Power generation floor system

The system uses footwear piezoelectric elements and wireless communication to track and calculate individual power generation contributions, addressing the challenge of multiple users on a power generation floor.

JP2024148414AInactive Publication Date: 2024-10-18JVC KENWOOD CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023061520
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-05
Publication Date
2024-10-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing power generation floor systems struggle to accurately identify and calculate the power generated by individual users when multiple users walk on the floor simultaneously.

Method used

The system incorporates footwear with integrated piezoelectric elements and wireless communication devices to track power generation at the individual level, combined with a management server that calculates power generation ratios and user-specific contributions using positional and identification data.

Benefits of technology

Enables accurate measurement and differentiation of power generation amounts for each user, allowing for precise calculation of individual contributions and rewards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024148414000001_ABST
    Figure 2024148414000001_ABST
Patent Text Reader

Abstract

To provide a power generation floor system capable of grasping a power generation amount by a power generation floor for each user who walks on the power generation floor.SOLUTION: A power generation floor system 1A comprises: a power generation floor 10A including a plurality of first piezoelectric elements 12; a power generation amount rate calculation section 323; and a first user basis power generation amount calculation section 324A. The power generation amount rate calculation section 323 calculates power generation amount rate information indicating a rate of a footwear power generation amount for each of footwear Ya and Yb with respect to a total amount of footwear power generation amounts, which are power generation amounts of second piezoelectric elements 21a and 21b installed in bottom parts of the footwear Ya and Yb, regarding a predetermined period in which users Xa and Xb put the footwear Ya and Yb on and walk on the power generation floor 10A. The first user basis power generation amount calculation section 324A calculates a power generation amount on a user basis by multiplying a floor power generation amount, which is a total amount of power generation amounts by the first piezoelectric elements 12 during the predetermined period, by the rate of the footwear power generation amount for each of the footwear Ya and Yb indicated in the power generation amount rate information.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a power generating floor system. [Background technology]

[0002] A power-generating floor has been developed that has multiple piezoelectric elements installed under the floor. When a user walks on the floor, the piezoelectric elements convert the pressure into electrical energy.

[0003] A system may be envisaged in which users who contribute to power generation by walking on such a power-generating floor are rewarded according to the degree of their contribution. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Japanese Patent Application Publication No. 2016-224803 Summary of the Invention [Problem to be solved by the invention]

[0005] In the above-mentioned system, when calculating the degree of contribution of a user to power generation, if multiple users walk on the power-generating floor at the same time, it is necessary to recognize the amount of power generated by the power-generating floor for each user. However, there is a problem that the system cannot distinguish between multiple users walking on the power-generating floor at the same time, and therefore cannot calculate the amount of power generated by each user.

[0006] An object of the present invention is to provide a power-generating floor system that makes it possible to grasp the amount of power generated by the power-generating floor for each user who walks on the power-generating floor. [Means for solving the problem]

[0007] In order to achieve the above-mentioned object, one embodiment of the power-generating floor system of the present invention comprises a power-generating floor having a plurality of first piezoelectric elements, a floor power generation acquisition unit that acquires, at a predetermined time interval, information on floor power generation, which is the total amount of power generation by the plurality of first piezoelectric elements, a footwear power generation acquisition unit that acquires, at a predetermined time interval, information on footwear power generation, which is the amount of power generation by a second piezoelectric element installed on the sole of footwear worn by each of a plurality of users walking on the power-generating floor, a power generation amount ratio calculation unit that calculates power generation amount ratio information indicating the ratio of the footwear power generation for each piece of footwear to the total amount of the plurality of footwear power generation acquired by the footwear power generation acquisition unit for a predetermined period of time, and a user-specific power generation calculation unit that calculates the floor power generation for each user wearing any of the footwear by multiplying the floor power generation corresponding to the predetermined period by the ratio of the footwear power generation for each piece of footwear indicated by the power generation amount ratio information.

[0008] In addition, another form of the power generating floor system of the present invention comprises a power generating floor having a plurality of piezoelectric elements, a user position acquisition unit that acquires position information of each of a plurality of users on the power generating floor, and a user-specific power generation calculation unit that calculates, when the plurality of users walk simultaneously on the power generating floor, the amount of power generated by the piezoelectric elements located at positions within the power generating floor corresponding to the positions of each user as the amount of power generated by each corresponding user.

[0009] In addition, another form of the power generating floor system of the present invention comprises a power generating floor having a plurality of piezoelectric elements, a user information acquisition unit that acquires identification information of a user walking on the power generating floor, and a user-specific power generation calculation unit that calculates the amount of power generated on the power generating floor within a predetermined period after the user information acquisition unit acquires the user's identification information as the amount of power generated by the user corresponding to the acquired identification information. Effect of the Invention

[0010] According to the power-generating floor system of the present invention, the amount of power generated by the power-generating floor can be grasped for each user who walks on the power-generating floor. [Brief description of the drawings]

[0011] [Figure 1] 1 is an overall view showing the configuration of a floor power generation system according to a first embodiment of the present invention. [Diagram 2] 1 is a diagram showing a power-generating floor of a floor power-generating system according to a first embodiment of the present invention, and a user walking on the power-generating floor while wearing footwear on which an information processing medium is installed, viewed obliquely from above. [Diagram 3] FIG. 2 is a sequence diagram showing the operation of the floor power generation system according to the first embodiment of the present invention. [Figure 4] FIG. 4 is an overall view showing the configuration of a floor power generation system according to a second embodiment of the present invention. [Diagram 5] FIG. 11 is a sequence diagram showing the operation of the floor power generation system according to the second embodiment of the present invention. [Figure 6] FIG. 11 is an overall view showing the configuration of a floor power generation system according to a third embodiment of the present invention. [Figure 7] FIG. 11 is a sequence diagram showing the operation of the floor power generation system according to the third embodiment of the present invention. [Figure 8] FIG. 11 is an overall view showing the configuration of a floor power generation system according to a fourth embodiment of the present invention. [Figure 9] FIG. 11 is a sequence diagram showing the operation of the floor power generation system according to the fourth embodiment of the present invention. [Figure 10] FIG. 13 is a diagram showing a modified example of the power generating floor of the floor power generating system according to the fourth embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, the power-generating floor systems according to first to fourth embodiments of the present invention will be described with reference to the drawings.

[0013] First Embodiment Configuration of the power-generating floor system according to the first embodiment 1 is an overall view showing the configuration of a power-generating floor system 1A according to a first embodiment. The power-generating floor system 1A includes a power-generating floor 10A, information processing media 20a and 20b, and a management server 30A. The information processing media 20a and 20b are installed in the soles of footwear for using the power-generating floor system 1A.

[0014] 2 is a diagram showing a power-generating floor 10A, a user Xa walking on the power-generating floor 10A wearing footwear Ya on which an information processing medium 20a is installed, and a user Xb walking on the power-generating floor 10A wearing footwear Yb on which an information processing medium 20b is installed, viewed from diagonally above. Although Fig. 1 and Fig. 2 show a case where the power-generating floor system 1A is equipped with two information processing media, it may be equipped with three or more information processing media, which may be installed on three or more pairs of footwear.

[0015] The power-generating floor 10A has a floor body 11, n first piezoelectric elements 12-1 to 12-n arranged in a matrix on the lower part of the floor body 11, and a power-generating floor control unit 13A communicatively connected to the first piezoelectric elements 12-1 to 12-n. Hereinafter, when it is not specified which of the first piezoelectric elements 12-1 to 12-n it is, it will be described as a first piezoelectric element 12.

[0016] Each of the first piezoelectric elements 12-1 to 12-n generates a voltage according to the applied pressure. The power-generating floor control unit 13A is connected to the management server 30A so as to be able to communicate with the management server 30A, and acquires information on the amount of power generated by the floor, which is the total amount of power generated by the first piezoelectric elements 12-1 to 12-n, at a predetermined time interval, for example, at intervals of several milliseconds, several tens of milliseconds, or several seconds, and transmits the information to the management server 30A.

[0017] The information processing medium 20a includes a second piezoelectric element 21a and a wireless communication device 22a. The second piezoelectric element 21a generates a voltage according to a given pressure. The wireless communication device 22a wirelessly transmits information on the amount of power generated by the footwear, which is the amount of power generated by the second piezoelectric element 21a, to the management server 30A at predetermined time intervals, for example, at intervals of several milliseconds, several tens of milliseconds, or several seconds.

[0018] The information processing medium 20b has a similar configuration to the information processing medium 20a, and therefore a detailed description thereof will be omitted.

[0019] The management server 30A includes a storage unit 31A and a CPU 32A. The storage unit 31A includes a footwear power generation amount storage unit 311 and a floor power generation amount storage unit 312.

[0020] The footwear power generation amount storage unit 311 stores the footwear power generation amount acquired by the CPU 32A as described later. The floor power generation amount storage unit 312 stores the floor power generation amount acquired by the CPU 32A as described later.

[0021] The CPU 32A includes a footwear power generation amount acquisition unit 321, a first floor power generation amount acquisition unit 322A, an power generation amount ratio calculation unit 323, and a first user-specific power generation amount calculation unit 324A.

[0022] The footwear power generation amount acquisition unit 321 acquires information on the footwear power generation amount transmitted from the footwear Ya and Yb when a user wearing the footwear Ya and a user wearing the footwear Yb are walking on the power-generating floor 10A, and stores the information in the footwear power generation amount storage unit 311. The first floor power generation amount acquisition unit 322A acquires information on the floor power generation amount transmitted from the power-generating floor 10A, and stores the information in the floor power generation amount storage unit 312.

[0023] The power generation ratio calculation unit 323 calculates power generation ratio information indicating the ratio of the footwear power generation for each of the footwear Ya and Yb to the total footwear power generation stored in the footwear power generation storage unit 311 for a predetermined period.

[0024] The first user-specific power generation calculation unit 324A calculates the floor power generation for each user Xa, Xb wearing footwear Ya, Yb by multiplying the floor power generation for the period for which the power generation ratio calculation unit 323 calculated the power generation ratio information by the footwear power generation ratio for each footwear Ya, Yb indicated in the power generation ratio information.

[0025] Operation of the power-generating floor system according to the first embodiment As an operation of the power-generating floor system 1A according to this embodiment, a case will be described in which a user Xa wears footwear Ya, a user Xb wears footwear Yb, and the users Xa and Xb walk simultaneously on the power-generating floor 10A.

[0026] FIG. 3 is a sequence diagram showing processes executed by the information processing medium 20a of the footwear Ya, the information processing medium 20b of the footwear Yb, the power-generating floor 10A, and the management server 30A during operation of the power-generating floor system 1A.

[0027] When the user Xa walks, pressure is applied to the bottom surface of the footwear Ya, and the second piezoelectric element 21a installed on the bottom surface of the footwear Ya generates a voltage according to the applied pressure. While the user Xa is walking on the power-generating floor 10A, the wireless communication device 22a in the footwear Ya wirelessly transmits the amount of footwear power generation generated by the second piezoelectric element 21a to the management server 30A at predetermined time intervals (S1).

[0028] In the management server 30A, the footwear power generation amount acquisition unit 321 sequentially acquires the information on the footwear power generation amount transmitted from the footwear Ya, and stores it in the footwear power generation amount storage unit 311 (S2).

[0029] Similarly, when the user Xb walks, pressure is applied to the bottom surface of the footwear Yb, and the second piezoelectric element 21b installed on the bottom surface of the footwear Yb generates a voltage according to the applied pressure. While the user Xb is walking on the power-generating floor 10A, the wireless communication device 22b in the footwear Yb wirelessly transmits the amount of footwear power generation generated by the second piezoelectric element 21b to the management server 30A at predetermined time intervals (S3).

[0030] In the management server 30A, the footwear power generation amount information transmitted from the footwear Yb is sequentially acquired by the footwear power generation amount acquisition unit 321, and stored in the footwear power generation amount storage unit 311 (S4).

[0031] In addition, when users Xa and Xb walk on the power-generating floor 10A, the first piezoelectric elements 12 at the corresponding positions on the power-generating floor 10A generate voltages according to the applied pressure. The power-generating floor control unit 13A transmits information on the amount of power generated by the first piezoelectric elements 12 to the management server 30A at predetermined time intervals (S5).

[0032] In the management server 30A, the first floor power generation amount acquiring unit 322A sequentially acquires the information on the floor power generation amount transmitted from the power-generating floor 10A, and stores it in the floor power generation amount storage unit 312 (S6).

[0033] 3, the process of steps S1, S3, and S5 is shown to start in the order of steps S1 → S3 → S5, but it is preferable that these processes start simultaneously. Also, even if the start timing of steps S1, S3, and S5 is different, these processes may be started in an order different from that shown in FIG.

[0034] The power generation ratio calculation unit 323 calculates power generation ratio information indicating the ratio of the footwear power generation for each footwear Ya, Yb to the total footwear power generation for the footwear Ya, Yb stored in the footwear power generation memory unit 311 for a specified period (S7).

[0035] The first user-specific power generation calculation unit 324A acquires the floor power generation amount for the period for which the power generation ratio calculation unit 323 has calculated the power generation ratio information from the floor power generation storage unit 312. The first user-specific power generation calculation unit 324A multiplies the acquired floor power generation amount by the footwear power generation ratio for each of the footwear Ya and Yb indicated in the power generation ratio information, thereby calculating the floor power generation amount for each of the users Xa and Xb wearing the footwear Ya and Yb for the target period (S8).

[0036] The management server 30A may calculate the remuneration for each of the users Xa and Xb based on the floor power generation amount for each of the users Xa and Xb calculated by the first user-specific power generation amount calculation unit 324A.

[0037] According to the first embodiment described above, the amount of power generated by the power-generating floor can be accurately grasped for each user based on the pressure applied to the footwear worn by the user who moves on the power-generating floor.

[0038] Second Embodiment Configuration of the power-generating floor system according to the second embodiment 4 is an overall view showing the configuration of a power-generating floor system 1B according to the second embodiment. The power-generating floor system 1B includes a power-generating floor 10B, user terminals 40c and 40d, a plurality of beacon receivers 50a and 50b installed near the power-generating floor 10B, and a management server 30B.

[0039] The power-generating floor 10B has a floor body 11, n first piezoelectric elements 12-1 to 12-n arranged in a matrix on the lower part of the floor body 11, and a power-generating floor control unit 13B communicatively connected to the first piezoelectric elements 12-1 to 12-n.

[0040] The power-generating floor control unit 13B is communicably connected to the management server 30B, acquires the amounts of power generated by the first piezoelectric elements 12-1 to 12-n, and transmits them together with the position information of the corresponding first piezoelectric elements 12 to the management server 30B.

[0041] User terminals 40c and 40d are, for example, smart devices, and transmit beacon (Bluetooth Low Energy; BLE) signals containing the terminal's identification information and transmission time information at predetermined time intervals within a range of several tens of meters using the functions of the installed applications.

[0042] The beacon receiver 50a receives the beacon signals transmitted from the user terminals 40c and 40d, and calculates the distance from the beacon receiver 50a to the user terminals 40c and 40d based on the difference between the transmission time indicated by the corresponding transmission time information and the reception time when the beacon receiver 50a received the beacon signal for each received beacon signal. The beacon receiver 50b has a similar configuration to the beacon receiver 50a, and calculates the distance from the beacon receiver 50b to the user terminals 40c and 40d.

[0043] The user terminals 40c, 40d and the beacon receivers 50a, 50b acquire the current time by receiving, for example, Global Navigation Satellite System (GNSS) signals from multiple satellites for the GNSS. One example of the GNSS is the Global Positioning System (GPS).

[0044] The management server 30B includes a storage unit 31B and a CPU 32B. The storage unit 31B includes a user-specific power generation amount storage unit 313B. The user-specific power generation amount storage unit 313B stores the user-specific power generation amount calculated by the CPU 32B as described later.

[0045] The CPA 32B includes a terminal distance acquisition unit 326, a user position acquisition unit 327, a second floor power generation amount acquisition unit 322B, and a second user-specific power generation amount calculation unit 324B.

[0046] The terminal distance acquisition unit 326 acquires information on the distance from each of the beacon receivers 50a, 50b to each of the user terminals 40c, 40d, calculated by the beacon receivers 50a, 50b. The user position acquisition unit 327 holds the position information of each of the beacon receivers 50a, 50b in advance, calculates the position information of the user terminals 40c, 40d based on the information acquired by the terminal distance acquisition unit 326 and the held position information of each of the beacon receivers 50a, 50b, and acquires the calculated position information of the user terminals 40c, 40d as the position information of the users carrying the user terminals 40c, 40d, respectively.

[0047] The second floor power generation amount acquisition unit 322B acquires information on the power generation amount for each position of the first piezoelectric element 12, which is transmitted from the power-generating floor 10B.

[0048] The second user-specific power generation calculation unit 324B calculates the amount of power generated by the first piezoelectric elements 12 arranged in the area corresponding to the position of each user in the power-generating floor 10B as the amount of power generated by the corresponding user. The second user-specific power generation calculation unit 324B stores the calculated amount of power generated for each user in the user-specific power generation storage unit 313B.

[0049] Operation of the power-generating floor system according to the second embodiment In this embodiment, an operation performed by the power-generating floor system 1B when a user Xc carrying a user terminal 40c and a user Xd carrying a user terminal 40d walk simultaneously on the power-generating floor 10B will be described.

[0050] Figure 4 shows, on the power-generating floor 10B, the position of user Xc at times T1 to T9, as indicated by the solid line shape of the sole, the position of user Xd at times T1 to T6, as indicated by the dotted line shape of the sole, the position of user terminal 40c at time T1, and the position of user terminal 40d at time T1.

[0051] FIG. 5 is a sequence diagram showing the processes executed by the beacon receiver 50a, the beacon receiver 50b, the power-generating floor 10B, and the management server 30B during operation of the power-generating floor system 1B.

[0052] While user Xc is walking on the power-generating floor 10B, user Xc operates user terminal 40c to transmit a beacon signal including the identification information and transmission time information of user terminal 40c at predetermined time intervals. Similarly, while user Xd is walking on the power-generating floor 10B, user Xd operates user terminal 40d to transmit a beacon signal including the identification information and transmission time information of user terminal 40d at predetermined time intervals.

[0053] When the beacon receiver 50a receives the beacon signal transmitted from the user terminal 40c at time T1, the beacon receiver 50a calculates the distance from the beacon receiver 50a to the corresponding user terminal 40c based on the difference between the transmission time indicated by the transmission time information included in the received beacon signal and the reception time when the beacon receiver 50a received the beacon signal. The beacon receiver 50a transmits the calculated information on the distance to the user terminal 40c to the management server 30B (S11).

[0054] In addition, when the beacon receiver 50a receives a beacon signal transmitted from the user terminal 40d at time T1, the beacon receiver 50a calculates the distance from the beacon receiver 50a to the corresponding user terminal 40d by the same process. The beacon receiver 50a transmits information on the calculated distance to the user terminal 40d to the management server 30B (S12).

[0055] In addition, when the beacon receiver 50b receives the beacon signal transmitted from the user terminal 40c at time T1, the beacon receiver 50b calculates the distance from the beacon receiver 50b to the corresponding user terminal 40c by the same process. The beacon receiver 50b transmits information on the calculated distance to the user terminal 40c to the management server 30B (S13).

[0056] In addition, when the beacon receiver 50b receives the beacon signal transmitted from the user terminal 40d at time T1, the beacon receiver 50b calculates the distance from the beacon receiver 50b to the corresponding user terminal 40d by the same process. The beacon receiver 50b transmits information on the calculated distance to the user terminal 40d to the management server 30B (S14).

[0057] In the management server 30B, the terminal distance acquisition unit 326 acquires information on the distance to user terminal 40c and information on the distance to user terminal 40d transmitted from the beacon receiver 50a, and information on the distance to user terminal 40c and information on the distance to user terminal 40d transmitted from the beacon receiver 50b (S15).

[0058] Moreover, the power-generating floor control unit 13B acquires the amount of floor power generation generated by the first piezoelectric element 12 of the power-generating floor 10B at time T1 and transmits it to the management server 30B together with the position information of the first piezoelectric element 12 that generated the power (S16).

[0059] In the management server 30B, the second floor power generation amount acquisition unit 322B acquires the information on the floor power generation amount for each position of the first piezoelectric element 12 transmitted from the power-generating floor 10B (S17).

[0060] 5 shows a case where the processes of steps S11, S12, S13, S14, and S16 are started in the order of steps S11 → S12 → S13 → S14 → S16, but it is preferable that these processes are started simultaneously. Also, even if the start timings of steps S11, S12, S13, S14, and S16 are staggered, these processes may be started in an order different from that shown in FIG.

[0061] The user position acquisition unit 327 calculates the position information of each of the user terminals 40c, 40d based on the information acquired by the terminal distance acquisition unit 326 and the previously stored position information of each of the beacon receivers 50a, 50b. The user position acquisition unit 327 acquires the calculated position information of each of the user terminals 40c, 40d as the position information of each of the users Xc, Xd at time T1 (S18).

[0062] The second user-specific power generation calculation unit 324B calculates the power generation amounts by the first piezoelectric elements 12 arranged in areas within the power-generating floor 10B corresponding to the positions of each user Xc, Xd acquired by the user position acquisition unit 327 as the power generation amounts by users Xc, Xd at time T1.

[0063] For example, the second-user power generation calculation unit 324B calculates the amount of power generated by the first piezoelectric elements 12 in a region within a predetermined range from the position of each of the users Xc and Xd as the amount of power generated by the users Xc and Xd. The second-user power generation calculation unit 324B stores the calculated amounts of power generated for each of the users Xc and Xd in the user power generation storage unit 313B (S19).

[0064] Thereafter, the management server 30B executes the processes of steps S11 to S19 at predetermined times T2, T3, T4, . . . to sequentially calculate and store the amounts of power generation of the users Xc and Xd at each time.

[0065] The management server 30B may calculate the remuneration for each of the users Xa and Xb based on the amount of power generated by each of the users Xc and Xd during a predetermined period stored in the user-specific power generation amount storage unit 313B.

[0066] According to the second embodiment described above, the amount of power generated by the power-generating floor can be calculated with high accuracy for each user based on the position information of the user identified using the beacon signal.

[0067] Third Embodiment Configuration of the power-generating floor system according to the third embodiment 6 is an overall view showing the configuration of a power-generating floor system 1C according to the third embodiment. The power-generating floor system 1C includes a power-generating floor 10C, user terminals 40e and 40f, a plurality of beacon receivers 50a and 50b installed near the power-generating floor 10C, and a management server 30C. The power-generating floor system 1C has the same configuration as the power-generating floor system 1B described in the second embodiment, except that the CPU 32C of the management server 30C has an area classification unit 328, so detailed configurations of parts having the same functions will be omitted.

[0068] In this embodiment, the area classification unit 328 of the management server 30C recognizes an area formed by a group of adjacent first piezoelectric elements 12 within a predetermined distance among the multiple first piezoelectric elements 12 that generate electricity, based on the information acquired by the third floor power generation acquisition unit 322C. The area classification unit 328 identifies the shape of each recognized area and classifies the multiple recognized areas into areas whose shapes resemble a shoe sole and areas whose shapes do not resemble a shoe sole. The area classification unit 328 recognizes the areas that resemble a shoe sole as user areas formed by a user's walking, and recognizes the areas that do not resemble a shoe sole as non-user areas formed by objects other than the user.

[0069] The third user-specific power generation calculation unit 324C calculates the power generation amount corresponding to the user area of ​​one user within a specified range from the position of a specified user within the power-generating floor 10C, and the non-user area within a specified range from this user area, as the power generation amount by the corresponding user.

[0070] Operation of the power-generating floor system according to the third embodiment In this embodiment, the operations performed by the power-generating floor system 1C are described when a user Xe carrying a user terminal 40e walks on the power-generating floor 10C while towing a portable item Ye with two wheels, and at the same time, a user Xf carrying a user terminal 40f walks.

[0071] Figure 6 shows, on the power-generating floor 10C, the position of user Xc at times T1 to T9, as shown by the solid sole shape, the movement trajectory of the wheels of carried item Ye at times T1 to T9, as shown by curved lines, the position of user Xd at times T1 to T6, as shown by the dotted sole shape, the position of user terminal 40c at time T1, and the position of user terminal 40d at time T1.

[0072] FIG. 7 is a sequence diagram showing the processes executed by the beacon receiver 50a, the beacon receiver 50b, the power-generating floor 10C, and the management server 30C during operation of the power-generating floor system 1C.

[0073] In FIG. 7, the processes executed in steps S21 to S27 are similar to the processes in steps S11 to S17 described in the second embodiment, and therefore detailed description thereof will be omitted.

[0074] 7 shows a case where the processes of steps S21, S22, S23, S24, and S26 are started in the order of steps S21 → S22 → S23 → S24 → S26, but it is preferable that these processes are started simultaneously. Also, even if the start timings of steps S21, S22, S23, S24, and S26 are staggered, these processes may be started in an order different from that shown in FIG.

[0075] In step S27, when the third floor power generation acquisition unit 322C of the management server 30C acquires information on the floor power generation for each position of the first piezoelectric element 12 from the power generation floor 10C, the area classification unit 328 recognizes an area formed by adjacent groups of first piezoelectric elements 12 within a specified distance among the multiple first piezoelectric elements 12 that have generated power.

[0076] The area classification unit 328 classifies the recognized areas into areas whose shapes resemble a shoe sole, i.e., user areas formed by the user's walking, and areas whose shapes do not resemble a shoe sole, i.e., non-user areas formed by objects other than the user, using techniques such as pattern matching (S28). At time T1, the area classification unit 328 recognizes three areas, and classifies two of them as user areas and the remaining one as a non-user area.

[0077] The user position acquisition unit 327 calculates the position information of the user terminals 40e and 40f based on the information acquired by the terminal distance acquisition unit 326 and the previously stored position information of each of the beacon receivers 50a and 50b. The user position acquisition unit 327 acquires the calculated position information of the user terminals 40e and 40f as the position information of the users Xc and Xd at time T1, respectively (S29).

[0078] The third per-user power generation calculation unit 324C recognizes, within the power-generating floor 10C, a user area of ​​one foot nearest to the position of the user Xe acquired by the user position acquisition unit 327, as a power generation area due to the walking of the user Xe. Also, recognizes a non-user area within a predetermined range from the determined user area of ​​the user Xe as a power generation area due to the carried item Ye of the user Xe.

[0079] Alternatively, the third per-user power generation amount calculation unit 324C may recognize a non-user area that moves along with the determined user area of ​​the user Xe as a power generation area for the carried item Ye of the user Xe.

[0080] In this case, the third per-user power generation calculation unit 324C compares the amount of change in the position of the user area of ​​the user Xe with the amount of change in the position of the non-user area during a predetermined period, for example, the period from time T1 to T2, and if the difference between the amounts of change is equal to or less than a predetermined value, recognizes the non-user area as a power generation area caused by the carried item Ye of the user Xe. At this time, when the difference between the amount of change in the position of the user area of ​​the user Xe and the amount of change in the position of the non-user area is equal to or less than a predetermined value and the difference in the direction of movement is equal to or less than a predetermined value, the non-user area may be recognized as a power generation area caused by the carried item Ye of the user Xe.

[0081] The third user-specific power generation calculation unit 324C may use a combination of the above-mentioned process of determining whether the non-user area is within a predetermined range from the user area and the process of determining whether the non-user area is moving along with the user area, or may adopt either one of them, as a process of determining whether the power generation area of ​​the non-user area is due to a carried item Ye of the user Xe.

[0082] The third user-specific power generation calculation unit 324C calculates the total amount of power generated in the power generation area due to walking by the user Xe and the amount of power generated in the power generation area due to the user Xe's carried items Ye as the amount of power generated by the user Xe at time T1.

[0083] The third per-user power generation calculation unit 324C recognizes, within the power-generating floor 10C, a user area of ​​one foot nearest to the position of the user Xf acquired by the user position acquisition unit 327, as a power generation area caused by the walking of the user Xf. It also determines that there is no non-user area within a predetermined range from the determined user area of ​​the user Xf.

[0084] The third user-specific power generation calculation unit 324C calculates the amount of power generation in the power generation area due to walking of the user Xf as the amount of power generation by the user Xf at time T1. The third user-specific power generation calculation unit 324C stores the calculated amounts of power generation for each of the users Xe and Xf in the user-specific power generation storage unit 313C (S30).

[0085] Thereafter, the management server 30C executes the processes of steps S21 to S30 at predetermined times T2, T3, T4, . . . to sequentially calculate and store the amounts of power generation of the users Xe and Xf at each time.

[0086] According to the above third embodiment, when the amount of electricity generated by the power-generating floor is calculated for each user based on the user's location information identified using a beacon signal, the amount of electricity generated can be calculated accurately, including the amount of electricity generated by the user's carried items.

[0087] Fourth Embodiment Configuration of the power-generating floor system according to the fourth embodiment 8 is an overall view showing the configuration of a power-generating floor system 1D according to the fourth embodiment. The power-generating floor system 1D includes entrance gate devices 60a and 60b, power-generating floors 10Da and 10Db installed corresponding to the entrance gate devices 60a and 60b, respectively, and a management server 30D.

[0088] The entrance gate machine 60a is a device installed at the entrance of a predetermined area AR where entrance is restricted, such as a ticket gate installed at a station, and has a reading unit 61a as a user information acquisition unit, a flap 62a, and a gate information processing unit 63a. The reading unit 61a reads the user's identification information from an IC card held by the user. The flap 62a is configured to be freely opened and closed, and when in the open state, the user can enter the area AR from the entrance, and when in the closed state, the user cannot enter the area AR.

[0089] The gate information processing unit 63a acquires the user's identification information read by the reading unit 61a and determines whether the user is allowed to enter based on the acquired identification information. The gate information processing unit 63a normally keeps the flaps 62a and 62b in a closed state, and opens the flaps when it determines that the user is allowed to enter. After opening the flaps 62a and 62b, the gate information processing unit 63a closes the flaps 62a and 62b when it detects that the user has entered the area AR.

[0090] In addition, the gate information processing unit 63a transmits to the management server 30D the acquired user identification information, a flap open notification generated when the flaps 62a, 62b are transitioned from a closed state to an open state, and a flap closed notification generated when the flaps 62a, 62b are transitioned from an open state to a closed state.

[0091] The entrance gate device 60b has a similar configuration to the entrance gate device 60a, so a detailed description thereof will be omitted.

[0092] The power-generating floor 10Da is installed on the floor in front of the flap 62a in correspondence with the entrance gate machine 60a, and has a floor main body 11, n first piezoelectric elements 12-1 to 12-n arranged in a matrix on the lower part of the floor main body 11, and a power-generating floor control unit 13Da communicatively connected to the first piezoelectric elements 12-1 to 12-n.

[0093] The power-generating floor control unit 13Da is communicably connected to the management server 30D, acquires the amount of power generated by the first piezoelectric elements 12-1 to 12-n, and transmits it to the management server 30D.

[0094] The power-generating floor 10Db is installed on the floor in front of the flap 62b in correspondence with the entrance gate device 60b. The power-generating floor 10Db has a similar configuration to the power-generating floor 10Da, and therefore a detailed description thereof will be omitted.

[0095] The management server 30D includes a storage unit 31D and a CPU 32D. The storage unit 31D includes a user-specific power generation amount storage unit 313D. The user-specific power generation amount storage unit 313D stores the user-specific power generation amount calculated by the CPU 32D as described below.

[0096] The CPA 32D includes a gate information acquisition unit 329, a fourth floor power generation amount acquisition unit 322D, and a fourth user-specific power generation amount calculation unit 324D.

[0097] The gate information acquisition unit 329 acquires the user's identification information, the flap open notification, and the flap closed notification transmitted from the gate information processing units 63a and 63b.

[0098] The fourth floor power generation amount acquisition unit 322D acquires information on the power generation amount transmitted from the power generation floors 10Da and 10Db.

[0099] The fourth user-specific power generation calculation unit 324D calculates the integrated value of the power generation generated on the power-generating floors 10Da and 10Db during the period corresponding to the timing when the gate information processing units 63a and 63b acquire the user's identification information as the power generation amount by the corresponding user. The period corresponding to the timing when the user's identification information is acquired is specifically the period from when the gate information acquisition unit 329 acquires the flap open notification to when it acquires the flap close notification.

[0100] Operation of the power-generating floor system according to the fourth embodiment As an operation of the power-generating floor system 1D according to this embodiment, first, a case where a user Xe walks on the power-generating floor 10Da will be described.

[0101] FIG. 9 is a sequence diagram showing the processes executed by the entrance gate unit 60a, the power-generating floor 10Da, and the management server 30D while the power-generating floor system 1D is in operation.

[0102] When user Xe approaches entrance gate machine 60a and holds an IC card storing his / her own identification information over reading unit 61a, reading unit 61a acquires user Xe's identification information from the IC card by short-range wireless communication or the like (S31). When reading unit 61a acquires user Xe's identification information, gate information processing unit 63a determines whether user Xe is allowed to enter based on the acquired identification information (S32).

[0103] When the gate information processing unit 63a determines that the user Xe is allowed to enter ("YES" in S32), it controls the flap 62a to be in an open state and transmits the identification information of the user Xe and a flap open notification to the management server 30D (S33). In the management server 30D, the gate information acquisition unit 329 acquires the information transmitted from the entrance gate device 60a.

[0104] When the flap 62a is in the open state and the user Xe walks on the power-generating floor 10Da toward the area AR, the power-generating floor control unit 13Da acquires the amount of floor power generation generated by the first piezoelectric element 12 of the power-generating floor 10Da at a predetermined time interval and transmits it to the management server 30D (S34).

[0105] In the management server 30D, the fourth floor power generation amount acquisition unit 322D sequentially acquires the information on the floor power generation amount transmitted from the power-generating floor 10Da. The fourth user-specific power generation amount calculation unit 324D recognizes the floor power generation amount of the power-generating floor 10Da acquired by the fourth floor power generation amount acquisition unit 322D as the power generation amount due to the walking of the user Xe whose identification information was acquired by the entrance gate device 60a corresponding to the power-generating floor 10Da, and sequentially accumulates it (S35).

[0106] Thereafter, when the gate information processing unit 63a determines that power generation by the power-generating floor 10Da has ceased or that user Xe has entered the area AR based on detection information from a sensor (not shown) installed on the entrance gate machine 60a ("YES" in S36), it controls the flap 62a to be in the closed state and sends a flap closed notification to the management server 30D (S37).

[0107] In the management server 30D, the gate information acquisition unit 329 acquires the flap closed notification transmitted from the power-generating floor 10Da. The fourth user-specific power generation amount calculation unit 324D calculates, as the amount of power generation by the user Xe, the integrated value of the amount of power generation generated on the power-generating floor 10Da during the period from when the gate information acquisition unit 329 acquires the flap open notification to when it acquires the flap closed notification.

[0108] The fourth user-specific power generation amount calculation unit 324D stores the calculated power generation amount of the user Xe in the user-specific power generation amount storage unit 313D (S38).

[0109] When user Xf walks on the power-generating floor 10Db and enters area AR through the entrance gate machine 60b, similar processing is executed in the entrance gate machine 60b, the power-generating floor 10Db, and the management server 30D, and the amount of power generated by user Xf is calculated and stored.

[0110] According to the above fourth embodiment, the amount of electricity generated on the power-generating floors corresponding to each of the multiple entrance gate machines is recognized as the amount of electricity generated by the walking of the users whose identification information has been obtained at each entrance gate machine, thereby making it possible to accurately grasp the amount of electricity generated for each user.

[0111] As a modified example of the above-described fourth embodiment, as shown in FIG. 10, the power-generating floor installed in front of the flap 62a of the entrance gate machine 60a and the power-generating floor installed in front of the flap 62b of the entrance gate machine 60b may be constituted by power-generating floor portions 101, 102 within a large power-generating floor 10DL.

[0112] In this case, the power-generating floor control unit 13DL of the large-scale power-generating floor 10DL acquires the amount of power generated by the first piezoelectric elements 12-1 to 12-n, and transmits it together with the position information of the corresponding first piezoelectric element 12 to the management server 30D.

[0113] The fourth-user-specific power generation calculation unit 324D of the management server 30D holds in advance correspondence information between the entrance gate machine 60a and the power-generating floor portion 101 on the large-power-generating floor 10DL, and correspondence information between the entrance gate machine 60b and the power-generating floor portion 102. The fourth-user-specific power generation calculation unit 324D then calculates the amount of power generated at the corresponding power-generating floor portion within a predetermined period of time after acquiring the user's identification information at a predetermined entrance gate machine as the amount of power generated by the corresponding user.

[0114] Specifically, the fourth per-user power generation calculation unit 324D calculates the amount of power generated in the power-generating floor section 101 within a predetermined period of time after the entrance gate device 60a acquires the identification information of user Xe as the amount of power generated by user Xe. The fourth per-user power generation calculation unit 324D also calculates the amount of power generated in the power-generating floor section 102 within a predetermined period of time after the entrance gate device 60b acquires the identification information of user Xf as the amount of power generated by user Xf.

[0115] By configuring the power-generating floor system 1D in this manner, even when multiple users are walking on one large power-generating floor, the amount of power generated for each user can be calculated according to the corresponding entrance gate device. [Explanation of symbols]

[0116] 1A, 1B, 1C, 1D Power Generation Floor System 10A, 10B, 10C, 10Da, 10Db Power generation floor 10DL Large power generating floor 11 Floor body 12, 12-1 to 12-n First piezoelectric element 13A, 13B, 13C, 13Da, 13Db, 13DL Power generation floor control unit 20a, 20b Information processing medium 21a, 21b Second piezoelectric element 22a, 22b Wireless communication device 30A, 30B, 30C, 30D Management Server 31A, 31B, 31C, 31D Storage section 32A, 32B, 32C, 32D CPUs 40c, 40d, 40e, 40f User terminal 50a, 50b Beacon receiver 60a, 60b Entrance gate machine 61a Reading section 62a, 62b Flaps 63a, 63b Gate information processing section 101, 102 Power generation floor section 311 Footwear power generation storage unit 312 Floor power generation amount memory unit 313B, 313C, 313D User-specific power generation storage section 321 Footwear Power Generation Acquisition Department 322A 1st Floor Power Generation Acquisition Unit 322B 2nd Floor Power Generation Acquisition Section 322C 3rd Floor Power Generation Acquisition Section 322D 4th Floor Power Generation Acquisition Unit 323 Power Generation Percentage Calculation Unit 324A 1st User-specific Power Generation Calculation Section 324B 2nd User-specific Power Generation Calculation Section 324C Third User Power Generation Calculation Section 324D 4th User-specific Power Generation Calculation Section 326 Terminal Distance Acquisition Unit 327 User location acquisition unit 328 Area classification part 329 Gate Information Acquisition Department

Claims

1. A power generating floor having a plurality of first piezoelectric elements; a floor power generation amount acquiring unit that acquires information on a floor power generation amount, which is a total amount of power generation by the plurality of first piezoelectric elements, at a predetermined time interval; a footwear power generation amount acquiring unit that acquires, at a predetermined time interval, information on footwear power generation amount, which is the amount of power generated by a second piezoelectric element installed in a sole of footwear worn by each of a plurality of users walking on the power-generating floor; an electricity generation ratio calculation unit that calculates electricity generation ratio information indicating a ratio of an amount of electricity generated by each of the footwear to a total amount of electricity generated by the footwear for a predetermined period of time acquired by the footwear electricity generation acquisition unit; A power generating floor system comprising: a user-specific power generation calculation unit that calculates the floor power generation for each user wearing any of the footwear by multiplying the floor power generation corresponding to the specified period by the footwear power generation ratio for each of the footwear indicated in the power generation ratio information.

2. A power generating floor having a plurality of piezoelectric elements; a user position acquisition unit that acquires position information of each of a plurality of users present on the power-generating floor; A power-generating floor system comprising: a user-specific power generation calculation unit that calculates, when the multiple users walk on the power-generating floor simultaneously, the amount of power generated by the piezoelectric elements located at positions within the power-generating floor corresponding to the positions of each user as the amount of power generated by each corresponding user.

3. A region classification unit classifies a region formed by a group of adjacent piezoelectric elements within a predetermined distance from the plurality of piezoelectric elements generating power into a user region formed by a user walking and a non-user region formed by an object other than the user based on the shape of each region, The power generating floor system of claim 2, wherein the user-specific power generation calculation unit calculates the power generation amount corresponding to the user area of ​​one user corresponding to the position of each user when the multiple users walk on the power generating floor simultaneously, and the power generation amount corresponding to a non-user area within a predetermined range from the user area or a non-user area that moves along with the user area, as the power generation amount of each corresponding user.

4. A power generating floor having a plurality of piezoelectric elements; a user information acquisition unit that acquires identification information of a user walking on the power-generating floor; A power generating floor system comprising: a user-specific power generation calculation unit that calculates the amount of power generated on the power generating floor within a specified period after the user information acquisition unit acquires the user's identification information as the amount of power generated by the user corresponding to the acquired identification information.

5. The power generating floor is configured as a power generating floor portion within a large power generating floor, and a plurality of power generating floors are installed; The user information acquisition unit is installed for each of the power-generating floor portions, The power generating floor system of claim 4, wherein the user-specific power generation calculation unit pre-stores correspondence information between the power generating floor portion and the user information acquisition unit, and calculates the amount of power generation generated in the corresponding power generating floor portion within a predetermined period after a predetermined user information acquisition unit acquires the user's identification information as the amount of power generation by the corresponding user.