Charge and discharge plan creation device and charge and discharge plan creation method

The charging/discharging plan creation device optimizes charging and discharging operations based on predicted electricity prices to maximize profits and efficiency, addressing inefficiencies in existing methods by aligning with price fluctuations and reducing temperature impacts.

JP2024145252AActive Publication Date: 2024-10-15THE CHUGOKU ELECTRIC POWER CO INC
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023057526
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-15
Estimated Expiration
2043-03-31

AI Technical Summary

Technical Problem

Existing methods for creating charging and discharging plans for storage batteries fail to maximize profit due to inefficiencies in charging and discharging efficiency, leading to suboptimal electricity sales prices and profits, especially when using renewable energy sources.

Method used

A charging/discharging plan creation device that optimizes charging and discharging operations based on predicted electricity prices, adjusting the plan to ensure maximum electricity sales revenue by charging during low-price periods and discharging during high-price periods, while considering charging and discharging efficiencies.

Benefits of technology

The device maximizes electricity sales prices and profits by creating a plan that aligns charging and discharging with predicted price fluctuations, improving efficiency and preventing temperature decreases in storage batteries.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024145252000001_ABST
    Figure 2024145252000001_ABST
Patent Text Reader

Abstract

To create a charge and discharge plan of a power storage battery, of which a power selling price becomes the maximum, and a profit by a power selling becomes the maximum.SOLUTION: A charge and discharge plan creation device contains: a first calculation part that calculates a first power selling price in a creation object day of a charging and discharging plan on the basis of a charging plan created by a charging plan part and a discharging plan created by a discharging plan part; and a second calculation part that updates the discharging plan by removing a discharging amount of a discharging frame until a prediction value of a power price is reached from a cheep to a discharge amount in accordance with a charging amount to be removed in each update of the change of the charging plan by removing the charging amount of one charging frame from the side where the prediction value of the power price is high, and calculates a second power selling price in each creation object day of the charging and discharging plan on the basis of the charging plan and the discharging plan that are updated; and a charging and discharging plan creation part that creates the charging and discharging plan on the basis of the charging plan and the discharging plan that become the highest power selling price from the first and second power selling prices.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a charge and discharge plan creating device and a charge and discharge plan creating method for creating a charge and discharge plan for a storage battery. [Background technology]

[0002] In recent years, the Feed-in-Premium (FIP) system has been introduced to allow power generation businesses that use renewable energy (such as solar, wind, and hydroelectric power) to sell electricity. With the introduction of the FIP system, a method has been proposed for the power generation businesses to earn revenue by selling electricity by combining a power generation facility that generates electricity using renewable energy with a storage battery, charging the generated electricity into the storage battery during time periods such as daytime when electricity prices are relatively low, and discharging the electricity charged in the storage battery during time periods such as nighttime when electricity prices are relatively high, a so-called time shift. (See Patent Document 1) [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2018-98952 A Summary of the Invention [Problem to be solved by the invention]

[0004] When charging the battery to its capacity, a charge amount A of "battery capacity / charging efficiency α" is required, while when discharging the battery to its capacity, only a discharge amount B of "battery capacity × discharge efficiency β" can be discharged. In other words, the relationship between charge amount A and discharge amount B is "discharge amount B < charge amount A" and "discharge amount B = α × β × charge amount A".

[0005] In order to create a daily charging and discharging plan for a storage battery, multiple charging frames are assigned to times such as daytime when electricity prices are low, and multiple discharging frames are assigned to times such as nighttime when electricity prices are high. Unless the relationship (average discharging price / average charging price) > (1 / (α x β)) holds between the average electricity price over the multiple charging frames (average charging price), the average electricity price over the multiple discharging frames (average discharging price), and the above-mentioned charging efficiency α and discharge efficiency β, no profit will be made even if the electricity charged in the storage battery is sold through time shifting, and there was a risk that it would be difficult to maximize this profit, even if a storage battery with a relatively large capacity was used.

[0006] The present invention has been made in consideration of the above-mentioned problems, and one object of the present invention is to provide a charge / discharge plan creation device and a charge / discharge plan creation method that are capable of creating a charge / discharge plan for a storage battery that will achieve the highest selling price and maximize revenue from selling electricity, regardless of the capacity of the storage battery. [Means for solving the problem]

[0007] One of the present inventions for achieving the above object is a charge / discharge plan creation device that creates a charge / discharge plan for a storage battery that charges with generated power from a power generation facility that generates power using renewable energy and discharges the charged power, the charge / discharge plan creation device comprising: a charge planning unit that creates a charge plan for charging, in a charging time period including a plurality of charge frames in which a predicted value of the power price on a target day for creating the charge / discharge plan is equal to or less than a first price, in the order of the charge frames in which the predicted value of the power price progresses from low to high prices, until the capacity of the storage battery is reached, in a discharging time period including a plurality of discharge frames in which the predicted value of the power price is equal to or greater than a second price that is equal to or greater than the first price, in the order of the discharge frames in which the predicted value of the power price progresses from high to low prices, until the capacity of the storage battery is reached. the charging and discharging plan creating unit is configured to create a discharge plan for discharging; a first calculation unit is configured to calculate a first power selling price on a target day for creating the charge and discharge plan based on the charging plan and the discharge plan; a second calculation unit is configured to update the discharge plan by deleting a discharge amount of the discharge unit from a side with a lower predicted value of the power price until a discharge amount corresponding to the deleted charge amount is reached each time the charging plan is updated by deleting a charge amount of one of the charging units from a side with a higher predicted value of the power price; and to calculate a second power selling price on a target day for creating the charge and discharge plan based on the updated charging plan and the discharge plan; and a charge and discharge plan creating unit is configured to create the charge and discharge plan based on the charging plan and the discharge plan that has the highest power selling price among the first power selling price and the second power selling price.

[0008] Another aspect of the present invention for achieving the above object is a charge / discharge plan creation device that creates a charge / discharge plan for a storage battery that charges with generated power from a power generation facility that generates power using renewable energy and discharges the charged power, the charge / discharge plan creation device including a charge planning unit that creates a charge plan for charging, in a charging time period including a plurality of charge frames in which a predicted value of the power price on a target day for creating the charge / discharge plan is equal to or less than a first price, in an order of the charge frames in which the predicted value of the power price progresses from a low price to a high price, until the capacity of the storage battery is reached, and a charge planning unit that creates a charge plan for charging, in a discharging time period including a plurality of discharge frames in which the predicted value of the power price is equal to or less than a second price that is equal to or greater than the first price, in an order of the discharge frames in which the predicted value of the power price progresses from a high price to a low price, until the capacity of the storage battery is reached. a first calculation unit that calculates a first power selling price on a target date for creating the charge / discharge plan based on the charging plan and the discharge plan; a second calculation unit that updates the charging plan by deleting a charge amount of the charging unit from a side with a higher predicted value of the power price until a charge amount corresponding to the deleted discharge amount is reached each time the discharge plan is updated by deleting a discharge amount of one of the discharging units from a side with a lower predicted value of the power price, and calculates a second power selling price on a target date for creating the charge / discharge plan based on the updated charging plan and the discharge plan; and a charge / discharge plan creation unit that creates the charge / discharge plan based on the charging plan and the discharge plan that provides the highest power selling price among the first power selling price and the second power selling price.

[0009] Another aspect of the present invention for achieving the above object is a charge / discharge plan creation device for creating a charge / discharge plan for a storage battery that charges with generated power from a power generation facility that generates power using renewable energy and discharges the charged power, the charge / discharge plan creation device including: a charge plan creation unit that creates a charge plan for charging the storage battery in a charging time period including a plurality of charge frames in which the predicted value of the power price on a target date for creating the charge / discharge plan is a first price or less, in an order of the charge frames in which the predicted value of the power price goes from a low price to a high price, until the capacity of the storage battery is reached; a discharge plan creation unit that creates a discharge plan for discharging the storage battery in a discharging time period including a plurality of discharge frames in which the predicted value of the power price is a second price or more that is equal to or greater than the first price, in an order of the discharge frames in which the predicted value of the power price goes from a high price to a low price, until the capacity of the storage battery is reached; a first calculation unit that calculates a first power selling price on a target date for creating the charge / discharge plan based on the charge plan and the discharge plan; a second calculation unit that updates the discharge plan by deleting a discharge amount of the discharging unit from the side with the lower predicted value of the power price until a discharge amount corresponding to the deleted charge amount is reached, each time the charging plan is updated by deleting a charge amount of one of the charging units from the side with the lower predicted value of the power price, and calculates a second power selling price on a target day for creating the charge and discharge plan based on the updated charging plan and the discharge plan; a third calculation unit that updates the charging plan by deleting a charge amount of the charging unit from the side with the higher predicted value of the power price until a charge amount corresponding to the deleted discharge amount is reached, each time the discharging plan is updated by deleting a discharge amount of one of the discharging units from the side with the lower predicted value of the power price, and calculates a third power selling price on a target day for creating the charge and discharge plan based on the updated charging plan and the discharge plan; and a charge and discharge plan creation unit that creates the charge and discharge plan based on the charging plan and the discharge plan that have the highest power selling price among the first power selling price, the second power selling price, and the third power selling price.

[0010] According to the charge and discharge plan creation device of the present invention, it is possible to create a charge and discharge plan for a storage battery that will result in the highest electricity selling price and maximize profits.

[0011] In order to achieve the above object, in another aspect of the present invention, in a charge and discharge schedule creating device, the discharging time zone is a time zone that follows the charging time zone.

[0012] The charge and discharge plan created by the charge and discharge plan creation device of the present invention is a plan that, on the day for which the charge and discharge plan for the storage battery is to be created, charges the storage battery collectively during times such as daytime when the predicted value of the electricity price is relatively low, and discharges the storage battery collectively during times such as nighttime when the predicted value of the electricity price is relatively high. Since the storage battery does not frequently repeat charging and discharging operations, it is possible to prevent the charging efficiency and discharging efficiency from decreasing prematurely.

[0013] In addition, the problems and solutions disclosed in this application will be made clear by the description in the section of the preferred embodiment of the invention and the descriptions in the drawings. Effect of the Invention

[0014] According to the present invention, it is possible to create a charge / discharge plan for a storage battery that maximizes the selling price of electricity and maximizes profits. [Brief description of the drawings]

[0015] [Figure 1] 1 is a block diagram showing a schematic configuration of a power generation system 1 including a charge / discharge schedule creation device 100. FIG. [Diagram 2] 1 is a graph showing an example of the relationship between the predicted value of the electricity price by the electricity price prediction device 160, the predicted value of the power generation output by the power generation prediction device 170, the planned value of the charge amount of the storage battery 120 in a charging frame, and the planned value of the discharge amount of the storage battery 120 in a discharging frame. [Diagram 3] 2 is a block diagram showing main functions of a charge and discharge plan creation device 100. FIG. [Figure 4A] 13 is a diagram of table data showing an example of a relationship between a predicted value of the power generation output of the PV power generation facility 110 and a predicted value of the power price, which is stored in a storage area 1072. FIG. [Figure 4B] 10 is a diagram showing an example of charge / discharge plan initial values ​​stored in a memory area 1075. FIG. [Figure 4C] 10 is a diagram showing an example of a first charge / discharge plan update value stored in a memory area 1078. FIG. [Figure 4D] 13 is a diagram showing an example of a second charge / discharge plan update value stored in a memory area 1078. FIG. [Figure 4E] 13 is a diagram showing an example of a third charge / discharge plan update value stored in a memory area 1078. FIG. [Figure 4F] 13 is a diagram showing an example of a fourth charge / discharge plan update value stored in a memory area 1078. FIG. [Figure 4G] 13 is a diagram showing an example of a fifth charge / discharge plan update value stored in a memory area 1078. FIG. [Diagram 5] 2 is a block diagram showing an example of hardware of an information processing device 10 that realizes the functions of the charge and discharge plan creation device 100. FIG. [Figure 6A] 4 is a flowchart showing an example of a process when the charge and discharge plan creation device 100 creates a charge and discharge plan in the first embodiment. [Figure 6B] 6B is a flowchart showing an example of a process when the charge and discharge plan creation device 100 creates a charge and discharge plan, which is a process subsequent to the process of FIG. 6A. [Figure 7A] 10 is a diagram showing an example of a first charge / discharge plan update value stored in a memory area 1078. FIG. [Figure 7B] 13 is a diagram showing an example of a second charge / discharge plan update value stored in a memory area 1078. FIG. [Figure 7C] 13 is a diagram showing an example of a third charge / discharge plan update value stored in a memory area 1078. FIG. [Figure 8A] 13 is a flowchart showing an example of a process performed when the charge and discharge plan creation device 100 creates a charge and discharge plan in the second embodiment. [Figure 8B] 8B is a flowchart showing an example of a process when the charge and discharge plan creation device 100 creates a charge and discharge plan, which is a process subsequent to the process of FIG. 8A. [Figure 9] 4 is another block diagram showing main functions of the charge and discharge plan creation device 100. FIG. [Figure 10A]13 is a flowchart showing an example of a process performed when the charge and discharge plan creation device 100 creates a charge and discharge plan in the third embodiment. [Figure 10B] 10B is a flowchart showing an example of a process when the charge and discharge plan creation device 100 creates a charge and discharge plan, which is a process subsequent to the process of FIG. 10A. [Figure 10C] 10C is a flowchart showing an example of a process when the charge and discharge plan creation device 100 creates a charge and discharge plan, which is a process subsequent to the process of FIG. 10B. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0016] At least the following matters will become apparent from the description of this specification and the accompanying drawings. Hereinafter, the present invention will be described in detail based on an embodiment thereof with reference to the accompanying drawings.

[0017] 1 is a block diagram showing a schematic configuration of a power generation system 1 including a charge / discharge plan creation device 100 according to this embodiment. In this embodiment, the power generation facility that generates power by utilizing renewable energy is, for example, a photovoltaic power generation facility (hereinafter referred to as a "PV power generation facility" (PV: Photo Voltaic)) 110 that generates power by utilizing sunlight.

[0018] The power generation system 1 includes a charge / discharge plan creation device 100, a PV power generation facility 110, a storage battery 120, a storage battery control device 130, a weather information providing device 150, a power price prediction device 160, and a generated power prediction device 170.

[0019] The charge / discharge plan creation device 100, the PV power generation facility 110, the storage battery 120, the storage battery control device 130, the weather information providing device 150, the power price prediction device 160, and the power generation prediction device 170 are connected in a communicable state via a communication network 180. The communication network 180 is, for example, a local area network (LAN), a wide area network (WAN), a dedicated line, a power line communication network, various public communication networks, etc. In addition to the communication network 180, the PV power generation facility 110 and the storage battery 120 are also connected to a power system 190 operated by a general power transmission and distribution company, etc.

[0020] The PV power generation facility 110 includes a solar power generation panel configured using, for example, a polycrystalline silicon power generation element, a single crystal silicon power generation element, a thin film power generation element, or the like. The PV power generation facility 110 also includes a power conditioner (PCS: Power Conditioning Subsystem) 110A that converts the power generated by the solar power generation panel from direct current to alternating current and supplies the power to a power grid 190. The power generated by the PV power generation facility 110 is either supplied to the power grid 190 via the power conditioner 110A (sold to a general power transmission and distribution company) or supplied to the storage battery 120 (charged to the storage battery 120), but in this embodiment, the power generated by the PV power generation facility 110 is supplied to the storage battery 120 in ten charging frames C1 to C10 included in the charging time slot.

[0021] The storage battery 120 is, for example, a lead battery, a lithium ion battery, a sodium sulfur battery, a nickel metal hydride battery, a redox flow battery, a fuel cell, a capacitor battery, etc. The storage battery 120 includes a power conditioner (PCS) 120A for charging and discharging between the storage battery 120 and the power grid 190.

[0022] The weather information providing device 150 provides the electricity price prediction device 160 and the generated power prediction device 170 with weather information (e.g., temperature, solar radiation, etc.) of the region where the PV power generation facility 110 is installed on the day when the charge / discharge plan for the storage battery 120 is created (the target day for creating the charge / discharge plan). The weather information providing device 150 may obtain the above weather information from a weather observation station in the region where the PV power generation facility 110 is installed, or may obtain the above weather information from a weather information providing server managed by the Japan Meteorological Agency.

[0023] The power price prediction device 160 refers to the weather information and information such as date, time, and day of the week acquired from the weather information providing device 150 for the day when the charge and discharge plan of the storage battery 120 is created (the target day for creating the charge and discharge plan), and predicts the power price (yen / kW) of the power to be traded on the target day for creating the charge and discharge plan of the storage battery 120. In this embodiment, the power price prediction device 160 predicts the power price for each frame, with a time span of, for example, 30 minutes. In addition, as a method for the power price prediction device 160 to predict the power price, for example, a well-known technology that predicts the power price by combining the above-mentioned weather information, information such as date, time, and day of the week, and an analysis technology such as artificial intelligence can be used. In addition, the power price prediction device 160 may acquire the predicted value of the power price published by a third party via the communication network 180 or the Internet.

[0024] The power generation prediction device 170 predicts the power generation output (MWh) for each frame in the PV power generation facility 110 based on the weather information acquired from the weather information providing device 150 for the day when the charge / discharge plan for the storage battery 120 is created (the day for which the charge / discharge plan is created), the location information (latitude, longitude, etc.) of the PV power generation facility 110, the installation area and installation angle of the solar power generation panel, and other information. Note that, as a method for the power generation prediction device 170 to predict the power generation output of the PV power generation facility 110, for example, a well-known technology such as a physical model that combines an analysis technology that pinpoints the power generation output with the above-mentioned weather information, the location information of the PV power generation facility 110, the installation area and installation angle of the solar power generation panel, etc., or a statistical model that combines an analysis technology such as artificial intelligence that has learned the relationship between past weather information and actual values ​​of power generation output can be used.

[0025] The charge and discharge plan creation device 100 acquires a predicted value of the power price from the power price prediction device 160 for the day when the charge and discharge plan of the storage battery 120 is created (a target day for creating the charge and discharge plan), and acquires a predicted value of the power output of the PV power generation facility 110 from the power generation power prediction device 170. Based on the predicted value of the power price and the predicted value of the power output, the charge amount in the ten charging frames C1 to C10 included in the charging time period when the predicted value of the power price is relatively low and the discharge amount in the seven discharging frames D1 to D7 included in the discharging time period when the predicted value of the power price is relatively high are adjusted, and a charge and discharge plan is created according to the charge amount for each of the charging frames C1 to C10 and the discharge amount for each of the discharging frames D1 to D7 when the power selling price (power selling revenue) of the storage battery 120 is at its highest. The charge and discharge plan creation device 100 will be described in detail later.

[0026] The battery control device 130 acquires the charge / discharge plan created by the charge / discharge plan creation device 100, and controls the charge / discharge operation of the battery 120 so that the battery 120 charges in accordance with the charge amount for each charging frame C1 to C10 planned in the charge / discharge plan, and discharges in accordance with the discharge amount for each discharging frame D1 to D7 planned in the charge / discharge plan.

[0027] FIG. 2 is a graph showing an example of the relationship between the predicted value of the electricity price by the electricity price prediction device 160, the predicted value of the power generation output by the power generation prediction device 170, the planned value of the charge amount of the storage battery 120 in the charging frames C1 to C10, and the planned value of the discharge amount of the storage battery 120 in the discharging frames D1 to D7 on the target day for creating the charge and discharge plan for the storage battery 120.

[0028] 2, the scale on the horizontal axis indicates time in 30-minute units (1 frame unit) in one day, the scale on the vertical axis on the left side indicates the power output in 0.5 MWh units of the PV power generation facility 110, and the scale on the vertical axis on the right side indicates the electricity price in 5 yen / kW units in the market where electricity is bought and sold. Also in Fig. 2, the dashed dotted line indicates the predicted value of the electricity price on the target day for creating the charge and discharge plan for the storage battery 120, the dashed two dotted line indicates the predicted value of the power output of the PV power generation facility 110 on the target day for creating the charge and discharge plan for the storage battery 120, the black line extending vertically indicates the planned value of the charge amount of the storage battery 120 in the charging frames C1 to C10 included in the charging time slot, and the white line extending vertically indicates the planned value of the discharge amount of the storage battery 120 in the discharging frames D1 to D7 included in the discharging time slot. In this embodiment, the charging time slot is the time slot from 9:30 to 14:00 when the predicted value of the power price is, for example, 19.85 yen (first price) / kW or less, and the discharging time slot is the time slot from 16:00 to 19:00 when the predicted value of the power price is, for example, 23.02 yen (second price) / kW or more. The charging time slot includes ten charging frames C1 to C10 by dividing the time slot from 9:30 to 14:00 into 30-minute units, and the discharging time slot includes seven discharging frames D1 to D7 by dividing the time slot from 16:00 to 19:00 into 30-minute units.

[0029] Here, the planned value of the charge amount per frame when the storage battery 120 charges the generated power generated by the PV power generation facility 110 is equal to the capacity / 2 of the power conditioner 110A when the predicted value of the power generation output per frame of the PV power generation facility 110 is equal to or more than the capacity / 2 of the power conditioner 110A, and on the other hand, when the predicted value of the power generation output per frame of the PV power generation facility 110 is less than the capacity / 2 of the power conditioner 110A, it is equal to the predicted value of the power generation output per frame of the PV power generation facility 110. Note that the capacity / 2 of the power conditioner 110A is the capacity that the power conditioner 110A can process the power generation output of the PV power generation facility 110 for one frame. In this embodiment, the predicted value of the power generation output of the PV power generation facility 110 during the charging time zone is equal to or more than the capacity / 2 of the power conditioner 110A. That is, the maximum planned value of the charge amount of the storage battery 120 in the charging frames C1 to C10 is limited to the capacity of the power conditioner 110A / 2 (2.5 MWh). The predicted value of the electricity price in the charging time slot is highest in the charging frames C6, C7, C8, C1, C5, C4, C3, C2, C9, and C10 in that order. The predicted value of the electricity price in the discharging time slot is lowest in the discharging frames D3, D4, D2, D5, D1, D6, and D7 in that order.

[0030] In FIG. 2, on the target day for creating the charge / discharge plan for the storage battery 120, a discharge time slot is set after the charge time slot, but if the predicted value of the power price rises to 23.02 yen or more during the charge time slot or falls to 19.85 yen or less during the discharge time slot, a discharge frame may be inserted during the charge time slot or a charge frame may be inserted during the discharge time slot. Also, in FIG. 2, different values ​​are selected as the predicted value of the power price (19.85 yen / kW) for setting the charge time slot and the predicted value of the power price (23.02 yen / kW) for setting the discharge time slot, but this is not limiting. For example, one predicted value of the power price that separates the charge time slot and the discharge time slot may be selected, and a time slot that is less than this predicted value of the power price may be set as the charge time slot, and a time slot that is equal to or greater than this predicted value of the power price may be set as the discharge time slot.

[0031] First Embodiment FIG. 3 is a block diagram showing main functions of the charge and discharge plan creation device 100 according to the first embodiment.

[0032] The charge and discharge plan creation device 100 includes an input unit 1010, a charge plan unit 1020, a discharge plan unit 1030, a first calculation unit 1040, a second calculation unit 1050, a charge and discharge plan creation unit 1060, a storage unit 1070, and an output unit 1080.

[0033] When the charge / discharge plan creation device 100 creates a charge / discharge plan for the storage battery 120, the input unit 1010 obtains from the power price prediction device 160 a predicted value of the electricity price on the target date for creating the charge / discharge plan for the storage battery 120, and obtains from the power generation power prediction device 170 a predicted value of the power generation output of the PV power generation equipment 110 on the target date for creating the charge / discharge plan for the storage battery 120.

[0034] The charging plan unit 1020 creates a charging plan for charging the storage battery 120 in the order (C6, C7, C8, C1, C5, C4, C3, C2, C9, C10) of the lowest to highest predicted value of the power price during the charging time slot for ten charging frames C1 to C10 included in the charging time slot from 9:30 to 14:00, where the predicted value of the power price obtained from the power price prediction device 160 is 19.85 yen / kW or less, until the cumulative value of the charge amount charged to the storage battery 120 reaches the capacity of the storage battery 120. Note that, since the predicted value of the power generation output of the PV power generation facility 110 is equal to or greater than half the capacity of the power conditioner 110A during the charging time slot, the planned maximum value of the charge amount in the storage battery 120 is limited to half the capacity of the power conditioner 110A. The planned values ​​of the charging amounts of the charging frames C1 to C10 included in the charging plan initially created by the charging plan unit 1020 are referred to as charging plan initial values.

[0035] The discharge planning unit 1030 creates a discharge plan for discharging the storage battery 120 in the order (D3, D4, D2, D5, D1, D6, D7) from the highest to the lowest predicted value of the power price in the discharge time period for the discharge frames D1 to D7 included in the discharge time period from the 16:00 frame to the 19:00 frame in which the predicted value of the power price acquired from the power price prediction device 160 is, for example, 23.02 yen / kW or more, until the cumulative value of the discharge amount discharged from the storage battery 120 reaches the capacity of the storage battery 120. In addition, in the discharge time period, the planned value of the maximum discharge amount in the storage battery 120 is limited to half the capacity of the power conditioner 110A. The planned value of the discharge amount of the discharge frames D1 to D7 included in the discharge plan created initially by the discharge planning unit 1030 is referred to as the discharge plan initial value. The charge and discharge plan creation unit 1060 creates the charge and discharge plan initial value by combining the above-mentioned charge and discharge plan initial values.

[0036] The first calculation unit 1040 calculates a first electricity selling price (also referred to as first electricity selling revenue) of the storage battery 120 for all 48 frames of the target date for creating the charge / discharge plan for the storage battery 120, using a predicted value of the power generation output of the PV power generation equipment 110, an initial charging plan value which is a planned value of the charge amount of the storage battery 120 initially planned in the charging time period, and an initial discharging plan value which is a planned value of the discharge amount of the storage battery 120 initially planned in the discharging time period.

[0037] The second calculation unit 1050 performs the following process to calculate a second power selling price (also referred to as a second power selling revenue) in order to confirm whether the first power selling price calculated by the first calculation unit 1040 is the highest power selling price on the target date for creating the charge and discharge plan of the storage battery 120. Specifically, the second calculation unit 1050 deletes the charge amount of one charging frame from among the charging frames C1 to C10 in the charging time slot starting from the side with the higher predicted value of the power price to update the charging plan of the storage battery 120, and deletes the discharge amount of a discharging frame from among the discharging frames D1 to D7 in the discharging time slot starting from the side with the lower predicted value of the power price until the discharge amount corresponding to the deleted charge amount is reached, thereby updating the discharging plan of the storage battery 120. The planned value of the charge amount of the charging frames C1 to C10 updated in this manner is referred to as a charging plan update value, and the planned value of the discharge amount of the discharging frames D1 to D7 updated in this manner is referred to as a discharging plan update value. Then, the second calculation unit 1050 calculates a second electricity selling price of the storage battery 120 for all 48 frames of the day for which the charge and discharge plan for the storage battery 120 is created, using the predicted value of the power generation output of the PV power generation equipment 110, the charging plan update value which is the planned value of the charge amount of the storage battery 120 updated during the charging time period, and the discharging plan update value which is the planned value of the discharge amount of the storage battery 120 updated during the discharging time period.

[0038] Furthermore, the process of calculating the second electricity selling price by the second calculation unit 1050 is repeated until it is determined that either the first electricity selling price or the second electricity selling price is the highest price on the target date for creating the charge / discharge plan for the storage battery 120.

[0039] The charge and discharge plan creation unit 1060 creates a charge and discharge plan initial value based on the charge plan initial value planned by the charge planning unit 1020 and the discharge plan initial value planned by the discharge planning unit 1030. The charge and discharge plan creation unit 1060 also creates a charge and discharge plan update value based on the charge plan update value and the discharge plan update value updated by the second calculation unit 1050. The charge and discharge plan creation unit 1060 compares the first power selling price and the second power selling price, and creates a charge and discharge plan based on the charge and discharge plan initial value when the first power selling price is the highest, and creates a charge and discharge plan based on the charge and discharge plan update value when the second power selling price is the highest.

[0040] The storage unit 1070 has ten storage areas. The storage area 1071 stores a control program for operating the charge / discharge plan creation device 100. The storage area 1073 stores a charge plan initial value planned by the charge plan unit 1020. The storage area 1074 stores a discharge plan initial value planned by the discharge plan unit 1030. The storage area 1075 stores a charge / discharge plan initial value and a first power selling price created by the charge / discharge plan creation unit 1060. The storage area 1076 stores a charge plan update value updated by the second calculation unit 1050. The storage area 1077 stores a discharge plan update value updated by the second calculation unit 1050. The storage area 1078 stores a charge / discharge plan update value and a second power selling price created by the charge / discharge plan creation unit 1060. In addition, the memory area 1072 stores the predicted value of the electricity price obtained from the electricity price prediction unit 160 and the predicted value of the power generation output obtained from the power generation prediction unit 170 on the target date for creating the charge / discharge plan for the storage battery 120, in correspondence with all 48 frames.

[0041] FIG. 4A is a diagram of table data showing an example of a relationship between a predicted value of the power output of the PV power generation facility 110 and a predicted value of the power price stored in the memory area 1072. The time on the target day for creating the charge / discharge plan of the storage battery 120 is divided into a total of 48 frames in 30-minute units, and the predicted value of the power output of the PV power generation facility 110 (MWh) and the predicted value of the power price (yen / kW) are associated with each frame. In the example of FIG. 4A, the power output of the PV power generation facility 110 is predicted to occur from the frame at 6:30 to the frame at 16:30, and within this frame, the time period from the frame at 9:30 to the frame at 14:00, in which the predicted value of the power price is 19.85 yen / kW or less, is set as the charging time period. In addition, the time period from the frame at 16:00 to the frame at 19:00, in which the predicted value of the power price is 23.02 yen / kW or more, is set as the discharging time period.

[0042] Fig. 4B is a diagram showing an example of charge and discharge plan initial values ​​stored in the memory area 1075. The charge and discharge plan initial values ​​in Fig. 4B are stored in the memory area 1075 in a form in which the charge frames C1 to C10, the discharge frames D1 to D7, the charge plan initial values ​​(MWh) planned by the charge planning unit 1020, the discharge plan initial values ​​(MWh) planned by the discharge planning unit 1030, and the power selling price (10,000 yen) are associated with each other for all 48 frames on the target day for creating the charge and discharge plan for the storage battery 120.

[0043] Fig. 4C is a diagram showing an example of a first charge / discharge plan update value stored in the memory area 1078. The charge / discharge plan update value in Fig. 4C is stored in the memory area 1078 in a form in which the charge frames C1 to C10, the discharge frames D1 to D7, a charge plan update value (MWh) obtained by deleting the planned value of the charge amount of the charge frame C10 in which the predicted value of the power price is the highest (19.85 yen / kW) in the charge time slot, and a discharge plan update value (MWh) obtained by deleting the discharge amount corresponding to the charge amount deleted in the charge frame C10 from the discharge frame D7 in which the predicted value of the power price is the lowest in the discharge time slot, for all 48 frames on the target day for creating the charge / discharge plan for the storage battery 120, are associated with each other.

[0044] Fig. 4D is a diagram showing an example of the second charge / discharge plan update value stored in the memory area 1078. The charge / discharge plan update value in Fig. 4D is stored in the memory area 1078 in a form in which the charge frames C1 to C10, the discharge frames D1 to D7, and the charge plan update value (MWh) obtained by further deleting the planned value of the charge amount of the charge frame C9 in which the predicted value of the power price in the charge time period is the second highest (17.04 yen / kW) from the highest, and the discharge plan update value (MWh) obtained by deleting the discharge amount corresponding to the charge amount deleted in the charge frame C9 from the discharge frame D7 in which the predicted value of the power price in the discharge time period is the lowest and the discharge frame D6 in which the predicted value of the power price is the second lowest (23.03 yen / kW) from the lowest, are associated with each other for all 48 frames on the target day for creating the charge / discharge plan for the storage battery 120.

[0045] Fig. 4E is a diagram showing an example of the third charge / discharge plan update value stored in the memory area 1078. The charge / discharge plan update value in Fig. 4E is stored in the memory area 1078 in a form in which the charge frames C1 to C10, the discharge frames D1 to D7, and the charge plan update value (MWh) obtained by further deleting the planned value of the charge amount of the charge frame C2 in which the predicted value of the power price in the charge time slot is the third highest from the highest (17 yen / kW), and the discharge plan update value (MWh) obtained by deleting the discharge amount corresponding to the charge amount deleted in the charge frame C2 from the discharge frame D6 in which the predicted value of the power price in the discharge time slot is the second lowest from the lowest (23.03 yen / kW) are associated with each other for all 48 frames on the target day for creating the charge / discharge plan for the storage battery 120.

[0046] Fig. 4F is a diagram showing an example of the fourth charge / discharge plan update value stored in the memory area 1078. The charge / discharge plan update value in Fig. 4F is stored in the memory area 1078 in a form in which the charge plan update value (MWh) obtained by further deleting the planned value of the charge amount of the charge frame C3 in which the predicted value of the power price in the charge time period is the fourth highest (16.81 yen / kW) from the highest, and the discharge plan update value (MWh) obtained by deleting the discharge amount corresponding to the charge amount deleted in the charge frame C3 from the discharge frame D6 in which the predicted value of the power price in the discharge time period is the second lowest (23.03 yen / kW) from the lowest, and the discharge frame D1 in which the predicted value of the power price in the discharge time period is the third lowest (23.04 yen / kW) from the lowest, are associated with each other for all 48 frames on the target day for creating the charge / discharge plan for the storage battery 120.

[0047] Fig. 4G is a diagram showing an example of the fifth charge / discharge plan update value stored in the memory area 1078. The charge / discharge plan update value in Fig. 4G is stored in the memory area 1078 in a form in which the charge plan update value (MWh) obtained by further deleting the planned value of the charge amount of the charge frame C4 in which the predicted value of the power price in the charge time period is the fifth highest from the highest (16.12 yen / kW) and the discharge plan update value (MWh) obtained by deleting the discharge amount corresponding to the charge amount deleted in the charge frame C4 from the discharge frame D1 in which the predicted value of the power price in the discharge time period is the third lowest from the lowest and the discharge frame D5 in which the predicted value of the power price in the discharge time period is the fourth lowest from the lowest (24.58 yen / kW) are associated with each other for all 48 frames on the target day for creating the charge / discharge plan for the storage battery 120.

[0048] The output unit 1080 outputs the charge / discharge plan that maximizes the amount of electricity sold, which is created by the charge / discharge plan creation unit 1060. Information on this charge / discharge plan is input to the storage battery control device 130 via the communication network 180.

[0049] FIG. 5 is a block diagram showing an example of hardware of the information processing device 10 that realizes the function of the charge / discharge plan creation device 100 shown in FIG. 3. The information processing device 10 includes a processor 11, a main storage device 12, an auxiliary storage device 13, an input device 14, an output device 15, and a communication device 16. The information processing device 10 is, for example, a personal computer, an office computer, various server devices, a general-purpose machine, or the like. The information processing device 10 may be realized, in whole or in part, by using virtual information processing resources provided by using a virtualization technology, such as a virtual server provided by a cloud system. The charge / discharge plan creation device 100 may be realized by using a plurality of information processing devices 10 that are communicably connected.

[0050] The processor 11 is configured using, for example, a Central Processing Unit (CPU), a Micro Processing Unit (MPU), a Graphics Processing Unit (GPU), a Field Programmable Gate Array (FPGA), an Application Specific Integrated Circuit (ASIC), an Artificial Intelligence (AI) chip, etc.

[0051] The main memory device 12 is a device that stores programs and data, and is, for example, a Read Only Memory (ROM), a Random Access Memory (RAM), or a non-volatile memory (Non Volatile RAM (NVRAM)).

[0052] The auxiliary storage device 13 is, for example, a solid state drive (SSD), a hard disk drive, an optical storage device (such as a compact disc (CD) or a digital versatile disc (DVD)), a storage system, a reading / writing device for a recording medium such as an IC card, an SD card, or an optical recording medium, a storage area of ​​a cloud server, etc. Programs and data can be read into the auxiliary storage device 13 via a recording medium reading device or a communication device 16. The programs and data stored in the auxiliary storage device 13 are read into the main storage device 12 as needed.

[0053] The input device 14 is an interface that accepts input from the outside, and is, for example, a keyboard, a mouse, a touch panel, a card reader, a pen-input tablet, a voice input device, or the like.

[0054] The output device 15 is an interface that outputs various information such as the progress of processing and the results of processing. The output device 15 is, for example, a display device (LCD (Liquid Crystal Display), a graphic card, etc.) that visualizes the various information described above, a device that converts the various information described above into voice (voice output device (speaker, etc.)), or a device that converts the various information described above into text (printer, etc.). The information processing device 10 may be configured to input and output information to and from other devices via the communication device 16.

[0055] The input device 14 and the output device 15 constitute a user interface for receiving information from the user and presenting information.

[0056] The communication device 16 is a device that realizes communication (wired communication or wireless communication) with other devices via a communication infrastructure such as a communication network 5, and is configured using, for example, a NIC (Network Interface Card), a wireless communication module, a USB module, etc.

[0057] In addition, the information processing device 10 may be implemented with, for example, an operating system, a file system, a DBMS (Data Base Management System) (relational database, NoSQL, etc.), a KVS (Key-Value Store), etc.

[0058] The functions of the charge / discharge plan creation device 100 are realized by the processor 11 of the information processing device 10 reading and executing a control program stored in the main storage device 12, or by the functions of the hardware (FPGA, ASIC, AI chip, etc.) constituting the charge / discharge plan creation device 100. For example, the input unit 1010 is realized by the input device 14, the output unit 1080 is realized by the output device 15, the charge plan unit 1020, the discharge plan unit 1030, the first calculation unit 1040, the second calculation unit 1050, and the charge / discharge plan creation unit 1060 are realized by the processor 11, and the storage unit 1070 is realized by the main storage device 12 and the auxiliary storage device 13.

[0059] 6A and 6B are flowcharts showing an example of processing performed by the charge and discharge plan creation device 100 to create a charge and discharge plan on a target date for creating a charge and discharge plan for the storage battery 120. In FIG.

[0060] Hereinafter, an example of the processing operation of the charge and discharge plan creation device 100 will be described with reference to FIGS. 2, 3, and 4A to 4G.

[0061] For ease of explanation, it is assumed that the SOC (State Of Charge) indicating the state of charge of the storage battery 120 before the charging time slot and after the discharging time slot is 0% on the target day for creating the charge / discharge plan for the storage battery 120. That is, the charge / discharge plan creation device 100 creates a charge / discharge plan in which the storage battery 120 is charged until the SOC of the storage battery 120 becomes 0% to 100% during the charging time slot, and is discharged until the SOC of the storage battery 120 becomes 100% to 0% during the discharging time slot. In this embodiment, based on the predicted value of the power price and the predicted value of the power generated by the PV power generation facility 110, 19.85 yen / kW is selected as the power price for setting the charging time slot so as to ensure the time span of the charging time slot in which the SOC of the storage battery 120 is changed from 0% to 100%, and 23.02 yen / kW is selected as the power price for setting the discharging time slot so as to ensure the time span of the discharging time slot in which the SOC of the storage battery 120 is changed from 100% to 0%.

[0062] In the following explanation, n is an integer that starts at 1 and increases by 1, and the charging frame with the first (n=1) lowest predicted power price and the lowest price within the charging time slot is C6, the charging frame with the second (n=2) lowest predicted power price is C7, the charging frame with the third (n=3) lowest predicted power price is C8, the charging frame with the fourth (n=4) lowest predicted power price is C1, the charging frame with the fifth (n=5) lowest predicted power price is C5, the charging frame with the sixth (n=6) lowest predicted power price is C4, the charging frame with the seventh (n=7) lowest predicted power price is C3, the charging frame with the eighth (n=8) lowest predicted power price is C2, the charging frame with the ninth (n=9) lowest predicted power price is C9, and the charging frame with the highest predicted power price within the charging time slot is C10.

[0063] Furthermore, in the following explanation, m is an integer that starts at 1 and increases by 1, and the discharge frame with the first (m=1) highest predicted power price and the highest value within the discharge time slot is D3, the discharge frame with the second (m=2) highest predicted power price is D4, the discharge frame with the third (m=3) highest predicted power price is D2, the discharge frame with the fourth (m=4) highest predicted power price is D5, the discharge frame with the fifth (m=5) highest predicted power price is D1, the discharge frame with the sixth (m=6) highest predicted power price is D6, and the discharge frame with the seventh (m=7) highest predicted power price and the lowest value within the discharge time slot is D7.

[0064] It is also assumed that the charging efficiency α when charging the storage battery 120 is 0.85, and the discharging efficiency β when discharging the storage battery 120 is 0.85.

[0065] First, the charging planning unit 1020 sets n, which is used in steps S2020 to S2050 described later, to an initial value of 1 (S2010).

[0066] Next, the charging planning unit 1020 refers to the predicted value of the electricity price and the predicted value of the generated power of the PV power generation equipment 110 on the target date for creating the charge / discharge plan shown in Fig. 4A, which are stored in the memory area 1072 of the memory unit 1070, and plans to charge the generated power of the PV power generation equipment 110 to the storage battery 120 for the charging frame C6 in which the predicted value of the electricity price is the lowest (5 yen / kW) first (n=1) among the charging time slots. In the charging frame C6, since the predicted value of the generated power of the PV power generation equipment 110 is larger than half the capacity of the power conditioner 110A, the planned value of the charge amount of the storage battery 120 is limited to 2.5 MWh, which is half the capacity of the power conditioner 110A (S2020).

[0067] When charging the storage battery 120 with the power generated by the PV power generation facility 110, it is necessary to consider the charging efficiency α of the storage battery 120. Therefore, the charging plan unit 1020 determines whether the sum of the charged amounts of the storage battery 120 up to the charging frame C6 with the cheapest predicted value of the electricity price is equal to or greater than "capacity of the storage battery 120 / charging efficiency α" (S2030).

[0068] When the sum of the charge amounts of the storage battery 120 up to the charging frame C6 with the cheapest predicted value of the power price is not equal to or greater than "capacity of the storage battery 120 / charging efficiency α" (S2030: NO), the charging planning unit 1020 changes n from 1 to 2 (S2040) and executes the above-mentioned steps S2020 and S2030 again for the charging frame C7 with the second cheapest predicted value of the power price (6.27 yen / kW) (n=2). In this embodiment, the charging planning unit 1020 repeatedly executes the above-mentioned steps S2020 and S2030 by incrementing n by +1 until n=10, that is, until a plan is made to charge the storage battery 120 with the generated power of the PV power generation facility 110 for the charging frame C10 with the highest predicted value of the power price (19.85 yen / kW) in the charging time slot. In addition, the planned values ​​of the charging amounts of the storage batteries 120 in the charging frames C7, C8, C1, C5, C4, C3, C2, C9, and C10, which have the second to tenth cheapest predicted electricity prices, are also limited to 2.5 MWh, which is half the capacity of the power conditioner 110A, as in the charging frame C6.

[0069] Then, since the sum of the charge amounts of the storage battery 120 up to the charging frame C10 where the predicted electricity price becomes the lowest at the 10th (n=10), that is, the predicted electricity price becomes the highest during the charging time period, is greater than or equal to "capacity of the storage battery 120 / charging efficiency α" (S2030: YES), the charging planning unit 1020 calculates a planned value of the charge amount of the storage battery 120 in the charging frame C10 by subtracting the sum of the charge amounts of the storage battery 120 up to the charging frame C9 where the predicted electricity price becomes the lowest at the 9th (n=9) from the charge amount "capacity of the storage battery 120 / charging efficiency α" so that the sum of the charge amounts of the storage battery 120 up to the 10th becomes equal to "capacity of the storage battery 120 / charging efficiency α" (S2050).

[0070] The planned values ​​of the charge amounts of the storage batteries 120 in the charging frames C1 to C10 obtained by executing the processes of steps S2010 to S2050 described above are stored in the storage area 1073 of the storage unit 1070 as charging plan initial values.

[0071] Next, the discharge planning unit 1030 sets m, which is used in steps S2070 to S2100 described later, to an initial value of 1 (S2060).

[0072] Next, the discharge planning unit 1030 refers to the predicted value of the power price and the predicted value of the power generated by the PV power generation facility 110 on the target day for creating the charge and discharge plan shown in Fig. 4A, and plans to discharge the storage battery 120 for the discharge frame D3 in which the predicted value of the power price is the highest (m=1) (26.17 yen / kW) in the discharge time period. In the discharge frame D3, the planned value of the discharge amount of the storage battery 120 is set to 2.5 MWh, which is half the capacity of the power conditioner 110A (S2070).

[0073] When discharging the storage battery 120, it is necessary to consider the discharge efficiency β of the storage battery 120. Therefore, the discharge planning unit 1030 determines whether the sum of the discharge amounts of the storage battery 120 up to the discharge frame D3 with the highest predicted value of the electricity price is equal to or greater than "the capacity of the storage battery 120 × the discharge efficiency β" (S2080).

[0074] When the sum of the discharge amounts of the storage battery 120 up to the discharge frame D3 with the highest predicted value of the power price is not equal to or greater than "the capacity of the storage battery 120 x the discharge efficiency β" (S2080: NO), the discharge planning unit 1030 changes m from 1 to 2 (S2090) and executes the above-mentioned steps S2070 and S2080 again for the discharge frame D4 with the second highest predicted value of the power price (25.7 yen / kW) (m=2). In this embodiment, the discharge planning unit 1030 repeatedly executes the above-mentioned steps S2070 and S2080 until m=7, that is, until a plan is made to discharge the storage battery 120 for the discharge frame D7 with the lowest predicted value of the power price (23.02 yen / kW) in the discharging time slot. In addition, the planned values ​​of the discharge amounts of the storage battery 120 in the discharge frames D4, D2, D5, D1, D6, and D7, which have the second to seventh highest predicted values ​​of electricity prices, are also limited to 2.5 MWh, which is half the capacity of the power conditioner 110A, as in the discharge frame D3.

[0075] Then, since the sum of the discharge amounts of the storage battery 120 up to the discharge frame D7 where the predicted value of the electricity price is the seventh highest (m=7), that is, the discharge frame D7 where the predicted value of the electricity price is the lowest during the discharge time period, is greater than or equal to "capacity of the storage battery 120 x discharge efficiency β" (S2080: YES), the discharge planning unit 1030 calculates a planned value of the discharge amount of the storage battery 120 in the discharge frame D7 by subtracting the sum of the discharge amounts of the storage battery 120 up to the discharge frame D6 where the predicted value of the electricity price is the sixth highest (m=6) from the discharge amount of "capacity of the storage battery 120 x discharge efficiency β" so that the sum of the discharge amounts of the storage battery 120 up to the discharge frame D7 where the predicted value of the electricity price is the seventh highest is equal to "capacity of the storage battery 120 x discharge efficiency β" (S2100).

[0076] The planned values ​​of the discharge amounts of the storage batteries 120 in the discharging frames D1 to D7 obtained by executing the processes in steps S2060 to S2100 described above are stored in the memory area 1074 of the memory unit 1070 as discharge plan initial values.

[0077] The charge / discharge plan creation unit 1060 creates a charge / discharge plan initial value for the creation target date of the charge / discharge plan shown in Fig. 4B based on the charge plan initial value stored in the memory area 1073 and the discharge plan initial value stored in the memory area 1074 (S2110). This charge / discharge plan initial value is stored in the memory area 1075 of the memory unit 1070.

[0078] Next, the first calculation unit 1040 calculates a first power selling price by charging and discharging the storage battery 120 based on the charge and discharge plan initial value shown in FIG. 4B stored in the storage area 1075 of the storage unit 1070 (S2120). Specifically, the first calculation unit 1040 calculates the power selling price of the storage battery 120 in each frame by performing a calculation of {(predicted value of power output of the PV power generation facility 110)-(planned value of the charge amount of the storage battery 120)+(planned value of the discharge amount of the storage battery 120)}×(predicted value of the power price) for each of all 48 frames on the target date for creating the charge and discharge plan, and further calculates a first power selling price (757,000 yen) on the target date for creating the charge and discharge plan by adding the power selling prices of the storage battery 120 calculated for all frames. This first power selling price is added to the information on the charge and discharge plan initial value shown in FIG. 4B and stored again in the storage area 1075 of the storage unit 1070.

[0079] Since it is currently unknown whether the first electricity selling price calculated in step S2120 above is the highest electricity selling price on the date for which the charging / discharging plan is created, the following steps are executed to determine the highest electricity selling price.

[0080] The second calculation unit 1050 sets n, which is used in steps S2140 to S2190 described later, to an initial value of 1 (S2130).

[0081] 4B stored in the memory area 1075 of the memory unit 1070, deletes the planned value (1.029412 MWh) of the charge amount of the storage battery 120 in the charging frame C10 in which the predicted value of the electricity price is the highest (19.85 yen / kW) first (n=1) among the charging time slots, and updates it to 0 MWh (S2140). The planned value of the charge amount of the storage battery 120 in the charging time slot after this update is stored in the memory area 1076 of the memory unit 1070 as the charging plan update value.

[0082] 4B stored in the memory area 1075 of the memory 1070, the second calculation unit 1050 deletes the discharge amount corresponding to the planned value of the charge amount of the storage battery 120 in the charging frame C10 deleted in step S2140 from the planned value of the discharge amount of the storage battery 120 in the discharging frame D7 in which the predicted value of the power price is the lowest (23.02 yen / kW) in the discharging time period (S2150). Specifically, the second calculation unit 1050 deletes the discharge amount obtained by multiplying the planned value (1.029412 MWh) of the charge amount of the storage battery 120 in the deleted charging frame C10 by the charging efficiency α (0.85) and the discharge efficiency β (0.85) from the planned value (2 MWh) of the discharge amount of the storage battery 120 in the discharging frame D7. As a result, the planned value of the discharge amount of the storage battery 120 in the discharging frame D7 is updated from 2 MWh to 1.25625 MWh. This updated planned value of the discharge amount of the storage battery 120 in the discharging time period is stored in the memory area 1077 of the memory unit 1070 as an updated discharge plan value.

[0083] The charge / discharge plan creation unit 1060 creates a first charge / discharge plan update value for the target day for creating the charge / discharge plan shown in Figure 4C based on the charge plan update value stored in the memory area 1076 of the memory unit 1070 and the discharge plan update value stored in the memory area 1077, and stores the first charge / discharge plan update value in the memory area 1078.

[0084] Next, the second calculation unit 1050 calculates a second power selling price (760,298,000 yen) by charging and discharging the storage battery 120 in the same manner as in step S2120 described above, based on the first charge / discharge plan update value stored in the memory area 1078 of the storage unit 1070 (S2160). This second power selling price is added to the information on the charge / discharge plan update value shown in FIG. 4C and is stored again in the memory area 1078 of the storage unit 1070.

[0085] The charge / discharge plan creation unit 1060 compares the first power selling price calculated in the above step S2120 with the second power selling price (first update) calculated in the above step S2160 (S2170).

[0086] Because the second power selling price is higher than the first power selling price (S2170: YES), the charge / discharge plan creation unit 1060 provisionally sets the second power selling price (first update) calculated from the first charge / discharge plan update value as the highest power selling price (S2180).

[0087] Next, the second calculation unit 1050 changes n from 1 to 2 (S2190), and executes the processes from step S2140 onwards again.

[0088] The second calculation unit 1050 refers to the first charge / discharge plan update value shown in Fig. 4C stored in the memory area 1078 of the memory unit 1070, and deletes the planned value (2.5 MWh) of the charge amount of the storage battery 120 in the charging frame C9 in which the predicted value of the electricity price is the second highest (n=2) among the charging time slots (17.04 yen / kW) and updates it to 0 MWh (S2140). The planned value of the charge amount of the storage battery 120 in this updated charging time slot is updated and stored in the memory area 1076 of the memory unit 1070 as the charging plan update value.

[0089] Next, the second calculation unit 1050 refers to the charge / discharge plan update value shown in Fig. 4C stored in the memory area 1078 of the memory unit 1070, and deletes the discharge amount corresponding to the planned value of the charge amount of the storage battery 120 in the charging frame C9 deleted in the above step S2140 from the planned value of the discharge amount of the storage battery 120 in the discharging frame D7 that has the cheapest predicted value of the electricity price among the discharging frames in which the planned value of the discharge amount of the storage battery 120 is not 0 MWh during the discharging time period (S2150). Specifically, the second calculation unit 1050 deletes the discharge amount obtained by multiplying the planned value (2.5 MWh) of the charge amount of the storage battery 120 in the deleted charging frame C9 by the charging efficiency α (0.85) and the discharge efficiency β (0.85) from the planned value (1.25625 MWh) of the discharge amount of the storage battery 120 in the discharging frame D7. As a result, the planned value of the discharge amount of the storage battery 120 in the discharging frame D7 is updated from 1.25625 MWh to 0 MWh. However, since it is not possible to delete all of the discharge amount obtained by multiplying the planned value of the charge amount of the storage battery 120 in the deleted charging frame C9 by the charging efficiency α and the discharging efficiency β from the planned value of the discharge amount of the storage battery 120 in the discharging frame D7, the remaining discharge amount is deleted from the planned value of the discharge amount of the storage battery 120 (2.5 MWh) in the discharging frame D6 in which the next predicted value of the electricity price is the lowest. As a result, the planned value of the discharge amount of the storage battery 120 in the discharging frame D6 is updated from 2.5 MWh to 1.95 MWh. The planned value of the discharge amount of the storage battery 120 in the discharging time zone after this update is updated and stored in the memory area 1077 of the memory unit 1070 as a discharge plan update value.

[0090] The charge / discharge plan creation unit 1060 creates a second charge / discharge plan update value for the target date for creating the charge / discharge plan shown in FIG. 4D based on the charge plan update value stored in the memory area 1076 of the memory unit 1070 and the discharge plan update value stored in the memory area 1077, and stores the second charge / discharge plan update value in the memory area 1078.

[0091] Next, the second calculation unit 1050 calculates a second power selling price (761,282,000 yen) by charging and discharging the storage battery 120 in the same manner as in step S2120 described above, based on the second charge / discharge plan update value stored in the memory area 1078 of the storage unit 1070 (S2160). This second power selling price is added to the information on the charge / discharge plan update value shown in FIG. 4D and is stored again in the memory area 1078 of the storage unit 1070.

[0092] The charge / discharge plan creation unit 1060 compares the second power selling price (first update) calculated from the first charge / discharge plan update value shown in Figure 4C with the second power selling price (second update) calculated from the second charge / discharge plan update value shown in Figure 4D (S2170).

[0093] Because the second power selling price (second update) is higher than the second power selling price (first update) (S2170: YES), the charge / discharge plan creation unit 1060 provisionally sets the second power selling price (second update) as the highest power selling price (S2180).

[0094] Next, the second calculation unit 1050 changes n from 2 to 3 (S2190), and executes the processes from step S2140 onwards again.

[0095] In this manner, the process of step S2140 described above is repeatedly executed, and the third charge / discharge plan update value shown in Fig. 4E and the fourth charge / discharge plan update value shown in Fig. 4F are stored in the memory area 1078. In this embodiment, at this point in time, the second power selling price (76.2575 yen / kW) of the storage battery 120 calculated from the fourth charge / discharge plan update value is provisionally set to the highest value.

[0096] 4F stored in the memory area 1078 of the memory unit 1070, deletes the planned value (2.5 MWh) of the charge amount of the storage battery 120 in the charging frame C4 in which the predicted value of the electricity price is the fifth highest (n=5) among the charging time slots (16.12 yen / kW) and updates it to 0 MWh (S2140). The planned value of the charge amount of the storage battery 120 in the charging time slot after this update is updated and stored in the memory area 1076 of the memory unit 1070 as the charging plan update value.

[0097] Next, the second calculation unit 1050 refers to the charge / discharge plan update value shown in FIG. 4F stored in the memory area 1078 of the memory unit 1070, and deletes the discharge amount corresponding to the planned value of the charge amount of the storage battery 120 in the charging frame C4 deleted in the above step S2140 from the planned value of the discharge amount of the storage battery 120 in the discharging frame D1 having the cheapest predicted value of the electricity price among the discharging frames in which the planned value of the discharge amount of the storage battery 120 is not 0 MWh during the discharging time period (S2150). Specifically, the second calculation unit 1050 deletes the discharge amount obtained by multiplying the planned value (2.5 MWh) of the charge amount of the storage battery 120 in the deleted charging frame C4 by the charging efficiency α (0.85) and the discharge efficiency β (0.85) from the planned value (0.8375 MWh) of the discharge amount of the storage battery 120 in the discharging frame D1. As a result, the planned value of the discharge amount of the storage battery 120 in the discharging frame D7 is updated from 0.8375 MWh to 0 MWh. However, since it is not possible to delete all of the discharge amount obtained by multiplying the planned value of the charge amount of the storage battery 120 in the deleted charging frame C4 by the charging efficiency α and the discharging efficiency β from the planned value of the discharge amount of the storage battery 120 in the discharging frame D1, the remaining discharge amount is deleted from the planned value of the discharge amount of the storage battery 120 (2.5 MWh) in the discharging frame D5 having the next lowest predicted value of the electricity price. As a result, the planned value of the discharge amount of the storage battery 120 in the discharging frame D5 is updated from 2.5 MWh to 1.53125 MWh. The planned value of the discharge amount of the storage battery 120 in the discharging time zone after this update is updated and stored in the memory area 1077 of the memory unit 1070 as a discharge plan update value.

[0098] The charge / discharge plan creation unit 1060 creates a fifth charge / discharge plan update value for the target day for creating the charge / discharge plan, as shown in FIG. 4G, based on the charge plan update value stored in the memory area 1076 of the memory unit 1070 and the discharge plan update value stored in the memory area 1077, and stores the fifth charge / discharge plan update value in the memory area 1078.

[0099] Next, the second calculation unit 1050 calculates a second power selling price (759,767,000 yen) by charging and discharging the storage battery 120 in the same manner as in step S2120 described above, based on the fifth charge / discharge plan update value stored in the memory area 1078 of the storage unit 1070 (S2160). This second power selling price is added to the information on the charge / discharge plan update value shown in FIG. 4G and is stored again in the memory area 1078 of the storage unit 1070.

[0100] The charge / discharge plan creation unit 1060 compares the second power selling price (fourth update) calculated from the fourth charge / discharge plan update value in Figure 4F with the second power selling price (fifth update) calculated from the fifth charge / discharge plan update value in Figure 4G (S2170).

[0101] Because the second power selling price (fifth update) is cheaper than the second power selling price (fourth update) (S2170: NO), the charge / discharge plan creation unit 1060 determines the second power selling price (fourth update) to be the highest power selling price, and creates the charge / discharge plan update value shown in FIG. 4G as a charge / discharge plan in which the power selling price of the storage battery 120 is the highest (S2200).

[0102] <Second embodiment> Fig. 7A is a diagram showing an example of a first charge / discharge plan update value stored in the memory area 1078. The charge / discharge plan update value in Fig. 7A is stored in the memory area 1078 in a form in which the charge frames C1 to C10, the discharge frames D1 to D7, a discharge plan update value (MWh) obtained by deleting the planned value of the discharge amount of the discharge frame D7 in which the predicted value of the power price is the lowest (23.02 yen / kW) in the discharge time slot, and a charge plan update value (MWh) obtained by deleting the charge amount corresponding to the discharge amount deleted in the discharge frame D7 from the charge frame C10 in which the predicted value of the power price is the highest (19.85 yen / kW) in the charge time slot and the charge frame C9 in which the predicted value of the power price is the second highest (17.04 yen / kW).

[0103] Fig. 7B is a diagram showing an example of the second charge / discharge plan update value stored in the memory area 1078. The charge / discharge plan update value in Fig. 7B is stored in the memory area 1078 in a form associated with the charge plan update value (MWh) obtained by further deleting the planned value of the discharge amount of the discharge frame D6 in which the predicted value of the power price is the second lowest (23.03 yen / kW) in the discharge time slot, and the charge plan update value (MWh) obtained by deleting the charge amount corresponding to the discharge amount deleted in the discharge frame D6 from the charge frame C9 in which the predicted value of the power price is the second highest in the charge time slot, the charge frame C2 in which the predicted value of the power price is the third highest (17 yen / kW), and the charge frame C3 in which the predicted value of the power price is the fourth highest (16.81 yen / kW).

[0104] Fig. 7C is a diagram showing an example of the third charge / discharge plan update value stored in the memory area 1078. The charge / discharge plan update value in Fig. 7C is stored in the memory area 1078 in a form in which the charge frames C1 to C10, the discharge frames D1 to D7, a discharge plan update value (MWh) obtained by further deleting the planned value of the discharge amount of the discharge frame D1 in which the predicted value of the power price is the third lowest (23.04 yen / kW) in the discharge time slot, and a charge plan update value (MWh) obtained by deleting the charge amount corresponding to the discharge amount deleted in the discharge frame D1 from the charge frame C3 in which the predicted value of the power price is the fourth highest in the charge time slot and the charge frame C4 in which the predicted value of the power price is the fifth highest (16.12 yen / kW) in the charge time slot.

[0105] 8A and 8B are flowcharts showing an example of processing performed by the charge and discharge plan creation device 100 to create a charge and discharge plan on a target date for creating a charge and discharge plan for the storage battery 120. In FIG.

[0106] In FIG. 6, the second calculation unit 1050 performs a first process of deleting the discharge amount of a discharge frame from the side with the low predicted value of the power price in the discharging time period until the discharge amount reaches the planned value of the deleted charge amount multiplied by the charging efficiency α and the discharging efficiency β, and updating the discharging plan, every time the second calculation unit 1050 deletes the discharge amount of a discharge frame from the side with the low predicted value of the power price in the discharging time period to update the discharging plan. In contrast, in FIG. 8, the second calculation unit 1050 performs a second process of deleting the charge amount of a charge frame from the side with the high predicted value of the power price in the charging time period until the charge amount reaches the plan value of the deleted discharge amount multiplied by the reciprocal of the charging efficiency α and the reciprocal of the discharging efficiency β, and updating the charging plan, every time the second calculation unit 1050 deletes the discharge amount of a discharge frame from the side with the low predicted value of the power price in the discharging time period to update the discharging plan. The difference is that the second calculation unit 1050 performs the first process in the first embodiment and the second process in the second embodiment. In the second embodiment, FIG. 3 used in the first embodiment is used in common.

[0107] Moreover, since the processing of steps S3010 to S3120 in FIG. 8 is the same as the processing of steps S2010 to S2120 in FIG. 6, the description thereof will be omitted.

[0108] Hereinafter, with reference to FIGS. 2, 3, 4A, 4B, and 7A to 7C, an example of the processing operation of the charge and discharge plan creation device 100 according to the second embodiment will be described starting from step S3130.

[0109] The second calculation unit 1050 sets m, which is used in steps S3140 to S3190 described later, to an initial value of 1 (S3130).

[0110] 4B stored in the memory area 1075 of the memory unit 1070, deletes the planned value (2 MWh) of the discharge amount of the storage battery 120 in the discharge frame D7 in which the predicted value of the electricity price is the lowest (23.02 yen / kW) first (m=1) in the discharge time slot, and updates it to 0 MWh (S3140). The planned value of the discharge amount of the storage battery 120 in the discharge time slot after this update is stored in the memory area 1077 of the memory unit 1070 as the updated discharge plan value.

[0111] Next, the second calculation unit 1050 refers to the charge / discharge plan initial value shown in FIG. 4B stored in the storage area 1075 of the storage unit 1070, and deletes the charge amount corresponding to the discharge amount of the storage battery 120 in the discharging frame D7 deleted in step S3140 from the planned value of the charge amount of the storage battery 120 in the charging frame C10 in which the predicted value of the power price is the highest (19.85 yen / kW) in the charging time slot (S3150). Specifically, the second calculation unit 1050 deletes the charge amount obtained by multiplying the planned value of the discharge amount of the storage battery 120 in the deleted discharging frame D7 (2 MWh) by the reciprocal of the charging efficiency α and the reciprocal of the discharging efficiency β from the planned value of the charge amount of the storage battery 120 in the charging frame C10 (1.029412 MWh). As a result, the planned value of the charge amount of the storage battery 120 in the charging frame C10 is deleted and becomes 0 MWh. However, the planned value of the charge amount of the storage battery 120 in the charging frame C10 alone cannot delete all of the charge amounts obtained by multiplying the planned value of the discharge amount of the storage battery 120 in the deleted discharging frame D7 by the reciprocal of the charging efficiency α and the reciprocal of the discharging efficiency β. Therefore, the remaining charge amount is deleted from the planned value (2.5 MWh) of the charge amount of the storage battery 120 in the charging frame C9, which has the next highest predicted value of the electricity price in the charging time slot. As a result, the planned value of the charge amount of the storage battery 120 in the charging frame C9 is updated from 2.5 MWh to 0.761246 MWh. The planned value of the charge amount of the storage battery 120 in this updated charging time slot is updated and stored in the memory area 1076 of the memory unit 1070 as an updated charging plan value.

[0112] The charge / discharge plan creation unit 1060 creates a first charge / discharge plan update value for the target date for creating the charge / discharge plan shown in FIG. 7A based on the charge plan update value stored in the memory area 1076 of the memory unit 1070 and the discharge plan update value stored in the memory area 1077, and stores the first charge / discharge plan update value in the memory area 1078.

[0113] Next, the second calculation unit 1050 calculates a second power selling price (760,982,000 yen) by charging and discharging the storage battery 120 in the same manner as step S3120, which is equivalent to step S2120 in the first embodiment, based on the first charge / discharge plan update value stored in the memory area 1078 of the storage unit 1070 (S3160). This second power selling price is added to the information on the charge / discharge plan update value shown in FIG. 7A and is stored again in the memory area 1078 of the storage unit 1070.

[0114] The charge / discharge plan creation unit 1060 compares the first power selling price calculated in the above step S3120 with the second power selling price (first update) calculated in the above step S3160 (S3170).

[0115] Because the second power selling price (first update) is higher than the first power selling price (S3170: YES), the charge / discharge plan creation unit 1060 provisionally sets the second power selling price (first update) calculated from the first charge / discharge plan update value as the highest power selling price (S3180).

[0116] Next, the second calculation unit 1050 changes m from 1 to 2 (S3190), and executes the above-mentioned step S3140 and subsequent steps again.

[0117] 7A stored in the memory area 1078 of the memory unit 1070, the second calculation unit 1050 deletes the planned value (2.5 MWh) of the discharge amount of the storage battery 120 in the discharge frame D6 in which the predicted value of the electricity price is the second lowest (m=2) in the discharge time period (23.03 yen / kW) and updates it to 0 MWh (S3140). The planned value of the discharge amount of the storage battery 120 in the discharge time period after this update is updated and stored in the memory area 1077 of the memory unit 1070 as the discharge plan update value.

[0118] Next, the second calculation unit 1050 refers to the charge / discharge plan update value shown in Fig. 7A stored in the memory area 1078 of the memory unit 1070, and deletes the charge amount corresponding to the planned value of the discharge amount of the storage battery 120 in the discharging frame D6 deleted in the above step S3140 from the charge amount of the storage battery 120 in the charging frame C9 having the highest predicted value of the electricity price among the charging frames in which the planned value of the charge amount of the storage battery 120 is not 0 MWh during the charging time period (S3150). Specifically, the second calculation unit 1050 deletes the charge amount obtained by multiplying the planned value (2.5 MWh) of the discharge amount of the storage battery 120 in the deleted discharging frame D6 by the reciprocal of the charging efficiency α (0.85) and the reciprocal of the discharging efficiency β (0.85) from the planned value of the charge amount of the storage battery 120 in the charging frame C9. As a result, the planned value of the charge amount of the storage battery 120 in the charging frame C9 is updated from 0.761246 MWh to 0 MWh. However, the planned value of the charge amount of the storage battery 120 in the charging frame C9 alone is not enough to delete all of the charge amount obtained by multiplying the planned value of the discharge amount of the storage battery 120 in the deleted discharging frame D6 by the reciprocal of the charging efficiency α and the reciprocal of the discharging efficiency β. Therefore, the remaining charge amount is deleted from the planned value of the charge amount of the storage battery 120 in the charging frame C2, which has the next highest predicted value for the electricity price. As a result, the planned value of the charge amount of the storage battery 120 in the charging frame C2 is updated from 2.5 MWh to 0 MWh. However, the planned value of the charge amount of the storage battery 120 in the charging frame C2 does not yet completely remove all of the charge amount obtained by multiplying the planned value of the discharge amount of the storage battery 120 in the deleted discharging frame D6 by the reciprocal of the charging efficiency α and the reciprocal of the discharging efficiency β, so the remaining charge amount is further removed from the planned value of the charge amount of the storage battery 120 in the charging frame C3, which has the next highest predicted value for the electricity price. As a result, the planned value of the charge amount of the storage battery 120 in the charging frame C3 is updated from 2.5 MWh to 2.301038 MWh. The planned value of the charge amount of the storage battery 120 in this updated charging time slot is updated and stored in the memory area 1076 of the memory unit 1070 as an updated charging plan value.

[0119] The charge / discharge plan creation unit 1060 creates a second charge / discharge plan update value for the target day for creating the charge / discharge plan, as shown in FIG. 7B, based on the charge plan update value stored in the memory area 1076 of the memory unit 1070 and the discharge plan update value stored in the memory area 1077, and stores the second charge / discharge plan update value in the memory area 1078.

[0120] Next, the second calculation unit 1050 calculates (S3160) a second power selling price (762,199,000 yen) for charging and discharging the storage battery 120, in the same manner as in step S3120 described above, based on the second charge / discharge plan update value stored in the memory area 1078 of the storage unit 1070. This second power selling price is added to the information on the charge / discharge plan update value shown in FIG. 7B, and is stored again in the memory area 1078 of the storage unit 1070.

[0121] The charge / discharge plan creation unit 1060 compares the second power selling price (first update) calculated from the first charge / discharge plan update value in Figure 7A with the second power selling price (second update) calculated from the second charge / discharge plan update value in Figure 7B (S3170).

[0122] Because the second power selling price (second update) is higher than the second power selling price (first update) (S3170: YES), the charge / discharge plan creation unit 1060 provisionally sets the second power selling price (second update) as the highest power selling price (S3180).

[0123] Next, the second calculation unit 1050 changes m from 2 to 3 (S3190), and executes the above-mentioned step S3140 and subsequent steps again.

[0124] 7B stored in the memory area 1078 of the memory unit 1070, the second calculation unit 1050 deletes the planned value (2.5 MWh) of the discharge amount of the storage battery 120 in the discharge frame D1 in which the predicted value of the electricity price is the third lowest (23.04 yen / kW) in the discharge time period (m=3) and updates it to 0 MWh (S3140). The planned value of the discharge amount of the storage battery 120 in the discharge time period after this update is updated and stored in the memory area 1077 of the memory unit 1070 as the discharge plan update value.

[0125] Next, the second calculation unit 1050 refers to the charge / discharge plan update value shown in FIG. 7B stored in the storage area 1078 of the storage unit 1070, and deletes the charge amount corresponding to the planned value of the discharge amount of the storage battery 120 in the discharging frame D1 deleted in the above step S3140 from the charge amount of the storage battery 120 in the charging frame C3 having the highest predicted value of the electricity price among the charging frames in which the planned value of the charge amount of the storage battery 120 is not 0 MWh during the charging time period (S3150). Specifically, the second calculation unit 1050 deletes the charge amount obtained by multiplying the planned value (2.5 MWh) of the discharge amount of the storage battery 120 in the deleted discharging frame D1 by the reciprocal of the charging efficiency α and the reciprocal of the discharging efficiency β from the planned value of the charge amount of the storage battery 120 in the charging frame C3. As a result, the planned value of the charge amount of the storage battery 120 in the charging frame C3 is updated from 2.301038 MWh to 0 MWh. However, the planned value of the charge amount of the storage battery 120 in the charging frame C3 alone does not completely remove all of the discharge amount obtained by multiplying the planned value of the discharge amount of the storage battery 120 in the deleted discharging frame D1 by the reciprocal of the charging efficiency α and the reciprocal of the discharging efficiency β. Therefore, the remaining discharge amount is removed from the planned value of the charge amount of the storage battery 120 in the charging frame C4, which has the next highest predicted value for the electricity price. As a result, the planned value of the charge amount of the storage battery 120 in the charging frame C4 is updated from 2.5 MWh to 1.34083 MWh. The planned value of the charge amount of the storage battery 120 in this updated charging time slot is updated and stored in the memory area 1076 of the memory unit 1070 as an updated charging plan value.

[0126] The charge / discharge plan creation unit 1060 creates a third charge / discharge plan update value for the target day for creating the charge / discharge plan, as shown in FIG. 7C, based on the charge plan update value stored in the memory area 1076 of the memory unit 1070 and the discharge plan update value stored in the memory area 1077, and stores the third charge / discharge plan update value in the memory area 1078.

[0127] Next, the second calculation unit 1050 calculates (S3160) a second power selling price (761,965,000 yen) for charging and discharging the storage battery 120, in the same manner as in step S3120 described above, based on the third charge / discharge plan update value stored in the memory area 1078 of the storage unit 1070. This second power selling price is added to the information on the charge / discharge plan update value shown in FIG. 7C and is stored again in the memory area 1078 of the storage unit 1070.

[0128] The charge / discharge plan creation unit 1060 compares the second power selling price (second update) calculated from the second charge / discharge plan update value in Figure 7B with the second power selling price (third update) calculated from the third charge / discharge plan update value in Figure 7C (S3170).

[0129] Because the second power selling price (third update) is not higher than the second power selling price (second update) (S3170: NO), the charge / discharge plan creation unit 1060 determines the second power selling price (second update) to be the highest power selling price (S3180), and creates the charge / discharge plan update value shown in FIG. 7B as a charge / discharge plan in which the power selling price of the storage battery 120 is the highest (S3200).

[0130] <Third embodiment> FIG. 9 is a block diagram showing main functions of a charge and discharge plan creation device 100 according to the third embodiment.

[0131] 9, a third calculation unit 1090 is newly added as a function of the charge and discharge plan creation device 100. In addition, in FIG. 9, the second calculation unit 1050 is the same as the second calculation unit 1050 in the first embodiment, and the third calculation unit 1090 is the same as the second calculation unit 1050 in the second embodiment.

[0132] The second calculation unit 1050 calculates the second power selling price by performing the following process in order to confirm whether the first power selling price calculated by the first calculation unit 1040 is the highest power selling price on the target day for creating the charge / discharge plan of the storage battery 120. Specifically, each time the second calculation unit 1050 updates the charging plan of the storage battery 120 by deleting the charge amount of one charging frame from among the charging frames C1 to C10 in the charging time slot starting from the side with the higher predicted power price value, the second calculation unit 1050 updates the discharge plan of the storage battery 120 by deleting the discharge amount of a discharging frame from among the discharging frames D1 to D7 in the discharging time slot starting from the side with the lower predicted power price value until the discharge amount corresponding to the deleted charge amount is reached. Then, the second calculation unit 1050 calculates a second electricity selling price of the storage battery 120 for all 48 frames of the day for which the charge and discharge plan for the storage battery 120 is created, using the predicted value of the power generation output of the PV power generation equipment 110, the charging plan update value which is the planned value of the charge amount of the storage battery 120 updated during the charging time period, and the discharging plan update value which is the planned value of the discharge amount of the storage battery 120 updated during the discharging time period.

[0133] Each time the third calculation unit 1090 updates the discharge plan of the storage battery 120 by deleting the discharge amount of one discharging frame from among the discharging frames D1 to D7 in the discharging time period starting from the side with the lower predicted value of the power price, the third calculation unit 1090 deletes the charge amount of a charging frame from among the charging frames C1 to C10 in the charging time period starting from the side with the higher predicted value of the power price until the charge amount corresponding to the deleted discharge amount is reached, thereby updating the charging plan of the storage battery 120. Then, the third calculation unit 1090 calculates the third power selling price of the storage battery 120 for all 48 frames on the target day for creating the charge and discharge plan of the storage battery 120, using the predicted value of the power generation output of the PV power generation facility 110, the charging plan update value which is the planned value of the charge amount of the storage battery 120 updated in the charging time period, and the discharging plan update value which is the planned value of the discharge amount of the storage battery 120 updated in the discharging time period.

[0134] 10A to 10C are flowcharts showing an example of processing when the charge and discharge plan creation device 100 creates a charge and discharge plan on a target date for creating a charge and discharge plan for the storage battery 120. Note that Figs. 10A to 10C show processing that combines steps S2010 to S2190 in the series of processing in Figs. 6A and 6B and steps S3130 to S3200 in the series of processing in Figs. 8A and 8B. Specifically, steps S4010 to S4190 in Figs. 10A to 10C are the same as steps S2010 to S2190 in Figs. 6A and 6B, and steps S4200 to S4260 in Figs. 10A to 10C are the same as steps S3130 to S3190 in Figs. 8A and 8B.

[0135] Then, the charge / discharge plan creation unit 1060 compares the second power selling price (fourth update) shown in Figure 4F, which was provisionally set to the highest value in step S4180, with the third power selling price (second update) shown in Figure 7B, which was set to the highest value in step S4250 (S4240), and since the second power selling price (fourth update) is higher than the third power selling price (second update), it determines the second power selling price (fourth update) to be the highest power selling price (S4270), and creates the charge / discharge plan update value shown in Figure 4F as a charge / discharge plan in which the power selling price of the storage battery 120 is the highest value.

[0136] In this way, by executing the processes of steps S4130 to S4190 and the processes of steps S4200 to S4260 in a series of processes, it is possible to improve the accuracy of creating a charge / discharge plan that maximizes the power selling price.

[0137] In addition, in the series of processes in FIGS. 10A to 10C, the processes in steps S4130 to S4190 and the processes in steps S4200 to S4260 may be interchanged to execute the series of processes.

[0138] As described above, the charge and discharge plan creation device 100 creates a charge and discharge plan for the storage battery 120 that charges the storage battery 120 with power generated by the PV power generation facility 110 that generates power by utilizing solar light and discharges the charged power. The charge plan creation device 100 includes a charge plan creation unit 1020 that creates a charge plan for charging the storage battery 120 until the capacity of the storage battery 120 is reached in a charging time period including the charging frames C1 to C10 in which the predicted value of the power price is 19.85 yen / kW (first price) or less, and a charge plan creation unit 1020 that creates a charge plan for charging the storage battery 120 until the capacity of the storage battery 120 is reached in a discharging time period including the discharging frames D1 to D7 in which the predicted value of the power price is 23.02 yen / kW (second price) or more, in a discharging time period including the discharging frames D1 to D7 in which the predicted value of the power price is 23.02 yen / kW (second price). a first calculation unit 1040 that calculates a first power selling price on a target day for creating the charge / discharge plan based on the above charging plan and discharging plan; a second calculation unit 1050 that updates the discharge plan by deleting a discharge amount of a discharging frame from a side with a lower predicted value of the power price until a discharge amount corresponding to the deleted charge amount is reached each time the charging plan is updated by deleting a charge amount of one charging frame from a side with a higher predicted value of the power price, and calculates a second power selling price on a target day for creating the charge / discharge plan based on the updated charging plan and discharging plan; and a charge / discharge plan creation unit 1060 that creates a charge / discharge plan based on the charging plan and discharging plan that provides the highest power selling price among the first power selling price and the second power selling price.

[0139] The charge and discharge plan creation device 100 creates a charge and discharge plan for a storage battery 120 that charges the storage battery 120 with power generated by a PV power generation facility 110 that generates power by utilizing solar light and discharges the charged power. The charge and discharge plan creation device 100 includes a charge plan unit 1020 that creates a charge plan for charging the storage battery 120 until the capacity of the storage battery 120 is reached in a charging time period including charging frames C1 to C10 in which the predicted value of the power price is 19.85 yen / kW (first price) or less, and a charge plan unit 1020 that creates a charge plan for charging the storage battery 120 until the capacity of the storage battery 120 is reached in a discharging time period including discharging frames D1 to D7 in which the predicted value of the power price is 23.02 yen / kW (second price) or more, in a discharging time period including discharging frames D1 to D7 in which the predicted value of the power price is 23.02 yen / kW (second price). a first calculation unit 1040 which calculates a first power selling price on a target day for creating the charge / discharge plan based on the charging plan and the discharge plan; a second calculation unit 1050 which updates the charging plan by deleting a charge amount of a charging frame from a side with a higher predicted value of the power price until a charge amount corresponding to the deleted discharge amount is reached each time the discharge plan is updated by deleting a discharge amount of one discharging frame from a side with a lower predicted value of the power price, and calculates a second power selling price on a target day for creating the charge / discharge plan based on the updated charging plan and discharge plan; and a charge / discharge plan creation unit 1060 which creates a charge / discharge plan based on the charging plan and the discharge plan which provides the highest power selling price among the first power selling price and the second power selling price.

[0140] The charge and discharge plan creation device 100 creates a charge and discharge plan for a storage battery 120 that charges the storage battery 120 with power generated by a PV power generation facility 110 that generates power using solar light and discharges the charged power. The charge and discharge plan creation device 100 includes a charge plan unit 1020 that creates a charge plan for charging the storage battery 120 until the storage battery 120 reaches its capacity in a charge time period including charge frames C1 to C10 in which the predicted power price value is 19.85 yen / kW (first price) or less, a discharge plan unit 1030 that creates a discharge plan for discharging the storage battery 120 until the storage battery 120 reaches its capacity in a discharge time period including discharge frames D1 to D7 in which the predicted power price value is 23.02 yen / kW (second price) or more, and a discharge plan unit 1030 that calculates a first power selling price on the charge and discharge plan creation date based on the charge plan and the discharge plan. The system includes a first calculation unit 1040, a second calculation unit 1050 that updates the discharge plan by deleting a discharge amount of a discharge unit from the side with a lower predicted value of the power price until a discharge amount corresponding to the deleted charge amount is reached, each time the charging plan is updated by deleting a charge amount of one charging unit from the side with a higher predicted value of the power price, and calculates a second power selling price on the target day for creating the charge / discharge plan based on the updated charging plan and discharge plan, a third calculation unit 1090 that updates the charging plan by deleting a charge amount of a charge unit from the side with a higher predicted value of the power price until a charge amount corresponding to the deleted discharge amount is reached, each time the discharging plan is updated by deleting a discharge amount of one discharging unit from the side with a lower predicted value of the power price, and calculates a third power selling price on the target day for creating the charge / discharge plan based on the updated charging plan and discharge plan, and a charge / discharge plan creation unit 1060 that creates a charge / discharge plan based on the charging plan and discharge plan that provides the highest power selling price among the first power selling price, the second power selling price, and the third power selling price.

[0141] According to the charge and discharge plan creation device 100, it is possible to create a charge and discharge plan for a storage battery that will result in the highest power selling price and maximize profits.

[0142] In addition, in the charge and discharge schedule creating device, the discharging time zone is a time zone that follows the charging time zone.

[0143] The charge and discharge plan created by the charge and discharge plan creation device 100 is a plan that, on the target day for creating the charge and discharge plan for the storage battery 120, charges the storage battery 120 collectively during time periods such as daytime when the predicted value of the electricity price is relatively low, and discharges the storage battery 120 collectively during time periods such as nighttime when the predicted value of the electricity price is relatively high. Since the storage battery 120 does not frequently repeat charging and discharging operations, it is possible to prevent the charging efficiency and discharging efficiency from decreasing early.

[0144] It should be noted that the present embodiment is provided to facilitate understanding of the present invention, and is not intended to limit the present invention. The present invention may be modified or improved without departing from the spirit thereof, and equivalents thereof are also included in the present invention. [Explanation of symbols]

[0145] 1. Power generation system 100 Charging and discharging plan creation device 110 PV power generation equipment 110A,120A Power Conditioner 120 Battery 130 Battery control device 150 Weather information providing device 160 Electricity Price Prediction Device 170 Power generation forecasting device 180 Communication Network 190 Power system 1010 Input section 1020 Charging Planning Department 1030 Discharge Planning Department 1040 First Calculation Section 1050 Second Calculation Section 1060 Charging and discharging planning department 1070 Storage section 1071~1078 Storage area 1080 Output section 1090 3rd Calculation Section

Claims

1. A charge / discharge plan creation device that creates a charge / discharge plan for a storage battery that charges a storage battery with power generated by a power generation facility that generates power using renewable energy and discharges the charged power, a charging plan unit that creates a charging plan for charging the storage battery until the capacity is reached in a charging time period including a plurality of charging frames in which a predicted value of the electricity price on a target date for creating the charge and discharge plan is equal to or lower than a first price, in an order of the charging frames in which the predicted value of the electricity price progresses from a low price to a high price; a discharge planning unit that creates a discharge plan for discharging the storage battery in a discharge time period including a plurality of discharge frames in which the predicted value of the power price is equal to or higher than a second price that is equal to or higher than the first price, in a sequence of the discharge frames in which the predicted value of the power price progresses from a high price to a low price, until the capacity of the storage battery is reached; A first calculation unit that calculates a first electricity selling price on a target date for creating the charge and discharge plan based on the charge plan and the discharge plan; a second calculation unit that updates the discharge plan by deleting a discharge amount of one of the charging frames from the side with a lower predicted value of the power price until a discharge amount corresponding to the deleted charge amount is reached each time the charging plan is updated by deleting a charge amount of one of the charging frames from the side with a higher predicted value of the power price, and calculates a second power selling price on a target date for creating the charging and discharging plan based on the updated charging plan and the updated discharging plan; a charge / discharge plan creation unit that creates the charge / discharge plan based on the charge plan and the discharge plan that results in the highest power selling price among the first power selling price and the second power selling price; A charge and discharge plan creation device comprising:

2. A charge / discharge plan creation device that creates a charge / discharge plan for a storage battery that charges a storage battery with power generated by a power generation facility that generates power using renewable energy and discharges the charged power, a charging plan unit that creates a charging plan for charging the storage battery until the capacity is reached in a charging time period including a plurality of charging frames in which a predicted value of the electricity price on a target date for creating the charge and discharge plan is equal to or lower than a first price, in an order of the charging frames in which the predicted value of the electricity price progresses from a low price to a high price; a discharge planning unit that creates a discharge plan for discharging the storage battery in a discharge time period including a plurality of discharge frames in which the predicted value of the power price is equal to or higher than a second price that is equal to or higher than the first price, in a sequence of the discharge frames in which the predicted value of the power price progresses from a high price to a low price, until the capacity of the storage battery is reached; A first calculation unit that calculates a first electricity selling price on a target date for creating the charge and discharge plan based on the charge plan and the discharge plan; a second calculation unit that updates the charging plan by deleting a charge amount of the charging frame from a side having a high predicted value of the power price until a charge amount corresponding to the deleted discharge amount is reached each time the discharging plan is updated by deleting a discharge amount of one of the discharging frames from a side having a low predicted value of the power price, and calculates a second power selling price on a target date for creating the charging and discharging plan based on the updated charging plan and the updated discharging plan; a charge / discharge plan creation unit that creates the charge / discharge plan based on the charge plan and the discharge plan that results in the highest power selling price among the first power selling price and the second power selling price; A charge and discharge plan creation device comprising:

3. A charge / discharge plan creation device that creates a charge / discharge plan for a storage battery that charges a storage battery with power generated by a power generation facility that generates power using renewable energy and discharges the charged power, a charging plan unit that creates a charging plan for charging the storage battery until the capacity is reached in a charging time period including a plurality of charging frames in which a predicted value of the electricity price on a target date for creating the charge and discharge plan is equal to or lower than a first price, in an order of the charging frames in which the predicted value of the electricity price progresses from a low price to a high price; a discharge planning unit that creates a discharge plan for discharging the storage battery in a discharge time period including a plurality of discharge frames in which the predicted value of the power price is equal to or higher than a second price that is equal to or higher than the first price, in a sequence of the discharge frames in which the predicted value of the power price progresses from a high price to a low price, until the capacity of the storage battery is reached; A first calculation unit that calculates a first electricity selling price on a target date for creating the charge and discharge plan based on the charge plan and the discharge plan; a second calculation unit that updates the discharge plan by deleting a discharge amount of one of the charging frames from the side with a lower predicted value of the power price until a discharge amount corresponding to the deleted charge amount is reached each time the charging plan is updated by deleting a charge amount of one of the charging frames from the side with a higher predicted value of the power price, and calculates a second power selling price on a target date for creating the charging and discharging plan based on the updated charging plan and the updated discharging plan; a third calculation unit that updates the charging plan by deleting a charge amount of the charging unit from a side having a high predicted value of the power price until a charge amount corresponding to the deleted discharge amount is reached each time the discharging plan is updated by deleting a discharge amount of one of the discharging units from a side having a low predicted value of the power price, and calculates a third power selling price on a target date for creating the charging and discharging plan based on the updated charging plan and the updated discharging plan; a charge / discharge plan creation unit that creates the charge / discharge plan based on the charge plan and the discharge plan that results in the highest power selling price among the first power selling price, the second power selling price, and the third power selling price; A charge and discharge plan creation device comprising:

4. The charge / discharge schedule creation device according to any one of claims 1 to 3, The discharging time period is a time period following the charging time period. Charging and discharging plan creation device.

5. A charge / discharge plan creation method for creating a charge / discharge plan for a storage battery that charges a storage battery with power generated by a power generation facility that generates power using renewable energy and discharges the charged power, comprising: creating a charging plan for charging the storage battery until the capacity is reached in a charging time period including a plurality of charging frames in which a predicted value of the electricity price on a target date for creating the charge / discharge plan is equal to or lower than a first price, in the order of the charging frames in which the predicted value of the electricity price progresses from a low price to a high price; creating a discharge plan for discharging the storage battery in a discharge time period including a plurality of discharge frames in which the predicted value of the electricity price is equal to or higher than a second price that is equal to or higher than the first price, in a sequence of the discharge frames in which the predicted value of the electricity price progresses from a high price to a low price, until the capacity of the storage battery is reached; Calculating a first electricity selling price on a target date for creating the charge / discharge plan based on the charge plan and the discharge plan; Each time the charging plan is updated by deleting a charging amount of one of the charging frames from the side with the higher predicted value of the power price, the discharging plan is updated by deleting a discharging amount of the discharging frame from the side with the lower predicted value of the power price until a discharging amount corresponding to the deleted charging amount is reached, and a second power selling price on a target date for creating the charging and discharging plan is calculated based on the updated charging plan and the updated discharging plan; The charging and discharging plan is created based on the charging plan and the discharging plan that results in the highest power selling price among the first power selling price and the second power selling price. How to create a charging and discharging plan.

6. A charge / discharge plan creation method for creating a charge / discharge plan for a storage battery that charges a storage battery with power generated by a power generation facility that generates power using renewable energy and discharges the charged power, comprising: creating a charging plan for charging the storage battery until the capacity is reached in a charging time period including a plurality of charging frames in which a predicted value of the electricity price on a target date for creating the charge / discharge plan is equal to or lower than a first price, in the order of the charging frames in which the predicted value of the electricity price progresses from a low price to a high price; creating a discharge plan for discharging the storage battery in a discharge time period including a plurality of discharge frames in which the predicted value of the electricity price is equal to or higher than a second price that is equal to or higher than the first price, in a sequence of the discharge frames in which the predicted value of the electricity price progresses from a high price to a low price, until the capacity of the storage battery is reached; Calculating a first electricity selling price on a target date for creating the charge / discharge plan based on the charge plan and the discharge plan; Each time the discharge plan is updated by deleting the discharge amount of one of the discharging units from the side with the lower predicted value of the power price, the charging plan is updated by deleting the charge amount of the charging unit from the side with the higher predicted value of the power price until the charge amount corresponding to the deleted discharge amount is reached, and a second power selling price on a target date for creating the charge and discharge plan is calculated based on the updated charging plan and the discharge plan; The charging and discharging plan is created based on the charging plan and the discharging plan that results in the highest power selling price among the first power selling price and the second power selling price. How to create a charging and discharging plan.

7. A charge / discharge plan creation method for creating a charge / discharge plan for a storage battery that charges a storage battery with power generated by a power generation facility that generates power using renewable energy and discharges the charged power, comprising: creating a charging plan for charging the storage battery until the capacity is reached in a charging time period including a plurality of charging frames in which a predicted value of the electricity price on a target date for creating the charge / discharge plan is equal to or lower than a first price, in the order of the charging frames in which the predicted value of the electricity price progresses from a low price to a high price; creating a discharge plan for discharging the storage battery in a discharge time period including a plurality of discharge frames in which the predicted value of the electricity price is equal to or higher than a second price that is equal to or higher than the first price, in a sequence of the discharge frames in which the predicted value of the electricity price progresses from a high price to a low price, until the capacity of the storage battery is reached; Calculating a first electricity selling price on a target date for creating the charge / discharge plan based on the charge plan and the discharge plan; Each time the charging plan is updated by deleting a charging amount of one of the charging frames from the side with the higher predicted value of the power price, the discharging plan is updated by deleting a discharging amount of the discharging frame from the side with the lower predicted value of the power price until a discharging amount corresponding to the deleted charging amount is reached, and a second power selling price on a target date for creating the charging and discharging plan is calculated based on the updated charging plan and the updated discharging plan; Each time the discharge plan is updated by deleting the discharge amount of one of the discharging frames from the side with the lower predicted value of the power price, the charging plan is updated by deleting the charge amount of the charging frame from the side with the higher predicted value of the power price until the charge amount corresponding to the deleted discharge amount is reached, and a third power selling price on a target date for creating the charge and discharge plan is calculated based on the updated charging plan and the discharge plan; The charging and discharging plan is created based on the charging plan and the discharging plan that results in the highest power selling price among the first power selling price, the second power selling price, and the third power selling price. How to create a charging and discharging plan.

8. The charge / discharge schedule creation method according to any one of claims 5 to 7, The discharging time period is a time period following the charging time period. How to create a charging and discharging plan.

Citation Information

Patent Citations

  • Power supply control device

    JP2010233362A

  • Electric power control system and power control method

    JP2017195752A

  • Management device, management method, and management program

    JP2022186394A

  • Charging / discharging control system, program, charging / discharging control method

    WO2016079863A1

  • Power storage system and photovoltaic power generation system

    JP2018098952A