, but is not limited to this. For example, the voltage application circuit 42 may be configured to boost and output an input voltage using a transformer. In addition, the voltage application circuit 42 may be a circuit capable of outputting only two types of voltages, a first voltage and a second voltage.

[0092] In the above embodiment, a potential difference is generated between the electrode 41 and the head 20 by applying a voltage to the electrode 41 by the voltage application circuit 42 and holding the head 20 at the ground potential, but this is not limiting. The electrode may be held at the ground potential and a voltage may be applied to the head 20 by the voltage application circuit 42.

[0093] Furthermore, in the above-described embodiment, the leakage current detection process is executed after the inspection command signal is received and before the nozzle inspection process is executed, but this is not limited to this and the process may be performed at another timing.

[0094] In the above embodiment, when the DC or AC leakage current detected by the leakage current detection process is equal to or greater than the threshold value Td, Ta, the wiping process and the idle suction process are performed, but this is not limited thereto. When the DC or AC leakage current is equal to or greater than the threshold value Td, Ta, only one of the wiping process and the idle suction process may be performed. When the DC or AC leakage current is equal to or greater than the threshold value Td, Ta, a purging process may be performed instead of the wiping process. By performing the purging process, foreign matter such as ink attached to the nozzle surface 20a can be removed, so that the ink that causes the leakage current can be removed. In this case, the cap 30 and the suction pump 31 correspond to the "cleaning means". When the DC or AC leakage current is equal to or greater than the threshold value Td, Ta, a notification unit such as a display or a speaker (not shown) may be used to notify the user that a large leakage current is flowing.

[0095] In the above embodiment, when the DC or AC leakage current detected by the leakage current detection process is equal to or greater than the threshold value Td, Ta, the wiping process and the idle suction process are performed, and then the nozzle inspection process is performed without performing the leakage current detection process again, but this is not limited to the above. After the wiping process and the idle suction process are performed, the leakage current detection process may be performed again, and after it is confirmed that the DC or AC leakage current is less than the threshold value Td, Ta, the nozzle inspection process may be performed. In this case, the possibility of a large leakage current flowing in the nozzle inspection process can be further reduced.

[0096] In the above embodiment, the electrode 41 is disposed inside the cap 30, but this is not limiting. For example, the electrode 41 may be disposed outside the cap 30. Even in this case, if the head 20 and the electrode 41 are close to each other, there is a risk of a leak current flowing between the head 20 and the electrode 41, and therefore it is necessary to detect the leak current.

[0097] In the above embodiment, whether or not ink has been ejected from the nozzle 10 is determined based on the ejection detection signal output from the inspection circuit 40, but this is not limiting. Whether or not there is another abnormality, such as an abnormality in the ink ejection direction, may also be determined based on the ejection detection signal output from the inspection circuit 40.

[0098] In the above embodiment, ejection drive is performed for all nozzles 10 of the head 20 to determine whether or not there is an abnormality in the nozzles 10, but this is not limited to the above. For example, ejection drive may be performed for only some of the nozzles 10 of the head 20, such as every other nozzle 10 in each nozzle row 9, to determine whether or not there is an abnormality in the nozzles 10. Then, for the other nozzles 10, it may be estimated whether or not there is an abnormality in the nozzles 10 based on the determination results for the above-mentioned some of the nozzles 10.

[0099] In the above embodiment, the voltage (first voltage) applied during the nozzle inspection process is fixed to 500V, but is not limited to this. Here, when a DC leakage current flows between the head 20 and the electrode 41, the voltage of the electrode 41 continues to drop. Therefore, the voltage output from the voltage application circuit 42 may be increased according to the magnitude of the DC leakage current indicated by the DC leakage signal output from the DC leakage signal output unit 44. More specifically, the voltage output from the voltage application circuit 42 may be increased by an amount that compensates for the voltage drop according to the leakage current. This makes it possible to suppress the voltage drop of the electrode 41 when a leakage current flows between the head 20 and the electrode 41.

[0100] 6 and 7, the voltage (first voltage) applied during the nozzle inspection process is fixed to 500V, but is not limited thereto. For example, a voltage of 200V is applied to the electrode 41 the first time of the leakage current detection process, a voltage of 400V is applied to the electrode 41 the second time, and a voltage of 500V is applied to the electrode 41 the third time. If a leakage current equal to or greater than the thresholds Td2 and Ta2 is not detected in the second leakage current detection process in which 400V is applied to the electrode 41, and a leakage current equal to or greater than the thresholds Td3 and Ta3 is detected in the third leakage current detection process in which 500V is applied to the electrode 41, the voltage (first voltage) applied to the electrode 41 during the nozzle inspection process may be lowered to 400V to perform the nozzle inspection process. If a leakage current equal to or greater than the thresholds Td4 and Ta4 is not detected in the fourth leakage current detection process in which 600V is applied to the electrode 41, the voltage (first voltage) applied during the nozzle inspection process may be increased to 600V to perform the nozzle inspection process. In other words, depending on the result of the leakage current detection process, the voltage (first voltage) applied during the nozzle inspection process may be changed as long as the voltage does not cause a leakage current of a predetermined level or more. The leakage current detection process may serve to confirm within what range the nozzle inspection process can be performed without causing a leakage current.

[0101] Furthermore, it is not necessary to have either the DC leak signal output section 44 or the AC leak signal output section 47. In other words, it is possible to detect only one of the DC leak current and the AC leak current.

[0102] The present invention can also be applied to a so-called line-type inkjet printer that prints an image on paper transported by a transport mechanism with the head fixed. Although an example of applying the present invention to a printer that ejects ink from a nozzle to record an image on paper has been described, the present invention is not limited to this. It can also be applied to a liquid ejection device that ejects liquid onto a recording medium other than paper P. For example, as described in JP 2017-144726 A, the stage on which the recording medium is placed can be moved in the transport direction, and the present invention can also be applied to a liquid ejection device that performs recording on a recording medium by alternately repeating the operation of ejecting ink from a nozzle while moving the head together with the carriage in the scanning direction and the movement of the stage. Examples of recording media in such printers include T-shirts and sheets for outdoor advertising. It can also be applied to a liquid ejection device that ejects liquid other than ink, such as a material for a wiring pattern, onto a wiring board to perform recording. It can also be applied to a liquid ejection device that ejects ink onto a case of a mobile terminal such as a smartphone, cardboard, resin, etc. to perform recording. [Explanation of symbols]

[0103] 1. Inkjet printer 10 Nozzles 20 Inkjet head 40 Test Circuit 41 electrode 42 Voltage application circuit 100 Control device

Claims

1. a liquid ejection head having a nozzle and ejecting liquid from the nozzle; An electrode; a voltage application unit that applies a voltage to the liquid ejection head or the electrode as an application destination to generate a potential difference between the liquid ejection head and the electrode; a signal output unit that outputs a signal corresponding to an electrical change in the electrode; A control unit; Equipped with The control unit is an abnormal nozzle inspection process for controlling the voltage application unit to apply a first voltage to the application destination, driving the liquid ejection head to eject liquid from the nozzle toward the electrode, and inspecting whether or not the nozzle is an abnormal nozzle based on the signal obtained from the signal output unit; a voltage inspection process for determining whether or not a predetermined voltage is maintained based on the signal acquired from the signal output unit without driving the liquid ejection head, in a state in which the voltage application unit is controlled to apply a second voltage lower than the first voltage to the application destination; and A liquid ejection apparatus comprising:

2. The control unit is When an instruction signal instructing execution of the abnormal nozzle inspection process is received, The voltage inspection process is performed before the abnormal nozzle inspection process is performed; When the value of the signal detected by the voltage inspection process is less than the threshold value, the abnormal nozzle inspection process is executed.

2. The liquid ejection device according to claim 1, wherein the abnormal nozzle inspection process is not executed when the value of the signal detected by the voltage inspection process is equal to or greater than the threshold value.

3. a cap in which the electrode is housed and which is capable of covering the nozzle; a switching means capable of switching between a capped state in which the nozzle is covered by the cap and an uncapped state in which the nozzle is not covered by the cap; a suction pump connected to the cap; Further equipped with The control unit is When the abnormal nozzle inspection process and the voltage inspection process are performed, the switching means is controlled to be in the capped state. When the signal detected by the voltage inspection process is equal to or greater than a threshold value, 2. The liquid ejection device according to claim 1, wherein the switching means is controlled so as to enter the uncapped state, and then an empty suction process is executed to drive the suction pump.

4. The control unit is When the signal detected by the voltage inspection process is equal to or greater than a threshold value, 2. The liquid ejection device according to claim 1, wherein the voltage inspection process is executed again after a predetermined time has elapsed.

5. the liquid ejection head has a nozzle surface on which the nozzles are formed, a cleaning unit capable of removing liquid adhering to the nozzle surface, The control unit is When the signal detected by the voltage inspection process is equal to or greater than a threshold value, The liquid ejection apparatus according to claim 1 , further comprising a cleaning process for controlling the cleaning means so as to remove liquid adhering to the nozzle surface.

6. The control unit is If the signal detected in the voltage inspection process is less than a threshold value, The liquid ejection device described in claim 1, characterized in that the voltage application unit is controlled to apply a third voltage higher than the second voltage to the destination, and a voltage re-examination process is performed to determine whether a specified voltage is maintained based on the signal obtained from the signal output unit without driving the liquid ejection head.

7. The control unit is When an instruction signal instructing execution of the abnormal nozzle inspection process is received, The voltage inspection process is performed before the abnormal nozzle inspection process is performed; When the signal detected by the voltage inspection process is less than a first threshold value as the threshold value, the voltage re-inspection process is executed before executing the abnormal nozzle inspection process; When the signal detected by the voltage re-check process is less than a second threshold value, the abnormal nozzle check process is executed; When the signal detected by the voltage inspection process is equal to or greater than the first threshold value, or when the signal detected by the voltage re-inspection process is equal to or greater than the second threshold value, the abnormal nozzle inspection process is not executed, The liquid ejection device according to claim 6 , wherein the first threshold value is lower than the second threshold value.

8. The liquid ejection apparatus according to claim 6 , wherein the third voltage is higher than the first voltage.

9. The voltage application unit includes: A liquid ejection device according to any one of claims 1 to 8, further comprising a charge pump including a capacitor and a diode, capable of boosting an input voltage, and applying the voltage boosted by the charge pump to the destination.

10. the voltage application unit includes a switch element that switches between a charging state of the capacitor and a discharging state of the capacitor by the voltage input to the charge pump; 10. The liquid ejection device according to claim 9, wherein the control unit adjusts the voltage to be applied to the destination by controlling the switch element with a PWM signal to switch between the charging and discharging states of the charge pump.

Citation Information

Patent Citations

  • Liquid ejection device