Training support device, training support system, training support method, method for generating training estimation model, and program

The training support device and system leverage a training estimation model to predict performance outcomes and generate targeted training menus, addressing the limitations of existing technologies by providing effective training support for achieving specific goals.

JP2024147197AActive Publication Date: 2024-10-16CASIO COMPUTER CO LTD

Patent Information

Application Number
JP2023060056
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-03
Publication Date
2024-10-16
Estimated Expiration
2043-04-03

AI Technical Summary

Technical Problem

Existing training support technologies, such as those described in Patent Document 1, primarily focus on presenting training menus and target values based on user data but fail to effectively support actual training for achieving specific goals, such as completing a marathon or acing an exam.

Method used

A training support device and system that utilizes a training estimation model to predict results and generate training menus by inputting training data, target time, and content, employing machine learning to provide probabilistic outcomes for user training support.

Benefits of technology

Enables targeted and effective training support by predicting actual performance outcomes and tailored training menus, allowing users to set realistic goals and follow specific training plans to achieve their objectives.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024147197000001_ABST
    Figure 2024147197000001_ABST
Patent Text Reader

Abstract

To preferably support training for a target.SOLUTION: An actual event result prediction part 143 inputs training data of training which has been executed by a user (hereinafter, a target user) as a prediction target, a content (a running distance in an actual event) of a target being an actual event such as a marathon tournament, a target date (a time point at which the target is performed) and the like to a leaned training estimation model so as to predict a result (time) with respect to the content of the target being the actual event in a probability distribution.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a training support device, a training support system, a training support method, and a method and program for generating a training estimation model. [Background technology]

[0002] There is known a technology that utilizes information processing technology to support training such as running. For example, Patent Document 1 describes an invention that refers to a user information DB (database), a training history DB, a training information DB, etc., and analyzes and sets the optimal training method, training menu, and target values ​​for a user based on input user data, and presents them to the user. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2004-016738 A Summary of the Invention [Problem to be solved by the invention]

[0004] Users often train to achieve good results in a certain event, such as a marathon. The technology described in Patent Document 1 only presents a training menu and target values ​​based on user data, and does not support training for the event.

[0005] The present invention has been made in consideration of the above-mentioned situation, and aims to provide a training support device, a training support system, a training support method, a method for generating a training estimation model, and a program that are capable of preferably supporting training aimed at a target. [Means for solving the problem]

[0006] In order to achieve the above object, a training support device according to the present invention comprises: an actual result prediction means for inputting training data, a time point of interest, and a content of the subject into the trained training estimation model, and predicting a result of the content of the subject at the time point of interest using a probability distribution; Equipped with It is characterized by: Effect of the Invention

[0007] According to the present invention, it is possible to preferably support training for a target. [Brief description of the drawings]

[0008] [Figure 1] 1 is a block diagram of a training support device according to a first embodiment of the present invention. [Diagram 2] FIG. 3 is a diagram showing an example of the configuration of training data according to the first embodiment of the present invention. [Diagram 3] 4 is a flowchart illustrating a model generation process executed by the training support device according to the first embodiment of the present invention. [Figure 4] FIG. 2 is a diagram showing an example of masked training data according to the first embodiment of the present invention. [Diagram 5] 4 is a flowchart illustrating a training support process executed by the training support device according to the first embodiment of the present invention. [Figure 6] 4 is a flowchart for explaining an actual competition result prediction process executed by the training support device according to the first embodiment of the present invention. [Figure 7] FIG. 2 is a diagram showing an example of the configuration of training data of a target user according to the first embodiment of the present invention. [Figure 8] FIG. 2 is a diagram showing an example of the configuration of data for predicting actual results according to the first embodiment of the present invention. [Figure 9] FIG. 4 is a diagram showing an example of the configuration of actual result prediction data to which noise has been input according to the first embodiment of the present invention. [Figure 10]FIG. 2 is a diagram showing an example of the configuration of data for predicting actual results after estimation using a model according to the first embodiment of the present invention. [Figure 11] FIG. 2 is a diagram showing an example display of predicted results of a race time according to the first embodiment of the present invention. [Figure 12] 4 is a flowchart for explaining a training menu prediction process executed by the training support device according to the first embodiment of the present invention. [Figure 13] FIG. 2 is a diagram showing an example of a configuration of training menu prediction data according to the first embodiment of the present invention. [Figure 14] FIG. 4 is a diagram showing an example of the configuration of training menu prediction data to which noise has been input according to the first embodiment of the present invention. [Figure 15] FIG. 2 is a diagram showing an example of the configuration of training menu prediction data after estimation using a model according to the first embodiment of the present invention. [Figure 16] FIG. 4 is a diagram showing an example of a training menu display screen according to the first embodiment of the present invention. [Figure 17] FIG. 11 is a diagram showing an example of training data according to the second embodiment of the present invention. [Figure 18] FIG. 11 is a diagram showing an example of the configuration of data for predicting actual results according to the second embodiment of the present invention. [Figure 19] FIG. 11 is a diagram showing an example of the configuration of training menu prediction data according to the second embodiment of the present invention. [Figure 20] FIG. 11 is a block diagram of a training support system according to a third embodiment of the present invention. [Figure 21] FIG. 13 is a diagram showing an example of the configuration of training data according to a modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, a training support device, a training support system, a training support method, a method for generating a training estimation model, and a program according to embodiments of the present invention will be described with reference to the drawings. In the drawings, identical components are denoted by the same reference numerals.

[0010] (Embodiment 1) A training support device 1 according to a first embodiment of the present invention will be described below. The training support device 1 is a device for supporting a user's running training. As shown in Fig. 1, the training support device 1 includes a communication unit 11, an operation unit 12, a display unit 13, a control unit 14, and a storage unit 15. The user is an example of a subject.

[0011] The communication unit 11 is an interface for communicating with an external device via a network such as the Internet or short-distance wireless communication. The external device here is, for example, a smartphone, a wearable device, or a PC of a user who is doing training.

[0012] The operation unit 12 is an input device such as a keyboard, a mouse, etc., and outputs a signal corresponding to an input operation received from a user to the control unit 14. For example, the operation unit 12 receives an input of a target time for a marathon race from the user.

[0013] The display unit 13 is a display device such as a liquid crystal display, and displays various information based on instructions from the control unit 14. For example, the display unit 13 displays a predicted time in a marathon race as a probability distribution, or displays a training menu that can achieve a target time in the race.

[0014] The control unit 14 includes a central processing unit (CPU), a read only memory (ROM) that stores programs such as an operating system (OS), and a random access memory (RAM) that serves as a work area, and controls the entire training support device 1. The control unit 14 also includes, as functional components according to this embodiment, a training data acquisition unit 141, a model generation unit 142, a performance result prediction unit 143, a prediction result output unit 144, a training menu prediction unit 145, and a training menu output unit 146. The control unit 14 executes the programs stored in the storage unit 15 to function as each of these units.

[0015] The training data acquisition unit 141 acquires training data indicating the contents of the training performed by the user and stores it in the training history DB 151 of the storage unit 15. The training data is an example of teacher data. FIG. 2 shows an example of the training data. In the first embodiment, the user runs as training, so the training data includes the number of training sessions performed so far, running time, running distance, and running index values ​​indicating the state of the user during running (for example, vertical movement of the hips, lateral movement, forward lean angle, pitch), and the like. In addition, although not shown in FIG. 2, the training data is assigned a user ID that is identification information of the user who performed the training. For example, when a user runs while wearing a wearable device, the wearable device can measure the running distance, running time, running index values, and the like. Therefore, after the end of training, the training data acquisition unit 141 may connect to the wearable device via the communication unit 11 to acquire these measured values ​​and update the training data stored in the training history DB 151. Alternatively, the training data acquisition unit 141 may acquire and update the training data by accepting input of the training data from the user via the operation unit 12. Even if the user participates in a marathon event, the user is still running, and the details of the running are recorded in the training data. For example, the 50th training shown in the training data of FIG. 2 has a running distance of "42.195 km", which actually represents the details of a marathon event. The training history DB 151 stores training data of multiple users. Although a training estimation model, which will be described later, may be generated from training data that does not include a running index value, the prediction accuracy of the training estimation model can be improved by including a running index value in the training data. In addition, the training data acquired by the training data acquisition unit 141 is not limited to the training actually performed by the user, and the training data acquisition unit 141 may acquire training data input as a simulation, etc.

[0016] Returning to FIG. 1, the model generation unit 142 performs machine learning on the large amount of training data stored in the training history DB 151, generates a training estimation model that outputs the content of future training from the content of training performed so far, and stores the generated model in the model storage DB 152 of the storage unit 15. In this embodiment, the training estimation model is a probability diffusion model, so that the content of future training can be output as a probability distribution. Details of the process executed by the model generation unit 142 will be described later. The model generation unit 142 is an example of a model generation means.

[0017] The actual race result prediction unit 143 inputs training data of the training performed so far by the user to be predicted (hereinafter, the target user), the contents of the actual race such as a marathon (the distance to be run in the actual race) and the schedule of the race (the time when the race is held) into the learned training estimation model, and predicts the results (time) of the actual race using a probability distribution. Details of the process executed by the actual race result prediction unit 143 will be described later. The actual race result prediction unit 143 is an example of an actual race result prediction means.

[0018] The prediction result output unit 144 outputs the predicted time predicted by the actual result prediction unit 143 in the form of a probability distribution to the display unit 13 or the smartphone of the target user. The prediction result output unit 144 is an example of a prediction result output means.

[0019] The goal acquisition unit 147 acquires a goal (a target time for a marathon) accepted from the user by the operation unit 12. The goal acquisition unit 147 may acquire the goal from an external terminal or the like via a network. The goal acquisition unit 147 is an example of a goal acquisition means.

[0020] The training menu prediction unit 145 inputs the training data of the training performed by the target user up to now, the content of the target event, the target schedule, and the target time obtained into a training estimation model, and predicts a training menu for achieving the target time in the actual event. Details of the process executed by the training menu prediction unit 145 will be described later. The training menu prediction unit 145 is an example of a training menu prediction means.

[0021] Training menu output section 146 outputs the training menu predicted by training menu prediction section 145 to display section 13 or the target user's smartphone, etc. Training menu output section 146 is an example of a training menu output means.

[0022] The storage unit 15 serves as a so-called secondary storage device (auxiliary storage device) and is, for example, a readable / writable non-volatile flash memory, a hard disk drive, etc. The storage unit 15 stores programs executed by the control unit 14 and various data. For example, the storage unit 15 stores the above-mentioned training history DB 151 and model storage DB 152. The training history DB 151 is an example of a training history storage means.

[0023] Next, the operation of the training support device 1 will be described. First, the model generation process will be described. For example, when the training history DB 151 stores training data for a sufficient number of people for learning and the model storage DB 152 does not yet store a training estimation model, or when a long time has passed since the previous training estimation model was generated, the model generation unit 142 executes the model generation process shown in the flowchart of FIG.

[0024] First, the model generating unit 142 randomly selects training data for a predetermined number of people (for example, 100 people) from the training history DB 151 (step S11).

[0025] Next, the model generation unit 142 masks the contents of the training from the nth time onwards for each of the selected training data (step S12). Here, "n" is a random integer equal to or greater than 2. It is not necessary to set the value of "n" to the same for all of the selected training data. In addition, in this case, the running distance of the training data corresponding to the distance of a competition such as a full marathon is not masked even for the nth time onwards. In addition, in this case, whether or not to mask the running time when running the running distance corresponding to the distance of a competition such as a full marathon is determined by lottery. The probability of determining to mask in this lottery may be set to an arbitrary value in advance. In this embodiment, it is configured to determine to mask with a probability of 50%. An example of masking the 11th time onwards in the training data shown in FIG. 2 is shown in FIG. 4. In this figure, the shaded parts are masked parts. In this example, the running distance of the 50th training is the distance of a full marathon, so it is excluded from the masking target. In this example, the running time of the 50th training is masked according to the result of the lottery. In the following description, the masked portion of the training data will be referred to as the masked portion, and the other portion will be referred to as the non-masked portion.

[0026] 3, the model generating unit 142 then learns each of the masked training data using a machine learning technique to generate a training estimation model that estimates the masked portion from the non-masked portion (step S13). Specifically, the model generating unit 142 generates the training estimation model by adjusting each parameter of the model function so that the training content of the masked portion estimated from the non-masked portion using the training estimation model for each of the training data matches the content before being masked as closely as possible.

[0027] Next, the model generating unit 142 determines whether or not a termination condition is satisfied (step S14). The termination condition here is, for example, a condition that learning is completed with training data of a predetermined number of people or more, the accuracy of the training estimation model generated in step S13 is equal to or higher than a reference value, or there is no improvement over the training estimation model generated previously. If the termination condition is not satisfied (step S14; No), the model generating unit 142 repeats the process of selecting training data and generating a training estimation model (steps S11 to S13). Note that the amount of training data selected in step S11 may be increased each time model generation is repeated.

[0028] On the other hand, if the termination condition is satisfied (step S14; Yes), the model generation unit 142 stores the training estimation model generated in step S13 in the model storage DB 152 (step S15). If the training estimation model has already been stored in the storage unit 15, the model generation unit 142 updates it to the training estimation model generated this time. This ends the training estimation model learning process.

[0029] (Training support processing) Next, the training support process will be described. Note that the above-mentioned model generation process must be completed before the training support process. For example, a user who is training daily for a competition such as a marathon and who is to be supported in the training (hereinafter, referred to as a target user) operates the operation unit 12 of the training support device 1, inputs his / her user ID, and issues an instruction to execute the training support process. In response to the instruction, the control unit 14 executes the training support process shown in the flowchart of FIG. 5.

[0030] When the training support process is started, first, the control unit 14 searches the training history DB 151 with the user ID input by the target user, and acquires the training data of the target user (step S21).

[0031] Next, the control unit 14 (the actual result prediction unit 143) inputs the training data of the target user into the training estimation model, and executes the actual result prediction process to predict the time in the actual competition to be participated in in the future using a probability distribution (step S22). The details of the actual result prediction process will be described with reference to the flowchart of FIG.

[0032] When the actual race result prediction process is started, the user first operates the operation unit 12 to input the date when the race will be held, the running distance, and the number of training sessions per week. The actual race result prediction unit 143 then acquires the input information (step 221). Note that the user may input the days of the week on which training sessions will be performed instead of the number of training sessions per week.

[0033] Next, the actual result prediction unit 143 calculates the number of training sessions that the target user can perform before the competition (hereinafter, also referred to as the possible number of sessions) based on the information acquired in step S221 (step S222). For example, if the competition is three weeks away and the target user performs training four times per week, the possible number of sessions is calculated to be 12. Also, for example, if the competition is three weeks away and the target user performs training on Saturdays and Sundays, the possible number of sessions is calculated to be six.

[0034] Next, the actual competition result prediction unit 143 prepares training data for predicting the actual competition result (race time) (step S223). The training data prepared in step S223 is also referred to as actual competition result prediction data.

[0035] Here, the process of step S223 will be described with a specific example. For example, assume that the training data of the target user is as shown in FIG. 7, and the possible number of times is calculated to be 9 times in step S222. In this case, the control unit 14 adds 9 columns from 11 times to 19 times, which correspond to the possible number of times, to the training data of the target user, with the running distance, running time, etc., left blank. This corresponds to the training to be performed from now until the competition. Then, the control unit 14 adds a column corresponding to the competition, which is the last one, the 20th time. The running distance of the column added here is set to a fixed value of "42.195 km" to be run in the competition, and the other columns are left blank. With the above, the data for predicting the actual result shown in FIG. 8 is completed.

[0036] Returning to Fig. 6, the actual result prediction unit 143 then inputs the actual result prediction data into the training estimation model to predict the time of the competition. That is, first, the actual result prediction unit 143 inputs noise (random values) into the blank spaces of the actual result prediction data (step S224). Then, the actual result prediction unit 143 predicts the time of the competition by estimating the noise portion of the actual result prediction data using the training estimation model (step S225).

[0037] For example, when predicting a race time from the data for predicting actual results shown in Figure 8, first, noise (shaded areas represent noise) is input into the blank spaces in the data as shown in Figure 9. Then, the noise portion is estimated using a training estimation model, and the data for predicting actual results finally becomes as shown in Figure 10. As a result, the final running time "200 minutes," which corresponds to the race, is predicted as the race time in the data for predicting actual results.

[0038] Returning to FIG. 6, the actual competition result prediction unit 143 then determines whether the number of times the competition time has been predicted has reached a predetermined number (e.g., 100 times) (step S226). If the predetermined number has not been reached (step S226; No), the actual competition result prediction unit 143 inputs noise again and repeats the process of predicting the competition time (steps S224 to S225). Since the noise input in step S224 is a random number and is different each time, the predicted value of the competition time is also different each time.

[0039] On the other hand, if the number of times the race time has been predicted reaches a predetermined number (step S226; Yes), the actual result output unit displays the predicted values ​​of the race time predicted the predetermined number of times on the display unit 13 in the form of a probability distribution as shown in Fig. 11 (step S227). As can be seen from this figure, the predicted times are distributed in accordance with a normal distribution. This completes the race time prediction process.

[0040] Returning to FIG. 5, when the competition time prediction process is completed, the target user determines a target time for the competition by referring to the probability distribution of predicted times (FIG. 11) displayed on the display unit 13, and operates the operation unit 12 to input the target time. For example, if the target user plans to perform the same training up to the competition as the training he or she has performed up until now, he or she can input the time with the highest probability in the distribution of predicted times, and if the target user plans to perform training that is more strenuous than the training he or she has performed up until now, he or she can input a faster time. As a result, the control unit 14 (goal acquisition unit 147) acquires the input target time (step S23).

[0041] Next, the control unit 14 (training menu prediction unit 145) executes a training menu prediction process that predicts a training menu that will enable the target time to be achieved in the actual competition using the training estimation model (step S24). Details of the training menu prediction process will be described with reference to the flowchart of FIG.

[0042] First, the training menu prediction unit 145 prepares training data for predicting a training menu for achieving a target time in a competition (step S241). The training data prepared in step S241 is also referred to as training menu prediction data. The training menu prediction data is data as shown in FIG. 13 in which the acquired target time is input into the running time of the final run of the actual result prediction data shown in FIG. 8. In this example, 180 minutes is input as the target time for the 20th and final run.

[0043] Returning to Fig. 12, the training menu prediction unit 145 then inputs the training menu prediction data into a training estimation model to predict a training menu. That is, first, the control unit 14 inputs noise (random values) into blank spaces in the training menu prediction data (step S242). Then, the training menu prediction unit 145 uses the training estimation model to estimate the noise portion of the training menu prediction data, thereby predicting a training menu that will achieve a target time in a competition (step S243).

[0044] For example, when predicting a training menu from the training menu prediction data shown in Fig. 13, noise is input into the blank spaces in the data as shown in Fig. 14. Then, the noise portion is estimated by the training estimation model, and the training menu prediction data becomes as shown in Fig. 15. As a result, the estimated content of each training session in the actual result prediction data (the content of the 11th to 19th training sessions in this example) is predicted as the training menu (the running distance and running time of each training session) for achieving the goal in the actual event.

[0045] Returning to FIG. 12, training menu prediction unit 145 then determines whether the number of times the training menu has been predicted has reached a predetermined number (e.g., three times) (step S244). If the predetermined number of times has not been reached (step S244; No), the process of inputting noise again and estimating a training menu is repeated (steps S242 to S243). Since the noise input in step S242 is different each time, the predicted result of the training menu is also different each time.

[0046] On the other hand, if the number of times the training menu has been calculated reaches a predetermined number (step S244; Yes), the training menu output unit 146 displays a training menu display screen as shown in FIG. 16 on the display unit 13, which displays and selects the training menu predicted a predetermined number of times (step S245). In this figure, three types of training menus are displayed because three training menus that can achieve the target time were predicted. The dates of the displayed training menus are appropriately set based on the schedule of the competition and the number of training sessions per week performed by the target user.

[0047] Next, the target user operates the operation unit 12 to select a training menu to be performed from the training menu display screen, and the control unit 14 stores the selected training menu in the storage unit 15 in association with the user ID of the target user (step S246). This ends the training menu prediction process (step S24). Thereafter, the target user performs training until the competition with reference to the selected training menu, and the training data acquisition unit 141 performs processing to update the training data according to the content of the training performed by the target user in parallel with the training support processing, in a separate thread processing.

[0048] Returning to FIG. 5, when the training menu prediction process is completed, the control unit 14 determines, at the timing when the date changes (step S25; Yes), whether or not today is the actual day of the tournament (step S26).

[0049] If it is not the day of the actual event (step S26; No), the control unit 14 acquires the training data of the target user and determines whether the training content of the target user deviates from the selected training menu based on a predetermined criterion (step S27). For example, if the target user did not train on the day scheduled in the training menu, or if the training was performed but only half the scheduled distance was traveled, the control unit 14 may determine that the training content deviates from the training menu.

[0050] If the training content deviates from the training menu (step S27; Yes), the process returns to step S21. This allows the target user's competition time and a goal-achieving training menu to be predicted again, making it possible to provide training support that is more suited to the current situation. On the other hand, if the training content does not deviate from the training menu (step S27; No), the target user's training is going well, and the process returns to step S25.

[0051] Then, when it is the actual day (step S26; Yes), the training support process ends.

[0052] As described above, according to this embodiment, a training estimation model is generated that performs machine learning on training data and outputs the content of future training from the content of the executed training in the form of a probability distribution. Then, using the generated training estimation model, a predicted result (time) of the target user's actual event (such as a marathon) is output in the form of a probability distribution. This allows the user to easily know an estimate of how fast he or she can run in the actual event, which can assist in setting a target time and ultimately provide suitable support for the user's training for the actual event.

[0053] Furthermore, according to this embodiment, by inputting a target time for the actual event into the training estimation model, it is possible to predict a training menu for achieving the target time, thereby making it possible to provide more specific support for the user's training leading up to the actual event.

[0054] (Embodiment 2) Next, a description will be given of a second embodiment of the present invention. In the first embodiment, a training support device 1 that supports running training has been described. In contrast, the second embodiment is characterized in that it supports training (study) conducted by a user, such as a student, for an actual exam.

[0055] In this case, similarly to embodiment 1, a training data estimation model is generated from training data indicating the study contents of each user, and the test results and the training menu (study menu) for achieving the target score are predicted from the generated training data estimation model.

[0056] 17 shows an example of training data in embodiment 2. In embodiment 2, since the user studies as training, the training data includes the number of times the user has studied so far, a problem vector [1], [2], [3], ... indicating the types of problems the user has solved in the study, the difficulty of the solved problems, and the accuracy rate.

[0057] Then, in order to predict the correct answer rate of the actual test from such training data, data for predicting actual results as shown in FIG. 18 is used. The final round of the data for predicting actual results represents the actual test. Fixed values ​​are set for the question vector and difficulty level of the final round by referring to past exam questions, etc. As in the first embodiment, noise is input into the blank spaces of such data for predicting actual results, and the correct values ​​of the blank spaces are estimated using a model, thereby predicting the correct answer rate in the test using a probability distribution.

[0058] In addition, in order to predict a training menu (study menu) that will achieve the goal, training menu prediction data such as that shown in Fig. 19 is used. From this training menu prediction data, study menus (problem vectors and difficulty levels of each training, and correct answer rate) for the blanks 11 to 19 are predicted to achieve an 80% correct answer rate in the test.

[0059] In this way, even when the user is training (studying) for an exam, it is possible to preferably support the user's training, similarly to the first embodiment.

[0060] (Embodiment 3) Next, a third embodiment of the present invention will be described. In the first and second embodiments, the training of a user is supported by a training support device 1, but in the third embodiment, the training of a user is supported by a training support system 100 in a similar manner. As shown in FIG. 20, the training support system 100 according to the third embodiment includes a training support device 2 and a user terminal 3. The training support device 2 and the user terminal 3 are communicatively connected via a network 4 such as the Internet. The training support device 2 and the user terminal 3 are examples of a first information processing device and a second information processing device of the present invention, respectively.

[0061] The training support device 2 according to the third embodiment includes a communication unit 11, an operation unit 12, a display unit 13, a control unit 14, and a storage unit 15, similar to the training support device 1 according to the first and second embodiments. However, in the third embodiment, the control unit 14 does not include a prediction result output unit 144, a training menu output unit 146, and a goal acquisition unit 147. Each of these units has the functions of a user terminal 3, which will be described later.

[0062] The user terminal 3 is a smartphone, a tablet terminal, or the like used by a user. The user terminal 3 includes a communication unit 31 that communicates with the training support device 2 via the network 4, a touch panel 32 that receives operations from the user and displays information, a control unit 33 that controls the entire user terminal 3, and a memory 34 that stores various data.

[0063] Moreover, the control unit 33 of the user terminal 3 includes, as functional components, a prediction result output unit 331, a training menu output unit 332, and a goal acquisition unit 333.

[0064] The prediction result output section 331 displays the predicted time predicted by the actual race result prediction section 143 of the training support device 2 on the touch panel 32 in the form of a probability distribution.

[0065] The training menu output section 332 causes the touch panel 32 to display the training menu predicted by the training menu prediction section 145 of the training support device 2.

[0066] The target acquisition unit 333 acquires a target that the touch panel 32 accepts from the user.

[0067] The training support processing executed by the training support system 100 of this embodiment is basically the same as the training support processing of embodiments 1 and 2, except that the prediction result output unit 331, the training menu output unit 332, and the goal acquisition unit 333 of the user terminal 3 perform some processing in place of the training support device 2, and therefore a description thereof will be omitted.

[0068] In this way, the training support system 100 can also support the user's training in a similar manner.

[0069] (Modification) Although an embodiment of the present invention has been described above, the present invention is not limited to the above-described embodiment, and various modifications are possible without departing from the gist of the present invention.

[0070] For example, in the first embodiment, a model was created from training data including the number of times training was performed as shown in Fig. 2, and the model was used to predict goals and training menus. However, it is also possible to create a model and make predictions using training data including the number of days since the start of training as shown in Fig. 21(A) or the date of training as shown in Fig. 21(B) instead of the number of times training was performed. The same applies to the training data in the second embodiment.

[0071] For example, the training estimation model created in each embodiment is described as a probability diffusion model, but the type of model is not limited to this. For example, the training estimation model may be created by techniques such as deep learning and neural network. In this case, it is necessary to create multiple models with adjusted parameters in order to enable prediction based on probability distribution.

[0072] In addition, when learning a training estimation model from training data, learning may be performed using a latent space.

[0073] In the first embodiment, an example of supporting running training was shown, and in the second embodiment, an example of supporting the user's study as training was shown, but the training supported by the present invention is not limited to this, and it is possible to support all kinds of training that the user performs in preparation for an actual event using a similar method. Note that it is necessary to appropriately devise the contents of the data items of the training data according to the type of training to be supported.

[0074] In the above embodiment, the control unit 14 has been described as functioning as each unit shown in FIG. 1. However, this is merely an example, and the functions of each unit shown in FIG. 1 may be realized by dedicated hardware. Examples of dedicated hardware include a single circuit, a composite circuit, a programmed processor, an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), and combinations of these. Note that the functions of each unit shown in FIG. 1 may be realized by individual hardware, or the functions of each unit may be realized together by a single piece of hardware.

[0075] It should be noted that some of the functions of each unit shown in Fig. 1 may be realized by dedicated hardware, and the remaining functions may be realized by software or firmware. In this way, the functions of each unit shown in Fig. 1 can be realized by hardware, software, firmware, or a combination of these.

[0076] By applying a program for realizing each function of the training support device 1 of the present invention so that it can be executed by a processor that controls an existing information processing device, the existing information processing device can be made to function as the training support device 1 of the present invention.

[0077] Such a program can be applied by any method. For example, the program may be applied by storing it in a computer-readable non-transitory storage medium such as a flexible disk, a CD (Compact Disc)-ROM, a DVD (Digital Versatile Disc)-ROM, or a memory card. Alternatively, the program may be superimposed on a carrier wave and applied via a communication network such as the Internet or a LAN (Local Area Network). Specifically, the program may be posted and distributed on a bulletin board (BBS: Bulletin Board System) on a communication network. Then, a processor that controls an existing information processing device may start up this program and execute it under the control of an OS in the same way as other application programs, thereby realizing each function of the training support device 1 according to the present invention.

[0078] Although the embodiment and the modified examples of the present invention have been described above, the present invention is not limited to these. The present invention includes appropriate combinations of the embodiment and the modified examples, and appropriate modifications thereto.

[0079] The present invention allows various embodiments and modifications without departing from the broad spirit and scope of the present invention. The above-described embodiments are for explaining the present invention and do not limit the scope of the present invention. In other words, the scope of the present invention is indicated by the claims, not the embodiments. Various modifications made within the scope of the claims and within the scope of the meaning of the invention equivalent thereto are considered to be within the scope of the present invention. [Explanation of symbols]

[0080] 1,2...Training support device, 11,31...Communication unit, 12...Operation unit, 13...Display unit, 14,33...Control unit, 141...Training data acquisition unit, 142...Model generation unit, 143...Actual result prediction unit, 144,331...Prediction result output unit, 145...Training menu prediction unit, 146,332...Training menu output unit, 147,333...Goal acquisition unit, 15,34...Memory unit, 151...Training history DB, 152...Model memory DB, 100...Training support system, 3...User terminal, 32...Touch panel, 4...Network

Claims

1. an actual result prediction means for inputting training data, a time point of interest, and a content of the subject into the trained training estimation model, and predicting a result of the content of the subject at the time point of interest using a probability distribution; Equipped with A training support device comprising:

2. a prediction result output means for outputting a prediction result by the actual result prediction means; A goal acquisition means for acquiring a goal regarding the content of the object at a time point of the object; a training menu prediction means for inputting the certain training data, the time point of the subject, the content of the subject, and the goal acquired by the goal acquisition means into the learned training estimation model, and predicting a training menu for achieving the goal; Further comprising:

2. The training support device according to claim 1.

3. The learned training estimation model is a trained training estimation model that is obtained by machine learning using training data including the time and content of training and the results of the training as teacher data, and that inputs training data, a target time point, and target content, and predicts the result of the target content at the target time point using a probability distribution; 2. The training support device according to claim 1.

4. The teacher data further includes an index value indicating a state of the subject obtained when the subject performs the training.

4. The training support device according to claim 3.

5. A model generation means for generating the trained estimation model; Further comprising:

4. The training support device according to claim 3.

6. a training menu prediction means for inputting certain training data, a time point of a target, a content of the target, and a goal for the content of the target at the time point of the target into the learned training estimation model, and predicting a training menu for achieving the goal; Equipped with A training support device comprising:

7. The learned training estimation model is a trained training estimation model that predicts a result for the target content at a target time using a probability distribution by inputting training data, a target time, target content, and a goal for the target content at the target time, the training data being obtained by machine learning using the training data including the time and content of the training and the result of the training as teacher data; 7. The training support device according to claim 6.

8. A model generation means for generating the trained estimation model; Further comprising:

7. The training support device according to claim 6.

9. The learned training estimation model is a probability diffusion model. The training support device according to any one of claims 1 to 8.

10. The training data is training data related to running or study training performed by the subject. The training support device according to any one of claims 1 to 8.

11. The certain training data is training data of a training performed by the subject before a predetermined time point, and includes a time point when the training was performed before the predetermined time point, a content of the training, and a result of the training. The training support device according to any one of claims 1 to 8.

12. A training data set, a time point of a target, and a content of the target are input to the trained training estimation model, and an outcome of the content of the target at the time point of the target is predicted using a probability distribution. A training support method comprising:

13. A training menu for achieving the goal is predicted by inputting training data, a time point of a target, a content of the target, and a goal for the content of the target at the time point of the target into a trained training estimation model. A training support method comprising:

14. Computer, inputting certain training data, a time point of interest, and a content of the subject into the learned training estimation model, and making the model function as an actual result prediction means for predicting the result of the content of the subject at the time point of interest using a probability distribution; A program characterized by:

15. and causing the learned training estimation model to function as a training menu prediction means for inputting training data, a time point of a target, a content of the target, and a goal for the content of the target at the time point of the target, and predicting a training menu for achieving the goal. A program characterized by:

16. A training support system including a first information processing device and a second information processing device, The first information processing device is a real-world result prediction means for inputting training data, a time point of interest, and a content of the target into the trained training estimation model, and predicting a result of the content of the target at the time point of interest using a probability distribution; The second information processing device is a prediction result output means for outputting a prediction result by the actual result prediction means; A goal acquisition means for acquiring a goal regarding the content of the object at a time point of the object, The first information processing device is a training menu prediction means for predicting a training menu for achieving the goal by inputting certain training data, a target time point, target content, and the goal acquired by the goal acquisition means at the target time point into the learned training estimation model, A training support system comprising:

17. A training data set, a time point of a target, and a content of the target are input to the trained training estimation model, and a result of the content of the target at the time point of the target is predicted using a probability distribution; Output the prediction results, Obtaining a goal for the content of the subject at a time of the subject; inputting certain training data, the time point of the subject, the content of the subject, and the obtained goal into the trained training estimation model, and predicting a training menu for achieving the goal; A training support method comprising:

18. A method for generating a learned training estimation model that uses training data, including the time and content of the training and the results of the training, as teacher data through machine learning, and that inputs certain training data, a target time point, and the target content, and predicts the results of the target content at the target time using a probability distribution.

19. A method for generating a learned training estimation model that uses training data, including the time and content of the training and the results of the training, as teacher data through machine learning, and that inputs certain training data, a target time and content of the target, and a goal for the target content at the target time, to predict a training menu for achieving the goal.

Citation Information

Patent Citations

  • Efficiency estimation device

    CN115136225A

  • Device for analyzing time sequence based on recurrent neural network and its method

    JP1998111862A

  • System and method for real-time user verification in online education

    JP2018511890A

  • Learning support device and program

    JP2019135507A

  • A hybrid method for assessing and predicting athletic performance

    JP2021503357A

Cited By

  • Determination system, determination method, and computer program

    WO2026110292A1