Operation support device and operation support method for electrically-driven work machine

The operation support device optimizes battery-driven construction machinery assignments based on workload and deterioration predictions, addressing inefficiencies in battery usage and extending battery life by minimizing degradation.

JP2024146144AActive Publication Date: 2024-10-15HITACHI CONSTRUCTION MACHINERY CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023058875
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-15
Estimated Expiration
2043-03-31

AI Technical Summary

Technical Problem

Existing power supply systems for construction machinery with battery-driven electric motors do not account for variations in battery deterioration, leading to inefficient battery usage and reduced lifespan.

Method used

An operation support device and method that includes a server to allocate electric working machines to work sites based on workload and battery deterioration states, predicting future deterioration and optimizing assignments to minimize battery degradation.

Benefits of technology

The system effectively suppresses battery deterioration and extends the life of batteries by strategically assigning machines to work sites, reducing the rate of battery degradation and improving overall efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024146144000001_ABST
    Figure 2024146144000001_ABST
Patent Text Reader

Abstract

To provide an operation support device that can suppress battery deterioration in an electrically-driven work machine while extending its life.SOLUTION: An operation support device 1 allocates a plurality of electrically-driven work machines EWM1, EWM2, ..., EWMn to a plurality of operation sites WS1, WS2, ..., WSn, respectively. The operation support device 1 comprises: an information storage unit 11 that stores information on an operation load at each operation site WS; a state acquisition unit 12 that acquires a deterioration state of a battery B incorporated in each electrically-driven work machine EWM; a state prediction unit 13 that calculates a predicted deterioration state of the battery B for a case where each electrically-driven work machine EWM operates in its operation site WS; and an operation planning unit 14. The operation planning unit 14 selects operation sites WS in descending order of operation load on the basis of the information stored by the information storage unit 11, and allocates a specific electrically-driven work machine EWM to the selected operation site WS on the basis of the predicted deterioration state from among the plurality of electrically-driven work machines EWM1, EWM2, ..., EWMn.SELECTED DRAWING: Figure 1A
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an operation support device and an operation support method for an electric working machine. [Background technology]

[0002] There is a known invention relating to a power supply system for a construction machine equipped with a battery-powered electric motor (see Patent Document 1 below). The power supply system for a construction machine described in Patent Document 1 includes a plurality of towed vehicles, at least one construction machine, a charging facility, at least one transport vehicle, and a computer (paragraph 0009 and claim 1).

[0003] Each of the plurality of towed vehicles is equipped with a battery. The at least one construction machine tows one of the plurality of towed vehicles and has an electric motor driven by the power of the battery of the towed vehicle and a hydraulic pump driven by the electric motor. The charging facility is a facility for charging the batteries installed in the plurality of towed vehicles.

[0004] The at least one transport vehicle tows a charged towed vehicle among the multiple towed vehicles that has been charged at a charging facility to the vicinity of at least one of the construction machines, and tows the towed vehicle that was towed by the construction machine to the charging facility in place of the charged towed vehicle.

[0005] The computer predicts the number of times and the time of each replacement of the towed vehicle that the construction machine will replace in a predetermined period based on the work amount plan of at least one construction machine in the predetermined period. The computer further calculates the time when at least one transport vehicle will arrive near the construction machine towing the charged towed vehicle in time for each replacement time. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2016-084633 A Summary of the Invention [Problem to be solved by the invention]

[0007] According to the above-mentioned conventional power supply system for construction machinery, the time to replace the battery can be estimated based on the work volume plan of the construction machinery, thereby improving the work efficiency and battery utilization efficiency of the construction machinery (Patent Document 1, paragraph 0010). However, this conventional system does not take into account the variation in the progress of battery deterioration of each construction machinery, so there is room for improvement in terms of suppressing battery deterioration and extending the life of the battery.

[0008] The present disclosure provides an operation support device and an operation support method for an electric work machine that are capable of suppressing deterioration of the battery of the electric work machine and extending its lifespan. [Means for solving the problem]

[0009] One aspect of the present disclosure is an operation support device for electric work machines including a server that allocates a plurality of electric work machines to a plurality of work sites, the server including an information storage unit that stores information on the workload of each of the plurality of work sites, a status acquisition unit that acquires a deterioration state of a battery mounted on each of the plurality of electric work machines, a status prediction unit that calculates a predicted deterioration state of the battery when each of the plurality of electric work machines works at one of the plurality of work sites, and an operation planning unit that selects work sites in order of highest workload based on the workload information stored in the information storage unit, and allocates a specific electric work machine from among the plurality of electric work machines to the selected work sites in the order of the work sites based on the deterioration state of the battery acquired by the status acquisition unit and the predicted deterioration state of the battery calculated by the status prediction unit. Effect of the Invention

[0010] It is possible to provide an operation support device for an electric work machine that can suppress deterioration of the battery of the electric work machine and extend its lifespan. [Brief description of the drawings]

[0011] [Figure 1A] 1 is a schematic diagram showing a first embodiment of an operation support device according to the present disclosure. [Figure 1B] 1B is a flow diagram showing an example of the operation of the operation support device shown in FIG. 1A. [Diagram 2] FIG. 4 is a flow diagram illustrating a second embodiment of a driving assistance device according to the present disclosure. [Diagram 3] FIG. 11 is a flow diagram illustrating a driving assistance device according to a third embodiment of the present disclosure. [Figure 4] FIG. 11 is a flow diagram illustrating a driving assistance device according to a fourth embodiment of the present disclosure. [Diagram 5] FIG. 11 is a flow diagram illustrating a driving assistance device according to a fifth embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, embodiments of an operation support device and an operation support method for an electric working machine according to the present disclosure will be described with reference to the drawings.

[0013] [Embodiment 1] 1A is a schematic diagram showing a first embodiment of an operation support device for an electric working machine according to the present disclosure. The operation support device 1 of this embodiment is, for example, configured by a computer equipped with a central processing unit (CPU) and a storage device (not shown), and is a server connected to a network N such as the Internet. The operation support device 1 is a device that assigns each of a plurality of electric working machines EWM1, EWM2, ..., EWMn to each of a plurality of work sites WS1, WS2, ..., WSn.

[0014] Each electric work machine EWM is, for example, equipped with a battery B, and generates driving force by rotating a motor using the power stored in the battery B. The multiple electric work machines EWM1, EWM2, ..., EWMn include, for example, at least one of an electric hydraulic excavator, an electric dump truck, or an electric material handling machine. Before being assigned to each work site WS by the operation support device 1, the multiple electric work machines EWM1, EWM2, ..., EWMn wait, for example, at a machine station MS.

[0015] Each electric work machine EWM is equipped with a communication device (not shown), such as a wireless communication device or a satellite communication device, and a controller (not shown) that calculates the deterioration state of battery B. As the deterioration state of battery B, for example, the "State of Health: SOH" which is the ratio of the full charge capacity of battery B at the time of deterioration to the initial full charge capacity of battery B can be used. The deterioration state SOH of battery B is expressed, for example, as a percentage with the initial full charge capacity being 100, and decreases as battery B deteriorates. Note that the deterioration state SOH may be calculated, for example, based on the charge / discharge capacity of battery B when the electric work machine EWM is in operation, or the charge capacity charged to battery B by a charging device.

[0016] The communication device mounted on each electric work machine EWM is connected to be able to communicate information with the operation support device 1 via, for example, a wireless communication line RCL including a wireless base station WBS, or a satellite communication line SCL including a communication satellite CS and a satellite base station SBS, and a network N. The controller mounted on each electric work machine EWM transmits, for example, the state of deterioration SOH of the battery B mounted on each electric work machine EWM to the operation support device 1 via the communication device mounted on each electric work machine EWM.

[0017] The operation support device 1 includes, for example, an information storage unit 11, a state acquisition unit 12, a state prediction unit 13, and an operation planner unit 14. Each unit of the operation support device 1 represents each function of the operation support device 1 that is realized, for example, by the CPU of the operation support device 1 executing a program stored in a storage device of the operation support device 1. Hereinafter, with reference to Fig. 1B, the operation of the operation support device 1 of this embodiment and the operation support method OSM of the electric work machine EWM of this embodiment will be described.

[0018] Fig. 1B is a flow diagram showing the operation of the operation support device 1 shown in Fig. 1A, and is a flow diagram explaining each step of the operation support method OSM of this embodiment. The operation support method OSM of this embodiment is a method of allocating each of a plurality of electric work machines EWM1, EWM2, ..., EWMn to each of a plurality of work sites WS1, WS2, ..., WSn, for example, using the operation support device 1.

[0019] When the operation support device 1 starts the operation support method OSM shown in Fig. 1B, first, it executes an information storage step S1. In this step S1, the information storage unit 11 stores, for example, information on the workload of each work site WS. The workload information is input, for example, from an information terminal (not shown) owned by the user of the electric work machine EWM to the input / output unit of the operation support device 1 via the network N, and is stored in the memory device of the operation support device 1 by the information storage unit 11. An example of the workload information of each work site WS stored by the information storage unit 11 is shown in the following Table 1A.

[0020] [Table 1A]

[0021] In the example shown in Table 1A, the workload information includes, for example, the number of working days, the average temperature when the electric work machine EWM is operating (daytime), the average temperature when the electric work machine EWM is not operating (nighttime), the charge / discharge amount per day, the discharge power, and the charge power. The workload information may also include, for example, the discharge current and the charge current instead of the discharge power and the charge power. Next, the operation support device 1 executes a state acquisition step S2 to acquire the deterioration state SOH of the battery B mounted on each electric work machine EWM.

[0022] In this step S2, the status acquisition unit 12 of the operation support device 1 acquires the degradation state SOH of the battery B mounted on each electric work machine EWM. The controller of each electric work machine EWM acquires the degradation state SOH of the battery B mounted on each electric work machine EWM, for example, at a predetermined cycle, and transmits it to the operation support device 1 via the communication device, the wireless communication line RCL or the satellite communication line SCL, and the network N. The status acquisition unit 12 acquires the degradation state SOH of the battery B of each electric work machine EWM transmitted from each electric work machine EWM via the input / output unit of the operation support device 1.

[0023] Next, the operation support device 1 executes a work feasibility prediction step S3 for predicting whether each electric work machine EWM can work. In this step S3, the state prediction unit 13 predicts whether each electric work machine EWM can work at each work site WS based on, for example, information on the workload of each work site WS stored by the information storage unit 11.

[0024] More specifically, the state prediction unit 13 acquires the specifications of the battery B of each electric work machine EWM stored in the storage device by the information storage unit 11, for example, and compares them with the charge / discharge amount and discharge power per day required at each work site WS. As a result, when the battery B of a certain electric work machine EWM cannot satisfy the charge / discharge amount and discharge power per day required at a certain work site WS, it records that the electric work machine EWM cannot accommodate that work site WS.

[0025] Next, the operation support device 1 executes a state prediction step S4 for calculating a predicted state of degradation ESOH of battery B. In this step S4, the state prediction unit 13 of the operation support device 1 calculates a predicted state of degradation ESOH of battery B when each electric work machine EWM works at each work site WS. The predicted state of degradation ESOH is a predicted value of the state of degradation SOH of battery B of each electric work machine EWM after each electric work machine EWM performs a predetermined work at each work site WS.

[0026] The state prediction unit 13 predicts the predicted degradation state ESOH of the battery B of each electric work machine EWM, for example, using all or some of the items of the workload as shown in Table 1A above as degradation factors. More specifically, the state prediction unit 13 calculates the predicted degradation state ESOH using, for example, the following equations (1) to (3).

[0027]

number

[0028]

number

[0029]

number

[0030] In the above formula (1), a_st is the storage deterioration rate of battery B [ / d 0.5 ] (d: days). In addition, T_st on the right side of equation (1) is the storage absolute temperature [K], SOC_st is the storage SOC (0≦SOC_st<1), a0 to a2 are coefficients, and a3 is a constant.

[0031] In the above formula (2), a_cyc is the deterioration rate [ / d] of battery B. In addition, T_op on the right side of formula (2) is the average temperature during operation [°C], D_day is the daily discharge amount, Dp is the discharge power, and Cp is the charge power. In addition, Q_bat is the battery capacity of battery B, a4 to a7 are coefficients, and a8 is a constant.

[0032] In the above formula (3), ESOH is the predicted deterioration state [%]. Also, a_st on the right side of formula (3) is the storage deterioration rate [ / d 0.5 ], a_cyc is the deterioration rate [ / day] of battery B calculated by the above formula (2), and d is the number of operating days of the electric work machine EWM.

[0033] That is, the predicted degradation state ESOH is calculated based on a storage degradation rate a_st, which is the rate of degradation during storage or rest when battery B is not charged or discharged, and a degradation rate a_cyc, which is the rate of cycle degradation due to charging and discharging of battery B. Note that the coefficients a0, a1, a3 to a7 and the constants a3 and a8 in equations (1) and (2) differ depending on battery B. Therefore, these coefficients and constants for each battery B are stored in advance in a storage device by the information storage unit 11 of the operation support device 1, for example.

[0034] Next, the operation support device 1 executes an operation plan creation step S5 for allocating an electric work machine EWM to each work site WS. In this step S5, the operation planner 14 of the operation support device 1 first selects the work site WS in descending order of workload based on the workload information (see Table 1A) of each work site WS stored in the storage device.

[0035] In this step S5, the operation planner 14 further assigns a specific electric work machine EWM based on the predicted deterioration state ESOH from among the multiple electric work machines EWM to the selected work site WS. An example of a procedure in which the operation planner 14 assigns each electric work machine EWM to each work site WS will be described with reference to Table 1B below.

[0036] [Table 1B]

[0037] In Table 1B, the machine number is, for example, an identification number of each of the multiple electric work machines EWM1, EWM2, ..., EWMn. The battery manufacturer, battery capacity, and SOH are, for example, the manufacturer, battery capacity, and latest deterioration state SOH of the battery B mounted on each electric work machine EWM.

[0038] ESOH is the predicted deterioration state of battery B after each electric work machine EWM performs a predetermined task at each work site WS. The predicted deterioration state ESOH is calculated for each combination of a plurality of work sites WS1, WS2, ..., WSn selected in descending order of workload from left to right and each of a plurality of electric work machines EWM1, EWM2, ..., EWMn.

[0039] ΔSOH is the amount of battery deterioration calculated based on the current deterioration state SOH and the predicted deterioration state ESOH of the battery B of each electric work machine EWM. Specifically, the amount of battery deterioration ΔSOH is the amount of change in the deterioration state SOH from the current deterioration state SOH of the battery B of each electric work machine EWM to the predicted deterioration state ESOH when each electric work machine EWM works at each work site WS.

[0040] That is, the operation planner 14 calculates the battery deterioration amount ΔSOH when each electric work machine EWM works at each work site WS based on the deterioration state SOH and the predicted deterioration state ESOH of the battery B. Furthermore, the operation planner 14 selects, for example, the work site WS1 with the highest work load, and assigns to that work site WS1, from among the multiple electric work machines EWM1, EWM2, ..., EWMn, the electric work machine EWM2 with a battery deterioration amount ΔSOH of -5[%] and the smallest decrease in the deterioration state SOH.

[0041] In the example shown in Table 1B, the electric work machine EWM3 of machine No. 3 is predicted to be unable (NA) to handle work at the work site WS1 in the above-mentioned step S3 of predicting whether the electric work machine EWM can perform work. In this case, the operation planner 14 does not assign the electric work machine EWM3 to the work site WS1.

[0042] After step S5 is completed, the operation planner 14 executes step S6, for example, to determine whether or not the allocation of all electric work machines EWM to the work sites WS is complete. If the operation planner 14 determines in step S6 that the allocation of at least one electric work machine EWM is not complete (NO), the operation planner 14 repeats step S5 of allocating each electric work machine EWM to each work site WS.

[0043] In the second step S5, the operation planner 14 selects the work site WS2 with the second highest workload. The operation planner 14 assigns to the selected work site WS2 the electric work machine EWMn with a battery deterioration amount ΔSOH of -5% and the smallest decrease in the deterioration state SOH from among the multiple electric work machines EWM1, EWM3, ..., EWMn excluding the electric work machine EWM2 assigned to the work site WS1.

[0044] Similarly, in the third process S5, the electric work machine EWM1 is assigned to the work site WS3 with the third highest workload, and in the fourth process S5, the electric work machine EWM3 is assigned to the work site WS4 with the fourth highest workload. After that, when the operation planner 14 determines in process S6 that the allocation of electric work machines EWM to all work sites WS has been completed (YES), it ends the operation support method OSM shown in Fig. 1B.

[0045] The operation planner 14 creates an operation plan for the electric work machine EWM including information on each work site WS assigned to each electric work machine EWM, and transmits it to an information terminal of a user of the electric work machine EWM via the network N. In addition, the operation planner 14 transmits information on each work site WS assigned to each electric work machine EWM to each electric work machine EWM via the network N and the satellite communication line SCL or the wireless communication line RCL.

[0046] Hereinafter, the actions of the operation support device 1 and the operation support method OSM for the electric working machine EWM of this embodiment will be described.

[0047] The operation support device 1 of this embodiment is a device equipped with a server that allocates multiple electric work machines EWM1, EWM2, ..., EWMn to multiple work sites WS1, WS2, ..., WSn. The server is equipped with an information storage unit 11, a state acquisition unit 12, a state prediction unit 13, and an operation plan unit 14. The information storage unit 11 stores information on the workload of the multiple work sites WS1, WS2, ..., WSn. The state acquisition unit 12 acquires the degradation state of the battery B mounted on each of the multiple electric work machines EWM1, EWM2, ..., EWMn. The state prediction unit 13 calculates a predicted degradation state ESOH of the battery B when each of the multiple electric work machines EWM1, EWM2, ..., EWMn works at one of the multiple work sites WS1, WS2, ..., WSn. The operation planner 14 selects work sites WS in the order of highest workload based on the workload information stored in the information storage unit 11, and assigns a specific electric work machine EWM based on the degradation state of battery B acquired by the status acquisition unit 12 and the predicted degradation state ESOH of battery B calculated by the status prediction unit 13 from among the multiple electric work machines EWM1, EWM2, ..., EWMn to the selected work sites WS in that order.

[0048] In other words, the operation support device 1 of this embodiment is a server that assigns each of the multiple electric work machines EWM1, EWM2, ..., EWMn to each of the multiple work sites WS1, WS2, ..., WSn, as described above. The operation support device 1 includes an information storage unit 11, a state acquisition unit 12, a state prediction unit 13, and an operation planner 14. The information storage unit 11 stores information on the workload of each work site WS. The state acquisition unit 12 acquires the degradation state SOH of the battery B mounted on each electric work machine EWM. The state prediction unit 13 calculates the predicted degradation state ESOH of the battery B when each electric work machine EWM works at each work site WS. The operation planner 14 selects a work site WS in descending order of workload based on the information stored by the information storage unit 11, and assigns a specific work site WS based on the predicted degradation state ESOH from among the multiple electric work machines EWM to the selected work site WS.

[0049] With this configuration, the operation support device 1 of this embodiment can assign appropriate electric work machines EWM to multiple work sites WS1, WS2, ..., WSn from among multiple electric work machines EWM1, EWM2, ..., EWMn in sequence from a work site WS with a high workload to a work site WS with a low workload based on the predicted deterioration state ESOH of battery B. This makes it possible to prevent the deterioration state SOH of battery B in each electric work machine EWM from decreasing excessively, making it possible to suppress deterioration of battery B and extend its lifespan.

[0050] Furthermore, in the operation support device 1 of this embodiment, the operation planner 14 calculates the battery deterioration amount ΔSOH when multiple electric work machines EWM1, EWM2, ..., EWMn work at multiple work sites WS1, WS2, ..., WSn, respectively, based on the deterioration state SOH of battery B and the predicted deterioration state ESOH of battery B. Furthermore, the operation planner 14 selects, as the specific electric work machine WS, the electric work machine EWM having the smallest battery deterioration amount ΔSOH from the multiple electric work machines EWM1, EWM2, ..., EWMn.

[0051] In other words, in the operation support device 1 of this embodiment, the operation planner 14 calculates the battery deterioration amount ΔSOH when each electric work machine EWM works at each work site WS based on the deterioration state SOH and the predicted deterioration state ESOH of battery B, for example as shown in Table 1B. Furthermore, the operation planner 14 assigns the electric work machine EWM with the smallest battery deterioration amount ΔSOH from among the multiple electric work machines EWM1, EWM2, ..., EWMn to the work site WS selected in descending order of workload.

[0052] With this configuration, the operation support device 1 of this embodiment can minimize the decrease in the state of deterioration SOH of the battery B after each electric work machine EWM works at each work site WS. As a result, it is possible to suppress the overall deterioration of the multiple batteries B mounted on the multiple electric work machines EWM1, EWM2, ..., EWMn, and to extend the overall lifespan of these batteries B.

[0053] The operation support method OSM of this embodiment is a method of allocating a plurality of electric work machines EWM1, EWM2, ..., EWMn to a plurality of work sites WS1, WS2, ..., WSn. As described above, the operation support method OSM of this embodiment has an information storage process S1, a state acquisition process S2, a state prediction process S4, and an operation plan creation process S5. The information storage process S1 is a process of storing information on the workloads of the plurality of work sites WS1, WS2, ..., WSn. The state acquisition process S2 is a process of acquiring the degradation state SOH of the battery B mounted on each of the plurality of electric work machines EWM1, EWM2, ..., EWMn. The state prediction process S4 is a process of calculating a predicted degradation state ESOH of the battery B when each of the plurality of electric work machines EWM1, EWM2, ..., EWMn works at one of the plurality of work sites WS1, WS2, ..., WSn. The operation plan creation process S5 is a process of selecting work sites WS in the order of highest workload based on the workload information stored in the information storage process S1, and allocating a specific electric work machine EWM to the selected work sites WS from among the multiple electric work machines EWM1, EWM2, ..., EWMn based on the degradation state SOH of battery B acquired in the state acquisition process S2 and the predicted degradation state ESOH of battery B calculated in the state prediction process S4.

[0054] In other words, the operation support method OSM of this embodiment is a method of allocating each of a plurality of electric work machines EWM1, EWM2, ..., EWMn to each of a plurality of work sites WS1, WS2, ..., WSn. As described above, the operation support method OSM of this embodiment has an information storage process S1, a state acquisition process S2, a state prediction process S4, and an operation plan creation process S5. The information storage process S1 is a process of storing information on the workload of each work site WS. The state acquisition process S2 is a process of acquiring the deterioration state SOH of the battery B mounted on each electric work machine EWM. The state prediction process S4 is a process of calculating a predicted deterioration state ESOH of the battery B when each electric work machine EWM works at each work site WS. The operation plan creation process S5 is a process of selecting a work site WS in descending order of workload based on the information stored in the information storage process S1, and allocating a specific electric work machine EWM from among the multiple electric work machines EWM1, EWM2, ..., EWMn to the selected work site WS based on the predicted deterioration state ESOH of the battery B.

[0055] With this configuration, the operation support method OSM of this embodiment makes it possible to assign appropriate electric work machines EWM from among a plurality of electric work machines EWM1, EWM2, ..., EWMn for a plurality of work sites WS1, WS2, ..., WSn in sequence from a work site WS with a high workload to a work site WS with a low workload based on the predicted deterioration state ESOH of battery B. This makes it possible to prevent the deterioration state SOH of battery B in each electric work machine EWM from decreasing drastically, making it possible to suppress deterioration of battery B and extend its lifespan.

[0056] As described above, according to this embodiment, it is possible to provide an electric work machine operation support device 1 and an operation support method OSM that are capable of suppressing deterioration and extending the life of the battery B of the electric work machine EWM.

[0057] [Embodiment 2] A second embodiment of the operation support device and operation support method for an electric working machine according to the present disclosure will be described below with reference to Fig. 1A, Fig. 2, and Table 2. Fig. 2 is a flow diagram explaining the operation of the operation support device 1 of this embodiment, and is a flow diagram explaining each step of the operation support method OSM2 of this embodiment.

[0058] The operation support device 1 and operation support method OSM2 of this embodiment differ from the operation support device 1 and operation support method OSM of the above-mentioned embodiment 1 in the operation of the operation plan unit 14 in the operation plan creation step S5a. Other points of the operation support device 1 and operation support method OSM2 of this embodiment are similar to the operation support device 1 and operation support method OSM of the above-mentioned embodiment 1, so similar parts are given the same reference numerals and descriptions are omitted.

[0059] 2, the operation support device 1 of this embodiment executes the information storage step S1 to the state prediction step S4 in the same manner as the operation support method OSM described above. As a result, as shown in Table 2, the predicted deterioration state ESOH and the battery deterioration amount ΔSOH when each of the multiple electric work machines EWM1, EWM2, ..., EWMn works at each of the multiple work sites WS1, WS2, ..., WSn are calculated.

[0060] [Table 2]

[0061] Thereafter, the operation planner 14 of the operation support device 1 executes an operation plan creation step S5a. In the operation support method OSM2 of this embodiment, the operation plan creation step S5a includes, for example, the following steps S51a to S55a. In step S51a, the operation planner 14 determines whether or not there is an electric work machine EWM whose predicted state of deterioration ESOH of battery B will be equal to or greater than a predetermined value when each of the multiple electric work machines EWM1, EWM2, ..., EWMn works at the selected work site WS.

[0062] Here, the operation planner 14 sets the predetermined value used in the judgment in step S51a to, for example, 80%. Then, in step S51, as shown in Table 2, the operation planner 14 judges whether or not there is an electric work machine EWM whose predicted deterioration state ESOH will be equal to or greater than a predetermined value when each of the multiple electric work machines EWM1, EWM2, ..., EWMn works at the initially selected work site WS1.

[0063] At the work site WS1, the predicted deterioration state ESOH of battery B of electric work machines EWM1, EWM4 of machine No. 1, 4 is equal to or greater than a predetermined value of 80%. Therefore, in step S51a, the operation planner 14 determines that there is an electric work machine EWM whose predicted deterioration state ESOH is equal to or greater than the predetermined value (YES), and executes the next step S52a.

[0064] In this step S52a, the operation planner 14 determines whether there are multiple electric work machines EWM whose predicted deterioration state ESOH is equal to or greater than a predetermined value. At the work site WS1, the predicted deterioration states ESOH of batteries B of electric work machines EWM1, EWM4 of machine Nos. 1 and 4 are equal to or greater than 80%, which is a predetermined value. Therefore, in this step S52a, the operation planner 14 determines that there are multiple electric work machines EWM whose predicted deterioration state ESOH is equal to or greater than the predetermined value (YES), and executes the next step S53a.

[0065] In this step S53a, the operation planner 14 assigns a specific electric work machine EWM from among the multiple electric work machines EWM1, EWM2, ..., EWMn to the selected work site WS1 based on the predicted degradation state ESOH of the battery B when each electric work machine EWM works at that work site WS1. More specifically, for example, as shown in Table 2, the electric work machine EWM4 with the smallest battery degradation amount ΔSOH calculated based on the degradation state SOH and the predicted degradation state ESOH of the battery B of each electric work machine EWM is assigned to the work site WS1.

[0066] In step S53a, the operation planner 14 excludes the work site WS3 determined in step S3 to be unable to handle the work at the work site WS1 (NA) from the multiple electric work machines EWM1, EWM2, ..., EWMn to be assigned to the work site WS1, as in the above-described embodiment 1. Next, the operation planner 14 executes step S6 as in the above-described embodiment 1, and when it determines that the assignment of electric work machines EWM to all work sites WS has not been completed (NO), it repeats the above-described steps S51a and onwards.

[0067] In the second step S51a, the operation planner 14 selects the work site WS2 with the second highest workload, for example, as shown in Table 2. Then, it is determined whether or not there is an electric work machine EWM whose predicted deterioration state ESOH when working at the work site WS2 is equal to or greater than a predetermined value among the multiple electric work machines EWM1, EWM2, ..., EWMn excluding the electric work machine EWM4 that has already been assigned to another work site WS1.

[0068] Here, as shown in Table 2, for example, if the predetermined value is 80%, then, excluding the electric work machine EWM4, only the electric work machine EWM1 has a predicted deterioration state ESOH that is equal to or greater than the predetermined value when working at the work site WS2. Therefore, in this second step S51a, the operation planner 14 determines that there is an electric work machine EWM whose predicted deterioration state ESOH is equal to or greater than the predetermined value (YES), and further determines in the second step S52a that there are not multiple electric work machines EWM whose predicted deterioration state ESOH is equal to or greater than the predetermined value (NO).

[0069] In this case, the operation planner 14 executes step S54a of allocating an electric work machine EWM1 whose predicted deterioration state ESOH is equal to or greater than a predetermined value to the selected work site WS2, and then executes step S6 for the second time, determines that allocation of electric work machines EWM to all work sites WS is not complete (NO), and executes step S51a for the third time. In this third step S51a, the operation planner 14 selects the work site WS3 with the third highest workload.

[0070] Here, as shown in Table 2, for example, if the predetermined value is 80%, there is no electric work machine EWM whose predicted degradation state ESOH of battery B after working at the work site WS3 is equal to or greater than the predetermined value, except for the electric work machines EWM4, EWM1 that have already been assigned to the other work sites WS1, WS2. Therefore, in this third step S51a, the operation planner 14 determines that there is no electric work machine EWM whose predicted degradation state ESOH is equal to or greater than the predetermined value (NO), and executes the next step S55a.

[0071] In this step S55a, the operation planner 14 assigns to the selected work site WS3 the electric work machine EWM3 having the maximum predicted state of deterioration ESOH of battery B from among the multiple electric work machines EWM2, EWM3, ..., EWMn excluding the electric work machines EWM4, EWM1 assigned to the other work sites WS1, WS2. After that, the operation planner 14 executes the second step S55a via step S6 and the fourth step S51a.

[0072] In this second step S55a, the operation planner 14 selects the work site WS4 with the fourth highest workload. The operation planner 14 also excludes the electric work machines EWM4, EWM1, and EM3 assigned to the other work sites WS1, WS2, and WS3 from the candidates for the electric work machine EWM to be assigned to the selected work site WS4. Furthermore, the operation planner 14 assigns the electric work machine EWMn with the largest predicted state of deterioration ESOH of battery B from among the multiple electric work machines EWM2, ..., EWMn to the selected work site WS4.

[0073] Thereafter, in step S6, when the operation planner 14 determines that allocation of electric working machines EWM to all work sites WS has been completed (YES), the operation support device 1 ends the operation support method OSM2 shown in FIG.

[0074] As described above, in the operation support device 1 of this embodiment, the operation planner 14 judges whether or not there is an electric work machine EWM whose predicted state of deterioration ESOH of battery B is equal to or greater than a predetermined value among the multiple electric work machines EWM1, EWM2, ..., EWMn. Furthermore, if such an electric work machine EWM is present, the operation planner 14 selects, as the specific electric work machine EWM, an electric work machine EWM4 from the multiple electric work machines EWM1, EWM2, ..., EWMn whose predicted state of deterioration ESOH of battery B is equal to or greater than a predetermined value and whose battery deterioration amount ΔSOH is the smallest.

[0075] In other words, in the operation support device 1 of this embodiment, the operation planner 14 judges whether or not there are multiple electric work machines EWM whose predicted deterioration state ESOH is equal to or greater than a predetermined value among the multiple electric work machines EWM1, EWM2, ..., EWMn. Furthermore, if there are multiple electric work machines EWM, the operation planner 14 assigns to the selected work site WS1 an electric work machine EWM4 whose predicted deterioration state ESOH of battery B is equal to or greater than a predetermined value and whose battery deterioration amount ΔSOH is the smallest, from among the multiple electric work machines EWM1, EWM2, ..., EWMn.

[0076] With this configuration, the operation support device 1 of this embodiment can assign an electric work machine EWM4 whose battery B has a predicted degradation state ESOH equal to or greater than a predetermined value and a minimum battery degradation amount ΔSOH to a work site WS1 that has a higher workload than the other work sites WS2, WS3, ..., Wsn. Therefore, the operation support device 1 of this embodiment can suppress degradation and extend the life of the battery B of each of the multiple electric work machines EWM1, EWM2, ..., EWMn, compared to a case in which an electric work machine EWM1, EWM2, ..., EWMn equipped with a battery B that has a relatively low predicted degradation state ESOH and a large battery degradation amount ΔSOH is assigned to a work site WS1 that has a relatively high workload.

[0077] Furthermore, in the operation support device 1 of this embodiment, when the operation planner 14 determines that there is only one electric work machine EWM1 whose predicted deterioration state ESOH is a predetermined value or more among the multiple electric work machines EWM1, EWM2, ..., EWMn, it assigns the electric work machine EWM1 whose predicted deterioration state ESOH is a predetermined value or more to the selected work site WS2.

[0078] With this configuration, the operation support device 1 of this embodiment can assign an electric work machine EWM1 whose battery B has a predicted state of deterioration ESOH equal to or greater than a predetermined value to a work site WS2 that has a higher workload than the other work sites WS3, WS4. Therefore, the operation support device 1 of this embodiment can suppress deterioration and extend the life of the battery B of each of the multiple electric work machines EWM2, EWM3, ..., EWMn, compared to a case in which an electric work machine EWM2, EWM3, ..., EWMn equipped with a battery B with a relatively low predicted state of deterioration ESOH is assigned to a work site WS2 that has a relatively high workload.

[0079] Furthermore, in the operation support device 1 of this embodiment, if there is no electric work machine EWM in which the predicted state of deterioration ESOH of battery B is equal to or greater than a predetermined value among the multiple electric work machines EWM2, EWM3, ..., EWMn, the operation planner 14 selects, as a specific electric work machine EWM, an electric work machine EWM in which the predicted state of deterioration ESOH of battery B is maximum from among the multiple electric work machines EWM2, EWM3, ..., EWMn.

[0080] In other words, in the operation support device 1 of this embodiment, the operation planner 14 assigns the electric work machine EWM3 having the maximum predicted deterioration state ESOH from among the multiple electric work machines EWM2, EWM3, ..., EWMn to the selected work site WS3. Similarly, the operation planner 14 assigns the electric work machine EWMn having the maximum predicted deterioration state ESOH from among the multiple electric work machines EWM2, ..., EWMn to the selected work site WS4.

[0081] With this configuration, the operation support device 1 of this embodiment can assign an electric work machine EWM3 having the greatest predicted state of deterioration ESOH of battery B to a work site WS3 having a higher workload than the other work sites WS4. Similarly, an electric work machine EWMn having the greatest predicted state of deterioration ESOH of battery B can be assigned to a work site WS4 having a higher workload than the other work sites WS. Therefore, the operation support device 1 of this embodiment can suppress deterioration and extend the life of the battery B of each of the multiple electric work machines EWM2, EWM3, ..., EWMn.

[0082] As described above, according to this embodiment, similar to the above-described first embodiment, it is possible to provide an electric work machine operation support device 1 and an operation support method OSM2 that are capable of suppressing deterioration and extending the life of the battery B of the electric work machine EWM.

[0083] [Embodiment 3] Hereinafter, a third embodiment of the operation support device and operation support method for an electric working machine according to the present disclosure will be described with reference to Fig. 1A, Fig. 3, Table 3A, and Table 3B. Fig. 3 is a flow diagram explaining the operation of the operation support device 1 of this embodiment, and is a flow diagram explaining each step of the operation support method OSM3 of this embodiment.

[0084] The operation support device 1 and operation support method OSM3 of this embodiment differ from the operation support device 1 and operation support method OSM of the above-mentioned embodiment 1 in that the operation plan unit 14 executes the sales appraisal step S7 and in the operation of the operation plan unit 14 in the subsequent operation plan creation step S5b. Other points of the operation support device 1 and operation support method OSM3 of this embodiment are similar to the operation support device 1 and operation support method OSM of the above-mentioned embodiment 1, so similar parts are given the same reference numerals and descriptions are omitted.

[0085] When the operation support device 1 of this embodiment starts the operation support method OSM3 shown in Fig. 3, it executes steps S1 to S4 in the same manner as in the above-described embodiment 1. Thereafter, the operation support device 1 executes a sales appraisal step S7. This step S7 includes, for example, the following steps S71 to S73. In step S71, the operation planner 14 of the operation support device 1 determines whether each of the multiple electric working machines EWM1, EWM2, ..., EWMn satisfies the evaluation index of the secondhand market.

[0086] More specifically, for example, as shown in Table 3A below, the operation planner 14 acquires the state of deterioration SOH, period of use, and total operating time of the battery B of each electric working machine EWM stored in the storage device by the information storage unit 11. Also, for example, as shown in Table 3B below, the operation planner 14 acquires the secondhand market evaluation indexes of each of the multiple electric working machines EWM1, EWM2, ..., EWMn stored in the storage device by the information storage unit 11.

[0087] [Table 3A]

[0088] [Table 3B]

[0089] The secondhand market evaluation index of each electric work machine EWM includes, for example, as shown in Table 3B, the conditions of the period of use, the total operating time, and the state of deterioration SOH of the battery B set for each of the multiple electric work machines EWM1, EWM2, ..., EWMn. These conditions can be set, for example, to any conditions under which each electric work machine EWM can be sold at a price equal to or higher than a predetermined price in the secondhand market.

[0090] In addition, the state of health (SOH), period of use, total operating time, and second-hand market evaluation index of each electric working machine EWM change over time, and therefore can be updated, for example, periodically. In addition, when the battery manufacturer and battery capacity are changed due to, for example, replacement of battery B, this information is also updated.

[0091] In step S71, the operation planner 14, for example, excludes the electric work machine EWM3 determined in step S3 to be unable (NA) to handle the work site WS1 from the judgment targets. Furthermore, in step S71, the operation planner 14, for example, compares the state of deterioration SOH, period of use, and total operating time of the battery B of each of the multiple electric work machines EWM1, EWM2, ..., EWMn shown in Table 3A with the conditions of each electric work machine EWM shown in Table 3B.

[0092] In the example shown in Table 3A, except for electric work machine EWM3, the state of deterioration SOH, period of use, and total operating time of battery B of electric work machines EWM1, EWM2, EWM4 of machines No. 1, 2, 4 enclosed in thick frames satisfy the secondhand market evaluation indexes of each electric work machine EWM1, EWM2, EWM4 enclosed in thick frames in Table 3B. In this case, the operation planner 14 determines in step S71 that the electric work machines EWM1, EWM2, EWM4 satisfy the secondhand market evaluation indexes (YES).

[0093] Furthermore, the operation planner 14 determines in step S71 that the electric work machines EWM3, EWMn do not satisfy the evaluation indexes of the secondhand market (NO). After that, the operation planner 14 executes step S72 of determining whether or not the electric work machines EWM1, EWM2, EWM4 that satisfy the evaluation indexes of the secondhand market can be sold.

[0094] More specifically, in step S72, the operation planner 14, for example, sends an inquiry about whether the electric work machines EWM1, EWM2, EWM4 can be sold to the user's terminal, and receives input of whether the electric work machines EWM1, EWM2, EWM4 can be sold from the user's terminal. In step S72, the operation planner 14, for example, determines whether the electric work machines EWM1, EWM2, EWM4 can be sold based on the input whether the electric work machines EWM1, EWM2, EWM4 can be sold. Here, if the operation planner 14 determines in step S72 that the electric work machines EWM1, EWM2, EWM4 cannot be sold (NO), a first step S5b is executed.

[0095] In this first step S5b, the operation planner 14 selects the work site WS1 with the highest workload, as in the above-described embodiment 1. Furthermore, the operation planner 14 assigns to the selected work site WS1 the electric work machine EWM2 with the least amount of battery deterioration ΔSOH of Battery B when working at the selected work site WS1, as shown in Table 3A. After that, the operation planner 14 executes the second step S71 via step S6.

[0096] In this second step S71, the operation planner 14 determines that the electric work machines EWM1, EWM4 satisfy the evaluation index of the secondhand market (YES), and executes the second step S72. If the operation planner 14 determines that the electric work machines EWM1, EWM4 are not sellable (NO) in this second step S72, the second step S5b is executed. In this second step S5b, the operation planner 14 assigns the electric work machine EWM4, which has the smallest battery deterioration amount ΔSOH, from among the remaining multiple electric work machines EWM1, EWM3, EWM4, EWMn, to the work site WS2, which has the second highest workload.

[0097] Thereafter, the operation planner 14 executes step S71 for the third time via step S6. In this third step S71, the operation planner 14 determines that the electric work machines EWM1, EWM3 satisfy the evaluation indexes of the secondhand market (YES), and executes step S72 for the third time. If, in this third step S72, the operation planner 14 determines, for example, that the electric work machine EWM1 is not sellable (NO) and that the electric work machine EWM3 is sellable (YES), the next step S73 is executed.

[0098] In this step S73, the operation planner 14 records information on the electric work machine EWM3 to be sold in a storage device via the information storage unit 11, for example. After that, the third step S5b is executed. In this third step S5b, the operation planner 14 allocates the electric work machine EWM3 to be sold, which has been determined to be available for sale (YES) in the previous step S72, to the work site WS3 with the third highest work load. The electric work machine EWM3 to be sold is sold, for example, on the secondhand market after work at the work site WS3 is completed. After that, the operation planner 14 executes the fourth step S71 via step S6.

[0099] In this fourth step S71, the operation planner 14 determines that the electric work machine EWM1 satisfies the evaluation index of the secondhand market (YES), and executes the fourth step S72. If the operation planner 14 determines, for example, that the electric work machine EWM1 is not sellable (NO) in this fourth step S72, the fourth step S5b is executed. In this fourth step S5b, the operation planner 14 assigns, for example, the electric work machine EWMn with the smallest battery deterioration amount ΔSOH from among the remaining multiple electric work machines EWM1, EWMn to the work site WS4 with the fourth highest workload.

[0100] As described above, in the operation support device 1 of this embodiment, the operation plan unit 14 records, among the multiple electric work machines EWM1, EWM2, ..., EWMn, the electric work machine EWM4 that satisfies a predetermined secondhand market evaluation index and that has been determined by the user to be sellable, as a sale target. With this configuration, the operation support device 1 and operation support method OSM3 of this embodiment not only achieve the same effects as the operation support device 1 and operation support method OSM of the above-mentioned first embodiment, but also make it possible to select an electric work machine EWM with high market value and sell it at a high price in the secondhand market.

[0101] [Embodiment 4] Hereinafter, a fourth embodiment of the operation support device and operation support method for an electric working machine according to the present disclosure will be described with reference to Fig. 1A, Fig. 4, and Table 4. Fig. 4 is a flow diagram explaining the operation of the operation support device 1 of this embodiment, and is a flow diagram explaining each step of the operation support method OSM4 of this embodiment.

[0102] The operation support device 1 and operation support method OSM4 of this embodiment differ from the operation support device 1 and operation support method OSM of the above-mentioned embodiment 1 in the operation of the operation plan unit 14 in the operation plan creation step S5c. Other points of the operation support device 1 and operation support method OSM4 of this embodiment are similar to the operation support device 1 and operation support method OSM of the above-mentioned embodiment 1, so similar parts are given the same reference numerals and descriptions are omitted.

[0103] 4, the operation support device 1 of this embodiment executes steps S1 to S4, similar to the above-mentioned embodiment 1. After that, the operation support device 1 executes an operation plan creation step S5c. In this step S5c, the operation plan unit 14 of the operation support device 1 selects work sites WS in descending order of workload based on the information stored by the information storage unit 11, similar to the above-mentioned embodiment 1.

[0104] Furthermore, the operation planner 14 allocates a specific electric work machine EWM based on the predicted deterioration state ESOH from among the multiple electric work machines EWM to the selected work site WS in the same manner as in the above-described embodiment 1. Here, the operation planner 14 allocates the electric work machine EWM with the largest predicted deterioration state ESOH from among the multiple electric work machines EWM to the selected work site WS, for example, as shown in Table 4 below.

[0105] [Table 4]

[0106] As shown in Table 4, at the work site WS1 with the highest workload, the electric work machine EWM1 with the largest predicted deterioration state ESOH is assigned from among the multiple electric work machines EWM1, EWM2, ..., EWMn excluding the electric work machine EWM3 that is excluded because it is not available (NA). Similarly, at the work site WS2, the electric work machine EWM2 is assigned, at the work site WS3, the electric work machine EWMn is assigned, and at the work site WS4, the electric work machine EWM3 is assigned.

[0107] According to the operation support device 1 and operation support method OSM4 of this embodiment, it is possible to sequentially assign the electric work machine EWM having the greatest predicted state of deterioration ESOH of the battery B after work to a work site WS with a high workload, starting from a work site WS with a low workload. Therefore, according to this embodiment, as in the above-described first embodiment, it is possible to provide an electric work machine operation support device 1 and operation support method OSM4 that are capable of suppressing deterioration and extending the lifespan of the battery B of the electric work machine EWM.

[0108] [Embodiment 5] 1A, 5, Table 5A, and Table 5B, a fifth embodiment of the operation support device and operation support method for an electric working machine according to the present disclosure will be described below. Fig. 5 is a flow diagram explaining the operation of the operation support device 1 of this embodiment, and is a flow diagram explaining each step of the operation support method OSM5 of this embodiment.

[0109] The operation support device 1 and operation support method OSM5 of this embodiment differ from the operation support device 1 and operation support method OSM of the above-mentioned embodiment 1 in the operation of the operation plan unit 14 in the operation plan creation step S5d. Other points of the operation support device 1 and operation support method OSM5 of this embodiment are similar to the operation support device 1 and operation support method OSM of the above-mentioned embodiment 1, so similar parts are given the same reference numerals and descriptions are omitted.

[0110] When the operation support device 1 of this embodiment starts the operation support method OSM5 shown in Fig. 5, it executes steps S1 to S4 in the same manner as in the above-described embodiment 1. Thereafter, the operation support device 1 executes an operation plan creation step S5d. In the operation support method OSM5 of this embodiment, the operation plan creation step S5d includes, for example, the following steps S51d to S55d. Hereinafter, the operation plan creation step S5d by the operation support device 1 of this embodiment will be described with reference to Tables 5A and 5B.

[0111] [Table 5A]

[0112] [Table 5B]

[0113] In step S51d, after selecting the work site WS1 with the highest workload, the operation planner 14 determines whether or not there is an electric work machine EWM that satisfies a predetermined evaluation index. Here, the evaluation index of the electric work machine EWM includes, for example, the conditions of the usage period, total operation time, and state of deterioration SOH set for each electric work machine EWM, as shown in Table 5B.

[0114] Here, the predicted deterioration state ESOH of the battery B of each electric work machine EWM when working at the work site WS1 shown in Table 5A is referenced. The predicted deterioration state ESOH of the electric work machine EWM1 satisfies the conditions of the deterioration state SOH shown in Table 5B, and also satisfies the conditions of the period of use and total operating time. Moreover, the predicted deterioration state ESOH of the battery B of the other electric work machines EWM does not satisfy the deterioration state SOH of the evaluation index of each electric work machine EWM.

[0115] In this case, the operation planner 14 determines in step S51d that there is an electric work machine EWM that satisfies the evaluation index (YES), and determines in the next step S52d that a plurality of electric work machines EWM do not satisfy the evaluation index (NO). Furthermore, the operation planner 14 executes step S54d, and allocates the electric work machine EWM1 that satisfies the evaluation index to the selected work site WS1. After that, the operation planner 14 executes step S51d for the second time via step S6.

[0116] In this second step S51d, the operation planner 14 selects the work site WS2 with the second highest workload. Furthermore, the operation planner 14 determines whether there is an electric work machine EWM whose usage period, total operating time, and predicted deterioration state ESOH of battery B when work is performed at the selected work site WS2 satisfy the evaluation index. At the work site WS2, only the electric work machine EWM4, machine No. 4, satisfies the evaluation index.

[0117] In this case, the operation planner 14 determines in the second process S51d that there is an electric work machine EWM that satisfies the evaluation index (YES), and determines in the second process S52d that multiple electric work machines EWM do not satisfy the evaluation index (NO). Furthermore, the operation planner 14 executes the second process S54d and assigns the electric work machine EWM4 that satisfies the evaluation index to the selected work site WS2. Thereafter, the operation planner 14 executes the third process S51d via process S6.

[0118] In this third step S51d, the operation planner 14 selects the work site WS3 with the third highest workload. Furthermore, the operation planner 14 determines whether there is an electric work machine EWM whose usage period, total operating time, and predicted deterioration state ESOH of battery B when work is performed at the selected work site WS3 satisfy the evaluation index. At the work site WS3, only the electric work machine EWM3 of machine No. 3 satisfies the evaluation index.

[0119] In this case, the operation planner 14 determines in the third step S51d that there is an electric work machine EWM that satisfies the evaluation index (YES), and determines in the third step S52d that a plurality of electric work machines EWM do not satisfy the evaluation index (NO). Furthermore, the operation planner 14 executes the third step S54d, and allocates the electric work machine EWM3 that satisfies the evaluation index to the selected work site WS3. Thereafter, the operation planner 14 executes the fourth step S51d via step S6.

[0120] In this fourth step S51d, the operation planner 14 selects the work site WS4 with the fourth highest workload. Furthermore, the operation planner 14 determines whether there is an electric work machine EWM whose usage period, total operating time, and predicted deterioration state ESOH of battery B when work is performed at the selected work site WS4 satisfy the evaluation index. At the work site WS4, two electric work machines EWM2 and EWMn, machine No. 2 and n, satisfy the evaluation index.

[0121] In this case, the operation planner 14 determines in the fourth step S51d that there is an electric work machine EWM that satisfies the evaluation index (YES), and determines in the fourth step S52d that a plurality of electric work machines EWM satisfy the evaluation index (YES). Furthermore, the operation planner 14 executes the next step S53d, and assigns to the selected work site WS4 the electric work machine EWM2 with the maximum predicted deterioration state ESOH among the plurality of electric work machines EWM2, EWMn that satisfy the evaluation index.

[0122] On the other hand, if the operation planner 14 determines in S51d that there is no work machine that satisfies the evaluation index (NO), it executes step S55d of allocating the electric work machine EWM with the smallest battery deterioration amount ΔSOH to the selected work site WS. After that, when the operation planner 14 determines in step S6 that the allocation of the electric work machines EWM to all work sites WS has been completed, the operation support device 1 ends the operation support method OSM5 shown in FIG.

[0123] As described above, in the operation support device 1 of this embodiment, when an electric work machine EWM that satisfies a predetermined evaluation index is present among the multiple electric work machines EWM, the operation planner 14 selects, as a specific electric work machine EWM, from the multiple electric work machines EWM, an electric work machine EWM that satisfies the evaluation index and has a maximum predicted deterioration state ESOH of battery B.

[0124] In other words, in the operation support device 1 of this embodiment, when there are multiple electric work machines EWM that satisfy a predetermined evaluation index among the multiple operation support devices 1, the operation planner 14 assigns to the selected work site WS an electric work machine EWM that satisfies the evaluation index and has a maximum predicted deterioration state ESOH from among the multiple electric work machines EWM. With this configuration, the operation support device 1 and operation support method OSM5 of this embodiment can not only achieve the same effects as those of the above-mentioned first embodiment, but also can appropriately manage the specifications of the electric work machines EWM assigned to each work site WS.

[0125] The above describes in detail the embodiments of the electric work machine operation support device and operation support method according to the present disclosure using the drawings. However, the specific configuration is not limited to this embodiment, and even if there are design changes and the like within the scope that does not deviate from the gist of the present disclosure, they are included in the present disclosure. [Explanation of symbols]

[0126] 1: Server (operation support device) 11: Information storage section 12: Status acquisition unit 13: State prediction unit 14: Operational Planning Department B: Battery ESOH: Estimated State of Health EWM,EWM1-EWMn:Electric working machine OSM,OSM2-OSM5:Operation support method S1: Information storage process S2: Status acquisition process S4: State prediction process S5, S5a-S5d: Operational planning process SOH: State of Deterioration WS,WS1-WSn:Work site ΔSOH: Battery degradation amount

Claims

1. An operation support device including a server that allocates a plurality of electric working machines to a plurality of work sites, The server, An information storage unit that stores information on the workloads of the plurality of work sites; a state acquisition unit that acquires a deterioration state of batteries mounted on each of the plurality of electric working machines; a state prediction unit that calculates a predicted deterioration state of the battery when each of the plurality of electric working machines works at any one of the plurality of work sites; an operation planning unit that selects work sites in descending order of workload based on the workload information stored in the information storage unit, and allocates, to the selected work sites, a specific electric work machine from among the multiple electric work machines, based on the deterioration state of the battery acquired by the state acquisition unit and the predicted deterioration state of the battery calculated by the state prediction unit; An operation support device for an electric working machine comprising:

2. The electric work machine operation support device according to claim 1, characterized in that the operation planner calculates the amount of battery deterioration when a plurality of the electric work machines work at a plurality of the work sites based on the deterioration state of the battery and the predicted deterioration state of the battery, and selects, as the specific electric work machine, an electric work machine with the smallest amount of battery deterioration from among the plurality of the electric work machines.

3. The electric work machine operation support device according to claim 2, characterized in that, when an electric work machine whose predicted deterioration state of the battery is equal to or greater than a predetermined value is included among the plurality of electric work machines, the operation planner selects, as the specific electric work machine, an electric work machine whose predicted deterioration state of the battery is equal to or greater than a predetermined value and whose amount of battery deterioration is minimum from among the plurality of electric work machines.

4. 3. The electric work machine operation support device according to claim 2, characterized in that, when there is no electric work machine among the plurality of electric work machines whose predicted deterioration state of the battery is equal to or greater than a predetermined value, the operation planner selects, as the specific electric work machine, an electric work machine among the plurality of electric work machines whose predicted deterioration state of the battery is the greatest.

5. 4. The electric work machine operation support device according to claim 3, characterized in that, when there is no electric work machine among the plurality of electric work machines whose predicted deterioration state of the battery is equal to or greater than a predetermined value, the operation planner selects, as the specific electric work machine, an electric work machine among the plurality of electric work machines whose predicted deterioration state of the battery is the greatest.

6. The electric work machine operation support device according to claim 1, characterized in that, when an electric work machine that satisfies a predetermined evaluation index is present among the plurality of electric work machines, the operation planning unit selects, as the specific electric work machine, an electric work machine that satisfies the evaluation index and has the greatest predicted deterioration state of the battery from among the plurality of electric work machines.

7. The electric work machine operation support device according to claim 1, characterized in that the operation planning unit records, among the plurality of electric work machines, electric work machines that satisfy predetermined secondhand market evaluation indexes and are determined by the user to be available for sale as targets for sale.

8. An operation support method for allocating a plurality of electric working machines to a plurality of work sites, comprising the steps of: an information storage step of storing information on the workloads of the plurality of work sites; a state acquiring step of acquiring a deterioration state of batteries mounted on each of the plurality of electric working machines; a state prediction step of calculating a predicted deterioration state of the battery when each of the plurality of electric working machines works at any one of the plurality of work sites; an operation plan creation step of selecting work sites in descending order of workload based on the workload information stored in the information storage step, and allocating specific electric work machines from among a plurality of electric work machines to the selected work sites in the order based on the deterioration state of the battery acquired in the state acquisition step and the predicted deterioration state of the battery calculated in the state prediction step; An operation support method for an electric working machine, comprising:

Citation Information

Patent Citations

  • Power supply system for construction machine

    JP2016084633A

  • Task allocation

    US20190370712A1

  • Power storage system and abnormality predictor diagnostic system

    WO2020137553A1

  • Information processing device and program

    WO2021192043A1