Shield construction management device and shield construction management method

The shield construction management device enhances efficiency by displaying management values and countermeasures on a screen, addressing inefficiencies and skill shortages, enabling unified management across sites.

JP2024147947APending Publication Date: 2024-10-17TAISEI CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023060712
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-04
Publication Date
2024-10-17

AI Technical Summary

Technical Problem

Existing shield construction management systems face inefficiencies due to unnecessary stoppages from noise-related malfunctions and require skilled managers, making it difficult to improve work efficiency and unify management across multiple sites.

Method used

A shield construction management device and method that displays management values, threshold deviations, and countermeasure techniques on a screen, allowing for early detection and simplified management of abnormalities, enabling unified management across sites.

Benefits of technology

Improves work efficiency by reducing the time to investigate abnormalities, allowing inexperienced workers to manage shield construction effectively, and facilitating a unified management system across multiple sites.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024147947000001_ABST
    Figure 2024147947000001_ABST
Patent Text Reader

Abstract

To propose a shield construction management device that improves work efficiency of shield construction by making it easier to manage shield construction, and a shield construction management method.SOLUTION: A shield construction management device of the invention comprises a display control part 12. The display control part displays, on a screen, the handling techniques for cases where a management value deviates from a threshold value for a plurality types of management items in a shield construction, and displays, on the screen, the management value (sign 424), information indicating whether or not the management value has deviated from the threshold value (sign 423), a link button to a detailed screen (sign 422), and a history of the management value according to distance (sign 425) for at least one first management item selected from the management items, and displays, on the screen, information (code 433) indicating whether or not the management value has deviated from the threshold value for a second management item among the management items other than the first management item, and a link button (code 432) to the detailed screen.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a shield construction management device and a shield construction management method. [Background technology]

[0002] In recent years, technological developments have been made in managing shield machines that excavate the ground, and related inventions have been made public. For example, Patent Document 1 discloses a shield excavation management system that requires approval by an experienced engineer in shield excavation work, making it difficult for mistakes due to lack of skill to occur, and also detects abnormal trends early and clarifies where responsibility lies. The invention in Patent Document 1 monitors data related to the excavation of the shield machine, and controls the stop or continuation of the operation of the shield machine depending on whether the monitored data deviates from the management value. In addition, the operation of the shield machine is set as a start condition for input operation related to the approval of the person in charge. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2015-221983 A Summary of the Invention [Problem to be solved by the invention]

[0004] In the invention of Patent Document 1, for example, even in the case of a malfunction that only affects the noise level and does not require specific measures, if the monitoring data deviates from the control value, there is a risk that excavation will be stopped. This causes a problem of reducing the work efficiency of shield construction. In addition, in light of the recent situation in which it is not easy to secure managers with sufficient skills in the construction industry, which is experiencing a labor shortage, it is difficult to introduce the invention of Patent Document 1, which requires the approval of a person in charge who should be highly skilled. In addition, there is a demand to improve the work efficiency of each site by unifying the management system for shield construction sites nationwide. An object of the present invention is to propose a shield construction management device and a shield construction management method that improve the work efficiency of shield construction by facilitating the management of shield construction. [Means for solving the problem]

[0005] The present invention, which solves the above-mentioned problems, is a shield construction management device that has a display control unit that displays on a screen countermeasure techniques for when a control value deviates from a threshold for multiple types of control items of shield construction, displays on a screen the control value, information indicating whether the control value has deviated from the threshold, a link button to a details screen, and a history of the control value according to distance for at least one first control item selected from the control items, and displays on a screen information indicating whether the control value has deviated from the threshold and a link button to a details screen for a second control item other than the first control item among the control items. The present invention also relates to a shield construction management method that executes a display control step in which a shield construction management device displays on a screen countermeasure techniques for when the control value deviates from a threshold for multiple types of control items of shield construction, and for a first control item selected from the control items, displays on a screen the control value, information indicating whether the control value has deviated from the threshold, a link button to a details screen, and a history of the control value according to distance, and for a second control item other than the first control item among the control items, displays on a screen information indicating whether the control value has deviated from the threshold and a link button to a details screen.

[0006] According to the present invention, since the threshold value for abnormality detection is set for each of the management items of the shield construction, which has many types, the accuracy of management can be improved. In addition, since the countermeasure technology is displayed for each management item, the time required for construction workers to investigate countermeasures in the event of an abnormality can be reduced, and the work efficiency of the shield construction can be improved. In addition, since it is not necessary to immediately stop excavation when an abnormality is detected, it is sufficient to take an abnormality countermeasure in accordance with the countermeasure technology, depending on the situation, a decrease in the work efficiency of the shield construction can be avoided. In addition, since even construction workers who are inexperienced or have insufficient skill can check the countermeasure technology, tendencies that lead to trouble or malfunction can be discovered early. In addition, since the display content on the screen can be simplified, even when new technology is added, it is sufficient to add and display new management items, making management easier. In addition, by displaying all of the management items on the screen, the management system can be unified for multiple sites. As a result, the management level can be improved and leveled, and the work efficiency of each site can be improved. In addition, for the first management item selected from the management items, the history of the management value according to the distance is displayed on the screen, making it easier to manage the management items that construction workers particularly value.

[0007] In addition, it is preferable that the display control unit displays on a screen, for a third control item selected for each site from among the first control items, the control value, information indicating whether the control value has deviated from the threshold value, a link button to a detailed screen, and a history of the control value according to distance.

[0008] This makes it easy to manage multiple sites in a manner that is suited to their unique circumstances, even if the management system is unified across multiple sites.

[0009] In addition, it is preferable that the display control unit displays, on a screen, a contact point for inquiries regarding the countermeasure technique.

[0010] This allows construction personnel to quickly identify any questions regarding countermeasures. Effect of the Invention

[0011] According to the present invention, the management of shield construction can be facilitated, thereby improving the work efficiency of shield construction. [Brief description of the drawings]

[0012] [Figure 1] 1 is a functional configuration diagram of a shield construction management device according to an embodiment of the present invention. [Diagram 2] 13 is an example of a comprehensive diagnosis screen. [Diagram 3] 13 is a screen example of a countermeasure technique. [Figure 4] 2 is a flowchart of a shield construction management method according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] Hereinafter, the embodiment of the present invention will be described in detail with reference to the drawings. Each drawing is merely a schematic illustration to allow a sufficient understanding of the present invention. Therefore, the present invention is not limited to the illustrated examples. In each drawing, common or similar components are denoted by the same reference numerals, and duplicated explanations thereof will be omitted.

[0014] [composition] FIG. 1 is a functional configuration diagram of the shield construction management device of this embodiment. The shield construction management device 1 is a computer that grasps abnormalities that occur during shield construction. The shield construction management device 1 includes hardware such as an input unit, an output unit, a control unit, and a storage unit. For example, when the control unit is composed of a CPU (Central Processing Unit), information processing by a computer including the control unit is realized by program execution processing by the CPU. In addition, the storage unit included in the computer stores various programs for realizing the functions of the computer by instructions from the CPU. This realizes collaboration between software and hardware. The programs can be provided by recording them on a recording medium or via a network. The shield construction management device 1 is connected to an excavation management system 2 and a console 3 so as to be able to communicate with each other. The excavation management system 2 is a system that centralizes construction management by collecting and managing survey data and measurement data obtained during shield construction. For example, the excavation management system 2 can estimate the condition of the ground and excavated soil and the load condition of the shield machine based on the changes over time and the results of statistical processing of the measurement data. In addition. The excavation management system 2 can further input survey data to calculate the positions of the shield machine and segments and determine the deviation from the baseline. The console 3 is a terminal used by users (those involved in the construction) who manage the shield construction, and can display the processing results of the shield construction management device 1 and input requests to the shield construction management device 1.

[0015] The shield construction management device 1 includes an acquisition unit 11 and a display control unit 12. The shield construction management device 1 also stores a management item DB 13 and a countermeasure technology DB 14. "DB" is an abbreviation for database. The acquisition unit 11 acquires various types of data from the excavation management system 2 that is data-linked with the shield construction management device 1. The acquired data is data managed by the excavation management system 2. The display control unit 12 controls the screen display by the console 3. The display control unit 12 can generate data for screen display in a predetermined format using the data acquired by the acquisition unit 11. The management item DB 13 can store various types of data in association with each of multiple types of management items used in managing the shield construction. The types of management items may be prepared in advance by the user, for example, or may be appropriately set based on the contents of the data managed by the excavation management system 2. The data associated with each of the management items includes, for example, a management value indicating data (e.g., survey data, measurement data) managed by the excavation management system 2, and a threshold value determining a normal range of the management value, but is not limited to these. For example, the stored management values ​​may be real-time values ​​during shield construction, or may be history at a predetermined timing based on a time stamp system. Also, for example, the stored management values ​​may be prepared for each shield construction site across the country. The countermeasure technique DB14 manages data indicating countermeasure techniques for abnormalities that occur during shield construction.

[0016] The items managed in shield construction are, for example, face earth pressure (value measured by an earth pressure gauge selected from among multiple earth pressure gauges) (kPa), face water pressure (value measured by a water pressure gauge selected from among multiple water pressure gauges) (kPa), integrated value of excavation volume (% / R), integrated value of backfill injection rate (% / R), maximum backfill injection pressure (MPa), minimum value of tail clearance (mm), instantaneous value of cutter torque (%), average value of excavation speed (mm / min), index of plastic fluidity (for example, the percentage of plastic fluidity below the specified value (%)), current value of screw pressure (MPa), maximum amount of cutter bit wear (mm), maximum value of cutter bit temperature (℃), cutter bearing seal pressure (differential pressure) (MPa), maximum value of cutter bearing seal temperature (℃), maximum value of cutter bearing seal plate thickness (mm), cutter drive motor temperature diagnosis (℃), cutter drive motor acceleration (mm / min 2 ), Cutter drive motor cf acceleration (mm / min 2 ), cutter drive motor speed (mm / min), cutter drive motor displacement (mm), remaining load life of screw conveyor drive section, wear on screw body, screw conveyor drive section seal window pressure gauge (MPa), screw conveyor contamination, tail grease pressure (differential pressure) (MPa), shield jack pressure gauge (MPa), segment internal dimensions (measured value by laser range finder), current hydraulic oil temperature (℃), power unit load, power unit hydraulic oil contamination diagnosis, ground surface subsidence / uplift (radar / GPS / leveling), segment surface orientation, results of natural ground collapse investigation (survey results by ultrasonic / electromagnetic waves) (mm), oxygen concentration / flammable gas concentration / humidity / temperature / communication inside the tunnel, dust concentration, belt conveyor drive section load, presence / absence of damage to general parts of belt conveyor, presence / absence of damage to belt conveyor joints, shield machine deviation (horizontal) (mm), shield machine deviation (vertical) (mm), excavation volume (accumulated value) (m 3 / R), the accumulated water loss (m 3 / R), cumulative dry sand volume (m 3 / R), deviation flow rate integrated value (m 3 / R), and instantaneous value of total thrust (kN), but are not limited to these.

[0017] (General diagnosis screen) FIG. 2 is an example of a comprehensive diagnosis screen. The comprehensive diagnosis screen 4 is a screen that displays signs of abnormality in shield construction. The display control unit 12 can set the comprehensive diagnosis screen 4 as a default screen to be displayed on the console 3. The comprehensive diagnosis screen 4 is configured to include a first area 41, a second area 42, a third area 43, and a fourth area 44. The first area 41 is an area that displays information showing the current work status of the shield construction at the target site. The first area 41 includes items such as "ring number", "excavation status", "cutter torque", "total thrust", "excavation distance", and current date and time. "Ring number" indicates the number (number of rings) of the segment ring being constructed. "Excavation status" indicates the current status of the excavation work (excavation in progress or stopped). "Cutter torque" indicates the current value of the torque applied to the cutter of the shield machine. "Total thrust" indicates the current value of the total thrust applied to the jack that propels the shield machine. "Excavation distance" is the advancement distance of the shield machine during excavation work.

[0018] The second area 42 is an area that displays data associated with a priority management item (first management item), which is a management item that is preferentially selected from all management items stored in the management item DB 13, and displays a history graph 425 showing the history (trend) of the priority management item as well as the current value (real-time management value) of the priority management item. The selection of the priority management item can be realized, for example, by an input from the user of the console 3. The selected priority management item can be, for example, a management item selected in common for shield construction sites nationwide. The second area 42 is divided for each priority management item. For each priority management item, a name field 421, a detail link button 422, a normal button 423, a management value field 424, and a history graph 425 are prepared. In the name field 421, the name of the target priority management item (for example, "face earth pressure (managed earth pressure) (kPa)") is displayed. The detail link button 422 is a button to which a link is set for displaying details of various data of the target priority management item on a screen. For example, the screen display of the details of various data of the management items including the priority management items can be the same as the screen display by the excavation management system 2 (not specifically shown). The normal button 423 is a button that indicates whether or not the management value of the priority management item in question has deviated from the threshold. If the threshold has not been deviated, "normal" is displayed. If the threshold has been deviated, "abnormal" is displayed. If a countermeasure technique for eliminating the threshold deviation is being implemented, "countermeasure in progress" is displayed. The threshold can be appropriately set as a value that indicates an abnormality sign of the shield construction. A link for displaying details of the countermeasure technique on the screen (e.g., pop-up display) can be set for the normal button 423. The management value field 424 displays the real-time management value of the priority management item in question. The display of the real-time management value can be, for example, a meter display, a numerical display, or a combination of both, but is not limited to these. The history graph 425 shows the history of the management value according to the distance of the tunnel in the shield construction. The horizontal axis of the history graph 425 can be the ring number of the segment ring, and the vertical axis can be the unit of the management value.

[0019] The third area 43 is an area for displaying data associated with non-priority management items (second management items), which are management items other than priority management items among all management items stored in the management item DB 13 (current value management). The third area 43 is divided into non-priority management items. For example, the third area 43 can display all of the non-priority management items on one screen by reducing the size of each non-priority management item, or can display all of the non-priority management items by making the display size of each non-priority management item larger than a predetermined size by using a scroll display format. For each non-priority management item, a name field 431, a detail link button 432, and a normal button 433 are provided. The name field 431 displays the name of the target non-priority management item (e.g., "Cutter bit wear detection (maximum value) (mm)"). The detail link button 432 has a function equivalent to the detail link button 422. The normal button 433 has a function equivalent to the normal button 423.

[0020] The fourth area 44 is an area that displays data associated with the site priority control item (third control item), which is a control item selected for each site among the priority control items, and displays the current value (real-time control value) of the site priority control item as well as a history graph 445 showing the history (trend) of the site priority control item. The site priority control item can be selected, for example, by an input from the user of the console 3. The selected site priority control item can be, for example, a control item selected for the site to be monitored among shield construction sites nationwide. The fourth area 44 is divided into site priority control items. For each site priority control item, a name field 441, a detail link button 442, a normal button 443, a control value field 444, and a history graph 445 are prepared. The name field 441 displays the name of the target site priority control item (e.g., "plastic fluidity (low pressure)"). The detail link button 442 has a function equivalent to the detail link button 422. The normal button 443 has a function equivalent to the normal button 423. The control value column 444 has the same function as the control value column 424. The history graph 445 has the same function as the history graph 425.

[0021] (Countermeasures) FIG. 3 is an example of a screen of the countermeasure technique. For example, when the excavation amount as a real-time management value exceeds a threshold, the normal button 423a (FIG. 2) is displayed as "abnormal" in the priority management item "excavation amount (accumulated value) % / R", and when the user presses this normal button 423a (FIG. 2) via the console 3, the countermeasure technique (excavation amount management) shown in FIG. 3 is popped up on the screen. The screen of FIG. 3 displays a "date" column 51, a "time" column 52, a "diagnosis result" column 53, a "management value" column 54, a "current value" column 55, a "detection location" column 56, an "initial" column 571 and a "response" column 572 in the "countermeasure technique" column 57, a "related item" column 58, a "remarks" column 59, a "trouble response record" button 60, a "alarm list" button 61, a "total alarm list" button 62, and a "print" button 63. The display contents of the countermeasure technique screen can be rewritten.

[0022] The "Date" column 51 displays the date when the sign of abnormality was detected. The "Time" column 52 displays the time when the sign of abnormality was detected. The "Diagnosis Result" column 53 displays details of the sign of abnormality (no entry is made in the example screen of Figure 3). The "Control Value" column 54 displays the control value at the time when the sign of abnormality was detected. The "Current Value" column 55 displays the current control value (in the example screen of Figure 3, "0.00m" is displayed because the shield machine has been stopped due to the implementation of a countermeasure technique). 3"). The "detection location" column 56 displays the location where the abnormality symptom was detected (such as the location of the shield machine failure) (in the example screen of FIG. 3, it is blank because it is the excavation volume, a management item for which the detection location cannot be determined). The "initial" column 571 displays the specific content of the initial stage of the countermeasure technique. The "response" column 572 displays the specific content of the countermeasure technique after the initial stage is completed (in the example screen of FIG. 3, no specific content has been written and it is blank). The "related items" column 58 displays a list of the names of the management items that are affected by the abnormality symptom related to the management item "excavation volume". The "remarks" column 59 displays the contact point for inquiries regarding the countermeasure technique. Specifically, the manufacturer, person in charge, and contact information (telephone number, email address, or these can be displayed as codes) for each piece of equipment and task related to the countermeasure technique are displayed.

[0023] The "trouble response record" button 60 is a button with a link set for displaying on a screen (not shown) a record of details of past troubles related to the target management item and a record of details of countermeasures against the troubles. The "alarm list" button 61 is a button with a link set for displaying on a screen (not shown) a list of alarms used in the shield construction management device 1. The "overall alarm list" button 62 is a button with a link set for displaying on a screen (not shown) a list of alarms used in the excavation management system 2. The "print" button 63 is a button for printing out the screen of the countermeasure technique. For example, the alarms that can be displayed by the "overall alarm list" button 62 can be alarms prepared for each of all management items (about several hundred types) used in the excavation management system 2. Also, the alarms that can be displayed by the "alarm list" button 61 can be alarms prepared for each of the management items (about 40 types) selected from the excavation management system 2 as being particularly important, and can be alarms prepared for each of the priority management items.

[0024] [process] FIG. 4 is a flowchart of the shield construction management method of this embodiment. As shown in FIG. 4, first, the shield construction management device 1 acquires the selection result of the priority management items (step S1). The selection result of the priority management items is, for example, one or more priority management items selected by the user of the console 3. Next, the shield construction management device 1 acquires the selection result of the site priority management items (step S2). The selection result of the site priority management items is, for example, one or more site priority management items at the target site selected by the user of the console 3. Next, the acquisition unit 11 of the shield construction management device 1 acquires data from the excavation management system 2 (step S3). Next, the display control unit 12 of the shield construction management device 1 controls the display of the overall diagnosis screen 4 (step S4). Specifically, the display control unit 12 generates the overall diagnosis screen 4 using the acquired selection result of the priority management items, the selection result of the site priority management items, and the data from the excavation management system 2, and displays it on the display unit of the console 3. Next, the shield construction management device 1 determines whether or not there is a request for displaying a countermeasure technique from the console 3 (step S5). The display request of the countermeasure technique means, for example, that at least one of the normal button 423 of a specific priority control item, the normal button 433 of a specific non-priority control item, and the normal button 443 of a specific site priority control item is displayed as "abnormal" and the normal button 423, 433, or 443 is pressed (clicked). If there is no display request of the countermeasure technique (No in step S5), the process returns to step S4 and continues the subsequent processes. On the other hand, if there is a display request of the countermeasure technique (Yes in step S5), the display control unit 12 of the shield construction management device 1 controls the display of the countermeasure technique (step S4). Specifically, the display control unit 12 pops up a screen as shown in FIG. 3 for the control item displayed as "abnormal". The user of the console 3 can write a predetermined text or the like on the screen of the countermeasure technique. Note that, when the countermeasure technique is being executed, the normal button 443 of the target control item is displayed as "Measure being taken". Next, the shield construction management device 1 judges whether or not there is a request to end the display of the countermeasure technique from the console 3 (step S7). The request to end the display of the countermeasure techniques means, for example, that the close button "X" on the displayed countermeasure technique screen has been pressed (clicked).If there is no request to end the display of the countermeasure techniques (No in step S7), the process returns to step S6 and continues from step S6 onward. On the other hand, if there is a request to end the display of the countermeasure techniques (Yes in step S7), the process returns to step S4 and continues from step S4 onward.

[0025] According to this embodiment, since the threshold value for abnormality detection is set for each of the management items of the shield construction, which has many types, the accuracy of management can be improved. In addition, since the countermeasure technology is displayed for each management item, the time required for construction workers to investigate countermeasures in the event of an abnormality can be reduced, and the work efficiency of the shield construction can be improved. In addition, since it is not necessary to immediately stop excavation when an abnormality is detected, it is sufficient to take an abnormality countermeasure in accordance with the countermeasure technology, depending on the situation, a decrease in the work efficiency of the shield construction can be avoided. In addition, since even construction workers who are not sufficiently skilled, such as those with little experience, can check the countermeasure technology, tendencies that lead to trouble or malfunction can be discovered early. In addition, since the display content on the screen can be simplified, even when a new technology or the like is added, it is sufficient to add and display a new management item, making management easier. In addition, by displaying all of the management items on the screen, the management system can be unified for multiple sites. As a result, the management level can be improved and leveled, and the work efficiency of each site can be improved. In addition, for the first management item selected from the management items, the history of the management value according to the distance is displayed on the screen, making it easier to manage the management item that construction workers particularly value. Furthermore, even if a management system is unified across multiple sites, management can be easily tailored to suit the unique circumstances of each site. In addition, construction personnel can quickly identify any questions regarding countermeasures.

[0026] [Variations] (a): The display control unit 12 may display, for the non-priority control items on the comprehensive diagnosis screen 4, control items that correspond to the on-site priority control items. (b) The display control unit 12 may display the name of the target site (eg, place name) in the first area 41 and the fourth area 44 of the comprehensive diagnosis screen 4.

[0027] (c) It is also possible to realize a technology that appropriately combines the various technologies described in this embodiment. (d) The software described in the present embodiment can be realized as hardware, and vice versa. (e) In addition, the hardware, software, flow charts, etc. may be modified as appropriate without departing from the spirit and scope of the present invention. [Explanation of symbols]

[0028] 1. Shield construction management device 2. Excavation Management System 3 Console 11 Acquisition Department 12 Display control section 13 Management item DB 14 Countermeasure Technology DB 41 Area 1 42 Area 2 43 Third Area 44 4th Area

Claims

1. For multiple types of control items in shield construction, countermeasures techniques are displayed on the screen when control values ​​deviate from thresholds. displaying on a screen the control value, information indicating whether the control value deviates from the threshold value, a link button to a detailed screen, and a history of the control value according to distance for at least one first control item selected from the control items; A shield construction management device comprising a display control unit that displays on a screen information indicating whether the management value deviates from the threshold value for a second management item other than the first management item among the management items, and a link button to a detailed screen.

2. The display control unit is A shield construction management device as described in claim 1, which displays on a screen, for a third management item selected for each site from among the first management items, the management value, information indicating whether the management value deviates from the threshold value, a link button to a detailed screen, and a history of the management value according to distance.

3. The display control unit is The shield construction management device according to claim 1 or 2, further comprising a screen displaying a contact point for inquiries regarding the countermeasure technique.

4. The shield construction management device, For multiple types of control items in shield construction, countermeasures techniques are displayed on the screen when control values ​​deviate from thresholds. displaying on a screen the control value, information indicating whether the control value deviates from the threshold value, a link button to a details screen, and a history of the control value according to distance for a first control item selected from the control items; A shield construction management method that executes a display control step of displaying on a screen information indicating whether or not the control value deviates from the threshold value for a second control item other than the first control item among the control items, and a link button to a detailed screen.

Citation Information

Patent Citations

  • Shield driving management system

    JP2015221983A