Temperature control apparatus, control method of temperature control device, program, and storage medium
The temperature control device optimizes cooling fan capacity based on estimated heat generation and regulating ability, addressing the inefficiencies in power device cooling to extend operating time and reduce power consumption.
Patent Information
- Application Number
- JP2023056838
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2024-10-11
AI Technical Summary
Existing power devices face challenges in extending operating time at maximum output due to insufficient cooling capacity of blowers, which increases power consumption when increasing cooling air volume.
A temperature control device that estimates the calorific value and temperature regulating ability of the power converter, adjusting the cooling fan's capacity based on these estimates to optimize cooling while minimizing power consumption.
The device effectively adjusts the temperature of the power converter by predicting heat generation and optimizing cooling capacity, extending operating time and reducing power consumption.
Smart Images

Figure 2024143899000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a temperature adjustment device, a control method for a temperature adjustment device, a program, and a storage medium. [Background technology]
[0002] Patent Document 1 discloses an electric power device. The electric power device includes a housing, a heating element, and a fan. The heating element and the fan are housed inside the housing. The heating element is a power converter that converts electric power. The power converter generates heat by converting electric power (operating). The fan cools the power converter by blowing air to the power converter. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] International Publication No. 2020 / 235617 Summary of the Invention [Problem to be solved by the invention]
[0004] In order to extend the operating time of a power device while operating it at maximum output, it is necessary to improve the cooling capacity (temperature control capacity) of the blower. Specifically, it is necessary to increase the amount of cooling air sent to the power converter, which is a heat generating body. However, increasing the amount of cooling air increases the power consumption of the cooling fan.
[0005] An object of the present invention is to solve the above-mentioned problems. [Means for solving the problem]
[0006] A first aspect of the present invention is a temperature control device that adjusts the temperature of a temperature control target, the temperature control device comprising a first estimator that estimates a heat generation amount of the temperature control target, a second estimator that estimates a temperature control capacity of the temperature control device, and a control unit that controls the temperature control device based on the heat generation amount estimated by the first estimator and the temperature control capacity estimated by the second estimator.
[0007] A second aspect of the present invention is a control method for a temperature control device that adjusts the temperature of a temperature control target, the control method having a first step of estimating a heat generation amount of the temperature control target, a second step of estimating a temperature control capacity of the temperature control device, and a third step of controlling the temperature control device based on the estimated heat generation amount and the temperature control capacity.
[0008] A third aspect of the present invention is a program for causing a computer to execute the above-mentioned control method.
[0009] A fourth aspect of the present invention is a storage medium for storing the program. Effect of the Invention
[0010] According to the present invention, the heat generation amount of the temperature control target is estimated, the temperature control capacity of the temperature control device is estimated, and the temperature control device is controlled based on the estimated heat generation amount and temperature control capacity. Since the temperature control device is controlled according to the future heat generation amount and temperature control capacity of the temperature control target, the temperature of the temperature control target can be appropriately adjusted. In addition, an increase in the power consumption of the temperature control device can be suppressed. [Brief description of the drawings]
[0011] [Figure 1] FIG. 1 is a perspective view of the electric power device according to the present embodiment. [Diagram 2] FIG. 2 is a circuit diagram of the power device of FIG. [Diagram 3] FIG. 3 is a block diagram of the inverter CPU, the converter CPU, the fan driver, and the cooling fan. [Figure 4] FIG. 4 is a diagram showing a map of a comparative example. [Diagram 5]FIG. 5 is a diagram showing a map of this embodiment. [Figure 6] FIG. 6 is a diagram showing a map of this embodiment. [Figure 7] FIG. 7 is a diagram showing a map of this embodiment. [Figure 8] FIG. 8 is a flowchart showing the operation of the power device according to this embodiment. [Figure 9] FIG. 9 is a flowchart showing the operation of the power device according to this embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] FIG. 1 is a perspective view of a power device 10 (temperature adjustment device) according to this embodiment.
[0013] The power device 10 includes a housing 12. The housing 12 is shaped like a substantially rectangular parallelepiped. The housing 12 has an internal space 14. The internal space 14 is provided with a slot 18 for accommodating a battery 16 (power storage device). The battery 16 is detachable from the slot 18.
[0014] At least one battery 16 may be attached to the power device 10. When the power device 10 includes a plurality of batteries 16, at least one of the plurality of batteries 16 may be detachable from the power device 10. It is more preferable that the battery 16 is detachable from the power device 10 without using a separate work tool or the like. That is, the battery 16 is configured to be detachable from the power device 10 without using a work tool or the like. In addition, "attaching to and detaching from the power device 10" includes a case where the battery 16 is attached to the power device 10 and a case where the battery 16 is detached from the power device 10. In the following description, a case where one battery 16 is detachable from the power device 10 will be described.
[0015] The battery 16 is a mobile battery that is detachable from the power device 10. The shape of the battery 16 is a substantially rectangular parallelepiped. The battery 16 is a mobile battery that is chargeable and dischargeable. The battery 16 is preferably, for example, a battery pack of a detachable lithium ion battery.
[0016] The battery 16 includes a case 20 and a handle 22. The case 20 includes a case body 24 and a bottom case 26. A battery body 28 is housed inside the case body 24. The battery body 28 stores electric power. The bottom case 26 is fixed to the bottom of the case body 24. The handle 22 is fixed to the upper part of the case body 24. The handle 22 is formed in a T-shape. The handle 22 includes a handle cover 30, a first handle portion 32, and a second handle portion 34. The handle cover 30 is fixed to the upper part of the case body 24. The first handle portion 32 is provided on the upper part of the handle cover 30 along the outer periphery of the handle cover 30. The second handle portion 34 is disposed so as to extend in a direction perpendicular to the first handle portion 32. One end of the second handle portion 34 is connected to the center part of the first handle portion 32. The other end of the second handle portion 34 is connected to a portion of the outer periphery of the handle cover 30 that is distant from the first handle portion 32. A gap large enough for a user to insert their hand (fingers) is formed between the handle cover 30 and the first and second handle portions 32 and 34. The user can insert their fingers into the gap between the second handle portion 34 and the handle cover 30 to grip the second handle portion 34.
[0017] An opening 36 for the slot 18 is formed in the upper part of the housing 12. A cover 38 that covers the opening 36 is provided in the upper part of the housing 12. An open button (not shown) is provided on the cover 38. When the user presses the open button, the cover 38 opens, and the outside of the housing 12 communicates with the slot 18. With the cover 38 open, the user can attach and detach the battery 16 to and from the slot 18. Note that FIG. 1 shows the cover 38 in an open state.
[0018] 1, an indicator 40 for indicating the remaining capacity of the battery 16 attached to the power device 10 is provided on the side surface of the housing 12. In addition, a plurality of operation buttons 42 are arranged on the side surface of the housing 12.
[0019] Furthermore, a plurality of output terminals 44 are provided on the side surface of the housing 12. The plurality of output terminals 44 are AC output terminals. The plurality of output terminals 44 are terminals for outputting AC power from the power device 10 to the outside of the power device 10. The plurality of output terminals 44 are, for example, sockets for commercial power plugs. The plurality of output terminals 44 are covered with a cover 46. The cover 46 protects the plurality of output terminals 44.
[0020] 2 is a circuit diagram of the power device 10. The power device 10 includes a battery 16, a slot 18, a first DC / DC converter 50 (a direct current converter), a second DC / DC converter 52, an inverter 56 (an alternating current / direct current converter), a filter 58, a converter CPU 60, an inverter CPU 62, a fan driver 64, a cooling fan 66, three voltage sensors 68, 70, and 72, two current sensors 74 and 76, a temperature sensor 78, an outside air temperature sensor 80, an input unit 82, and an output unit 84.
[0021] A connector 86 is provided in the slot 18. The connector 86 is provided at the bottom of the slot 18. The battery 16 has a connector 88. The connector 88 is provided at the bottom of the battery 16 (see FIG. 1). The connector 88 is connected to the battery body 28. When the battery 16 is inserted into the slot 18 and the bottom of the battery 16 abuts against the bottom of the slot 18, the two connectors 86, 88 are connected. Of the two connectors 86, 88, one is a male connector. The other is a female connector that fits (connects) to the male connector. FIG. 2 illustrates a case where the connector 88 is a female connector and the connector 86 is a male connector.
[0022] The first DC / DC converter 50, the second DC / DC converter 52, and the inverter 56 constitute a power conversion unit 90 (temperature control target) that converts power. The first DC / DC converter 50, the second DC / DC converter 52, and the inverter 56 each have a semiconductor element. The internal configurations of the first DC / DC converter 50, the second DC / DC converter 52, and the inverter 56 are well known. Therefore, a description of the internal configurations of the first DC / DC converter 50, the second DC / DC converter 52, and the inverter 56 will be omitted.
[0023] The first DC / DC converter 50 and the second DC / DC converter 52 are electrically connected in parallel to the battery body 28. A primary side (input side) 92 of the first DC / DC converter 50 and a primary side (input side) 94 of the second DC / DC converter 52 are electrically connected to the battery body 28 via two connectors 86, 88.
[0024] A secondary side (output side) 96 of the first DC / DC converter 50 is electrically connected to a primary side (input side) 98 of the inverter 56. A secondary side (output side) 100 of the inverter 56 is connected to a plurality of output terminals 44 via a filter 58. The plurality of output terminals 44 can be connected to an external device 102 that exists outside the power device 10. Fig. 2 illustrates a case where the external device 102 is connected to one of the two output terminals 44.
[0025] The secondary side (output side) 104 of the second DC / DC converter 52 is electrically connected to a cooling fan 66 via a fan driver 64 .
[0026] The voltage of the battery main body 28 (DC voltage Vi) is supplied to a primary side 92 of the first DC / DC converter 50 and a primary side 94 of the second DC / DC converter 52.
[0027] The first DC / DC converter 50 is a step-up converter. The first DC / DC converter 50 converts (steps up) the voltage value of the voltage (DC voltage Vi) on the primary side 92 to the voltage value of the DC voltage on the secondary side 96.
[0028] The inverter 56 converts the DC voltage (the voltage on the primary side 98 of the inverter 56) supplied from the secondary side 96 of the first DC / DC converter 50 into an AC voltage Vo (the voltage on the secondary side 100 of the inverter 56). Also, the inverter 56 can convert the AC voltage Vo on the secondary side 100 into the DC voltage on the primary side 98.
[0029] Therefore, the power conversion unit 90 can convert the DC power of the battery main body 28 into AC power and supply the converted AC power to the external device 102. Alternatively, the power conversion unit 90 can convert the AC power supplied from the external device 102 into DC power and store the converted DC power in the battery main body 28.
[0030] In the following description, the case where the power device 10 functions as a power supply that supplies the power of the battery main body 28 to the outside (external device 102) of the power device 10 will be described.
[0031] The filter 58 cuts the high-frequency noise superimposed on the AC voltage Vo.
[0032] The second DC / DC converter 52 is a step-down converter. The second DC / DC converter 52 converts (steps down) the voltage value of the DC voltage Vi on the primary side 94 to the voltage value of the DC voltage Vf on the secondary side 104. Therefore, the DC voltage Vf is lower than the DC voltage Vi and the DC voltage on the secondary side 96 of the first DC / DC converter 50 (Vf < Vi). The second DC / DC converter 52 supplies the converted DC voltage Vf on the secondary side 104 to the fan driver 64.
[0033] The fan driver 64 is a drive circuit (power supply circuit) for the cooling fan 66. The fan driver 64 receives DC power from the second DC / DC converter 52 and drives the cooling fan 66. The cooling fan 66 is driven under the control of the fan driver 64. The cooling fan 66 cools the power conversion unit 90 by blowing cooling air to the power conversion unit 90. As will be described later, the cooling fan 66 cools at least the inverter 56 of the power conversion unit 90.
[0034] The voltage sensor 68 is disposed between the connector 86 of the slot 18 and the primary side 92 of the first DC / DC converter 50 and the primary side 94 of the second DC / DC converter 52. The voltage sensor 68 sequentially detects the DC voltage Vi of the battery main body 28, and sequentially outputs the detection results to the converter CPU 60.
[0035] The voltage sensor 70 and the current sensor 74 are disposed between the second DC / DC converter 52 and the fan driver 64. The voltage sensor 70 sequentially detects the DC voltage Vf supplied to the fan driver 64, and sequentially outputs the detection results to the converter CPU 60. The current sensor 74 sequentially detects the DC current If flowing from the second DC / DC converter 52 to the fan driver 64, and sequentially outputs the detection results to the converter CPU 60.
[0036] The voltage sensor 72 and the current sensor 76 are disposed between the filter 58 and the multiple output terminals 44. The voltage sensor 72 sequentially detects the AC voltage Vo on the secondary side 100 of the inverter 56, and sequentially outputs the detection results to the inverter CPU 62. The current sensor 76 sequentially detects the AC current Io flowing from the inverter 56 to the multiple output terminals 44, and sequentially outputs the detection results to the inverter CPU 62.
[0037] The temperature sensor 78 detects the current temperature of the power conversion unit 90. More specifically, the temperature sensor 78 successively detects the temperature Ti of the semiconductor elements that constitute the inverter 56, and outputs the detection results to the converter CPU 60 successively.
[0038] The outside air temperature sensor 80 successively detects the temperature outside the power device 10 (outside air temperature) To, and outputs the detection results to the converter CPU 60 successively.
[0039] The input unit 82 is a plurality of operation buttons 42 (see FIG. 1) that can be operated by a user of the power device 10. The input unit 82 accepts an operation input from the user and outputs the contents of the accepted operation input to the converter CPU 60. The output unit 84 is an indicator 40 (see FIG. 1) or the like, and notifies the contents of notification from the converter CPU 60 to the outside of the power device 10 by an image, sound, or the like.
[0040] The converter CPU 60 and the inverter CPU 62 are ECUs (electronic control units) mounted on the power device 10. Each of the converter CPU 60 and the inverter CPU 62 is a computer that may include a processor such as a CPU or a GPU (graphics processing unit). That is, the converter CPU 60 and the inverter CPU 62 may be configured by a processing circuit. The converter CPU 60 realizes various functions by reading and executing a program stored in a memory 110 (storage medium). The inverter CPU 62 realizes various functions by reading and executing a program stored in a memory 112 (storage medium).
[0041] At least a part of each of the converter CPU 60 and the inverter CPU 62 may be realized by an integrated circuit such as an ASIC (Application Specific Integrated Circuit) or an FPGA (Field-Programmable Gate Array). At least a part of each of the converter CPU 60 and the inverter CPU 62 may be configured by an electronic circuit including discrete devices.
[0042] Each of the two memories 110, 112 may be composed of a volatile memory (not shown) and a non-volatile memory (not shown). The volatile memory may be, for example, a random access memory (RAM). This volatile memory is used as a working memory of the processor, and temporarily stores data and the like required for processing or calculation. The non-volatile memory may be, for example, a read only memory (ROM) or a flash memory. The non-volatile memory is used as a storage memory, and stores programs, tables, maps, and the like. At least a portion of each of the memories 110, 112 may be provided in the processor, integrated circuit, or the like as described above.
[0043] The inverter CPU 62 controls the operation of the inverter 56 based on the detection results of the voltage sensor 72 and the current sensor 76. The converter CPU 60 controls the operation of the first DC / DC converter 50 and the second DC / DC converter 52 based on the detection results of the voltage sensors 68, 70 and the current sensor 74.
[0044] In the power conversion unit 90, the semiconductor elements of the first DC / DC converter 50 and the second DC / DC converter 52 perform switching operations to convert DC voltage. The inverter 56 performs AC / DC conversion by switching operations of the semiconductor elements. Each semiconductor element consumes power and generates heat as it switches. Therefore, the power conversion unit 90 is both a load within the power device 10 and a heating element.
[0045] The power device 10 adjusts the temperature of the power conversion unit 90, with the power conversion unit 90 being the temperature adjustment target. Specifically, the cooling fan 66 is driven to blow cooling air from the cooling fan 66 to the power conversion unit 90. By blowing the cooling air to the power conversion unit 90, each semiconductor element is cooled, and the temperature of the power conversion unit 90 (the temperature of each semiconductor element) is adjusted.
[0046] In the power conversion unit 90, the inverter 56 generates the most heat. Therefore, it is sufficient for the cooling fan 66 to at least blow cooling air to the inverter 56 and cool the semiconductor elements of the inverter 56. In the following description, for convenience of explanation, the temperature Ti of the semiconductor elements constituting the inverter 56 may be referred to as the temperature Ti of the power conversion unit 90.
[0047] The inverter CPU 62 and the converter CPU 60 control the driving of the cooling fan 66 by functioning as follows.
[0048] As shown in FIG. 3, the inverter CPU 62 realizes the function of an instantaneous power calculation unit 114 (power calculation unit). The instantaneous power calculation unit 114 sequentially calculates an instantaneous value of AC power (instantaneous power P) based on the AC voltage Vo sequentially detected by the voltage sensor 72 (see FIG. 2) and the AC current Io sequentially detected by the current sensor 76 (P=Vo×Io). As described above, the power conversion unit 90 is a load in the power device 10, and each semiconductor element generates heat by consuming power. In addition, the instantaneous power P is calculated based on the current AC voltage Vo detected by the voltage sensor 72 and the current AC current Io detected by the current sensor 76. Therefore, the instantaneous power P is a power corresponding to the power consumption of the power conversion unit 90 and is also a current output power of the power conversion unit 90. The instantaneous power calculation unit 114 sequentially outputs the calculated instantaneous power P to the converter CPU 60.
[0049] The converter CPU 60 realizes the functions of a heat generation amount estimation unit 116 (first estimation unit), a cooling capacity estimation unit 118 (second estimation unit), a cooling airflow amount determination unit 120, and a cooling fan control unit 122 (control unit). In addition, the memory 110 of the converter CPU 60 has a first map 124 and a second map 126.
[0050] The heat generation amount estimation unit 116 estimates the heat generation amount X of the power conversion unit 90.
[0051] Specifically, a formula or map (first map 124) indicating the conversion efficiency of the power conversion unit 90 is stored in the memory 110 of the converter CPU 60. The heat generation amount estimation unit 116 refers to the formula or map stored in the memory 110 and calculates the current conversion efficiency η of the power conversion unit 90 from the instantaneous power P calculated by the instantaneous power calculation unit 114 and the DC voltage Vi detected by the voltage sensor 68. Note that FIG. 3 illustrates a case where the first map 124 is stored in the memory 110.
[0052] The heat generation amount estimating unit 116 estimates the heat generation amount X of the power conversion unit 90 based on the instantaneous power P and the current conversion efficiency η (X=P×(1−η)).
[0053] The DC voltage Vi detected by the voltage sensor 68 is the current voltage of the battery main body 28. The instantaneous power P is the current instantaneous power of the power conversion unit 90. Each semiconductor element of the power conversion unit 90 consumes the instantaneous power P and then generates heat. Therefore, the heat generation amount X estimated by the heat generation amount estimation unit 116 is the future heat generation amount when the power conversion unit 90 consumes the instantaneous power P and generates heat.
[0054] As described above, the inverter 56 generates the most heat among the power conversion unit 90. Therefore, most of the heat value X is the heat value of the inverter 56. Therefore, the heat value estimation unit 116 actually estimates the future heat value of the inverter 56. Therefore, the formula or map of the conversion efficiency of the power conversion unit 90 stored in the memory 110 may be the formula or map of the conversion efficiency of the inverter 56. In this case, the conversion efficiency η calculated by the heat value estimation unit 116 is the current conversion efficiency of the inverter 56.
[0055] The cooling capacity estimation unit 118 estimates the cooling capacity Y (temperature adjustment capacity) of the cooling fan 66.
[0056] Specifically, the cooling capacity estimation unit 118 estimates the cooling capacity Y of the cooling fan 66 based on the current temperature of the power conversion unit 90 and the cooling state (temperature control state) of the power device 10.
[0057] As described above, the inverter 56 generates the most heat among the power conversion unit 90. Therefore, the current temperature of the power conversion unit 90 is actually the current temperature Ti of the inverter 56 detected by the temperature sensor 78.
[0058] The cooling state of the power device 10 also includes the current air volume of the cooling fan 66 and the current outside air temperature To detected by the outside air temperature sensor 80.
[0059] The current air volume of the cooling fan 66 is the output of the cooling fan 66. The output of the cooling fan 66 can be estimated from the input of the cooling fan 66. The input of the cooling fan 66 is input power (Vf×If) based on the DC voltage Vf supplied from the second DC / DC converter 52 to the fan driver 64 and the DC current If flowing through the fan driver 64. Therefore, the cooling capacity estimation unit 118 estimates the current air volume of the cooling fan 66 from the input power (Vf×If) supplied to the cooling fan 66.
[0060] As described above, the temperature Ti is the current temperature of the power conversion unit 90 (inverter 56). Furthermore, the cooling state of the power device 10 is the current air volume of the cooling fan 66 and the current outside air temperature To. Therefore, the cooling capacity Y estimated by the cooling capacity estimation unit 118 is the future cooling capacity of the cooling fan 66 when cooling the power conversion unit 90 in the current environment.
[0061] The outside air temperature To is not an essential component for estimating the cooling capacity Y. Therefore, the cooling capacity estimation unit 118 may estimate the cooling capacity Y of the cooling fan 66 based on the current temperature (temperature Ti) of the power conversion unit 90 and the current air volume of the cooling fan 66.
[0062] FIG. 4 is an explanatory diagram showing a conventional control method (comparison example) for the cooling fan 66 (see FIG. 2).
[0063] Conventionally, the target value of the cooling air volume F (target air volume Ft) of the cooling fan 66 has been determined according to the temperature T of the semiconductor element that constitutes the power conversion unit 90 (the temperature Ti of the semiconductor element that constitutes the inverter 56). In FIG. 4, when the temperature T (Ti) of the semiconductor element is up to T1, the target air volume Ft is set to F0. Note that F0 is the air volume when the cooling fan 66 is in a stopped state (windless state). F0 may be 0. When T1 < T (Ti) ≤ T2, the target air volume Ft is set to F1 (F0 < F1). When T2 < T (Ti), the target air volume Ft is set to F2 (F1 < F2). That is, conventionally, as the temperature T of the semiconductor element increases, the target air volume Ft increases stepwise. Also conventionally, as the temperature T of the semiconductor element decreases due to cooling, the target air volume Ft decreases stepwise.
[0064] However, in this method, when the temperature T (Ti) of the semiconductor element increases, the target air volume Ft is simply set large. Although the cooling capacity Y increases as the target air volume Ft increases, the power consumption of the cooling fan 66 increases.
[0065] In contrast, in the present embodiment, as shown in FIG. 3, the converter CPU 60 has a cooling air volume determination unit 120. The cooling air volume determination unit 120 adjusts the cooling capacity Y of the cooling fan 66 using the heat generation amount X estimated by the heat generation amount estimation unit 116. The cooling air volume determination unit 120 determines the target air volume Ft based on the adjusted cooling capacity Y.
[0066] Specifically, in the present embodiment, the heat generation amount X of the power conversion unit 90 in the near future is predicted, and the cooling capacity Y of the cooling fan 66 in the near future is adjusted according to the predicted heat generation amount X. As a result, the adjusted cooling capacity Y corresponds to the minimum power consumption of the cooling fan 66 according to the heat generation amount X. When the target air volume Ft is determined based on the cooling capacity Y adjusted in this way and the cooling fan 66 is driven at the determined target air volume Ft, the power conversion unit 90 can be appropriately cooled and an increase in the power consumption of the cooling fan 66 can be suppressed.
[0067] As shown in FIG. 3, a second map 126 is stored in the memory 110 of the converter CPU 60. The second map 126 stores maps of a plurality of control modes showing the relationship between the heat generation amount X and the cooling capacity Y (see FIGS. 5 to 7). The control mode is a mode showing the control method of the cooling fan 66 and the fan driver 64 (see FIG. 2). The cooling air volume determination unit 120 refers to the map of one of the plurality of control modes, and uses the referred map and the heat generation amount X estimated by the heat generation amount estimation unit 116 to adjust the cooling capacity Y.
[0068] FIGS. 5 to 7 illustrate maps of a plurality of control modes. FIGS. 5 to 7 illustrate characteristic lines 130, 132, and 134 showing the relationship between the heat generation amount X and the cooling capacity Y. In these control modes, according to the characteristic lines 130, 132, and 134, the cooling capacity Y corresponding to the heat generation amount X can be set.
[0069] FIG. 5 is a map of a normal control mode. The normal control mode is a map showing normal control of the cooling fan 66. In FIG. 5, until the heat generation amount X reaches X1, the cooling capacity Y is set to Y0. Note that Y0 is the cooling capacity when the cooling fan 66 is in a stopped state (no-wind state). Y0 may be 0. Also, in FIG. 5, when the heat generation amount X exceeds X1, as the heat generation amount X increases, the cooling capacity Y increases linearly.
[0070] FIG. 6 is a map of a control mode for cooling the power conversion unit 90 (inverter 56) in advance. In FIG. 6, until the heat generation amount X reaches X1, the cooling capacity Y is set to Y0, and when X = X1, the cooling capacity Y rises from Y0 to Y1 (Y0 < Y1). Also, in FIG. 6, when the heat generation amount X exceeds X1, as the heat generation amount X increases, the cooling capacity Y increases linearly. However, the increase amount of the cooling capacity Y with respect to the heat generation amount X on the characteristic line 132 when X > X1 is smaller than the increase amount of the cooling capacity Y with respect to the heat generation amount X on the characteristic line 130 when X > X1.
[0071] In the control mode shown in FIG. 6, when X = X1, the cooling capacity Y increases from Y0 to Y1. As a result, before the power conversion unit 90 generates heat at the heat generation amount X, the cooling capacity Y is increased in advance and the cooling fan 66 is driven. As a result, the cooling fan 66 cools the power conversion unit 90 with a large cooling air volume with respect to the heat generation amount X. Also, when X > X1, as the heat generation amount X increases, the cooling capacity Y gradually increases. Thereby, the noise of the cooling fan 66 when the heat generation amount X is large can be suppressed.
[0072] FIG. 7 is a map of the control mode when it is desired to keep the power device 10 quiet. In FIG. 7, until the heat generation amount X reaches X2 (X2 > X1), the cooling capacity Y is set to Y0. Also, when the heat generation amount X reaches X2, the cooling capacity Y rises from Y0 to Y2 (Y2 < Y1). Further, in FIG. 7, when the heat generation amount X exceeds X2, as the heat generation amount X increases, the cooling capacity Y increases linearly.
[0073] In FIG. 7, until the heat generation amount X reaches X2, the cooling capacity Y is set to Y0. Therefore, in the control mode of FIG. 7, the start of cooling of the power conversion unit 90 by the cooling fan 66 can be delayed. Thereby, the noise generated by driving the cooling fan 66 can be suppressed low.
[0074] The user operates the input unit 82 (see FIG. 2) to select one control mode from among a plurality of control modes. The cooling air volume determination unit 120 (see FIG. 3) refers to (reads) the map corresponding to the control mode selected by the user from among the plurality of maps stored in the second map 126. The cooling air volume determination unit 120 adjusts the cooling capacity Y estimated by the cooling capacity estimation unit 118 using the referred map and the heat generation amount X estimated by the heat generation amount estimation unit 116.
[0075] Specifically, the cooling airflow determination unit 120 plots on a map the heat generation amount X (heat generation amount Xe) estimated by the heat generation amount estimation unit 116 and the cooling capacity Y (cooling capacity Ye0) estimated by the cooling capacity estimation unit 118. When the plot (Xe, Ye0) of the heat generation amount Xe and the cooling capacity Ye0 is on the characteristic lines 130, 132, 134, the cooling airflow determination unit 120 sets the airflow according to the plotted cooling capacity Ye0 to the target airflow Ft.
[0076] In addition, when the plot of the heat generation amount X (heat generation amount Xe) and the cooling capacity Y (cooling capacity Ye1 or Ye2) deviates from the characteristic lines 130, 132, 134, the cooling airflow determination unit 120 corrects the value of the cooling capacity (Ye1 or Ye2) estimated by the cooling capacity estimation unit 118 to the value of the cooling capacity (cooling capacity Yea) on the characteristic lines 130, 132, 134 for the heat generation amount Xe estimated by the heat generation amount estimation unit 116.
[0077] That is, when the value of the cooling capacity estimated by the cooling capacity estimation unit 118 is greater than the value of the cooling capacity on the characteristic lines 130, 132, and 134 for the heat generation amount Xe estimated by the heat generation amount estimation unit 116, the cooling capacity Ye2 estimated by the cooling capacity estimation unit 118 is excessive. That is, if the target airflow Ft is set at the cooling capacity Ye2 estimated by the cooling capacity estimation unit 118 and the cooling fan 66 is driven at the set target airflow Ft, the power conversion unit 90 is cooled with an airflow that is excessive for the heat generation amount Xe. As a result, the power consumption of the cooling fan 66 may increase. In this case, the cooling airflow determination unit 120 reduces the cooling capacity Ye2 to the cooling capacity Yea on the characteristic lines 130, 132, and 134, and sets the airflow according to the reduced cooling capacity Yea to the target airflow Ft.
[0078] In addition, when the value of the cooling capacity estimated by the cooling capacity estimation unit 118 is smaller than the value of the cooling capacity on the characteristic lines 130, 132, and 134 for the heat generation amount Xe estimated by the heat generation amount estimation unit 116, the cooling capacity Ye1 estimated by the cooling capacity estimation unit 118 is small. In other words, if the target air volume Ft is set at the cooling capacity Ye1 estimated by the cooling capacity estimation unit 118 and the cooling fan 66 is driven at the set target air volume Ft, the power conversion unit 90 is cooled with an air volume that is too small for the heat generation amount Xe. As a result, the power conversion unit 90 cannot be effectively cooled. In this case, the cooling air volume determination unit 120 increases the cooling capacity Ye1 to the cooling capacity Yea on the characteristic lines 130, 132, and 134, and sets the air volume according to the increased cooling capacity Yea to the target air volume Ft.
[0079] The cooling fan control unit 122 controls the fan driver 64 based on the target air volume Ft determined by the cooling air volume determination unit 120, thereby controlling the driving of the cooling fan 66. Specifically, the cooling fan control unit 122 supplies a control signal according to the target air volume Ft to the fan driver 64. The fan driver 64 controls the driving of the cooling fan 66 based on the control signal supplied from the cooling fan control unit 122 and the DC power supplied from the second DC / DC converter 52.
[0080] The power device 10 according to this embodiment is configured as described above. Next, the operation of the power device 10 will be described with reference to the flowcharts of Figures 8 and 9. Here, the cooling method (temperature control method) of the power conversion unit 90 by the cooling fan 66 (see Figures 2 and 3) will be mainly described.
[0081] In step S1 of Fig. 8, the conversion efficiency η of the power conversion unit 90 (inverter 56) (see Fig. 2) is measured. In this case, the power conversion unit 90 is operated, and the DC voltage Vi detected by the voltage sensor 68 and the AC voltage Vo detected by the voltage sensor 72 are obtained. A computer (not shown) calculates the conversion efficiency η using the obtained DC voltage Vi and AC voltage Vo.
[0082] In step S2, a computer (not shown) creates a mathematical expression or a map of the measured conversion efficiency η.
[0083] In step S3, a computer (not shown) stores in the memory 110 the created formula or map of the conversion efficiency η (first map 124).
[0084] In steps S1 to S3, the converter CPU 60 may calculate the conversion efficiency η, create a formula or a map, and store in the memory 110 the created formula or map.
[0085] In step S11 of Fig. 9, the power device 10 (see Figs. 1 and 2) starts operation. In this case, each of the first DC / DC converter 50 and the second DC / DC converter 52 converts the DC voltage Vi of the battery main body 28 into an output voltage. The inverter 56 converts the output voltage of the first DC / DC converter 50 into an AC voltage Vo, and supplies the converted AC voltage Vo (AC power) to the external device 102. The fan driver 64 receives the DC power supplied from the second DC / DC converter 52 and drives the cooling fan 66. As a result, the cooling fan 66 blows cooling air to the power conversion unit 90. The temperature (temperature Ti) of the power conversion unit 90 is adjusted by blowing the cooling air.
[0086] In step S12, the voltage sensors 68, 70, 72 detect voltages (DC voltage or AC voltage) Vi, Vo, Vf, and output the detection results to the inverter CPU 62 or the converter CPU 60. The current sensors 74, 76 detect currents (DC current or AC current) Io, If, and output the detection results to the inverter CPU 62 or the converter CPU 60. The temperature sensor 78 detects the temperature Ti of the semiconductor element, and output the detection result to the converter CPU 60. The outside air temperature sensor 80 detects the outside air temperature To, and output the detection result to the converter CPU 60.
[0087] In step S13, the instantaneous power calculation unit 114 (see FIG. 3) calculates the instantaneous power P based on the AC voltage Vo detected by the voltage sensor 72 and the AC current Io detected by the current sensor 76. The instantaneous power calculation unit 114 outputs the calculated instantaneous power P to the converter CPU 60.
[0088] In step S14 (first step), the heat generation amount estimation unit 116 refers to a formula or map (first map 124) stored in the memory 110, and calculates a current conversion efficiency η of the power conversion unit 90 from the instantaneous power P and the DC voltage Vi detected by the voltage sensor 68. Next, the heat generation amount estimation unit 116 estimates a heat generation amount X of the power conversion unit 90 using the calculated conversion efficiency η and the instantaneous power P. The heat generation amount estimation unit 116 outputs the estimated heat generation amount X to the cooling airflow determination unit 120.
[0089] In step S15 (second step), the cooling capacity estimation unit 118 estimates the cooling capacity Y of the cooling fan 66 from the temperature Ti detected by the temperature sensor 78, the outside air temperature To detected by the outside air temperature sensor 80, and the current air volume of the cooling fan 66 (the output of the cooling fan 66). The cooling capacity estimation unit 118 outputs the estimated cooling capacity Y to the cooling air volume determination unit 120.
[0090] In step S16, when the user selects one control mode from among a plurality of control modes, the cooling airflow determination unit 120 refers to (reads) the map of the control mode selected by the user from among the plurality of maps (see Figures 5 to 7) stored in the second map 126.
[0091] In step S17, the cooling airflow determination unit 120 determines whether the cooling capacity Y estimated by the cooling capacity estimation unit 118 and the heat generation amount X estimated by the heat generation amount estimation unit 116 are appropriate, using the map being referred to.
[0092] If the cooling capacity Y estimated by the cooling capacity estimation unit 118 deviates from the characteristic lines 130, 132, 134 of the map (see FIGS. 5 to 7) (step S17: NO), the cooling airflow determination unit 120 proceeds to step S18. In step S18, the cooling airflow determination unit 120 adjusts (corrects) the cooling capacity Y (Ye1 or Ye2) estimated by the cooling capacity estimation unit 118 to the cooling capacity Yea on the characteristic lines 130, 132, 134 corresponding to the heat generation amount X (heat generation amount Xe) estimated by the heat generation amount estimation unit 116.
[0093] If the cooling capacity Y (Ye0) estimated by the cooling capacity estimation unit 118 is plotted on the characteristic lines 130, 132, 134 of the map (step S17: YES), the cooling airflow determination unit 120 skips the process of step S18.
[0094] In step S19, cooling airflow determination unit 120 determines an airflow according to cooling capacity Y(Ye0) estimated by cooling capacity estimator 118 or cooling capacity Y(Yea) corrected in step S18 as target airflow Ft.
[0095] In step S20 (third step), the cooling fan control unit 122 outputs a control signal based on the target air volume Ft to the fan driver 64. The fan driver 64 controls the driving of the cooling fan 66 based on the control signal from the cooling fan control unit 122. As a result, the volume of the cooling air blown from the cooling fan 66 to the inverter 56 is adjusted to the target air volume Ft.
[0096] When the operation of the power device 10 is to be continued (step S21: NO), the power device 10 returns to step S12 and repeatedly executes the processes of steps S12 to S21.
[0097] Moreover, when the power device 10 ends the operation (step S21: YES), the power device 10 stops the operation of the power conversion unit 90.
[0098] In the present embodiment, the power device 10 is a power supply device that supplies power from the battery 16 to the outside. In the present embodiment, the power device 10 may function as a charger that stores power supplied from the outside in the battery 16. Alternatively, the power device 10 may function as both a power supply device and a charger.
[0099] In the present embodiment, the power device 10 is provided with two computers, the converter CPU 60 and the inverter CPU 62. In the power device 10, the functions of the converter CPU 60 and the inverter CPU 62 may be realized by one computer.
[0100] Further, in the present embodiment, the temperature sensor 78 detects the temperature Ti of the semiconductor element constituting the inverter 56, and the cooling capacity estimation unit 118 estimates the cooling capacity Y using the temperature Ti. In the present embodiment, it is sufficient that the cooling capacity estimation unit 118 estimates the cooling capacity Y based on the current temperature of the power conversion unit 90. Therefore, the temperature sensor 78 may detect the temperature of at least one of the converters among the first DC / DC converter 50, the second DC / DC converter 52, and the inverter 56. More specifically, the temperature sensor 78 may be provided in at least one of the converters among the first DC / DC converter 50, the second DC / DC converter 52, and the inverter 56. This makes it possible to detect the temperature of the semiconductor element constituting the converter in which the temperature sensor 78 is provided. Specifically, the temperature sensor 78 may detect the temperature of the semiconductor element constituting the first DC / DC converter 50. The temperature sensor 78 may detect the temperature of the semiconductor element constituting the second DC / DC converter 52. Alternatively, the temperature sensor 78 may be provided in both the first DC / DC converter 50 and the second DC / DC converter 52. In this case, each of the two temperature sensors 78 can detect the temperature of a semiconductor element constituting the converter to be installed. Alternatively, the temperature sensor 78 may be provided in each of the first DC / DC converter 50, the second DC / DC converter 52, and the inverter 56. In this case, each of the three temperature sensors 78 can detect the temperature of a semiconductor element constituting the converter to be installed. In either case, the cooling capacity estimation unit 118 can estimate the cooling capacity Y by using the temperature detected by the temperature sensor 78.
[0101] This embodiment has the following advantages.
[0102] 3 and 9, the heat generation amount X of the power conversion unit 90 (temperature control target) is estimated, the cooling capacity Y of the cooling fan 66 (temperature control capacity of the temperature control device) is estimated, and the cooling fan 66 is controlled based on the estimated heat generation amount X and cooling capacity Y. Since the cooling fan 66 is controlled according to the future heat generation amount and temperature control capacity, it is possible to appropriately adjust the temperature (temperature Ti) of the power conversion unit 90. Furthermore, even if the cooling capacity Y of the cooling fan 66 is increased, it is possible to suppress an increase in power consumption of the power device 10 (see FIGS. 1 and 2) including the cooling fan 66.
[0103] The cooling fan 66 is controlled based on the heat generation amount X estimated by the heat generation amount estimation unit 116 (first estimation unit), the cooling capacity Y estimated by the cooling capacity estimation unit 118 (second estimation unit), and characteristic lines 130, 132, 134 (operation level of the temperature adjustment device) (see FIGS. 5 to 7) of a map of a control mode predetermined according to the heat generation amount X and the cooling capacity Y. This makes it possible to appropriately control the cooling fan 66 according to the operation level of the cooling fan 66.
[0104] Based on the temperature of the power conversion unit 90 and the cooling state of the power device 10, the future cooling capacity Y can be estimated with high accuracy.
[0105] The future heat generation amount X can be accurately estimated based on the current instantaneous power P (electric power) consumed by the power conversion unit 90 (load). This makes it possible to appropriately adjust the temperature of the power conversion unit 90. In other words, the power conversion unit 90 can be appropriately cooled.
[0106] The future heat generation amount X is estimated based on the DC voltage Vi (input voltage), the instantaneous power P (output power) and the conversion efficiency η, and the future cooling capacity Y is estimated based on the current temperature (temperature Ti) of the power conversion unit 90 and the current air volume of the cooling fan 66. This makes it possible to predict a temperature rise in the power conversion unit 90 and increase the air volume sent from the cooling fan 66 to the power conversion unit 90 in advance. As a result, when the power device 10 is operated at maximum output, the operating time from the start of operation of the power device 10 to the end of operation to protect the power device 10 from overheating can be extended as long as possible.
[0107] Furthermore, the future heat generation amount X is estimated using the current DC voltage Vi, instantaneous power P, and conversion efficiency η, and the future cooling capacity Y is estimated using the current temperature and current airflow of the power conversion unit 90. This makes it possible to appropriately control the cooling fan 66 in response to changes in state even when the state of the power conversion unit 90 changes (instantaneous fluctuations in the instantaneous power P) or when the state of the battery 16 (electricity storage device) changes (fluctuations in the DC voltage Vi). In this way, by controlling the cooling fan 66 with feedforward control in response to transient changes, it is possible to effectively suppress a temperature rise in the power conversion unit 90.
[0108] 5 to 7, the future cooling capacity Y is adjusted using the future heat generation amount X, and the target air volume Ft is determined based on the adjusted cooling capacity Y. This makes it possible to control the volume of air sent from the cooling fan 66 (see FIGS. 2 and 3) to the power conversion unit 90 to an optimal cooling air volume. As a result, the power conversion unit 90 can be effectively cooled.
[0109] In addition, by adjusting the cooling capacity Y according to the future heat generation amount X, it is possible to prevent the cooling capacity Y from being insufficient for the heat generation amount X, or from being excessive for the heat generation amount X. That is, when the cooling capacity Y estimated by the cooling capacity estimation unit 118 is insufficient for the future heat generation amount X, the insufficient amount is added to the estimated cooling capacity Y. In addition, when the cooling capacity Y estimated by the cooling capacity estimation unit 118 is excessive for the future heat generation amount X, the cooling capacity Y is reduced by the excess amount. In this way, it is possible to balance the heat generation amount X and the cooling capacity Y. By such feedforward control, the cooling fan 66 can appropriately cool the power conversion unit 90 with the minimum necessary power consumption in advance before the temperature of the power conversion unit 90 rises. In addition, by balancing the heat generation amount X and the cooling capacity Y, it is possible to suppress the power consumption of the cooling fan 66 and the noise of the cooling fan 66.
[0110] Conventionally, the temperature of the junction of the semiconductor element constituting the power conversion unit 90 was estimated from the heat loss and thermal resistance of the semiconductor element, and the target airflow Ft was determined from the estimated junction temperature. Therefore, in the conventional method, the process for determining the target airflow Ft was complicated.
[0111] In contrast, in this embodiment, the future heat generation amount X of the entire power conversion unit 90 is estimated using the current DC voltage Vi, instantaneous power P, and conversion efficiency η. In addition, the future cooling capacity Y of the cooling fan 66 is estimated using the current temperature (temperature Ti) of the semiconductor elements constituting the power conversion unit 90 and the current air volume of the cooling fan 66. Furthermore, the estimated future heat generation amount X is used to adjust the cooling capacity Y, and the target air volume Ft according to the adjusted cooling capacity Y is determined. In this way, in this embodiment, the target air volume Ft is determined by a simple estimation method, so that it is possible to execute the process for determining the target air volume Ft using a general-purpose low-spec microcomputer. This makes it possible to realize the power device 10 at low cost.
[0112] The user only needs to select a desired one of a plurality of control modes (see Figs. 5 to 7). This allows the power conversion unit 90 to be cooled in the mode desired by the user while suppressing an increase in power consumption of the cooling fan 66. For example, a normal control mode (see Fig. 5), a control mode requiring quietness (see Fig. 7), a control mode for performing cooling in advance in preparation for heat generation (see Fig. 6), and the like are prepared in advance, allowing the user to select a desired mode.
[0113] As shown in Figures 2, 3 and 9, the future cooling capacity Y can be accurately estimated based on the current outside air temperature To of the power device 10, the current temperature (temperature Ti) of the power conversion unit 90, and the current air volume of the cooling fan 66.
[0114] Since the temperature of the power conversion unit 90 is the temperature of the semiconductor elements that constitute the power conversion unit 90, the future cooling capacity Y can be estimated with even greater accuracy.
[0115] The temperature of the semiconductor elements is at least the temperature Ti of the semiconductor elements constituting the inverter 56 (AC / DC converter). This makes it possible to estimate the future cooling capacity Y in consideration of the temperature Ti of the semiconductor elements of the inverter 56 that generate the most heat among the power conversion unit 90.
[0116] In addition to the above disclosure, the following notes are also disclosed.
[0117] (Appendix 1) A temperature adjustment device (10) that adjusts a temperature (Ti) of a temperature adjustment target (90), the temperature adjustment device including a first estimation unit (116) that estimates a heat generation amount (X) of the temperature adjustment target, a second estimation unit (118) that estimates a temperature adjustment capacity (Y) of the temperature adjustment device, and a control unit (122) that controls the temperature adjustment device based on the heat generation amount estimated by the first estimation unit and the temperature adjustment capacity estimated by the second estimation unit.
[0118] According to this configuration, the heat generation amount of the temperature control target is estimated, the temperature control capacity of the temperature control device is estimated, and the temperature control device is controlled based on the estimated heat generation amount and temperature control capacity. Since the temperature control device is controlled according to the future heat generation amount and temperature control capacity of the temperature control target, the temperature of the temperature control target can be appropriately adjusted. In addition, an increase in the power consumption of the temperature control device can be suppressed.
[0119] (Appendix 2) In the temperature control device described in Appendix 1, the control unit may control the temperature control device based on the heat generation amount estimated by the first estimation unit, the temperature control capacity estimated by the second estimation unit, and an operation degree (130, 132, 134) of the temperature control device that is predetermined according to the heat generation amount and the temperature control capacity.
[0120] According to this configuration, the temperature adjustment device is controlled based on the heat generation amount estimated by the first estimation unit, the temperature adjustment capacity estimated by the second estimation unit, and the operation degree of the temperature adjustment device that is determined in advance according to the heat generation amount and the temperature adjustment capacity. This makes it possible to appropriately control the temperature adjustment device according to the operation degree of the temperature adjustment device.
[0121] (Appendix 3) In the temperature adjustment device described in Supplementary Note 1 or 2, the second estimation unit may estimate the temperature adjustment capacity based on a temperature of the temperature adjustment target and a temperature adjustment state of the temperature adjustment device.
[0122] According to this configuration, the future temperature adjustment capacity can be estimated with high accuracy based on the temperature of the temperature adjustment target and the temperature adjustment state of the temperature adjustment device.
[0123] (Appendix 4) In the temperature adjustment device described in any one of Supplementary Notes 1 to 3, the temperature adjustment target may be a load that consumes power (P), and the first estimation unit may estimate the heat value based on the power consumed by the load.
[0124] According to this configuration, the amount of heat generated in the future can be accurately estimated based on the current power consumed by the load, thereby making it possible to appropriately adjust the temperature of the load that is the temperature adjustment target.
[0125] (Appendix 5) In the temperature adjustment device described in Appendix 4 which is dependent on Appendixes 1 to 3, the temperature adjustment device may further include a cooling fan (66) which is controlled by the control unit to cool the load, the temperature adjustment capacity being the cooling capacity of the cooling fan, and the temperature adjustment state being a cooling state of the temperature adjustment device.
[0126] According to this configuration, the cooling fan is controlled based on the future heat generation amount of the load and the future cooling capacity of the cooling fan. This makes it possible to appropriately cool the load that is the temperature control target. Furthermore, even if the cooling capacity of the cooling fan is increased, the increase in the power consumption of the cooling fan can be suppressed.
[0127] (Appendix 6) In the temperature control device described in Appendix 5, the load may be a power conversion unit (90) that converts the power, an input side (92) of the power conversion unit may be connected to a power storage device (16), and an output side (100) of the power conversion unit may be connectable to an external device (102) located outside the temperature control device.
[0128] According to this configuration, the power conversion unit can be appropriately cooled.
[0129] (Appendix 7) In the temperature control device described in Appendix 6, the temperature control device may further include a power calculation unit (114) that calculates an output power (P), which is the power on the output side, and the first estimation unit may estimate the heat generation amount of the power conversion unit based on an input voltage (Vi) supplied to the input side, the output power calculated by the power calculation unit, and a conversion efficiency (η) of the power conversion unit, and the second estimation unit may estimate the cooling capacity of the cooling fan based on a current temperature (Ti) of the power conversion unit and a current air volume of the cooling fan.
[0130] According to this configuration, the future heat generation amount is estimated based on the input voltage, the output power, and the conversion efficiency, and the future cooling capacity is estimated based on the current temperature of the power conversion unit and the current air volume of the cooling fan. This makes it possible to predict the temperature rise of the power conversion unit and increase the air volume sent from the cooling fan to the power conversion unit in advance. As a result, when the power device is operated at maximum output, the operating time from the start of operation of the power device to the end of operation to protect the power device from overheating can be extended as long as possible.
[0131] In addition, the future heat generation amount is estimated using the current input voltage, output power, and conversion efficiency, and the future cooling capacity is estimated using the current temperature and current airflow of the power conversion unit. This makes it possible to appropriately control the cooling fan in response to changes in state even when the state of the power conversion unit changes (instantaneous fluctuations in output power) or when the state of the power storage device changes (fluctuations in input voltage). In this way, by controlling the cooling fan with feedforward control in response to transient changes, it is possible to effectively suppress temperature rise in the power conversion unit.
[0132] (Appendix 8) The temperature adjustment device described in Appendix 7 may further include a cooling air volume determination unit (120) that adjusts the cooling capacity using the heat generation amount and determines a target air volume (Ft), which is a target value of the air volume of the cooling fan, based on the adjusted cooling capacity, and the control unit may control the cooling fan based on the target air volume determined by the cooling air volume determination unit.
[0133] According to this configuration, the future cooling capacity is adjusted using the future heat generation amount, and the target air volume is determined based on the adjusted cooling capacity. This makes it possible to control the air volume sent from the cooling fan to the power conversion unit to an optimal cooling air volume. As a result, the power conversion unit can be effectively cooled.
[0134] In addition, by adjusting the cooling capacity according to the future heat generation amount, it is possible to avoid the cooling capacity being insufficient for the heat generation amount or being excessive for the heat generation amount. That is, when the cooling capacity estimated by the second estimation unit is insufficient for the future heat generation amount, the insufficient amount is added to the estimated cooling capacity. In addition, when the cooling capacity estimated by the second estimation unit is excessive for the future heat generation amount, the cooling capacity is reduced by the excess amount. This makes it possible to balance the heat generation amount and the cooling capacity. By such feedforward control, the cooling fan can appropriately cool the power conversion unit with the minimum necessary power consumption in advance before the temperature of the power conversion unit rises. In addition, by balancing the heat generation amount and the cooling capacity, it is possible to reduce the power consumption of the cooling fan and the noise of the cooling fan.
[0135] In addition, in the past, the temperature of the junction of the semiconductor element constituting the power conversion unit was estimated from the heat loss and thermal resistance of the semiconductor element, and the target airflow was determined from the estimated junction temperature. Therefore, in the past, the process for determining the target airflow was complicated.
[0136] In contrast, in the present invention, the future heat generation amount of the entire power conversion unit is estimated using the current input voltage, output power, and conversion efficiency. In addition, the future cooling capacity of the cooling fan is estimated using the current temperature of the semiconductor elements constituting the power conversion unit and the current air volume of the cooling fan. Furthermore, the estimated future heat generation amount is used to adjust the cooling capacity, and a target air volume according to the adjusted cooling capacity is determined. In this way, since the target air volume is determined by a simple estimation method in the present invention, it is possible to execute the process for determining the target air volume using a general-purpose low-spec microcomputer. This makes it possible to realize a temperature control device at low cost.
[0137] (Appendix 9) In the temperature control device described in Appendix 8, the operation degree is a control mode of the cooling fan indicating the relationship between the heat generation amount and the cooling capacity, and the cooling air volume determination unit may adjust the cooling capacity using one of the control modes and the heat generation amount.
[0138] According to this configuration, the user only needs to select one desired control mode from among a plurality of control modes. This allows the power conversion unit to be cooled while suppressing an increase in power consumption of the cooling fan in the mode desired by the user. For example, a normal control mode, a control mode requiring quietness, a control mode that performs cooling in advance in preparation for heat generation, and the like are prepared in advance, allowing the user to select the desired mode.
[0139] (Appendix 10) In the temperature control device described in any one of Appendices 7 to 9, the second estimation unit may estimate the cooling capacity based on a current outside air temperature (To) of the temperature control device, a current temperature of the power conversion unit, and a current air volume of the cooling fan.
[0140] According to this configuration, the future cooling capacity can be estimated with high accuracy based on the current outside air temperature of the temperature adjustment device, the current temperature of the power conversion unit, and the current air volume of the cooling fan.
[0141] (Appendix 11) In the temperature adjustment device according to any one of Supplementary Notes 6 to 10, the temperature of the power conversion unit may be the temperature of a semiconductor element that constitutes the power conversion unit.
[0142] According to this configuration, since the temperature of the power conversion unit is the temperature of the semiconductor elements that constitute the power conversion unit, it is possible to estimate the future cooling capacity with even greater accuracy.
[0143] (Appendix 12) In the temperature adjustment device described in Appendix 11, the power conversion unit includes a DC converter (50) electrically connected to the power storage device and converting DC power, and an AC / DC converter (56) electrically connected between the DC converter and the external device and converting the DC power and AC power (P), and the temperature of the semiconductor element may be at least a temperature (Ti) of a semiconductor element constituting the AC / DC converter.
[0144] According to this configuration, the temperature of the semiconductor element is at least the temperature of the semiconductor element constituting the AC / DC converter, and thus it is possible to estimate the future cooling capacity in consideration of the temperature of the semiconductor element of the AC / DC converter that generates the most heat among the power conversion units.
[0145] (Appendix 13) A control method for a temperature control device that adjusts the temperature of a temperature control target, the control method having a first step (S14) of estimating a heat generation amount of the temperature control target, a second step (S15) of estimating a temperature control capacity of the temperature control device, and a third step (S20) of controlling the temperature control device based on the estimated heat generation amount and the temperature control capacity.
[0146] According to this method, the heat generation amount of the temperature control target is estimated, the temperature control capacity of the temperature control device is estimated, and the temperature control device is controlled based on the estimated heat generation amount and temperature control capacity. Since the temperature control device is controlled according to the future heat generation amount and temperature control capacity of the temperature control target, the temperature of the temperature control target can be appropriately adjusted. In addition, an increase in the power consumption of the temperature control device can be suppressed.
[0147] (Appendix 14) A program for causing a computer (60, 62) to execute the temperature adjustment device control method described in Supplementary Note 13.
[0148] (Appendix 15) A storage medium (110, 112) that stores the program described in Supplementary Note 14.
[0149] The present invention is not limited to the above disclosure, and various configurations can be adopted without departing from the gist of the present invention. [Explanation of symbols]
[0150] 10…Power equipment (temperature control device) 60…Converter CPU (computer) 62...Inverter CPU (computer) 90...Power conversion section (temperature control target) 110, 112...Memory (storage medium) 116...heat generation amount estimation unit (first estimation unit) 118…Cooling capacity estimation section (second estimation section) 122...Cooling fan control unit (control unit)
Claims
1. A temperature control device that adjusts the temperature of a temperature control target, A first estimation unit that estimates a heat generation amount of the temperature control target; A second estimation unit that estimates a temperature adjustment capacity of the temperature adjustment device; a control unit that controls the temperature adjustment device based on the heat generation amount estimated by the first estimation unit and the temperature adjustment capacity estimated by the second estimation unit; A temperature control device comprising:
2. The temperature control device according to claim 1, A temperature control device, wherein the control unit controls the temperature control device based on the heat generation amount estimated by the first estimation unit, the temperature control capacity estimated by the second estimation unit, and an operation degree of the temperature control device that is predetermined based on the heat generation amount and the temperature control capacity.
3. The temperature control device according to claim 1 or 2, The second estimation unit estimates the temperature adjustment capacity based on a temperature of the temperature adjustment target and a temperature adjustment state of the temperature adjustment device.
4. The temperature control device according to any one of claims 1 to 3, the temperature control target is a load that consumes power, The first estimation unit estimates the heat generation amount based on the power consumed by the load.
5. In the temperature control device according to claim 4 which is dependent on claims 1 to 3, The load is cooled by a cooling fan controlled by the control unit. the temperature control capacity is the cooling capacity of the cooling fan, The temperature control state is a cooling state of the temperature control device.
6. The temperature control device according to claim 5, the load is a power conversion unit that converts the power, An input side of the power conversion unit is connected to a power storage device, A temperature control device, wherein an output side of the power conversion unit is connectable to an external device located outside the temperature control device.
7. The temperature control device according to claim 6, A power calculation unit is further provided to calculate an output power, which is the power on the output side. the first estimation unit estimates the heat generation amount of the power conversion unit based on an input voltage supplied to the input side, the output power calculated by the power calculation unit, and a conversion efficiency of the power conversion unit; The second estimation unit estimates the cooling capacity of the cooling fan based on a current temperature of the power conversion unit and a current air volume of the cooling fan.
8. The temperature control device according to claim 7, a cooling airflow amount determination unit that adjusts the cooling capacity by using the heat generation amount and determines a target airflow amount, which is a target value of the airflow amount of the cooling fan, based on the adjusted cooling capacity; The control unit controls the cooling fan based on the target air volume determined by the cooling air volume determination unit.
9. The temperature control device according to claim 8, the operation degree is a control mode of the cooling fan indicating a relationship between the heat generation amount and the cooling capacity, The cooling airflow determination unit adjusts the cooling capacity by using one of the control modes and the amount of heat generation.
10. The temperature control device according to any one of claims 7 to 9, The second estimation unit estimates the cooling capacity based on a current outside air temperature of the temperature adjustment device, a current temperature of the power conversion unit, and a current air volume of the cooling fan.
11. The temperature control device according to any one of claims 6 to 10, A temperature adjustment device, wherein the temperature of the power conversion unit is a temperature of a semiconductor element that constitutes the power conversion unit.
12. The temperature control device according to claim 11, the power conversion unit includes a DC converter electrically connected to the power storage device and configured to convert DC power, and an AC / DC converter electrically connected between the DC converter and the external device and configured to convert the DC power and AC power; A temperature adjustment device, wherein the temperature of the semiconductor element is at least the temperature of a semiconductor element that constitutes the AC / DC converter.
13. A method for controlling a temperature control device that adjusts the temperature of a temperature control target, comprising: A first step of estimating a heat generation amount of the temperature control target; A second step of estimating a temperature control capability of the temperature control device; A third step of controlling the temperature adjustment device based on the estimated heat generation amount and the temperature adjustment capacity; The temperature adjustment device control method includes the steps of:
14. A program for causing a computer to execute the temperature adjustment device control method according to claim 13.
15. A storage medium for storing the program according to claim 14.
Citation Information
Patent Citations
Apparatus and method for cooling electrical equipment, and program for implementing the cooling method in computer and recording medium storing the program
JP2008153278A
Cooling system for power converter
JP2011083135A
Power output device, power input device, and power output / input device
WO2020235617A1
